个人中心
个人中心
添加客服WX
客服
添加客服WX
添加客服WX
关注微信公众号
公众号
关注微信公众号
关注微信公众号
升级会员
升级会员
返回顶部
深圳市南山区高新技术产业园区设计
深圳市南山区高新技术产业园区设计.pdf
下载文档 下载文档
规划专题
上传人:地** 编号:1229212 2024-10-10 107页 258.19MB
1、rendering 目录Rendering Project Profile Project Interpretation Strategy Space Technical DrawingsGreen Designed ArticleEngineering Explain渲染表现项目概况项目解读空间策略技术图纸绿色专篇工程说明Forward 前言In project planning design,weve been trying to seek project characteristics and development train of thought,in trying to provi2、de a design proposal,weve been providing a way of thinking,to express the project its own thinking,understanding and judgment.So we think:to explore space and the life quality of the project in the internal connotation is the basic proposition.Return to the design itself,with the construction the la3、nguage to express the connotation of the exploration-Sublimation:from a series of architectural form the restricting cocoon and concise,pure crystal,all things in the final analysis:which is simple.That is broken up,the cocoon bound,but a carrier.在项目规划设计中,我们一直试图寻求项目的特质和发展的脉络,试图在提供一种设计提案的同时,更提供一种思考方式4、,来表达对项目自身的思考、理解和判断。所以我们认为:探讨项目在空间和生活品质上的内在内涵是基本命题。回归到设计本身,用建筑的语言来表达这种探索的内涵-“破茧”:从一系列的建筑形体中破茧而出的简洁、纯净的晶体,任何事物归根到底:即为简单。破即为立,茧非束缚,而是一种载体。rendering 渲染表现Project ProFile 项目概况introduction 项目介绍This project is located in shenzhen nanshan district high-tech industrial park zone,Hi-tech zone is located in the5、 core areas.Section 4 is located in the joint of BaiShi road and science and technology south road.As a technology park landmark buildings,in addition to meet the basic needs of modern office,also need to create an international high-tech enterprise headquarters of the first-class service platform,a6、s well as the national low carbon ecological demonstration garden.本项目位于深圳市南山区高新技术产业园区南区,地处高新区核心地带。4标段位于白石路与科技南路的交汇处。作为科技园区标志性建筑,除了满足现代办公的基本需求,还需要打造国际一流的高科技企业总部服务平台,以及作为国家级低碳生态示范园。content of the project 项目内容Public transportation 车行交通road skyline 道路天际线landscape resources along 沿线景观资源industry housing 产7、业用房office 办公用房Hotel 酒店用房design basis 建筑及规划设计依据The scheme is based on the shenzhen bay eco-city construction scheme design project of science and technology;The national laws and regulations,and the relevant design specifications and local standards;Shenzhen city planning related specific requirement8、s for planning and design.本方案依据“深圳湾科技生态城建筑方案设计任务书”;国家各项法律法规、相关设计规范以及地方标准;深圳市城市规划相关具体要求进行规划设计。11234567891011234567891011land survey 用地概况1312141312151617181415161718shooting track 拍摄轨迹Base around基地周边base status 基地现状PRojEcT InTERPRETATIon 项目解读DEvEloPmEnT HISToRy-BAckGRounD 项目背景科技园发展简史作坊式办公模式The 70 sTra9、ditional office传统办公模式modern office现代办公模式Future未来办公趋势70年代The 70-80 s80-90年代Work ShopSince the 90 s90年代至今The Future不久的将来Activite活动nature自然multilayer多层Aesthetica艺术Environment环境Work/life工作/生活Structure结构Shopping购物communicate交流Hotel高级酒店office办公High tech高新技术something about industrial park 关于产业园的故事The first10、 generation:Scattered spontaneous workshop modeThe second generation:unified planning,The park to turn,Intelligence,And informationThe third generation:Work,life and leisure body,The blockHow about the the fourth generation?第一代:零散自发的厂房模式第二代:统一规划,园区化、智能化、信息化第三代:工作、生活、休闲一体,街区化第四代:?We think it should b11、e:Regression nature,more green,Energy saving,High efficiency,more humanistic care我们认为应该是:返璞归真,更加绿色、节能、高效,更多的人文关怀the development of the park 园区的过去、现状与将来20 years of development,Industrial park by Hatch,Growth,Expanding,in the present stage,should by Quantity to Quality,as biology said the Sublimation.12、So as to enhance the status of industrial park.Analysis of the regional features of itself:the biggest carrier-work carrier(office)is the leading factor,due to work derived life carrier(hotel)and the coordination.dissolve the negative factors and optimization space relation,reasonable decorate work 13、and life two carrier.derived two different architectural form,redefined the science and technology parks skyline as a landmark,let two form common express the city the multifaceted.20年的发展,产业园经历了“孵化”、“生长”、“壮大”。而现阶段,应该由“量”走向“质”,如同生物学所说的“破茧”。分析场地本身的地域特点:最大的载体-工作载体(办公)是主导因素,因工作而衍生的生活载体(酒店)与之相互协调。化解负面因素,14、优化空间关系,合理布置工作与生活两种载体。由此衍生出两种不同的建筑形体,重新定义了科技园的天际线,使之成为一种标志性,让两个形体共同表达城市的多面性。TEcHnoloGy 科技 cEllS 细胞comPuTER 电脑conSTAnT PlAnk 普兰克常数 ExPloRE探索PRoTonS 质子SuBlImATIon 质变Qm 量子力学 mIcRo 微观nEW mEAnInG-BAckGRounD 项目背景科技园新涵义TIny cHAnGE量变 InnovATIon创新ScIEncE AnD TEcHnoloGy IS THE FIRST PRoDucTIvE FoRcESPeople as 15、centerthe new definition 以人为本高新产业园的新涵义the evolution of human historynot only that 人类的进化简史但不仅仅是这样redefine 重新定义Return the nature of human needs,the new high-tech park,the new life of definition.let the work is no longer the whole of life,let production tools are no longer affect human evolution all mu16、nication,sports,shopping,entertainment,and even feelings,all get due carrier.At the same time,let the building itself back to the nature,let the advancement of science and technology service good for human being.Energy conservation,ecological and environmental protection,care,with the construction t17、he language,combined with the new age of science and technology,let the human life,work,and emotional carrier more reasonable and humanization.回归人类的本质需要,新的高新园区,新的生命定义。让工作不再是生命的全部,让生产工具不再是影响人类进化的全部依据。交流、运动、购物、娱乐、甚至情感,都得到应有的载体。同时,让建筑本身回归到自然,让科学技术的进步服务好人类。节能、生态、环保、人文关怀,用建筑的语言,结合新时代的科学技术,让人类生活、工作、情感的载体更18、加合理与人性化。Project reading 规划解读area constitute list 面积构成一览表industry H 产业用房office 办公用房Hotel 酒店用房shops 商铺131100 m 121800 m48000 m3000 mPlan interpretation 图则解读 Functional composition 功能组成THE cITyS BASIc FoR REPRoDucTIon SAmPlInG-PlAnnInG GEnERATIon 规划生成城市肌理底图取样Paris,France 法国巴黎Paris has the many open cit19、y axis.Main axis from west to east,parallel to the River Seine.In addition to the main axis,it has many vice axis.These vice axis in the city square and many building group,formed many scenicfocalpoint and view borrowing.巴黎有着丰富开敞的城市轴线。主轴线东西走向,平行于塞纳河。除主轴线外还有很多副轴线,这些副轴线通向市内许多广场和建筑群,形成了更多对景和借景。Fukuda c20、BD in the design concept of the axis of the embodied in the jiuGongGe city rule thought.The central axis vertical in shenzhen as a focused on the central administrative and cultural center of all buildings,including large shopping center,star hotel.福田cbd在体现中轴线的设计理念中融入了九宫格的城规思想。中心区的竖中轴上集中了深圳中心区作为行政文化21、中心的所有建筑,以及大型购物中心、星级大酒店。The whole space planning of nanShan science park for neat grid shape,based on the skeleton in the grid generated the north and south,the axis of the east-west.南山科技园区整体的空间规划为规整的网格状,在网格骨架的基础上生成了南北、东西向的轴线。Futian cBD shenzhen深圳福田cbdscience and technology park of Shenzhen深圳南山科技园GEn22、ERATIon STEP-PlAnnInG GEnERATIon 规划生成生成推导original planning 原始规划Two tower buildings tandem come,break the land neat axis relationship,and at the same time,distance is close to the BaiShi road,to the pedestrian constitute oppressive feeling.Rectangular interface,in the cities too much homogeneous,and 23、250 m tower in the streets scale,display surface too narrow.两栋塔楼一前一后,打破用地规整的轴线关系,同时,距离白石路较近,对行人构成压迫感。矩形界面,在城市中太多均质,而且,250m塔楼在沿街尺度上,展示面过窄。derivation 过程推导Adjust the position of the relationship between the towers,make its follow land shaft nets;section2、3、4 of the distance between larger,make visual c24、orridor is more arranged.调整塔楼之间的位置关系,使其遵循用地的轴网;二、三、四标段之间距离拉大,使视觉通廊更加连续。optimization results 优化成果In the floor of the relationship with follow net at the same time,put one tower buildings turning,inject vigor factor,to make it a plot point,increases the centripetal force,strengthening of the surroundi25、ng control;However,the torsion of tower increased technology south road toward the surface with landscape street facade.在遵循用地轴网关系的同时,将其中一栋塔楼扭转,注入活力因子,使其成为地块亮点,增大向心力,加强了对周边的控制力;同时,塔楼的扭转增加了科技南路的临街立面与景观朝向面。baishi road 白石路baishi road 白石路baishi road 白石路baishi road 白石路baishi road 白石路baishi road 白石路Derivat26、ion推导logic逻辑optimization优化Dynamic动态原有交通基地只能通过基地南面和东面的道路解决,与外界形成孤岛,难以联系。双向道路a和场地车出口道路b更是加重了原有道路的压力。The original traffic can only be solved by the roads on the northern and eastern sides of the base,which isolated from the outside and makes the connection difficult.The two-way road A and road B,the ve27、hicle exit of the base,increasing the pressure of the original road.case1:use the ring fire exit,solve the hotel auto route,respect for the upper planning.cASE2:open the vehicle exit on Baishi Road,not only icrease the accessibility of the base,but also scatter the traffic pressure of the road.optim28、ization upper planning.建议一:利用环形消防通道,解决好酒店车行路线,尊重上层规划。建议二:白石路上开场地车辆进口,不仅增强了场地的可达性,并分散了场地道路的交通压力。优化上层规划。TRAFFIc PlAn AGAIn-PlAnnInG GEnERATIon 规划生成交通再规划solution 解决方法original planning road 原有规划道路Scheme road planning 本方案中道路规划Auto space range analysis 车行空间范围分析Auto space range analysis 车行空间范围分析Bad accessi29、bility of the Base基地可达性差Flow analysis lines人流线路分析underground garage entrance地下车库入口transit site 公交站点shahe river 沙河ABcase1case2city basic城市肌理In this planning,we focused on studying how the two 250meter-high towers become a landmark in the area while coordinating with the surrounding environment reason30、ably at the same time.Firstly,we consider the coordination with urban fabric,which is integrated into the overall layout of the city,then basing on the original axis under the plan,thus producing a direct relationship with the three tenders,at last,the final dynamic layout energizes the entire park.31、本次规划中,我们着重研究了两栋250m高的塔楼是如何在成为一片区域的标志性建筑的同时又能很好的协调周边环境。首先,我们考虑要与城市肌理协调,融入城市整体布局,进而根据原有规划轴线,与三标段发生直接关系,最后动态布局,为整个园区注入活力,使之成为整个园区的标志性建筑。Planning analysis规划分析Spatial analysis空间分析Rotating analysis旋转分析Before rotating旋转前R=90R=180After rotating旋转后Symbol中心Planning axis 规划轴线street facade 沿街面the unity of no.3 32、and no4 三、四标段的统一continuing axis 轴线的延续conversation对话ShaHe Golf 沙河高尔夫 THE PlAnnInGS cooRDInATIon AnD SymBol-PlAnnInG GEnERATIon 规划生成规划的协调与标志THE HoTEl oF THE lAyouT oF THE ADAPTABIlITy To THE EnvIRonmEnT-PlAnnInG GEnERATIon 规划生成酒店总体布局的环境适应性most importantly,the position,shape and volume of the building 33、should have positive response to the environment around.建筑的体量、形态和位置首先应该是对它所紧邻环境的积极反应。Physical factors物理因素baishi road 白石路ooffice 办公office poured办公人流Hotel 酒店the hotel people 酒店人流kejinan road 科技南路ShaHe road 沙河西路SHahe golf 沙河高尔夫The hotel is located in the west base,close to the citys main thoroughfares-34、a Baishi road and kejinan road酒店位于基地西边,紧邻城市主干道-白石路和科技南路landscape factors景观因素Shahe golf landscape located in the east of base are totally in our eyes位于基地东面的沙河高尔夫景观尽收眼底As the land for office buildings located in the south and east parts of this project.It is very convenient,in terms of functions,for t35、he connections between no.2 and no.3 spots.项目南侧和东侧均为科技园区的办公用地,在功能上很方便二、三地段的连接People for hotels are mainly from Baishi road and Shahe road,while people who are working here mostly come from keji nan road and Tenth Gaoxinna road.酒店人流大部分来源于白石路和沙河西路,办公人流则多来源于科技南路和高新南十道。Function功能归属性Traffic accessibility36、交通可达性concePt 概念提出sublimation 破茧Biological Sublimation derived form two building,this is rooted in the science park to explore the essence of the innovation forever.Through the comparison of acme,using facade,form performance,modelling and new outline to locate their identity,make flagship landmarks.37、生物上的破茧衍生出两栋建筑形体,这是根植于科技园永远探索创新的本质而来的。通过这种极致的对比表现,运用立面、形态、造型和崭新的轮廓来定位自己的身份,打造旗舰性的地标建筑。Box 体块Remove移出Rotating旋转Generating生长cutting切割cutting Again再切割Sublimation破茧complete完成establisH scHeMe 确立方案Generation生成Existing基地范围Tensile拉伸cut切割Thick Edge环境介入Into function功能置入Events-integration事件整合Function 功能office办公38、Business 商业Industry housing产业用房Hotel 酒店Planning mode of the species规划模式种类area 面积vertical city 垂直城市city landmarks 城市地标radiation relationship 辐射关系architecture image 建筑形象strategy sPace 空间策略mulTI-DImEnSIonAl cyclE THEoRy多维循环理论In the construction of the carrier,all the factors involved in construction ac39、tivities,including with factitious core,wind,light,water,energy,they are in the carrier for all kinds of activities.By this time,factors and factor,between the factors and other factors all happened dialogue.We provide such a communication space:the wind is from the nature,and to return to the natur40、e,man ramble in building,let building space to be able to flow,and at the same time,make each factor happen interesting cycle.We put this interaction cycle,called it a multi-dimensional cycle theory.在建筑的载体里,参与建筑活动的各个因子,包括以人为核心,风、光、水、能源,它们在这个载体里进行各种活动。这时候,因子与因子之间、因子与其他因子都发生了对话。我们提供了这样一个交流的空间:风从自然来,回到41、自然去,人在建筑中游走,使建筑空间得以流动,同时,使各个因子发生有趣的循环。我们把这种互动循环,称之为“多维循环理论”。The wind factor circulation patterns风因子循环模式Fresh air 新风natural ventilation mode 自然通风模式mechanical ventilation mode机械通风模式Fresh air intake新风进入Hot air exhaust热风排出vAv-controlledair exchange变风空调系统The light factor circulation patterns光因子循环模式Atrium42、 diffused daylight through skylight中庭漫射天光circulation of office循环办公空间circulation of plaza循环广场空间The people factor circulation patterns人因子循环模式SQuARE clASSIFIcATIon THEoRy广场分级理论communication交流ctraffic交通T sports运动SPFor the city城市级exhibition展览repast就餐 shopping购物ERSPFor the zoning园区级REoEvrest休憩office办公 eva43、cuation疏散For Employees员工级ETcRRESPcoRSPTREREoEvEAccording to the characteristics of flow,redefine multi-layer 3D city space.0 m layer as city stateroom,hold and treat all aspects from the city of guests,defined as city level;8.4 m layer using personnel for the more parks,to providing this park and ci44、ty,the nature,the internal communication platform,for its park level;40 m layer of the park to provide green recreational roof afforestation,positioning for staff level.根据人流特点,重新定义“多层立体城市空间”。0米层作为城市大客厅,容纳并招待来自城市方方面面的客人,定义为“城市级”;8.4m层使用人员多为本园区,提供本园区与城市、自然、内部交流的平台,定位为“园区级”;40m层为园区提供绿色休闲的屋顶绿化,定位为“员工级”。45、streaMline analysis 流线分析industry Houseoffice产业用房 办公63F 64F leisure sports 休闲康体 44F 62F Hotel rooms 酒店客房43F refuge storey 避难层 31F 42F office 办公30F refuge storey 避难层1629F office 办公 15F refuge storey 避难层1114F industry House 产业用房610F industry House 产业用房 5F industry House 产业用房 34F conference center indus46、try H会议中心与办公用房12F Hotel industry House酒店与办公用房-3F-1F basement 地下室 46F 62F office 办公45F refuge storey 避难层31F 44F office 办公30F refuge storey 避难层16F 29F office 办公15F refuge storey 避难层11F 14F office 办公垂直交通 Perpendicular traffic避难层 refuge storey酒店配套功能酒店客房 Hotel rooms 会议中心 conference center酒店后勤管理 logistics47、 area办公 office产业用房 industry House水平交通 level traffic地下室 basementHotel酒店refuge storeyFire elevator避难层及消防电梯Air garden platformFunction streamline schemes功能流线示意图office entrance办公入口office entrance办公入口conference center entrance国际会议中心入口 HotelEntrance酒店入口Industry H entrance产业用房入口Function analysis 剖面示意图The b48、reakthroughing green room from south to north makes the Industry houses looks like a garden be hold in“the green arm of nature”.南北贯通的绿化巷道让产业用房像看起来一个花园,在庭院和风的环抱中倍感惬意。The office area a lot of interesting garden for the people have a rest,out of work can get effective relaxation办公用房拥有很多生动有趣的空中庭院供人们休憩,在49、工作之余可以得到有效的放松office space with the deepth of 12 meters and hight of 4 meters guarantee the height requirements,and good natural lighting.办公空间进深均控制在12米左右,层高4米能保证办公的净高要求,和良好的自然采光。conference center will design in 34 layer.It has the own hall and suit to every kind of conference and the party.会议中心布置在34层50、,拥有独立的门厅。适合大中小型的会议与宴会。The hotel has good view and unique landscape Angle,10 layer tall atrium with sunshine creat more value and quality.酒店拥有良好的景观视野及独特的景观角度,10层通高的阳光中庭更显酒店的品质与氛围。An air garden for leisure space is created by the slanting cutting of the top of tower building to bring us a green and na51、tural environment.塔楼顶端斜切造型刚好为康体娱乐空间创造了一个空中花园,营造多一分的自然绿意。Industry Housing产业用房Air garden空中花园office办公conference center会议中心Hotel酒店leisure sports休闲康体tHe Hotel streaMline analysis 酒店流线分析basement 地下层First floor 首层second floor 二层third floor 三层executive suites 行政套间observation platform 室外观景平台standard room 标准间52、luxury suites 豪华套房conference center 会议中心restaurant 餐厅Public area of the hotel 酒店公共区logistics area 酒店后勤行政区the participants streamline 与会人员流线residents streamline 住客流线service streamline 后勤服务流线Functional partition of the hotel 酒店功能分区示意图Fourth floor 四层44th floor 44层4551th floor 4551层52th floor 52层5361th 53、floor 5361层62th floor 62层6364th floor 6364层observation platform室外观景平台observation platform室外观景平台Executive lounge行政酒廊层 roof 屋顶层 atrium 酒店中庭 Section A剖面aSection B剖面bexecutive lounge行政酒廊 swimming pool泳池 The hotel perspective profile酒店剖透视示意图jiuGongGe modular Grid “类”九宫格模数化网格-功能布局的基础column grid 柱网:8.0m8.454、mbasic module unit 基本模数单元:8.0m8.4mBasic module unit of combination 基本模数单元组合的多种可能性Height Possibility 竖直面上的可能tower 塔楼Plan 平面Modular 模型Height&Plan Possibility 平面和竖直面上的可能Plan Possiblity 平面上的可能plan modular 平面模块3d modular立体模块If both sides of the platform belongs to one company,then this platform is the in55、ternal communication space.But if the two sides of the platform belongs to different ones,then the platform will be shared by the both companies,providing a place to communicate and understand each other,at the same time promote development and industry value to each other.若休息平台两边的单元为同一家企业所有,则该休息平台即56、为企业内部的交流休息场所;若平台两边单元为不同企业所有,则平台为两家企业的共享平台,为不同企业的人们提供了一个相互交流相互了解的场所,相互提升带动,相互提升产业价值。In this design,we create a basic combination of elements with the smallest unit modulus and the basic portfolios are separated by platforms for rest.Without affecting functions of buildings,we get some more spaces for57、 the outdoor activities which can both attract more people out and form more colorful internal spaces.In this design,we create a basic combination of elements with the smallest unit modulus and the basic portfolios are separated by platforms for rest.Without affecting functions of buildings,we get s58、ome more spaces for the outdoor activities which can both attract more people out and form more colorful internal spaces.本设计中我们用最小模数单元组合成可以复制的基本组合单元,基本组合单元之间用休息平台隔开。在不影响建筑功能的情况下,将面积适度的转移,争取更多的人达到室外空间,由此手段可以创造出更加丰富的室内空间。Modular design 模数化设计the plane modular tower 塔楼平面模块化tHe ForMation oF tHe courtyard59、 院落空间的生成Building Arrangement一般建筑排布 Plan 平面 Model 模型ambiguious space 多义空间Permeating Space渗透空间Flowing Space流动空间center Space中心空间Buildings and yard 建筑与院落Buildings Isolation and Independence建筑的分离与独立minus Space减去空间Spinning the whole andForming the yard整合旋转形成院落Edge modifrication边缘变化The Formation of yardAnd60、alley院落街巷空间生成communicating space 交流空间ambiguous half space 休息平台的多种使用site 基地basic grid 基本网络eating 饮食watching tv 看电视Multi-function 多功能consult 咨询Personal exhibition 个人展览Model 模型Public and Private 公共空间与半私密空间size 体型生成After optimization planning texture优化后规划肌理Building response planning relationship建筑回应规划关系61、Subtraction减法Subtraction减法Dissociation抽离Addition加法Tower A(Hotel)Generated a塔(酒店)体型生成Tower B(office)Generated b塔(办公)体型生成Box体块Dissociation抽离Emphasize强调volume体积cut切开Subtraction减法Tilt倾斜Thinning 细化Skirt Building Generated 裙楼体型生成tower a(Hotel)a塔酒店生成Emphasizes building city image,to head subtration design,62、strengthen building high feeling,increase the building to the surrounding control.At the same time,in response to the original planning texture.强调建筑城市形象,对头部进行减法设计,加强建筑高耸感,增加建筑对周边的控制力。同时,回应原有规划肌理。tower b(office)b塔办公生成Emphasized bulk feeling,in the park planning,it has echo with section 3 in space.For63、mation of the three pillars of interesting space.强调体积感,在园区规划上,在空间上与三标段取得呼应。形成三足鼎立的有趣空间。skirt building 裙楼体型生成let natures wind,light,water,energy involved in building,open the atrium,communicaing with natural.让自然的风、光、水、能源参与到建筑中来,打开大中庭,与自然发生对话。Architectural form 建筑构成outer ePiderMis analysis 外表皮分析The of64、fice retaining skin analysis办公层外围表皮分析The hotel retaining skin analysis酒店层外围表皮分析400mm wide level shading bar400宽水平外遮阳Invisible vertical points seam 隐形竖向分缝light gray low-E glass浅灰色low-e玻璃400mm wide level shading bar400毫米宽水平外遮阳light gray low-E glass浅灰色low-e玻璃Invisible vertical points seam 隐形竖向分缝little 65、ecological balcony 生态小阳台large window:viewing effect大玻璃窗:景观效果好Hollow courtyard:vertical ventilation design 中庭:竖向通风设计light gray hollow glass:reducing energy impairment浅灰色中空玻璃:减少能源折损The beautiful scenery outside the window 窗外美丽的风景outer ePiderMis analysis 外表皮分析Rudiment雏形Block diagonal cut through the bo66、dy deal with the formation of several groups of roughly the amount of units,the natural connection between the use of refuge floors to form a whole.notch processing,optimization corner landscape area,body mass after treatment of the landscape surface rotation richer,building space along the street f67、acade to add interest,while the corresponding increase in construction can also be fun.体块通过对角切割处理,形成几组大体量单元,之间用避难层自然连接,组成一个整体。切角处理,优化转角景观面,经过体块旋转处理后的景观面更加丰富,建筑沿街立面增添趣味空间,同时也可相应的增加建筑趣味性.cuting切角northwest coner西北角度Southeastconer东南角度Revolve旋转Separate分离TEcHnIcAl DRAWInGS技术图纸site-Plan 总平面图PlAnnInG STREAm68、lInE AnAlySIS 规划流线分析图elevation 立面图elevation 立面图tHe skirt building ProFile 裙楼剖面图tower ProFile 塔楼剖面图tHe elevator Partition scHeMes 电梯分区示意图Podium Industrial Housing Elevator Group裙房产业用房电梯组Fire Elevator A消防电梯aPartition Elevator Group Aa栋分区电梯组Partition Elevator Group Bb栋分区电梯组Fire Elevator B消防电梯bl-zone低区c69、-l-zone中低区c-H-zone中高区H-zone高区Fire Elevator B消防电梯bPodium Industrial Housing Elevator Group裙房产业用房分区电梯区Partition Elevator Group Bb栋分区电梯组o-l-Zone办公低区o-c-Zone办公中区o-H-Zone办公高区Hotel-Zone酒店电梯区Fire elevator a消防电梯aPartition Elevator Group Aa栋分区电梯组GREEn DESIGnED ARTIclE绿色专篇building ecological strategy 建筑生态策略So70、lar thermal collector太阳能集热器40.0mcollection of greywater雨水收集over 8.4mwindow-shade to prevent midday sun南立面外遮阳措施8.4mPedestrian flow人流去向constructed wetlands人工湿地Permeable surface透水表面Pedestrian flow人流去向0.0mrecycle of water 中水利用lighting system of optical fibres光导照明系统Pedestrian flow人流去向Basement地下室 Sun radiate太阳辐射热natural ventilation 自然通风natural lighting 自然采光over 30.0m15.030.0m0.0m15.0mchoice of plants is according to height高山理论依据不同高度配植不同植物EnGInEERInG ExPlAIn工程说明
会员尊享权益 会员尊享权益 会员尊享权益
500万份文档
500万份文档 免费下载
10万资源包
10万资源包 一键下载
4万份资料
4万份资料 打包下载
24小时客服
24小时客服 会员专属
开通 VIP
升级会员
  • 周热门排行

  • 月热门排行

  • 季热门排行

  1. 2025商场地产夏日啤酒龙虾音乐嘉年华(吃货的夏天主题)活动策划方案-47页.pptx
  2. 2022城区自来水提质改造智慧水务建设项目设计方案(199页).pdf
  3. 陕西化学工业公司招聘管理与职业发展管理手册30页.doc
  4. 动火作业安全告知卡(1页).docx
  5. 高处作业安全告知卡(1页).docx
  6. 广场工程建设项目施工招标评标报告表格(24页).pdf
  7. 原油码头消防工程维保方案(39页).docx
  8. 2020柏向堂房地产公司材料标准化手册3.0(143页).pdf
  9. 2021柏向堂房地产公司材料标准化手册4.0(108页).pdf
  10. 深圳装饰公司施工图纸会审及设计交底管理制度【13页】.doc
  11. 住宅小区工程施工方案【234页】.docx
  12. 鄂尔多斯空港物流园区总体规划方案(2017-2030)环境影响评价报告书(23页).doc
  13. 规划兰园西路道路工程环境方案环境影响评价报告书(89页).pdf
  14. 屋面圆弧形穹顶结构高支模施工方案(40米)(47页).doc
  15. 埋石混凝土挡土墙施工方案(23页).doc
  16. 土方开挖及地下室施工方案(21页).doc
  17. 重庆市五小水利工程建设规划报告(64页).doc
  18. 超高纯氦气厂建设项目办公楼、变电站、水泵房及消防水池、门卫、厂房、仓库、配套工程施工组织设计方案(140页).doc
  19. 邛崃市牟礼镇初级中学校学生宿舍建设工程施工组织设计方案(259页).doc
  20. 高层住宅工程施工方案(249页).doc
  21. 园林工程质量通病控制方案及防治措施(27页).doc
  22. 珠海市三灶镇二级生活污水处理厂工程技术标书方案说明书(135页).doc
  1. 房地产交易环节契税减征申报表(首套填写)(2页).doc
  2. 2025商场地产夏日啤酒龙虾音乐嘉年华(吃货的夏天主题)活动策划方案-47页.pptx
  3. 2024大楼室内精装修工程专业分包投标文件(393页).docx
  4. 苏州水秀天地商业项目购物中心100%室内设计方案(158页).pptx
  5. 2022城区自来水提质改造智慧水务建设项目设计方案(199页).pdf
  6. 小区人员配置档案建立保洁绿化物业管理服务投标方案(593页).docx
  7. 室内移动式操作平台工程施工方案(19页).doc
  8. 地铁6号线区间盾构下穿管线专项施工方案(30页).doc
  9. 矿山治理工程施工组织设计方案(240页).docx
  10. 老旧小区改造工程施工方案及技术措施(364页).doc
  11. 2020柏向堂房地产公司材料标准化手册3.0(143页).pdf
  12. 2021柏向堂房地产公司材料标准化手册4.0(108页).pdf
  13. 川主寺城镇风貌整治景观规划设计方案(60页).pdf
  14. 新疆风电十三间房二期工程49.5mw风电项目可行性研究报告(附表)(239页).pdf
  15. 土建、装饰、维修改造等零星工程施工组织设计方案(187页).doc
  16. 四川凉山攀西灵山国际度假区小镇活力中心商业业态规划方案建议书(33页).pdf
  17. 埋石混凝土挡土墙施工方案(23页).doc
  18. 地下停车场环氧地坪漆施工方案(45页).doc
  19. 深圳装饰公司施工图纸会审及设计交底管理制度【13页】.doc
  20. 住宅定价策略及价格表制定培训课件.ppt
  21. 西安名京九合院商业项目招商手册(28页).pdf
  22. 2010-2030年湖北咸宁市城市总体规划(32页).doc
  1. 建筑工程夜间施工专项施工方案(18页).doc
  2. 赣州无动力亲子乐园景观设计方案(111页).pdf
  3. 2016泰安乡村旅游规划建设示范案例(165页).pdf
  4. 房地产交易环节契税减征申报表(首套填写)(2页).doc
  5. 龙山县里耶文化生态景区里耶古城片区旅游修建性详细规划2015奇创.pdf
  6. 连云港市土地利用总体规划2006-2020年调整方案文本图集(78页).pdf
  7. 850亩项目塑钢门窗工程施工组织设计方案(34页).doc
  8. 老旧小区改造工程施工方案及技术措施(364页).doc
  9. 城市更新项目地价公式测算表.xlsx
  10. 房地产项目规划前期投资收益测算模板带公式.xls
  11. 存储器基地项目及配套设施建筑工程临时用水施工方案(40页).docx
  12. 铁路客运枢纽项目站前框构中桥工程路基注浆加固专项施工方案(19页).doc
  13. 室内移动式操作平台工程施工方案(19页).doc
  14. 装配式结构工业厂房基础、主体结构、门窗及装饰工程施工方案(83页).doc
  15. 地铁6号线区间盾构下穿管线专项施工方案(30页).doc
  16. 施工工程安全教育培训技术交底(13页).doc
  17. 老旧小区改造施工方案及技术措施(365页).doc
  18. 新建贵广铁路线下工程沉降变形观测及评估监理实施细则(126页).doc
  19. 消防火灾应急疏散演练预案(12页).doc
  20. 矿山治理工程施工组织设计方案(240页).docx
  21. 崖城站悬臂式挡墙施工方案(92页).doc
  22. 北京科技园公寓建设项目整体报告方案.ppt