个人中心
个人中心
添加客服WX
客服
添加客服WX
添加客服WX
关注微信公众号
公众号
关注微信公众号
关注微信公众号
升级会员
升级会员
返回顶部
59RTKL北京商务中心区核心区总体概念设计
59RTKL北京商务中心区核心区总体概念设计.pdf
下载文档 下载文档
规划专题
上传人:地** 编号:1225389 2024-10-10 63页 68.07MB
1、北京商务中心区核心区总体概念设计Beijing CBD Core Area Master Plan北京商务中心区核心区总体概念设计|Beijing CBD Core Area Master Plan愿景Vision15铸造首善之区壮丽形象Craft a grandiose image for CBD heart树立新千年国家发展标杆Project a Millennium standard for the country华夏门户,世纪标杆China Gateway,Millennium horizon6汇集人流物流经济流信息流Absorbing flows of people,resource2、 and information引领中国金融贸易发展Creating a hub for world finance and trade中枢都心,智慧引擎Metropolitan heart,Finance and Business Engine7建立全方位联系网络Build up a connection network both vertical and horizontal统筹新旧联动发展To form a mutual benefit partnership with existing development合纵连横,盘活全局Strategize connection:to creat3、e a synergy between the old and the new8城区社区相互给养Organic mixture of work,play and live输送24小时循环活力A 24-hour vivid city乐活都市,精彩纷呈ExchangeA Place of Culture,Business and living9城区社区相互给养Organic mixture of work,play and live输送24小时循环活力A 24-hour vivid city乐活都市,精彩纷呈ExchangeA Place of Culture,Business and livin4、g10人性化尺度:通过公共开放空间和景观设计以平衡高密度开发可能造成的压迫感Human Scale:Using public spaces and landscape to break down the scale of development强化联系:构造多个层面Well-Connected:Connections on multiple levels form an integrated network of movement公交导向:倡导可持续发展模式Transit Oriented Development:sustainable development拓展功能圈:创造生活、工作和休闲的5、多元复合Extend the Use Cycle:a vibrant mix of uses creates an active environment for living,working and leisure都市地标:首都天际线上一抹新的亮丽色彩An Urban Landmark:careful massing creates a landmark development in the skyline of Beijing基地理解Understanding the Site212北京环境肌理|Beijing Context13CBD现状分析|Existing CBD14现状CBD与CBD6、东扩|Existing CBD With CBD Expansion15战略中心|Strategic Heart16现状道路系统|Existing Road Network17现状公共交通系统|Existing Public Transport Network18现状规划条件|Existing Site Conditions19建议功能配比|Proposed Programme总体规划Masterplan321概念比选|Concept Options Development 方案1:下沉院落方案2:绿带方案3:交流Option 1:Sunken CourtyardsOption 2:Green7、 RibbonsOption 3:The Exchange22方案1:下沉院落|Option 01:Sunken Courtyards A series of open air courtyards form the backbone of public spaces;Central courtyards within each block create a legible urban fabric;Traditional urban planning enables easy development方案2:绿带|Option 02:Green Ribbons The regional gre8、en space network widens to form two distinct green spaces within the site;A linear park forms a soft route through the site;A core of entertainment and leisure uses forms a vibrant heart for the development,extending the use of the site.23优化方案:交流|Preferred Option:The Exchange The framework is made o9、f three distinct districts across the site;A dense organic urban grain along the third ring road forms a streets and squares retail environment;A series of water features across the site provide distinct environments within each district on the site;Formal block arrangement on the east of the site r10、esponds to the surrounding urban grain.24设计框架|Overall framework25规划结构|Overall masterplan with SOM26彩色总平面|Illustrative Masterplan27总平设计框架|Masterplan Strategy28标准高层平面|Typical upper leverl use planRetail and Leisure商业零售休闲Culture文化Office办公Hotel酒店Apartment公寓Transportation交通Servicing/BOH服务Parking停车29一层平面|11、Ground Floor Use PlanRetail and Leisure商业零售休闲Culture文化Office办公Hotel酒店Apartment公寓Transportation交通Servicing/BOH服务Parking停车30地下一层平面|Basement 01 Use PlanRetail and Leisure商业零售休闲Culture文化Office办公Hotel酒店Apartment公寓Transportation交通Servicing/BOH服务Parking停车31地下停车平面|Typical Basement Parking Use PlanRetail and12、 Leisure商业零售休闲Culture文化Office办公Hotel酒店Apartment公寓Transportation交通Servicing/BOH服务Parking停车32高度分析图|Height Diagram33地块指标|Area Schedule地块编号Plot商务酒店Hotel餐饮/娱乐Retail/Foodand Beverage 办公Offices公寓Appartment文化/城市公共Cultural停车Parking总计Plot Total 地块面积Land Area 占地面积FootprintArea 建筑面积GFA 容积率FAR 建筑密度Coverage1A8,8013、0 2,330 8,840 1.0 26%1A-17,4007,4001A-21,4401,440小计Sub total08,84000008,8401B8,900 3,560 87,540 9.8 40%1B-110,68010,6801B-276,86076,860小计Sub total010,68076,86000087,5402A8,300 4,500 16,880 2.0 54%2A-111,64011,6402A-22,2802,2802A-31,0801,0802A-41,8801,880小计Sub total016,880000016,8802B8,200 3,810 106,14、590 13.0 46%2B-111,43011,4302B-295,16095,160小计Sub total011,43095,160000106,590310,500 4,430 113,310 10.8 42%3-126,58026,5803-286,73086,730小计Sub total026,58086,730000113,310410,300 5,160 263,480 25.6 50%4-1124,160124,1604-215,48015,4804-3123,840123,840小计Sub total015,480248,000000263,48059,500 4,430 515、8,240 6.1 47%5-158,24058,240小计Sub total0058,24000058,240611,000 76,840 7.0 0%6-17,7007,7006-264,19064,1906-34,9504,950小计Sub total64,19012,650000076,840715,000 4,800 85,240 5.7 32%7-16,5106,5107-233,81033,8107-37,8907,8907-437,03037,030小计Sub total014,40070,84000085,24034地块指标|Area Schedule88,500 3,93516、 145,040 17.1 46%8-172,52072,5208-272,52072,520小计Sub total00145,040000145,04097,400 3,935 96,130 13.0 53%9-172,52072,5209-223,61023,610小计Sub total023,61072,52000096,130108,100 3,830 139,380 17.2 47%10-1127,890127,89010-211,49011,490小计Sub total127,89011,4900000139,380117,500 3,360 95,760 12.8 45%11-117、85,68085,68011-210,08010,080小计Sub total010,08085,68000095,760128,400 3,160 198,120 23.6 38%12-19,4809,48012-2188,640188,640小计Sub total09,4800188,64000198,120137,800 3,030 142,200 18.2 39%13-1133,110133,11013-29,0909,090小计Sub total09,090133,110000142,2001416,400 180,000 11.0 0%14-116,00074,00090,000118、80,000小计Sub total016,00074,00090,00000180,0001511,500 6,490 351,380 30.6 56%15-148,320289,920338,24015-212,40012,40015-3740740小计Sub total48,32013,140289,920000351,380商务酒店Hotel餐饮/娱乐Retail/Foodand Beverage 办公Offices公寓Appartment文化/城市公共Cultural停车Parking总计Plot Total 地块面积Land Area 占地面积FootprintArea 建筑面积GF19、A 容积率FAR 建筑密度Coverage总计Sub total240,400209,8301,436,100278,640002,164,970166,100 60,760 2,164,97013.0337%任务要求Target22100016700014610002790002128000差值Difference19,40042,830-24,900-3600036,970交通分析Movement Strategy436车行流线|Vehiculer MovementTransportation Strategy A sustainable transportation strategy i20、s one that not only maximises modal choice,but one that actually delivers that choice without compromise to mode,access,location or comfort.In this regard therefore,the three corner stones of the proposed transport strategy are:Sustainability Accessibility Permeability The proposed strategy is discu21、ssed based on the following modal hierarchy:Pedestrian Cycle Public transport Private motor car 交通策略可持续的交通既可以最大化交通能力,同时也为提供最多的出行模式。可持续交通应注重以下三个要点:可持续性便捷易达高覆盖率本方案的交通系统由以下几个系统构成步行系统非机动车系统公共交通系统车行系统37停车|Parking Parking Car Parking is provided underground in levels B2-B4 primarily.Cycle parking and VIP 22、parking are provided at B1.Four separate entry/exit points ensure that parking is easily accessed from all directions,no matter what your direction of approach or exit maybe.An internal service loop at B2 allows access to all car parks from all entry/exit ramps,providing safe and efficient dispersio23、n of traffic,A comprehensive external car park signage strategy intercepting traffic from all directions will ensure efficient movement across the site.停车提供的停车场主要是地下B2到B4层为主。周期停车场和贵宾停车场设于B1层4个独立的出入境点确保四面八方的访客能够方便停车在B2的内部为所有出入境停车场坡道提供安全,全面有效的交通疏导及服务。外部停车场标志将确保来自四面八方的车辆在整个网络中有效地行驶。38自行车流线|Bicycle Move24、ment Cycle Network Demarcated cycle provision is proposed via:Segregated routes adjacent to the primary highway network;and On road cycle routes along the secondary highway network.A cycle network will maximise the permeability of the development without compromising highway safety,Cycling routes mi25、nimise conflict between vehicular traffic flow,Cycle parking is proposed adjacent to and under the key development parcels at convenient locations that intersect the off-road cycle network.自行车网络自行车路线沿二级公路道路网络。不影响公路安全的情况下将循环网络最大限度地渗透减少车辆与自行车在交通流量的冲突重点发展相交的循环网络,方便停车。39人行流线|Pedestrian Movement Pedestri26、an Network Aims to minimise disruption from vehicular traffic Maximise permeability of the District A lower-level retail street network provides active linkages between each development parcels in a vehicle-free environment.Open-air courtyards bring an open feel to this layer of public realm,increas27、ing permeability of the site and prioritising pedestrian flow through retail environments,Integration between street-level public spaces and the lower-level network are frequent and legible.A comprehensive way-finding strategy will facilitate orientation and ease of navigating the site at all levels28、.行人网络以尽量减少交通受阻为宗旨最大化渗透到各区域零售街道网络与车辆环境区域相互积极联系。露天庭院带来一个开放的感觉,在这种公共领域,通过零售环境的流动增加网络的渗透性和行人流量街道的公共空间和其他的网络系统整合全面调查有利于缓和行人流量的策略和循环网络公共空间战略Public Realm Strategy541开放空间系统|Open Space Network42换乘广场|Exchange Square 中央商务园区的门户 提供多层次的联系 中央凹陷形式的前门商业区和表演艺术中心 北京CBD新中心活动场地的前门 The Gateway to the CBD;Offering multi-l29、evel connectivity;A central sunken atrium forms the front door to the business district and the performing arts centre below;A venue for events at the front door to the new centre of Beijing CBD.43中央公园|Central Park Extends the district-wide green network and offers recreational spaces Multi-dimensio30、nal landscape creates layered public spaces;The central sunken courtyards seamlessly link the central green park to the retail arcade below;Activated by a vibrant mix of uses,the central park extends the use cycle of the district,offering more than just a business environment 扩展绿地的范围,并提供休闲空间 多层次立体景观31、的公共场所 中央凹陷庭院绿化无缝连接中央公园下方的零售商场 充满活力的中央公园扩展区的使用周期和方式,不仅仅提供更多的营商环境44街道与广场生活区|Streets and Squares Lifestyle District A open-air shopping area forms a gateway into the scheme from CCTV and the development to the North-West Small-scale development creates an intimate shopping for shopping,dining and enter32、tainment A lower-level retail arcade links into the network of retail throughout the development 一个露天购物区形成了从门户到中央电视台向西北发展的计划 发展创造一个小规模的购物,餐饮和娱乐 在整个开发环节进入零售网络和零售商场的连接45中心庭院|Central Courtyard An internal courtyard creates human-scale space within an urban block form Ground level open space connects to33、 a lower level courtyard and the retail street below.Amenities are integrated for residents,hotel guests and office workers that share the space.Creates a micro-climate of use-able public space Opportunities for public art,landscape and hardscaped areas.创建一个内部庭院有一座城市规模的空间形式 地面开放空间连接到广场和零售街道 综合设施是为居民34、,酒店客人和上班族建立的共享空间 创建一个公共空间的气氛 公共艺术,景观和广场的机遇46中央林荫大道|Central Boulevard A park-lined central street forms a spine within the development Forms a vital East-West connection for vehicles and bicycle movement Links the development to the surrounding urban fabric,creating an integrate extension to the exis35、ting district.一个公园的林荫街道形成中央的脊柱 形成了汽车和自行车运动的重要连接 连接到周围的城市结构发展,目前形成一个集成扩展的区域天际线研究Skyline Study648照片合成效果图|Photomontage Of Base Scheme In Biad Photos国贸桥北视角49照片合成效果图|Photomontage Of Base Scheme In Biad Photos故宫东视角50方案天际线透视图|Skyline Perspectives1.三环北视点3rdRingRoadNorthViewPoint2.建国路西视点JianguoRoadWeastViewP36、oint3.三环南视点3rdRingRoadSorthViewPoint5.建国路东视点JianguoRoadEastViewPoint4.惠通河视点HuitongRiverViewPoint51铅笔楼方案对比|Existing Tower Treatment Options保留|Preserve移除|Remove52备选方案一|Alternative Option 1531.三环北视点3rdRingRoadNorthViewPoint2.建国路西视点JianguoRoadWeastViewPoint3.三环南视点3rdRingRoadSorthViewPoint5.建国路东视点Jianguo37、RoadEastViewPoint4.惠通河视点HuitongRiverViewPoint54551.三环北视点3rdRingRoadNorthViewPoint2.建国路西视点JianguoRoadWeastViewPoint3.三环南视点3rdRingRoadSorthViewPoint5.建国路东视点JianguoRoadEastViewPoint4.惠通河视点HuitongRiverViewPoint56571.三环北视点3rdRingRoadNorthViewPoint2.建国路西视点JianguoRoadWeastViewPoint3.三环南视点3rdRingRoadSorthVi38、ewPoint5.建国路东视点JianguoRoadEastViewPoint4.惠通河视点HuitongRiverViewPoint可持续发展Sustainability759TransportA sustainable transportation strategy is one that not only maximises modal choice,but one that actually delivers that choice without compromise to mode,access,location or comfort.In this regard therefor39、e,the three corner stones of the proposed transport strategy are:Sustainability Accessibility Permeability 交通系统可持续的交通既可以最大化交通能力,同时也为提供最多的出行模式。可持续交通应注重以下三个要点:可持续性便捷易达高覆盖率60Gray Water SystemCollect rain water on roof tops and through sisterns and re-use it for e.g.to maintain the site/landscape or for40、 internal water supply(toilets)in the buildings.中水系统通过天台和其他设施收集雨水,并进行再利用,例如:维持场所/景观绿化用水,或内部楼宇供水(厕所)。61Green RoofEnrich the vertical green space by the roof garden.Increase the green ratio and create public space.绿色屋顶通过建筑的屋顶绿化设计丰富绿化垂直空间环境,提升绿化率的同时,为人提供公共活动的空间。62Double Skin FaadeDouble skin faade to s41、ave on cooling and heating energy but also to provide a fresh-air supply system for the towers.Louvers will protect the faade,where necessary(southern exposed side)from overheating.双层立面双层正面铺设节省降温和取暖所耗能源,但为高层建筑提供新鲜空气供给系统。必要时(南暴露面)有百叶窗保护正面,防止过热。63Solar EnergyMake use of natural resources to achieve sustainable goals.太阳能利用自然资源以实现可持续发展目标。64BioswaleMake use of natural resources to achieve sustainable goals.土壤过滤利用自然资源以实现可持续发展目标。
会员尊享权益 会员尊享权益 会员尊享权益
500万份文档
500万份文档 免费下载
10万资源包
10万资源包 一键下载
4万份资料
4万份资料 打包下载
24小时客服
24小时客服 会员专属
开通 VIP
升级会员
  • 周热门排行

  • 月热门排行

  • 季热门排行

  1. 小区人员配置档案建立保洁绿化物业管理服务投标方案(593页).docx
  2. 陕西化学工业公司招聘管理与职业发展管理手册30页.doc
  3. 混凝土工程施工工艺标准化培训课件(50页).pptx
  4. 建筑工程外脚手架专项施工方案(悬挑式脚手架、落地式脚手架)(25页).doc
  5. 2020柏向堂房地产公司材料标准化手册3.0(143页).pdf
  6. 2021柏向堂房地产公司材料标准化手册4.0(108页).pdf
  7. 土建、装饰、维修改造等零星工程施工组织设计方案(187页).doc
  8. 深圳装饰公司施工图纸会审及设计交底管理制度【13页】.doc
  9. 天碱商业区观山苑工程人防监理规划(43页).doc
  10. 工程变形测量之基坑监测培训课件(155页).ppt
  11. 房地产开发企业拿地操作指引方案.pdf
  12. 新规下的户型增值秘籍.ppt(22页)
  13. 房地产开发贷款实操指南(5页).pdf
  14. 鄂尔多斯空港物流园区总体规划方案(2017-2030)环境影响评价报告书(23页).doc
  15. 规划兰园西路道路工程环境方案环境影响评价报告书(89页).pdf
  16. 屋面圆弧形穹顶结构高支模施工方案(40米)(47页).doc
  17. 埋石混凝土挡土墙施工方案(23页).doc
  18. 厂区至矿区管网蒸汽管道系统扩容改造工程施工组织设计方案(105页).doc
  19. 重庆市城口县东安乡等6个乡镇土地开发整理项目监理规划及施工组织设计方案(122页).doc
  20. 超高纯氦气厂建设项目办公楼、变电站、水泵房及消防水池、门卫、厂房、仓库、配套工程施工组织设计方案(140页).doc
  21. 园林景观投标方案施工组织设计方案技术标(115页).doc
  22. 园林绿化景观工程技术标施工组织设计方案(71页).doc
  1. 房地产交易环节契税减征申报表(首套填写)(2页).doc
  2. 2024大楼室内精装修工程专业分包投标文件(393页).docx
  3. 苏州水秀天地商业项目购物中心100%室内设计方案(158页).pptx
  4. 龙港市专业市场布局规划方案(2023-2035年)(草案)(61页).pdf
  5. 小区人员配置档案建立保洁绿化物业管理服务投标方案(593页).docx
  6. 室内移动式操作平台工程施工方案(19页).doc
  7. 地铁6号线区间盾构下穿管线专项施工方案(30页).doc
  8. 施工工程安全教育培训技术交底(13页).doc
  9. 老旧小区改造施工方案及技术措施(365页).doc
  10. 矿山治理工程施工组织设计方案(240页).docx
  11. 老旧小区改造工程施工方案及技术措施(364页).doc
  12. 北京科技园公寓建设项目整体报告方案.ppt
  13. 土建、装饰、维修改造等零星工程施工组织设计方案(187页).doc
  14. 四川凉山攀西灵山国际度假区小镇活力中心商业业态规划方案建议书(33页).pdf
  15. 埋石混凝土挡土墙施工方案(23页).doc
  16. 地下停车场环氧地坪漆施工方案(45页).doc
  17. 深圳装饰公司施工图纸会审及设计交底管理制度【13页】.doc
  18. 地铁深基坑及钢筋笼吊装安全专项施工方案【98页】.doc
  19. 住宅定价策略及价格表制定培训课件.ppt
  20. 西安名京九合院商业项目招商手册(28页).pdf
  21. 2010-2030年湖北咸宁市城市总体规划(32页).doc
  22. 建筑工程施工进度计划表横道图自动生成版(模板).xls
  1. 建筑工程夜间施工专项施工方案(18页).doc
  2. 永胜县程海镇河口村“多规合一”实用性村庄规划方案(2020-2035年)(116页).pdf
  3. 赣州无动力亲子乐园景观设计方案(111页).pdf
  4. 2016泰安乡村旅游规划建设示范案例(165页).pdf
  5. 房地产交易环节契税减征申报表(首套填写)(2页).doc
  6. 龙山县里耶文化生态景区里耶古城片区旅游修建性详细规划2015奇创.pdf
  7. 连云港市土地利用总体规划2006-2020年调整方案文本图集(78页).pdf
  8. 850亩项目塑钢门窗工程施工组织设计方案(34页).doc
  9. 老旧小区改造工程施工方案及技术措施(364页).doc
  10. 城市更新项目地价公式测算表.xlsx
  11. 房地产项目规划前期投资收益测算模板带公式.xls
  12. 室内移动式操作平台工程施工方案(19页).doc
  13. 装配式结构工业厂房基础、主体结构、门窗及装饰工程施工方案(83页).doc
  14. 地铁6号线区间盾构下穿管线专项施工方案(30页).doc
  15. 施工工程安全教育培训技术交底(13页).doc
  16. 老旧小区改造施工方案及技术措施(365页).doc
  17. 新建贵广铁路线下工程沉降变形观测及评估监理实施细则(126页).doc
  18. 消防火灾应急疏散演练预案(12页).doc
  19. 矿山治理工程施工组织设计方案(240页).docx
  20. 崖城站悬臂式挡墙施工方案(92页).doc
  21. 老旧小区改造施工组织设计F方案(232页).doc
  22. 北京科技园公寓建设项目整体报告方案.ppt