同润影佳路社区项目景观设计方案(80页).pptx
下载文档
上传人:偷****
编号:286666
2022-02-23
80页
169.58MB
1、同润影佳路1号项目景观TONGRUN YINGJIA ROAD NO.1 LANDSCAPE 方案设计Scheme Design CONTENTS 目录1.概念分析1.Conceptual Analysis2.总平分析2.Masterplan Analysis3.总体景观设计 3. Overall Landscape Design4.样板别墅庭院设计4. Model Villa Courtyard Design5.细部意向图5. Detail images CONCEPTUAL ANALYSIS概念分析1.项目地块分析1.Regional Analysis2.现场分析2. Site Analy2、sis3.建筑户型分析3. Building Type Analysis4.概念设计4. Concept Design5.项目调整建议5. Adjustment Analysis项目地块分析 Regional Analysis上海市中心URBAN CENTRE浦东国际机场PUDONG AIRPORT虹桥国际机场HONGQIAO AIRPORT 上海同润影佳路一号项目位于上海市松江区车墩镇,距上海市区30公里,面积约181236平方米。 地块环境西边与北边为一期同润玫瑰芳苑项目,东为车峰路,南为西上海高尔夫球场。项目周边环境具极好的景观价值。 The site is located in Che3、dun town, Songjiang District, Shanghai, 30 miles from Shanghai downtown. The site area is 181236 square meters. West and North of the site is Tongrun Rose Garden project phase one. On the east is Chefeng Road and on the south is West Shanghai Golf Course. The surrounding environment has very good landscape value.现场分析 Site Analysis 1.项目现场刚平整完土方,周边以围墙围合成场地,围墙外的高尔夫景观未来可为本项目的景观借景。 2.现状中河浜未挖掘,将来需考虑水道的衔