个人中心
个人中心
添加客服WX
客服
添加客服WX
添加客服WX
关注微信公众号
公众号
关注微信公众号
关注微信公众号
升级会员
升级会员
返回顶部
2023天府总部基地宗地超高层综合体项目建筑设计方案(18页)
2023天府总部基地宗地超高层综合体项目建筑设计方案(18页).pdf
下载文档 下载文档
建筑设计
上传人:十二 编号:950849 2024-07-23 18页 57.73MB
1、Parcel of Chengdu Tianfu Headquarters BaseArchitectural Scheme Design of No.9 ParcelCHENGDU TIANFU PARK TOWER成都天府公园之塔成都天府总部基地宗地一 9#地块建筑方案设计公园之塔THE TOWER OF PARK CITY根生天府ROOTED IN TIANFU参天而发GROWS TOWARDS THE SKYChengdu is one of the most important Economic,Research,and Cultural centers in China.Nonet2、heless this bustling and growing metropolis has a rich history as one of Chinas most liveable cities enjoying mild weather,laid-back leafy and flower-lined streets and easy access to nature set against the backdrop of snowy mountain peaks.The next step in the evolution of Chengdu,as a Park City will3、 take these ingredients that already exist and reimagine a future where urbanization and nature are seamlessly integrated as a model for meeting global challenges in environmental,social,and economic sustainability.Anchoring the western axis of the Tianfu New Area Central Business District an import4、ant initiative of the Park City concept The Tianfu Park Tower will be China Merchants Group future home.A contemporary development rooted in site that gathers together people,nature,activities the life of the city into a sheltered base-in a blending of architecture,nature,and urbanism And from which5、 A modern and efficient tower sprouts And grows towards the sky,in an ascent towards a prosperous future 成都是中国最重要的经济、研究和文化中心之一。这座繁华且持续发展的大都市,更以中国最宜居的城市之一久负盛名。它拥有温和气候,闲逸慢活、绿树成荫、花团锦簇的街道,近在咫尺的自然环境,远处白雪皑皑的山峰。在【公园城市】发展理念之下,我们结合成都先天的元素,重新构想一个城市与自然紧密结合的未来,成为一个引领世界环境、社会和经济可持续发展的范本。作为天府新区中央商务区西轴线地标,和践行公园城市理念6、的典范。天府公园之塔将成为招商局集团未来的家园,它根植于天府新区的现代化发展,将人、自然、活动,城市生活汇聚为一体。融合同在一个屋檐下,成为建筑、自然和都市主义的结合,一座现代而高效的塔从中萌芽,向天空生长,迈进繁荣的未来!PROJECT DESCRIPTION项目简介CITY ANALYSIS1911 Peoples Park-Relaxed Life styleAncient Shu-Living with NatureTaikoo-Li Retail VillagePeoples Park 1911 Ancient Shu(B.C 600-B,C 316)21st CenturyDESI7、GN CONCEPT宜人的街区尺度与现代塔楼的结合2018年成都提出了“公园城市”的概念,这是成都向城市化与自然和谐未来发展的下一步。公共空间与当地生活公园城市自然环抱的成都生活 现代化的发展是都市塔楼与传统街区尺度的碰撞。太古里作为中国最成功的商业聚落之一,代表了新与旧的结合。虽位于市中心,周围环绕着现代塔楼,它却为人们提供了最亲近的尺度和最舒适的室内外空间。城市研究成都是四川省的省会,拥有 1630 万人口,是中国西部人口最多的三个城市之一。它也是中国最重要的经济、研究和文化中心之一,在金融创新方面有着悠久的历史世界上第一种纸币焦子早在宋朝 1023 年就在成都被发现。成都作为主要大都市的8、规模不断被评为中国最宜居的城市,它拥有温和的天气、绿树成荫的慢活街道。在周边雪山山峰的衬托下,这个盆地城市被大自然簇拥着。最宜居城市经济文化中心在现代都市化的发展中,成都的茶文化,悠闲的生活方式得以传承。以人民公园为代表,当地社区聚集在半室外的屋檐下,被高大的树木和自然所环绕,展现出当地生活空间的重要品质。伴随着传统林盘社区在农村落户的历史,悠闲的生活方式已经在成 都平原扎根。村落中人们的的生活空间被高大的树木环绕,与悬挑的屋顶一起创造出了一个遮风避雨的檐下空间。人民公园-慢生活古蜀时期-与自然共生伴随着传统林盘社区在农村落户的历史,悠闲的生活方式已经在成 都平原扎根。生活空间被高大的树木环绕9、,与悬挑的屋顶一起创造出了一个遮风避雨的檐下空间,人们在这里与自然共生。茶文化与悠闲的生活方式,聚集在一个屋檐下,被高大的树木和自然所环绕 展现着当地生活空间的重要品质。太古里-商业聚落 太古里作为中国最成功的商业聚落之一,代表了新与旧的结合。太古里虽位于市中心,周围环绕着现代塔楼,却为人们提供了最亲近的建筑尺度,和最舒适的室内室外空间。古蜀时期 近代 21 世纪设计概念Human-scale Street-scapeModern TowerOne of the unique opportunities of this project is to create a modern and eff10、icient office tower rooted in a human-scale and nature-based retail experience.A visionary manifestation of the future of Chengdu as a financial and economic powerhouse living in harmony with nature.DESIGN CONCEPTFuture 街巷尺度的商业现代塔楼其中一个独特的课题是将建筑扎根于人性尺度,和与自然共处,创造一个零售商业体验与现代高效办公大楼结合的设计。将成都的未来的蓝图打造成与自然和11、谐相处的经济文化中心。设计概念未来Anchoring the western axis of the Tianfu New Area Central Business District,an important initiative of the Park City concept.The Tianfu Park Tower will be A contemporary development rooted in site.That gathers together the life of the city into a sheltered base-in a blending of arch12、itecture,nature,and urbanism.And from which A modern and efficient tower sprout and grows towards the sky,in an ascent towards a prosperous future.DESIGN CONCEPTChengdus bustling and growing metropolis has a rich history as one of Chinas most liveable cities enjoying mild weather,laid-back leafy and13、 flower-lined streets,and easy access to nature set against the backdrop of snowy mountain peaks.The next step in the evolution of Chengdu,as a Park City,will take these ingredients that already exist and reimagine a future where urbanization and nature are seamlessly integrated as a model for meeti14、ng global challenges in environmental,social,and economic sustainability.作为天府新区中央商务区西轴线地标和践行公园城市理念的典范,天府公园之塔将成为招商局集团未来的家园。它根植于天府新区的现代化发展,将人、自然、活动,城市生活汇聚为一体,融合同在一个屋檐下,成为建筑、自然和都市主义的结合,一座现代而高效的塔从中萌芽,向天空生长,迈进繁荣的未来!设计概念成都这座熙熙攘攘、不断发展的大都市有着悠久的历史,是中国最宜居的城市之一。它拥有温和气候,闲逸慢活、绿树成荫、花团锦簇的街道,近在咫尺的自然环境,远处白雪皑皑的山峰。在【公15、园城市】发展理念之下,我们结合成都先天的元素,重新构想一个城市与自然紧密结合的未来,成为一个引领世界环境、社会和经济可持续发展的范本。EconomyCultureTechnologyCommercialAmusementDESIGN CONCEPT公园城市,回归自然目光炯硕,树木参天长设计概念公园城市,回归自然目光炯硕,树木参天THE PARK CITY RETURNS TO THE NATURETHE SUNLIGHT IS SHININGTHE TOWERING TREES IS GROWINGThe life and vibrancy of the city gathered into 16、a human-scale retail village at the base and at the crown.Human ScaleLifted corners at the base invite access to the major program components of the project,the corners articulated as a generous roof that gathers and shelters the life and vibrancy of the city.Tower CrownRetail VillageThe crown of th17、e tower gently tapers in plan and section-appearing as a polestar reaching out into the heavens and establishing the tower as a future point of reference in the skyline.DESIGN CONCEPT人性尺度 城市的生机与活力汇聚在塔楼基座和塔冠的村落般的体量之中,为城市公共空间创造最人性化的尺度。商业聚落塔冠 塔顶在平面和截面上逐渐变细-看起来像一颗伸向天空的北极星,它将塔楼作为未来天际线的参考点。底部抬高的角落形成主要的功能入18、口,这些角落扬起形成一个宽敞的屋顶,聚集和庇护城市的生活和活力。设计概念The Tianfu Park Tower will become a seamless extension of the central herringbone park-and a unique marking of the western pole of development of the New Tianfu Area.THE PARK CITY天府公园之塔将成为中心人字形公园的无缝延伸也是天府新区西部开发的独特标志:一个城市与自然紧密结合,一个引领世界环境、社会和经济可持续发展的范本。公园城市Connectio19、n to Local CultureConnection to HumanityConnection to Local NatureConnection to the skyThe geometry of the facades is inspired by the local culture of a laid-back lifestyle under a sheltering roof-and harmony between humanity,nature,and the heavens.FACADE CONCEPT与当地文化连接人性化的连接与自然的连接与天空相连外立面的几何形状灵感来自于20、避风屋顶下悠闲生活方式的当地文化以及人性、自然和天堂之间的和谐。立面设计10m9m10m193m10m10m10m68m10m61m7m9m9m7m9m9m9m9m7m9m9m61m53m6m8m8m8m8m14310m53m8m53m8m6m8m6m8m8m8m6m6m53m8m8m8m8m6m6m8m61m7m9m9m7m9m9m7m9m9m7m9m10m61m5m3m1439m9m7m9m7m9m20m10m3m3m9m7m9m9m7m10m9m68m53m8m6m8m8m6m8m8m53m8m8m6m6m8m10m9m9m7m9m7m8m9m61m9m7m9m9m7m9m10m9m7m21、9m7m9m61m9m10m9m9m9m7m9m68m9m7m10m9m9m7m9m20m5m5m10m53m8m6m8m8m6m9m8m8m53m8m8m8m6m7m8m6m8m9m8m8m6m9m8m6m53m8m8m50m6m9m4.005.109.6020m4.0033.3063.759m79.44120.0042.209.003.808m8m8m6m8m61m8m9m7m9m10m9m9m7m9m9m7m9m9m7m9m9m9m61m80m9m53m9m7m9m19159m7m9m9m65m9m7m9m9m9m7m9m6m6m9m9m169m9m9m5m60m6m6m9m9m9m9m22、9m60m9m10m9m10m3m10m9m10m10m10m8m10m10m5m5m3m10m3m8m3m10m10m8m10m10m10m8m10m5m5m10m50m10m10m163m10m10m6m10m10m10m8m10m5m5m3m10m3m3m7m10m10m10m9m10m10m10m9m5m5m10m50mR9.00R7.208m159m7m9m7m9m9m机电MEP机电MEP机电机电MEPMEP 8 8 8 7 7 7 6 6 6 5 5 5 4 4 4 3 3 3 2 2 2 1 1 1 1 1 1 1 2 2 2 2 3 3 3 3 4 4 4 4 5 5 5 5 23、6 6 6 6 7 7 7 7 8 8 8 8 B B B B B A A A A A C C C C C 1 1 1 1 1 8 8 8 8 8 6 6 6 6 6 3 3 3 3 3 5 5 5 5 5 2 2 2 2 2 7 7 7 7 7 4 4 4 4 4CHILDRENSPLAY ZONEPARKING NUMBER:379TOTAL FLOOR AREA:16,836 M2PARKING NUMBER:183TOTAL FLOOR AREA:16,830 M2OBSERVATION DECK LOBBYRETAILMAIN ENTRYRETAIL POP-UP EVENT ZON24、EMEP/BOHRETAIL ANCHORRETAIL TERRACERETAIL TERRACERETAIL/F&BRETAIL/F&BRETAIL/F&BRETAIL/F&BRETAIL/F&BRETAIL/F&BRETAIL TERRACERETAIL F&B ANCHORRETAIL/F&BRETAIL TERRACERETAIL TERRACERETAIL/F&BRETAIL TERRACERETAIL TERRACERETAIL/F&BRETAIL/F&BRETAIL/F&BRETAIL F&B ANCHORRETAIL ANCHORRETAIL ANCHORRETAILRETAI25、LRETAILRETAIL ANCHORHOTEL LOBBYCANOPY OUTLINERETAIL DROP-OFFRETAILRETAILRETAILRETAILRETAILRETAILHOTEL DROP-OFFHOTEL LOBBYCULTURAL PLAZARETAILRETAILRETAILRETAILRETAILRETAILRETAILRETAILFAMILY/KID ZONEOFFICE LOBBYOFFICE LOBBYCO-WORKING LOUNGEOFFICE DROP-OFFOFFICE LOBBYCO-WORKING LOUNGESUNKEN PLAZASUNKE26、N PLAZARETAILRETAIL TERRACERETAIL TERRACERETAIL TERRACERETAIL TERRACE5FLHOTEL AMENITYTERRACE BARHOTEL AMENITY GYMGYM TERRACELOUNGE BAROUTDOORS SWIMMING POOLINDOORS SWIMMINGPOOLB1观景平台屋顶露台屋顶主题餐厅屋顶露台酒店空中大堂空中大堂空中大堂室外游泳池休闲酒吧室内游泳池酒店配套健身房健身房露台机电/后勤零售主力店家庭/亲子活动区商业露台商业露台商业露台商业露台商业露台商业露台商业露台办公大堂上空酒店大堂上空办公大堂上空27、零售主力店零售主力店零售商业零售商业零售商业零售主力店共享办公空间商业中心活动区商业主入口雨棚范围商业落客点零售商业零售商业零售商业零售商业零售商业零售商业办公落客点办公大堂共享办公空间酒店落客点酒店大堂下沉广场下沉广场会议中心前厅多功能会议室后勤贵宾休息厅文化广场零售商业零售商业零售商业零售商业零售商业零售商业零售商业零售商业宴会厅BALL ROOM观景台大堂零售餐饮主力店零售商业/餐饮零售商业/餐饮零售商业/餐饮零售商业/餐饮零售商业/餐饮零售餐饮主力店零售商业/餐饮零售商业/餐饮零售商业/餐饮零售商业/餐饮零售商业/餐饮零售商业/餐饮物业管理办公室零售商业商业露台商业露台商业露台商业露台28、酒店配套儿童活动中心酒店配套露台空中酒廊共享办公/商务中心空中酒吧屋顶露台屋顶露台屋顶酒吧2FL4FLRECEPTIONRECEPTIONRECEPTIONGFGROUND PLAN3FLPODIUM PLANSHOTEL AMENITIESGROUND FLOOR PLAN(L4)GROUND FLOOR PLAN(L3)TRASH ROOMRETAIL LOADINGRETAIL BOHHOTEL BOHHOTEL LOADING商业卸货区商业后勤办公后勤办公卸货区OFFICE LOADINGOFFICE BOH垃圾收集点酒店卸货区酒店后勤B4通往B3落客点DROP OFF通往B3通往B329、通往B4通往B4通往B2通往B2通往B2通往B3通往B3机电/后勤机电/后勤落客点DROP OFF机电/后勤机电/后勤机电/后勤机电/后勤机电/后勤落客点DROP OFF通往B2通往B2通往B2通往GF通往GF通往GFMEP/BOHMEP/BOHMEP/BOHMEP/BOHMEP/BOHMEP/BOHMEP/BOHTO/FROM B3TO/FROM B3 TO/FROM B4 TO/FROM B2 TO/FROM B2 TO/FROM B4TO/FROM B2 TO/FROM B3 TO/FROM B3 TO/FROM B3 TO/FROM B2 TO/FROM B2 TO/FROM B2 T30、O/FROM GFTO/FROM GF TO/FROM GFREQUIREMENT:-40,000m-FFL(3.6m/3.8m)-280-320 rooms-width5m-area 50m-corridor width 1.6(1.8 for double sided arrangement)GROUND FLOOR PLAN(L4)-100 Parking Spots for HOTEL VIP-HOTELs own loading dock-Staffs canteen,kitchen,storage,laundary-Staff changing-Fire monitor-Worki31、ng room-Linen room-Uniform room-Loundary-Trash handling 950 M2 4#BLOCK UNDERGROUND ROAD UNDERGROUND ROAD 4#BLOCK SUBWAY与地铁站连接与公园连接与4号地块连接与市政地下环路连接与市政地下环路连接与4号地块连接TO PARKE-W SECTIONOFFICE TYPICAL PLAN LOW-ZONE(WITH BALCONY)OFFICE TYPICAL PLAN LOW-ZONE(WITH BALCONY)MEDIUM GVSKY BARHOTEL SKY LOBBYOBSER32、VATIONTECHBELOW GROUNDHOTELPROGRAM REQUIREMENT:-LOBBY-GUESS ROOM-CATERING(share with office)-RECREATION(share with office),1400 sqm-MEETING(share with office),2000 sqm+-LOGISTIC(100 VIP parking,special parking area)+staff rooms-SUPPORT-PUBLIC(Ground parking,10 small bus and 2 big bus)-ADMINOFFICE TY33、PICAL PLAN LOW-ZONEOFFICE TYPICAL PLAN LOW-ZONES-N SECTIONE-W SECTIONSITE SECTIONSNORTH ELEVATIONWEST ELEVATIONSOUTH ELEVATIONEAST ELEVATION12%12%OFFICE TYPICAL PLAN MID-ZONEOFFICE TYPICAL PLAN MID-ZONEB2B1GFB3PARKINGRETAILRETAILCIRCULATION472.8476.8481.9491.5PARKING468.8B48%8%12%12%SECTIONSELEVATIO34、NSHOTELOFFICETYPICAL HOTEL PLANHOTEL TYPICAL PLANHOTEL SKY LOBBYOFFICE SKY LOBBYOFFICE SKY LOBBYTYPICAL OFFICE PLANTYPICAL OFFICE PLANTYPICAL OFFICE PLANTYPICAL OFFICE PLANOBERVATION DECKOBERVATION DECKMEP/REFUGE LEVEL606 M2606 M2538 M2538 M2498 M2498 M2622 M2622 M2506 M2506 M2506 M2TOTAL OFFICE:2,635、98 M2(CORRIDOR 255 M2)TOTAL FLOOR AREA:3,844 M2EFFICIENCY:76.8%(70.1%)TOTAL OFFICE:2,698 M2(CORRIDOR 255 M2)TOTAL FLOOR AREA:3,844 M2EFFICIENCY:76.8%(70.1%)TOTAL OFFICE:2,698 M2(CORRIDOR 255 M2)TOTAL FLOOR AREA:3,844 M2EFFICIENCY:76.8%(70.1%)TOTAL OFFICE:2,698 M2(CORRIDOR 255 M2)TOTAL FLOOR AREA:3,836、44 M2EFFICIENCY:76.8%(70.1%)TOTAL OFFICE:3,467 M2(CORRIDOR 255 M2)TOTAL FLOOR AREA:4,613 M2EFFICIENCY:80.6%(75.1%)TOTAL OFFICE:3,467 M2(CORRIDOR 255 M2)TOTAL FLOOR AREA:4,613 M2EFFICIENCY:80.6%(75.1%)TOTAL OFFICE:3,467 M2(CORRIDOR 255 M2)TOTAL FLOOR AREA:4,613 M2EFFICIENCY:80.6%(75.1%)HOTEL SKY LOBB37、Y28 KEYS/FLOORTOTAL FLOOR AREA:2,500 M228 KEYS/FLOORTOTAL HOTEL:1642 M2(CORRIDOR 218 M2)TOTAL FLOOR AREA:2,500 M2EFFICIENCY:74%TOTAL OFFICE:1,982 M2(CORRIDOR 218 M2)TOTAL FLOOR AREA:2,840 M2EFFICIENCY:77.4%(69.7%)TOTAL OFFICE:1,982 M2(CORRIDOR 218 M2)TOTAL FLOOR AREA:2,840 M2EFFICIENCY:77.4%(69.7%)T38、OTAL OFFICE:1,982 M2(CORRIDOR 218 M2)TOTAL FLOOR AREA:2,840 M2EFFICIENCY:77.4%(69.7%)TOTAL OFFICE:1,982 M2(CORRIDOR 218 M2)TOTAL FLOOR AREA:2,840 M2EFFICIENCY:77.4%(69.7%)TYPICAL OFFICE LEVEL(MID ZONE)TYPICAL OFFICE LEVEL(MID ZONE)TYPICAL OFFICE LEVEL(MID ZONE)TYPICAL OFFICE LEVEL(MID ZONE)TYPICAL O39、FFICE LEVEL(LOW ZONE)TYPICAL OFFICE LEVEL(LOW ZONE)TYPICAL OFFICE LEVEL(LOW ZONE)TYPICAL OFFICE LEVEL(LOW ZONE)TYPICAL OFFICE LEVEL(LOW ZONE WITH BALCONY)TYPICAL OFFICE LEVEL(LOW ZONE WITH BALCONY)TYPICAL OFFICE LEVEL(LOW ZONE WITH BALCONY)OFFICE SKY LOBBYOBSERVATION DECK(L77)REFUGE LEVEL(L53)28 KEY40、S/FLOORTOTAL FLOOR AREA:3,600 M228 KEYS/FLOORTOTAL FLOOR AREA:2,500 M2 TYPICAL HOTELSKY LOBBYSKY LOBBYSKY BARCOWORKING/BUSINESS CENTERB2B3HOTEL PARKINGS-N SECTIONGROUNDPODIUMBELOW GROUND123,200M2ABOVE GROUND255,200M2ABOVE GROUND255,200M2BELOW GROUND123,200M2OBSERVATION LOUNGEROOFTOP BARROOFTOP THEME41、DRESTAURANTROOFTOPTERRACEROOFTOPTERRACEROOFTOPTERRACEROOFTOPTERRACEREFUGEMEP D D D D D H H H H H G G G G G F F F F F E E E E E A A A A B B B B C C C C D D D D E E E E F F F F G G G G H H H H A A A B B B C C C D D D E E E F F F G G G H H H 4 7 6 5 3 2 B C D E F G H A 8 1 2 2 2 1 1 1 3 3 3 4 4 4 5 5 542、 6 6 6 7 7 7 B B B A A A C C C D D D E E E F F F G G G B A C D E F GPARKING NUMBER:403TOTAL FLOOR AREA:16,897 M2RETAIL:11,213 M2HOTEL:2,647 M2OFFICE:1,343 M2TOTAL FLOOR AREA:16,897 M2TOTAL MEZ AREA:8,204 M2RETAIL:5,456 M2OFFICE:890 M2TOTAL FLOOR AREA:6,346 M2RETAIL:6,421 M2OFFICE:890 M2TOTAL FLOOR A43、REA:7,311 M2RETAIL:5,976 M2OFFICE:890 M2TOTAL FLOOR AREA:6,867 M2GF1,982 M2496 M2496 M2496 M2496 M2406 M2496 M2496 M2496 M2496 M2496 M2496 M2496 M2496 M2406 M2406 M2436 M2436 M2436 M22,698 M2506 M2506 M2506 M2406 M2406 M2406 M2436 M2436 M2436 M2MANAGEMENTOFFICEHOTEL AMENITY AREA:3,933 M2MEP:820 M2TE44、RRACE:1,968 M2TOTAL GFA:5,736 M2MULTI-FUNCTION HALLBOHVIPBREAKOUT98 M2(BALCONY)98 M2(BALCONY)98 M2(BALCONY)534 M2(INTERIOR)1,762 M2(INTERIOR)534 M2(INTERIOR)50M010203040Ground Floor Plan 1:1000PODIUM-THE SHELTERED BASE首层平面 1:1000檐下聚落Tower Podium SectionThe retail village will be seamlessly connected45、 to the context for both under and above ground access across multiple levels.10m9m10m193m10m10m10m68m10m61m7m9m9m7m9m9m9m9m7m9m9m61m53m6m8m8m8m8m14310m53m8m53m8m6m8m6m8m8m8m6m6m53m8m8m8m8m6m6m8m61m7m9m9m7m9m9m7m9m9m7m9m10m61m5m3m1439m9m7m9m7m9m20m10m3m3m9m7m9m9m7m10m9m68m53m8m6m8m8m6m8m8m53m8m8m6m646、m8m10m9m9m7m9m7m8m9m61m9m7m9m9m7m9m10m9m7m9m7m9m61m9m10m9m9m9m7m9m68m9m7m10m9m9m7m9m20m5m5m10m53m8m6m8m8m6m9m8m8m53m8m8m8m6m7m8m6m8m9m8m8m6m9m8m6m53m8m8m50m6m9m4.005.109.6020m4.0033.3063.759m79.44120.0042.209.003.808m8m8m6m8m61m8m9m7m9m10m9m9m7m9m9m7m9m9m7m9m9m9m61m80m9m53m9m7m9m19159m7m9m9m65m9m7m947、m9m9m7m9m6m6m9m9m169m9m9m5m60m6m6m9m9m9m9m9m60m9m10m9m10m3m10m9m10m10m10m8m10m10m5m5m3m10m3m8m3m10m10m8m10m10m10m8m10m5m5m10m50m10m10m163m10m10m6m10m10m10m8m10m5m5m3m10m3m3m7m10m10m10m9m10m10m10m9m5m5m10m50mR9.00R7.208m159m7m9m7m9m9m机电MEP机电MEP机电机电MEPMEP 8 8 8 7 7 7 6 6 6 5 5 5 4 4 4 3 3 3 2 2 2 1 1 48、1 1 1 1 1 2 2 2 2 3 3 3 3 4 4 4 4 5 5 5 5 6 6 6 6 7 7 7 7 8 8 8 8 B B B B B A A A A A C C C C C 1 1 1 1 1 8 8 8 8 8 6 6 6 6 6 3 3 3 3 3 5 5 5 5 5 2 2 2 2 2 7 7 7 7 7 4 4 4 4 4CHILDRENSPLAY ZONEPARKING NUMBER:379TOTAL FLOOR AREA:16,836 M2PARKING NUMBER:183TOTAL FLOOR AREA:16,830 M2OBSERVATION DECK LO49、BBYRETAILMAIN ENTRYRETAIL POP-UP EVENT ZONEMEP/BOHRETAIL ANCHORRETAIL TERRACERETAIL TERRACERETAIL/F&BRETAIL/F&BRETAIL/F&BRETAIL/F&BRETAIL/F&BRETAIL/F&BRETAIL TERRACERETAIL F&B ANCHORRETAIL/F&BRETAIL TERRACERETAIL TERRACERETAIL/F&BRETAIL TERRACERETAIL TERRACERETAIL/F&BRETAIL/F&BRETAIL/F&BRETAIL F&B A50、NCHORRETAIL ANCHORRETAIL ANCHORRETAILRETAILRETAILRETAIL ANCHORHOTEL LOBBYCANOPY OUTLINERETAIL DROP-OFFRETAILRETAILRETAILRETAILRETAILRETAILHOTEL DROP-OFFHOTEL LOBBYCULTURAL PLAZARETAILRETAILRETAILRETAILRETAILRETAILRETAILRETAILFAMILY/KID ZONEOFFICE LOBBYOFFICE LOBBYCO-WORKING LOUNGEOFFICE DROP-OFFOFFI51、CE LOBBYCO-WORKING LOUNGESUNKEN PLAZASUNKEN PLAZARETAILRETAIL TERRACERETAIL TERRACERETAIL TERRACERETAIL TERRACE5FLHOTEL AMENITYTERRACE BARHOTEL AMENITY GYMGYM TERRACELOUNGE BAROUTDOORS SWIMMING POOLINDOORS SWIMMINGPOOLB1观景平台屋顶露台屋顶主题餐厅屋顶露台酒店空中大堂空中大堂空中大堂室外游泳池休闲酒吧室内游泳池酒店配套健身房健身房露台机电/后勤零售主力店家庭/亲子活动区商业露台52、商业露台商业露台商业露台商业露台商业露台商业露台办公大堂上空酒店大堂上空办公大堂上空零售主力店零售主力店零售商业零售商业零售商业零售主力店共享办公空间商业中心活动区商业主入口雨棚范围商业落客点零售商业零售商业零售商业零售商业零售商业零售商业办公落客点办公大堂共享办公空间酒店落客点酒店大堂下沉广场下沉广场会议中心前厅多功能会议室后勤贵宾休息厅文化广场零售商业零售商业零售商业零售商业零售商业零售商业零售商业零售商业宴会厅BALL ROOM观景台大堂零售餐饮主力店零售商业/餐饮零售商业/餐饮零售商业/餐饮零售商业/餐饮零售商业/餐饮零售餐饮主力店零售商业/餐饮零售商业/餐饮零售商业/餐饮零售商业/餐53、饮零售商业/餐饮零售商业/餐饮物业管理办公室零售商业商业露台商业露台商业露台商业露台酒店配套儿童活动中心酒店配套露台空中酒廊共享办公/商务中心空中酒吧屋顶露台屋顶露台屋顶酒吧2FL4FLRECEPTIONRECEPTIONRECEPTIONGFGROUND PLAN3FLPODIUM PLANSHOTEL AMENITIESGROUND FLOOR PLAN(L4)GROUND FLOOR PLAN(L3)TRASH ROOMRETAIL LOADINGRETAIL BOHHOTEL BOHHOTEL LOADING商业卸货区商业后勤办公后勤办公卸货区OFFICE LOADINGOFFICE 54、BOH垃圾收集点酒店卸货区酒店后勤B4通往B3落客点DROP OFF通往B3通往B3通往B4通往B4通往B2通往B2通往B2通往B3通往B3机电/后勤机电/后勤落客点DROP OFF机电/后勤机电/后勤机电/后勤机电/后勤机电/后勤落客点DROP OFF通往B2通往B2通往B2通往GF通往GF通往GFMEP/BOHMEP/BOHMEP/BOHMEP/BOHMEP/BOHMEP/BOHMEP/BOHTO/FROM B3TO/FROM B3 TO/FROM B4 TO/FROM B2 TO/FROM B2 TO/FROM B4TO/FROM B2 TO/FROM B3 TO/FROM B3 TO/55、FROM B3 TO/FROM B2 TO/FROM B2 TO/FROM B2 TO/FROM GFTO/FROM GF TO/FROM GFREQUIREMENT:-40,000m-FFL(3.6m/3.8m)-280-320 rooms-width5m-area 50m-corridor width 1.6(1.8 for double sided arrangement)GROUND FLOOR PLAN(L4)-100 Parking Spots for HOTEL VIP-HOTELs own loading dock-Staffs canteen,kitchen,storage,56、laundary-Staff changing-Fire monitor-Working room-Linen room-Uniform room-Loundary-Trash handling 950 M2 4#BLOCK UNDERGROUND ROAD UNDERGROUND ROAD 4#BLOCK SUBWAY与地铁站连接与公园连接与4号地块连接与市政地下环路连接与市政地下环路连接与4号地块连接TO PARKE-W SECTIONOFFICE TYPICAL PLAN LOW-ZONE(WITH BALCONY)OFFICE TYPICAL PLAN LOW-ZONE(WITH BA57、LCONY)MEDIUM GVSKY BARHOTEL SKY LOBBYOBSERVATIONTECHBELOW GROUNDHOTELPROGRAM REQUIREMENT:-LOBBY-GUESS ROOM-CATERING(share with office)-RECREATION(share with office),1400 sqm-MEETING(share with office),2000 sqm+-LOGISTIC(100 VIP parking,special parking area)+staff rooms-SUPPORT-PUBLIC(Ground parking,58、10 small bus and 2 big bus)-ADMINOFFICE TYPICAL PLAN LOW-ZONEOFFICE TYPICAL PLAN LOW-ZONES-N SECTIONE-W SECTIONSITE SECTIONSNORTH ELEVATIONWEST ELEVATIONSOUTH ELEVATIONEAST ELEVATION12%12%OFFICE TYPICAL PLAN MID-ZONEOFFICE TYPICAL PLAN MID-ZONEB2B1GFB3PARKINGRETAILRETAILCIRCULATION472.8476.8481.949159、.5PARKING468.8B48%8%12%12%SECTIONSELEVATIONSHOTELOFFICETYPICAL HOTEL PLANHOTEL TYPICAL PLANHOTEL SKY LOBBYOFFICE SKY LOBBYOFFICE SKY LOBBYTYPICAL OFFICE PLANTYPICAL OFFICE PLANTYPICAL OFFICE PLANTYPICAL OFFICE PLANOBERVATION DECKOBERVATION DECKMEP/REFUGE LEVEL606 M2606 M2538 M2538 M2498 M2498 M2622 60、M2622 M2506 M2506 M2506 M2TOTAL OFFICE:2,698 M2(CORRIDOR 255 M2)TOTAL FLOOR AREA:3,844 M2EFFICIENCY:76.8%(70.1%)TOTAL OFFICE:2,698 M2(CORRIDOR 255 M2)TOTAL FLOOR AREA:3,844 M2EFFICIENCY:76.8%(70.1%)TOTAL OFFICE:2,698 M2(CORRIDOR 255 M2)TOTAL FLOOR AREA:3,844 M2EFFICIENCY:76.8%(70.1%)TOTAL OFFICE:2,661、98 M2(CORRIDOR 255 M2)TOTAL FLOOR AREA:3,844 M2EFFICIENCY:76.8%(70.1%)TOTAL OFFICE:3,467 M2(CORRIDOR 255 M2)TOTAL FLOOR AREA:4,613 M2EFFICIENCY:80.6%(75.1%)TOTAL OFFICE:3,467 M2(CORRIDOR 255 M2)TOTAL FLOOR AREA:4,613 M2EFFICIENCY:80.6%(75.1%)TOTAL OFFICE:3,467 M2(CORRIDOR 255 M2)TOTAL FLOOR AREA:4,662、13 M2EFFICIENCY:80.6%(75.1%)HOTEL SKY LOBBY28 KEYS/FLOORTOTAL FLOOR AREA:2,500 M228 KEYS/FLOORTOTAL HOTEL:1642 M2(CORRIDOR 218 M2)TOTAL FLOOR AREA:2,500 M2EFFICIENCY:74%TOTAL OFFICE:1,982 M2(CORRIDOR 218 M2)TOTAL FLOOR AREA:2,840 M2EFFICIENCY:77.4%(69.7%)TOTAL OFFICE:1,982 M2(CORRIDOR 218 M2)TOTAL F63、LOOR AREA:2,840 M2EFFICIENCY:77.4%(69.7%)TOTAL OFFICE:1,982 M2(CORRIDOR 218 M2)TOTAL FLOOR AREA:2,840 M2EFFICIENCY:77.4%(69.7%)TOTAL OFFICE:1,982 M2(CORRIDOR 218 M2)TOTAL FLOOR AREA:2,840 M2EFFICIENCY:77.4%(69.7%)TYPICAL OFFICE LEVEL(MID ZONE)TYPICAL OFFICE LEVEL(MID ZONE)TYPICAL OFFICE LEVEL(MID ZO64、NE)TYPICAL OFFICE LEVEL(MID ZONE)TYPICAL OFFICE LEVEL(LOW ZONE)TYPICAL OFFICE LEVEL(LOW ZONE)TYPICAL OFFICE LEVEL(LOW ZONE)TYPICAL OFFICE LEVEL(LOW ZONE)TYPICAL OFFICE LEVEL(LOW ZONE WITH BALCONY)TYPICAL OFFICE LEVEL(LOW ZONE WITH BALCONY)TYPICAL OFFICE LEVEL(LOW ZONE WITH BALCONY)OFFICE SKY LOBBYOB65、SERVATION DECK(L77)REFUGE LEVEL(L53)28 KEYS/FLOORTOTAL FLOOR AREA:3,600 M228 KEYS/FLOORTOTAL FLOOR AREA:2,500 M2 TYPICAL HOTELSKY LOBBYSKY LOBBYSKY BARCOWORKING/BUSINESS CENTERB2B3HOTEL PARKINGS-N SECTIONGROUNDPODIUMBELOW GROUND123,200M2ABOVE GROUND255,200M2ABOVE GROUND255,200M2BELOW GROUND123,200M266、OBSERVATION LOUNGEROOFTOP BARROOFTOP THEMEDRESTAURANTROOFTOPTERRACEROOFTOPTERRACEROOFTOPTERRACEROOFTOPTERRACEREFUGEMEP D D D D D H H H H H G G G G G F F F F F E E E E E A A A A B B B B C C C C D D D D E E E E F F F F G G G G H H H H A A A B B B C C C D D D E E E F F F G G G H H H 4 7 6 5 3 2 B C D E67、 F G H A 8 1 2 2 2 1 1 1 3 3 3 4 4 4 5 5 5 6 6 6 7 7 7 B B B A A A C C C D D D E E E F F F G G G B A C D E F GPARKING NUMBER:403TOTAL FLOOR AREA:16,897 M2RETAIL:11,213 M2HOTEL:2,647 M2OFFICE:1,343 M2TOTAL FLOOR AREA:16,897 M2TOTAL MEZ AREA:8,204 M2RETAIL:5,456 M2OFFICE:890 M2TOTAL FLOOR AREA:6,346 M68、2RETAIL:6,421 M2OFFICE:890 M2TOTAL FLOOR AREA:7,311 M2RETAIL:5,976 M2OFFICE:890 M2TOTAL FLOOR AREA:6,867 M2GF1,982 M2496 M2496 M2496 M2496 M2406 M2496 M2496 M2496 M2496 M2496 M2496 M2496 M2496 M2406 M2406 M2436 M2436 M2436 M22,698 M2506 M2506 M2506 M2406 M2406 M2406 M2436 M2436 M2436 M2MANAGEMENTOFF69、ICEHOTEL AMENITY AREA:3,933 M2MEP:820 M2TERRACE:1,968 M2TOTAL GFA:5,736 M2MULTI-FUNCTION HALLBOHVIPBREAKOUT98 M2(BALCONY)98 M2(BALCONY)98 M2(BALCONY)534 M2(INTERIOR)1,762 M2(INTERIOR)534 M2(INTERIOR)50M010203040534 M2(INTERIOR)1,570 M2(INTERIOR)534 M2(INTERIOR)98 M2(BALCONY)98 M2(BALCONY)98 M2(BALCO70、NY)RETAIL:5,003 M2HOTEL:694 M2OFFICE:1,811 M2MANAGEMENT OFFICE:316 M2TOTAL FLOOR AREA:7,825 M2RETAIL:5,003 M2HOTEL:694 M2OFFICE:1,811 M2MANAGEMENT OFFICE:316 M2TOTAL FLOOR AREA:7,825 M2FIRE ZONE 4000 PODIUM-THE SHELTERED BASE建筑裙房剖面建筑基底的商业聚落将无缝连接地铁系统和地上空间,成为垂直系统上多层次的通道檐下聚落10m9m10m193m10m10m10m68m10m671、1m7m9m9m7m9m9m9m9m7m9m9m61m53m6m8m8m8m8m14310m53m8m53m8m6m8m6m8m8m8m6m6m53m8m8m8m8m6m6m8m61m7m9m9m7m9m9m7m9m9m7m9m10m61m5m3m1439m9m7m9m7m9m20m10m3m3m9m7m9m9m7m10m9m68m53m8m6m8m8m6m8m8m53m8m8m6m6m8m10m9m9m7m9m7m8m9m61m9m7m9m9m7m9m10m9m7m9m7m9m61m9m10m9m9m9m7m9m68m9m7m10m9m9m7m9m20m5m5m10m53m8m6m8m8m672、m9m8m8m53m8m8m8m6m7m8m6m8m9m8m8m6m9m8m6m53m8m8m50m6m9m4.005.109.6020m4.0033.3063.759m79.44120.0042.209.003.808m8m8m6m8m61m8m9m7m9m10m9m9m7m9m9m7m9m9m7m9m9m9m61m80m9m53m9m7m9m19159m7m9m9m65m9m7m9m9m9m7m9m6m6m9m9m169m9m9m5m60m6m6m9m9m9m9m9m60m9m10m9m10m3m10m9m10m10m10m8m10m10m5m5m3m10m3m8m3m10m10m8m1073、m10m10m8m10m5m5m10m50m10m10m163m10m10m6m10m10m10m8m10m5m5m3m10m3m3m7m10m10m10m9m10m10m10m9m5m5m10m50mR9.00R7.208m159m7m9m7m9m9m机电MEP机电MEP机电机电MEPMEP 8 8 8 7 7 7 6 6 6 5 5 5 4 4 4 3 3 3 2 2 2 1 1 1 1 1 1 1 2 2 2 2 3 3 3 3 4 4 4 4 5 5 5 5 6 6 6 6 7 7 7 7 8 8 8 8 B B B B B A A A A A C C C C C 1 1 1 1 1 74、8 8 8 8 8 6 6 6 6 6 3 3 3 3 3 5 5 5 5 5 2 2 2 2 2 7 7 7 7 7 4 4 4 4 4CHILDRENSPLAY ZONEPARKING NUMBER:379TOTAL FLOOR AREA:16,836 M2PARKING NUMBER:183TOTAL FLOOR AREA:16,830 M2OBSERVATION DECK LOBBYRETAILMAIN ENTRYRETAIL POP-UP EVENT ZONEMEP/BOHRETAIL ANCHORRETAIL TERRACERETAIL TERRACERETAIL/F&BRETAI75、L/F&BRETAIL/F&BRETAIL/F&BRETAIL/F&BRETAIL/F&BRETAIL TERRACERETAIL F&B ANCHORRETAIL/F&BRETAIL TERRACERETAIL TERRACERETAIL/F&BRETAIL TERRACERETAIL TERRACERETAIL/F&BRETAIL/F&BRETAIL/F&BRETAIL F&B ANCHORRETAIL ANCHORRETAIL ANCHORRETAILRETAILRETAILRETAIL ANCHORHOTEL LOBBYCANOPY OUTLINERETAIL DROP-OFFRETA76、ILRETAILRETAILRETAILRETAILRETAILHOTEL DROP-OFFHOTEL LOBBYCULTURAL PLAZARETAILRETAILRETAILRETAILRETAILRETAILRETAILRETAILFAMILY/KID ZONEOFFICE LOBBYOFFICE LOBBYCO-WORKING LOUNGEOFFICE DROP-OFFOFFICE LOBBYCO-WORKING LOUNGESUNKEN PLAZASUNKEN PLAZARETAILRETAIL TERRACERETAIL TERRACERETAIL TERRACERETAIL TE77、RRACE5FLHOTEL AMENITYTERRACE BARHOTEL AMENITY GYMGYM TERRACELOUNGE BAROUTDOORS SWIMMING POOLINDOORS SWIMMINGPOOLB1观景平台屋顶露台屋顶主题餐厅屋顶露台酒店空中大堂空中大堂空中大堂室外游泳池休闲酒吧室内游泳池酒店配套健身房健身房露台机电/后勤零售主力店家庭/亲子活动区商业露台商业露台商业露台商业露台商业露台商业露台商业露台办公大堂上空酒店大堂上空办公大堂上空零售主力店零售主力店零售商业零售商业零售商业零售主力店共享办公空间商业中心活动区商业主入口雨棚范围商业落客点零售商业零售商业零售78、商业零售商业零售商业零售商业办公落客点办公大堂共享办公空间酒店落客点酒店大堂下沉广场下沉广场会议中心前厅多功能会议室后勤贵宾休息厅文化广场零售商业零售商业零售商业零售商业零售商业零售商业零售商业零售商业宴会厅BALL ROOM观景台大堂零售餐饮主力店零售商业/餐饮零售商业/餐饮零售商业/餐饮零售商业/餐饮零售商业/餐饮零售餐饮主力店零售商业/餐饮零售商业/餐饮零售商业/餐饮零售商业/餐饮零售商业/餐饮零售商业/餐饮物业管理办公室零售商业商业露台商业露台商业露台商业露台酒店配套儿童活动中心酒店配套露台空中酒廊共享办公/商务中心空中酒吧屋顶露台屋顶露台屋顶酒吧2FL4FLRECEPTIONRECE79、PTIONRECEPTIONGFGROUND PLAN3FLPODIUM PLANSHOTEL AMENITIESGROUND FLOOR PLAN(L4)GROUND FLOOR PLAN(L3)TRASH ROOMRETAIL LOADINGRETAIL BOHHOTEL BOHHOTEL LOADING商业卸货区商业后勤办公后勤办公卸货区OFFICE LOADINGOFFICE BOH垃圾收集点酒店卸货区酒店后勤B4通往B3落客点DROP OFF通往B3通往B3通往B4通往B4通往B2通往B2通往B2通往B3通往B3机电/后勤机电/后勤落客点DROP OFF机电/后勤机电/后勤机电/后勤80、机电/后勤机电/后勤落客点DROP OFF通往B2通往B2通往B2通往GF通往GF通往GFMEP/BOHMEP/BOHMEP/BOHMEP/BOHMEP/BOHMEP/BOHMEP/BOHTO/FROM B3TO/FROM B3 TO/FROM B4 TO/FROM B2 TO/FROM B2 TO/FROM B4TO/FROM B2 TO/FROM B3 TO/FROM B3 TO/FROM B3 TO/FROM B2 TO/FROM B2 TO/FROM B2 TO/FROM GFTO/FROM GF TO/FROM GFREQUIREMENT:-40,000m-FFL(3.6m/3.8m81、)-280-320 rooms-width5m-area 50m-corridor width 1.6(1.8 for double sided arrangement)GROUND FLOOR PLAN(L4)-100 Parking Spots for HOTEL VIP-HOTELs own loading dock-Staffs canteen,kitchen,storage,laundary-Staff changing-Fire monitor-Working room-Linen room-Uniform room-Loundary-Trash handling 950 M2 482、#BLOCK UNDERGROUND ROAD UNDERGROUND ROAD 4#BLOCK SUBWAY与地铁站连接与公园连接与4号地块连接与市政地下环路连接与市政地下环路连接与4号地块连接TO PARKE-W SECTIONOFFICE TYPICAL PLAN LOW-ZONE(WITH BALCONY)OFFICE TYPICAL PLAN LOW-ZONE(WITH BALCONY)MEDIUM GVSKY BARHOTEL SKY LOBBYOBSERVATIONTECHBELOW GROUNDHOTELPROGRAM REQUIREMENT:-LOBBY-GUESS ROOM83、-CATERING(share with office)-RECREATION(share with office),1400 sqm-MEETING(share with office),2000 sqm+-LOGISTIC(100 VIP parking,special parking area)+staff rooms-SUPPORT-PUBLIC(Ground parking,10 small bus and 2 big bus)-ADMINOFFICE TYPICAL PLAN LOW-ZONEOFFICE TYPICAL PLAN LOW-ZONES-N SECTIONE-W SE84、CTIONSITE SECTIONSNORTH ELEVATIONWEST ELEVATIONSOUTH ELEVATIONEAST ELEVATION12%12%OFFICE TYPICAL PLAN MID-ZONEOFFICE TYPICAL PLAN MID-ZONEB2B1GFB3PARKINGRETAILRETAILCIRCULATION472.8476.8481.9491.5PARKING468.8B48%8%12%12%SECTIONSELEVATIONSHOTELOFFICETYPICAL HOTEL PLANHOTEL TYPICAL PLANHOTEL SKY LOBBY85、OFFICE SKY LOBBYOFFICE SKY LOBBYTYPICAL OFFICE PLANTYPICAL OFFICE PLANTYPICAL OFFICE PLANTYPICAL OFFICE PLANOBERVATION DECKOBERVATION DECKMEP/REFUGE LEVEL606 M2606 M2538 M2538 M2498 M2498 M2622 M2622 M2506 M2506 M2506 M2TOTAL OFFICE:2,698 M2(CORRIDOR 255 M2)TOTAL FLOOR AREA:3,844 M2EFFICIENCY:76.8%(86、70.1%)TOTAL OFFICE:2,698 M2(CORRIDOR 255 M2)TOTAL FLOOR AREA:3,844 M2EFFICIENCY:76.8%(70.1%)TOTAL OFFICE:2,698 M2(CORRIDOR 255 M2)TOTAL FLOOR AREA:3,844 M2EFFICIENCY:76.8%(70.1%)TOTAL OFFICE:2,698 M2(CORRIDOR 255 M2)TOTAL FLOOR AREA:3,844 M2EFFICIENCY:76.8%(70.1%)TOTAL OFFICE:3,467 M2(CORRIDOR 255 M87、2)TOTAL FLOOR AREA:4,613 M2EFFICIENCY:80.6%(75.1%)TOTAL OFFICE:3,467 M2(CORRIDOR 255 M2)TOTAL FLOOR AREA:4,613 M2EFFICIENCY:80.6%(75.1%)TOTAL OFFICE:3,467 M2(CORRIDOR 255 M2)TOTAL FLOOR AREA:4,613 M2EFFICIENCY:80.6%(75.1%)HOTEL SKY LOBBY28 KEYS/FLOORTOTAL FLOOR AREA:2,500 M228 KEYS/FLOORTOTAL HOTEL:88、1642 M2(CORRIDOR 218 M2)TOTAL FLOOR AREA:2,500 M2EFFICIENCY:74%TOTAL OFFICE:1,982 M2(CORRIDOR 218 M2)TOTAL FLOOR AREA:2,840 M2EFFICIENCY:77.4%(69.7%)TOTAL OFFICE:1,982 M2(CORRIDOR 218 M2)TOTAL FLOOR AREA:2,840 M2EFFICIENCY:77.4%(69.7%)TOTAL OFFICE:1,982 M2(CORRIDOR 218 M2)TOTAL FLOOR AREA:2,840 M2EF89、FICIENCY:77.4%(69.7%)TOTAL OFFICE:1,982 M2(CORRIDOR 218 M2)TOTAL FLOOR AREA:2,840 M2EFFICIENCY:77.4%(69.7%)TYPICAL OFFICE LEVEL(MID ZONE)TYPICAL OFFICE LEVEL(MID ZONE)TYPICAL OFFICE LEVEL(MID ZONE)TYPICAL OFFICE LEVEL(MID ZONE)TYPICAL OFFICE LEVEL(LOW ZONE)TYPICAL OFFICE LEVEL(LOW ZONE)TYPICAL OFFIC90、E LEVEL(LOW ZONE)TYPICAL OFFICE LEVEL(LOW ZONE)TYPICAL OFFICE LEVEL(LOW ZONE WITH BALCONY)TYPICAL OFFICE LEVEL(LOW ZONE WITH BALCONY)TYPICAL OFFICE LEVEL(LOW ZONE WITH BALCONY)OFFICE SKY LOBBYOBSERVATION DECK(L77)REFUGE LEVEL(L53)28 KEYS/FLOORTOTAL FLOOR AREA:3,600 M228 KEYS/FLOORTOTAL FLOOR AREA:2,91、500 M2 TYPICAL HOTELSKY LOBBYSKY LOBBYSKY BARCOWORKING/BUSINESS CENTERB2B3HOTEL PARKINGS-N SECTIONGROUNDPODIUMBELOW GROUND123,200M2ABOVE GROUND255,200M2ABOVE GROUND255,200M2BELOW GROUND123,200M2OBSERVATION LOUNGEROOFTOP BARROOFTOP THEMEDRESTAURANTROOFTOPTERRACEROOFTOPTERRACEROOFTOPTERRACEROOFTOPTERR92、ACEREFUGEMEP D D D D D H H H H H G G G G G F F F F F E E E E E A A A A B B B B C C C C D D D D E E E E F F F F G G G G H H H H A A A B B B C C C D D D E E E F F F G G G H H H 4 7 6 5 3 2 B C D E F G H A 8 1 2 2 2 1 1 1 3 3 3 4 4 4 5 5 5 6 6 6 7 7 7 B B B A A A C C C D D D E E E F F F G G G B A C D E93、 F GPARKING NUMBER:403TOTAL FLOOR AREA:16,897 M2RETAIL:11,213 M2HOTEL:2,647 M2OFFICE:1,343 M2TOTAL FLOOR AREA:16,897 M2TOTAL MEZ AREA:8,204 M2RETAIL:5,456 M2OFFICE:890 M2TOTAL FLOOR AREA:6,346 M2RETAIL:6,421 M2OFFICE:890 M2TOTAL FLOOR AREA:7,311 M2RETAIL:5,976 M2OFFICE:890 M2TOTAL FLOOR AREA:6,867 M94、2GF1,982 M2496 M2496 M2496 M2496 M2406 M2496 M2496 M2496 M2496 M2496 M2496 M2496 M2496 M2406 M2406 M2436 M2436 M2436 M22,698 M2506 M2506 M2506 M2406 M2406 M2406 M2436 M2436 M2436 M2MANAGEMENTOFFICEHOTEL AMENITY AREA:3,933 M2MEP:820 M2TERRACE:1,968 M2TOTAL GFA:5,736 M2MULTI-FUNCTION HALLBOHVIPBREAKOU95、T98 M2(BALCONY)98 M2(BALCONY)98 M2(BALCONY)534 M2(INTERIOR)1,762 M2(INTERIOR)534 M2(INTERIOR)50M010203040THE PARK TOWERTower Section B公园之塔塔楼剖面 B9m7m9m9m9m7m9m68m9m9m7m9m9m7m9m20mFire Lift(Service)消防(后勤)电梯Fire Lift(Service)消防(后勤)电梯MEPSUPPORT服务用房MEP机电服务用房SUPPORTSUPPORT服务用房W.C洗手间W.C洗手间机电MEP机电SUPPORT服务用96、房疏散电梯Evacuation Lift疏散电梯Evacuation Lift低区办公客梯LOCAL ZONE GROUP 8 7 6 5 4 3 2 1606 M2538 M2498 M2622 M2 A B C D E F G H98 M2(BALCONY)534 M2(INTERIOR)534 M2(INTERIOR)98 M2(BALCONY)9m9m7m9m9m9m7m9m9m7m9m9m7m61m9m61mFire Lift(Service)Fire Lift(Service)消防(后勤)电梯机电MEPSUPPORTMEP机电服务用房SUPPORTSUPPORT服务用房洗手间W.C97、洗手间W.C服务用房SUPPORT服务用房MEP机电消防(后勤)电梯疏散电梯Evacuation Lift疏散电梯Evacuation LiftLOCAL ZONE GROUP低区办公客梯 1 2 3 4 5 6 7 8506 M2 A B C D E F G H406 M2436 M2506 M2406 M2436 M210m3m10m10m10m10m10m10m5m5m3m3m3m10m10m10m10m10m5m5m10m50m10m10m10m2mFire Lift(Service)消防(后勤)电梯Fire Lift(Service)消防(后勤)电梯服务用房SUPPORT机电机电机电98、服务用房服务用房服务用房SUPPORTMEPMEPMEPSUPPORTSUPPORT疏散电梯Evacuation Lift疏散电梯Evacuation LiftLOCAL ZONE GROUP高区酒店客梯100 M250 M250 M250 M250 M250 M250 M250 M250 M250 M250 M250 M2100 M250 M2100 M250 M250 M250 M250 M250 M250 M2100 M250 M250 M250 M250 M250 M250 M2 2 1 3 4 5 6 7 B A C D E F GTOTAL OFFICE:3,723 M2 TOTA99、L FLOOR AREA:4,578 M2EFFICIENCY:81.3%442 working desks/per desk 8.42 M2可租赁办公面积:3,723 M2楼层总面积:4,578 M2使用率:81.3%共有442 办公桌,平均每桌 8.42 M210m9m10m193m10m10m10m68m10m61m7m9m9m7m9m9m9m9m7m9m9m61m53m6m8m8m8m8m14310m53m8m53m8m6m8m6m8m8m8m6m6m53m8m8m8m8m6m6m8m61m7m9m9m7m9m9m7m9m9m7m9m10m61m5m3m1439m9m7m9m7m9m2100、0m10m3m3m9m7m9m9m7m10m9m68m53m8m6m8m8m6m8m8m53m8m8m6m6m8m10m9m9m7m9m7m8m9m61m9m7m9m9m7m9m10m9m7m9m7m9m61m9m10m9m9m9m7m9m68m9m7m10m9m9m7m9m20m5m5m10m53m8m6m8m8m6m9m8m8m53m8m8m8m6m7m8m6m8m9m8m8m6m9m8m6m53m8m8m50m6m9m4.005.109.6020m4.0033.3063.759m79.44120.0042.209.003.808m8m8m6m8m61m8m9m7m9m10m9m9m7m9101、m9m7m9m9m7m9m9m9m61m80m9m53m9m7m9m19159m7m9m9m65m9m7m9m9m9m7m9m6m6m9m9m169m9m9m5m60m6m6m9m9m9m9m9m60m9m10m9m10m3m10m9m10m10m10m8m10m10m5m5m3m10m3m8m3m10m10m8m10m10m10m8m10m5m5m10m50m10m10m163m10m10m6m10m10m10m8m10m5m5m3m10m3m3m7m10m10m10m9m10m10m10m9m5m5m10m50mR9.00R7.208m159m7m9m7m9m9m机电MEP机电MEP机电机102、电MEPMEP 8 8 8 7 7 7 6 6 6 5 5 5 4 4 4 3 3 3 2 2 2 1 1 1 1 1 1 1 2 2 2 2 3 3 3 3 4 4 4 4 5 5 5 5 6 6 6 6 7 7 7 7 8 8 8 8 B B B B B A A A A A C C C C C 1 1 1 1 1 8 8 8 8 8 6 6 6 6 6 3 3 3 3 3 5 5 5 5 5 2 2 2 2 2 7 7 7 7 7 4 4 4 4 4CHILDRENSPLAY ZONEPARKING NUMBER:379TOTAL FLOOR AREA:16,836 M2PARKING N103、UMBER:183TOTAL FLOOR AREA:16,830 M2OBSERVATION DECK LOBBYRETAILMAIN ENTRYRETAIL POP-UP EVENT ZONEMEP/BOHRETAIL ANCHORRETAIL TERRACERETAIL TERRACERETAIL/F&BRETAIL/F&BRETAIL/F&BRETAIL/F&BRETAIL/F&BRETAIL/F&BRETAIL TERRACERETAIL F&B ANCHORRETAIL/F&BRETAIL TERRACERETAIL TERRACERETAIL/F&BRETAIL TERRACERE104、TAIL TERRACERETAIL/F&BRETAIL/F&BRETAIL/F&BRETAIL F&B ANCHORRETAIL ANCHORRETAIL ANCHORRETAILRETAILRETAILRETAIL ANCHORHOTEL LOBBYCANOPY OUTLINERETAIL DROP-OFFRETAILRETAILRETAILRETAILRETAILRETAILHOTEL DROP-OFFHOTEL LOBBYCULTURAL PLAZARETAILRETAILRETAILRETAILRETAILRETAILRETAILRETAILFAMILY/KID ZONEOFFICE105、 LOBBYOFFICE LOBBYCO-WORKING LOUNGEOFFICE DROP-OFFOFFICE LOBBYCO-WORKING LOUNGESUNKEN PLAZASUNKEN PLAZARETAILRETAIL TERRACERETAIL TERRACERETAIL TERRACERETAIL TERRACE5FLHOTEL AMENITYTERRACE BARHOTEL AMENITY GYMGYM TERRACELOUNGE BAROUTDOORS SWIMMING POOLINDOORS SWIMMINGPOOLB1观景平台屋顶露台屋顶主题餐厅屋顶露台酒店空中大堂空中106、大堂空中大堂室外游泳池休闲酒吧室内游泳池酒店配套健身房健身房露台机电/后勤零售主力店家庭/亲子活动区商业露台商业露台商业露台商业露台商业露台商业露台商业露台办公大堂上空酒店大堂上空办公大堂上空零售主力店零售主力店零售商业零售商业零售商业零售主力店共享办公空间商业中心活动区商业主入口雨棚范围商业落客点零售商业零售商业零售商业零售商业零售商业零售商业办公落客点办公大堂共享办公空间酒店落客点酒店大堂下沉广场下沉广场会议中心前厅多功能会议室后勤贵宾休息厅文化广场零售商业零售商业零售商业零售商业零售商业零售商业零售商业零售商业宴会厅BALL ROOM观景台大堂零售餐饮主力店零售商业/餐饮零售商业/餐饮零107、售商业/餐饮零售商业/餐饮零售商业/餐饮零售餐饮主力店零售商业/餐饮零售商业/餐饮零售商业/餐饮零售商业/餐饮零售商业/餐饮零售商业/餐饮物业管理办公室零售商业商业露台商业露台商业露台商业露台酒店配套儿童活动中心酒店配套露台空中酒廊共享办公/商务中心空中酒吧屋顶露台屋顶露台屋顶酒吧2FL4FLRECEPTIONRECEPTIONRECEPTIONGFGROUND PLAN3FLPODIUM PLANSHOTEL AMENITIESGROUND FLOOR PLAN(L4)GROUND FLOOR PLAN(L3)TRASH ROOMRETAIL LOADINGRETAIL BOHHOTEL B108、OHHOTEL LOADING商业卸货区商业后勤办公后勤办公卸货区OFFICE LOADINGOFFICE BOH垃圾收集点酒店卸货区酒店后勤B4通往B3落客点DROP OFF通往B3通往B3通往B4通往B4通往B2通往B2通往B2通往B3通往B3机电/后勤机电/后勤落客点DROP OFF机电/后勤机电/后勤机电/后勤机电/后勤机电/后勤落客点DROP OFF通往B2通往B2通往B2通往GF通往GF通往GFMEP/BOHMEP/BOHMEP/BOHMEP/BOHMEP/BOHMEP/BOHMEP/BOHTO/FROM B3TO/FROM B3 TO/FROM B4 TO/FROM B2 TO/109、FROM B2 TO/FROM B4TO/FROM B2 TO/FROM B3 TO/FROM B3 TO/FROM B3 TO/FROM B2 TO/FROM B2 TO/FROM B2 TO/FROM GFTO/FROM GF TO/FROM GFREQUIREMENT:-40,000m-FFL(3.6m/3.8m)-280-320 rooms-width5m-area 50m-corridor width 1.6(1.8 for double sided arrangement)GROUND FLOOR PLAN(L4)-100 Parking Spots for HOTEL VIP-H110、OTELs own loading dock-Staffs canteen,kitchen,storage,laundary-Staff changing-Fire monitor-Working room-Linen room-Uniform room-Loundary-Trash handling 950 M2 4#BLOCK UNDERGROUND ROAD UNDERGROUND ROAD 4#BLOCK SUBWAY与地铁站连接与公园连接与4号地块连接与市政地下环路连接与市政地下环路连接与4号地块连接TO PARKE-W SECTIONOFFICE TYPICAL PLAN LOW-111、ZONE(WITH BALCONY)OFFICE TYPICAL PLAN LOW-ZONE(WITH BALCONY)MEDIUM GVSKY BARHOTEL SKY LOBBYOBSERVATIONTECHBELOW GROUNDHOTELPROGRAM REQUIREMENT:-LOBBY-GUESS ROOM-CATERING(share with office)-RECREATION(share with office),1400 sqm-MEETING(share with office),2000 sqm+-LOGISTIC(100 VIP parking,special pa112、rking area)+staff rooms-SUPPORT-PUBLIC(Ground parking,10 small bus and 2 big bus)-ADMINOFFICE TYPICAL PLAN LOW-ZONEOFFICE TYPICAL PLAN LOW-ZONES-N SECTIONE-W SECTIONSITE SECTIONSNORTH ELEVATIONWEST ELEVATIONSOUTH ELEVATIONEAST ELEVATION12%12%OFFICE TYPICAL PLAN MID-ZONEOFFICE TYPICAL PLAN MID-ZONEB2113、B1GFB3PARKINGRETAILRETAILCIRCULATION472.8476.8481.9491.5PARKING468.8B48%8%12%12%SECTIONSELEVATIONSHOTELOFFICETYPICAL HOTEL PLANHOTEL TYPICAL PLANHOTEL SKY LOBBYOFFICE SKY LOBBYOFFICE SKY LOBBYTYPICAL OFFICE PLANTYPICAL OFFICE PLANTYPICAL OFFICE PLANTYPICAL OFFICE PLANOBERVATION DECKOBERVATION DECKME114、P/REFUGE LEVEL606 M2606 M2538 M2538 M2498 M2498 M2622 M2622 M2506 M2506 M2506 M2TOTAL OFFICE:2,698 M2(CORRIDOR 255 M2)TOTAL FLOOR AREA:3,844 M2EFFICIENCY:76.8%(70.1%)TOTAL OFFICE:2,698 M2(CORRIDOR 255 M2)TOTAL FLOOR AREA:3,844 M2EFFICIENCY:76.8%(70.1%)TOTAL OFFICE:2,698 M2(CORRIDOR 255 M2)TOTAL FLOO115、R AREA:3,844 M2EFFICIENCY:76.8%(70.1%)TOTAL OFFICE:2,698 M2(CORRIDOR 255 M2)TOTAL FLOOR AREA:3,844 M2EFFICIENCY:76.8%(70.1%)TOTAL OFFICE:3,467 M2(CORRIDOR 255 M2)TOTAL FLOOR AREA:4,613 M2EFFICIENCY:80.6%(75.1%)TOTAL OFFICE:3,467 M2(CORRIDOR 255 M2)TOTAL FLOOR AREA:4,613 M2EFFICIENCY:80.6%(75.1%)TOTA116、L OFFICE:3,467 M2(CORRIDOR 255 M2)TOTAL FLOOR AREA:4,613 M2EFFICIENCY:80.6%(75.1%)HOTEL SKY LOBBY28 KEYS/FLOORTOTAL FLOOR AREA:2,500 M228 KEYS/FLOORTOTAL HOTEL:1642 M2(CORRIDOR 218 M2)TOTAL FLOOR AREA:2,500 M2EFFICIENCY:74%TOTAL OFFICE:1,982 M2(CORRIDOR 218 M2)TOTAL FLOOR AREA:2,840 M2EFFICIENCY:77.117、4%(69.7%)TOTAL OFFICE:1,982 M2(CORRIDOR 218 M2)TOTAL FLOOR AREA:2,840 M2EFFICIENCY:77.4%(69.7%)TOTAL OFFICE:1,982 M2(CORRIDOR 218 M2)TOTAL FLOOR AREA:2,840 M2EFFICIENCY:77.4%(69.7%)TOTAL OFFICE:1,982 M2(CORRIDOR 218 M2)TOTAL FLOOR AREA:2,840 M2EFFICIENCY:77.4%(69.7%)TYPICAL OFFICE LEVEL(MID ZONE)TYP118、ICAL OFFICE LEVEL(MID ZONE)TYPICAL OFFICE LEVEL(MID ZONE)TYPICAL OFFICE LEVEL(MID ZONE)TYPICAL OFFICE LEVEL(LOW ZONE)TYPICAL OFFICE LEVEL(LOW ZONE)TYPICAL OFFICE LEVEL(LOW ZONE)TYPICAL OFFICE LEVEL(LOW ZONE)TYPICAL OFFICE LEVEL(LOW ZONE WITH BALCONY)TYPICAL OFFICE LEVEL(LOW ZONE WITH BALCONY)TYPICAL119、 OFFICE LEVEL(LOW ZONE WITH BALCONY)OFFICE SKY LOBBYOBSERVATION DECK(L77)REFUGE LEVEL(L53)28 KEYS/FLOORTOTAL FLOOR AREA:3,600 M228 KEYS/FLOORTOTAL FLOOR AREA:2,500 M2 TYPICAL HOTELSKY LOBBYSKY LOBBYSKY BARCOWORKING/BUSINESS CENTERB2B3HOTEL PARKINGS-N SECTIONGROUNDPODIUMBELOW GROUND123,200M2ABOVE GRO120、UND255,200M2ABOVE GROUND255,200M2BELOW GROUND123,200M2OBSERVATION LOUNGEROOFTOP BARROOFTOP THEMEDRESTAURANTROOFTOPTERRACEROOFTOPTERRACEROOFTOPTERRACEROOFTOPTERRACEREFUGEMEP D D D D D H H H H H G G G G G F F F F F E E E E E A A A A B B B B C C C C D D D D E E E E F F F F G G G G H H H H A A A B B B C121、 C C D D D E E E F F F G G G H H H 4 7 6 5 3 2 B C D E F G H A 8 1 2 2 2 1 1 1 3 3 3 4 4 4 5 5 5 6 6 6 7 7 7 B B B A A A C C C D D D E E E F F F G G G B A C D E F GPARKING NUMBER:403TOTAL FLOOR AREA:16,897 M2RETAIL:11,213 M2HOTEL:2,647 M2OFFICE:1,343 M2TOTAL FLOOR AREA:16,897 M2TOTAL MEZ AREA:8,204 122、M2RETAIL:5,456 M2OFFICE:890 M2TOTAL FLOOR AREA:6,346 M2RETAIL:6,421 M2OFFICE:890 M2TOTAL FLOOR AREA:7,311 M2RETAIL:5,976 M2OFFICE:890 M2TOTAL FLOOR AREA:6,867 M2GF1,982 M2496 M2496 M2496 M2496 M2406 M2496 M2496 M2496 M2496 M2496 M2496 M2496 M2496 M2406 M2406 M2436 M2436 M2436 M22,698 M2506 M2506 M25123、06 M2406 M2406 M2406 M2436 M2436 M2436 M2MANAGEMENTOFFICEHOTEL AMENITY AREA:3,933 M2MEP:820 M2TERRACE:1,968 M2TOTAL GFA:5,736 M2MULTI-FUNCTION HALLBOHVIPBREAKOUT98 M2(BALCONY)98 M2(BALCONY)98 M2(BALCONY)534 M2(INTERIOR)1,762 M2(INTERIOR)534 M2(INTERIOR)50M010203040534 M2(INTERIOR)1,570 M2(INTERIOR)5124、34 M2(INTERIOR)98 M2(BALCONY)98 M2(BALCONY)98 M2(BALCONY)RETAIL:5,003 M2HOTEL:694 M2OFFICE:1,811 M2MANAGEMENT OFFICE:316 M2TOTAL FLOOR AREA:7,825 M2RETAIL:5,003 M2HOTEL:694 M2OFFICE:1,811 M2MANAGEMENT OFFICE:316 M2TOTAL FLOOR AREA:7,825 M2FIRE ZONE 4000 TOTAL OFFICE:2,954 M2 TOTAL FLOOR AREA:3,844 M125、2EFFICIENCY:76.8%(70.1%)可租赁办公面积:2,954 M2 楼层总面积:3,844 M2使用率:76.8%TOTAL HOTEL:1,680 M2 TOTAL FLOOR AREA:2,500 M2EFFICIENCY:67.2%28 ROOMS/LEVEL套内酒店面积:1,680 M2 楼层总面积:2,500 M2使用率:67.2%共28个客房4个豪华标间为100M2TOWER PLANSTypical Office Level(Low Zone With Balcony)(L8)办公标准层(低区退台户型)办公标准层(低区)L14Typical Office Level126、(Low Zone)(L14)Typical Hotel Level(High Zone)L65-L72酒店标准层(高区)L65-L72塔楼平面The Sky GardenTower CrownCrown Geometry-PolestarObservation Deck&Sky BarThe observation deck is located along the east-west axis,with primary views towards the mountains to the west,and the herringbone park towards the east.The 127、north and south faces of the crown are proposed for a rooftop bar and restaurant.All four corners are open,allowing for outdoor terrace gardens enjoying expansive views towards the mountains,park,and city-and seamless connectivity between indoor and outdoor spaces as an extension of the park below.THE PARK TOWER空中花园塔冠设计塔冠形态-北极星观景平台与天空酒吧天空酒吧天空酒吧观景平台观景平台观景台位于东西轴线上,西望雪山,东眺人字绿廊。塔冠的北面和南面设置屋顶酒吧和餐厅。四个角落都是开放的,提供户外露台花园以欣赏山脉、公园和城市的广阔景色。室内和室外空间之间的无缝连接,作为下面公园的延伸。公园之塔
会员尊享权益 会员尊享权益 会员尊享权益
500万份文档
500万份文档 免费下载
10万资源包
10万资源包 一键下载
4万份资料
4万份资料 打包下载
24小时客服
24小时客服 会员专属
开通 VIP
升级会员
  • 周热门排行

  • 月热门排行

  • 季热门排行

  1. 高速公路路基填筑边坡填料运输水土保持施工设计方案30页.doc
  2. 2023年县乡村振兴示范带新建农旅融合项目可行性研究报告(117页).pdf
  3. 2023城镇19个老旧小区改造项目可行性研究报告(附表)(273页).pdf
  4. 2023西路3个老旧小区改造项目可行性研究报告(199页).pdf
  5. 兰新铁路工程施工测量技术方案(22页).doc
  6. 装饰装修施工项目管理人员岗位职责(19页).doc
  7. 尤庄子小学教学楼施工组织设计方案(155页).doc
  8. 网络机房工程施工组织设计方案(132页).doc
  9. 制药总厂厂区及家属区道路维修施工工程施工组织设计方案(84页).doc
  10. 国际机械城会展中心项目钢结构工程钢筋桁架楼层板施工专项方案(22页).docx
  11. 北京CBD核心区z6地块地质勘察工程高层超高勘察方案(71页).doc
  12. 大厦项目工程承包人实施方案(195页).doc
  13. 赫山区乡镇污水处理设施建设及运营PPP项目泥江口镇污水处理厂及管网工程可行性研究报告(212页).docx
  14. 桃渚风景名胜区总体规划方案文本+图集(2021-2035年).pdf
  15. 春晓家园高层施工组织设计方案(177页).doc
  16. 扬子石化年产20万吨乙二醇项目可行性研究报告(169页).docx
  17. 施工现场建筑垃圾处置方案(7页).doc
  18. 颍泉区国民经济和社会发展第十四个五年规划和2035年远景目标纲要方案(2021-2025年)(119页).pdf
  19. 江西省庐山西海风景名胜区湖岛旅游开发概念性规划设计方案(107页).pdf
  20. 2020两江人才公寓营销推广方案(83页).pptx
  21. 人才公寓日常物业管理方案(158页).doc
  22. 市政污水管工程安全文明施工专项方案(25页).doc
  1. 南风花园二期开口工程施工组织设计方案(23页).doc
  2. 2024党建红色市集(红色市集惠民声主题)活动策划方案-53页.ppt
  3. 电子信息产业园道路路基工程监理项目施工监理细则103页.doc
  4. 高速公路路基填筑边坡填料运输水土保持施工设计方案30页.doc
  5. 学生宿舍施工钢筋混凝土砖砌体涂刷水电施工方案74页.doc
  6. 2023年县乡村振兴示范带新建农旅融合项目可行性研究报告(117页).pdf
  7. 2023古镇旅游景区基础设施配套工程可行性研究报告(184页).pdf
  8. 2023城镇19个老旧小区改造项目可行性研究报告(附表)(273页).pdf
  9. 2023西路3个老旧小区改造项目可行性研究报告(199页).pdf
  10. 中央商务区360米超高层建筑幕墙施工专项方案(219页).doc
  11. 脚手架、配电箱等设施设备设施风险分级管控清单汇编(2页).doc
  12. 施工现场常见隐患培训课件(46页).ppt
  13. 洋房、商业工程淋水试验专项施工方案(15页).doc
  14. 兰新铁路工程施工测量技术方案(22页).doc
  15. 外立面改造装饰工程施工组织设计方案(177页).doc
  16. 杭州金地41外墙防水淋水施工方案(12页).doc
  17. 电力工程(电缆、电力设备安装、配电室安装)施工组织设计方案(76页).doc
  18. 10KV及以下电力工程施工组织设计方案(88页).doc
  19. 武汉超高层豪宅项目前期策划.ppt
  20. 2020中南工程材料管理制度、精装修管理制度修订方案.ppt
  21. 地产项目开盘定价体系-定价工具.xlsx
  22. 2019年时光PARK湿地公园文旅小镇招商及运营推广方案(215页).pdf
  1. 2024长隆北加油站建设项目可行性研究报告(145页).pdf
  2. 客专铁路建设声屏障安装工程施工技术交底书.doc
  3. 48MW风电项目工程风机设备吊装专项施工方案86页.doc
  4. 2025商场地产夏日啤酒龙虾音乐嘉年华(吃货的夏天主题)活动策划方案-47页.pptx
  5. 铁路声屏障工程路基非金属声屏障搭设操作平台单元板安装施工方案27页.docx
  6. 2022城区自来水提质改造智慧水务建设项目设计方案(199页).pdf
  7. 小区人员配置档案建立保洁绿化物业管理服务投标方案(593页).docx
  8. 2023古镇旅游景区基础设施配套工程可行性研究报告(184页).pdf
  9. 南风花园二期开口工程施工组织设计方案(23页).doc
  10. 土建、装饰、维修改造等零星工程施工组织设计方案(187页).doc
  11. 2021柏向堂房地产公司材料标准化手册4.0(108页).pdf
  12. 弱电工程维保合同(15页).doc
  13. 黄埔区广州开发区城市更新专项总体规划方案(2020-2035年)(46页).pdf
  14. 农业种植公司甘草GAP种植基地建设项目可行性研究报告(76页).doc
  15. 公路工程雨季施工专项施工方案(38页).doc
  16. 榆林市档案馆消防工程施工组织设计方案(58页).doc
  17. 阳泽河水库清淤工程建设项目可行性研究报告47页.doc
  18. 襄樊电厂二期主厂房施工方案【202页】.doc
  19. 煤矿与建设机械装备生产制造基地项目锻压、下料厂房、热处理厂房、返修及涂装厂房吊车梁、屋架等预制构件制作及吊装工程施工方案【128页】.doc
  20. 深圳装饰公司施工图纸会审及设计交底管理制度【13页】.doc
  21. 房地产开发全流程培训.ppt
  22. 2010-2030年湖北咸宁市城市总体规划(32页).doc