深圳理工大学建设工程建筑专业初步设计方案(150页).pdf
下载文档
上传人:十二
编号:946909
2024-07-09
150页
88.24MB
1、(正本)中国科学院深圳理工大学建设工程方案设计及建筑专业初步设计International tender for Shenzhen Institute of Advanced Technology,Chinese Academy of Sci-ences(tentative name)Schematic Design and Architectural Design Development中国科学院深圳理工大学建设工程方案设计及建筑专业初步设计International tender for Shenzhen Institute of Advanced Technology,Chinese A2、cademy of Sciences(tentative name)Schematic Design and Architectural Design Development规划设计总平面图PlanningMASTER PLANN050 100200m002 总平面图中国科学院深圳理工大学建设工程方案设计及建筑专业初步设计International tender for Shenzhen Institute of Advanced Technology,Chinese Academy of Sciences(tentative name)Schematic Design and Archite3、ctural Design Development规划设计总平面图PlanningMASTER PLAN指标备注544065.12建设用地面积 Construction Site area()476966.40GIC5管理用地面积 Management Site area()67098.72E2615500417700地上计容(教学及附属等)Aboveground()379200地下计容(教研附属用房)Underground()3850022000架空层Tilted Space1758002143000.8814635030.7%18475338.7%3800100其中Incl.不计容地上建筑4、面积 GFA Aboveground()地下建筑面积 FAR-counted floor area()经济技术指标Technical and economic indicators分项总用地面积Total Site area()总建筑面积 GFA 建筑限高(m)其中Incl.机动车停车位Car parking Qty.(辆)容积率 FAR建筑覆盖率 Building coverage绿化覆盖率 Greening coverage绿化面积 Greening Area()不计容地下建筑面积 GFA Underground()计容建筑面积 FAR-counted floor area()建筑基底面积5、 Building coverage area()地上计容15000地下计容1800055000175000地上计容10000地下计容5000书院食堂7000大学食堂3000清真食堂20060000地上计容27000地下计容3000150004000地上计容2500地下计容2500地下计容1000055004177001758002200038500615500动物房 Experimental Animal Room()分功能指标Functional indicators图书馆 Library()本科生书院 Residence()学院和研究院 Academy and Research Inst6、itutes()多功能礼堂(音乐厅)Concert Hall()食堂 Dining Hall()硕博公寓 Graduate Apartment()行政楼+国际交流中心 Admin and International Communication Center()室内体育馆 Indoor Stadium()大型设备房 Room for Large Equipment()总建筑面积()特殊实验室 Special Laboratory()外籍教师生活用房 Apartment for Foreign Teachers()计容总计 FAR-counted floor area()地下设备和车库 Under7、ground Equipment and Garage不计容地上架空层 GFA Aboveground()地下计容 FAR-counted floor area-Underground()N050 100200m音乐厅 H=30MUSIC HALL体育馆 H=30STADIUM覆土动物房 H=6ANIMAL HOLDING覆土特殊实验室SPECIAL LABS本科三院一体组团1 H=24TRINITY CLUSTER 01本科三院一体组团2 H=30TRINITY CLUSTER 02本科三院一体组团3 H=35TRINITY CLUSTER 03会议/餐厅 H=12CONFERENCE/CA8、NTEEN硕士三院一体组团 H=50MASTER TRINITY CLUSTER博士三院一体组团 H=45DOCTOR TRINITY CLUSTER学术平台图书馆 H=20ACADEMIIC PLATFORM LIBRARY行政国际会议中心 H=73ADMIN&INTERNATIONAL CONFERENCE 外籍专家公寓 H=36FOREIGN EXPERTS APARTMENT南侧预留用地SOUTH RESERVED LAND北侧预留用地NORTH RESERVED LAND文化平台服务大厅 H=12CULTURAL PLATFORM SERVICE HALL大设备实验平台 H=24LA9、RGE EQUITMENT LABS次要车行入口SECONDARY CAR ENTRANCE建设范围线SITE RED LINE次要车行入口SECONDARY CAR ENTRANCE消防/主后勤入口FIRE TRUCK/LOGISTIC CAR ENTRANCE主要车行入口MAIN CAR ENTRANCE主要车行入口MAIN CAR ENTRANCE主要人行入口MAIN CAR ENTRANCEVIP入口VIP ENTRANCE主要人行入口MAIN CAR ENTRANCE管理范围线CONTROL LINE体育场 H=24SPORTS FIELD餐厅CANTEEN学校食堂CANTEEN0010、3 总平面图中国科学院深圳理工大学建设工程方案设计及建筑专业初步设计International tender for Shenzhen Institute of Advanced Technology,Chinese Academy of Sciences(tentative name)Schematic Design and Architectural Design Development效果图东侧俯瞰图山城相生 知识的航站楼MOUNTAIN CITY KNOWLEDGE TERMINAL004 东侧俯瞰图中国科学院深圳理工大学建设工程方案设计及建筑专业初步设计International t11、ender for Shenzhen Institute of Advanced Technology,Chinese Academy of Sciences(tentative name)Schematic Design and Architectural Design Development效果图西南角鸟瞰图RenderingSOUTH WEST BIRD EYE VIEW005 西南角鸟瞰图中国科学院深圳理工大学建设工程方案设计及建筑专业初步设计International tender for Shenzhen Institute of Advanced Technology,Chine12、se Academy of Sciences(tentative name)Schematic Design and Architectural Design Development效果图北侧沿湖生活组团RenderingNORTH LAKE CLUSTER006 北侧沿湖俯瞰图中国科学院深圳理工大学建设工程方案设计及建筑专业初步设计International tender for Shenzhen Institute of Advanced Technology,Chinese Academy of Sciences(tentative name)Schematic Design and A13、rchitectural Design Development效果图西侧城市面硕博组团RenderingWEST URBAN INTERFACE gRADUATE CLUSTER007 西侧硕博组团俯瞰图中国科学院深圳理工大学建设工程方案设计及建筑专业初步设计International tender for Shenzhen Institute of Advanced Technology,Chinese Academy of Sciences(tentative name)Schematic Design and Architectural Design Development效果图南侧山景14、书院组团RenderingSOUTH SHUYUAN MOUNTAIN CLUSTER008 南侧书院组团俯瞰图中国科学院深圳理工大学建设工程方案设计及建筑专业初步设计International tender for Shenzhen Institute of Advanced Technology,Chinese Academy of Sciences(tentative name)Schematic Design and Architectural Design Development效果图西南侧入口俯瞰RenderingSOUTHWEST ENTRANCE PLAZA VIEW009 西15、南侧入口俯瞰图中国科学院深圳理工大学建设工程方案设计及建筑专业初步设计International tender for Shenzhen Institute of Advanced Technology,Chinese Academy of Sciences(tentative name)Schematic Design and Architectural Design Development效果图西南主入口人视角RenderingSOUTH WEST MAIN ENTRANCE010 西南主入口人视图中国科学院深圳理工大学建设工程方案设计及建筑专业初步设计International tend16、er for Shenzhen Institute of Advanced Technology,Chinese Academy of Sciences(tentative name)Schematic Design and Architectural Design Development效果图图书馆主入口人视角RenderingLIBRARY MAIN ENTRANCE VIEW011 图书馆主入口人视图中国科学院深圳理工大学建设工程方案设计及建筑专业初步设计International tender for Shenzhen Institute of Advanced Technology,17、Chinese Academy of Sciences(tentative name)Schematic Design and Architectural Design Development效果图图书馆空间人视角RenderingLIBRARY SPACE VIEW012 图书馆主入口人视图中国科学院深圳理工大学建设工程方案设计及建筑专业初步设计International tender for Shenzhen Institute of Advanced Technology,Chinese Academy of Sciences(tentative name)Schematic Desig18、n and Architectural Design Development效果图体育馆人视角RenderingSTADIUM VIEW013 体育馆人视图中国科学院深圳理工大学建设工程方案设计及建筑专业初步设计International tender for Shenzhen Institute of Advanced Technology,Chinese Academy of Sciences(tentative name)Schematic Design and Architectural Design Development效果图体育馆临湖视角RenderingSTADIUM LAKE19、 SIDE VIEW014 体育馆临湖人视图中国科学院深圳理工大学建设工程方案设计及建筑专业初步设计International tender for Shenzhen Institute of Advanced Technology,Chinese Academy of Sciences(tentative name)Schematic Design and Architectural Design Development效果图北侧入口俯瞰RenderingNORTH ENTRANCE PLAZA VIEW015 北侧入口俯瞰图中国科学院深圳理工大学建设工程方案设计及建筑专业初步设计Inter20、national tender for Shenzhen Institute of Advanced Technology,Chinese Academy of Sciences(tentative name)Schematic Design and Architectural Design Development效果图北侧入口广场RenderingNORTH ENTRANCE PLAZA016 北侧入口广场人视图中国科学院深圳理工大学建设工程方案设计及建筑专业初步设计International tender for Shenzhen Institute of Advanced Technol21、ogy,Chinese Academy of Sciences(tentative name)Schematic Design and Architectural Design Development效果图北核心学术广场RenderingNORTH ACADEMIC PLAZA017 北核心学术广场人视图中国科学院深圳理工大学建设工程方案设计及建筑专业初步设计International tender for Shenzhen Institute of Advanced Technology,Chinese Academy of Sciences(tentative name)Schematic22、 Design and Architectural Design Development效果图音乐厅湖景RenderingMUSIC HALL LAKE VIEW018 音乐厅湖景人视图中国科学院深圳理工大学建设工程方案设计及建筑专业初步设计International tender for Shenzhen Institute of Advanced Technology,Chinese Academy of Sciences(tentative name)Schematic Design and Architectural Design Development效果图音乐厅入口前厅Render23、ingMUSIC HALL ENTRANCE HALL019 音乐厅入口前厅人视图中国科学院深圳理工大学建设工程方案设计及建筑专业初步设计International tender for Shenzhen Institute of Advanced Technology,Chinese Academy of Sciences(tentative name)Schematic Design and Architectural Design Development效果图主入口行政会议中心RenderingMAIN ENTRANCE ADMIN AND CONFERENCE CENTRE STREE24、T VIEW020 主入口人视图中国科学院深圳理工大学建设工程方案设计及建筑专业初步设计International tender for Shenzhen Institute of Advanced Technology,Chinese Academy of Sciences(tentative name)Schematic Design and Architectural Design Development效果图行政会议中心内庭院RenderingADMIN AND CONFERENCE CENTRE INNER COURTYARD021 会议中心内庭院人视图中国科学院深圳理工大学建设工程25、方案设计及建筑专业初步设计International tender for Shenzhen Institute of Advanced Technology,Chinese Academy of Sciences(tentative name)Schematic Design and Architectural Design Development效果图书院朝山内庭院RenderingSHUYUAN INNER COURTYARD TOWARD MOUNTAIN022 书院朝山内庭院人视图中国科学院深圳理工大学建设工程方案设计及建筑专业初步设计International tender for26、 Shenzhen Institute of Advanced Technology,Chinese Academy of Sciences(tentative name)Schematic Design and Architectural Design Development效果图硕博公寓视觉通廊RenderingMASTERS AND DOCTORS APARTMENT VISUAL CORRIDOR023 硕博公寓人视图项目背景INTRODUCTION中国科学院深圳理工大学建设工程方案设计及建筑专业初步设计International tender for Shenzhen Institu27、te of Advanced Technology,Chinese Academy of Sciences(tentative name)Schematic Design and Architectural Design Development至长三角地区至大西南地区港珠澳大桥深中通道虎门大桥粤港澳大湾区GUANGDONG-HONGKONG-MACAO GREATER BAY AREA香港HONG KONG惠州HUIZHOU东莞DONGGUAN肇庆ZHAOQING广州GUANGZHOU江门JIANGMEN中山ZHONGSHAN珠海ZHUHAI佛山FOSHAN深圳SHENZHEN澳门MACAOI28、ntroductionPROJECT LOCATION项目概况项目位置guangdong-Hong Kong-Macao greater Bay AreaThe Guangdong-Hong Kong-Macao Greater Bay Area consists of nine Pearl River Delta cities:Hong Kong,Macau,Guangzhou,Shenzhen,Zhuhai,Foshan,Huizhou,Dongguan,Zhongshan,Jiangmen,and Zhaoqing.It is one of the most open and econo29、mically dynamic regions in China.It has an important strategic position in the overall situation of national development.This project is based on Shenzhen,aims at the needs of innovation and development in the Guangdong-Hong Kong-Macao Greater Bay Area,and faces the demand for talents in the develop30、ment of future technology and high-end industries.Relying on the advantages of the existing talent team,technological innovation and facility platform of the Advanced Institute,it integrates the Chinese Academy of Sciences in the Guangdong-Hong Kong-Macao Greater Bay Area.粤港澳大湾区粤港澳大湾区由香港、澳门、广州、深圳、珠海31、佛山、惠州、东莞、中山、江门、肇庆九个珠三角城市组成,是中国开放程度最高、经济活力最强的区域之一,在国家发展大局中具有重要战略地位。本项目立足深圳、瞄准粤港澳大湾区创新发展需要,面向未来科技与高端产业发展的人才需求,依托先进院现有人才队伍、科技创新和设施平台优势,整合中国科学院在粤港澳大湾区科研力量,科教融合,探索中国特色社会主义新型公办高校的建设路径,打造粤港澳大湾区标杆性具有中国特色的世界一流研究型大学。北京BEIJING上海SHANGHAI广东省GUANGDONG粤港澳大湾区GUANGDONG-HONGKONG-MACAO GREATER BAY AREA025 项目位置分析图中国科学32、院深圳理工大学建设工程方案设计及建筑专业初步设计International tender for Shenzhen Institute of Advanced Technology,Chinese Academy of Sciences(tentative name)Schematic Design and Architectural Design Development城市发展带URBAN DEVELOPMENT BELT城市发展带URBAN DEVELOPMENT BELT城市发展轴URBAN DEVELOPMENT AXIS城市发展轴城市发展轴URBAN DEVELOPMENT AXIS33、URBAN DEVELOPMENT AXIS往香港TO HK往广州东莞TO GZDONGGUAN惠州HUIZHOU大鹏新区DAPENG NEW DISTRICT坪山新区PINGSHAN NEW DISTRICTLONGHUA NEW DISTRICT南山区NANSHAN罗湖区LUOHU宝安区BAOAN福田区FUTIAN盐田区YANTIAN龙岗区LONGGANG龙华新区GUANGMING NEW DISTRICT光明新区广深港高铁GSH HSRguangming District,ShenzhenThe Guangming District of Shenzhen is located on t34、he development axis of Guangzhou-Shenzhen-Hong Kong.It is an important node of the Guangzhou-Shenzhen Science and Technology Innovation Corridor and one of the core areas of the Guangdong-Hong Kong-Macao Greater Bay Area.The Guangming Science City is based on the concept of“science+city+industry”and35、 the spatial layout planning of“one heart,two districts,and green ring”.Give full play to the location advantages,super-conventional layout of world-class major scientific and technological infrastructure clusters supporting multiple types,multiple levels,and mutual cooperation,to create a world-cla36、ss science city with outstanding competitiveness and influence.IntroductionPROJECT LOCATION项目概况项目位置深圳市光明区深圳市光明区位于广深港发展中轴,是广深科技创新走廊的重要节点,也是粤港澳大湾区核心区域之一。光明科学城以“科学+城市+产业”的理念及“一心两区、绿环萦绕”的空间布局规划。充分发挥区位优势,超常规布局多类型、多层次、相互协作支撑的世界级重大科技基础设施集群,打造竞争力影响力卓著的世界一流科学城。广东省GUANGDONG粤港澳大湾区GUANGDONG-HONGKONG-MACAO GREAT37、ER BAY AREA026 项目位置分析图中国科学院深圳理工大学建设工程方案设计及建筑专业初步设计International tender for Shenzhen Institute of Advanced Technology,Chinese Academy of Sciences(tentative name)Schematic Design and Architectural Design DevelopmentIntroductionPROJECT LOCATION项目概况项目位置场地信息本项目选址位于中国广东省深圳市光明区,总用地面积544065.12平方米,其中校园建设用地4738、76966.40平方米,管理用地67098.72平方米。选址位于光明科学城东北角,新湖街道,公常路南侧,北圳路东侧,距离光明中心区约5公里。项目选址西北侧为中山大学(深圳校区在建),北侧为脑科学、合成生物学重大基础设施,西南侧规划城市绿轴与云谷创新活力链,东侧为塘角山与公明水库。Site informationThe project site is located in Guangming District,Shenzhen,Guangdong Province,China,with a total land area of 544065.12 square meters,of which c39、ampus construction land is 4,776,964.40 square meters and management land is 67098.72 square meters.The site is located at the northeast corner of Guangming Science City,Xinhu Street,south of Gongchang Road,and east of Beizhen Road,about 5 kilometers away from the central area of Guangming.The proje40、ct site is located on the northwest side of Sun Yat-sen University(Shenzhen campus under construction),on the north side are major infrastructures for brain science and synthetic biology,on the southwest side is the planned urban green axis and Yungu innovation vitality chain,and on the east side ar41、e Tangjiao Mountain and Gongming Reservoir.基地SITE脑科学、合成生物学重大基础设施BRAIN SCIENCE,SYNTHETIC BIOLOGYMAJOR INFRASTRUCTURE深圳理工大学地铁站METRO STATION天安云谷(在建)TIANAN TECHNOPARK(UNDER CONSTRUCTION)公明水库GONGMING RESERVIOR森林/郊野公园引导区FOREST PARK AREA教育科研区R&D AREA创意产业园区CREATIVE INDUSTRY AREA塘角山TANGJIAO MOUNTAIN公常路GONGCH42、ANG RD圳园路ZHENYUAN RD北圳路BEIZHEN RD总建筑面积建设用地范围CONSTRUCTION LAND管理范围MANAGEMENT AREAGFA 561,988sqm中山大学深圳校区(在建)SUN YAT-SEN UNIVERSITY SHENZHEN(UNDER CONSTRUCTION)住宅RESIDENCE云谷创新活力链(规划)规划城市绿轴(在建)TECHNOPARK INNOVATION AXISCITY GREEN SPINE AXIS/UNDER CONSTRUCTION现存水库EXISTING RESERVIOR027 场地信息分析图中国科学院深圳理工大学建43、设工程方案设计及建筑专业初步设计International tender for Shenzhen Institute of Advanced Technology,Chinese Academy of Sciences(tentative name)Schematic Design and Architectural Design DevelopmentIntroductionPROJECT LOCATION项目概况项目位置场地对比本项目总用地面积544065.12平方米,其中校园建设用地476966.40平方米。选取部分典型大学校园为案例,对比校园占地面积与容积率,更加清晰的认知中国科学院44、深圳理工大学建设定位。Site comparisonThe total land area of this project is 544065.12 square meters,of which the campus construction land is 476,966.40 square meters.Select some typical university campuses as cases,compare the campus area and floor area ratio,and have a clearer understanding of the constructio45、n positioning of Shenzhen University of Technology,Chinese Academy of Sciences.Chinese University of Hong Kong,Shenzhen香港中文大学(深圳)容积率 FAR:1.06Sun Yat-sen University,Shenzhen 中山大学(深圳)容积率 FAR:0.9(一期)Southern University of Science and Technology,Shenzhen南方科技大学(深圳)容积率 FAR:0.46Southern University of Scien46、ce and Technology,Shenzhen深圳大学(深圳)容积率 FAR:0.77University of Macau澳门大学容积率 FAR:0.84Shenzhen Institute of Advanced TechonologyChinese Academy of Sciences中国科学院深圳理工大学容积率 FAR:0.87028 场地信息分析图中国科学院深圳理工大学建设工程方案设计及建筑专业初步设计International tender for Shenzhen Institute of Advanced Technology,Chinese Academy of Sc47、iences(tentative name)Schematic Design and Architectural Design DevelopmentIntroductionPROJECT LOCATION项目概况项目现状缺少自然与社交资源A LACK OF NATURE AND SOCIAL LIFEGFA PER STUDENT人均建筑面积/m RATE OF SATISFICATOION师生舒适度SUST:78.8南方科技大学CUHK:48.3香港中文大学(深圳)SYSU:64.5中山大学(深圳)WU:103.4西湖大学(杭州)UM:94.5澳门大学SZTU:70.2深圳理工大学025548、075100GROUND FLOOR AREAPER STUDENT人均占地面积/m RATE OF SATISFICATOION师生舒适度68.0深圳理工大学80.4南方科技大学45.5香港中文大学(深圳)72.4中山大学(深圳)97.1西湖大学(杭州)109澳门大学0255075100项目场地东侧山形陡峭、进深狭窄,北侧自然水体应予保留,西侧有住宅区,建设用地形状崎岖,可塑性有限。对比国内其他大学,中科院深圳理工大学的人均建筑面积及人均占地面积排名靠后,常规规划下师生舒适度有限,因此需要营造自然舒适和丰富的社交空间The east side of the project site has 49、a steep mountain shape and narrow depth.The natural water body on the north side should be preserved.There is a residential area on the west side.The construction land has a rugged shape and limited plasticity.Compared with other domestic universities,Shenzhen University of Technology of the Chinese50、 Academy of Sciences ranks low in terms of per capita building area and per capita floor area.Under the current planning,the comfort of teachers and students is limited.Therefore,it is necessary to create a natural,comfortable and rich social space029 场地现况分析图中国科学院深圳理工大学建设工程方案设计及建筑专业初步设计International51、 tender for Shenzhen Institute of Advanced Technology,Chinese Academy of Sciences(tentative name)Schematic Design and Architectural Design Development基地红线REDLINE管理范围MANAGEMENT LINE场地入口 ENTRANCE沿街界面 STREET INTERFACE沿街界面 STREET INTERFACE引入城市绿轴 INTRODUCE GREEN AXIS场地入口 ENTRANCE安置房 RESIDENTIAL123环境视角 1V52、IEW 1环境视角 2VIEW 2环境视角 3VIEW 3+117.00+80.00+10.00+103.00+53.00IntroductionSITE STRATEgY项目概况场地策略本项目场地西南侧规划城市绿轴和天安云谷。The urban green axis and Tianan Cloud Valley are planned on the southwest side of the project site.Planning resettlement housing in the northwest corner and the Shenzhen campus of Sun Ya53、t-sen University.The north side is a major infrastructure for brain science and synthetic biology.The entrances to the site are located on the north and southeast sides.西北角规划安置房和中山大学深圳校区。北侧为脑科学、合成生物学重大基础设施,场地入口分别位于北侧和东南侧。030 场地策略分析图中国科学院深圳理工大学建设工程方案设计及建筑专业初步设计International tender for Shenzhen Instit54、ute of Advanced Technology,Chinese Academy of Sciences(tentative name)Schematic Design and Architectural Design DevelopmentIntroductionSITE STRATEgY321基地红线REDLINE管理范围MANAGEMENT LINE+4.50+4.50+0.00+12.00+18.00+9.00环境视角 3VIEW 3环境视角 1VIEW 1环境视角 2VIEW 2+18.00+98.00+98.00+9.00+96.00+0.00+0.00+0.00+116.0055、城市景观 CITY VIEW水景 LAKE山景 MOUNTIAN项目概况场地策略本项目用地形状不规则,整体呈南北走向,总体地势起伏明显。南部及西部地势较高,场地内有较多山体。原有建筑已完成拆迁,场地相对平整,为项目建设提供良好的基础条件。场地东北侧现存山塘水景。The land for this project has an irregular shape,with a north-south direction as a whole,and the overall topography is obviously undulating.The original building has bee56、n demolished and the site is relatively flat,providing good basic conditions for project construction.Existing mountain and pond waterscapes on the northeast side of the site.031 场地策略分析图中国科学院深圳理工大学建设工程方案设计及建筑专业初步设计International tender for Shenzhen Institute of Advanced Technology,Chinese Academy of 57、Sciences(tentative name)Schematic Design and Architectural Design DevelopmentIntroductionVISION项目概况愿景连接城市与自然的纽带THE LINK BETWEEN THE CITY AND NATURE山城相生场地特质显著,西侧为城市空间,东侧为山体植被。项目引入规划绿轴,呼应城市机理,融合山与城特质,协调城市公共空间与自然资源和谐共生。Mountain and CityThe site has remarkable characteristics,with urban space on the wes58、t side and mountain vegetation on the east side.The project introduces the planning green axis,echoes the urban mechanism,integrates the characteristics of mountains and cities,and coordinates the harmonious coexistence of urban public space and natural resources.032 愿景分析图中国科学院深圳理工大学建设工程方案设计及建筑专业初步设59、计International tender for Shenzhen Institute of Advanced Technology,Chinese Academy of Sciences(tentative name)Schematic Design and Architectural Design DevelopmentAs the predecessor of Shenzhen University of Technology,Advanced Institute provides a strong guarantee for the establishment and future 60、development of the university based on years of scientific research experience and faculty resources.The Institute hopes to break through the traditional education model and cultivate market-oriented academically competent professionals for Shenzhen.作为深圳理工大学的前身,先进院基于多年的科研经验与师资资源为大学的创办以及未来发展提供了有力的保障。61、研究院希望突破传统教育模式,为深圳培养市场导向的学术过硬的专业人才。一所富有科研底蕴的年轻高等学府A YOUNg UNIVERSITY OF RENOWNED RESEARCH ACHIEVEMENTS 健康与医疗新能源&新材料机器人云计算与智能城市Health and MedicalNew Energy&New MaterialRoboticCloud Computing&Smart City033 愿景分析图中国科学院深圳理工大学建设工程方案设计及建筑专业初步设计International tender for Shenzhen Institute of Advanced Technolo62、gy,Chinese Academy of Sciences(tentative name)Schematic Design and Architectural Design Development多层级共享空间多层级共享空间使得多维度网络交流空间得以实现整体性的空间定义了统一连续完整的中科院深理工MULTILAYERED SPACELEARNING COMMUNITYMULTIDIMENSIONAL NETWORKCROWD GATHERINGHOLISTIC SPACEINSPIRING CONVERSATION学习型社区知识航站楼汇聚人群鼓励思想碰撞的空间主旨交流启发加强空间连通性构成灵63、感多样化极具前瞻性的办校目标A FORWARD-LOOKINg FOUNDINg PURPOSE034 概念分析图中国科学院深圳理工大学建设工程方案设计及建筑专业初步设计International tender for Shenzhen Institute of Advanced Technology,Chinese Academy of Sciences(tentative name)Schematic Design and Architectural Design Development改变未来求学潮流的先驱者A PIONEER TRANSFORMINg THE TREND OF gLOB64、AL EDUCATION20102030Under the wave of globalization,“going out”has become a popular trend in Chinas education field.After the completion of Shenzhen University of Technology,as a world-class research university with Chinese characteristics as a benchmark for the Guangdong-Hong Kong-Macao Greater Bay65、 Area,it will showcase the image of contemporary high-level teaching and scientific research institutions,and will surely attract scholars and scientific research institutions from all over the world to“walk in”in the future.全球化浪潮下,“走出去”成为中国教育领域的一个流行趋势。深圳理工大学建成后,作为粤港澳大湾区标杆性具有中国特色的世界一流研究型大学,展现当代高水平教学66、科研机构形象,将来必定会吸引来自世界各地的学者、科研机构“走进来”035 概念分析图中国科学院深圳理工大学建设工程方案设计及建筑专业初步设计International tender for Shenzhen Institute of Advanced Technology,Chinese Academy of Sciences(tentative name)Schematic Design and Architectural Design Development校园功能与学术空间UNIVERSITY FUNCTIONS AND ACADEMIC PROgRAMS 9am 12pm 3pm 6p67、mtime scale compressed 压缩时间尺度 COLLEGE 书院 FACULTY学院INSTITUTE研究院LABORATORY实验室OFFICE办公室INCUBATOR孵化器AUDITORIUM报告厅CLASSROOM教室LABORATORY实验室LIBRARY图书馆PUBLIC STUDY自习室DORMITORY宿舍CANTEEN食堂COMMON ROOM活动室PUBLIC STUDY自习室COLLEGES 书院FACULTY 学院INSTITUTE 研究院PROFESSOR教授STUDENT学生RESEARCHER研究员TRIANGULAR INTERACTION AMO68、NG ACADEMIC PROGRAMSACTIVE PERIOD OF ACADEMIC PROGRAMS学术功能互动三角学术功能的活跃时段036 概念分析图中国科学院深圳理工大学建设工程方案设计及建筑专业初步设计International tender for Shenzhen Institute of Advanced Technology,Chinese Academy of Sciences(tentative name)Schematic Design and Architectural Design DevelopmentIntroductionDESIgN CONCEPT项目概69、况设计概念“三院一体”办学理念三院一体是深理工率先提出的全新办学理念。学院,书院,研究院在空间上穿插融合,打破物理界限,校园互动模式从传统的师生的二元对立,变成师生研三元联动的科教产全链条模式。基于最简单的数学原理,设计创造性地实现空间和功能复合,以书院院落式布局为基础,学院和研究院交叉进入,形成各功能组团。School Philosophy-Three in OneThe integration of three institutes is a brand-new school-running concept first proposed by Shenzhen Polytechnic.Co70、lleges,academies,and research institutes are interspersed and integrated in space,breaking physical boundaries.The campus interaction model has changed from the traditional dual opposition of teachers and students to a full-chain model of science,education and industry with a ternary linkage between71、 teachers and students.Based on the simplest mathematical principles,the design creatively realizes the combination of space and function.Based on the courtyard layout of the academy,colleges and research institutes cross into each other to form functional groups.The groups are connected in pairs to72、 form an efficient and independent science and education community.The functional loop continuity connects the groups to complete the major functional space themes.It not only connects research and teaching,but also promotes communication,improves efficiency,and catalyzes cross-reactions between dis73、ciplines through various physical measures.办学理念-三院一体School Philosophy-THREE IN ONEEXPLORE探索SOLID FUNDATION强基HUMANITY人文PRACTICE实践MORAL立德APPLICATION应用研究院 INSTITUTE书院 COLLEGES学院 FACULTY研究院 INSTITUTEPROFESSOR教授STUDENT学生RESEARCHER研究员书院 COLLEGES学院 FACULTY037 概念分析图中国科学院深圳理工大学建设工程方案设计及建筑专业初步设计International 74、tender for Shenzhen Institute of Advanced Technology,Chinese Academy of Sciences(tentative name)Schematic Design and Architectural Design DevelopmentIntroductionDESIgN CONCEPT项目概况设计概念弹性生长与可复制性可能性通过有理化的三元一体概念。衍生出多种建筑组合与功能拼接模式。在统一的基础逻辑与模数下生成多样化的全新的结构体系。从而为未来功能的变化与复制提供相对灵活的空间语言。并创造了一种内在连贯的秩序。在突出当前阶段的独特75、性同时,也创造了一个独一无二的可识别的规划结构系统。并可以很好的转化为功能不同,形态各异的建筑空间形态。Elastic growth and reproducibilityThrough the rationalized concept of trinity.Derive a variety of architectural combinations and functional splicing modes.Under the unified basic logic and modulus,a diversified new structure system is generated.So 76、as to provide a relatively flexible spatial language for future function changes and replication.And it creates an inner coherent order.While highlighting the uniqueness of the current stage,it also created a unique and identifiable planning structure system.And it can be well transformed into archi77、tectural spatial forms with different functions and forms.LARGE FOOTPRINTCARVINGSTACKINGCOURTYARDPOSSIBILITYSTEPPINGINTERLOCKPLINTHTOWERINNER TOWER大平面切割叠加院落阶梯搭接裙房塔楼塔院038 概念分析图中国科学院深圳理工大学建设工程方案设计及建筑专业初步设计International tender for Shenzhen Institute of Advanced Technology,Chinese Academy of Sciences(te78、ntative name)Schematic Design and Architectural Design DevelopmentPLATFORMROOF平台屋顶通过中间层的科教高线形成科教三维的知识社区FORM A THREE-DIMENSIONAL KNOWLEDgE COMMUNITY OF SCIENCE AND EDUCATION THROUgH THE MIDDLE-LEVEL SCIENCE AND EDUCATION HIgH-SPEED LINE知识的航站楼中国科学院深圳理工大学,依托先进院的深厚科研教育资源,以学院,书院,研究院三院一体的全新办学理念打造一个史无前例的知识79、的航站楼。校园形成一个多维度的网络学习社区,通过主次分明的空间节点,从平面和立体维度渗透整个校园。The terminal of knowledgeThe Shenzhen University of Technology,Chinese Academy of Sciences,relies on the profound scientific research and education resources of the Advanced Institute,and builds an unprecedented knowledge terminal building with the ne80、w school concept of the college,the academy,and the research institute.The campus forms a multi-dimensional network learning community,which penetrates the entire campus from both plane and three-dimensional dimensions through spatial nodes with distinct primary and secondary.IntroductionVISION项目概况愿81、景039 概念分析图总体规划PLANNING中国科学院深圳理工大学建设工程方案设计及建筑专业初步设计International tender for Shenzhen Institute of Advanced Technology,Chinese Academy of Sciences(tentative name)Schematic Design and Architectural Design Development知识的航站楼多维度网络学习社区山城相生自然与城市和谐共生Mountain and CityHarmony between nature and cityThe termina82、l of knowledge Multi-dimensional online learning community041 概念分析图中国科学院深圳理工大学建设工程方案设计及建筑专业初步设计International tender for Shenzhen Institute of Advanced Technology,Chinese Academy of Sciences(tentative name)Schematic Design and Architectural Design DevelopmentIntroductionCHALLENgES AND STRATEgIES项目概况挑83、战与策略山城相生 知识的航站楼MOUNTAIN CITY KNOWLEDgE TERMINAL042 愿景效果图中国科学院深圳理工大学建设工程方案设计及建筑专业初步设计International tender for Shenzhen Institute of Advanced Technology,Chinese Academy of Sciences(tentative name)Schematic Design and Architectural Design DevelopmentType B Module44,410 m2B型模块Type C Module97,702 m2C型模块R84、esidence50,028 m2书院Graduate Aptment32,000 m2硕士生公寓Graduate Aptment31,800 m2博士生公寓食堂外籍教师公寓室内体育馆学生素质拓展中心图书馆A型模块Type A Module4,120 m2后勤模块Logistics Module8,640 m2Library22,400 m2Indoor Stadium15,500 m2行政楼Admin.16,240 m2国际交流中心Communication Centre15,000 m2Canteen10,160 m2Development Centre35,000 m2Teacher A85、partment5,084 m2动物房特殊实验室大型设备房Large Equipement15,000 m2Animal Room5,000 m2Special Lab10,000 m2学院研究院组团书院、硕博公寓组团公共服务设施Public supporting facilities buildings149,384 m2Four faculty clusters113,828 m2Public teaching cluster129,000 m2PlanningPROgRAM总体规划规划功能功能需求本项目主要建设内容包括图书馆、书院、学院和研究院、国际交流中心、行政楼、硕博公寓、食堂、室内86、体育馆、室外体育场、地下车库等。形成集本科生培养、研究生教育、科学研究和师生生活的大学校区。基本功能可分为学院研究院组,书院硕博公寓组,及相关的公共服务设施三大类别。致力于以小而精的模式,致力于创建一所中国特色社会主义的新型公办高校,构建若干世界一流新兴交叉学科与研究平台。Functional RequirementsThe main construction contents of this project include libraries,academies,colleges and research institutes,international exchange centers,a87、dministrative buildings,master and doctoral apartments,canteens,indoor gymnasiums,outdoor stadiums,underground garages,etc.Form a university campus that integrates undergraduate training,postgraduate education,scientific research,and teacher and student life.The basic functions can be divided into t88、hree categories:college research group,college master and doctor apartment group,and related public service facilities.Committed to using a small and sophisticated model,committed to creating a new type of public university with Chinese characteristics,and building a number of world-class emerging i89、nterdisciplinary and research platforms.043 规划分析图中国科学院深圳理工大学建设工程方案设计及建筑专业初步设计International tender for Shenzhen Institute of Advanced Technology,Chinese Academy of Sciences(tentative name)Schematic Design and Architectural Design DevelopmentAcademy学院Academy学院Research研究院Research研究院Graduate Apt.硕士生公寓Gr90、aduate Apt.博士生公寓特殊实验室大型设备房Large EquipSpecial Lab硕士生组团Graduate Cluster博士生组团Graduate Cluster特殊研究组团Special Cluster体育馆学生素质拓展中心Sports Centre游泳馆Swimming室外体育场地Sports Field食堂Canteen配套Support学生服务Student ServiceStudent Development Centre体育运动组团Sports Cluster配套服务组团Support and Service ClusterAcademy学院Residence书院91、Research研究院Academy学院Residence书院Research研究院Academy学院Residence书院Research研究院三院组团AAcademy Research&Residence Cluster A三院组团BAcademy Research&Residence Cluster A三院组团CAcademy Research&Residence Cluster A行政楼Admin.国际交流中心Communication Centre外籍教师公寓Teacher Apartment图书馆Library学生服务中心Student Center本科教研组团Undergradu92、ate Teaching Cluster硕博科创组团Graduate Innovation Cluster文体休闲组团Cultural Sports Cluster音乐Music学生活动Activity餐饮Catering运动Sports教学Teaching教学Teaching住宿Accommodation住宿Accommodation研究Research学习Study学习Study科创InnovationPlanningCLUSTERS总体规划功能组团功能分析秉承“三院一体”的办学理念和学科交叉的教学模式,通过项目功能需求分析与不同学生学研的特有模式和共性,将校园功能分为本科教研组团、硕博教93、研组团、文体休闲组团及图书馆、行政楼等标志性建筑。打破不同学科之间的物理界限,考虑功能、布局的灵活性与兼容性。形成贯通课堂内外、全方位的人才培养机制。Functional AnalysisAdhering to the“three academies in one”school concept and interdisciplinary teaching mode,through the analysis of project function requirements and the unique models and commonalities of different students 94、study and research,the campus functions are divided into undergraduate teaching and research group,master and doctor teaching and research group,cultural,sports and leisure group and books Landmark buildings such as museums and administrative buildings.Break the physical boundaries between different95、 disciplines and consider the flexibility and compatibility of functions and layouts.Form an all-round talent training mechanism that runs through inside and outside the classroom.044 规划分析图中国科学院深圳理工大学建设工程方案设计及建筑专业初步设计International tender for Shenzhen Institute of Advanced Technology,Chinese Academy 96、of Sciences(tentative name)Schematic Design and Architectural Design DevelopmentPlanningCONCEPT gENERATION总体规划概念生成东接山景East to Moutain 北侧对接城市界面North to Urban Face西南延续城市绿轴South to Green Corridor山Mountain城City学术文化轴 Academy Cultural SpineLake 水 Mountain山City 城 根据场地水域景观特质适宜布局丰富的公共活动功能营造活跃动态的校园氛围According97、 to the characteristics of the water landscape,its suitable for layout of abundant public activity functions andcreate an active and dynamic campus group根据场地城市界面特质适宜布局活跃的科创研究功能 打造创新的实验平台According to the characteristics of the urban interface,its suitable for layout of active scientific innovation re98、search functionsand create an innovative experimental platform根据场地山体景观特质适宜布局安静的书院、学院、研究院等教研及住宿功能,营造宜人的学院生活According to the characteristics of the mountain landscape,its suitable for layout of quiet academies,colleges,and research institutesand create a pleasant campus life一轴三区场地现状由为山体、水域、和城市三大特质构成,各99、自特色鲜明。项目随形就势,积极呼应场地特质,将场地规划成三大片区。同时重视西南城市绿轴,衔接引入城市景观轴,北侧对接城市界面。打造与城市、景观有机融合、开放共享、活力多元的创新型校园。One axis three zonesThe current situation of the site consists of three major characteristics:mountains,waters,and cities,each with distinctive characteristics.The project follows the trend and actively respo100、nds to the characteristics of the site,planning the site into three major areas.At the same time,it pays attention to the green axis of the southwest city,and introduces the urban landscape axis to connect with the city interface on the north side.Create an innovative campus that is organically inte101、grated with the city and landscape,open and shared,and vibrant and diverse.045 规划分析图中国科学院深圳理工大学建设工程方案设计及建筑专业初步设计International tender for Shenzhen Institute of Advanced Technology,Chinese Academy of Sciences(tentative name)Schematic Design and Architectural Design Development文体休闲组团Cultural Sports Clu102、ster音乐Music学生活动Activity餐饮Catering运动Sports本科教研组团Undergraduate Teaching Cluster教学Teaching住宿Accommodation研究Research学习Study硕博科创组团Graduate Innovation Cluster教学Teaching住宿Accommodation学习Study科创InnovationDynamic灵动Innovation创新Quiet Study静学三大组团通过功能分类与场地特性分析,由南向北将本科教研组团与山体相结合,硕博教研组团与城市相结合,文体休闲组团与水域相结合。景观脉络贯穿南北103、,和公共空间将三大组团相连接,形成核心轴线。山水城相互渗透编织出理性有机的整体校园。Three ClustersThrough functional classification and site characteristics analysis,the undergraduate teaching and research group is combined with the mountain from south to north,the master and doctor teaching and research group is combined with the city,and 104、the cultural,sports and leisure group is combined with the water.The landscape context runs through the north and south,connecting the three major clusters with the public space to form a core axis.The interpenetration of Shanshui City weaves a rational and organic whole campus.PlanningCONCEPT gENER105、ATION总体规划概念生成046 规划分析图中国科学院深圳理工大学建设工程方案设计及建筑专业初步设计International tender for Shenzhen Institute of Advanced Technology,Chinese Academy of Sciences(tentative name)Schematic Design and Architectural Design Development本科教研轴 UNDERGRADUATE TEACHING Spine硕博科创轴 GRADUATE INNOVATION Spine 文体休闲轴 CULTURAL SPORTS106、 Spine文化广场CULTURAL PLAZA北入口North Entrance南入口South EntranceACADEMIC PLAZA学术广场三轴两核本科科研轴、硕博科研轴、文体休闲轴三大轴线贯穿校园。学术广场、文化广场南北双核与三轴有机结合。校园南北景观轴贯通衔接城市绿轴。Three Axis Two CoreThe north-south dual-core undergraduate scientific research axis,the master-doctoral scientific research axis,and the recreational sports 107、axis run through the campus.The academic plaza and cultural plaza are organically combined with north-south dual cores and three-axis.The north-south landscape axis of the campus connects with the green axis of the city,and the landscape and city penetrate each other to create a rational and organic108、 whole campus.PlanningCONCEPT gENERATION总体规划概念生成047 规划分析图中国科学院深圳理工大学建设工程方案设计及建筑专业初步设计International tender for Shenzhen Institute of Advanced Technology,Chinese Academy of Sciences(tentative name)Schematic Design and Architectural Design Development书院(本科生)图书馆学院音乐厅研究院博士公寓硕士公寓行政楼室内体育馆预留用房国际交流中心PHD Stud109、ent ApartmentGraduate Student ApartmentAdministration BuildingReserved Building预留用房Reserved BuildingInternational Communication Center室外体育场地ResidenceLibrary 学术广场Cultural MarketAcademyMusic HallResearch Institutes学院研究院AcademyResearch InstitutesIndoor StadiumOutdoor Sports Venue外籍教师公寓Apt for Foreign T110、eachers食堂Dining Hall本科教研组团Undergraduate Teaching Cluster文体休闲组团Cultural Sports Cluster硕博科创组团Graduate Innovation Cluster功能布局场地由南向北分别为:本科生教研组团、硕博科创组团和文体休闲组团。组团之间再两两相连,形成高效独立的科教社区。功能环连续性串联各组团,完成各大功能空间主题,不仅串联研究和教学,也通过各种物理措施促进了沟通、提高效率、催化学科间的交叉反应。南北两侧适当预留发展空间,满足可持续发展需要,充分考虑校园向外扩展建设的可操作性。Function layoutThe 111、venues from south to north are:undergraduate teaching and research group,master and doctoral science and technology innovation group,and cultural,sports and leisure group.The groups are connected in pairs to form an efficient and independent science and education community.The functional loop contin112、uity connects the groups to complete the major functional space themes.It not only connects research and teaching,but also promotes communication,improves efficiency,and catalyzes cross-reactions between disciplines through various physical measures.Appropriately reserve development space on the nor113、th and south sides to meet the needs of sustainable development,and fully consider the operability of campus expansion.PlanningCONCEPT gENERATION总体规划概念生成048 规划分析图中国科学院深圳理工大学建设工程方案设计及建筑专业初步设计International tender for Shenzhen Institute of Advanced Technology,Chinese Academy of Sciences(tentative name)114、Schematic Design and Architectural Design DevelopmentN050 100200m音乐厅 H=30MUSIC HALL体育馆 H=30STADIUM覆土动物房 H=6ANIMAL HOLDING覆土特殊实验室SPECIAL LABS本科三院一体组团1 H=24TRINITY CLUSTER 01本科三院一体组团2 H=30TRINITY CLUSTER 02本科三院一体组团3 H=35TRINITY CLUSTER 03会议/餐厅 H=12CONFERENCE/CANTEEN硕士三院一体组团 H=50MASTER TRINITY CLUSTER博115、士三院一体组团 H=45DOCTOR TRINITY CLUSTER学术平台图书馆 H=20ACADEMIIC PLATFORM LIBRARY行政国际会议中心 H=73ADMIN&INTERNATIONAL CONFERENCE 外籍专家公寓 H=36FOREIGN EXPERTS APARTMENT南侧预留用地SOUTH RESERVED LAND北侧预留用地NORTH RESERVED LAND文化平台服务大厅 H=12CULTURAL PLATFORM SERVICE HALL大设备实验平台 H=24LARGE EQUITMENT LABS次要车行入口SECONDARY CAR ENT116、RANCE建设范围线SITE RED LINE次要车行入口SECONDARY CAR ENTRANCE消防/主后勤入口FIRE TRUCK/LOGISTIC CAR ENTRANCE主要车行入口MAIN CAR ENTRANCE主要车行入口MAIN CAR ENTRANCE主要人行入口MAIN CAR ENTRANCEVIP入口VIP ENTRANCE主要人行入口MAIN CAR ENTRANCE管理范围线CONTROL LINE体育场 H=24SPORTS FIELD餐厅CANTEEN学校食堂CANTEENPlanningMASTER PLAN总体规划总平面图指标备注544065.12建设用117、地面积 Construction Site area()476966.40GIC5管理用地面积 Management Site area()67098.72E2615500417700地上计容(教学及附属等)Aboveground()379200地下计容(教研附属用房)Underground()3850022000架空层Tilted Space1758002143000.8814635030.7%18475338.7%3800100其中Incl.不计容地上建筑面积 GFA Aboveground()地下建筑面积 FAR-counted floor area()经济技术指标Technical a118、nd economic indicators分项总用地面积Total Site area()总建筑面积 GFA 建筑限高(m)其中Incl.机动车停车位Car parking Qty.(辆)容积率 FAR建筑覆盖率 Building coverage绿化覆盖率 Greening coverage绿化面积 Greening Area()不计容地下建筑面积 GFA Underground()计容建筑面积 FAR-counted floor area()建筑基底面积 Building coverage area()地上计容15000地下计容1800055000175000地上计容10000地下计容5119、000书院食堂7000大学食堂3000清真食堂20060000地上计容27000地下计容3000150004000地上计容2500地下计容2500地下计容1000055004177001758002200038500615500动物房 Experimental Animal Room()分功能指标Functional indicators图书馆 Library()本科生书院 Residence()学院和研究院 Academy and Research Institutes()多功能礼堂(音乐厅)Concert Hall()食堂 Dining Hall()硕博公寓 Graduate Apartm120、ent()行政楼+国际交流中心 Admin and International Communication Center()室内体育馆 Indoor Stadium()大型设备房 Room for Large Equipment()总建筑面积()特殊实验室 Special Laboratory()外籍教师生活用房 Apartment for Foreign Teachers()计容总计 FAR-counted floor area()地下设备和车库 Underground Equipment and Garage不计容地上架空层 GFA Aboveground()地下计容 FAR-counte121、d floor area-Underground()049 总平面图中国科学院深圳理工大学建设工程方案设计及建筑专业初步设计International tender for Shenzhen Institute of Advanced Technology,Chinese Academy of Sciences(tentative name)Schematic Design and Architectural Design DevelopmentN050 100200mPlanningMASTER PLAN总体规划总平面图050 总平面图中国科学院深圳理工大学建设工程方案设计及建筑专业初步设计122、International tender for Shenzhen Institute of Advanced Technology,Chinese Academy of Sciences(tentative name)Schematic Design and Architectural Design Development人车分流校园主入口建设与东南方位北圳路一侧,主入口广场延续城市绿轴景观和水景,开阔庄严;次入口设于北侧公常路,临近地铁口,方便师生日常生活。步行流线舒适宜人,师生参与主要活动的路线合理、便捷,风雨连廊贯穿校园,形成完善的步行交通网络。校园道路畅通,内部动静分离、人车分流,致123、力于打造无车校园,最大限度的减少机动车对对教学区的干扰。Pedestrian and Vehicles CirculationThe main entrance of the campus is on the side of Beizhen Road to the southeast.The main entrance square continues the urban green axis landscape and waterscape,which is open and solemn;the secondary entrance is located on Gongchang Road124、 on the north side,close to the subway entrance,which is convenient for teachers and students in daily life.The pedestrian flow line is comfortable and pleasant,the route for teachers and students to participate in the main activities is reasonable and convenient,and the wind and rain corridor runs 125、through the campus,forming a perfect pedestrian transportation network.The campus roads are unobstructed,the internal dynamics and statics are separated,and people and vehicles are separated.We are committed to building a car-free campus and minimizing the interference of motor vehicles on the teach126、ing area.PlanningCIRCULATION总体规划流线说明人行主入口Pedestrian Main Entrance人行主入口Pedestrian Main Entrance人行主流线Pedestrian Main Circulation建筑入口Building Entrance人行次流线Pedestrian Secondary Circulation景观流线Landscape CirculationPPPPP车行流线Vehicle Circulation地下车库入口Basement Entrance051 人行与车行流线图中国科学院深圳理工大学建设工程方案设计及建筑专业初步设计127、International tender for Shenzhen Institute of Advanced Technology,Chinese Academy of Sciences(tentative name)Schematic Design and Architectural Design Development消防与地下室流线消防道路畅通,合理满足安全规范。各功能区和重要建筑物地下配置机动车停车位,方便师生日常工作生活需要。停车场出入口设置在校园进出口附近,有利于对外来车辆进入校园进行有效控制和管理。Fire and basement circulationThe fire pr128、otection road is unblocked and meets the safety regulations reasonably.Motor vehicle parking spaces are arranged underground in various functional areas and important buildings to facilitate the daily work and life needs of teachers and students.The entrance and exit of the parking lot are set near 129、the entrance and exit of the campus,which is conducive to effective control and management of foreign vehicles entering the campus.PlanningCIRCULATION总体规划流线说明整体两层地下室地下建筑面积 214,300m2其中 计容功能面积 38,500m2 设备与车库 175,800m2B1 B2 车库约1,500个车位B1 会议 餐厅 报告厅 下沉广场B2 车库约7,507个车位B1 会议 餐厅 报告厅 下沉广场B2 车库约7,507个车位B1 大设备130、与车库B2 车库约430个车位L1 动物房B1 特殊实验室+27.00+33.00地下室区域Basement 1F Area地下车库入口Basement Entance物流流线及卸货点Logistics Circulation消防登高面FireTrucks Fire Fighting Coverage建筑外部消防车流线Fire Trucks Circulation建筑外部消防车流线Fire Trucks Circular Circulation052 消防与物流流线图中国科学院深圳理工大学建设工程方案设计及建筑专业初步设计International tender for Shenzhen In131、stitute of Advanced Technology,Chinese Academy of Sciences(tentative name)Schematic Design and Architectural Design DevelopmentPlanningWEST ENTRANCE总体规划西入口053 西入口效果图中国科学院深圳理工大学建设工程方案设计及建筑专业初步设计International tender for Shenzhen Institute of Advanced Technology,Chinese Academy of Sciences(tentative na132、me)Schematic Design and Architectural Design DevelopmentPlanningNORTH ENTRANCE总体规划北入口054 北入口效果图中国科学院深圳理工大学建设工程方案设计及建筑专业初步设计International tender for Shenzhen Institute of Advanced Technology,Chinese Academy of Sciences(tentative name)Schematic Design and Architectural Design Development总体规划功能布局Master133、 planPROgRAM DISTRIBUTION食堂CANTEEN学生服务中心STUDENTSERVICE CENTER食堂CANTEEN学院ACADEMY博士公寓DOMITORY外籍教师公寓DOMITORY硕士公寓DOMITORY大型设备房LARGE EQUIPMENT研究院INSTITUTE图书馆LIBRARY室内体育馆SPORTS CENTER动物房ANIMAL HOLDING特殊实验室SPECIAL LAB书院DOMITORY国际交流中心INTERNATIONALCENTER室外体育场地SPORTS FIELD行政楼ADMIN音乐厅MUSIC HALL功能落位于城市百米高层侧布局都市134、感的硕博科研组团,呼应场地现存水库,并改造为内湖,环绕布局生活休闲组团。顺应场地山势高差,于南侧布局书院教研组团。行政楼国际交流中心组团与音乐厅作为标志建筑分置于入口广场。鉴于狭长的场地条件,设计通过三条由风雨连廊,交流平台,公共实验教学等功能组成的活力高线以及南图书馆,北学术广场,两个枢纽连接各个组团。Function layoutThe master and doctoral scientific research group with an urban feel on the high-rise side of the city 100 meters away corresponds t135、o the existing reservoir on the site and is transformed into an inner lake to surround the living and leisure group.In accordance with the height difference of the mountain,the teaching and research group of the college is arranged on the south side.The international exchange center group of the adm136、inistration building and the concert hall are located in the entrance plaza as a landmark building.In view of the long and narrow site conditions,the design connects each group through three vitality high lines composed of wind and rain corridors,communication platforms,public experimental teaching 137、and other functions,as well as the South Library,the North Academic Plaza,and two hubs.055 功能布局轴测图中国科学院深圳理工大学建设工程方案设计及建筑专业初步设计International tender for Shenzhen Institute of Advanced Technology,Chinese Academy of Sciences(tentative name)Schematic Design and Architectural Design Development总体规划天际线 Mas138、ter planSKYLINE0.0040m30-40m20-30m?uG?+?u?P?&?O?D?V?V?U?R?R?P?0?R?G?X?O?H?&?O?D?V?V?U?R?R?P?I?R?U?S?S?O?6?P?L?Q?D?U?U?R?R?P?I?R?U?S?S?O?/?H?F?W?X?U?H?K?D?O?O?I?R?U?S?S?O?W?.JA?Ll?&?O?D?V?V?U?R?R?P?0?R?G?X?O?H?6?H?F?X?U?L?W?P?D?L?O?S?U?L?Q?W?L?Q?J?V?W?R?U?D?J?H?Z?D?U?H?K?R?X?V?H?W?R?L?O?H?W?H?W?F?D?W139、?-?l?0?R?G?X?O?H?&?R?P?E?L?Q?D?W?L?R?QModule B?%?R?R?W?K?D?U?H?D?2?F?H?V?D?G?P?L?Q?V?X?S?S?R?U?W?U?R?R?P?V?$W?p?uG?+?uModule B?%?R?R?W?K?D?U?H?D?2?F?H?V?D?G?P?L?Q?V?X?S?S?R?U?W?U?R?R?P?V?G?U?O?D?E?V?%W?p?uG?+?u?P?&?O?D?V?V?U?R?R?P?0?R?G?X?O?H?6?H?F?X?U?L?W?P?D?L?O?S?U?L?Q?W?L?Q?J?V?W?R?U?D?J?H?Z?D?U140、?H?K?R?X?V?H?W?R?L?O?H?W?H?W?F?D?W?-?l?u?+UL*1建筑设计建筑模块Building DesignBUILDINg MODULARITY三院一体模块化设计原则依托三院一体基本及设计理念,各功能空间按照需求合理面积配比,各种功能组团内部以模块化形式组合以满足校园规划近期使用需求,并且给与远期使用考虑提供充分的协调空间,满足未来科学发展的动态变化。3 in 1 modular building principleRelying on the basic and design concept of the integration of the three ho141、spitals,each functional space has a reasonable area ratio according to the needs,and the various functional groups are combined in a modular form to meet the short-term use needs of campus planning,and provide sufficient coordination space for long-term use considerations.Meet the dynamic changes of142、 future scientific development.建筑模块分析069中国科学院深圳理工大学建设工程方案设计及建筑专业初步设计International tender for Shenzhen Institute of Advanced Technology,Chinese Academy of Sciences(tentative name)Schematic Design and Architectural Design Development建筑设计模块化校园Building DesignMODULAR CAMPUS模块化校园模块化校园规划从功能上能够符合未来教育所需要的多元化143、智能化、开放互动等要求,模块化建筑可以在每个单元体间形成许多空间,这些单元体既可以独立发挥功能,又可以相互组合、共享,还能随时叠加,将所需的功能植入到模块化建筑里,将深圳理工大学三院一体贯彻到底,融合并贯穿整个校园规划设计中,成为中国科研领域未来领军学校。Modular CampusModular campus planning can meet the requirements of diversification,intelligence,open interaction and other requirements for future education.Modular buildi144、ngs can form many spaces between each unit.These units can perform functions independently and It can be combined and shared with each other,and can be superimposed at any time.The required functions are implanted into the modular building,and the three hospitals of Shenzhen University of Technology145、 are implemented to the end,integrated and run through the entire campus planning and design,and become the future leading school in Chinas research field.?A?odule A?B?odule B?C?odule C?Classroom?ogistics?Student Residence070 模块化校园分析图中国科学院深圳理工大学建设工程方案设计及建筑专业初步设计International tender for Shenzhen Inst146、itute of Advanced Technology,Chinese Academy of Sciences(tentative name)Schematic Design and Architectural Design DevelopmentMountain Landscape?L?0-?Landscape GardensK?Z?z?Main Plaza?A?vReading/Communication?gDomitoryj4)WCanteenIiKgResearch Institute,gAcademy建筑设计本科教研组团Building DesignUNDERgRADUATE TE147、ACHINg CLUSTER071 本科教研组团分析图中国科学院深圳理工大学建设工程方案设计及建筑专业初步设计International tender for Shenzhen Institute of Advanced Technology,Chinese Academy of Sciences(tentative name)Schematic Design and Architectural Design Development建筑设计教研轴Building DesignUNDERgRADUATE TEACHINg SPINE?/?_?UNDERgRADUATE TEACHINg SPIN148、E?t?USTAgE?t?USTAgE?t?USTAgEBRIDgE?BRIDgE?BRIDgE?BRIDgE?LABORATORYLABLAB?0?0?CLASSROOMCLASSROOMCLASSROOMCLASSROOMLIBRARY?_?_?+35.5m+31.0m+27.3m+19.7m8K&FtP?(7?$UNDERgRADUATE CLUSTER A8K&FtP?(7?%UNDERgRADUATE CLUSTER B8K&FtP?(7?&UNDERgRADUATE CLUSTER C依山的教研轴串联了三个本科生组团,包含学院、研究院以及六个本科生书院。教研轴主要服务本科生,集教学149、研究、实验于一体,为本科生的学习、思考、实验和交流打造独特的空间。Undergraduate Teaching SpineUndergraduate teaching and research axis analysis Yishans teaching and research axis connects three undergraduate groups,including colleges,research institutes,and six undergraduate colleges.The teaching and research axis mainly serves un150、dergraduates,integrating teaching,research,and experimentation to create a unique space for undergraduates to study,think,experiment and communicate.本科教研轴072 教研轴剖面分析图中国科学院深圳理工大学建设工程方案设计及建筑专业初步设计International tender for Shenzhen Institute of Advanced Technology,Chinese Academy of Sciences(tentative n151、ame)Schematic Design and Architectural Design Development建筑设计南侧鸟瞰Building DesignSOUTH BIRD EYE073 南侧鸟瞰效果图中国科学院深圳理工大学建设工程方案设计及建筑专业初步设计International tender for Shenzhen Institute of Advanced Technology,Chinese Academy of Sciences(tentative name)Schematic Design and Architectural Design Development建筑设计152、三合一书院组团Building DesignTRINITY CLUSTER074 三合一书院效果图中国科学院深圳理工大学建设工程方案设计及建筑专业初步设计International tender for Shenzhen Institute of Advanced Technology,Chinese Academy of Sciences(tentative name)Schematic Design and Architectural Design Development建筑设计书院组团平面书院组团联通层平面Building DesignSHUYUAN CLUSTER PLANShuyua153、n Cluster Connecting Layer Plan六大书院随山势而建,强调“三院一体”的教育理念,以院落式布局为基础,书院、学院和研究院围绕庭院交叉融合,形成各功能组团。三院之间联系紧密,交通便捷。组团中穿插大小不一的共享教室、公共活动、食堂等辅助功能,满足多方面的校园需求。组团之间再两两相连,形成高效独立的科教社区。The six academies are built along the mountain,emphasizing the educational concept of“three academies in one”.Based on the courtyard l154、ayout,the academies,colleges and research institutes are intersected and integrated around the courtyard to form various functional groups.The three hospitals are closely connected and the transportation is convenient.Auxiliary functions such as shared classrooms,public activities,canteens,etc.are i155、nterspersed in the group to meet the needs of various campuses.The groups are connected in pairs to form an efficient and independent science and education community.Undergraduate College本科生书院?o?c?秩c?s?r?组?e?r?s?s?s?s?s?r?r?r?075 书院组团平面图中国科学院深圳理工大学建设工程方案设计及建筑专业初步设计International tender for Shenzhen I156、nstitute of Advanced Technology,Chinese Academy of Sciences(tentative name)Schematic Design and Architectural Design Development建筑设计书院院落平面Building DesignSHUYUAN COURTYARD PLAN书院二层平面书院西立面Shuyuan Cluster 2nd Floor PlanShuyuan Cluster West Elevation#?2?F?H?&?L?U?F?X?O?D?W?L?R?q0?&?R?q?I?H?U?H?q?F?H o?6157、?H?U?Y?L?F?H%c$9?5?H?F?H?S?W?L?R?q40?(?K?L?E?L?W?L?R?q-J?5?H?V?L?g?H?q?F?H-?6?X?S?S?R?U?W?V#?/?D?E?R?U?W?R?U?,k?/?H?F?W?X?U?H6,?6?K?D?U?H?g?6?S?D?F?H?6?S?R?U?W?Va%#?/?6?W?D?F?N?5?R?R?PgZ?5?H?D?g?L?q?J?5?R?R?P076 书院院落平面图中国科学院深圳理工大学建设工程方案设计及建筑专业初步设计International tender for Shenzhen Institute of Advanc158、ed Technology,Chinese Academy of Sciences(tentative name)Schematic Design and Architectural Design Development建筑设计书院院落平面Building DesignSHUYUAN COURTYARD PLAN书院三层平面Shuyuan Cluster 3rd Floor Plan#?2?F?H?&?L?U?F?X?O?D?W?L?R?q0?&?R?q?I?H?U?H?q?F?H o?6?H?U?Y?L?F?H%c$9?5?H?F?H?S?W?L?R?q40?(?K?L?E?L?W?L?R?159、q-J?5?H?V?L?g?H?q?F?H-?6?X?S?S?R?U?W?V#?/?D?E?R?U?W?R?U?,k?/?H?F?W?X?U?H6,?6?K?D?U?H?g?6?S?D?F?H?6?S?R?U?W?Va%#?/?6?W?D?F?N?5?R?R?PgZ?5?H?D?g?L?q?J?5?R?R?P077 书院院落平面图中国科学院深圳理工大学建设工程方案设计及建筑专业初步设计International tender for Shenzhen Institute of Advanced Technology,Chinese Academy of Sciences(tentative n160、ame)Schematic Design and Architectural Design Development建筑设计书院院落平面Building DesignSHUYUAN COURTYARD PLAN书院六层平面Shuyuan Cluster 6th Floor Plan中国科学院深圳理工大学建设工程方案设计及建筑专业初步设计International tender for Shenzhen Institute of Advanced Technology,Chinese Academy of Sciences(tentative name)Schematic Design and A161、rchitectural Design Development建筑设计硕博科创组团Building DesigngRADUATE INNOVATION CLUSTER079 硕博科创组团分析图中国科学院深圳理工大学建设工程方案设计及建筑专业初步设计International tender for Shenzhen Institute of Advanced Technology,Chinese Academy of Sciences(tentative name)Schematic Design and Architectural Design Development建筑设计科创轴Buildi162、ng DesigngRADUATE INNOVATION SPINE临城的科创轴串联了硕士生组团、博士生组团以及特殊设备组团,包含学院、研究院、大型设备用房,以及硕士生公寓和博士生公寓。科创轴主要服务硕士生和博士生,集科研、实验、创新于一体,为硕士生和博士生的学习、思考、实验和交流打造独特的空间。graduate Innovation SpineThe science and technology axis in Lincheng connects a master student group,a doctoral student group,and a special equipment g163、roup,including colleges,research institutes,large-scale equipment rooms,as well as master student apartments and doctoral student apartments.The Science and Innovation Axis mainly serves master students and doctoral students,integrating scientific research,experimentation,and innovation,creating a u164、nique space for master students and doctoral students to study,think,experiment,and communicate.硕博科创轴080 科创轴剖面分析图中国科学院深圳理工大学建设工程方案设计及建筑专业初步设计International tender for Shenzhen Institute of Advanced Technology,Chinese Academy of Sciences(tentative name)Schematic Design and Architectural Design Develop165、ment建筑设计硕博科创组团Building DesigngRADUATE INNOVATION CLUSTER081 硕博科创组团效果图中国科学院深圳理工大学建设工程方案设计及建筑专业初步设计International tender for Shenzhen Institute of Advanced Technology,Chinese Academy of Sciences(tentative name)Schematic Design and Architectural Design Development建筑设计硕博科创组团Building DesigngRADUATE INNOVA166、TION CLUSTER082 硕博科创组团效果图中国科学院深圳理工大学建设工程方案设计及建筑专业初步设计International tender for Shenzhen Institute of Advanced Technology,Chinese Academy of Sciences(tentative name)Schematic Design and Architectural Design Development建筑设计硕博科创组团平面Building DesigngRADUATE INNOVATION CLUSTER PLAN模块化校园硕博科研组团,邻城而起。学院与研究院打破167、不同学科之间的物理界限,充分考虑了功能、布局的灵活性与兼容性,不同学科互动交流,创造性地实现空间和功能复合。Modular campusThe master and doctoral scientific research group rises from neighboring cities.The college and research institute break the physical boundaries between different disciplines,fully consider the flexibility and compatibility of funct168、ions and layouts,interact and communicate with different disciplines,and creatively realize the combination of space and function.硕博科创组团联通层平面graduate Innovation Cluster Connecting Layer Plan#?2?F?H?&?L?U?F?X?O?D?W?L?R?q0?&?R?q?I?H?U?H?q?F?H o?6?H?U?Y?L?F?H%c$9?5?H?F?H?S?W?L?R?q40?(?K?L?E?L?W?L?R?q-J169、?5?H?V?L?g?H?q?F?H-?6?X?S?S?R?U?W?V#?/?D?E?R?U?W?R?U?,k?/?H?F?W?X?U?H6,?6?K?D?U?H?g?6?S?D?F?H?6?S?R?U?W?Va%#?/?6?W?D?F?N?5?R?R?PgZ?5?H?D?g?L?q?J?5?R?R?P083 硕博科创组团平面图中国科学院深圳理工大学建设工程方案设计及建筑专业初步设计International tender for Shenzhen Institute of Advanced Technology,Chinese Academy of Sciences(tentative na170、me)Schematic Design and Architectural Design Development建筑设计硕博庭院平面Building DesigngRADUATE COURTYARD PLAN硕博科创组团西立面graduate Innovation Cluster West Elevation硕博科创组团地下一层平面graduate Innovation Cluster B1 Floor Plan中国科学院深圳理工大学建设工程方案设计及建筑专业初步设计International tender for Shenzhen Institute of Advanced Technolo171、gy,Chinese Academy of Sciences(tentative name)Schematic Design and Architectural Design Development建筑设计硕博庭院平面Building DesigngRADUATE COURTYARD PLAN硕博科创组团三层平面graduate Innovation Cluster 3rd Floor Plan#?2?F?H?&?L?U?F?X?O?D?W?L?R?q0?&?R?q?I?H?U?H?q?F?H o?6?H?U?Y?L?F?H%c$9?5?H?F?H?S?W?L?R?q40?(?K?L?E?L?172、W?L?R?q-J?5?H?V?L?g?H?q?F?H-?6?X?S?S?R?U?W?V#?/?D?E?R?U?W?R?U?,k?/?H?F?W?X?U?H6,?6?K?D?U?H?g?6?S?D?F?H?6?S?R?U?W?Va%#?/?6?W?D?F?N?5?R?R?PgZ?5?H?D?g?L?q?J?5?R?R?P085 硕博科创组团平面图中国科学院深圳理工大学建设工程方案设计及建筑专业初步设计International tender for Shenzhen Institute of Advanced Technology,Chinese Academy of Sciences(ten173、tative name)Schematic Design and Architectural Design Development建筑设计文体休闲组团Building DesignCULTURAL SPORTS CLUSTER086 文体休闲组团分析图中国科学院深圳理工大学建设工程方案设计及建筑专业初步设计International tender for Shenzhen Institute of Advanced Technology,Chinese Academy of Sciences(tentative name)Schematic Design and Architectural D174、esign Development建筑设计文体休闲轴Building DesignCULTURAL SPORTS SPINE傍水的休闲轴串联了体育组团、学生服务组团以及学生素质拓展中心,包含游泳馆、体育馆、学生服务中心、食堂和音乐厅。休闲轴服务全校师生,集文化拓展、体育活动和学生服务于一体,为全校师生的文化生活、体育运动、休闲娱乐打造别致的空间。The Leisure Spine by the water connects the sports group,the student service group and the student quality development center,175、including the swimming pool,gymnasium,student service center,canteen and concert hall.The leisure axis serves the teachers and students of the whole school,integrating cultural development,sports activities and student services,and creates a unique space for the cultural life,sports,leisure and ente176、rtainment of the teachers and students of the whole school.文体休闲轴Cultural Sports Spine087 文体休闲轴剖面分析图中国科学院深圳理工大学建设工程方案设计及建筑专业初步设计International tender for Shenzhen Institute of Advanced Technology,Chinese Academy of Sciences(tentative name)Schematic Design and Architectural Design DevelopmentAcademy学院A177、cademy学院Research研究院Research研究院Graduate Apt.硕士生公寓Graduate Apt.博士生公寓特殊实验室大型设备房Large EquipSpecial Lab硕士生组团Graduate Cluster博士生组团Graduate Cluster特殊研究组团Special Cluster体育馆学生素质拓展中心Sports Centre游泳馆Swimming室外体育场地Sports Field食堂Canteen配套Support学生服务Student ServiceStudent Development Centre体育运动组团Sports Cluster配套服178、务组团Support and Service ClusterAcademy学院Residence书院Research研究院Academy学院Residence书院Research研究院Academy学院Residence书院Research研究院三院组团AAcademy Research&Residence Cluster A三院组团BAcademy Research&Residence Cluster A三院组团CAcademy Research&Residence Cluster A行政楼Admin.国际交流中心Communication Centre外籍教师公寓Teacher Apart179、ment图书馆Library学生服务中心Student Center本科教研组团Undergraduate Teaching Cluster硕博科创组团Graduate Innovation Cluster文体休闲组团Cultural Sports Cluster音乐Music学生活动Activity餐饮Catering运动Sports教学Teaching教学Teaching住宿Accommodation住宿Accommodation研究Research学习Study学习Study科创Innovation建筑设计文体休闲组团Building DesignCULTURAL SPORTS CLUS180、TER088 文体休闲组团效果图中国科学院深圳理工大学建设工程方案设计及建筑专业初步设计International tender for Shenzhen Institute of Advanced Technology,Chinese Academy of Sciences(tentative name)Schematic Design and Architectural Design Development建筑设计体育馆Building DesignSTADIUM089 体育馆效果图中国科学院深圳理工大学建设工程方案设计及建筑专业初步设计International tender for S181、henzhen Institute of Advanced Technology,Chinese Academy of Sciences(tentative name)Schematic Design and Architectural Design Development建筑设计体育馆平面图Building DesignSTADIUM PLANS体育馆首层平面体育馆立面Stadium 1st Floor PlanIndoor Stadium Elevation#?2?F?H?&?L?U?F?X?O?D?W?L?R?q0?&?R?q?I?H?U?H?q?F?H o?6?H?U?Y?L?F?H%182、c$9?5?H?F?H?S?W?L?R?q40?(?K?L?E?L?W?L?R?q-J?5?H?V?L?g?H?q?F?H-?6?X?S?S?R?U?W?V#?/?D?E?R?U?W?R?U?,k?/?H?F?W?X?U?H6,?6?K?D?U?H?g?6?S?D?F?H?6?S?R?U?W?Va%#?/?6?W?D?F?N?5?R?R?PgZ?5?H?D?g?L?q?J?5?R?R?P090 体育馆平面图中国科学院深圳理工大学建设工程方案设计及建筑专业初步设计International tender for Shenzhen Institute of Advanced Technology,183、Chinese Academy of Sciences(tentative name)Schematic Design and Architectural Design Development建筑设计体育馆平面图Building DesignSTADIUM PLANS体育馆二层平面体育馆三层平面Stadium 2nd Floor PlanStadium 3rd Floor Plan#?2?F?H?&?L?U?F?X?O?D?W?L?R?q0?&?R?q?I?H?U?H?q?F?H o?6?H?U?Y?L?F?H%c$9?5?H?F?H?S?W?L?R?q40?(?K?L?E?L?W?L?R?q184、-J?5?H?V?L?g?H?q?F?H-?6?X?S?S?R?U?W?V#?/?D?E?R?U?W?R?U?,k?/?H?F?W?X?U?H6,?6?K?D?U?H?g?6?S?D?F?H?6?S?R?U?W?Va%#?/?6?W?D?F?N?5?R?R?PgZ?5?H?D?g?L?q?J?5?R?R?P#?2?F?H?&?L?U?F?X?O?D?W?L?R?q0?&?R?q?I?H?U?H?q?F?H o?6?H?U?Y?L?F?H%c$9?5?H?F?H?S?W?L?R?q40?(?K?L?E?L?W?L?R?q-J?5?H?V?L?g?H?q?F?H-?6?X?S?S?R?U?W?V#185、?/?D?E?R?U?W?R?U?,k?/?H?F?W?X?U?H6,?6?K?D?U?H?g?6?S?D?F?H?6?S?R?U?W?Va%#?/?6?W?D?F?N?5?R?R?PgZ?5?H?D?g?L?q?J?5?R?R?P091 体育馆平面图中国科学院深圳理工大学建设工程方案设计及建筑专业初步设计International tender for Shenzhen Institute of Advanced Technology,Chinese Academy of Sciences(tentative name)Schematic Design and Architectural D186、esign Development建筑设计南核心学术平台Building DesignSOUTH ACADEMIC PLATFORM 092 南核心学术平台分析图中国科学院深圳理工大学建设工程方案设计及建筑专业初步设计International tender for Shenzhen Institute of Advanced Technology,Chinese Academy of Sciences(tentative name)Schematic Design and Architectural Design Development建筑设计南核心学术平台Building DesignSO187、UTH ACADEMIC PLATFORM 093 南核心学术平台效果图中国科学院深圳理工大学建设工程方案设计及建筑专业初步设计International tender for Shenzhen Institute of Advanced Technology,Chinese Academy of Sciences(tentative name)Schematic Design and Architectural Design Development建筑设计图书馆主入口Building DesignLIBRARY MAIN ENTRANCE094 图书馆主入口效果图中国科学院深圳理工大学建设工188、程方案设计及建筑专业初步设计International tender for Shenzhen Institute of Advanced Technology,Chinese Academy of Sciences(tentative name)Schematic Design and Architectural Design Development建筑设计图书馆室外阅览区Building DesignLIBRARY OUTDOOR READINg AREA095 图书馆阅览区效果图中国科学院深圳理工大学建设工程方案设计及建筑专业初步设计International tender for Sh189、enzhen Institute of Advanced Technology,Chinese Academy of Sciences(tentative name)Schematic Design and Architectural Design Development建筑设计图书馆平面Building DesignLIBRARY PLANS图书馆地下一层平面图Library B1 Floor Plan#?2?F?H?&?L?U?F?X?O?D?W?L?R?q0?&?R?q?I?H?U?H?q?F?H o?6?H?U?Y?L?F?H%c$9?5?H?F?H?S?W?L?R?q40?(?K?L190、?E?L?W?L?R?q-J?5?H?V?L?g?H?q?F?H-?6?X?S?S?R?U?W?V#?/?D?E?R?U?W?R?U?,k?/?H?F?W?X?U?H6,?6?K?D?U?H?g?6?S?D?F?H?6?S?R?U?W?Va%#?/?6?W?D?F?N?5?R?R?PgZ?5?H?D?g?L?q?J?5?R?R?P096 图书馆平面图中国科学院深圳理工大学建设工程方案设计及建筑专业初步设计International tender for Shenzhen Institute of Advanced Technology,Chinese Academy of Sciences(t191、entative name)Schematic Design and Architectural Design Development建筑设计图书馆平面Building DesignLIBRARY PLANS图书馆首层平面图图书馆南立面图Library 1st Floor PlanLibrary South Elevation#?2?F?H?&?L?U?F?X?O?D?W?L?R?q0?&?R?q?I?H?U?H?q?F?H o?6?H?U?Y?L?F?H%c$9?5?H?F?H?S?W?L?R?q40?(?K?L?E?L?W?L?R?q-J?5?H?V?L?g?H?q?F?H-?6?X?S?192、S?R?U?W?V#?/?D?E?R?U?W?R?U?,k?/?H?F?W?X?U?H6,?6?K?D?U?H?g?6?S?D?F?H?6?S?R?U?W?Va%#?/?6?W?D?F?N?5?R?R?PgZ?5?H?D?g?L?q?J?5?R?R?P#?2?F?H?&?L?U?F?X?O?D?W?L?R?q0?&?R?q?I?H?U?H?q?F?H o?6?H?U?Y?L?F?H%c$9?5?H?F?H?S?W?L?R?q40?(?K?L?E?L?W?L?R?q-J?5?H?V?L?g?H?q?F?H-?097 图书馆平面图中国科学院深圳理工大学建设工程方案设计及建筑专业初步设计Intern193、ational tender for Shenzhen Institute of Advanced Technology,Chinese Academy of Sciences(tentative name)Schematic Design and Architectural Design Development建筑设计图书馆平面Building DesignLIBRARY PLANS图书馆三层平面图Library 3rd Floor Plan#?2?F?H?&?L?U?F?X?O?D?W?L?R?q0?&?R?q?I?H?U?H?q?F?H o?6?H?U?Y?L?F?H%c$9?5?H?F194、?H?S?W?L?R?q40?(?K?L?E?L?W?L?R?q-J?5?H?V?L?g?H?q?F?H-?6?X?S?S?R?U?W?V#?/?D?E?R?U?W?R?U?,k?/?H?F?W?X?U?H6,?6?K?D?U?H?g?6?S?D?F?H?6?S?R?U?W?Va%#?/?6?W?D?F?N?5?R?R?PgZ?5?H?D?g?L?q?J?5?R?R?P#?2?F?H?&?L?U?F?X?O?D?W?L?R?q0?&?R?q?I?H?U?H?q?F?H o?6?H?U?Y?L?F?H%c$9?5?H?F?H?S?W?L?R?q40?(?K?L?E?L?W?L?R?q-J?5?H195、?V?L?g?H?q?F?H-?098 图书馆平面图中国科学院深圳理工大学建设工程方案设计及建筑专业初步设计International tender for Shenzhen Institute of Advanced Technology,Chinese Academy of Sciences(tentative name)Schematic Design and Architectural Design Development建筑设计北核心学术平台Building DesignNORTH ACADEMIC PLATFORM?aStudent Market?Student Service?S196、tudent Innovation/Creativity Venue?rR?Shuttle Bus?u?V?CPlatform Level?r?Courtyard(Communication after class)Sinking Theater(academic lecture)Open lawn(campus culture)=U;RH6+p6=/%E,8?1?Culture MartActivity LawnWood DeckAcademic Core123432142119 景观分区分析图中国科学院深圳理工大学建设工程方案设计及建筑专业初步设计International tender 197、for Shenzhen Institute of Advanced Technology,Chinese Academy of Sciences(tentative name)Schematic Design and Architectural Design DevelopmentLandscape DesignCENTRAL gREEN SPACE RENDERINg景观设计中庭效果图120 景观中庭效果图中国科学院深圳理工大学建设工程方案设计及建筑专业初步设计International tender for Shenzhen Institute of Advanced Technolog198、y,Chinese Academy of Sciences(tentative name)Schematic Design and Architectural Design DevelopmentLandscape DesignZONINg DESIgN景观设计分区设计文体活力景观区 ACTIVE RECREATION AREA?$7?KgI79v(Bj#7,?E?)&Pg?U*Y7?KgI?%D?/Ftg3*k#:%?9v(B6$k R?#5%_?g(%a7K%D:P(%7?8LL)au89v(B6$k%0(CSg7?s(?$:E?83*g3au*o#O*k$9=KgI03e?c#0Ugi?199、*|=i&Pg9v(B-Jh?sTThe public landscape space of Lake district is a scenic space with pleasant scenery and beautiful environment in the campus,it can provide enough space for outdoor activities of teachers and students as well as campus culture and sports activities.Meanwhile,it can combine with lands200、cape architecture to shape the landscape with campus culture and local characteristics.In the lake area to create a modern approach to the field water space to form a broad vision,the atmosphere of the beautiful campus display.?1?$H8p/%E?70?999?Lake AreaWood DeckBridge of ViewBrideKiosk1123345234512201、1 景观分区分析图中国科学院深圳理工大学建设工程方案设计及建筑专业初步设计International tender for Shenzhen Institute of Advanced Technology,Chinese Academy of Sciences(tentative name)Schematic Design and Architectural Design DevelopmentLandscape DesignACTIVE RECREATION AREA RENDERINg景观设计文体区效果图122 景观人视效果图中国科学院深圳理工大学建设工程方案设计及建筑专业初步设计Int202、ernational tender for Shenzhen Institute of Advanced Technology,Chinese Academy of Sciences(tentative name)Schematic Design and Architectural Design DevelopmentLandscape DesignZONINg DESIgN景观设计分区设计灵动庭院景观区 ACTIVITY COURTYARDS?g?U g8K&b=0?gT?(B?0?gb8%D f2g7?-?,Ft(gg7?6“8?1?%&A2t0*%?*Y?sS?FAg?BU?-KgIa0203、YgK?/XP*o?f2KgI?/Ft3au?-!*o9g#Fh?sThe courtyard garden,equipped with repose landscape furniture,enables students to relax and inspire in their spare time.Free and flexible design language,the space for soft isolation,layout of a number of open space,for teachers and students to create a rich and div204、erse interface activities.#0?g-70?g-0?gCourtyard of ActivityCourtyard of HillCourtyard of Island112323123 景观分区分析图中国科学院深圳理工大学建设工程方案设计及建筑专业初步设计International tender for Shenzhen Institute of Advanced Technology,Chinese Academy of Sciences(tentative name)Schematic Design and Architectural Design Develop205、mentLandscape DesignACTIVITY COURTYARDS RENDERINg景观设计庭院效果图124 景观人视效果图中国科学院深圳理工大学建设工程方案设计及建筑专业初步设计International tender for Shenzhen Institute of Advanced Technology,Chinese Academy of Sciences(tentative name)Schematic Design and Architectural Design DevelopmentLandscape DesignZONINg DESIgN景观设计分区设计灵感庭206、院景观区 INSPIRATION COURTYARDS?g?U?I$IiKFt$)4?7?3f A-S?B-#?$kg?=0j#?s/?i?c)#/WPT=NPHMa34?03eS?B=0E?NPP4?%DYP./W6”7?F=?sIn the landscape design of Shuobo postgraduate area,we introduce the lake water purified by natural mountain body into the space.The natural water system runs through the courtyard lan207、dscape,which makes the water dynamic and arouse the vitality of the landscape space.It is connected with the urban oasis water system to form the natural water cycle,which can supply the water for the municipal landscape.125 景观分区分析图中国科学院深圳理工大学建设工程方案设计及建筑专业初步设计International tender for Shenzhen Instit208、ute of Advanced Technology,Chinese Academy of Sciences(tentative name)Schematic Design and Architectural Design DevelopmentLandscape DesignINSPIRATION COURTYARDS RENDERINg 景观设计庭院效果图126 景观人视效果图中国科学院深圳理工大学建设工程方案设计及建筑专业初步设计International tender for Shenzhen Institute of Advanced Technology,Chinese Acade209、my of Sciences(tentative name)Schematic Design and Architectural Design DevelopmentLandscape DesignDESIgN STRATEgY景观设计空间结构冬季庭院夏季庭院春季庭院常绿庭院秋季庭院?The concept of three in one makes the five atriums the space with the highest use density for students.How to make the five spaces harmonious but different i210、s particularly important01 changes of architectural color and horizontal and vertical form details.02 courtyard and the surrounding environment have different ways of integration,which are related to the mountain,water and the main axis of the campus to create a sense of recognition of the space.03 211、In terms of plants,the courtyard is divided into four seasons:spring,summer,autumn and winter flowering and evergreen plants,so that teachers and students can feel the sense of time on campus and witness their own progress and growth.三院一体庭院空间THREE IN ONE COURTYARDS127 景观结构分析图中国科学院深圳理工大学建设工程方案设计及建筑专业212、初步设计International tender for Shenzhen Institute of Advanced Technology,Chinese Academy of Sciences(tentative name)Schematic Design and Architectural Design DevelopmentgRAY BASE+BRIgHT COLORS优雅大气的材质,导向型的拼接,整体统一彩色点缀,绚烂活泼,设计的丰富性曲线引导性的铺装贯穿于校园,指引人群进入公共区域,独特的铺装机理不仅串联功能空间而且与建筑机理相辅相成选用透水混凝土、透水砖、以及碎石等铺装材质,从而213、使校园中庭、院落以及滨水区域可以收集雨水,渗透、过滤,达到一定程度上的再利用PERMEABLE PAVEMENT CURVES PAVEMENT 透水铺装灰色基底+亮色点缀曲线铺装Deailed Design LA-PAVEMENT专项设计铺装设计128 景观铺装分析图中国科学院深圳理工大学建设工程方案设计及建筑专业初步设计International tender for Shenzhen Institute of Advanced Technology,Chinese Academy of Sciences(tentative name)Schematic Design and Archit214、ectural Design DevelopmentNATIVE VEgETATION乡土植被NATURAL ECOLOgY 自然生态SEASONAL CHANgE 季相变化MODERN SIMPLICITY 现代简洁以乡土树种为主,地被选择形态自然、少修剪的多年生草本类品种,打造低维护的自然植物景观尊重场地周边环境,结合雨水花园与景观水体,打造生态自然的植物景观综合运用各个季节不同观赏特色的植物种类,营造富有季相变化的四季植物景观采用上层乔木结合下层简洁地被及草坪的种植层次,打造简洁疏朗、大气现代的校园景观Deailed DesignPLANTINgPlanting strategy专项设计215、植物设计植物设计策略129 景观植物分析图中国科学院深圳理工大学建设工程方案设计及建筑专业初步设计International tender for Shenzhen Institute of Advanced Technology,Chinese Academy of Sciences(tentative name)Schematic Design and Architectural Design DevelopmentDeailed DesignPLANTINg专项设计植物设计Plant spatial division 植物空间分区入口形象区缤纷庭院区中央绿地区活力文体区?估入口形象区?缤216、纷庭院区?中央绿地区?活力文体区?According to the architectural space,the landscape site is divided into different styles of plant space.Entrance image area:the use of tall and straight big trees,combined with sparse and simple lawn and neat ground cover,to create a simple atmosphere,fresh and modern entrance plant217、 landscape.Colorful courtyard area:select the courtyard with different flowers and evergreen plants in spring,summer,autumn and winter to create a garden plant landscape with scenery in four seasons and rich seasonal changes.Central green area:select shade trees with big crown and thick shade to cre218、ate sparse forest grassland and sunny grass slope,and combine flowering trees to create green ecological,natural and comfortable public green space.Vigorous cultural and sports area:combining with the waterscape,the theme plants with autumn leaf characteristics are selected to create a natural water219、 system space full of seasonal changes,wide vision and vitality.130 景观植物分析图中国科学院深圳理工大学建设工程方案设计及建筑专业初步设计International tender for Shenzhen Institute of Advanced Technology,Chinese Academy of Sciences(tentative name)Schematic Design and Architectural Design Development入口形象区?ENTRANCE IMAgE AREAUse of ta220、ll and straight big trees,combined with sparse and simple lawn and neat ground cover,to create a simple atmosphere,fresh and modern entrance plant landscape.Arbor species Ground cover species Deailed DesignPLANTINg专项设计植物设计?131 景观植物分析图中国科学院深圳理工大学建设工程方案设计及建筑专业初步设计International tender for Shenzhen Inst221、itute of Advanced Technology,Chinese Academy of Sciences(tentative name)Schematic Design and Architectural Design DevelopmentDeailed DesignPLANTINg专项设计植物设计缤纷庭院区?COLORFUL COURTYARD AREASelect the characteristic theme plants,use the four seasons of spring,summer,autumn and winter flowering and evergre222、en plants to differentiate the courtyard,create the garden plant landscape with four seasons and rich seasonal changes,let the teachers and students feel the sense of time in the campus and witness their progress and growth.Arbor species Ground cover species NT?j#f?8NT?ow-“c&%KIHU+V?ovC/R?VQ5ST-d*-?223、MNT#9#E8*|R8:?9132 景观植物分析图中国科学院深圳理工大学建设工程方案设计及建筑专业初步设计International tender for Shenzhen Institute of Advanced Technology,Chinese Academy of Sciences(tentative name)Schematic Design and Architectural Design DevelopmentDeailed DesignPLANTINg专项设计植物设计中央绿地区?CENTRAL gREEN AREAChoose shade trees with big c224、rown and thick shade to create sparse forest grassland and sunny grass slope,and combine with flowering trees to create green ecological,natural and comfortable public green space.Arbor species Ground cover species*|%K:k#L)Z&:pu-“TV2h?T?O?U?O-9Tj;t#9#E8fKn3j#f?8133 景观植物分析图中国科学院深圳理工大学建设工程方案设计及建筑专业初步设225、计International tender for Shenzhen Institute of Advanced Technology,Chinese Academy of Sciences(tentative name)Schematic Design and Architectural Design DevelopmentDeailed DesignPLANTINg专项设计植物设计活力文体区?ACTIVE RECREATION AREA Combining with the waterscape,the theme plants with autumn leaf characteristi226、cs are selected to create a natural water system space full of seasonal changes,wide vision and vitality.Arbor species Ground cover species UQ?8P?%KSN%KDQ-“Tc&OQ?DQ-“T-Y/%!Sc#ow-“A7tT?9=IH:p?c&j9H134 景观植物分析图中国科学院深圳理工大学建设工程方案设计及建筑专业初步设计International tender for Shenzhen Institute of Advanced Technolog227、y,Chinese Academy of Sciences(tentative name)Schematic Design and Architectural Design Development雨水储存Stormwater Storage雨水收集与过滤Stormwater Runoff Collection and Treatment?a?m?o?roc?Cilt?lr?f?o?roc?Cilt?dri?o?lo?t?o?fm?glo?lo?t?o?fm?o?i?sf?d?fl?t?i?T?o C?ro?fl?l?a雨水利用Stormwater Reuse外接城市绿轴水系Connecting228、 to Greenway外接雨水管网Connecting to Stormwater LinesLandscape DesignSTORMWATER MANAgEMENT景观设计海绵系统135 景观海绵系统分析图场地雨水管理系统分为三个主要部分:雨水收集与过滤,雨水储存,和雨水再利用。雨水收集与过滤:设置山体边沟截止径流量较大的山体排水,采用排水沟和雨水管网收集引导屋顶排水,以及硬质铺装和普通绿化的地表径流,并就近排入生态植草沟进行过滤和净化。雨水储存:场地雨水经由生态植草沟排入蓄水池进行留滞和储存,雨洪排水超过蓄水量时将由排洪管线排至城市雨水管网和绿轴水系。雨水再利用:将储存的雨水用于定期补229、充溪流水景,并且可以作为灌溉和清洁等日常维护用水来源。Stormwater Runoff Collection and Treat-ment:Surface runoff from mountains will be collected through bio-swales,while roof runoff and surface runoff from hardscape and lawn area mainly collected by stormwater trenches and pipes.All runoff is organized to circulate through b230、io-swale for filtration and purification.Stormwater Storage:stormwater runoff will be led to and stored in retention ponds.The overflow will be directed to the city stormwater lines and greenway system.Stormwater Reuse:the stored water will be used for water features and maintanance,including irriga231、tion and cleaning.Stormwater management system is divided into three main parts:stormwater runoff collection and treatment,stormwa-ter storage,and stormwater reuse.中国科学院深圳理工大学建设工程方案设计及建筑专业初步设计International tender for Shenzhen Institute of Advanced Technology,Chinese Academy of Sciences(tentative nam232、e)Schematic Design and Architectural Design Development雨水储存Stormwater Storage雨水收集与过滤Stormwater Runoff Collection and TreatmentLandscape DesignSTORMWATER MANAgEMENT景观设计海绵系统雨水利用Stormwater Reuse136 景观海绵系统分析图中国科学院深圳理工大学建设工程方案设计及建筑专业初步设计International tender for Shenzhen Institute of Advanced Technology,C233、hinese Academy of Sciences(tentative name)Schematic Design and Architectural Design Development照明设计原则?To ensure the safety of teachers and students activities on campus at nightEmbellishment landscape art lighting,rendering the campus cultural atmosphereEnvironment friendly,reduce energy consumption234、,avoid light pollution,reduce interference to animals,plants and other organismsB?PU7?S8B7c?9(9v(B6$k=i=pE?)%*?#$-fRRQl?a=9(?#$-f-N#:bCL+FtCG/3OUTDOOR FURNITUREDeailed DesignLIgHTINg专项设计照明设计137 景观照明分析图中国科学院深圳理工大学建设工程方案设计及建筑专业初步设计International tender for Shenzhen Institute of Advanced Technology,Chin235、ese Academy of Sciences(tentative name)Schematic Design and Architectural Design DevelopmentSIGNAGE SYSTEMINTELLIGENT FACILITIES 导视系统智能设施?景观家具LANDSCAPE FURNITUREContinue the overall landscape language,find the interesting changes in the unity of colors and materials,and intersperse different materia236、ls to form a simple,generous and durable designThe simple,standard,humanized and designed guide system can easily guide different people to their destinations,and help to show the spiritual culture of the campus.The campus is integrated with intelligent system to give teachers,students and visitors 237、a sense of technology experience.Deailed DesignLIgHTINg专项设计景观布品138 景观布品分析图技术说明Technical Strategy中国科学院深圳理工大学建设工程方案设计及建筑专业初步设计International tender for Shenzhen Institute of Advanced Technology,Chinese Academy of Sciences(tentative name)Schematic Design and Architectural Design Development设计说明Design De238、scriptives?)?d?f?“?-=?W?W?i?Y?V?8?B?c?5?V?8?$?x?$?x?c?d?_?c?d?I?H?u?X?X?%?V?8?u?X?X?W?i?u?X?X?W?i?O?-T?u?W?i?u?X?X?W?i?u?X?X?e?7?u?X?X?V?8?u?X?X?X?W?i?u?X?X?X?x?W?i?u?X?X?G?V?8?u?X?X?X?L?J?W?i?u?X?X?X?H?W?i?u?X?X?X?J?F?W?i?u?X?X?X?W?i?u?X?X?X?*?q?W?i?u?X?X?X?W?i?u?X?X?X?-?u?W?i?u?X?X?X?-?W?i?X?X?u?X239、?X?V?8?u?X?X?X?0?u?X?X?X?0?“?u?X?X?X?“?y?B?o?“?u?X?X?X?K?g?)?6?h?u?X?X?X?u?X?X?X?J?(?1?u?X?X?X?g?z?!?=?A?v?u?X?X?X?u?X?X?X?u?X?X?X?u?X?X?X?Nf?d?t?u?X?X?X?q?C?u?X?X?G?V?8?u?X?X?X?L?J?W?i?u?X?X?X?H?W?i?u?X?X?X?W?i?u?X?X?X?W?i?u?X?X?X?*?q?W?i?u?X?X?/?b?l-?V?f?V?8?r?=?)?d?f?“?-=?W?W?i?Y?V?8?B?c?5?V?8?$?240、x?$?x?c?d?_?c?d?I?/?b?l-?V?f?V?8?r?=?X?W?i?u?X?X?X?-?u?W?i?u?X?X?X?H?W?i?u?X?X?X?J?W?i?u?X?X?X?*?X?X?+?J?W?i?u?X?;?B?V?8?u?X?3?z?u?X?X?W?i?u?X?X?Q?J?X?J?v?X?u?X?X?J?W?i?u?X?d?W?i?u?X?W?i?u?X?NjK?W?i?X?I?V?8?f?X?%?y?X?%?y?X?W?i?X?W?i?X?W?i?-?_?X?W?i?(?X?M?W?X?W?i?!?X?%?W?X?%?A?X?W?i?X?X?J?4?_?X?/?D?X241、?X?A?*?_?X?U?X?yo?!?y?X?J?4?W?i?X?*?N?7 Ci?N-?8 A?u?X?!?Z?9?X?l?u?l?u?l?u?N?G?w?_?Z?X?9?_?Z?G?w?Z?X?9N?_?Z?!?Z?_?ZN?_?Z?9?9?G?w?_?Z?9?Z?_?Z投资估算表140中国科学院深圳理工大学建设工程方案设计及建筑专业初步设计International tender for Shenzhen Institute of Advanced Technology,Chinese Academy of Sciences(tentative name)Schematic Desig242、n and Architectural Design Development设计说明Design Descriptives?*1?C?J A A B$?0?A A?A+X?*1AA5?0?7?r?*1AALb&?93?(x?r?QAA?93?r?L.AA?93?r?*187-AA?93?l?d?r?A+X?*1L?AA?93?r?*1G?yAA?7?l?d?r?*1?G?AALb&?93?r?2?FJ?Q?*A?7?*?7?N-?N-?:m?X$!?c?2?y?j?hD?G?cD?4?L?L?F?$!)?0?G?8?fd?+?9?E?o?*A+X?(?W?9L?k+X?M0?X?2?5?*A+243、X?M0?X?2?1*6+X?M0?X?2?k?*1M0?4?2?A?*1M0?4?,?o2?=A?*1M0?4?2?4?0?+O4?.?.D0+O?.D0+O4?:?*1?0Q?U?2?A5?pG?;?T?r?kA?E?4?E?9?B*6?%?A?H?;?AAL?a?9?W?7-?j?+a?A?G?6?j?0?+O?.D4?.?0?.D4?AL4?795?C_0?G?0L$5?8?h?E4?d?-(?$GF?5F4?*6?W?9?j,?Q?0L$?3?p?:G?2?*6?%?I?_?Q?AA,P?9L?0?_$!*6?)?x?*,?*6?%?L?L?.D0L?X0L$?:0?=?8?.d(*244、6+|L?Q?Q?P5?,?8+O,?s?)0?8+O.D?9?s6?,0?K.?Q?*?01?,?*6?AA?KFP?W?)0L$?7-?=?8?LL:m?3?p?j?*.p?L?.D0L?F?4?7-4?4?L$?T?T-(F?Q?x)?0,0?/n?j?7-)F?5?W?b6?44?4?W?7-0L$?kN?=?b6.D0?FJE?4/(*6?F?FJ?Q?x)?F?0?L$,?0?L$!?c*6?W?_?0?p?=?=?O?,?.D?K,8?F?G,M?U?=?UM=?&?y?&L$?j!?Z?0)?,CR?Q?0?.?A,8Z1?0?Z?&?kG-?X%?KFP,55?0?$!?c?245、F?G%?E-p?f9CO?0?0?65?XF?G?$?0+O,3PCX0?#?WT?6?0?,?6,?O?-p$!*6?F?5?m?Q?7O?*1?A A?B?|?o?JA?j?7?=?5/8?j?Q?)?F?#q,0?8?_?FK?j?4?V?+a?.?O?K?L?2?j?4?FJE?9?Q?4?5?4?Z4?j)?K,?j?w?-,?=?z?Q?x?PE.?A?$?8?*?Q?,?9y?9?Q?4?_?Q?k?*14?.D4?0?Z?Z8+?6?*?W?LL?F?5%C?m?6?9?4?(8,2/?L?.?0?.D4?IF?6MBW,?L?M?M?p?Q?,2/?Q?.?O?+a?7?W246、?)*?N?F?FL5?Lf?6FJ?1?0O?r?O?6?,8?+aL5?r?X?=?FL$#q?%?-?w?KFP?j?0?Z?9?h?E?,?_?G?K?L?2?X?0(wE,?N?;?+O?=?W?/j?P?+O#k?=?A?|?0!Q?0%DA?PCd?P#?0?A?.?,&8:UFP?0?Z?z?F?F?G?+O#k?AL4?)d6?T?W?|?w?*?#LbE?#Lb)F?w?3?Q?*?)5?!?Z?*1?L:m?wA?9?F?#LbEF?Q?r?*1A?91V?8?93?r,#Lb?MK?*1?wA5?9#Lb?$0?*1?G?9Lb&?sA5+?“?*1A?7?FP7-%?247、C#Lb?93?r?;?G?6A8?&3+5?k?M?3?p?M?35?Lb&?Lb?6?j?+?“?*1?FP?#Lb5?d?*?&?Lb?+eD#Lb1y?4?M?-(?,63?1+?k?+O?1)?_-(5?8,?+X?5?5/?F?ZLc7-?Y+X?FFLc3+5?M?d?d?j3+5?$?#%3+5?1y?xF?)?87-?_?!?j?nC?7,?$?)*?+X)*,?4)?=?W?X?=?)?E?*1(?V?y?=?$?*1,?r?*1?f?1V?8)|?9?x,L?f?/!?+X,?*1?f?,-(?5?C?J A A B$?0?A A?X?k?5?AA?+X?L?k?5?AA248、?+X?L?j?X?8?f?&?62?8?f?&?M7?+X?*1?M7ALb&?AA?*?M7?FO?X?P?AA?M7?64?1?04?j?2?/?/?j?(?O?X?N9E-?*?N?X?l?E?l?u?Z?A?X?l?E?l?u?Z?A?M23?2?M?9E-?)?2?F?;?O?&M?j?2?!“?h)?&?j?02?0;?CX?B?j?z?X?*A?9?&?N-?9?7?&?X?k?#?&?0;?*A?7?j?f?W?o?*1G?6?(x?*CX?*1?0;AA?&5F?f$!?(x?X?k?AA?7?7?=0?7?5F?-?M7?j?B?.?t?*1?*?*.pAA?93?t?*249、15?9E-?93?t?$?O5?AA?93?(x?t?*1?M7AA?93?(x?t?*1AALb&?93?t?J5?AA?7?t?O?0;?93?(x?t?ALb0?;?AA?93?t?*15?M?WAA5?0?7?t?;?0;Lbd?_?93?r?结构专业设计说明142中国科学院深圳理工大学建设工程方案设计及建筑专业初步设计International tender for Shenzhen Institute of Advanced Technology,Chinese Academy of Sciences(tentative name)Schematic Design and Arc250、hitectural Design Development设计说明Design Descriptives?7?=0?7?5F?0;5?M?WAA5?0?7?t?*1?0;?M7ALb?62?7?t?J1$?O5?_?93?r?5/8?*1A?7?l?d?r?$?O5?6?u?WAA?7?l?d?r?Q?r?*1$?O5?_?0;?:?:?t?Q?r?*11?1?*.p?_?93?:?:?r?Q?r?*1?O?0;?0;?:?:?r?*1?*?_?93?:?:?t?Q?rA+X?*1J5?_?0;?:?:?r?4?85?_?93?:?:?t?*1?0;?#?_?7?:?:?r?J1$?O5?_?251、0;?W?.?J1$?O5?_?0;?W?Q?r?*1J?$?O$?85?AA?0;?W?L-1?7?*1?*?*.pAA?93?:?r?r?L-1?7?*1?*?*.p?#?93?:?r?r?L-1?7?Q?r?*1$?O5?_?0;?:?r?r?L-1?7?*15?9E-?93?:?r?r?L-1?7?*1Lbd?0;?_?0;?:?l?d?r?r?$!?c?2?7?*?*.p?AA?93?:?r?$!?c?2?7?$!?c?2?*A?0;Lbd?_?7?:?r?$!?c?2?7?5/8?*1A?93?:?r?*1?6 2 1y4?62?1y4?*15?1y4?4?*1?M7ALb2?I2252、?*?*.pAA1y4?+b4?;?Lbd1y4?4?Lb?;?1y4?+b2?J1$?O5?M71y4?v?5?v?4?v?r?5?*1Q?0?u?v?94?4?9?k?M9 E-?X?k?M9E-?l?E?l?u?7-?6?j?Lt?E-?7?l?#kE-?7?l?*1M?r?j+e14?=?:N?+X#k9E-?0+?L?8=?X?X?X?r?r?r?X?X?X?X?B?P?L5?JA?X?X?X?r?r?r?O?2?O?08Ct?“?x?X?X?X?r?r?r?j?9?*?,-;?9?Lu?9?Lu?X?r?r?r?#G“?o?X?X?X?r?r?r?v?X?X?X?r?r?r?*?,253、-;?9?Lu?9?Lu?X?r?r?r?D?o?%D?*8N?9?Lu?9?Lu?X?r?r?r?F?j?8N?9?Lu?9?Lu?X?r?r?r?“?x?C;?9?Lu?9?Lu?X?r?r?r?L?9?Lu?9?Lu?X?r?r?r?FJN?j?o?+e?j?o?X?X?X?r?r?r?EFJF?E?X?X?X?r?r?r?#LbEF?E?X?=?O?X?X?l?X?l?A?r?r?r?o?9?Lu?9?Lu?X?r?r?r?#?+OL$?-?#G?9?Lu?X?X?r?r?r?C?L?X?X?X?r?r?r?X?X?X?r?r?r?Lc?X?X?X?r?r?r?M?=?:?,?M?X?254、X?X?r?r?r?:?,?M?X?X?X?r?r?r?N8?X?X?X?r?r?r?V?LA?7?M?X?X?X?r?r?r?O?5/?F?M8?1yh?u9E-?l?+a?9?C?J?63|?o?G+X?v?r?5?3+?*1(?k?G+X?v?5?3+?-?k?G+XJ1$?O?3+?N#?WD?NG+XJ?q?M$?O?4?8?-?*.p?x?Z?j?,?*1(?G+X?Yf?*?F1?*.p?Yf?*?E-?E?=7-%?C?结构专业设计说明143中国科学院深圳理工大学建设工程方案设计及建筑专业初步设计International tender for Shenzhen Institu255、te of Advanced Technology,Chinese Academy of Sciences(tentative name)Schematic Design and Architectural Design Development设计说明Design DescriptivesE-?r?&?G+X?jN?F?j?1?r,?*.p?k?5?k?5?F9+X?;?=0?2?$?O?wG+X N?$?O?j?1y4?1?A?&?v?!?G+X?;?F?G+X?1yG+X?$G1y4?;?F?N?Lbd$?O?$G1y4?W?W?M?d1Lbd$?O?$G1y4?W?J1?J1(|?G+X256、?,?Z?,?Z?,?Z?FPJ1?6?3J1?08G+X(|?,?W?J?J?k?G+X(|?Y?u?F?G+X:?D$?O.?G+XECX?F:?D$?O.?E5?8?G?L?FP?u?,.?AA?*15?d?dAA?7?*?%?F5?dAA?7?*?%?F?dAA?93?*?%?(x?*1AALb&?93?*?%?(x?-E?E?E?jAALb&?93?*?%?8?d&3+5?AA?93?*?%?D?&3+5?AA?93?*?%?*1&?G5AA?93?*?%?#Lb5?d?#&?C3+5?_?93?*?%?*1?jM?d?Y+X?0;?_?93?*?%?-?5/8?*1A?7?*?%?257、7?+e?-E?u+e?*.pA?0;?_?0;?6?-?*?*A?,AACt?*1?C?J?p?,Ct?AA 93?$?!QAA93?$?j?*144?F+O#k5?d3+5?M?d?d3+5?d?d3+5?#Lb5?d3+5?5?dA A?0;,5?dAA?I?_?3+5?M?Ct?8*6?F?|1*6?AA?7?F2?+X8BF2?W?-?3+5?8d?87-?8-1F?|Ci+X?+O#k 5?d?d$?0;d$G+X?2?od$?+a?2?od?X?;?0?rA?F#LbCd?+O#kCd1?d?6?E?2?oD?4?E?1?,1F?X?j,?FA5?1?,5?d)5?+O#k5?d258、?+X?F#Lb15+a?;?F#Lbd#%?1?j?1?d?+O#k5?d3+5?j?u?6?Y+X?2?o?d?X?2?o?d93?$?,5?d&?O?r?;?*1,5?d+a?2?o5?d15-$?5?C?*?2?o?d?93?$?4?6?j?0?+O?Gd&?4,Md?=?W?0?S?D?j?I?6?j?N?d?*A?9?+X?7-?6A+O#k5?d3+5?7-?j?.D?7-?j?6?A5)?0给排水及消防水专业设计说明144中国科学院深圳理工大学建设工程方案设计及建筑专业初步设计International tender for Shenzhen Institute of Adva259、nced Technology,Chinese Academy of Sciences(tentative name)Schematic Design and Architectural Design Development设计说明Design Descriptives?,?N+O#k?5?d3+5?P?9+XdM0rN+-(?5?d?j?A+Xd?+O?*A?4+Xd?j?p?mGG+XM?W?FM?0?1V?8?;?G?r?+OL$,#G?,?G+X?O?8?dU?d?G+X8?#GL0?D?W?G+X7JD?8?L?#GL0?F?O?#GL0?O+X?0 d?4?r?i?1*6M0r?X260、F2?5A59fdL$?G+e?0d?V?d?U?d?8?d4E%?jO+Xd?d?42?8=?G?+X?o?j?u?6?Y+X$5#1,?ZLc7-?A5?ZLc7-L?d?0D$?#%?jE?$?d4?+O#k?d?6?G+XL?L?L?,L?ZLc7-?d3+5?6O#?j?A5)?0,?d3+5?F9+X0D$?#%?pG?9?dM0r,#G?,?+a?dGM0r?A?D+Xd?&L$?=?*?G+X+e?d?#G?d?d?d3+5?+OL$?dG+X?6#q?d4?F15?fL?F?F2?4*6?2?od1F?P?j?9?7-M0r?-(?5N+?d?P?P?d?)?A501?fL?261、L?4*6E?7?F?2?o15?OO?dM04L?4*6A?4*6?F?2?o15?;E?d?E?#G?d+a?;Ld?fL?%#%?w?8#?2?od1F?*1?MM?dG+XG?#q?n?fL?4*6?+X?F?j?M?dG+XM?d?fL?A?FM?d1F?8#?2?oM?d1F?dG?M?dG?MM?d?9?G)?OAA?LM?&?9?P?L?QA1?F?j?M?d?9?G)?OAA?LM?&?9?P?L?QA1?N-?fL?MM?d?Y+X?fL,M?dF?|5/?F&|$?6?MM?d?fL8#M?d?4E?4*6?+X?F5/?F#w#B?FD?#G?;E?#G?M?fL,M?262、dwL?M?:m1?04w?fL?F?M?d?Y+X3+5?fL?Y+X?j?M?d?I63?2?oM?d1?0G?6FJE?$GF?M?$G?O?#?;d?M?d?+X3+5?,?fL?F?8F2,?5?6?“?FL?A5?fL+X?fLM?d?jMO+Xd?N?F,d$?+X?9y?&|$?F?M?#G?d?d?X?fL,?1?0?Z?P?P,?=K8J22?rCXE%?5?+X?)#q?fL,d?,?!$SF?|E%?fL?,M?d?6FJE$G%?f?_#?fL?#%?*?4E?0?4*6,M?d?6#%?0?Z:d?:d?,dF?|F?0!?4*6?Y+X?j?0?WL?Y+X8d?263、7-?M?1*6?7-?V?,?4?M?d?fL,?G?B?i?D?I?+Xd?N?+XM0?F?|AA?#LbA A?C 1?#Lb+XdG?#Lb+Xd?7?/?6?&?&L$?+?U?#Lb+XdG?0?7?#?F#&?C?;?#&?C?8?d3+5?E?.?O?Q?W?0?j?p?F#&?C 3+5?6?E?2?oFD?4?E?1?P?P,1F?j?F#Lb15-(F?X?j?F#Lb15?:A?:?F#&?C?#&?CL$D?=?W?P?#&?C?z?=?W?P?%?C?F#LbM0?#&?C 3+5?3+5?#q G?0;?#&?CAA#qG?j?/?6?F#&?C#qG?j?/?264、6?&?&5?&L$?j给排水及消防水专业设计说明145中国科学院深圳理工大学建设工程方案设计及建筑专业初步设计International tender for Shenzhen Institute of Advanced Technology,Chinese Academy of Sciences(tentative name)Schematic Design and Architectural Design Development设计说明Design Descriptives?K?3+5?d$?X?;?0?rA5?P?#LbCd?Z?6?j?T?C?9?#&?C+Xd?8?#3+5?+Xd265、?d?A5)?0,#&?C#Lb3+5?G+X?d?&Q?5?d3+5?+a?;?0?r#Lbd#%?d?3+5?A?X|?o?NA#LbQ?d1?Z?CdG?P?#Lb5?d1F?35?)(?!?r#&?C?35?9.?+?G?+O&?&?rG-?9?T6d?!?E?+O&G?7&d?V?1?h?P?P-$#qd?_?p?9#&?C?4?wG?V?7/j&?A?9J?Z?FAC?O?G,#&?Cd#%?8?#Lb5?d15-(F?NAB?P+X#&?C?Z?8?d&3+5?9?93?4?rL”?=?+Xd?,?j?p?F?wA8?d&3+5?.?O?E?d?j?/?P?L?Q?g?P?+XM266、0?P?15?d?&L$?K?0?=?Y&?#B?d?0?S?D?3+5?AA+XdG?/?V?+?0?P Q?W0L$?d?j?/?P?L?Q?P?+XM0?P?15?d?&L$?K?+?0?P Q?W0L$?d?j?/?P?L?Q?P?+XM0?P?15?d?&L$?K?8?3+5?9!?Z?AL0?f,?d?=CE?Z?Gd1F?=CE?0?3?D F?|?35?FAC?O?G,8?d#%?8?#Lb5?d15-(F?W0 L$8?4 dQ?0 d&3+5?0Q?W?P,?1y?j?A5Q?0d&3+5?ZQ?0d&?z?j?P?Q?j?P?!?Zd&G?0?Z+e.L0?+a?d&?,267、4?F?#4?&8?f?6?d&5?d15-(F?Q?4 dM.3+5?.?|?o?j,?42?L?“?x?A5Q?4dM.3+5?G+X?$)?+X?0?3+5?0?3+5?&L$?=?W?V?3+5?15?M.?&L$?P?L?Q?jAA#?=?/?P?L?Q?g?0?=?Y&?d?=?0?3?D?&?G 5?9?*1&?G5AA?93?+e?-E?u+e?*.pA?0;?_?0;?-(?rA5/GK%-?2&?D?&3+5?Q?G+e?G+e?1yG+X?3O?ID?&3+5?A?7?A G?)?X?A?d,?*1?4+Xd&?wAdAG?p?9A?7?wF9+X?*AG?9?9?)?+268、O?D?N#,A?7?wA5-(?,L”?D?#?1y?4*6A?dCX?+X1V?8?-?)|?9?7?r,?d1?G?A?d?=?CX,?p?95?d?d1F?A?7?A?A5?.?$5?,h?u?W?7A?87-8 d?C 1?dCt$1*6-?,?_?mG84?*1+Xd?6L?2?d?d3+5?,CO?FJE84+Xd?fd?A?*1?+O#k+Xd?+XG?-?7?_?A?+O,?dG?+O#kd,M0rG?5?:d?r?f?d?d11y?dA?O$5#G#?A?B?D+O#kO+Xd?dA?!?z?$5#G#?=?A?!Q?+O#kO+XddCX?%?C)|?-?7?+O#kO+269、Xd?+O?7?*?%?,?r?M?P5?d$1F?A?7?A5?.?$5?,h?u?W?7A?+O?G?&?1V?8)|?J?7?8d?+O#k+Xd?&?-?,?9?r?+O?+Xd?x)1y4E?4?+X?FP?8?Vd?1,?D?d?1$!?=?P?P?u?6?Y+X?2?o?8*6.?2?o-$?93?$?2?o-$?93?$?F,G?6G+X?d3+5?9?+X+XFD?Ci?F1*6?s?8=?.D+X?o1y+Xd?E?#G?5/?F#w#B?wA5d?)?0AG?+Xd?9G?A5+XdGF?PAG3+5?7-?62?64A?5?A?6?4/+Xd?Y+XAG?F?|15%?270、8?#?6?i?1F%?)?+Xd&?4d?W?0?3?D?,Gd?_1?A5?A?%?C5?d?G?&?0?,?r?5/?F5?8)?AAG+X6?!?=(?5/?F&|$G+X8d&|$3+5?A5?O?$?O?M?Y8?L?51y8d?f?给排水及消防水专业设计说明146中国科学院深圳理工大学建设工程方案设计及建筑专业初步设计International tender for Shenzhen Institute of Advanced Technology,Chinese Academy of Sciences(tentative name)Schematic Design and Ar271、chitectural Design Development设计说明Design Descriptives?FJ?C?J A A B$?0?A A?A+X?*1?FJN?0DB38AA?93?*?%?*1AALb&?93?*?%?(x?*1Lb?3+5?_?7?*?%?-E?E?E?jAALb&?93?*?%?-E?*1AA?93?-?*?-?*187-AA?7?*?%?$!?c?2?*187-AA?93?6?-?*?5/8?*1A?7?*?%?7?$!?7?5/8?*1A?93?6?-?*?A+X?*1?AA?93?*?%?A+X?*1AAFJ?I?*?%?+O(?B?P?*1?_?93?*272、?%?P?+O(?FJ+X?r?*?%?#1?oAA?93?*?%?.?O?*1AA?93?-?*?-?KwDAA?93?*?%?$!?c?2?D1F?0;?*A?_?0;?6?-?*?OO?*1AA?93?-?*?-?OO?J?n?f?93?6?=?%?=?A A?0B3?AA?;?j?“$Y?q?&?“-(?)$?P?NG?P?K?S?.?O?0?9?*1?7?0?+O?L?0?9?*1?7?L?.D0L?0?9?*1?7?J?7-/l?2?N#?0?9?*1?7?|?o?-Lu?#q?0?F?*1?7?(!?P?0?9?*1?7?1?(?o?0?9?*1?7?1?6O?0?9?*1?7?273、|?o?0?O?2?0?F?*1?7?9?8?r,?P+X?o?9?8?rAA?#?G?A+X?*1?FJN?0DB38AA?93?*?%?*187-AA?7?*?%?FJN?AA?j?+XFD?!?&?D!Q?j?+XFD?!?&?D!Q?+OL$?+e?j?o?&?P?1?+e?j?o?(?LL$?+e?5?d?#Lb#%?o?G+e?E?K5&?o?f?j?o?#?G?+e?o?9A?7?Lu?G?Q?h?9?CO9 A 1?$F9?0B33+5?CO9?1?7-?*1M0?0B3M0?CO9?CO9?CO9?7?7?k?CO9?CO9?7?7?k?CO9?P?P?:?P?N?:?:?P274、?N?:?N#?.?O?6O?|?o?-Lu?#q?L?.D0L?0?+O?L?(!?P?(?O?2?F2+O#k+X?o?6?0B3?#?G?0B3M0?9?*1M0?a?1?$F9?暖通专业设计说明147中国科学院深圳理工大学建设工程方案设计及建筑专业初步设计International tender for Shenzhen Institute of Advanced Technology,Chinese Academy of Sciences(tentative name)Schematic Design and Architectural Design Development设计说明D275、esign Descriptives?7-?$3+5?$3+5?3+5?3+5?G5?3+5?3+5?G5?N#?N?#%?5?7?N?#%?+X?$3+5?.?O?h?+e?f?/?5?7?=?v?6O?N?#%?5?7?|?o?-Lu?#q?N?#%?5?7?L?.D0L?N?J6?j?+?3?0?+O?L?N?J6?j?+?3?(!?P?N?#%?5?7?0B3?G+XN?#%3+5?0B3?$G+XN?#%?5?7?;?(?N?#%?5?7?0B3?G+XN?#%3+5?O?2?N?J6?j?+?3?7#?(?P?M0A5?7+X?$?#LbA A?Lb?78?fFJN?&,?1L?L276、$?Lb?L$?8+X?G+X8?f?=%?C8?fFJN?&,Lb?L$?8+X?wA5?j?F1N3+5?A5?j?F1N3+5?,?L$?8+X?NG?9?*1Lb?3+5?_?7?rF?|A1?93?r?l?E?W?l?N?j?wA5?X?C+X?N?j?o?F1N3+5?=?Q?=?W?2?j?F1NG%?CC?8#?8#?L$,?xFB?6?3?l1V?8?;?1L?FL?r?L$?C F?L$,?j?a?3?D?L$?C F?L$,?j?a?3?D?A5?j?F1N3+5?,?L$?8+X?1y?wA5?P?O?L$A5?XF?1?4?8+X?!?rA5?G?lC?*AA?l?&277、?0?_?N?j?FJ1?A5?j?F1N3+5?,?1L?L$?Lb?L$?X?NG?wA5?=?P?,?*?0?M?F?,Lb?L$?J?X?F?:!?r?A5?kM0?=?P?,?*?0?:?7-?j?AA?A5?A?,?j?p?*1?*1M0?W?P?D4?h?9?+,?:?oL$?*1?*1M0?W?P?D?(E?J,?:?oL$?*1M0?W?P?,?:?*1?0?oL$?D4?h?9?+?F?(E?J?&?K?W?P,+?“C F?:?*1L”C F?*1M0?P?,?oL$?F?A5?3+5?,?j?pNA5N3+5?NG?=?G,?;?7-?j?AA?A5?A?,?j?p?;278、?F?z?;?*1?k?*1M0?W?P?F?0?Z?oL$?*1M0?W?P?D4?h?9?+?F?(E?J?&?A5?A?8?fFJN?DK?CE?P,+?“C F?A5?A?;?*1A5?3+5?,?j?pNA5N3+5?NG?=?G,?A5?A?,?j?p?G?F8?f?0?,?r?9?*1Lb?3+5?_?7?*?%?a?F?|A1?;E?;E?AA?j?N?3+5?&?N?&?&?暖通专业设计说明148中国科学院深圳理工大学建设工程方案设计及建筑专业初步设计International tender for Shenzhen Institute of Advanced Technol279、ogy,Chinese Academy of Sciences(tentative name)Schematic Design and Architectural Design Development设计说明Design Descriptives+eD?C?J A A B$?0;A A?G+eAA?93?*?%?G+eAA?93?*?%?A+X?*1+eDAA?7?*?%?&8?A3+5?AA?93?*?%?-E?E?E?jAA?93?*?%?5,?8?343+5?0;AA?93?*?%?7-?*1AA?7?*?%?7?*1AALb&?93?*?%?(x?6?*1+eDAA?93?-?*?-?280、+eD3+5?AA?N-?4?7-?*1CO9?7?7?9?;63|?o?-Lu?#q?;E?(?o?u+e?N?:?Z?W?A?7?o?#?:?)?7?7?w?5?f?+X+e?u+e?G?9E?E?G,?1?+e?CO9?64?N-?=?A?L.?+X+e?k?J?A1?j3+5?+X+e?Lb3+5?+X+e?+e?A?7?j?o+X+e?+X+e?#%+X+e?+O#kd#%+X+e?4CO9?k?FJF?L$?+X+e?94CO9?L”?:F A?7+X+e?F,+X+e?+X+eCO9?1?)Lf!?N-?CO9?1?G?;?j?1+X+eCO9?N?9?$?G?N?9?$?.?O281、?0?+O?L?L?.D0L?6O?J?7-/l?2?O?2?.?|?o?-Lu?#q?W?A?7?o?(?o?(!?P?F2?+O#k+X?o?;E?u+e?8A?G+e3+5?Q?+e?x?i?CO9?15?N-?j?G?j?N?9?$?i?+e?p?M!?,5?N-?G+X?N?9?C4?+e?j?L?N-?+e,?M?W?G+X?TD?Q?C5?+e?2?o?E?TD?+e$8#?N-?Q?0?o?+aQ?0?oG+e8#?G+e?o?Q?0?o?G+e?oA5?;?0?r?04Q?+e?x?+eG?L?F?0G?FJ.A,5?j?G+e3+5?G+e?o?)A5?)?0F?|?X!?282、4A65?G+X?!4?6!?+e?!“?h?;?!6?0?0?T!?!4?6?F?|?!6?6!?0?F?4?0?A+eD?j?6K1?7?!6?0?0?uL?&?+a?0?p?9,?0?4CO9,+X+e?G+e3+5?G+X?n?4?A?-(5?8,G+e?GE?W,CO9?G?CO9?+O#kd#%?O?1y?G+X?n?4?G+e?)?!“?h?08CO9G+X?A?G+e?#Lb+X+eA?7?#&?C#%?#%?#Lb+e?Lb?N?j?#Lb?f?1yG+X+a?G+e?CL?D?+a?D?+e$?X?1?G+e1?4?7?,?+e?7+X+e$?w?8?+e?j?!4!?N-283、?4?G+e?o?M!A5?;?A?7?j?o?A5?5?0?o?%?G+e?o?%?0?A5?+e?8?B38?)?)?=?Q?,?)?1V?8?+eG?L?r?p?9D?n+e&A5?+e?)?3P?W?B#?*6?N-?6O?P?A5?9$%?#?fB#?)?G+e3+5?,?+e.?;m?i?A+X?*1+eDAA?7?*?%?+e.?+e.)?+O,-(?G+e?p,+e.E?4?j?M0?P?7?;?j,?G+e?p,+e.E?4?j?9%?C?-?7?63?+eCiAG?+eG?L?AG?N-?G+XQ?AG?Q?G+e?o?A5AG?Q?AG?04+a?+e?p.?7+X?U+284、e$3+5?j?A#LbCO9?G?CO9,?+e?M?W?N-?M!63,?0?8?C?+e$?7?+e5?8?$?+e?j,COE-?X?2?o+e$?=?p?9COE-?68?7?2?o+e$?+e?$?+e?j?X?8?E?$?+e?j?oA5?;?0?r?j?oM0A58?-,?N?LN#A?+a?+e?j?p?V,M#LbG?A?7CO9?X.A&?+O?G?F0?*F?|?.?#LbA?7,?+e?N-?$?+e?j?D,?nM0%?C)AG?L?,?r?)?G?6G?a+e3+5?A1?j1*63+5?#Lb?f?&8?A3+5?3+5?+e$?+eA?j?o+e$1y?6?8285、?3?6+e$?k?A?7F9?N?9?G+X-O0?0?E?0?G+X?y?0?N?9?G+X)?87-?#w#?A72?1?A?4$Y?G?9?jF?N?5?VLb?F5?Lb?1y4?j?,?3?:?#Lb+X+e56G+X./(5?5H+e56?F6&+e56?FJ+e56G+X?”?Lk+e56?3+5?3+5?5?FJ?U?FJ?M0?)?7?7?%?C?-?93?U?FJ?3+5?)?0?6?0?X?#k?j?p?;E?j?a+eA?7?o?d#%?o?N?j?o?+e?L$?1y?4A5?9?U?C F?+?“?L$1y?4A+?“?7/j?7?&?LbM?3+5?N-?9?2286、LbM?*1AALbMA?Y+X?*1(?J1?E?;4?)?D?,+e?+e#q?9?)?)?)?3P?B#?1y?F?|#G?电气设计说明149中国科学院深圳理工大学建设工程方案设计及建筑专业初步设计International tender for Shenzhen Institute of Advanced Technology,Chinese Academy of Sciences(tentative name)Schematic Design and Architectural Design Development设计说明Design Descriptives?a+e3+5?AA93287、?$?N-?k?7-?j?1yG?+X?o?;E?4?J?1,?7-?F3+5?*AA5?;?3+5?G?+X?o?E?3+5?h?343+5?h?0+?FJ?-?3+5?+X?g+eB?3+5?h?55?3+5?9L+e?3+5?3+5?JA3+5?h?,?E?33+5?h?_ L b933+5?N-?3+5?A3+5?$3+5?3W?U?A3+5?*?f3+5?h?E?1*63+5?h?h?Lb935,?81*6?3+5?63?j-?3+5?h?h?*1A?7-?1*63+5?*17-?x-?13+5?6?N#?U?3+5?&8?A3+5?7-?f3+5?7-?F?L?3+5?L?+X3+288、5?Q?7-?+X3+5?Q?(?J1*63+5?1*63+5?+eD#LbA A?#Lb+e$?G+e?N-?#Lb?f?#Lbd#%?#Lb+e?Lb?j?u+?“?1y#Lb+X+e+a?T?Z+e$?2+e$?$?+e?j?+e?D?X?1?8?7?#Lb+X+eA?7G+X?)?+e?D?G+eA?7A?n?7?#Lb+X+eA?7G+e4D?G+X-(?1y4,6&+e?+e56?f+e56?&8?A?#Lb6?3+5?&8?A3+5?k?_?)?N-?&?F?|-?#Lb6?f3+5?Lb?3+5?#Lbd#%1yA?76?#Lb?&?i?-?7?&8?AAA?93?*?%?N-289、?&8?A3+5?G+X?f?A3+5?U?3+5?#Lb?C?JFJA?N-?A5#Lb?U?3+5?6?N#?#Lb?8+X?k?j?3+5?k?jA?7?O?r#Lb?f?3+5?7-)?0?j?6?N#?J?W?u3W?U?#Lb?U?+?“?7/j?7?X#Lb?f?#LbA?7?o?$?+e?j?o?G+e?+?“?#Lb+e?C F?FL?r1y?L?j?8?wA5#Lb?U?&?&-(?j?,?+?“?#Lb+e?+?“C F?K?CE?P,?C F?*?4?wA5+?“?7/j?7?Lb&L?-?3+5?Lb&L?-?3+5?k?_FJELb&L?-?)+?“FJF?:,Lb290、&L?,?0L?(?1?uL(?1F?|-?Lb&L?-?7-?n/j-$?F?,+e?L?L?G?n?,?0L?(?1?X?f8#&?A?7-?A+e?L?L?G?n?*?_?FJE+e?L?L?G?n?FL?.?0?)Lb&L?,?0L?F?|?f?+eD&?A3+5?i?&8?A3+5?AA?93?9+eD&?L,?j?pA5+eD&-?3+5?FJE+eD&-?&?#G+e4D?%?+e+e#q?456$Y?1?$Y?1y?4D?uL(?1?08CO9G+e1?#?uL?&?*?A?7?uL4D?+e$?UCO9G+e1?4?A?=?7?+e$?#LbA?7+e$-?3+5?N-?,?p?9#LbA?7,G+e?f1?A5#LbA?7+e$-?Q?-?#LbA?7,F?|(?1?#Lb+e$-?7-?n/j#Lb+X+eA?7,?+e+e$?7+X+e$,?(?1?电气设计说明150