2021深圳前海金融总部超高层大厦项目建筑设计方案(92页).pdf
下载文档
上传人:偷****
编号:607751
2022-10-17
92页
84.12MB
该文档所属资源包:
2024年商业步行街住宅酒店民宿改造建筑设计方案资料合集
1、September 2020前海之窗T102-0317地块项目建筑设计Windows of Qianhai Architectural Design of T102-0317 Parcel Project副本微信免费领取精品资料 QQ2150701285同QQ号 该资源为学习资料,仅供参考,禁止商用。请于下载后24小时内删除!https:/目录Contents种植策略Planting Strategy 70首层设计Ground Floor Design 71架空层设计Balcony Design 72屋顶层设计Roof Garden Design 75海绵城市设计Sponge City 76位2、置优势Materiality 78设计图纸Design drawings平面图Plans 82立面图Elevations 100剖面图Site section 104体量和用途Massing and Uses 106电梯配置策略Vertical transportation statement 108电梯配置方案Vertical transportation options 110连通性Traffic analysis 112设计说明Technical Appendix 115建筑设计说明Architecture Design Statement 120绿色建筑说明Green Building3、 Strategy 124健康设计WELL Building 126结构方案设计说明Structure Statement 128装配式建筑简要说明Prefabricated Building Statement 146暖通设计说明HVAC System Statement 148给排水方案设计说明Drainage System Statement 154电气方案设计说明Electric System Statement 158消防设计说明Fire Protection Statement 164智能化设计选型Automation System Statement 166BIM正向设计说明BI4、M Forward Design 173投资估算编制说明Investment Estimate 177项目设计团队Team List 179建筑表皮The Building Envelope 36可施工性Constructability 38聚焦主要空间Focus on Key Space 41街道/广场Streetscape/Uwrban Plaza 44入口大堂Entrance Lobbies 46阳台瞭望Balcony Look-outs 48环境影响分析Environmental analysis 50阳台瞭望Roof Top Terrace 60景观概念Landscape Conce5、pt 62景观设计总平面Landscape Masterplan 63高程设计Level Design 64交通分析及功能分区Circulation System and Zoning 65节点设计-塔楼主入口界面Node Design-Tower Main Entrance 66节点设计-城市干道界面Node Design-Primary Road Interface 67节点设计-交通功能区Node Design-Traffic Area 68节点设计-落客区Node Design-Drop-off Area 69前言Introduction项目位置与背景Context&backgroun6、d 4分析论述Analysis Narrative分析论述Analysis narrative 10对任务书的回应Response to the brief 12对场地的回应Response to the Site 14对城市的回应Response to the City 16对全球的回应Global response 18设计理念Design Principle设计理念Design Principle 22建筑如何迎合首层How the Building meets the Ground 24建筑如何迎合办公How the Building meets the Office Brief 267、建筑如何迎合天空How the Building meets the Sky 28平、立、剖面的配置Composition in Plan,Section and Elevation 30建筑选材The Materiality of the Building 34微信免费领取精品资料 QQ2150701285同QQ号 该资源为学习资料,仅供参考,禁止商用。请于下载后24小时内删除!https:/前言Introduction微信免费领取精品资料 QQ2150701285同QQ号 该资源为学习资料,仅供参考,禁止商用。请于下载后24小时内删除!https:/前海湾掠影Qianhai Bay aer8、ial view The teamThe design proposals outlined in this report are the result of a truly effective collaborative effort between two architectural practices,one based in Shenzhen,the other in London.We are excited by the breadth of experience as well as the complementary skills of the project team we 9、have put together for this project.我们的团队本报告的设计提案是由两家分别位于深圳和伦敦的建筑事务所通力合作的高效成果。我们很高兴能够组成如此经验丰富又彼此专业互补的团队。前言IntroductionRogersStirkHarbour+Partners|AUBERogersStirkHarbour+Partners|AUBE前海之窗|WindowsofQianhai32前海之窗|WindowsofQianhai微信免费领取精品资料 QQ2150701285同QQ号 该资源为学习资料,仅供参考,禁止商用。请于下载后24小时内删除!https:/9/8/202010、Google Mapshttps:/ Wan Er Lu-Google Mapshttps:/ TOWERQIANHAIBAYSHENZHENQIANHAI BAYHONGKONGZHONGSHANMACAUZHUHAI项目位置Site location 前海湾掠影Qianhai Bay view项目位置Site location基地现状 Site 位置与背景Context&backgroundThe taskWe recognise the importance of this project.It is important:To the two clients bodies,Qianhai11、 Financial Holdings Co.Ltd and Century Securities Co Ltd who will make their home in this new building For Qianwan,the modern Hong Kong Industrial City,because the site of this tower sits at the very heart of this new district.Shenzhen,the Garden City by the Bay because the client and their new head12、quarters further strengthen the position of Shenzhen as a global city.As the brief emphasises Shenzhen Special Economic Zone benefits from a unique geographical position and the design for the QFH/Century tower outlined in the following pages celebrates the strategic position both within the distric13、t,within the city,within the region and in relation to the world.The aim is to create a project that benchmarks against the best in the world.Referring to Qianhai Financial Holdings the brief calls out the following qualities of the company:Expertise,Diligence and Worry free.Referring to Century Sec14、urities the following virtues are highlighted:Enterprising,innovation,transparency and convergence.设计任务我们明白项目对以下各方的重要性:对业主双方的意义:前海金控和世纪证券未来的新家 对前海的意义:现代香港工业城,因为塔楼就位于这个新区的中心 对深圳的意义:深圳湾花园城市,因为业主和其新总部将进一步强化深圳贵为全球城市的地位。由于任务书强调了深圳经济特区的独特地理位置,接下来介绍的前海金控/世纪证券大厦设计,将突显建筑在片区、城市、区域的位置,以及与世界的关系,以创造一座世界顶级标杆建筑为目标15、。任务书也明确地阐述了共同业主的企业理念:前海金控企业文化:专业、用心、简单。世纪证券企业文化:拼搏、创新、透明、融合。RogersStirkHarbour+Partners|AUBERogersStirkHarbour+Partners|AUBE前海之窗|WindowsofQianhai54前海之窗|WindowsofQianhai微信免费领取精品资料 QQ2150701285同QQ号 该资源为学习资料,仅供参考,禁止商用。请于下载后24小时内删除!https:/位置与背景Context backgroundThe taskThe design we present for your con16、sideration aims to give architectural form to all of these qualities.The brief sets out the clear objectives for the design team.It states that the new headquarters building should be:Solemn and graceful we believe these are the attributes are reflected in our design and it is these qualities that w17、ill enable our design for the tower to stand out from the crowd.At the same time the importance of the range of amenities on offer in the building is underscored throughout the brief.Underpinning the importance of these amenities is the clients desire to promote a sense of community,both within and 18、around the building.A sense of community will do much to enhance the wellbeing of its employees.We believe we have designed a building that creatively expresses these ambitions.Our design creates an attractive new home for Qianhai Financial Holdings Co.Ltd and Century Securities Co Ltd.We are confid19、ent it will attract many like-minded companies to seek space in the Tower.It will also contribute a classic but striking new addition to the skyline of Shenzhen.Great buildings are the result of successful collaborations not only within the design team but also between the professional team and clie20、nt.We have created a great team for your project and the team looks forward to working with the client to bring our vision to fruition.设计任务任务书为设计团队提出了明确的目标,要求新的总部大楼应该是:庄重而典雅我们相信这些特质都体现在了我们的设计之中,正是这些特质使我们的塔楼设计脱颖而出。同时任务书强调了大楼内应该提供一系列的配套服务,这也代表了业主对于提升建筑内、外社群归属感的期望。社群意识对提高员工福祉能够起到积极作用。我们相信,我们所设计的是一座以创意手21、法传达雄心壮志的建筑。我们的设计为前海金控和世纪证券创造了一个美丽的新家,而且它将吸引许多志同道合的公司希望在大楼内占有一席之地,同时也将为深圳的天际线增添一笔经典又夺目的新亮点。伟大的建筑不仅是设计团队内部成功协作的结果,也是专业团队和业主之间密切合作的成果。我们为该项目组织了一个强大的团队,全体团队也非常期待与您合作,将愿景付诸实现。鸟瞰效果图Aerial view RogersStirkHarbour+Partners|AUBERogersStirkHarbour+Partners|AUBE前海之窗|WindowsofQianhai76前海之窗|WindowsofQianhai微信免费领22、取精品资料 QQ2150701285同QQ号 该资源为学习资料,仅供参考,禁止商用。请于下载后24小时内删除!https:/分析论述Analysis Narrative微信免费领取精品资料 QQ2150701285同QQ号 该资源为学习资料,仅供参考,禁止商用。请于下载后24小时内删除!https:/分析论述Analysis narrativeRSHPs success,as architects,is based on our ability to understand the requirements of the brief and the qualities of the site,a23、nd translate these into an architectural proposition.Our work begins with a careful interrogation of the briefing documents.Buildings have enormous potential to support and reinforce the values and aspirations of the client and it is notable in that the brief for this project places emphasis on the 24、health and wellbeing of the employees.Given this we have chosen to celebrate in our architecture the spaces dedicated to these support activities.The space that will contribute to community feature as the most striking elements of our design proposition.Buildings should respond to the aims and objec25、tives of the client but at the same time they must also respond to the site and its surrounding.It is not widely understood that buildings make cities and good buildings ones that contribute positively to the quality of the public realm can help make cities better places to live.We,as architects bot26、h live and work in a city and the bulk of our work is in City centres.Our aim as architects is to find ways in which our designs for buildings can make a positive contribution to the cities where we are fortunate enough to work.The new Headquarters for Qianhai Financial Holdings Co.Ltd and Century S27、ecurities Co Ltd is located at the geographic centre of the new District of Qianwan and as such must address the neighbourhood which will surround it.In much the same way as a building should be for and of it locality it must also be for and of its age that is to say they must acknowledge,and respon28、d to,the forces at work in the wider context,outside its immediate physical environs.The brief recognises that there now exists an imperative for buildings to contribute to creating a more sustainable future.Since its inception the architecture of RSHP has celebrated the technologies that make for m29、ore efficient buildings.In addition we have pioneered the use of off-site manufacturing and modularisation of the construction process to drive up quality and drive down waste.Each of our project aims to extend this trajectory and we are always looking for new and innovative ways to make our project30、s more environmental considerate.We will apply the knowledge and experience we have gained over the last 40 years to this project.作为建筑师,RSHP的成功是建立在对任务书,场地的深刻理解,以及将其转化成为建筑方案的能力设计工作的第一步是梳理任务书的内容。建筑物有巨大的潜力能够支持、巩固业主价值和愿景,而且特别注意任务书十分强调员工的健康福祉。于是我们也刻意在建筑中强调配套活动的专用空间。这些空间将有助于提升设计方案最引人注目的元素社群氛围。建筑应响应客户的目标和目31、的,但同时他们还必须响应用地及周边环境。人们常常忽略建筑能够成就城市,好的建筑那些对公共空间的质量有积极贡献的建筑使城市变得更宜居。我们作为建筑师在城市生活和工作,并且我们大部分作品也都位于市中心。身为建筑师的我们致力于通过设计对我们有幸工作的城市做出积极的贡献。前海金融控股有限公司和世纪证券有限公司的新总部位于前湾新区中心,因此必须处理好同周边环境的关系。如同建筑必须因地制宜,建筑也必须回应时代的精神建筑必须承认并且回应周边实体环境之外更广大的脉络。任务书表示建筑必须促成一个更可持续发展的未来。RSHP自成立以来,我们的项目一直致力于运用各种提高建筑效率的技术。此外,我们还率先使用场外预制和32、的模块化施工,以提高质量并减少施工废材。我们的每一个项目都以推广这一趋势为目标,而且我们一直在寻找新的创新方法,使我们的项目有更多的环境考量,并且把过去40年累积的知识和经验用于这个项目。伦敦利登豪大楼The Leadenhall Building,London伦敦IQL6-伦敦市交通厅总部大楼IQL S6-Transport for London(TFL headquarters)香港口岸旅检大楼设施Recently completed Hong Kong Boundary Crossing FacilityRogersStirkHarbour+Partners|AUBERogersStir33、kHarbour+Partners|AUBE前海之窗|WindowsofQianhai1110前海之窗|WindowsofQianhai微信免费领取精品资料 QQ2150701285同QQ号 该资源为学习资料,仅供参考,禁止商用。请于下载后24小时内删除!https:/360 DEGREES响应任务书Response to the brief In just 22 pages the project brief provides a very clear,complete and concise summary of the clients aims and ambitions for thi34、s building.It sets out a both the commercial considerations along with a forward thinking strategy focused on the wellbeing of the buildings users.It proposes that the design should create a balanced response that measures the needs for an efficient workplace against a concern for the wellness of th35、e workforce.All of this alongside a regard for the wider issues of ecology,energy and the environment.We have extracted key words from this brief.Words that find resonance in our design include:InternationalSolemn and gracefulShared communityHuman CentricWellbeingIn addition to all these attributes 36、the building should be:Eco-friendlyEnvironmentally responsibleAnd sustainableThus the brief describes a building that must addresses a concern for the individuals that will work in the building,the communities that will take shape in the building,the businesses which will prosper in the building,the37、 local community which will be neighbours to the building,as well as global issues arising from the challenges of climate change.In all our commercial buildings we seek to provide efficient and flexible workspace of the highest quality whilst at the same time finding expression of the communal struc38、ture of the populations that will call the building home.We also try to give voice to the needs of the immediate neighbourhood.In summary the design we present here strives to achieve a physical manifestation of the ambitions set out in the brief,one that will provide a positive contribution to the 39、neighbourhood and at the same time realise a beautiful and efficient building that will stand the test of time.Our track record demonstrates we have achieved considerable success with office buildings around the world.任务书以短短22页非常清晰、完整和简洁地传达了业主的目标和抱负,为建筑使用者的福祉制定商业考量和前瞻性策略。任务书要求设计必须设法在高效的工作环境和员工身心健康之间40、取得平衡,同时还必须考虑更广泛的生态、能源和环境。我们从任务书中截取关键词,通过设计形成共鸣的有:国际性 庄重、大方 共享 人文 健康除了这些特质外,建筑应该是:生态友善 环保有责 可持续发展因此任务书所描述的建筑必须解决下列问题,使用者在其中工作、社群在建筑内形成、企业在建筑内繁荣、周围环境和建筑相处,以及气候变迁所引起的全球性问题。我们所有的商业建筑无不追求提供高效和灵活的最高质量工作空间,同时为未来以此为家的人群找到共同的组织架构,并且努力满足临近社区的需求。总之,我们所展示的设计力求以实体形式落实任务书的展望,这是能够为邻里提供积极贡献的设计,同时实现一座历久弥新的美丽高效建筑。历年的41、业绩证明我们在世界各地设计的办公大楼皆相当的成功。奇夫利大楼空中露台Chifley Square terrace奇斯克商务园的绿色景观Chiswick Park eco-friendly landscaped 墨西哥银行总部大楼-空中露台BBVA Mexico terrace设计概念示意图Concept diagram RogersStirkHarbour+Partners|AUBERogersStirkHarbour+Partners|AUBE前海之窗|WindowsofQianhai1312前海之窗|WindowsofQianhai微信免费领取精品资料 QQ2150701285同QQ号 该42、资源为学习资料,仅供参考,禁止商用。请于下载后24小时内删除!https:/响应场地Response to the Site新总部大楼有得天独厚的地理位置:位于前湾9乘9网格的核心地段。位于听海大道和前湾二路两条主干道的交汇处俯瞰着滨海公园步道,从而将地块连接到一个连续的绿色空间网络,最终通达环前海湾的滨海绿带。我们认为这栋建筑需要作为片区的支点,突显其在社区的中心地位。塔楼将位于一个新的城市象限,俯瞰与场地相邻最重要的元素城市绿带。这只是贯穿深圳这个海湾花园城市各区开放空间网络的一部分。我们相信地块有机会进一步扩大绿色网络,把绿化向上延伸进入塔楼内部空间。虽然塔楼应该善用其跨越公园的优越地理43、位置,以展现其在前海湾心脏地带的位置,同时从周围看过来也应该展现塔楼坚毅不拔的形象,因此我们建议在四面布置大面积窗户,突显塔楼的中心位置,捕捉北、南、东、西的景色,并宣布塔楼在城市天际线的存在感。The site for the new Headquarter building is a privileged one:It occupies the central lot in the 7 by 7 grid thatmakes up the Qianwan.Its sits astride the intersection of the two mainstreets that bisect44、 the district Junction of TinghaiAvenue and Qianwan 2 RDIt overlooks the linear parkway that leads downthe waterfront,thereby connecting this lot to acontinuous network of greenspaces that culminatesin an arc of parkland that encircles the bay.We believe the building needs to act as fulcrum for the 45、district creating a point of reference that emphasises the centrality of its position within the community.The tower will sit at the nexus of a new city quadrant overlooking the most important feature adjacent to the site namely the Municipal Green Belt.This is just one component of a city wide netw46、ork of open spaces that permeates all quarters of Shenzhen the Garden City on the Bay.We believe the siteprovides an opportunity to extend and amplify this network of green spaces by extending the green spaces up and into the tower.Whilst its main address should exploit its privileged location astri47、de the park in order to command it location at the heart of Qianwan it should also present an assertive presence when seen from the surroundings hence we propose a tower punctuated on all four faces with giant windows that celebrate the centrality of its location,captures view to the north,south,eas48、t and west and announce it presence on the citys skyline.项目基地位于9个地块的正中央The building occupies the central plot of the nine square grid 前海之窗Windows of Qianhai大楼辐射影响示意图Radiating diagram大楼灯塔效应示意图Building lighthouse diagramRogersStirkHarbour+Partners|AUBERogersStirkHarbour+Partners|AUBE前海之窗|WindowsofQian49、hai1514前海之窗|WindowsofQianhai微信免费领取精品资料 QQ2150701285同QQ号 该资源为学习资料,仅供参考,禁止商用。请于下载后24小时内删除!https:/响应城市Response to the City山脉-金色露台模型Mountain-Gold terrace model 天空Sky山脉Mountain海湾Bay河流River公园The park钻石空中露台Diamond sky terrace金色空中露台Gold sky terrace银色空中露台Silver sky terrace铜色空中露台Copper sky terrace裙楼绿色露台Green 50、podium terrace海湾-银色露台模型Bay-Silver terrace model 河流-铜色露台模型River-Copper terrace model The brief succinctly states that the design should be in harmony with the natural and business environment within the districtIt goes on to state that Shenzhen is characterised by diversity and it seems appropriate t51、hat the brief for the building contains a diverse mix of uses and tenants.This will enrich the project and the neighbourhood.The aim of our design is to give identity to each of these different activities without diminishing the singularity of the design.In accommodating this wide range of activitie52、s our intention is to establish strong interconnections between the constituent communities without compromising the overall clarity of the composition one that must address the central objective ofthe project,namely that this Tower is to be the new headquarters for Qianhai Financial Holdings Co.Ltd53、 and Century Securities Co Ltd.Harmony is a key word used in the brief and we have sought to find a harmonious relationship between the diverse components of the brief.We believe a building of discordant forms would be inappropriate given these aspirations.Thus we propose a building form that is har54、monious in form,in proportion and in character.At the same time we believe the design should make visible the clients commitments to the importance of community,Wellness and the environment in summary it should combine business propriety with a Human-Centric emphasis this in essence,characterises ou55、r design proposal.任务书要求设计应该“与地区内的自然和商业环境相融合”。而且说明深圳的特点就在于多样性,因此理所当然建筑的功能也必须迎合多元用途和租户,好让项目和周边街坊更丰富更有内涵。设计的目的是赋予每个不同的活动其专属特征,同时维持建筑设计的独特性。为了容纳如此多样化活动,我们致力于在社群之间建立强大的相互联系,同时保留整体布局的清晰度:即项目的最重要目标打造前海金控和世纪证券的新总部。融合是任务书提到的关键词,我们力求调和任务书提及的各个部分。如果建筑本身的造型不谐调,这些愿景就无法实现,因此我们提出了一个在形式、比例和性质等方面都很和谐的形式。同时,我们认为设计应该突56、显业主对社群、健康、环境的承诺简而言之,应当结合商业信息与以人为本的重要性这本质上就是我们设计方案的特点。RogersStirkHarbour+Partners|AUBERogersStirkHarbour+Partners|AUBE前海之窗|WindowsofQianhai1716前海之窗|WindowsofQianhai微信免费领取精品资料 QQ2150701285同QQ号 该资源为学习资料,仅供参考,禁止商用。请于下载后24小时内删除!https:/河流River山脉MOUNTAIN360度全景360DEGREESVIEW响应全球Global responseThe stated ori57、entation of Shenzhen is outward looking.We would suggest that new headquarters for Qianhai Financial Holdings Co.Ltd and Century Securities should personify these ambitions and thereby help give expression to its role in guiding and facilitating these far-reaching objectives.As the brief states the 58、Shenzhen region is:A mechanism for the cooperation between Hong Kong and the Mainland A spearhead for the growth of the Pearl River Delta The citys vast network of waterways link the South China Sea to the Pacific beyond Shenzhen provides a window(and a bridge)between China and worldThe tower we hav59、e proposed acknowledges Shenzhens ambition as a Window into the World by literally creating windows or look-out on all four sides providing the tower with a 360 degree outlook one that captures each of the keys views on offer-the park,the river,the sea and the Mountains.At the same time the brief em60、phasises that the building needs to address the challenges facing the world global issues relating to environment and ecology.The windows onto the world provide an opportunity to promote consciousness of the relationships between the individual and the world around them.展望全球是深圳的愿景,因此我们建议前海金控和世纪证券的新总61、部应体现这些雄心壮志,这将有助于体现其在指导和促进这些深远目标方面的作用。正如任务书所说,深圳地区是:香港与内地紧密合作的先导区 珠三角地区成长的引领区 有辽阔海域连接南海及太平洋 中国和世界之间的窗口(和引桥)我们的方案配合深圳成为通向世界窗口的愿景,在塔楼的四个面都提供了宽广的观景平台提供360度的对外视野:公园、河流、海和山等各主要景观一览无余。同时,任务书也强调建筑需要应对全球面临的挑战全球性的环境和生态相关问题。通往世界的窗口让我们有机会提升个人与周遭世界关系的意识。通往世界的窗口将是教学空间、公共空间,促使用户了解生态和环境的重要性。山景Mountain 前海湾景QianhaiLa62、 Villette-公园参考图La Villette-Park (reference image)场地回应示意图Site response diagram海湾BAY河流RIVER公园THEPARK钻石型空中露台Diamond sky terrace金色空中露台Gold sky terrace银色空中露台Silver sky terrace铜色空中露台Bronze sky terrace绿色裙房露台Green podium terraceRogersStirkHarbour+Partners|AUBERogersStirkHarbour+Partners|AUBE前海之窗|WindowsofQi63、anhai1918前海之窗|WindowsofQianhai微信免费领取精品资料 QQ2150701285同QQ号 该资源为学习资料,仅供参考,禁止商用。请于下载后24小时内删除!https:/模型照片Model PhotosRogersStirkHarbour+Partners|AUBERogersStirkHarbour+Partners|AUBE前海之窗|WindowsofQianhai2120前海之窗|WindowsofQianhai微信免费领取精品资料 QQ2150701285同QQ号 该资源为学习资料,仅供参考,禁止商用。请于下载后24小时内删除!https:/设计理念Design64、 Principle微信免费领取精品资料 QQ2150701285同QQ号 该资源为学习资料,仅供参考,禁止商用。请于下载后24小时内删除!https:/设计理念Design PrincipleThe brief challenges us as architect to conjure a design that achieves a harmonious balance between two,possibly contradictory,requirements:On the one hand the design should establish afinancial icon in 65、the Greater Bay area,a classicfinancial tower that reinforces the profile of the client.At the same time the tower should create a buildingthat is human centric and promotes a diversified,artistic,green and low carbon communityThe design must therefore find a means of mediating between the scale of 66、the company and the scale of the individual within the company.To help guide our approach we have extracted two words from the brief which we believe neatly summarise the broader objectives of this project these words are classic and community.We have taken these two words to guide our design.We bel67、ieve the Tower should be imposing and approachable.It should communicate formality and yet invite informality.It should describe continuity and at the same time celebrate change.The Tower is elegantly proportioned like a well cut suit.The square tower is perfectly balanced between four strong corner68、s.The simplicity and order described on each elevations speak of efficiency and diligence.These elegant planes are interrupted by cut outs which make visible the social life of the communities within.任务书考验建筑师的设计能否调和两个相互矛盾的要求:一方面设计必须在大湾区建造一座经典的金融大厦,强化业主的形象。同时这座大厦还必须具以人为本,形成一个多元、浪漫、绿意、低碳的社区。因此设计必须在企业尺69、度和个别员工的尺度之间取得平衡。再以这两个词作为设计的指引。我们相信塔楼必须兼具气势和亲和力。展现正规形式感又同时鼓励放松随意。呈现传承延续又求新求变塔楼优美的比例有如一套剪裁良好的西装,正方形塔楼的四个转角完美平衡各立面的简约和规整传达高效和勤奋的精神这些优美的平面上布置了室外平台,对外展示内部的社交生活RogersStirkHarbour+Partners|AUBERogersStirkHarbour+Partners|AUBE前海之窗|WindowsofQianhai2524前海之窗|WindowsofQianhai微信免费领取精品资料 QQ2150701285同QQ号 该资源为学习资料70、,仅供参考,禁止商用。请于下载后24小时内删除!https:/建筑如何迎合首层How the Building meets the Ground任务书提到“经典”和“风格”,所以设计的特色就在于大厦首层的特殊处理,在城市里展现其坚毅不拔的自信。大厦将是许多企业的总部,有各自的独立入口。前海金控和世纪证券既是业主也是最大用户,而且皆要求要有正式的入口,我们认为面向公园的入口从逻辑上讲应该是最有仪式感的。因此大厦就坐落地块的前沿,直接面对公园。外框巨柱的正中间有排正式柱廊,盘踞着前海这一块黄金地段。专用的入口,即前海金控入口和世纪证券专用落客区。这个专有的入口身处庭院采光空间,其经典布局形式向访客71、展现企业的价值。这个内部庭院也向访客暗示了顶层办公空间营造的特色。塔楼的田字形和十字形核心筒布局,整合了两个入口,同时为其他租户在另一个轴线上增加两个额外而且完全独立的入口。商业和会议空间的入口远离塔楼,围绕下沉庭院布置。建筑的这5个出入口合理的分布在基地内,确保了每个出入口的可识别性和通达性,而不会影响其他租户的需求或干扰其识别度。首层的景观强化了不同用户和功能之间的分隔。茂密的乔木围绕着北侧裙房,从这里可以进入商铺,而大厦本身则稳稳坐落城市广场的正中央。总体来说,前海金控和世纪大厦占据前海的黄金地段,而我们的建筑设计充分挖掘区位优势,发挥用地的潜力,打造一个引人注目的首层平面,同时为业主提72、供较为正式的出入口,以及为相关休闲设施提供较为非正式的出入口。Classic and style-two words used in the brief and the tone of our design is established by the way our tower meets the ground-how it confidently asserts its presence in the City.The Tower will become home to many organisations and each will need to have its own entranc73、e.Quanhai Financial Holdings Co.Ltd and Century Securities,as owners and prime occupants of the Tower,have requested a formal entrance and logic dictate that this faces onto the park.Thus the Tower occupies the front edge of the site directly opposite the park.Centred between the powerful columns th74、at frame the tower a formal portico take possession of this prime address in Qianwan.A more private entrance Quanhai Financial Holdings Co.Ltd and Century Securities with a dedicated vehicular drop-off sits on the opposite side of the Tower.This discrete entry sits within an elegant,top lit courtyar75、d space,the classical composition of which will communicate to visitors the values of the company.This internal courtyard also provides a point of reference to the very unique qualities of the office space the visitor will encounter at the very top of the tower.The four square form of the tower and 76、the cruciform arrangement of the core enables us to unite these two entry points and,at the same time to provide,on the other axis,two additional,but wholly independent entrances for the other office tenants.Access to the commercial and conference space is pulled away from the tower and is focused a77、round the sunken patio already described.The distribution of five distinct and independent points of access around the site ensures that each has an appropriate visibility and accessible without compromising the needs or identity of the other tenants.The landscape treatment of the ground plane reinf78、orces the formality of this segregation of uses and users.Dense grove of trees surround the pavilion that provides access to the commercial whilst the tower itself sits four square at the centre of an urban plazaIn summary the site chosen by Qianhai Financial Holdings Co.Ltd and Century Securities C79、o Ltd occupies the 100%corner within Qianwan and our tower is designed to exploit this location to its full potential of the site by creating an attractive ground plane that neatly delineates between the more formal entrance for the client companies and the more informal uses associated with the ame80、nities.主要入口效果图Main entrance view西北角效果图North West tower base view RogersStirkHarbour+Partners|AUBERogersStirkHarbour+Partners|AUBE前海之窗|WindowsofQianhai2726前海之窗|WindowsofQianhai微信免费领取精品资料 QQ2150701285同QQ号 该资源为学习资料,仅供参考,禁止商用。请于下载后24小时内删除!https:/建筑如何迎合办公How the Building meets the Office Brief首先塔楼将是工作场所,81、而且正如任务书所述锁定金融业为目标使用者,尤其是有意向“立足深圳”,寻求的5A甲级写字楼的企业。项目长期的目标将取决于办公空间的灵活度以及设计的韧性。从最近这一次疫情中可见工作模式和办公空间已经在发生改变,而且这种改变未来也将持续。设计方案将特别注重办公空间的质量,尤其是灵活度:建筑使用十字形中央核心筒,其四面联通可以容纳各种办公布局。这个核心筒布局甚至可以配合同层多租户再细分配置,这估计必是未来必须的。十字形布局也可以包容不同的电梯配置,供业主在初步设计阶段微调大厦内的功能分区。核心筒和转角柱展现主结构的刚性,实现完全无柱的平面空间。设计将外围柱子隐藏在外墙内,创造通透无阻的楼层平面,为办公82、租户提供百分百布局灵活性。设计各方面都经过仔细推敲,最大限度降低能耗,提高资源使用效率,实现以人为本的设计。我们向来都以最高级别的绿色建筑认证为目标,近期完工的两栋高层建筑皆取得LEED白金级认证。针对本案,我们也将努力争取中国绿色建筑三星级认证。我们将借鉴过往办公项目的成功经验,这其中很多项目已成为高品质办公空间的标杆,并且以社群架构为重点。同时考虑深圳的气候条件,并根据业主的任务书量身定做本案。First and foremost the Tower will be a place of work and as the brief states the target market for 83、the building is the financial sector,in particular those looking for a new foothold in Shenzhen with 5A Grade A office.The long term value of the project will be determined by the flexibility of the office space and how the resilient the design is.As recent events have illustrated working practices 84、and the use of office space has changed and will continue to do so.Our proposal place a premium on the quality of the office space,in particular its flexibility:The building has a central core with lifts arranged in a cruciform,the four points of access permit any number of different arrangements of85、 office space.This core arrangement even would allow for the subdivision of individual floors for multiple tenant should this be deemed necessary at some time in the future.The cruciform arrangement also permit a wide range of different lifting configurations which would enable the client to fine tu86、ne the vertical distribution of space within the building during the detail design phase.The Core and corner columns describe the primary structural rigidity system and enable us to provide a floorplan that is completely column free.Perimeter columns are concealed within the faade leaving clear floo87、rplate completely free of obstructions granting tenants total flexibility in the layout of their office space.All aspects of the design will be interrogated to ensure that energy use is minimised,resources are used wisely and above all that the resultant design is human centric.As a matter of practi88、ce we aim to secure the highest levels of sustainability related certification in all our buildings and two recently completed high rise projects have secured LEED Platinum.For this project we will also aim to garner China 3 star Green Building.We will be able to draw on a unique portfolio of office89、 projects that have establish benchmarks for quality office space with an emphasis on communal structure.We will draw on this experience to create a building tailored to the specific needs of the client brief whilst taking into account the climatic conditions of Shenzhen.This focus on community will90、 ensure that the objectives of WELL Certification are met and exceeded.IQLS6-伦敦市交通部总部IQL S6-Transport for London(TFL headquarters)伦敦利登豪大楼 The Leadenhall BuildingIQLS5-双层挑空中庭IQL S5-Double height space atrium 标准低层办公楼Typical low rise office plan 标准中高层办公楼Typical middle rise office plan RogersStirkHarbou91、r+Partners|AUBERogersStirkHarbour+Partners|AUBE前海之窗|WindowsofQianhai2928前海之窗|WindowsofQianhai建筑如何迎合天空How the Building meets the Sky 塔楼顶部效果图Top of the tower view 楼顶观海效果图Top of the tower view towards the bayQianhai Financial Holdings Co.Ltd and Century Securities Co Ltd have opted to occupy the upper 92、floors in the building.Each company will have its own sky lobby and the cruciform organisation of the core permit us to incorporate some very special feature to the floor plans in the upper floors.For the clients portion of the tower we envisage a central atrium opening up at the very heart of the f93、loorplate.This space provides a very special opportunity to interconnect floors.Stair and lifts will provide quick and easy communication between the different levels.For Qianhai Financial Holdings Co.Ltd,who will occupy the very uppermost floors in the tower,this central atrium space open directly 94、up on the roof terrace admitting light deep into the heart of the office space and giving the office space direct access to the rooftop gardens where 360 degree views are on offer.Thus Qianhai Financial Holdings Co.Ltd and Century Securities Co Ltd will occupy a building within a building where the 95、upper floor are different and unique from the typical floors below.A visitor arriving at the private drop-off at ground level enter the building within an intimate elegant courtyard and when arriving in the sky lobbies service either Qianhai Financial Holdings Co.Ltd or Century Securities Co Ltd Pri96、vate find office space similarly arranged around an internal courtyard.前海金控和世纪证券都选择使用高楼层空间。两者各有独立的空中大堂,十字形核心筒足以在高楼层容纳非常特殊的平面布局。在我们的设想中,业主的楼层中央有一个壮观的中庭,随着楼层的上升,中庭逐渐扩大,向上展开。这个中庭空间提供了楼层间联系的纽带。楼梯和电梯将提供快速便捷的跨层联系。前海金控将使用最顶层,而中庭空间直接打通屋顶露台,将自然光引入办公空间,办公空间直接连通屋顶花园,享受360全景。于是前海金控和世纪证券的使用空间将自成一栋楼,独特的平面布局同下方的标准97、层区别开来。访客抵达首层专有落客区后,穿过私密优美的庭院进入大厦,通过前海金控或世纪证券的空中大堂,抵达围绕庭院布置的办公区。前海金控标准办公楼层 QFH typical office plan 世纪证券标准办公楼层Century typical office plan RogersStirkHarbour+Partners|AUBERogersStirkHarbour+Partners|AUBE前海之窗|WindowsofQianhai3130前海之窗|WindowsofQianhai建筑设计素材网 h t t p s:/w w w.j z s u ca i.co m/平、立、剖面的配置Co98、mposition in Plan,Section and ElevationOur design can be summarised as a classically proportioned volume accented by cut-outs openings in the faade line that reveal flashes of colour,light and shadow with organic forms that contrast with the order and recti linearity of the towers outline.We believe99、 a Tower for such a prestigious financial institution should communicate solidity and permanence this calls for a design inspired by the principals of classical architecture proportion,order and symmetry.In the classical traditions of clarity and legibility the form of the tower is a clear expressio100、n of the activities contained within.The structure of the tower is also clearly expressed and indeed is celebrated the four strong corners give the tower a sense of stability.The corner columns also separate and frame each of the four faces of the tower.Each elevation within these frames has been ca101、refully composed into a series of elegant rectangles.Three story opening further subdivide each of the elevations thereby expressing the structure and order of the communities contained within the Tower设计可以被总结为黄金比例的体量缀以室外开放空间(外墙上的开口),室外平台流露出的色彩、光影和有机形体,与建筑主体的规整造型形成鲜明的对比。我们相信高端金融机构的大厦应该传达稳重和恒久的特性,必须取102、材自经典建筑的审美原则:比例、规整、对称。在经典建筑的清晰易读的传统中,塔楼的形式体现内部蕴含的活动。塔楼的结构清晰外露,突显四个有力的转角,赋予视觉稳重感。转角柱分隔塔楼的四面,也构成立面框架。这些框架内的每个立面都经过精心组成,形成一系列优雅的矩形。三层通高开放空间再细分每个立面,展现大厦内部的社群结构和秩序。RogersStirkHarbour+Partners|AUBERogersStirkHarbour+Partners|AUBE前海之窗|WindowsofQianhai3332前海之窗|WindowsofQianhai钻石型空中露台铜色空中阳台Bronze sky terrace花103、园楼庭楼顶43楼-机电层37楼-空中花园36楼-避难层30楼-空中花园24楼23楼-避难层11楼10楼-避难层7楼5楼4楼3楼2楼首层地下一层地下5层地铁连接通道裙楼裙楼业主专用入口QFH/CenturyPrivate Entrance业主专用入口QFH/CenturyEntrance大厅Lobby大厅Lobby低区机电机电机电机电机电停车场 商业商业/联合商业办公楼层办公楼层办公楼层办公楼层办公楼层屋顶平台空中大堂空中大堂大堂/公共空间餐厅中区世纪证券前海金控业主楼层-共12层标准平面图-前海金控空中大厅Typical plan-QFH sky lobby terrace裙房Ancillar104、y Building花园楼庭Park Pavilion平、立、剖面的配置Composition in Plan,Section and Elevation南侧立面图South elevation西侧立面West elevationRogersStirkHarbour+Partners|AUBERogersStirkHarbour+Partners|AUBE前海之窗|WindowsofQianhai3534前海之窗|WindowsofQianhai建筑选材The Materiality of the Building任务书对建筑的外观提出具体要求,包括”简约”、”现代”、”庄重”、”优雅”等。因105、此我们为建筑主体选择了非常经典的材料组合。内敛的材料组合,点缀以各种富有异国风的色彩和材料。我们在外墙的切口添加明亮的金属饰面,建议选用与金融最有关联性的金属色-青铜、白银和黄金。因此通过材料的选用,建筑主体的庄重和优雅与切口的色彩就形成了对比。切口采用明亮发光的金属材料,闪烁着精心挑选的互补色彩。建筑底层的材料则选用与地面相关的材料如石材、木材等,结合大面积绿化,因此建筑物的基座似乎从相邻公园中生长出来。四个转角巨柱通过青铜色调的阳极氧化铝板包裹。这些铝板的表面纹理倒影着天空,使这座庞大而雄伟的建筑看似无比轻盈。巨型框架的暗色调将被我们选用的主立面玻璃所抵消,利用最高性能规格的超白玻璃,由此106、形成一片淡白色幕墙。沿着塔楼向上,光滑优雅的外墙面将点缀着切口或阳台,各有不同的金属为主题,各有自己独特的造型。最低的切口位于建筑的最底层,从这里可纵观前方的公园。切口的主要材料将是青铜辅以几抹紫色互补。第二个切口位于西北立面,从这里能够看到河流。这里使用的主要材料将是银色系材料,其反射率将以几抹蓝色加以突显。第三个也是最后的切口,位于东北侧立面,将使用金色色系的材料,抹上少许的红色。最后,建筑的顶部取义自钻石使用大面积反光、水晶般清澈的玻璃。钻石的光彩照人与光线折射息息相关。我们根据色彩光谱建议增加几抹橙色、绿色和紫色等,这些是由原色调和成的颜色。西北侧效果图Tower view from 107、the North WestThe brief is very specific with regards the appearance of the building and includes words such as simple,modern,solemn and elegant.We have therefore opted for a very classic pallet of material for the main body of the building.This restrained pallet of material is punctuated by touches108、 of more exotic colours and materials.In the cut-out openings in the facades we have introduced bright metallic finishes and our proposed choice are the metals most frequently associated with finance bronze,silver and gold.Thus we create a contrast between the material used for the body of the build109、ing,which speak of solemnity and elegance and the coloration of cut-outs which incorporate bright,sparkling metallic materials highlighted with flashes of carefully selected complimentary colours.Choice of material at the base of the building will be materials of and for the ground namely stone,wood110、 combined with extensive use of planting.Thus the base of the building grow up and out of the adjacent park.The mega columns of the Tower on the four corners are over clad in textured bronze toned anodised.The textured surface of these aluminium panelling reflects the sky giving this large and impos111、ing building a beguiling weightlessness.The darker tone of the mega frame will be offset by our choice of glass for the main facades.This will utilise low iron glass with the highest performance specification.The resultant tone and colour of these facades will be a pale white.Moving up the tower the112、 smooth elegant planes of the faade will be punctuated with cut-outs or balconies,each featuring a different metal each inhabited with architecture with its own distinctive shape and form.The lowest of these cut-outs is on the lowest face of the building.Located here it captures views of the park.Th113、e predominant material for this cut-out will be bronze offset with the touches of the complementary colour purple.The second cut-out in the sequence is on the North West elevation.From here you will be able to see the river.The primary materials used here will be materials silver in colour the refle114、ctivity of which will be emphasised by combining it with touches of the colour blue.The third and final balcony towards the mountains,that which is located on the North East faade,will use material with a golden hue emphasised with dabs of the colour red.Finally the pinnacle of the building will mak115、e reference to diamonds with extensive use of reflective,crystal clear glass.Diamonds are associated with the refraction of light and from the full spectrum of colours we propose to introduce touches of orange,green and purple,the colours that emerge from at the interface between the primary colours116、.圆形遮阳Circular shades玻璃Glass 黄铜Gold brass 木材Timber 青铜Bronce玻璃管Fluted glass银色结构Silver structures 酒红色BurgundyRogersStirkHarbour+Partners|AUBERogersStirkHarbour+Partners|AUBE前海之窗|WindowsofQianhai3736前海之窗|WindowsofQianhai“Micro-grills”at 4.5m centresAtriaAtriaAtriaAtriaAirDb redux.Dry airHEPAOzoneHEPABal117、eenCoated glass(not reflecting)AtriaAtriaAtriaAtriaAirDb redux.Dry airHEPAOzoneHEPABaleenCoated glass(not reflecting)“Micro-grills”at 4.5m centresAtriaAtria建筑表皮The Building Envelope 布景排序田字形大楼嵌有 观景飘窗,每个 窗台 都提供了优美的风景:街区、海湾、城市,大湾区以及遥远的天际线。设计使用剥离法,使得建筑形态更加动感、独特,将工作团结奋进的要求,融合社群发声、舒压和互助的渴望。前海金控和世纪证券大厦毅然挺立118、在公园和快速公路的交汇处。大厦四周的树丛与公园更加突然了它的庄重大气。4个大树主干一样的核心筒提供了最大限度的垂直流通与分配功能。它的排布是井然有序的,并无任何限制。附属建筑与大厦磅礴大气的形态形成了鲜明对比。附楼选用现代建筑设计方法,巧妙结合了传统的金属与木质材料,打造了一种个温馨的餐饮、社交场所。建筑表皮采用高效超薄的系统,可提供自然空气交换与通风路径,空气微粒经过过滤,阳光也得以吸收并提供能量及自然光照。绿色垂吊植物遍布阳台,为业务合作和商业洽谈提供了舒适的富氧空间。角落处臭氧杀菌系统Corner detail with ozone virus systems独立分流系统Individu119、al micro-grills for subdivision大型通风百叶Ducted hat-vent(Mega grils)裙房角落细部截面Detail cut corner view of the podiumArticulation&orderThe 4-square linear bar,has bay windows punched through by the power of the views and scenery;local,bay,city,region,horizon.This peeling away,allows for a dynamic,expressive 120、manifestation.The confluence of the demands of unity of working,endeavor,against the desire for community expression,relief and succor.The QFH and Century Building proudly asserts itself at the intersection of park and expressway.It commands respect,regimenting the trees that surround its grove-like121、 parkland retreat.The 4 trunk core allows for maximal response for vertical circulation and distribution.It permits permutations rather than limits.Ancillary Building is seen as a counterpoint to the powerful form of the Tower.The use of modern methods of construction to fashion long established met122、al and timber materials,provides a harmonious eating and social adjunct.The building skin is a highly efficient,slimline system providing a breathing,hybridized naturally ventilated pathway.Particulates are filtered,sunlight combed for energy and natural light.The green carpet is run up the terracin123、g,providing a pleasant,oxygenated atmosphere for collaboration and business diversity.竖框空气过滤示意图Mullion air filtration diagram太阳板及开口PV and openings 冷却系统与阳台过滤系统Cooling atria and balcony filter AirDb redux.“Micro-grills”at 4.5m centresAtriaAtriaAtriaAtriaAirDb redux.Dry airCoated glass(not reflecting)“124、Micro-grills”at 4.5m centresAtriaAtriaAtriaAtriaAirDb redux.Dry airHEPAOzoneHEPABaleen外墙细部截面Detail cut view of facadeRogersStirkHarbour+Partners|AUBERogersStirkHarbour+Partners|AUBE前海之窗|WindowsofQianhai3938前海之窗|WindowsofQianhai标准幕墙开间转角Typical cladding bay corner装配式建造Constructability任务书要求使用预制工法施工,对此我125、们完全认同。对于前海金控控或世纪证券来说,新总部的建设是展示预制工法各种优点的绝佳机会。为了最大限度地发挥预制的优势,从一开始就必须将场外施工的标准纳入建筑设计中,否则一旦设计完成就无法套用实施了。只有充分考虑设计各个方面的合理化,才能实现场外施工的所有优点。RSHP以模块化建筑元素设计而闻名,并发展了一种标志性的建筑语言,充分发挥构件外露的优势,彰显建筑的建造方式以及预制的潜力。在过去40年中,我们对施工流程提出质疑,宣导行业利用场外预制所带来的优势,其中包括:降低建筑成本 缩短施工时间 升建筑质量 高施工安全性 减少材料和能源浪费 减少现场噪音和污染 减少施工车辆在市区移动我们为项目选择的126、简单造型将允许大部分的施工采取场外预制,我们希望与业主合作,为项目制定远大的目标,使得项目不仅树立办公空间的新标杆,而且创造新的施工标准。马德里4号航站楼预制钢构Terminal 4 Madrid Barajas,example of prefabricated steelwork 利登豪大楼外墙,大量使用装配式工法 The Leadenhall Building,made extensive use of the site assemblyThe brief requires that prefabrication shall be used in construction and we w127、holeheartedly support this objective.For Qianhai Financial Holdings Co.Ltd or Century Securities Co Ltd,companys focused on the probity of investment,the construction of the new Headquarters offers a unique opportunity to showcase the many benefits of prefabrication.To maximise the advantages of pre128、fabrication the criteria for off-site construction has to be factored into the architectural design from the outset it cannot be overlaid as an aspiration once design is complete.The full benefits of off-site construction can only be secured if due consideration is given to the rationalisation of al129、l aspects of the design.RSHP is renowned for the design of buildings that exploit the modularisation of the building elements and have evolved a trademark architectural language that makes a virtue of the expression of the component parts.This architecture celebrates the way buildings are built and 130、the potentials of prefabrication.Over the last 40 years we have interrogated the construction process,pushing the industry to take advantage of the benefits on offer from off-site assembly.These include:Reduction in construction costsReduction in construction timeImprovement in build qualityEnhanced131、 construction safetyReductions in waste of material and energyReduction in noise and pollution on siteLess construction vehicle movements in the city普洛托斯酒庄的轻量木屋顶结构Protos winery parabolic arches allow for a lightweight timber structure利登豪大楼的幕墙 The Leadenhall Building claddingRogersStirkHarbour+Partne132、rs|AUBERogersStirkHarbour+Partners|AUBE前海之窗|WindowsofQianhai4140前海之窗|WindowsofQianhai聚焦主要空间Focus on Key Space聚焦主要空间Focus on Key SpacesThe drama of our architectural vision for the new Headquarter building for Qianhai Financial Holdings Co.Ltd and Century Securities Co Ltd centres on the contrast and133、 interplay between the calm,classical composition of the glass facades that frame and contain the office functions with the theatre of the cut-outs-balconies containing the communal spaces.These spaces adopt playful,organic forms to express the human centric focus that sits at the heart of the clien134、ts brief.These balconies or look-outs spiral upwards from park to sky,capturing key views as they climb the building to its pinnacle.They articulate the presence of Qianhai Financial Holdings Co.Ltd and Century Securities Co Ltd and the strategic position of Shenzhen that is summarised at the beginn135、ing of the briefing document.In the following few pages we paint a picture,combining words with images,spirit and feel of each of the five communal spaces that punctuate the four faces of the building.我们想象前海金控与世纪证券的新总部大楼有一种因强烈对比而塑造的美感,这种对比是通过玻璃幕墙的沉静和经典,与建筑开口(包含共享空间的阳台)的热闹形成对比烘托的美感。这些空间采用趣味的有机造型来表达以人136、为中心的专注,而以人为本正是业主任务书的核心诉求。这些阳台或瞭望台从公园向上盘旋到空中,一路捕捉关键视野直到顶层,突显前海金控与世纪证券的身份,及其在深圳的战略地位,这也是任务书开头概要的重点。接下来我们将以图文并茂的方式,说明建筑立面上五大共享空间各自的精神和氛围。海湾BAY河流RIVER山脉MOUNTAIN360度全方位观景台360DEGREESVIEW公园THEPARK设计概念示意图Concept diagram RogersStirkHarbour+Partners|AUBERogersStirkHarbour+Partners|AUBE前海之窗|WindowsofQianhai454137、4前海之窗|WindowsofQianhai塔楼的量体-露台Tower massing-terraces 街道/广场Streetscape/Uwrban PlazaThe building takes a commanding stance incorporating the park as its foreground.The park pavilion serves as the frontispiece to a classical set-piece,a noble public space serving as a transept to deliver occupants to t138、heir intended address.The tower and ancillary building sit with an urban landscape that is the union of park,social mix and building.The scheme proposes a new take on the classical plaza,going back to the work of the great C20 modernists.A 3D city infuses to create a stepped plaza,providing a varied139、 topography.Public open space for co-workers,visitors and building tenants is coaxed up from the groundscape below.The selection of materials compliments and contrasts with the base notes of the city.It espouses nobility through a palette of metallic hues,each giving character,definition and persona140、lity to each tenants address,at ground and sky levels.大楼以公园绿地为前庭,庄严地屹立在前湾片区。公园里的凉亭成为其后方现代主义经典建筑的前奏;这是一个高雅的公共空间,访客经此前往他们的目的地。工整的四方造型直接嵌入地基:4个强而有力的边角,4个如同大树主干一样的电梯核。线性外墙窗格也清晰地界定了大楼开合点之间的空间;底座,飘窗,观景台。如马赛克般排布的水平玻璃幕墙都配有光伏遮阳百叶,为整个城市的光影变幻、季节交替,城市能量增添了动态效果。这个大楼也将成为深圳社会生活的最佳代表。大楼与附楼坐落于由公园、社交场所以及其他建筑所构成的城市景观之141、中。该方案对20世纪现代主义的广场概念进行了翻新。三维立体城市理念为设计注入了一个阶梯式广场,打造了多样化的地形;为大楼内的工作者,访客和用户提供了一个多层次的公共开放空间。建筑材料的选择也与整个城市的基调形成了鲜明的对比衬托。通过一系列的金属色调来彰显建筑的庄重典雅,同时也从地面和空中两个角度赋予每个用户不同的个性与标识。裙楼效果图Building podium view 首层平面图Ground floor plan正门入口效果图Main entrance viewRogersStirkHarbour+Partners|AUBERogersStirkHarbour+Partners|AUBE142、前海之窗|WindowsofQianhai4746前海之窗|WindowsofQianhai入口大堂Entrance Lobbies We have brought the Tower firmly down to ground thus the tower roots itself in the district,asserting it presence besides the park.This four square composition is intended to represents solidity,reliability,permanence.Four entrances 143、occupy four sides of the building,the primary orientation an exclusive address for the client.Each entrance is delineated by a freestanding portal that forms part of the stone plaza that surround the tower.A fosse separates the street from the lobby.The lobby floor itself is delicately elevated abov144、e the surrounding datum by virtue of the clever manipulation of the ground plane around the building framed by the fosse.Thus those within the tower the interior lobbies are discretely separated and elevated away from the surrounding streets.Contrasting paving patterns and stone finishes further dif145、ferentiates from sidewalk from the setback,the inside from the outside.Vertical surfaces combine stone and wood with the wood predominatingThe woodwork with be progressively more refined and more polished and more continuous the further into the building it is located,helping emphasis the distance f146、rom outside to inside.我们把大厦牢牢地扎根地上,深植于该地区,耸立在公园旁,不容忽视。方正的形体代表坚固、可靠、恒久。四个入口占据大楼的四面,主要朝向则是业主的专用正门。每个入口都有独立的门户,融入塔楼四周的石材地坪广场一条小渠道作为街道和大厅的分界。大堂的地坪被巧妙地提高到周围的基准之上,因为大厦周围的地平面被巧妙地渠道所围绕。因此,塔楼内部的大堂被抬高,远离周围的街道。对比的铺面图案和石材饰面,进一步区别人行道和建筑退线;内外有别。竖向表面结合石材和木制面材,并且以木制饰面为主越往里走木制饰面更加精致,更光滑,更连续,突显从外到内的距离。底楼大厅效果图Main ent147、rance lobby viewRogersStirkHarbour+Partners|AUBERogersStirkHarbour+Partners|AUBE前海之窗|WindowsofQianhai4948前海之窗|WindowsofQianhai业主专用入口QFH and Century private entrace露台瞭望Balcony Look-outsThe balcony spaces give voice to the working communities housed within the Tower.At the same time these openings fra148、me vistas,open up views onto the surroundings and beyondThey signal,in each direction,the presence of Qianhai Financial Holdings Co.Ltd and Century Securities Co Ltd at the nexus of Qianwan The Look-outs will be the focus of the communities that will call the new Tower homeAccess to these informal o149、utdoor spaces is fundamental to health and wellbeing of the workforce thus the look-outs are not formal spaces but spaces to be occupied,used and enjoyed.To ensure they are attractive and active they will be carefully designed to ensure they can be utilised all year round.In a climate characterised 150、by heat and humidity for much of the year,one that is subject to the extremes of the monsoon season,the balconies will be designed in such a way that the communal space can be used whatever the time of day,whatever the time of year,whatever the weather.As can be seen from the following illustration 151、each community space will have a different feel and character.露台空间为塔楼内办公的社群提供畅所欲言的空间。这些开口也创造框景,眺望周遭和更远的空间视野。这些开口向四面八方传达前海金控和世纪证券在前海核心区的存在瞭望台将是未来进驻本案的社群的聚点进入这些非正式的”户外”空间对员工的健康和福祉至关重要,因此,瞭望区不是正式的空间,而是要供人占用、使用、享用受的空间。为了确保这些空间宜人热闹,它们将被精心设计,以确保全天候都皆可使用。深圳大多时间都是湿热的气候,还有梅雨季,但露台被设计成不分昼夜、全年、全天候都可以的共享空间。从下图中可152、以看到每个社群空间都有不同的氛围和特色。银色湾景观赏台The Bay window Silver 金色山景观赏台Mountain Bay Window Gold 金色山景观赏台Mountain bay window view铜色河流观赏台River Bay Window BronceRogersStirkHarbour+Partners|AUBERogersStirkHarbour+Partners|AUBE前海之窗|WindowsofQianhai5150前海之窗|WindowsofQianhai环境影响分析Environmental analysis RogersStirkHarbour+153、Partners|AUBERogersStirkHarbour+Partners|AUBE前海之窗|WindowsofQianhai5352前海之窗|WindowsofQianhaiNSENWSWNE深圳的太阳路径(北纬22.5o、东经114.0o)Sun path diagram Shenzhen(22.5oN,114.0oE)周围建筑物的影响Impact of surrounding buildings较低的楼层受益于临近高楼的保护Lower floors remain protected due to tall buildings next to the site东南和西南立面具有高曝光154、度High exposure on SE and SW facades凹陷式阳台提供部分遮阳保护Recessed balconies offer some solar protection8006004002000120090015001800kWh/m2kWh/m260030005432SWNWSENE112181509正午前低角度的太阳光照Low angled sun before lunchtime.Balcony 4|SE Solar exposure:10-12:0012181509Balcony 3|NW Solar exposure:17-19:00午后较晚时间的太阳光照,特别是155、在最热的月份。Late afternoon sun,especially during hottest months.12181509Balcony 2|NE Solar exposure:08-10:00清晨的太阳(上班时间前)。Early morning sun(before office hours).12181509Balcony 1|SW Solar exposure:12-17:00下午大部分时间的光照-一天里最热的时候。由于位置较低,太阳曝晒较少。Most of the afternoon.Radiation during warmest part of the day.Less156、 radiation due to low elevation.Climatic Exposure:Solar At 22.5oN,Shenzhen experiences a clear distinction of received solar radiation in different orientations.Due to tall surroundings,some of the facades and balconies benefit from mutual shading and reduced solar exposure(adjacent images on the ri157、ght).All the balconies are assessed for orientation and the time at which direct solar radiation would be received on balcony floors.This is presented on far right on this page.Based on this,the level of criticality in terms of solar exposure is summarised.气候特征:太阳光照深圳地处北纬22.5度,不同的方向接收的太阳辐射的明显区别。由于周围158、高大的建筑物,一些建筑的外墙和阳台面可提供相互遮荫功能,减少太阳暴露(如右边所示)。所有阳台的分析都是按照阳台的朝向和阳台地板接收直接太阳辐射的时间而评估的,如本页最右侧图示。在此基础上,我们总结了太阳辐照的影响程度。8006004002000120090015001800kWh/m2kWh/m26003000SENWNESW环境影响分析Environmental analysis RogersStirkHarbour+Partners|AUBERogersStirkHarbour+Partners|AUBE前海之窗|WindowsofQianhai5554前海之窗|WindowsofQian159、hai东北、西北面外墙面临较大的风压High pressures on facades facing NE and NW东南面和西南面外墙面临较低的风压SE SW Facades experience low pressures554321N-NEQFH&CenturyTower0m/s2468m/s+风速 Wind speeds压力 Pressure-10-20pa2001025pa+3顶层露台自然通风Terraces exposed to passing winds.有些阳台风速较高,路径清晰,无障碍。Higher wind speeds seen in case of a through160、 window.Wind follows a clear unobstructed path.开放空间可能会在拐角处感受到更高的风速。凹式阳台会自然进风,但没有出风口。Open spaces directly facing the winds may experience higher wind speeds in corners.Recessed balconies attract winds but has no place to go.Climatic Exposure:Wind Understanding local wind patterns can assist in design161、ing both wind protection and ventilation strategy for the open spaces.The design was assessed for winds from North North-east(as seen from local weather stations),and combining the effect of surrounding buildings.Wind direction for cooler months of the year.7am-7pm.Wind speed of 5m/s assumed.气候特征:季风162、了解地方季风特征可协助设计为开放空间提供防风和通风策略。该塔楼的设计主要是根据“一年里相对凉爽的月份,从早7点至晚7点的北风东北风来评估的(根据当地气象站的情况),并结合了基地附近建筑物的影响。假定风速为5米/秒Wind speeds压力 Pressure-10-20pa2001025pa+环境影响分析Environmental analysis RogersStirkHarbour+Partners|AUBERogersStirkHarbour+Partners|AUBE前海之窗|WindowsofQianhai5756前海之窗|WindowsofQianhai?29oC30oC31oC32163、oC33oC34oC?35oC阳台1|西南Balcony 1|SWUniversalThermalClimateIndex1:Trees/vegetation2:Hard Paving气温Air Temp.UTCI/Feels like3:Canopy4:Green/grass cover+2oC+5oC-2oC+4oC日晒Solar暴露级别Level of Exposure风吹Wind阳台2|东北Balcony 2|NE阳台3|西北Balcony 3|NW阳台4|东南Balcony 4|SE露台5|360度Terrace 5|360o室外舒适度模拟/UTCI(上图)显示不同景观配置下的使用者164、体验。Outdoor Comfort simulations/UTCI(above)-Show what occupants would experience with different landscape treatments.树木/植栽硬铺面遮棚绿化/草皮体感温度通用气候指标Environmental Design Considerations Shenzhen has a sub-tropical climate.Dry,mild winters are followed by warm,humid and wet summers.Though the temperature rise165、 is not significant,increase in humidity and reduction in air speeds could cause discomfort.At the same time,standing in an open space in a tall building could be very windy and uncomfortable.The design aims to provide a balance between protected and open/connected to nature spaces.This is achieved 166、by:Creating weather-protected barriers Surface treatment and landscaping improving comfort conditions Subdividing spaces and treating each one differently as per occupancy patterns环境设计考虑深圳为亚热带气候。.冬季干燥、温和,夏季温暖、湿润而多雨。夏季气温上升但并不显著,而湿度会明显增加,空气流速降低也会引起不适。如果站在高楼的开阔空间里,可能风大,也不舒服。我们的设计旨在在”受保护”和”与自然开放/连接”空间之间167、通过一下方法获取平衡:设置天气防护屏 表面处理及景观美化改善舒适条件 将空间细分,并根据用途区别对待每一空间环境影响分析Environmental analysis RogersStirkHarbour+Partners|AUBERogersStirkHarbour+Partners|AUBE前海之窗|WindowsofQianhai5958前海之窗|WindowsofQianhaiABCDCB8006004002000120090015001800kWh/m2kWh/m260030001:分析楼平面Analyse floor plan2:建立”环境区划”Establish environme168、ntal zoning3:设计围护结构Design enclosures提供不同舒适等级的空间Spaces offering different grades of ComfortABCDClose environmental control of office spacesQFH Terrace 前海金控大厦露台Semi outdoor space with some environmental control and is closely linked to office spaceTemperedairsupplyWeatherprotectionViews to ShenzhenEdg169、e of balcony/terraceIncreased contact with outdoor environment.With a certain degree of protection from weather elements咖啡厅/休闲/活动空间Cafe/relaxation/event spaces户外座位空间Outdoor Seating areas空中阳台/户外座位Sky Terrace Outdoor SeatingOutdoor spaces towards the edge of the balconies/terraces.Mostly exposed to we170、ather elements一年中较舒适的时间段Comfortable periods over the year4:微气候处理营造室外舒适度Microclimatic Treatment for outdoor comfortSemicontrolledenvironment半控制的环境ABCD大楼露台年日照辐射分析Annual solar radiation analysis for QFH Terrace将地板按功能区分每种功能都有不同的舒适标准和使用模式。Divide floor area into functions-each with different comfort crite171、ria and usage patterns大楼露台年日照辐射。Annual solar radiation analysis for QFH Terrace设计景观/表面处理以实现室外舒适。Designing landscape/surface treatments to achieve outdoor comfort.办公空间Office spaces半开放式室外空间紧邻办公空间,设有部分环境控制更加接近室外空间,有一定程度的天气保护靠近阳台边缘的室外空间大部分暴露于天然气候之中办公空间的环境控制处理过的新鲜空气抵挡风吹日晒雨淋Designing for Outdoor Comfort A172、 step by step approach is taken to develop a balcony design.Different spaces offering different grades of comfort,each grade can be adopted for different times of the year.The final design maintains an unobstructed connectivity to Shenzhen.户外舒适度的设计阳台设计是通过逐步分析而成形。提供不同舒适等级的不同空间,每个“等级”也可因应季节进行调整。最终的设计也173、确保了与深圳的视觉连接畅通无阻。环境影响分析Environmental analysis RogersStirkHarbour+Partners|AUBERogersStirkHarbour+Partners|AUBE前海之窗|WindowsofQianhai6160前海之窗|WindowsofQianhai顶层露台Roof Top TerraceEach facet of the Tower celebrates a different vistas.In order the sequence of cut-outs create windows onto each of the key f174、eatures in the surroundings are:Park River Bay MountainsPlanning guidelines permit the Tower for Qianhai Financial Holdings Co.Ltd and Century Securities Co Ltd to climb to a height of 220 m which is somewhat taller than the heights permitted for buildings in the surrounding plots.Thus the summit of175、 the Qianhai Financial Holding tower will have views in all directions enabling it to have vistas of all the features.The four corner mega columns unite to create a skyline pagoda.This frame neatly closes and completes the tower.All the different activities within the tower are thus contained within176、 the simple frame.The pagoda like structure atop the building supports a quadrant of giant vanes that,during the day will refract the sunlight and project gentle beams of light down into the interior courtyard that forms the heart of the new offices for Qianhai Financial Holdings.At night time the s177、ame vanes will reflect the light emerging from the interior light-well creating a very discrete rooftop lantern The light blades also provide shade for a sky garden that surrounds the skylight.A circular deck provides a recreational walkway around the inner edge of the rooftop planting and from this178、 promenade visitors can enjoy the panorama over sea,mountains,river and trees.大厦每一面都有不同的景观。切口朝向周遭主要的特色景观,依序为:公园 河流 海湾 群山导则允许前海金控和世纪证券的塔楼高达220,该高度略高于周遭建筑物的允许高度,所以前海金控的顶楼将享受四面八方的景色,饱览全部特色景观。四个角落的巨柱共同创造天际线宝塔,整齐地围合成完整的建筑,以简单的构架容纳大厦内部所有活动。顶层如宝塔般的结构支撑着巨大的扇形叶片,白天折射阳光,将柔和的光束投射到内部庭院中,把庭院空间变成前海金控新办公室的核心。入夜后,同179、样的叶片将反射从内部光井产生的光,形成一座独特的屋顶天窗灯光叶片为天窗周围的空中花园提供遮蔽。环形甲板在屋顶绿化内缘形成一条休闲走廊,访客可从这里欣赏山、海、河、森林全景。屋顶结构的材质将结合清澈的玻璃和木质材料。顶楼观景台Tower top sky terrace顶楼观景台Tower top terrace view顶楼观景台视野Views from the top of the buildingRogersStirkHarbour+Partners|AUBERogersStirkHarbour+Partners|AUBE前海之窗|WindowsofQianhai6362前海之窗|Windo180、wsofQianhai建筑设计素材网 h t t p s:/w w w.j z s u ca i.co m/景观概念Landscape Concept景观设计概念取意于前海湾水面的波光粼粼,闪耀在项目周边,让场地熠熠生辉。水面随机的波光抽象意像体现在铺面、植栽和水景的长方形体,同时呼应着建筑设计语言。The landscape concept aims to show an extension of the sparkles on Shenzhen Bay to the site.Random rectangles abstracted from sparkles on water expre181、ssed in paving,planting and water feature,at the same time responding to the similar design language of architecture.不同颜色的长条铺装Paving strips with different colors各种深浅的长条绿色植栽Planting strips with different green高低起伏石材特色水景Water feature with stones of different heightsabc景观总平面Landscape Masterplan12345761182、234576塔楼主出入口Main Entrance特色植栽Feature Planting特色水景Water Feature落客区水景Drop-off Area Water Feature消防登高面Firefighting Field南公园景观亭楼South Park Pavilion南公园树阵South Park Tree ArrayRogersStirkHarbour+Partners|AUBERogersStirkHarbour+Partners|AUBE前海之窗|WindowsofQianhai6564前海之窗|WindowsofQianhai高程设计Level Design+0.00183、+0.00+0.00FFE+0.50+0.50+0.40+0.30+0.30流线及分区Circulation System and Zoning人行流线Pedestrian Route落客区Drop-off Area交通功能区Traffic Area城市干道界面Primary Road Interface塔楼主入口界面Tower Main Entrance首层到达通道Ground Floor Arriving Access往南公园的地道Underpass to South Park车行流线Vehicle Route主要分区Main ZonesRogersStirkHarbour+Partner184、s|AUBERogersStirkHarbour+Partners|AUBE前海之窗|WindowsofQianhai6766前海之窗|WindowsofQianhai节点设计-塔楼主入口Node Design-Tower Main Entrance首层南侧尽量利用红线内的范围塑造绿化,视觉延伸引导至南公园。绿带刻意深浅对比排布,营造利落、大气、灵动的效果。Green area is enlarged to full extent in boundary line at south side,creating an extension to the south park.Planting st185、rips with jumping green are clean,grand and vivid.节点设计-城市干道界面Node Design-Primary Road Interface首层西侧打造特色水景面向城市次干道,形成项目最聚焦的昭示面。水面结合干净的地被和草坪,引导各个方向都通透的视线抵达建筑主体。A focal water feature is created at the west side facing to the municipal primary road.With clean groundcover and lawn,views from different dir186、ections can be led directly to the building.RogersStirkHarbour+Partners|AUBERogersStirkHarbour+Partners|AUBE前海之窗|WindowsofQianhai6968前海之窗|WindowsofQianhai节点设计-交通区Node Design-Traffic Area北侧存在大量交通疏散功能,植物的设计以屏蔽杂乱构筑和快速引导流线为原则。同时尽可能利用红线内的面积打造绿化,增加首层绿量。The planting design at the north is to buffer the com187、plicated traffic area and create clear circulation for pedestrians.At the same time,green area is enlarged extremely in the boundary line to increase green ratio.节点设计-落客区Node Design-Drop-off Area落客区的特色景观延续西侧水景设计语言,通过跌宕的流水和潺潺水声回应河流和港湾的设计主题。Water feature of same language as the west one is put in the 188、drop-off area.The running water and sounds created are both reacting the design themes RIVER and BAY.RogersStirkHarbour+Partners|AUBERogersStirkHarbour+Partners|AUBE前海之窗|WindowsofQianhai7170前海之窗|WindowsofQianhai运用不同的绿色打造简洁直线型的条形种植带,回应景观设计概念;局部点缀不阻挡太多建筑立面的特色大灌木。Use shrubs with varied green to create 189、simple and clean planting strips to respond to the landscape concept and control the height of big shrubs among shrubs and groundcover to well show architecture大型乔木使用在远离建筑立面的市政道边界用以提供遮阳;南公园使用高开枝,树冠通透的乔木品种。Big trees are used along the municipal roads to provide shades.Trees with high branches and tra190、nsparent crown are suggested in the south park to give clear view corridors.合理围合大量的交通空间引导流线,增加红线内绿化面积Make use of green buffer to create better circulation on north side and enlarge green area in boundary line空间宽裕处两侧增加两到三棵树,以不阻挡建筑丰富的构造为原则怕;平台可适量增加休息座椅Add two to three trees at the corner to well show 191、the architecture.Seatings can be put in the large platforms.局部增加攀爬植物软化栏杆立面Soften railings by partly adding climbers面向城市干道的界面设置水景聚焦Water feature becomes the focal scene facing to the municipal main road植栽策略Planting Strategy基础品种Basic Species灌木及地被Shrub and Groundcover乔木Tree米仔兰Aglaia odorata Lour.花叶假连翘D192、uranta repens var.Variegata小叶紫薇Lagerstroemia indica花叶女贞Ligustrum sinense Variegatum香樟Cinnamomum camphora凤凰木Delonix regia胡椒木Zanthoxylum piperitum Benn.朴树Celtis sinensis Pers.小叶榄仁Terminalia neotaliala黄金香柳Melaleuca bracteata F.Muell.首层设计Ground Floor Design设计主题公园Theme PARK东侧及北侧East and North西侧及南侧West an193、d SouthRogersStirkHarbour+Partners|AUBERogersStirkHarbour+Partners|AUBE前海之窗|WindowsofQianhai7372前海之窗|WindowsofQianhai架空层设计Balcony Design局部增加攀爬植物软化栏杆立面Soften railings by partly adding climbers光线好的位置适量增加小乔木Add certain small trees in sunny area水石榕Elaeocarpus hainanensis Oliver鸡爪槭Acer palmatum Thunb.细叶芒194、Miscanthus sinensis cv.非洲凌霄Podranea ricasoliana(Tanfani)Sprague设计主题河流THEME RIVER架空层设计Balcony Design圆叶轴榈Licuala grandis H.Wendl.光棍树锦Euphorbia tirucalli Rosea马鞍藤Ipomoea pes-caprae(L.)Sweet光线好的位置适量增加小乔木,以不阻挡建筑丰富的构造为原则Add certain small trees in sunny area but well show the architecture structure廊架上适量增加攀195、爬植物Soften the feature structure by partly adding climbers宽裕的平台上适量增加座椅Add seatings in large platforms设计主题港湾THEME BAYRogersStirkHarbour+Partners|AUBERogersStirkHarbour+Partners|AUBE前海之窗|WindowsofQianhai7574前海之窗|WindowsofQianhai露台设计Balcony Design局部增加攀爬植物软化特色构造立面Soften the feature structure by partly ad196、ding climbers光线好的位置适量增加小乔木Add certain small trees in sunny area屋顶花园设计Roof Garden Design四个角位形成较私密休息或外摆区Corners become the private seating area or outdoor dinning to provide the most luxury experience in roof通过增加绿量软化幕墙;放射形植物带分隔休息空间Soften the glass wall by adding green area along the edge.Create radial197、 planting strips to divide seating area面向建筑出入口的范围成为公共观赏区Area facing to the entrances of building becomes the public viewing area设计主题山丘THEME MOUNTAIN铁冬青Ilex rotunda Thunb石榴Punica granatum L.鸟巢蕨Asplenium nidus花叶常春藤Hedera nepalensis金红羽狼尾草Pennisetum setaceum(Forssk.)Chiov.花叶女贞Ligustrum sinense Variegatu198、m小叶紫薇Lagerstroemia indica朴树Celtis sinensis Pers.RogersStirkHarbour+Partners|AUBERogersStirkHarbour+Partners|AUBE前海之窗|WindowsofQianhai7776前海之窗|WindowsofQianhai海绵城市Sponge CitySponge City Construction StrategyBy establishing a low-impact development ecological sponge system,collecting building water,us199、ing a water purification system to meet landscape water standards,and storing it underground.Purify water quality by designing rainwater wetlands,recessed green spaces,biological retention ponds,etc.Concentrated Application of Six Elements of SpongeBy solving the six elements of sponge on different 200、outstanding problems,we can achieve the most efficient use of sponge city in this project.海绵城市建设策略通过建立一个低影响开发的生态海绵体系,收集建筑用水,利用水净化系统达到景观用水标准,储存于地下。通过设计雨水湿地、下凹绿地、生物滞留池等净化水质。海绵六要素的几种运用通过海绵六要素在不同突出问题上针对性的解决,从而达到海绵城市在项目中最高效的运用渗渗透塘、透水铺装、绿色屋顶、下沉绿地。净土壤渗滤、人工湿地植被缓冲带用景观水景用水、浇灌用水、城市路面清洁用水排城市管网、自然水体滞生态植草沟、植被缓冲带、201、下沉绿地、雨水花园。蓄生态植草沟、植被缓冲带、下沉绿地、雨水花园。Penertration pond,permeable pavment,green roof,sinking green spacePenertration pond,permeable pavment,green roof,sinking green spaceLnadscape water use watering urban pavement clean watereUrban pipe network,natural water bodyceEcological grass ditch,vegetation buffer202、 zone,sinking green space,rain gardenEcological grass ditch,vegetation buffer zone,sinking green space,rain garden低洼绿地Low Elevation Greenbelt生态草沟Ecological Grass Swale雨水花园Rainwater Garden雨水流向Water FlowLow Elevation GreenbeltThe low elevation greenbelt has the function of supplementing the undergroun203、d,regulating runoff and flood detention,and reducing runoff pollutants.低洼绿地低洼绿地具有补充地下谁,调节径流和滞洪以及削减径流污染物的作用。Ecological Grass SwaleEcological grass ditch can meet the needs of alleviating instantaneous rainstorms,purifying surface runoff water quality,and providing ecological habitat for animals.生态草沟生204、态草沟可以满足缓解瞬时暴雨、净化地表径流水质,为动物提供生态栖息地需求。Rainwater GardenRetaining rainwater to infiltrate to replenish the ground and reduce the flood peaks of storm surface runoff.It can also reduce pollution through processes such as adsorption,degradation,ion exchange and volatilization.雨水花园将雨水滞留下渗来补充地下谁并降低暴雨地表径流的洪峰205、,还可吸附、降解、离子交换和挥发等过程减少污染。RogersStirkHarbour+Partners|AUBERogersStirkHarbour+Partners|AUBE前海之窗|WindowsofQianhai7978前海之窗|WindowsofQianhaiEach occupant enjoys a principle view and address;parkland,river,bay,mountain and sky.These are codified by noble materials;greenery,bronze,silver,gold and diamond.Th206、e diurnal and nocturnal plays with these finishes to amplify the circadian rhythms,and the modern requirements for providing a home at work,as well as a workplace at home.The bright full spectrum makes way for the evening warmth and calm.Parkland terraces and patios are small techtonic plates hewn a207、nd elevated.They are a stage to the local area.The bronze terraced bay window is a series of river deltas,emanating from the core as its source.The silver terraced bay window crackles to the tune of the grid city,shimmering and fractal,connected and synapse tingling.The gold tubed bay window echoes 208、the vertical dance of the mountain silhouette.It captures the crepuscular rays spilling over the ridgelines.It bathes in the light,and provides a warmth and integrity to befit the occupants stature.The diamond,crystalline rotunda is omnidirectional,welcoming within and without.It provides a funnel t209、o draw light into the atrium below,and as a spout to greet the night sky.Epic views are entertained across and up to the stars above.The balconies provide respite and healthy escape from the demands of work.The character encourages momentary escapism and reflection,connecting to the geographical fea210、tures afar.The bay windows like the Shenzhen Bay itself,harbour and focus hidden energies.They are habitable pavilions,shelters in the sky functional and emotive.Expressive like stage sets of the opera.The city is the audience,the performance happens between there and the stage.大楼的每个用户都拥有自己独特的视野与位置;211、公园,河流,海湾,山脉和天空。这些都对应着天然材质:绿地、青铜、金银钻石。所有这些元素为白天黑夜增添了旋律,也满足了现代人对办公室家庭感和在家办公的要求。明亮的灯光也带来了夜晚的宁静祥和。公园的阶梯和露台都是小型的构造板块,并逐渐抬高,成为当地社群的的活动中心。青铜色飘窗如同河流的三角洲一般,从建筑的中心延伸出来。银白色的飘窗跳入城市网格,闪闪发亮,交合分离。金黄色飘窗的管饰与远山的剪影相呼应,捕获了山脊之上、云隙之间的光线。它的光照度创造了温馨而又稳实的感觉,与用户的身份完全匹配。圆形钻石晶体是全方位的,内外兼容。它像漏斗一样将光线吸引到下面的中庭,也像喷泉一般往上迎接夜空。这里既可纵贯全景212、也可仰望星空。露台成为工作期间放松休息的舒缓空间,提供短暂的休憩还可观赏远方的美景。这些窗台就像深圳湾一样,聚集着无线潜能。它们是非常实用的亭台,空中遮护台兼具功能性与情调感,如同歌剧舞台的布景一般,城市是观众,精彩演出就发生在舞台和剧幕之间。建筑材料MaterialityRogersStirkHarbour+Partners|AUBERogersStirkHarbour+Partners|AUBE前海之窗|WindowsofQianhai8180前海之窗|WindowsofQianhai设计图纸Design drawings平面图Plans首层平面图Ground floor plan裙楼平面213、图-二楼Podium plan-Level 02RogersStirkHarbour+Partners|AUBERogersStirkHarbour+Partners|AUBE前海之窗|WindowsofQianhai8584前海之窗|WindowsofQianhai裙楼平面图-三楼Podium plan-Level 03平面图Plans裙楼平面图-四楼 Podium plan-Level 04RogersStirkHarbour+Partners|AUBERogersStirkHarbour+Partners|AUBE前海之窗|WindowsofQianhai8786前海之窗|Windows214、ofQianhai建筑设计素材网 h t t p s:/w w w.j z s u ca i.co m/裙楼平面图-五楼Podium plan-Level 05平面图Plans裙楼平面图-六楼 Podium plan-Level 06RogersStirkHarbour+Partners|AUBERogersStirkHarbour+Partners|AUBE前海之窗|WindowsofQianhai8988前海之窗|WindowsofQianhai平面图Plans世纪证券-标准办公楼层平面图Century typical office plan世纪证券-空中大厅平面图Century sky 215、lobby terrace planRogersStirkHarbour+Partners|AUBERogersStirkHarbour+Partners|AUBE前海之窗|WindowsofQianhai9190前海之窗|WindowsofQianhai建筑设计素材网 h t t p s:/w w w.j z s u ca i.co m/前海金控-标准办公楼层平面图QFH typical office plan平面图Plans前海金控-空中阳台平面图QFH sky lobby terrace planRogersStirkHarbour+Partners|AUBERogersStirkHar216、bour+Partners|AUBE前海之窗|WindowsofQianhai9392前海之窗|WindowsofQianhai平面图Plans低层-标准办公楼层平面图Low rise typical office plan中高层-标准办公楼层平面图Midd rise typical office planRogersStirkHarbour+Partners|AUBERogersStirkHarbour+Partners|AUBE前海之窗|WindowsofQianhai9594前海之窗|WindowsofQianhai建筑设计素材网 h t t p s:/w w w.j z s u ca 217、i.co m/平面图Plans屋顶露台平面图Roof terrace plan 屋顶平面图Roof planRogersStirkHarbour+Partners|AUBERogersStirkHarbour+Partners|AUBE前海之窗|WindowsofQianhai9796前海之窗|WindowsofQianhai地下室平面图Basement PlanTower commercial liftsPodium pasenger liftsExecutive liftsTower fire refuge liftsService roomElevator lobbyAutomobile218、 parkingBasement areaNumer of parking 机动车停车位设备用房电梯厅地下室面积5933.8本层停车位机动车:144辆塔楼商业电梯裙房客梯VIP电梯塔楼消防电梯05N1025m123地下三层平面-3Basementfloor1112222333任务书对地下空间的要求也是一项考验,因为必须整合各种不同的功能:有很大部分的商业必须布置在地下。地下层必须提供两个相邻地铁站的连接。停车空间必须设在地下。任务书最重要的部分是商业空间,其中有大部分是餐饮店。商业空间的既定目标是为大楼租户提供配套设施,同时吸引附近居民前来。于是人潮络绎不绝,从而丰富了用地的使用体验,增进商户219、入驻的意愿。为了最大限度提高地下商业空间的质量,我们创造了下沉庭院,除了可以从这里可看见商店,还为地下室配套提供自然采光和对外景观。此外下沉庭院打开了通往地铁的连接性,使得地下交通空间更清晰和吸引人。因此基地提供了非常显眼和极为便利的方式出入地下世界,增加整体商业空间的人潮,提高商业价值。因此可以预计下沉中庭将成为当地的高人气聚点,不只是大厦用户,还将嘉惠附近街坊邻里。下沉中庭将扩大和丰富大厦首层的公共空间,创造高商业价值的街景。根据我们的设计经验,任何高人气公共空间相关的建筑都将成为城市知名地标,连带提升房产的价值。Basement areaNumer of parking本层停车位机动车:220、152辆Service roomElevator lobbyAutomobile parking机动车停车位设备用房电梯厅123Service roomElevator lobbyAutomobile parking机动车停车位设备用房电梯厅123111222333111222333地下四层平面-4Basementfloor地下五层平面-5 Basement floor05N1025m地下室面积5933.8Basement areaNumer of parking 本层停车位机动车:144辆 地下室面积5933.8The brief for the below ground areas is 221、demanding.A lot of different functions needs to be accommodated in the basements:A significant portion of the retail component has to be below ground.The basement levels need to provide links to the two adjacent metro stations.Parking spaces have to be provided below ground.The most important compon222、ent of this brief is the commercial space,much of which will be food and beverage related.The stated objective of the commercial space is to provide amenity for the buildings tenants whilst also attracting people from the surrounding neighbourhood.The resultant activity will enrich the experience on223、 site,thereby enhancing the attractiveness of the tower to tenants.To maximise the quality of the below ground commercial space we have created a generous patio that not only establishes visibility to the commercial content but also introduces daylight and aspect to the commercial offer located belo224、w ground.At the same time this patio opens up a clear and attractive entrance route to the network of tunnels that lead to the metro.Thus this site will provide a very visible and extremely accessible entryway into this underground world.This will enhance footfall across the commercial space increas225、ing its value.It can therefore be anticipated that this patio space will become a popular gathering spot not only for the occupants of the Tower but for the whole neighbourhood.The sunken patio will expand and enriches the public realm at the foot of the tower,making a valuable contribution to the s226、treetscape.As our portfolio of projects demonstrates a building associated with a popular public space becomes a well-known landmark in the city.Securing landmark quality will in turn,enhance the value of a property.Tower commercial liftsPodium pasenger liftsExecutive liftsTower fire refuge lifts塔楼商227、业电梯裙房客梯VIP电梯塔楼消防电梯RogersStirkHarbour+Partners|AUBERogersStirkHarbour+Partners|AUBE前海之窗|WindowsofQianhai9998前海之窗|WindowsofQianhaiACCESS FROMBASEMENTTO PARKACCESS FROMBASEMENTTO ADJACENTBUILDINGLINK TOQUINWANMETROLOADINGBAY24 hour public passage areaTower commercial liftsTower commercial liftsPodium p228、asenger liftsPodium pasenger liftsExecutive liftsExecutive liftsTower fire refuge liftsTower fire refuge liftsLoading bayCommercialService roomElevator lobbyElevator lobbyEscalator lobbyBicycle parkingAutomobile parkingBasement areaBasement areaNumer of parkingNumer of parking地下室平面图Basement Plan非机动车229、停车位机动车停车位连接地铁连接相邻东侧宗地商业卸货区设备用房电梯厅电梯厅扶梯厅连接南侧绿地公园地下室面积5933.8地下室面积5933.824小时公共通道面积876.6地下一层平面-1 Basement floor地下二层平面-2 Basement floor本层停车位机动车:3辆非机动车:390本层停车位机动车:82辆塔楼商业电梯塔楼商业电梯裙房客梯裙房客梯VIP电梯VIP电梯塔楼消防电梯塔楼消防电梯05N1025m05N1025m111222211223333344551111111332RogersStirkHarbour+Partners|AUBERogersStirkHarbour+230、Partners|AUBE前海之窗|WindowsofQianhai101100前海之窗|WindowsofQianhai立面图Elevations北立面North elevation南立面South elevationRogersStirkHarbour+Partners|AUBERogersStirkHarbour+Partners|AUBE前海之窗|WindowsofQianhai103102前海之窗|WindowsofQianhai立面图Elevations东立面East elevation西立面West elevationRogersStirkHarbour+Partners|AUB231、ERogersStirkHarbour+Partners|AUBE前海之窗|WindowsofQianhai105104前海之窗|WindowsofQianhai剖面图Site section剖面-AALong section AA剖面-BBCross section BBRogersStirkHarbour+Partners|AUBERogersStirkHarbour+Partners|AUBE前海之窗|WindowsofQianhai107106前海之窗|WindowsofQianhai建筑设计素材网 h t t p s:/w w w.j z s u ca i.co m/FloorLev232、elDatum(m)FloorHeight(m)RetailArea(m)OfficeGrossArea(mConferenceCentre(m)Cafeteria(m)PlantArea/MEP(m)Core(m)CoWorking(m)230.80Top218.8012.0046214.304.5053145209.804.5053144205.304.502,29620043200.804.5052942196.304.502,29641191.804.502,29640187.304.502,29639182.804.501,86838178.304.502,01637173.804.233、501,70636167.806.0074052935163.304.502,29634158.804.502,29633154.304.502,29632149.804.501,86831145.304.502,01630140.804.501,70629136.304.502,29628131.804.502,29627127.304.502,29626122.804.502,29625118.304.502,29624113.804.502,29623107.806.0075052922103.304.502,2962198.804.502,2962094.304.502,2961989234、.804.502,2961885.304.502,2961780.804.502,2961676.304.502,2961571.804.502,2961467.304.502,2961362.804.502,2961258.304.502,2961153.804.502,2964405291047.806.00943.304.502,296838.804.502,296734.304.502,296629.804.502,224208525.304.502,286208419.306.002,4570208ConferenceCentreCoWorking313.905.405442,000235、2081,27128.505.403,009208CommercialM14.004.001,058CommercialLobby10.008.501,7702,00010020810,34781,5312,00002,0303,3641,271CommercialPlantArea(m)CarParkingArea(m)Core&CirculationArea(m)CarParkingSpacesBicycleParkingSpacesBicycleParkingCommercialB15.405.4037001,29271027200B28.903.505,278422130187B312236、.403.505,278422130B415.903.505,278422130B519.403.505,2784223,7005,27817,1262,39841738728,502TOTALQianhaiFinancialHoldingsAreaScheduleCarParkingCarParkingOverrunFunctionMidRiseOffice(Tenant)MidRiseOffice(Tenant)SkyLobby(QFH)Roof(TopofTower)SkyLobby(Century)SkyLobby(Century)LowRiseOfficeLowRiseOffice1237、00,543TOTALGFATOWERTOTALCommercial(Skyterrace)Commercial(Skyterrace)CanteenCommercialLowRiseOfficeLowRiseOfficeFireRefuge+PlantLowRiseOfficeRoofGarden(QFH)RoofGarden(QFH)SkyLobby(QFH)LowRiseOfficeFireRefuge+PlantMidRiseOffice(Tenant)LowRiseOfficeMidRiseOffice(Tenant)MidRiseOffice(Tenant)MidSkyterrac238、e(Tenant)MidSkyterrace(Tenant)MidSkyterrace(Tenant)LowRiseOfficeLowRiseOfficeLowRiseOfficeSkyLobby(QFH)CarParkingPlantHighRiseOffice(QFH)PlantRoofGarden(QFH)FireRefuge+PlantHighRiseOffice(Century)MidRiseOffice(Tenant)HighRiseOffice(Century)HighRiseOffice(Century)MidRiseOffice(Tenant)SkyLobby(Century239、)MidRiseOffice(Tenant)TOTALGFABASEMENTHighRiseOffice(QFH)HighRiseOffice(QFH)体量和功能Massing and Uses The tower will be occupied by premier financial organisations and to support these activities a range of complimentary uses need to be provided.These amenities are a key element of a strategy to humaniz240、e the workplace and promote a sense of community.However great care has to be taken in integrating these two different types of activities.Each has quite distinct set of requirements and the relationships between activities needs to complementary and not create conflicts.The successful integration o241、f workplace and social space into a living,vibrant community will be the measure of the success of the project The communal spirit of the tower will be important in attracting and retaining occupants.First and foremost the Tower will be a place of work and the supporting amenities need to be housed 242、within the building without detracting from the gravitas of the Tower.Considerable care has been taken in the distribution of the Towers amenities space such that each can be clearly articulated as independent yet interlocking components.The clarity of the Towers corner structure and cruciform core 243、provide a robust framework which permits the insert of pavilion with Tower in an order and coherent manner.该塔将由高端的金融机构使用,因此需要提供一系列配套设施以支持相应的活动。这些配套设施是将工作场所人性化的关键,同时促进社群归属感。然而,整合这两种活动必须格外谨慎,因为各有不同的需求,活动彼此必须互补而非互斥。项目的成败关键就在于如何成功将工作和社交场所整合成一个活力生活圈。大厦的共享精神将是吸引使用者进驻且长居久安的关键。首要重点在于大厦是个工作场所,各项配套设施的布置必须不减损大244、厦的稳重感。在配套空间分布方面也相当谨慎,每个配套功能都能够既独立又相互关联。大厦转角清晰的结构和十字核心筒提供健全的框架,能够以有序有致的方式穿插亭楼。RogersStirkHarbour+Partners|AUBERogersStirkHarbour+Partners|AUBE前海之窗|WindowsofQianhai109108前海之窗|WindowsofQianhai电梯配置策略Vertical transportation statement电梯配置示意图Vertical transportation diagram底层核心平面图Ground floor core plan标准中高层245、核心平面图Typical middle rise core plan前海金控-标准核心平面图Typical QFH core plan低层核心平面图Typical low rise core plan世纪证券-标准核心平面图Typical Century core planRogersStirkHarbour+Partners|AUBERogersStirkHarbour+Partners|AUBE前海之窗|WindowsofQianhai111110前海之窗|WindowsofQianhaiFunctionLevelGarden43Garden42Garden41Refuge40Office246、39Office38Office37Office36Office35Office34Office33Office32Office&SL31Refuge30Office29Office28Office27Office26Office25Office24Office23Office22Office21Refuge20Office19Office18Office17Office16Office15Office14Office13Office12Office11Refuge10Office9Office8Office7Office6Office5Garden4PodiumOffice3PodiumOf247、fice2PodiumOffice1Lobby0ParkingB1ParkingB2ParkingB3ParkingB4VTDiagramTowerAOL1toOL81800kg6.0m/sOL15toOL20(OL22)1800kg3.0m/sOfficePassengerLiftsOwnersPL1toPL31600kg1.6m/sExecL01SL1toSL41600or1800kg8.0m/sGL1GL22000kg/persons4.0m/sOwnerShuttles1600kg8.0m/sExecliftBuildinggoods/fireliftsOL9toOL141800kg8248、.0m/sOfficePassengerLiftsLowZoneOfficePassengerLiftsMidZonePodiumOfficeliftsCP1toCP41600kg1.6m/sCarParkLiftliftsFunctionLevelGarden43Office42Office41Refuge40Office39Office38Office&SL237Office36Office35Office34Office33Office32Office&SL131Refuge30Office29Office28Office27Office26Office25Office24Office2249、3Office22Office21Refuge20Office19Office18Office17Office16Office15Office14Office13Office12Office11Refuge10Office9Office8Office7Office6Office5Garden4PodiumOffice3PodiumOffice2PodiumOffice1Lobby0ParkingB1ParkingB2ParkingB3ParkingB4SL16OwneCarParkLiftliftsExecliftBuildinggoods/fireliftsOfficePassengerLi250、ftsLowZoneOfficePassengerLiftsMidZonePodiumOfficelifts1600kg8.0m/s4.0m/s6.0m/s8.0m/s1.6m/s1.6m/s1600kg2000kg/persons1800kg1800kg1600kgExecL01GL1GL2OL1toOL8OL9toOL14PL1toPL3CP1toCP4OfficePassengerLiftsVTDiagramTowerAOL15toOL221800kg3.0m/s电梯配置方案Vertical transportation optionsFunctionLevelGarden43Offic251、e42Office41Refuge40Office39Office38Office37Office36Office35Office34Office33Office&SL232Office&SL131Refuge30Office29Office28Office27Office26Office25Office24Office23Office22Office21Refuge20Office19Office18Office17Office16Office15Office14Office13Office12Office11Refuge10Office9Office8Office7Office6Offic252、e5Garden4PodiumOffice3PodiumOffice2PodiumOffice1Lobby0ParkingB1ParkingB2ParkingB3ParkingB4CarParkLiftliftsOwnerShuttlesExecliftBuildinggoods/fireliftsOfficePassengerLiftsLowZoneOfficePassengerLiftsMidZonePodiumOfficelifts1600kg8.0m/s8.0m/s4.0m/s6.0m/s8.0m/s1.6m/s1.6m/s1600kgDD1600kg2000kg/persons180253、0kg1800kg1600kgSL1toSL3ExecL01GL1GL2OL1toOL8OL9toOL14PL1toPL3CP1toCP4OfficePassengerLiftsOwnersVTDiagramTowerAOL15toOL221800kg3.0m/sFunctionLevelGarden43Garden42Garden41Refuge40Office39Office38Office37Office36Office35Office34Office33Office32Office&SL31Refuge30Office29Office28Office27Office26Office25254、Office24Office23Office22Office21Refuge20Office19Office18Office17Office16Office15Office14Office13Office12Refuge11Office10Office9Office8Office7Office6Office5Garden4PodiumOffice3PodiumOffice2PodiumOffice1Lobby0ParkingB1ParkingB2ParkingB3ParkingB4OfficePassengerLiftsVTDiagramTowerAOL11toOL14(OL16)1800kg255、3.0m/sSL1toSL3ExecL01GL1GL2OL1toOL6OL7toOL10PL1toPL3CP1toCP41600kg8.0m/s8.0m/s4.0m/s6.0m/s8.0m/s1.6m/s1.6m/s1600kg1600kg2000kg/persons1800kg1800kg1600kgCarParkLiftliftsOwnerShuttlesExecliftBuildinggoods/fireliftsOfficePassengerLiftsLowZoneOfficePassengerLiftsMidZonePodiumOfficeliftsRogersStirkHarbou256、r+Partners|AUBERogersStirkHarbour+Partners|AUBE前海之窗|WindowsofQianhai113112前海之窗|WindowsofQianhai结构概念StructureThe general form of this building is that of a centre-core structure.The height is of the order of 230m and the core dimension at ground level is 47m.This gives an aspect ratio of less than 1:257、5,and is therefore sensibly proportioned for stability and strength.The external frame can be arranged to have moment capacity which can be utilised for an extreme event.Gravity system:is defined by large corner columns and an open structure,free of vertical columns,where the gardens exist.Transfer 258、trusses above(or below)the garden level connect to the corner columns.This has the effect of increasing the compressive load on the columns and avoiding possible(though unlikely)tension forces introduced by outriggers.Outriggers may be used on a diagonal axis to connect core and corner columns and t259、ie into a belt truss.Lateral System:the centre core is capable of stabilizing the building for 100%of the lateral wind load.Resilience against seismic forces can be realised by adding ductile elements within the outrigger framing.The large corner columns can be reinforced to carry 25%of the lateral 260、forces in shear.This will require a steel-concrete-composite structural section.Features of the design:the transfer trusses above the garden floors can act as belt trusses,so sharing vertical strain and tying to the outriggers.The absence cross bracing at lower levels means that the amount of shear 261、fed into the corner columns can be adjusted by varying the stiffness of the out-riggers.A steel-concrete composite approach for the columns and floors is anticipated to be the most economic approach.塔楼结构的总体形式为中心筒型,大楼高度约为230米,地面核心筒的尺寸为47米。这就形成了小于1:5的长宽比,合理地提供了结构的稳定性与强度。大楼外部框架的结构提供了强大的抗弯承载力,可应对极端情况下的保262、护需求。重力系统由大型角柱和开放式结构所构成,空中花园/阳台没有垂直柱体。花园上方(或下方)的转移桁架与角柱直接相连。这样的设计既可增加柱子的抗压荷载,也可避免因支腿引起的张力(可能性非常小)。对角轴可采用支腿结构来连接核心筒及角柱,并形成皮带输送机桁架。横向系统:大楼的中心筒完全能够承载100的横向风荷载,提供稳定性。抗震需求可通过在支腿框架内添加韧性元件来实现。巨型角柱也可通过结构强化以承受25的横向剪力。这种强化结构将需要钢铁-混凝土复合材料。设计亮点:空中花园上方的转移桁架可以充当皮带输送机桁架,因此可以承载垂直应变并与支腿结构相结合。较低楼层无交叉支撑结构,这就意味着可以通过支架的刚263、度来调节角柱的剪切力。角柱与地板可采用钢铁-混凝土复合材料,这应该也是最经济实用的方式。RogersStirkHarbour+Partners|AUBERogersStirkHarbour+Partners|AUBE前海之窗|WindowsofQianhai115114前海之窗|WindowsofQianhai交通分析Traffic analysis任务书明确了塔楼必须容纳的各种用途和用户,而且各有不同的出入需求。因此难点在于如何为不同的人群创造一系列出入方式。除了在街道层打造不同的”出入口”之外,总体布局也需要塔楼在地下室与地铁连接,以及通过桥梁与公园的连接。最后必须为访客提供私人落客区,以264、及通往地下停车场的坡道。所有这些车流通道都必须在用地内合理安排,以避免车流与各入口的人流形成交织。因此难点在于组织不同的出入点,使得各自的安排皆合理(便于使用)又不失优雅。这是一个极具挑战的任务。The brief identifies a wide mix of uses and users that have to be accommodated it the tower.Each of these have their own specific requirements with regards access.The challenge therefore is to create a 265、series of addresses for each these different constituencies.In addition to creating these different front doors at the street level the masterplan for the quadrant requires that the tower provide connections to the metro at basement level and to the Park via bridges.-I think the brief request link t266、o the park.Vehicular access has to be provided for the clients private drop-off as well as general access to the below ground parking.All this traffic access needs to be arrangement around the site in such a way the resultant vehicular movements do not conflict with the flow of pedestrian to each of267、 the entrances.The challenge therefore is to organise each of these different points of access so that their arrangement is both legible(ie.easy to use)and elegant.This is no small task.人行流线Pedestrian Route首层进场通道Ground Floor Arriving Access地下通道Underpass 车行流线Vehicle Route消防车环线Fire Truck Loop Route消防扑268、救面Fire Rescure Surface出入动线示意图Accessibility diagramB1 Commercial to Park PavilionTenant Entrance WestTenant Entrance SouthCentrum&QFH EntranceB1 to adjacent PlotB1 Metro&ShoppingTenant Entrance EastB1 to adjacent PlotCars&VIPService&CarsRogersStirkHarbour+Partners|AUBERogersStirkHarbour+Partners|AUBE269、前海之窗|WindowsofQianhai117116前海之窗|WindowsofQianhai设计说明Technical Appendix1.Design BasisRelated national and regional policies and regulationsMain building design specifications:“Code for Fire Protection Design of Buildings”2018 Edition“Code for fire protection of building interior decoration design”“Un270、iform Standard for Civil Building Design”GB50352-2019“Office Building Design Standard”JGJ/T67-2019“Code for fire protection design of garages,repair garages and parking lots”GB50067-2014“Store Building Design Code”JGJ48-2014“Barrier Free Design Code”GB50763-2012“Shenzhen Architectural Design Rules”2271、019 Edition“Shenzhen City Planning Standards and Guidelines”(2019 edition)2.Project OverviewThe T102-0317 plot project is located in Nanshan District,Shenzhen,adjacent to Tinghai Avenue and Qianwan 2nd Road,and close to the subway stations Qianwan Station and Menghai Station.This project is a compre272、hensive project integrating office and business.The west side of the project land is for transfer,with a height limit of 250m,the northwest side is Hengchang Technology Building,with a height limit of 153m;the land on the west side is untransferred,with a height limit of 250m;the north side is an un273、transferred land with a height limit of 220m;Untransferred land,with a height limit of 180m;the municipal green belt on the south side.The land area of the project is 6872.43 square meters,the specified floor area ratio is 13.63,the building height is 220m,and the specified floor area ratio is 93,70274、0 square meters,of which the above-ground commercial building area is 8,000 square meters,the office building area is 82,000 square meters,the conference center is 2,000 square meters,and the canteen is 4,000 square meters.There are 417 underground motorized parking spaces.3.General layout design1)G275、eneral layout:Based on considerations such as the visibility of landmarks,the circulation of the site,and the relationship with the surroundings,in order to echo the surrounding environment and maximize the use of the surrounding landscape,the towers are arranged in a rectangular shape.Each side of 276、the faade faces different landscape resources.The north side can enjoy the river view,the south side faces the compound green park,and the mountain landscape resources can be enjoyed.To the west,you can enjoy the talent park,the vast Shenzhen Bay,and Hong Kong across the bay.Viewed from Tinghai Aven277、ue on the west side,the elegant vertical faade is highly recognizable,establishing a unique end image in the larger triangular city block.At the same time,it reduces the pressure on the adjacent 180m building on the east side.The design creates a stable and revealing headquarters building by echoing278、 the grid texture of the city.The linear tower adapts to the particularity of the site,and the tower is arranged on the south side of the site.2)Traffic analysisThe project has obvious location advantages and convenient external transportation.The project is adjacent to the citys secondary arterial 279、road Tinghai Avenue in the west,single-cycle transportation Gongyi South Street in the south,single-cycle transportation Gongyi Avenue in the north,close to subway stations Qianwan Station and Menghai Station,and the northwest corner is from Exit B of Qianwan Station of Metro Line 5.About 100m.The p280、roject is connected to the subway underground,and an underground walkway is set to connect to the east and north parcels,and a connection port to the south to the south composite green space park is reserved;the sky walkway and the east and north parcels are set on the second floor Connected;the roa281、d on the south side has an office drop-off entrance to facilitate office personnel to enter the office tower.3)Fire protection organizationThe distance between the fire lane of this project and the building is less than 30 meters.Fire fighting is located on the east side of the tower,and its side le282、ngth is 1/4 larger than the perimeter of the tower.The loads of the fire lane and the fire fighting field meet the requirements of the code.The underground part of the evacuation is completely independent of the garage.4)Garage analysisThe project has 2 garage entrances and exits,which are located o283、n Gongyi Avenue on the north side and the road on the east side.The garage is from the first underground floor to the fifth underground floor,and the evacuation distance of the safety exit is less than 60 meters.5)Main technical and economic indicators建筑设计说明 Architecture Design Statement1.设计依据国家及地区相284、关政策法规主要建筑设计规范:建筑设计防火规范 2018版建筑内部装修设计防火规范 民用建筑设计统一标准 GB50352-2019办公建筑设计标准 JGJ/T67-2019汽车库、修车库、停车场设计防火规范 GB50067-2014商店建筑设计规范 JGJ48-2014无障碍设计规范 GB50763-2012深圳市建筑设计规则 2019版深圳市城市规划标准与准则(2019年版)2工程概况T102-0317地块项目位于深圳市南山区毗邻听海大道和前湾二路,临近地铁站前湾站及梦海站。本项目是一个集办公和商业为一体的综合性项目。项目用地西侧为出让用地,限高250m,西北侧为恒昌科技大厦,限高153m;西285、侧地块未出让,限高250m;北侧为未出让地块,限高220m;东侧为未出让地块,限高180m;南侧为市政绿化带。项目用地面积为6872.43,规定容积率为13.63,建筑高度220m,计规定容积率建筑面积为93700,其中地上商业建筑面积8000,办公建筑面积82000,会议中心2000,食堂4000。地下机动停车位417辆。3.总平面设计1)总图布局:基于地标昭示性、场地流线、以及与周边关系等因素的考虑,为呼应周边环境,最大化利用周边景观,塔楼呈长方形布置。各边立面分别面向不同的景观资源,北面可享河流景观,南面面向复合绿地公园,且可享山脉景观资源,往西可饱览人才公园、广阔的深圳湾,并与香港隔湾286、相望。从西侧的听海大道上看,优雅的垂直立面极具识别性,在较大的三角城市街区树立了个性的端部形象。同时减轻了对东侧相邻的180m建筑的压迫感。设计通过呼应城市的网格肌理,创建稳重并具有昭示性的总部大厦。直线形的塔楼适应场地的特殊性,塔楼于场地内的南侧布置。2)交通分析项目区位优势明显,对外交通便利。项目西邻城市次干道听海大道,南临单循环交通公正南街,北临单循环交通公正大街,临近地铁站前湾站及梦海站,西北角距离地铁5号线前湾站B出口约100m。项目通过地下与地铁连通,设置地下步行通道与东侧及北侧宗地连通,并预留与南侧连接南侧复合绿地公园的连通口;二层设置空中步道与东侧、北侧宗地连通;南侧道路设置办287、公落客出入口,方便办公人员进入办公塔楼。3)消防组织本项目消防车道距建筑距离均小于30米。消防扑救设于塔楼东侧,其边长大于塔楼周长1/4。消防车道和扑救场地荷载均满足规范要求。地下部分疏散与车库完全独立。4)车库分析本项目设置2个车库出入口,分别位于北侧公正大街和东侧道路上;地下一层至地下五层为车库,安全出口疏散距离小于60米。5)主要技术经济指标经济技术指标表 建设用地面积()6872.43 计规定容积率 13.63 建筑基底面积()3436.28 容积率 17.52 建筑最高高度(m)220 覆盖率 50%机动车停车位(辆)417 绿化率 21.22%自行车停车位(辆)387 最大层数(地288、上/地下)43F/5F 总建筑面积()120413 计规定容积率 建筑面积()93700 地上 办公 82000 商业 8000 地下 商业 3700 不计容积率 建筑面积()31704.7 地上核增 架空绿化面积 2679.64 避难空间面积 3060.36 地下核增 24 小时公共通道 1291.94 车库及设备用房 24672.8 RogersStirkHarbour+Partners|AUBERogersStirkHarbour+Partners|AUBE前海之窗|WindowsofQianhai121120前海之窗|WindowsofQianhai4.Architectural de289、sign1)Commercial partCommercial layout is on the first floor,first floor,second floor,fifth floor,and sixth floor.In order to maximize the quality of the underground commercial space,the plan sets up a lower courtyard,which not only allows you to see the shops from here,but also provides natural lig290、hting and external views for the basement.In addition,the sunken courtyard opens up the connectivity to the subway,making the underground transportation space clearer and more attractive;the first floor uses landscape to strengthen the separation between different users and functions,and the dense a291、rbor surrounds the north podium,which can be accessed from here Commercial shops:The second-floor and above commercial space connects the commercial space with the second-story bridge system through the setback on the south side,allowing the commercial space to be sunny and surrounded by beautiful s292、cenery,increasing the overall commercial space traffic and increasing commercial value.2)Tower partThe first floor of the tower is located on the south side of the plot,directly facing the park,enhancing the sense of entrance ceremony;a dedicated office drop-off area is set between the tower on the 293、south side and the podium on the north side.This exclusive entrance is located in the courtyard lighting space.Visitors show corporate value and echo with the unique top-level office space.The elevator system divides the tower into four main sections,providing all employees with direct access to sha294、red facilities.The VIP channel can easily lead to all floors.The tower is equipped with multiple shared facilities:the first floor is designed with a pavilion on the south side of the park;the third to sixth floors are designed with terraces in a way of stepping back;the tower is set with themes of 295、copper river,silver bay view and golden mountain The viewing platform opens its vision in different directions,introducing rivers,harbors,and mountain views into the office space;the roof is designed with a 360-degree viewing platform to enjoy the beautiful sky.Each group of shared facilities enjoys296、 a high-quality outdoor space,which forms the core of employees social and cultural life,provides comfortable activity areas for employees daily lives,and brings distinctive features to this new high-rise building.3)FacadeThe facade design is decorated with an outdoor open space with a golden ratio 297、volume.The colors,light and shadows and organic shapes of the outdoor platform are in sharp contrast with the regular shape of the main building.The buildings of high-end financial institutions should convey the characteristics of stability and permanence,and must be based on the aesthetic principle298、s of classic architecture:proportion,regularity,and symmetry.The structure of the tower is clearly exposed,highlighting the four powerful corners,giving a sense of visual stability.The corner columns separate the four sides of the tower and also constitute the facade frame.Each faade within these fr299、ames has been carefully composed to form a series of elegant rectangles.The three-story open space is subdivided into each facade to show the community structure and order inside the building.For the LEED platinum certification,the design proposed a facade concept based on sunlight lighting analysis300、,which can improve the indoor space by preventing the heat radiation of the building from sunlight.Through a fully integrated design strategy,Li has given a positive response and high-performance feedback to the local environment.summaryQianhai Financial Center,this 220-meter-high tower,on the one h301、and builds a classic financial building in the Greater Bay Area to strengthen the image of the owners;at the same time,it is people-oriented and forms a diverse,romantic,green,and low-carbon community.It will embrace the urban coastal environment and embody the values of the owners with an innovativ302、e vision.Among the many high-rise buildings,it will create a distinctive image with its unique temperament and give people an unforgettable experience.Based on the city,interacting with the environment,highlighting oneself,becoming an important part of Qianhai CBD,conveying its value to the world.4.303、建筑设计 1)商业部分商业布置在负一层、首层、二层、五层、六层。为了最大限度提高地下商业空间的质量,方案设置了下层庭院,除了可以从这里看见商店,还为地下室配套提供自然采光和对外景观。此外下沉庭院打开了通往地铁的连接性,使得地下交通空间更清晰和吸引人;首层用景观强化不同用户和功能之间的分隔,茂密的乔木围绕北侧裙房,从这里可以进入商铺;二层及以上的商业通过南侧的退台串联商业空间与二层桥梁系统,让商业空间阳光充沛,美景环绕的同时,增加整体商业空间人流量,提高商业价值。2)塔楼部分塔楼首层位于地块南侧,直接面对公园,增强入口仪式感;南侧塔楼和北侧裙房之间设置办公专用落客区,这个专有入口位于庭院采光空间304、,其经典布局形式向访客展现企业价值,也和气质独特的顶层办公空间相呼应。电梯系统将塔楼分为四个主要分区,为所有员工提供了直接到达共享设施的通道。VIP通道可以便捷通往各个楼层。塔楼设置多处共享设施:首层在南侧公园设计凉亭;三到六层用层层退台的方式设计露台空间;塔楼上设置主题分别为为铜色河流、银色湾景、金色山景的观赏台,各自朝不同的方向打开视野,将河流、港湾、山景引进办公空间;屋顶设计360度观景台,尽享天空美景。每组共享设施都享有高质量的室外空间,组成了员工的社交和文化生活核心,为员工的日常生活提供了舒适的活动区域,并为这座新的高层建筑带来了鲜明的特色。3)立面部分立面设计以黄金比例的体量缀以室305、外开放空间,室外平台流露出的色彩、光影和有机形体,与建筑主体的规整造型形成鲜明的对比。高端金融机构的大厦应该传达稳重和恒久的特性,必须取材自经典建筑的审美原则:比例、规整、对称。塔楼的结构清晰外露,突显四个有力的转角,赋予视觉稳重感。转角柱分隔塔楼的四面,也构成立面框架。这些框架内的每个立面都经过精心组成,形成一系列优雅的矩形。三层通高开放空间再细分每个立面,展示大厦内部的社群结构和秩序。针对LEED铂金认证,设计提出了一种基于阳光照明分析的立面概念,可通过防止阳光对建筑物的热辐射来改善室内空间。通过完全集成的设计策略,立面对当地环境给与了积极响应和高性能反馈。小结前海金融中心,这座220米高306、的塔楼,一方面在大湾区建造一座经典的金融大厦,强化业主形象;同时以人为本,形成一个多元、浪漫、绿意、低碳的社区。它将以创新的视野,拥抱城市沿海环境并体现业主的价值观。在众多高楼大厦中,将以其独特的气质创造与众不同形象并给人以难忘的体验。立足城市,与环境互动,彰显自我,成为前海CBD的重要组成部分,向世界传达其价值。建筑设计说明 Architecture Design StatementRogersStirkHarbour+Partners|AUBERogersStirkHarbour+Partners|AUBE前海之窗|WindowsofQianhai123122前海之窗|WindowsofQ307、ianhaiHeat recovery|排风冷量回收Sustainable Skygarden|屋顶花园Daylight Sensor|日光感应Exterior shading|建筑外遮阳High-efficient lighting|高效节能照明Condensed Water Recycling|冷凝水回收High-efficient Filtration|高效过滤系统High-performance faade|高性能立面Water-saving irrigation|节水灌溉技术BMS|楼宇设备自控管理系统利用建筑立面垂直构件达到外遮阳的效果。To create exterior sha308、ding effect by vertical faade structure.采用高性能围护结构,降低建筑太阳辐射得热。To reduce solar heat gains by high-performance building facade.利用自然光引入空间来减少电力照明的使用。To reduce the use of electrical lighting by daylight sensor.通过换热装置把排出的冷空气与送入的热空气进行热交换,降低空调冷负荷。To employs a cross flow heat exchanger between the inbound and309、 outbound air flow and reduce cooling load.创建外部开放空间,以鼓励环境互动。To create exterior open space that encourages interaction with the environment.使用高效灯具提供高质量照明,改善驻户舒适性和健康。To apply high-efficient lighting and promote occupants comfort and well-being by high-quality lighting.利用回收的空调冷凝水进行场地清洁、绿化浇灌与部分楼层冲厕。To a310、pply recycled condensed water for on-site floor-washing,irrigation and sewage conveyance.灌溉采用喷灌、微喷灌、滴灌等技术对绿化进行灌溉。To apply drip or sprinkler irrigation system to achieve outdoor water use reduction.采用高效过滤系统(MERV13 or F7),提高室内空气质量。To apply air filtration media of over MERV13 or F7 for improving indoor311、 air quality.对不同建筑能耗终端的分路用电计量或能量计量,充分展现建筑实际运行的能耗情况。To apply building energy sub-metering and manage building energy use.Sustainable Design从前期设计阶段到施工运营阶段,将人类健康作为基础的评价准测,在不同专业和不同建筑系统之间实现协同整合绿色建筑策略。Maximize opportunities for integrated,cost-effective adoption ofgreen design and construction strategies,312、emphasizing human health as a fundamentalevaluative criterion for building design,construction and operational strategies.LEED目标整合过程(IP)选址与交通(LT)可持续场址(SS)用水效率(WE)能源与大气(EA)材料与资源(MR)室内环境质量(IEQ)设计创新(ID)Integrative Process Location&TransportationSustainable SitesWater EfficiencyEnergy&AtmosphereMaterial313、s&Resources Indoor Environmental Quality Innovative DesignGoing Green|绿色永续设计Sustainable DesignEnergy/Water/Waste Saving Target|节能/节水/节材目标高性能立面配合建筑外遮阳每年可节约627,000度电,相当于年能源消耗的1.9%High-performance faade can potentially save electricity consumption for up to 627,000 kWh/year,or 1.9%annual energy consump314、tion.高效灯具配合智能照明控制每年可节约1,320,000度电,相当于年能源消耗的4.0%High-performance lighting fixture and intelligent lighting control can potentially save electricity consumption for up to 1,320,000 kWh/year,or 4.0%annual energy consumption.制冷机部分变频并使用冷机群控,结合一次泵变流量输配系统每年可节约1,320,000度电,相当于年能源消耗的4.0%Chilled-Water VAV Syst315、ems with group control and primary CHW pump with VFD distribution systems can potentially save electricityconsumption for up to 1,320,000 kWh/year,or 4.0%annual energy consumption.过渡季节可调节室外新风量结合需求控制新风系统每年可节约165,000度电,相当于年能源消耗的0.5%Variable Outdoor air flow intake during mid-seasons and with demand co316、ntrol system can potentially save electricity consumption for up to 165,000 kWh/year,or 0.5%annual energy consumption.排风热回收系统每年可节约165,000度电,相当于年能源消耗的0.5%Variable Outdoor air flow intake during mid-seasons and with demand control system can potentially save electricity consumption for up to 165,000 k317、Wh/year,or 0.5%annual energy consumption.利用深圳市的蓄冷空调用电谷期电价以冰蓄冷系统节费,每kWh冷量可节约费用0.015 RMB,年节费量约23,854 RMBIce storage system can potentially save electric bill for up to 24,385 RMB/year,or 0.015 RMB per kWh cooling amount.利用高效节水器具可节约40%年用水量.To apply high-efficient flush and flow fixtures can potentially318、 save annual on-site potable water consumption by 40%.利用回收的空调冷凝水进行场地清洁、绿化浇灌与部分楼层冲厕可节约20%年用水量。To apply recycled condensed water for on-site floor-washing,irrigation and sewage conveyance can potentially save annual on-site potable water consumption by 20%.项目在施工废弃物减量方面预期达到75%的减量目标。The project aims to 319、achieve 75%of construction waste reduction by recycled and/or salvage non-hazardous construction and demolition debris.绿色建筑说明Green Building StatementRogersStirkHarbour+Partners|AUBERogersStirkHarbour+Partners|AUBE前海之窗|WindowsofQianhai125124前海之窗|WindowsofQianhai人员福祉 Occupants Wellbeing95%100%活动空间空气经灭320、菌卫生处理运行时间办公内空间处于热舒适水平100%室内用水处理至国际领先水质标准AirWaterNourishmentLightFitComfort空气水营养光线健身舒适性精神Mind本项目健康建筑性能指标/WELL Building KPI环境用户EnvironmentOccupants90%以上常用空间具备自然采光条件100%办公空间最大设计噪音不超过40dB提升用户健康、福祉及生产力增加建筑价值、用户满意度通过建筑释放人类潜能Improve occupants health,wellbeing and productivity.Unlock human potentials throug321、h building.Increase building value and occupant satisfactionAir filtration for occupant spacesIndoor water treatment to achieve international leading water quality standardOperation period with thermal comfort level within design threshold More occupant area with natural lighting conditions Office a322、rea with max.design noise level lower than 40dB100%员工可达主动/被动健身设施Staff with access to active/passive fitness facilities 以WELL金级为基准,基于/高于相关要求定制贯穿空气、水、舒适、光、健身等方面的健康性能指标。Based on WELL gold rating standard,create bespoke key performance index throughout air,water,comfort,light and fitness etc.健康建筑策略 WELL323、 Building Strategies将人类健康特性融入空气、水、营养、光线、健身、舒适性、精神七大建筑环境概念,以建筑环境为手段,基于性能测量和认证建筑健康水平。超越传统环境友好设计,将本项目绿色建筑认证目标从人体健康角度予以补足,一体化实施实现综合最优建筑性能。Integrate human health features in the built environment,evaluate building wellbeing level through performance-based assessment.Surpass traditional environmental frie324、ndly design and supplement green building design from occupants wellbeing aspect,hence to optimize building performance.130设计说明Design Description(WELL building项目愿景/Project Vision本项目将前瞻性地自设计阶段即结合 WELL 健康建筑理念,根据建筑功能及业态,成为全球首个将 WELL 金级设计策略落实于包括超高层在内的健康办公项目,同步贯彻健康设计原则至商业、酒店部分,打造一体化健康设计。This project will325、 incorporate WELL concept from design and implement golden strategies into offices including the super high-rise north tower,design principle will be considered in commercial and hotel development also to create total healthy design.日趋严重的环境污染不仅有害公共健康,同时将损害经济发展。平均每人大于 90%的时间发生在室内,建筑环境对人员表现有直接影响。据数据统计326、,企业运营费用中 90%用于员工薪资福利。同时,随着建筑技术及人员意识的进步,仅仅注重环境友好的绿色建筑认证已不能满足市场需求。自国际到国内,越来越多的企业及地产开发单位已意识到健康建筑环境对企业的重要性,并将国外领先的健康建筑标准如 WELL 引进项目实践中。对于健康建筑的认知国内尚处于起步阶段,前瞻性考虑健康设计将对地产开发竞争力起到至关重要的作用。The increasing environmental pollution affects both public heath and economy.Built environment directly affects people as 327、90%time are spent indoors.Survey result shows that 90%of the operation cost goes to staff salary and benefit.Property development focuses only on environmental friendly design can no longer meet the market need under developing scenario.More project owners have realized the importance of heath and i328、nduced leading standard such as WELL.WELL 由美国 DELOS 研究室提出,是全球第一个以建筑中的用户健康为核心的建筑标准,它将设计及施工种的最佳实践与医学和科学相结合,促进建筑环境下人类健康的发展。其认证按等级分为铂金、金、银级。WELL is invented by U.S.DELOS lab and is the first building standard with occupants wellbeing as evaluation principle.It combines design and construction best pract329、ices and medical researches to promote occupant wellbeing.WELL certification levels include platinum,gold and silver.2017绿色建筑认证/Green Building Certification综合可持续设计/Integrated Green Design数码化/Digitalization建筑物理/Building Physics微环境分析/Micro-Environment减碳/Carbon Reduction零碳建筑/Zero-carbon Building智慧建筑/Sm330、art Building健康建筑/WELL Building建筑技术发展轨迹Building Technology Development环境污染日趋严重/Environmental Pollution公共健康意识觉醒/Public Awareness of Heath建筑运营费用中90%用于员工薪资福利。9%用于租金,1%用于能源。人员价值日益凸显/Human Value Awareness IWBI为什么要做健康建筑Why WELL building健康设计WELL Building RogersStirkHarbour+Partners|AUBERogersStirkHarbour+Pa331、rtners|AUBE前海之窗|WindowsofQianhai127126前海之窗|WindowsofQianhai构件部位Component part混凝土强度等级Concrete strengthgrade备注Notes基础垫层 Foundation cushionC15筏板、桩 Raft,pileC40地下室底板采用抗渗等级为P10的防水混凝土The basement floor is made of waterproof concrete with animpermeability grade of P10地下室外墙 Basement exterior wallC35地下室外墙采用抗332、渗等级为P6P10的防水混凝土The basement outdoor wall adopts waterproof concrete withimpermeability grade P6P10水池 poolC30水池挡水墙采用抗渗等级为P8的防水混凝土The water retaining wall of the pool is made of waterproofconcrete with an impermeability grade of P8塔楼墙、柱 Tower wall,columnC60C30板、梁 Plate,beamC30/C35裙房柱 Podium columnC40/333、C30坡道 RampC30人防墙 Air defense wallC30楼梯 stairsC30构造柱、圈梁、过梁 Constructioncolumn,ring beam,lintelC20后浇带 Post pouring belt标准构件 Standard component柱最高可用到C60The column can be used up to C60采用比相应构件部位混凝土强度等级高一级的微膨胀混凝土Use micro-expansion concrete that is one level higher than the concrete strength of thecorresponding component parts按标准图集的要求 According to the requirements of the standard atlas45框架:一级-5核心筒:一级超限