住宅户型配比测算案例.xls(15页)
下载文档
上传人:故事
编号:148281
2021-07-03
15页
106.50KB
1、澄澄迈迈填填海海地地块块户户型型配配比比 产品型号外立面风格 单体容积率 预估容积率 景观/梯户层数户型面积 综合套数 比例 产品套数 比例 预估套数预估幢数建筑面积比例总建筑面积 每幢平均 面积 占地比例 总占地面积 () 总占地面积 (亩) 每栋占地 面积 双拼 G270东南亚0.530.59前/后景观2126.04/125.820.41%39%48241.0%6,0452524%10,24515.4427 G256东南亚0.620.65后景观2139.87/141.490.22%21%26130.6%3,6582812%5,6278.4433 G257东南亚0.630.63前景观21312、.44/131.630.36%34%42210.9%5,5242634%8,76913.2418 G208东南亚0.580.63后景观2169.63/199.750.03%3%420.1%7393690%1,1731.8586 G209东南亚0.840.70前景观2209.41/237.260.03%3%420.1%8934471%1,2761.9638 小小计计-1.05%100%124622.8%16,859-11%27,09040.6- 高层(18层) J600现代2/1.822梯4户1874.32/78.269.19%9%10801512.9%77,158514418%42,395633、.62826 J488(风车型)现代2/2.941梯8户1868/71/7720.82%21%2448928.4%170,3011892224%57,92686.96436 30.01%30%35282441.2%247,459-41%100,320150.5 高层(30层) J588现代2/3.003梯8户30 67.86/69.59/71.18/ 70.21/104.96/111.5 3 12.04%12%1416616.5%99,1501652514%33,05049.65508 J350T(风车型)现代2/3.003梯8户30 62.68/64.85/73.09/ 79.03 53.08%54%62401336.3%218,1271677930%72,709109.15593 J682现代3/2.802梯8户28 38.58/39.67/43.08/ 44.25/45.48 3.8
CAD图纸
上传时间:2023-10-25
32份