FETMOP05-009-01装机证.doc
下载文档
上传人:地**
编号:1214858
2024-09-21
1页
91KB
该文档所属资源包:
飞机客机ETMOP维修放行安全教育应急预案资料合集打包下载
1、装机证Serviceable检验放行 此证明该件已按中国民航管理部门和/或EASA和/或FAA和东航工程手册的相关规定进行了检验,且检验合格。原适航凭证已被存档并可以提档查验。INSPECTION RELEASE The unit identified above is inspected in accordance with CEA EM and CAAC/EASA/FAA requirements, and the unit is approved for return to service. The original airworthiness certificate or certif2、icate of conformity is on file at CEA facilities.签字(Signed)检验地点(Sta. Receiving)检验日期(Inspection Date)件号P/N序号/批次号 S/N名称Description合同号/退料单号 P/O No.数 量Qty.单 位UOM件 状Condition标识Amdt.证件类型Cert. Type生产日期Manufacture Date到寿日期 Expiry date出厂/修理日期Repair Date下次进厂/修理日期Next-repair Date本次称重日期Weigh Date绿区检查日期Green INS3、P Date温度Temp 湿度Humidity NFFFAA PMACAAC PMA收料单号Receipt No.Yes NoYes NoYes No备注 Remarks:FETMOP05-009-01(11/2014) 装机证Serviceable检验放行 此证明该件已按中国民航管理部门和/或EASA和/或FAA和东航工程手册的相关规定进行了检验,且检验合格。原适航凭证已被存档并可以提档查验。INSPECTION RELEASE The unit identified above is inspected in accordance with CEA EM and CAAC/EASA/FAA4、 requirements, and the unit is approved for return to service. The original airworthiness certificate or certificate of conformity is on file at CEA facilities.签字(Signed)检验地点(Sta. Receiving)检验日期(Inspection Date)件号P/N序号/批次号 S/N名称Description合同号/退料单号 P/O No.数 量Qty.单 位UOM件 状Condition标识Amdt.证件类型Cert. Type生产日期Manufacture Date到寿日期 Expiry date出厂/修理日期Repair Date下次进厂/修理日期Next-repair Date本次称重日期Weigh Date绿区检查日期Green INSP Date温度Temp 湿度Humidity NFFFAA PMACAAC PMA收料单号Receipt No.Yes NoYes NoYes No备注 Remarks:FETMOP05-009-01(11/2014) Height:38.1cm Width:24.2cm
地产商业
上传时间:2022-04-25
101份