2016年台湾宜兰旅行小屋策划方案-41页.pdf
下载文档
上传人:地**
编号:1286722
2024-12-17
41页
28.57MB
1、上滕聯合建築師事務所-台湾宜兰旅行小屋丨JPG平面+官方摄影丨40P丨29M丨2016丨“消融的波浪与闪烁的泡沫”Project Name:Onyx lit HouseClient:Xiao-qing,LinLocation:Toucheng District,YilanFunction:HousingArchitectureArchitects:Emerge Architectshttp:/https:/ in Charge:Sam Yang,Ally Chang,UZ LiuParticipants of project:Ying-Chen LingApproved Building In2、spector:Emerge Architects Structural Engineer:K.C.Structure Engineering OfficeHydropower Engineer:Kai Jian Engineering OfficeConstructionArchitecture,Electrical Engineering,Interior and Landscape Manufacturer:Kai Jian Engineering OfficeMaterialsFaade:Washed granolithicSite Area:180.77 sqmConstructio3、n Area:101.12 sqmGross Floor Area:270.97 sqmFloors:3 Floors above groundConstruction CostArchitecture:12,000,000 NTD$Electrical Engineering:1,600,000 NTD$AC:600,000NTD$Interior:2,000,000 NTD$Landscape:400,000 NTD$Years of Design:Nov,2013-Aug,2014Years of Construction:Dec,2014-Aug,2016咸味的海浪、卵石海滩的潮声和远处的龟山岛美景,是宜兰头城镇和乌石港为我们留下的第一印象。消融的波浪和闪烁的泡沫因而成为了设计这座旅行小屋的灵感源泉。黑色立面上的一系列圆形窗洞使光束投射到室内,宛如泡沫一般在空气中消散。整座建筑好像一盏朦胧的灯笼,以微光照耀着旅行者的道路。通过昏暗而狭长的楼梯便能够直接到达3层,颇有豁然开朗之感。这一空间体验模仿了从台北通向该村庄的一条最长的隧道:终点处的“星空”如同带领着你走进宜兰的开阔平原。客房墙壁上大小不一的窗洞能够在过滤噪声的同时为房间引入宁静的街景。阳台保持了开放,但并未暴露于室外。不论庭院还是山丘,不论晴天还是雨天,每位客人都能在自己的房间内惬意地享受专属的风景。