2014山东济南鹊山龙湖城市综合体项目概念规划(74页).pdf
下载文档
上传人:ven****re
编号:86770
2021-04-08
74页
91.64MB
1、QUESHAN L O N G H U M A S T E R P L A N D E S I G N CONTENTS 目录 DESIGN STATEMENT 设计说明 MASTER PLANNING / LAND USE 总体规划/ 用地分析 SPACE STRUCTURE 空间结构 MASTER PLAN 总体平面图 DIVISION ENLARGEMENTS 景观节点放大 CHARACTER PERSPECTIVES 特色透视图 PROJECTS SECTIONS 节点剖面图 PROJECT DIAGRAMS 项目分析图 05 11 19 29 33 45 57 67 DESIGN S2、 T A T E M E N T 设计说明 6 JINAN SHANDONG CHINA Design Statement The project site is located North of the City of Jinan, the capital of Shandong province in Eastern China. The area of present-day Jinan has played an important role throughout the history of the region. From the earliest beginnings of ci3、vilization it has evolved into a major national administrative, economic, and transportation hub. The city, which holds sub-provincial administrative status, is located in the north-western portion of Shandong province about 400 kilometres (250 mi) south of the national capital of Beijing. It borders Liaocheng to the southwest, Dezhou to the northwest, Binzhou to the northeast, Zibo to the east, L
地产商业
上传时间:2022-04-25
101份