石家庄市空间发展战略规划(中规院)(23页).doc
-
资源ID:65475
资源大小:1.60MB
全文页数:21页
-
资源格式:
DOC
下载积分:
15金币
下载报告请您先登录!
验证码下载
账号登录下载
微信登录下载
|
友情提示
2、PDF文件下载后,可能会被浏览器默认打开,此种情况可以点击浏览器菜单,保存网页到桌面,就可以正常下载了。
3、本站不支持迅雷下载,请使用电脑自带的IE浏览器,或者360浏览器、谷歌浏览器下载即可。
4、本站资源下载后的文档和图纸-无水印,预览文档经过压缩,下载后原文更清晰。
5、试题试卷类文档,如果标题没有明确说明有答案则都视为没有答案,请知晓。
|
石家庄市空间发展战略规划(中规院)(23页).doc
1、Introduction As the capital city of Hebei, the development An inland metro in the coastal area; A city that can only plays supporting role in the capital economic zone; A center in puzzles of having inadequate power to be regional increase-pole. A place with potentials to be the focus of investment;
2、 A region of abundant resources and insufficient water; Shijiazhuang: A city of hope and puzzles. (2) Why? Try to find out explanations for the puzzles and problems through history review, comparison, reasoning, etc. New power needed; Traffic axle and industry axle misplace; The uncertainty of urban
3、 space developing direction; Orientation does not fit; The lock-in effect in industry; Huge imbalance between urban and rural area; Siphon effect of Beijing and Tianjin. (3) Where to go? Raise directions Shijiazhuang should followed in the future including the direction for space, economy, population, traffic, culture and so on. Make rapid increase to win the competition with surrounding central c