2024合川河心半岛帐篷营地文旅景区景观概念设计方案(49页).pdf
下载文档
上传人:十二
编号:940271
2024-06-12
49页
29.06MB
1、合川河心半岛帐篷营地景观概念方案 Landscape Design of Tent Camps in the Central Peninsula of Hechuan River无牌词 涪江雅颂玉带环岛,阡陌含烟。黛瓦依竹,鹭点纱笼。登高处,望山河,意随灵空。禅音似在,轻车掠花丛。青山碧水柳叶洲,漫润清风。老街新院,古渡横舟。石墙篱笆,乡乐美酒。循稻香,闻蛙鸣,指拂莲蓬。鱼潜波底,天车破林头。雅舍丽铺青葱客,更见霓虹。PRE-PHASE ANALYSES前期分析本项目位于“合川后花园”之称的铜溪镇河心半岛,利用河心半岛滩涂闲置地,设置“江畔帐篷营地”。场地三面临江,视野开阔,自然条件优越,利于2、景观打造。The project is located in theHechuan back garden,known as the Tongxi Town River Peninsula,the use of the River Peninsula Beach idle land,set upRiverside Tent Camp.Site three facing the river,wide vision,superior natural conditions,conducive to landscape building.SITELocation analysis 区位分析河心半岛营地3、河心半岛营地(项目位置)Project construction location41122334Current situation analysis 地形地貌滩涂林地江石野草Current situation analysis 现状分析 1.周边绿意环绕,有山有水,有良好的生态基底 2.现状树木长势良好,具备林荫空间 3.场地临水有大面积的滩涂空间,满足场地的功能性需求 4.沿着江边有部分乱石堆及茅草,野外氛围感十足Surrounded by green,with mountains and water,there is a good ecological baseThe current t4、rees grow well and have shade spaceThe site has a large area of lawn space to meet the functional requirements of the site总结Customer group portrait 客群画像核心客群主要客群争取客群重庆市区青年客群(21-30岁)出行特征:同学、朋友、同事组团出行重庆市区家庭客群(30-45岁)出行特征:家庭自驾出行重庆市区中老年客群成都中短途游客群123如何在保护现状优良自然本底的前提下,创造一个具有打卡性,参与性,互动性,娱乐性的优秀的露营场地?I.充分发挥自然5、本底特色,强化江畔田园的参与体验感II.营造多个主题营地空间,丰富营地特色III.拉大客群画像,扩大营地辐射范围IV.丰富营地活动,强化后期运营。营地的思考?营地的思考?question打造中高端精致营地以涪江风光为主导【田园风情诗意山林】打造一处集休闲,旅游,亲子,微度假为一体的多功能生态营地。偷浮光山色,享人间闲余,倡导一种田园牧歌般生活态度!Current situation analysis 项目定位CONCEPTUAL DESIGN方案设计Current situation analysis 概念构思涪江利 水栖水栖 田园田园 归园归园 杉林 林居 用现有丰富的水资源 打造宜人的亲水6、环境利用原有的肥沃土壤 打造大片属于自己的田园场地原生的林木资源丰富 是天然的生态氧吧田园归隐,雅江野宿自 然 生 态,山 青 水 绿。让城市人能回归田野,宿在田园江畔,与星辰对话,枕自然而眠!Current situation analysis 概念构思归园(田园)林居(杉林)水栖(涪江)Current situation analysis 概念构思Scheme plane 方案平面Plane dimension 平面标注01020304050607080910111213入口大门停车位充电停车位接待中心室外平台汽车营地林间固定帐篷林间自搭营位观江码头卫生间烧烤营地观江天幕互动江滩010207、20304050607080910111213Flood level line 洪水位线20年洪水位线10年洪水位线5年洪水位线5年以下洪水位线图例:停车场出入口 营地入口车行动线 人行动线 移动卫生间Moving line 动线动线停车场 二期帐篷营地汽车营地 林间营地烧烤营地临搭天幕 江滩湿地 休闲垂钓Landscape partition 景观分区观江码头观江码头二期帐篷营地停车场汽车营地临搭天幕江滩湿地 林间营地休闲垂钓 停车场烧烤营地生态茂林卫生间生态茂林PRE-PHASE ANALYSES分区设计回归田园生活。是一种返璞归真的生活方式。归园归园利用原有的肥沃土壤,打造大片属于自己的8、 田园,共享农田Zoom plane 放大平面入口大门Entrance gate入口大门采用生态原木做大门框架,营造出生态自然的氛围。The entrance gate adopts ecological logs as the gate frame,creating an ecological and natural atmosphere.服务中心服务中心隐于山林之间,可养生。林居是一 种健康的生活方式。林居居场地原生的林木资源丰富,自然的生态氧吧。茂密杉林林间露营Zoom plane 放大平面林间营地Forest Camp营地分为林间营地和房车露营地。The campsite is div9、ided into forest campsites and RV campsites.房车营地林间营地固定帐篷共15个Zoom plane 林间营地Zoom plane 林间营地5米X5米混凝土压印木纹平台,自搭帐篷营位共13个Zoom plane 林间营地RV park 房车营地提供房车营位15个,每个营位旁设有30的自搭空间。同时该场地在园区车位紧张时也可做为停车位使用。水栖水栖与水共生,滨水而居,是一种休闲舒适的生活方式。休闲垂钓江滩湿地观江码头Zoom plane 放大平面烧烤营地Barbecue Camp烧烤营地此区域可临时搭建自带帐篷和天幕等户外装备,草坪局部铺设砾石,在满足烧烤10、野营需求的同时不破坏植被。This area can be temporarily equipped with outdoor equipment such as tents and canopy,and gravel can be laid locally on the lawn to meet the needs of barbecue camping without damaging vegetation.Barbecue Camp 烧烤营地Zoom plane 放大平面江滩营地Jiangtan Campsite此区域更加靠近水面,景观性较好。但地势较低,只可临时搭建自带帐篷和天幕等户外11、装备。This area is closer to the water surface and has a good landscape.But the terrain is relatively low,and outdoor equipment such as self owned tents and canopy can only be temporarily built.江滩营地Jiangtan Campsite 江滩营地Zoom plane 放大平面江滩活动区Jiangtan Activity Area江滩活动区此区域亲水性较好,但安全问题不容忽视,需设置警示标牌。This area12、 has good hydrophilicity,but safety issues cannot be ignored and warning signs need to be set up.Jiangtan Activity Area 江滩活动区SUPPORTING FACILITIES 配套设施主道路采用彩色混凝土路面,同时设置为人车分流。游步道采用灰色混凝土路面和青石板。Camp Road 营地道路营地平台采用压膜混凝土木纹蓝色人行道路灰色车行道路石板汀步卫生间:固定卫生间在20年洪水位以上设有一个点位。5年以下洪水位设置一个移动卫生间。Toilet 卫生间Vegetation res13、toration 植被修复清理现状的杂草,保留原有景观性较强的植物。设置景观石,种植芒草等植物,打造自然野趣的植物空间。Clean up the existing weeds and preserve the plants with strong landscape characteristics.Set up landscape stones and plant plants such as grass to create a natural and wild plant space.“营营地地+”模模式式营地+体育活动(划船、江滩排球)营地+户外研习(亲子自然课堂)营地+主题派对(企业团建14、草坪婚礼、音乐会)通过“营地+”模式,实现“营地经济”与自然保护、乡村振兴融合,促进文旅产业创新有序发展,文化空间不断延伸,推动乡村振兴与文旅融合发展,以文化赋能提升旅游体验。打通城乡互动资源,做好乡村重塑、产业重塑、生态重塑、文化重塑。Sports activities 体育活动Outdoor training 户外研习outdoor party 户外派对Lawn Concert 草坪音乐会1.酒店式露营区提供一站式露营体验,自助餐食,多种类特色帐篷房。3.租赁烧烤架烧烤营地可利用租赁的可移动烤架,进行自主租赁。4.租赁垂钓位在现状的江边设置垂钓区,游客可租赁位置享受野趣垂钓。5.活动小卖15、部活动摊位可售卖咖啡等饮品、合作商的啤酒、烧烤食材、烧烤酱、面包等野餐所需品。6.场地收费停车费,临搭区帐篷及天幕营位费,人头卫生费等。Profit point analysis 盈利点分析2.租赁帐篷、吊床、彩灯临时搭建区帐篷营地的类型分为睡觉休憩帐篷配套装备与野餐天幕帐篷配套装备,休闲吊床,均为租赁类型。帐篷营地主要以帐篷、彩灯、旗帜、标语牌等营造舒适氛围。Activity booth 活动摊位通过灯光营造特定的温馨的氛围:1.平日的夜晚通过串串灯来打造舒适休 闲的氛围。2.举办 party 通过气球等装饰结合亮化,营造热闹的氛围。3.节假日通过大型的灯具亮化,渲染缤 纷假日的氛围。Brightening intention 亮化意向平时亮化平时亮化 平时亮化派对亮化节假日亮化THANKS