2018年开平融创潭江首府住宅示范区景观概念方案.pdf
下载文档
上传人:故事
编号:156662
2021-07-17
60页
18.26MB
1、开平谭江首府项目示范区 Kaiping Tan River Display Area Landscape Pre- Concept Package 景观概念设计文本 Prepared For 2018年06月28日 28June, 2018 1 现状分析 Site Analysis 3 Kaiping Tan River Display Area 开平谭江首府项目示范区 Landscape Preliminary Concept Package 景观概念文本 Project Site 项目区位 Project Site 佛山市 Project Site 广州市 Project Site 东莞市2、 Project Site 珠海市 珠三角经济圈 Project Site 深圳市 Project Site 香港 Project Site 江门市 20KM 40KM 95KM,2h车程车车 200KM,3h车程车车 Project Site 中山市 Kaiping City is a county-level city in Guangdong Province with a total popu- lation of about 700,000 and an area of 1659.5 square kilometers. It is a fa- mous hometown of ov3、erseas Chinese, a hometown of architecture, a home- town of art, and a famous hometown of “miraculous buildings”. Kaiping City, where the base is located, belongs to the peripheral radiation area of the “PRD Economic Circle” and is approximately 2 hours drive away from Foshan, Zhuhai, and Macau, and a 3-hour drive from Shenzhen. 开平市属于广东省内县级市,总人口数约70万,面积1659.5平方 公里,是中国著名的华侨之乡,建筑之乡,艺术之乡、是全国著名 的“碉楼之乡
地产商业
上传时间:2022-04-25
101份