建筑专业词汇中英文对照6(5页).doc
下载文档
上传人:正***
编号:445045
2022-07-11
5页
40KB
1、 建筑专业词汇(中英文对照)-0022008-02-03 01:17秘书室 secretary room电气室 electrical room控制室 control room工长室 foreman office开关柜室 switch gear前室 antecabinet (Ante.)生产区 production area马达控制中心 Mcc多功能用房 utility room化验室 laboratory room经理室 manager room披 屋(阁楼) penthouse警卫室 guard housee. ROOFING AND CEILING 屋面及天棚女儿墙 parapet雨蓬 c2、anopy屋脊 roof ridge坡度 slope坡跨比 pitch分水线 water-shed二毡三油 2 layers of felt & 3 coats of bitumastic附加油毡一层 extra ply of felt檐口 eave挑檐 overhanging eave檐沟 eave gutter平屋面 flat roof坡屋面 pitched roof雨水管 downspout, rain water pipe)(R.W.P)汇水面积 catchment area泛水 flashing内排水 interior drainage外排水 exterior drainage滴水 3、drip屋面排水 roof drainage找平层 leveling course卷材屋面 built-up roofing天棚 ceiling檩条 purlin屋面板 roofing board天花板 ceiling board防水层 water-proof course检查孔 inspection hole人孔 manhole吊顶 suspended ceiling, false ceiling檐板(窗帘盒) cornicef. WALL (CLADDING) 墙体(外墙板)砖墙 brick wall砌块墙 block wall清水砖墙 brick wall without plaster4、ing抹灰墙 rendered wall石膏板墙 gypsum board, plaster board空心砖墙 hollow brick wall承重墙 bearing wall非承重墙 non-bearing wall纵墙 longitudinal wall横墙 transverse wall外墙 external (exterior) wall内墙 internal (interior) wall填充墙 filler wall防火墙 fire wall窗间墙 wall between window空心墙 cavity wall压顶 coping圈梁 gird, girt, girth玻璃5、隔断 glazed wall防潮层 damp-proof course (D.P.C)遮阳板 sunshade阳台 balcony伸缩缝 expansion joint沉降缝 settlement joint抗震缝 seismic joint复合夹心板 sandwich board压型单板 corrugated single steel plate外墙板 cladding panel复合板 composite panel轻质隔断 light-weight partition牛腿 bracket砖烟囱 brick chimney勒脚(基座) plinthg. FLOOR AND TRENCH 地6、面及地沟地坪 grade地面和楼面 ground and floor素土夯实 rammed earth炉渣夯实 tamped cinder填土 filled earth回填土夯实 tamped backfill垫层 bedding course, blinding面层 covering, finish结合层 bonding (binding) course找平层 leveling course素水泥浆结合层 neat cement binding course混凝土地面 concrete floor水泥地面 cement floor机器磨平混凝土地面 machine trowelled con7、crete floor水磨石地面 terrazzo flooring马赛克地面 mosaic flooring瓷砖地面 ceramic tile flooring油地毡地面 linoleum flooring预制水磨 石地面 precast terrazzo flooring硬木花地面 hard-wood parquet flooring搁栅 joist硬木毛地面 hard-wood rough flooring企口板地面tongued and grooved flooring防酸地面 acid-resistant floor钢筋混凝土楼板 reinforced concrete slab (R.C Slab)乙烯基地面 vinyl flooring水磨石嵌条 divider strip for terrazzo
CAD图纸
上传时间:2023-10-25
13份