个人中心
个人中心
添加客服WX
客服
添加客服WX
添加客服WX
关注微信公众号
公众号
关注微信公众号
关注微信公众号
升级会员
升级会员
返回顶部
连锁超市大盘点程序手册P17(19页)
连锁超市大盘点程序手册P17(19页).doc
下载文档 下载文档
实施手册
上传人:大宝 编号:26328 2021-01-12 17页 221KB
1、GENERAL INVENTORY PROCEDURE大盘点程序Organizations Affected :All StoresPeriodic Compliance Checking :Finance Director, China Accounting-Reporting Manager and Business Controlling ManagerProcedure Organized By: Finance/ProcedureApproved By: Financial DirectorVersion: FA/V1.0Effective Date: June 25, 2005Da2、te Validated: June 24, 2005CONTENT内容1. Scope 范畴2. Control objectives 控制目标3. Key control points 控制要点4. Other specific policies 其他有关政策制度5. Main parties involved and responsibilities 涉及人员及职责6. Key documents 主要文件7. Procedures specifications程序要点 - Preparation准备工作 Administration 行政准备 Goods arrangement 商品整3、理 - Inventory day盘点日 Before counting初盘之前 Counting初盘 Count checking复盘 Scanning扫描 Inventory list checking 清单复核 Data adjusting and transferring数据调整及传送- Stock devaluation (refer to Decote procedure) 存货削价 ( 参见 “Decote” 程序 )8. Appendix 附表- 100% Re-Count Items List 100% 复盘单品表- Inventory Card 盘点卡- Shelf Con4、trol Sheet 货架控制表- Inventory Follow Up 盘点进度跟踪- Shelves Inventory Timing盘点时间表1ScopeThis procedure is applied to the physical inventory of the goods in the store, especially the general inventories of June and December. It consists of preparation, counting, count checking, scanning, inventory list chec5、king, data adjusting and stock valuation. Inventory must be conducted to all the goods that exist on the inventory day, including Goods in outside storage Material that will be incorporated to the goods to sell to customers (film, packaging, etc.) Free goods destined to be sold Repair and return goo6、ds that exist in the storage on the inventory day The goods excluded in the inventory are Free gifts which are not destined to be sold Goods which have been sold, waiting for delivery Consignment goods if we have not received any invoice from supplier Broken Items Consigned GoodsThe stock valuation 7、is performed with the latest purchase price.BControl objectives Ensure that all the goods on the inventory day that should be counted are inventoried Ensure the accuracy of the inventory resultsCKey control points Goods that should not be counted into the inventory must be separated with ordinary pu8、rchased inventory with clear sign. Such as Consigned goods, Free gifts and Broken Items. Ensure the store is clean before the inventory. Ensure the goods return work has been done one day before the inventory. All goods must be tidied up well. During the inventory, each step has to get validation an9、d must strictly be controlled and followed up. Once the stocktaking of storage is done, any goods movement is not allowed between storage and store. Stock adjustment and valuation must be done under the control of store business controller.4Other specific policies Big inventory schedule of June and 10、December must be validated by the Finance Department of the Head Office Store business controller reports city IT the approved inventory date. Tianjin IT help desk is responsible for the inventory date maintenance in P4 system after received the report from city IT. Re-count ratio for reference:100%11、 re-count:special areas (TG, display set, promotion areas) and the Items listed on Appendix 150%-70% re-count by shelf:storage30%-50% re-count by shelf:sales areas Stock devaluation: refer to Decote procedure5Main parties involved and responsibilitiesq Store Manager * Guarantee the procedure impleme12、ntation * Validate the preparation * Authorize the count phase * Validate the stock depreciation q Store Business Controller* Assist Store Manager for procedure implementation * Train Division Chiefs and Department Heads * Manage the control team * Authorize the count phase with the Store Manager * 13、Responsible for count checking and inventory list control* Responsible for inventory list adjustment and stock valuationq Division Chief* Train his team on procedure* Organize the control table and follow up the inventory progress * Manage the count and scan team * Responsible for counting and scann14、ing* Supervise the inventory in the special areas (TG/ promotion area, display set) * Responsible for inventory depreciation q IT Pilot* Setup the inventory date* Ensure that hand held terminals, computers and printers work in good condition * Train the staff to use correctly the materialsq Maintena15、nce Head * Responsible for assets maintenance on the inventory dayq Security Head* Ensure no goods movement between storage and store once stocktaking is done in storage* Responsible for inventory of caddies and baskets on the inventory day1范畴该程序适用于商场的盘点,尤其是6月和12月底的大盘点,它包括准备工作、初盘、复盘、扫描、清单复核、数据调整和存货估16、价。盘点涉及所有在盘点日在场的商品,包括: 外库商品; 附带在出售商品上的材料 ( 如包装薄膜 ); 免费商品; 盘点日仍留在店中的待修商品和退货。不盘的商品包括: 供应商赠品; 待送商品 ( 已售出 ); 寄售商品 (指我们尚未收到发票 ) 破损单品 代销商品存货估价以最后进价为准。B控制目标 确保盘点日所有应盘点的在场商品都被盘入 确保盘点结果准确C控制要点 卖场必须以清楚的标识将不需盘点的商品与其他商品区分并分开堆放,如,代销商品、免费赠品和破损单品。 盘点前商场必须清洁。 退货工作必须在盘点前一天完成 所有的商品必须被整理整齐。 盘点过程中,每一步骤必须被确认并跟踪控制 一旦仓库盘点完17、毕,严禁仓库与卖场之间有商品流动 存货调整和计算必须在财务主管控制下进行4 其他有关的政策制度 6月和12月底的盘点时间表必须由总部财务部确认 门店营运监控将批准的盘点日期提前3天报告城市IT,天津IThelpdesk在收到城市IT的报告后负责将盘点日维护到P4系统中。 如下复盘率以供参考: 100%复盘:特殊区域(TG、陈列品和促销区) 以及附表1所列的单品50%-70%: 仓库内每一货架30%-50%: 卖场内每一货架 存货削价:参阅存货削价程序 5涉及人员及职责q 店长确保执行程序确认准备工作指令初盘开始确认存货削价q 门店营运监控协助店长落实程序培训处长和部长管理复查组与店长一起指令初18、盘开始对复盘和清单复查结果负责负责清单数据调整和存货估价q 处长培训本处员工组织控制台并跟踪盘点进度管理初盘和扫描组对初盘和扫描结果负责监督特殊区域的盘点 ( TG、促销、展台)负责存货削价计算q IT设置盘点日期确保扫描仪、电脑和打印机等正常工作培训员工正确操作仪器和设备q 维修主管负责在盘点日进行资产维修和护理q 保安主管 确保在仓库盘点后,仓库和卖场之间无商品流动 负责在盘点日清点手推车和篮子6. Key documents 主要文件Document文件名Prepared by负责人Key Content主要内容Number of Copies份数Inventory Notice盘点通知19、Store Manager Business Controller店长、门店营运监控Preparation Inventory day Procedure准备盘点日的程序to all Division Chiefs and Departments Heads所有的处长和课长Monthly accounting closing schedule财务部月结安排Business Controller门店营运监控Requirement Deadline月结需求、截止时间to all Division Chiefs and Departments Heads所有的处长和课长Receiving yard 20、closing timetable收货处关门时间安排Store Manager Business controller店长、门店营运监控Opening timeClosing time收货处开门关门时间to all Division Chiefs and Departments Heads所有的处长和课长Inventory card盘点卡Business Controller门店营运监控Count / Check初盘、复查Shelves map货架图Division Chief 处长Department Head 课长Shelf no, location货架号、位置1 map per divi21、sion每处一份Shelves control sheet货架控制表Division Chief 处长Department Head 课长Shelf no 货架号Inventory steps 盘点步骤1 sheet per shelf每个货架一份Inventory Follow up盘点跟踪表Division Chief 处长Department Head 课长Shelves 货架Inventory steps 盘点步骤1 document per department每部门一份Shelf inventory timing货架盘点时刻表Division Chief 处长Department 22、Head 课长Time required for each shelf and each step 每个货架、每个步骤时间需要1 document per division 每处一份Decote Items List削价单品表Division Chief 处长Department Head 课长Decote amount by item单品削价金额1 list per department每部门一份7. Procedures specifications程序要点 Key Steps 主要步骤Person in Charge 负责人Due day期限1Preparation 准备工作 1.1Ad23、ministration 行政准备1.1.1Inventory schedule and training 盘点排期和培训 Prepare “Inventory Notice” 准备“盘点通知”Store Manager 店长Business Controller营运监控D-25前25天 Inform Division Chiefs and Department Heads of the inventory schedule, and train them on procedure and methods 通告处长和课长有关盘点排期,对他们予以培训Store Manager 店长Busines24、s Controller营运监控D-25前25天 Inform their team of the inventory schedule and train them on procedure and methods 通告部门员工有关盘点排期,对他们予以培训Division Chiefs 处长Department Head 课长D-20前20天 Prepare “Monthly Accounting Closing Schedule” 准备“月结安排表”Business Controller营运监控D-20前20天 Prepare the Receiving Yard Closing Time25、table 准备“收货处关门时刻表”Store Manager 店长Business Controller营运监控D-7前7天 Inform the suppliers of the Receiving Yards closing timetable 通知供应商收货处关门时间Commercial department 营业部Receiving Yard 收货区D-5前5天1.1.2Materials and human resources 人力和物力 Prepare the stationary and other materials required in inventory 准备盘点相关的26、文具和工具Assistant to Store Manager店长秘书D-10前10天 Prepare “Inventory Cards” 准备“盘点卡”Business Controller 营运监控D-10前10天 Prepare sufficient hand held terminals and check that they are in good condition 准备足够的扫描仪,并检查其运作是否正常 Check that the computer and printer are in good condition 检查电脑和打印机运作是否正常IT Pilot电脑部D-7前7天27、 Prepare the “Shelves Map” 准备“货架图” Codify the shelf with 4 digits. 用4位数给货架编号For instance1101: 如 1101: 11=department No 11=部门号 01=sheft No 01=货架号 Create a code for each TG, promotion area and display set TG、促销区域和展台分别编号 Prepare “Shelves Control sheet” 准备“货架控制表” Prepare “Inventory Follow Up” 准备“盘点跟踪表”D28、ivision Chief处长D-7 前7天 Coordinate with other departments for human resource support 与其他部门配合筹备支援人员 Organize the teams for count, scan and control 组织初盘组、扫描组和复查组 Assign “Shelf Inventory Timing” 制作“货架盘点时刻表”Division Chief 处长Business Controller 营运监控D-10 前10天1.1.3Items data 单品数据 Check “No Movement Items Re29、port” 检查“无周转单品报告” Check barcodes and make sure there is no unknown item 检查条码,确认没有条码无法识别的单品 Check the last purchasing price of the items 检查单品最后进价Division Chief 处长D-7前7天1.1.4100% Re-count items list 100% 复盘单品清单 Define “100% Re-count Items List” 确定100%复盘单品Division Chief 处长Store Manager 店长Business Contr30、oller 营运监控D-7前7天1.1.5Decote list 削价单品清单 Prepare the “Decote Items List” (refer to Decote procedure) 准备“削价单品清单” ( 参见“Decote”程序 )Division Chief 处长Store Manager 店长D-1前1天1.2Goods arrangement 商品整理1.2.1Arrangement Tidy up the goods by item in storage 整理好仓库商品 Tidy up the goods in sales areas 整理好卖场商品 Clean 31、the storage and store 清洁仓库和卖场 Dont keep the goods of other departments 清理开不属于本部门商品 Take down the goods on the top of the shelf for easy counting 取下货架顶部的商品,以便清点 In the storage, make sure one box contains only one item, with standard quantity as mention on the box确保仓库中每一个箱子只装同一单品,数量与箱子上所指示的相同 If possi32、ble, take the open and incomplete boxes to the sales area to fill up the shelves, in order to keep only the full boxes in the storage for easy counting如可能,把已开封和不完整的箱子中的商品拿到卖场摆放,在仓库中尽量只保留完整的箱子以便清点Commercial Department营业部D-1前1天1.2.2Goods return and breakage 退货和破损 Finish the goods return to supplier 完成33、退货工作 Clear all the damaged items (refer to Breakage procedure La Boucle complete) 处理破损单品 ( 参阅Boucle Complete )Commercial Department营业部D-1前1天2Inventory Day 盘点日2.1Before counting 初盘之前2.1.1Control table 控制台 Place the Division Chiefs control table 摆放好处长控制台 Put the “Inventory Map” and “Inventory Follow U34、p” on the table 将“货架盘点图”和“盘点跟踪表”放于台面 Put the “Shelf Control Sheet” at the beginning of each shelf 将“货架控制表”放于每一货架的始端Division Chief处长2.1.2Receiving Yard and Information Center 收货区和服务中心 Check that no goods are left in the Receiving Yard 检查收货区,确保不存放商品 Clear all the unsolved receiving documents to ensure35、 that no unmatched documents are left 处理所有未解决的收货文件,确保不遗留未核对的文件Order Pool 订货组Receiving Yard 收货区 Check all the unsolved customers “ Return Form” 处理所有未解决的顾客退货文件 Check that no goods are left in the Information Center 检查服务中心,确保不存放商品Information Center服务中心 Clear the returned goods left in the Information C36、enter and take them back to the sales areas 清理服务中心的退货商品,将商品放回卖场Information Center服务中心Commercial Department营业部门2.1.3Goods excluded in the inventory 不盘点的商品 Isolate the goods excluded in the inventory with indication “No stocktaking”: 将非盘商品独立摆放,标上“非盘商品”: Goods waiting for delivery 待送商品 Free gifts etc 免37、费赠品 Write down the “No stocktaking Goods” above-mentioned on a list and send it to the Accounting Department for control 将本部门“非盘商品”列单,送财务部待查Commercial Department营业部门Person in charge of Big purchase 大宗购物负责人 Check if the goods are isolated 检查商品是否独立摆放 Random check if the goods correspond to the deliver38、y vouchers kept in the department concerned 抽查这些非盘商品(待外送商品),与部门保留的外送单核对Accounting Department 财物部2.2Counting 初盘 Make sure that the preparation is finished 确认准备工作结束 Ask the Store Manager to authorize to start counting 请示店长准许初盘Division Chief处长 Stick the “Inventory Cards” on the left corner of the items39、 将“盘点卡”贴于单品左上角 Count from left to right, top to bottom, element by element 初盘时按从左到右,从上到下的顺序清点 Write down the quantity in black or bleu pen on the “Inventory card” 将盘点数量用黑色或蓝色标在盘点卡上 Make sure that the whole shelf has been counted 确认全货架清点完成 Sign on the “Inventory Card” 在“盘点卡”上签字 When the count is fini40、shed, sign on the “Shelf Control Sheet” 初盘结束,在“货架控制表”上签字 Report to the Division Control Table 返回处长控制台汇报Commercial Department营运部 Record on the “Inventory Follow Up Sheet” 在“盘点跟踪表”上作记录Division Chief处长2.3Count Checking 复盘 Re-count the items by shelf (refer to D: other specific policies and Appendix 1) 41、按货架复盘单品(参见D:其他政策和附表1) Write down the checked quantity in red pen on the “Inventory Card” 将复盘数量用红色标在盘点卡上 Sign on the “Inventory Card” 在“盘点卡”上签名 When the checking is finished, sign on the “Shelf Control Sheet” 当复盘完成后,在“货架控制表”上签名 Report to the Division Control Table 返回处长控制台汇报Accounting Department财物部 Re42、cord on the “Inventory Follow Up Sheet” 在“盘点跟踪表”上作记录Division Chief处长 If errors 15% (e.g. find out 3 errors while recounting and checking 20 cards for a shelf), report immediately to the business controller.如果错误超出15%(如:在一个货架复盘20张卡时,找出3个错误),应立即向营运监控汇报 Decide the need to re-count or not the whole shelf 决定是否需要重盘整个货架Accounting Department财物部Business Controller营运监控Division Chief处长2.4Scanning 扫描 Form a 2 p
会员尊享权益 会员尊享权益 会员尊享权益
500万份文档
500万份文档 免费下载
10万资源包
10万资源包 一键下载
4万份资料
4万份资料 打包下载
24小时客服
24小时客服 会员专属
开通 VIP
升级会员
  • 周热门排行

  • 月热门排行

  • 季热门排行

  1. 小区人员配置档案建立保洁绿化物业管理服务投标方案(593页).docx
  2. 陕西化学工业公司招聘管理与职业发展管理手册30页.doc
  3. 混凝土工程施工工艺标准化培训课件(50页).pptx
  4. 建筑工程外脚手架专项施工方案(悬挑式脚手架、落地式脚手架)(25页).doc
  5. 2020柏向堂房地产公司材料标准化手册3.0(143页).pdf
  6. 2021柏向堂房地产公司材料标准化手册4.0(108页).pdf
  7. 土建、装饰、维修改造等零星工程施工组织设计方案(187页).doc
  8. 深圳装饰公司施工图纸会审及设计交底管理制度【13页】.doc
  9. 天碱商业区观山苑工程人防监理规划(43页).doc
  10. 工程变形测量之基坑监测培训课件(155页).ppt
  11. 房地产开发企业拿地操作指引方案.pdf
  12. 新规下的户型增值秘籍.ppt(22页)
  13. 房地产开发贷款实操指南(5页).pdf
  14. 鄂尔多斯空港物流园区总体规划方案(2017-2030)环境影响评价报告书(23页).doc
  15. 规划兰园西路道路工程环境方案环境影响评价报告书(89页).pdf
  16. 屋面圆弧形穹顶结构高支模施工方案(40米)(47页).doc
  17. 埋石混凝土挡土墙施工方案(23页).doc
  18. 厂区至矿区管网蒸汽管道系统扩容改造工程施工组织设计方案(105页).doc
  19. 重庆市城口县东安乡等6个乡镇土地开发整理项目监理规划及施工组织设计方案(122页).doc
  20. 超高纯氦气厂建设项目办公楼、变电站、水泵房及消防水池、门卫、厂房、仓库、配套工程施工组织设计方案(140页).doc
  21. 园林景观投标方案施工组织设计方案技术标(115页).doc
  22. 园林绿化景观工程技术标施工组织设计方案(71页).doc
  1. 房地产交易环节契税减征申报表(首套填写)(2页).doc
  2. 2024大楼室内精装修工程专业分包投标文件(393页).docx
  3. 苏州水秀天地商业项目购物中心100%室内设计方案(158页).pptx
  4. 龙港市专业市场布局规划方案(2023-2035年)(草案)(61页).pdf
  5. 小区人员配置档案建立保洁绿化物业管理服务投标方案(593页).docx
  6. 室内移动式操作平台工程施工方案(19页).doc
  7. 地铁6号线区间盾构下穿管线专项施工方案(30页).doc
  8. 施工工程安全教育培训技术交底(13页).doc
  9. 老旧小区改造施工方案及技术措施(365页).doc
  10. 矿山治理工程施工组织设计方案(240页).docx
  11. 老旧小区改造工程施工方案及技术措施(364页).doc
  12. 北京科技园公寓建设项目整体报告方案.ppt
  13. 土建、装饰、维修改造等零星工程施工组织设计方案(187页).doc
  14. 四川凉山攀西灵山国际度假区小镇活力中心商业业态规划方案建议书(33页).pdf
  15. 埋石混凝土挡土墙施工方案(23页).doc
  16. 地下停车场环氧地坪漆施工方案(45页).doc
  17. 深圳装饰公司施工图纸会审及设计交底管理制度【13页】.doc
  18. 地铁深基坑及钢筋笼吊装安全专项施工方案【98页】.doc
  19. 住宅定价策略及价格表制定培训课件.ppt
  20. 西安名京九合院商业项目招商手册(28页).pdf
  21. 2010-2030年湖北咸宁市城市总体规划(32页).doc
  22. 建筑工程施工进度计划表横道图自动生成版(模板).xls
  1. 建筑工程夜间施工专项施工方案(18页).doc
  2. 永胜县程海镇河口村“多规合一”实用性村庄规划方案(2020-2035年)(116页).pdf
  3. 赣州无动力亲子乐园景观设计方案(111页).pdf
  4. 2016泰安乡村旅游规划建设示范案例(165页).pdf
  5. 房地产交易环节契税减征申报表(首套填写)(2页).doc
  6. 龙山县里耶文化生态景区里耶古城片区旅游修建性详细规划2015奇创.pdf
  7. 连云港市土地利用总体规划2006-2020年调整方案文本图集(78页).pdf
  8. 850亩项目塑钢门窗工程施工组织设计方案(34页).doc
  9. 老旧小区改造工程施工方案及技术措施(364页).doc
  10. 城市更新项目地价公式测算表.xlsx
  11. 房地产项目规划前期投资收益测算模板带公式.xls
  12. 室内移动式操作平台工程施工方案(19页).doc
  13. 装配式结构工业厂房基础、主体结构、门窗及装饰工程施工方案(83页).doc
  14. 地铁6号线区间盾构下穿管线专项施工方案(30页).doc
  15. 施工工程安全教育培训技术交底(13页).doc
  16. 老旧小区改造施工方案及技术措施(365页).doc
  17. 新建贵广铁路线下工程沉降变形观测及评估监理实施细则(126页).doc
  18. 消防火灾应急疏散演练预案(12页).doc
  19. 矿山治理工程施工组织设计方案(240页).docx
  20. 崖城站悬臂式挡墙施工方案(92页).doc
  21. 老旧小区改造施工组织设计F方案(232页).doc
  22. 北京科技园公寓建设项目整体报告方案.ppt