石家庄市空间发展战略规划(中规院)(23页).doc
下载文档
1、Introduction As the capital city of Hebei, the development An inland metro in the coastal area; A city that can only plays supporting role in the capital economic zone; A center in puzzles of having inadequate power to be regional increase-pole. A place with potentials to be the focus of investment;2、 A region of abundant resources and insufficient water; Shijiazhuang: A city of hope and puzzles. (2) Why? Try to find out explanations for the puzzles and problems through history review, comparison, reasoning, etc. New power needed; Traffic axle and industry axle misplace; The uncertainty of urban3、 space developing direction; Orientation does not fit; The lock-in effect in industry; Huge imbalance between urban and rural area; Siphon effect of Beijing and Tianjin. (3) Where to go? Raise directions Shijiazhuang should followed in the future including the direction for space, economy, population, traffic, culture and so on. Make rapid increase to win the competition with surrounding central c