2022西安万象城商业购物中心整体装饰规划设计方案(167页).pdf.pdf
下载文档
上传人:十二
编号:932199
2024-06-04
167页
185.02MB
1、Xian CCBDSD 100 Architecture24/01/2022Contents1.Visuals 效果图2.Concept development 概念发展3.Massing SD Stage Progress 体量方案进展4.Bridge of Possibilities development 潜力之桥设计发展5.Facade Development&Progress 幕墙发展及进度6.Roof Development and Coordination 屋顶发展及协调7.Skylight Development 天窗发展目录1.Visuals效果图678910111213142、15161718192.Concept Development概念发展21Since our 100%concept submission,the studio has been working on the overall form of the massing自从我们概念100%递交以来 工作室一直致力于 发展体量的整体形式taking cognizance of various changes to the project.体量原则非常重要.but really focusing on maintaining the fact that the podium steps down to 3、the streets and creates an elegant and dynamic form.项目最大的变化之一是 塔楼数量从两栋增加到四栋 裙楼的体量2.Interlocking Massing2.交叠体量1.Visual Layering1.视觉层次感It s really important for us to establish our massing principles.同时让我们保留设计的精髓避免裙楼上层框架3.Dynamic Roofs3.动感屋顶4.Human Scale Moments4.人体尺度时刻22One of the largest changes is 4、the number of towers和屋顶的界面过于复杂One of the largest changes is the number of towers和屋顶的界面过于复杂has increased from two to four,在整个项目期间,我们一直与拾稼合作has increased from two to four,在整个项目期间,我们一直与拾稼合作23and the massing of the podium has had 确保体量与发展中的商业平面和功能布局保持一致 to ensure the qualities and aspirations我们与科进密切合作to 5、respond accordingly,with particular focus在方案设计阶段are maintained from when we started the project.将必要的机电纳入我们的设计演化Reducing the number of tables has had a number of benefits.在这里,我们发展出的系统It simplifies the overall composition,将所有机电容纳在合适的位置24but still it allows us to keep the essence of the design.再用演化后的设计6、元素加以遮盖but still it allows us to keep the essence of the design.再用演化后的设计元素加以遮盖It avoids complex interfaces of the frames and roofs of the upper levels of the podium.简化屋顶几何形状,在这里形成了更大的平坦区域We ve been working with 10 Design throughout the project,ensuring the massings alignment with the evolving commerc7、ial plan and program distribution.我们现在将其想象为屋顶花园 这是项目新的主要公共空间整个项目的露台25what we now imagine as a roof garden,a new main public space for the project.提供了机会在我们想象中,四栋塔楼what we now imagine as a roof garden,a new main public space for the project.提供了机会在我们想象中,四栋塔楼Through the schematic design phase,we ve work8、ed closely with WSP to incorporate the necessary MEP into our reform.Here,we have developed systems都能连接到屋顶层可以从不同方位进入创造各式体验我们对该项目的最初意图之一 so it accommodates all the MEP in the correct locations,but all disguised by our reforms.Simplifying the roof geometry has created larger,flat areas here,是创建一系列旅程露台9、和屋顶花园是其中的重要方面这个屋顶花园也为四栋塔楼界面创造有趣味性的体验26The terraces throughout the project are connected to this roof level,allowing access fromnumerous points through and creating different experiences.坐落在桌子结构上如此一来,活力动感的裙楼和简单优雅的塔楼就形成了鲜明的对比One of our original intents for the project was to create a series of journey10、s.Terraces and roof gardens are an important aspect of that.项目西侧面向长安路的体量规模较大形成了更宏伟的外观也是项目面向城市的展面creating a clear separation between the active and dynamic podium and the simple and elegant towers above.街道两边都有多层露台我们用餐饮让露台活跃起来在整个项目中创造激动人心的景色This roof garden also creates an opportunity for really inter11、esting interface between the garden and the four towers.西北入口与西北下沉广场相连 为项目整合了多层次的入口 北街的规模分解了体量We have imagined those four towers sitting on our table structure,从而为项目创造了更小范围的活动空间和不同的到达体验2728Across the project,the facade is composed of a number of different types.我们认为可以透过柱子和框架来真正达成目标We have glazed faca12、des and solid,each of which had their own detailed system approach.受到城市当地工艺和文化的启发我们希望运用到项目当中We also have arguably the most important比如釉面陶瓷的使用,就是表达feature of the project,the columns and frames.这种愿景强有力的方式29303.Massing SD Stage Progress方案阶段 体量成果31Massing-SD Stage Evolution 方案阶段 体量演化Key Brief Changes 主要13、设计概要更改1From 2 to 4 Towers 从2到4座塔楼3Massing Simplification体量简化2L5 Roof Garden L5屋顶花园*Design detail to be discussed in separate chapter 设计细节将在另一章中讨论32Massing-SD Stage Evolution 方案阶段 体量演化Massing Principles 体量原则1.Visual Layering1.视觉层次感2.Interlocking Massing2.交叠体量3.Dynamic Roofs3.动感屋顶4.Human Scale Moments14、4.人体尺度时刻33Massing-SD Stage Evolution 方案阶段 体量演化Key Massing Evolution 主要体量发展34Massing-SD Stage Evolution 方案阶段 体量演化Key Massing Evolution 主要体量发展竞赛 Competition方案30%SD 30%方案100%SD 100%概念100%Concept 100%35Massing-SD Stage Evolution 方案阶段 体量演化Key Massing Progress 主要体量发展1Commercial Plan Coordination 商业平面协调3St15、ructural Coordination结构协调2Roof MEP Integration屋顶机电融合 36Massing-SD Stage Evolution 方案阶段 体量演化Key Massing Elements 主要体量发展1North Street北商业街区3Roof Garden 屋顶花园2Central Plaza and Terrace Loop中央广场和露台环路37Massing-SD Stage Evolution 方案阶段 体量演化Key Visuals 主要效果图方案100%SD 100%概念100%Concept 100%38Massing-SD Stage Ev16、olution 方案阶段 体量演化Key Visuals 主要效果图方案100%SD 100%概念100%Concept 100%39Massing-SD Stage Evolution 方案阶段 体量演化Key Visuals 主要效果图方案100%SD 100%概念100%Concept 100%40Massing-SD Stage Evolution 方案阶段 体量演化Key Visuals 主要效果图方案100%SD 100%概念100%Concept 100%41Massing-SD Stage Evolution 方案阶段 体量演化Key Visuals 主要效果图方案100%SD17、 100%概念100%Concept 100%42Massing-SD Stage Evolution 方案阶段 体量演化Key Visuals 主要效果图方案100%SD 100%概念100%Concept 100%43Massing-SD Stage Evolution 方案阶段 体量演化Key Visuals 主要效果图方案100%SD 100%概念100%Concept 100%44Massing-SD100 方案100 体量Supplementary Studies 补充局部研究SD 100 Massing Supplementary Studies 方案100 补充体量局部研究 118、.North Street and Central Plaza 北街和中央广场 North Street South Massing 北街南体量 2.Bridge of Possibility Massing Development 体量发展 L2 Connection L2 连桥 Structural Coordination 结构协调45North Street South 北街南体量L3L3L2L2L1L110D studying core re-arrrangement 10D正在研究核心筒佈UPDATE10D Plan 21/12/23HS Preferred 推荐商街南端研究SOU19、THERN RETAIL STREET STUDYB1L1L2L3商街南端研究SOUTHERN RETAIL STREET STUDYB1L1L2L3商街南端研究SOUTHERN RETAIL STREET STUDYB1L1L2L3HS Massing 22/01/06Where we were and CRL Comments 上回決策及华润反馈CRL Preferred 选中方案CRL:Optimise the L2 plan,can the facade be straightened?华润:优化L2平面,平面可以拉直吗?46North Street South 北街南体量Option20、 1(06.01.2022)Added birdmouth for frame interface为框架界面添加鸟嘴L3RoofL2L147North Street South 北街南体量Option 2-Flattened Facade 拉平平面L3RoofL2L1A flattened Facade will result in an additional table column and smaller shopfront 拉平平面将导致额外桌子柱子和更小的店面面积Additional Column额外柱子Additional Column额外柱子48North Street South21、 北街南体量Option 3-Flagship Duplex 复式旗舰Allow maximum shop front for a duplex anchor flagship为双层旗舰店提供最大的店面面积L3RoofL2L1DuplexDuplex49504.Bridge of PossibilitiesDevelopment潜力之桥 设计发展51Design Development设计发展Competition100%ConceptSD70(28/05/2021)52EQEQEvolution of the Geometry 几何形体演变SD30Bridge as a Table geom22、etry does not focus on ToL连桥几何形状为桌子,并不强调生命之树SD70Bridge Flat focuses on ToL平坦连桥强调生命之树53Allow for Roof Garden flexible space 支持屋顶花园灵活空间SD30 Bridge geometry does not allow for Roof Garden space方案30连桥几何形状不支持屋顶花园的空间Proposed Bridge allows for circulation and Roof Garden programme提案连桥支持动线和屋顶花园功能54Bridge as23、 Terrace connection 连桥作为露台连接Terrace and glazing section detail露台及玻璃剖面节点55Continue the terrace language延续露台语言Bridge design principles 潜力之桥设计原则Maximize views to ToL最大限度提高生命之树视角56Bridge massing change 体量变化Table column clashes with bridge facade桌子立柱和连桥幕墙有冲突Bridge extent is increased by 3.5m to terminate24、 column on roof level连桥西面幕墙向西移3.5m使框架立柱落在连桥屋面Before 之前After 改善后3.5m57Bridge massing change 体量变化Before 之前After 改善后58211217 CRLand Meeting-Glazing Summary Page 设计会议-玻璃总结SD70%Glazing方案70Maximum Panel Size 板材最大化Transom横框Staggered Panels交错板材Rippling Panels波纹板材CRL commented that the bridge should look cle25、an,clear and cost effective.Tall glazing seems too expensive.CRL评论连桥应该看干净清晰,有成本效益-玻璃过高,或太昂贵59Client Comment 客户反馈CRL questioned whether part of the roof can be glazed to allow for better view to TOL CRL询问屋顶是否可以部分采用玻璃,以使面向生命之树的视野更加开阔60Skylight studies 天窗研究Orthogonal Skylight 正交天窗Transom横框Pillow Window26、枕式窗户3D Straggered skylight3维交错天窗Staggered Skylight交错天窗Rippling Panels波纹板材HS Preferred HS 推荐61L3-4 west facade is display box to avoid excessive solar gainL3-4西立面为展窗,避免过多的太阳能增益Chamfered corners to reduce thermal stress切角减小热应力ARUP is costing 8.8m uninterrupted glazing panel and potential to loosen sky27、light sizing restrictionsARUP 正在计算 8.8m 不间断玻璃面板成本,及天窗尺寸限制放宽的可能性Vision GlazingDisplay BoxLatest Design 最新设计62Latest Design 最新设计63No columns on east facade for L3 and L2 bridge连桥L3和L2东立面无柱More steel 用钢更多Vierendeel truss for L2 bridge connection 用于 L2 桥接的 Vierendeel 桁架Less steel 用钢更少Where we were-struc28、tual coordination 早期内容-结构协调Option 1Option 264Structure above L2 bridge is raised to provide sufficient headheightL2 桥以上的结构局部往上推,以提供L2所需的高度 No restriction on amplitheatre size剧场大小没有限制No columns on L2 bridgeL2 桥幕墙不需要柱子 Lower headheight under bridge地面和桥底之间的高度比较低Thinner beams on east side can accomodate29、 amplitheatre within floor build up东面的粱比较细,可以在地板整合半圆剧场Amplitheatre size is restricted 剧场大小受限 Columns at L2 will block tree of life viewL2 桥幕墙需要立柱,会影响生命之树的视角 Higher headheight under bridge 地面和桥底之间的高度比较高Structual coordination 结构协调Option 1Option 2-HS Preferred HS 推荐65665.Facade Development&Progress幕墙发展30、及进度67Decisions Required所需决策Frame Option框架选项Glass Set-out+MEP Strategy玻璃设置+机电策略Opaque Facade Types不透明幕墙类型Average Facade Cost平均幕墙成本VMU视觉模型68Frames框架69Actual Tension/Compression columns as per SD 70%Note:70%SD Massing 方案70体量方案70拉力/压力柱70400400500500130013405405401001202002207001700500700500Ceramic tiles31、,mould standardisation to be developed with ArupSubstructure and attachments,Arup to adviseIndicative fireproofing expansion zoneRefer to RBS structural drawings74017407401001202002204002004002008004404408401001202002202000400440Ceramic tiles,mould standardisation to be developed with ArupStainless 32、steel cap and gutterWeatherproof membraneSubstructure and attachments,see Arup drawingsIndicative fireproofing expansion zoneOpen jointed shadow gap to allow tiles to rotate with roof planeInsulation where neededSteel I Beam refer to RBS drawings25007007402250500540Type CType BType A0-15m High15-25m33、 High25m or above500 R500 R500 R1.51.51.5225025002000300400500EQEQEQEQEQEQ8001300170084013401740400Variable440500Variable540700Variable740A0Date Drawn356-364 Grays Inn Road,London WC1X 8BH|T:+44(0)20 7833 8800 |StatusSizeSheet NameClient/Project NameDrawn ByCheckedRevisionProject No.Sheet No.ScaleKe34、y PlanRev Date PLOT DATE:FILE NAME:General NotesSheet NotesTHIS DRAWING IS FOR DESIGN INTENT PURPOSES ONLY,NOT FOR CONSTRUCTION.HEATHERWICK STUDIO TAKE NO RESPONSIBILITY FOR ANY DIMENSIONS OBTAINED BY MEASURING OR SCALING FROM THIS DRAWING.ALL DIMENSIONS AND LEVELS ARE TO BE CHECKED ON SITE BEFORE P35、ROCEEDING.THIS DRAWING MUST BE READ IN CONJUNCTION WITH RELEVANT CONSULTANT AND SPECIALIST DRAWINGS.ALL STRUCTURE,MEP,LIGHTING,PLANTING CIVILS&DRAINAGE ARE INDICATIVE ONLY.THE SIZING OF STRUCTURAL AND SERVICES ELEMENTS MUST BE CHECKED AGAINST THE RELEVANT ENGINEERS DRAWINGS.THIS DRAWING IS THE COPYR36、IGHT OF HEATHERWICK STUDIO AND IS NOT TO BE REPRODUCED IN ANY FORM WITHOUT PRIOR WRITTEN CONSENT.2018 Heatherwick Studio01As indicated30/11/2130/11/2021 22:14:13C:BIM0437-HS-XX-XX-M2-A-000001_AlfredoChavezFQXXH.rvtXian CCBDJNENLHS-XX-XX-DT-ASCHEMATIC DESIGN30/06/210437Yanta District,Qujiang New Dist37、rict,Xian,ChinaXX/XXEXTERNAL WALLS&CLADDING外部墙体及覆面Compression Cruciform Frame Cladding 十字柱覆面-EWS-20121-40-50CR LandSCALE 1:203Plan-Frame Type B BaseSCALE 1:202Plan-Typical Frame Type A Column BaseSCALE 1:204Plan-Typical Frame Type C BaseSCALE 1:2010Section-Typical Frame Type C BeamSCALE 1:208Section38、-Typical Frame Type A BeamSCALE 1:209Section-Typical Frame Type B BeamSCALE 1:1001Elevation-Frame Column Set-out PrinciplesSCALE 1:207Plan-Typical Frame Type C Column TopSCALE 1:206Plan-Frame Type B Column TopSCALE 1:205Plan-Typical Frame Type A Column TopREVDATEDESCRIPTION0030/06/21 70%SD Facade01339、0/11/21 70%Schematic Design340315315970260120Ceramic tiles,mould standardisation to be developed with ArupSubstructure and attachments,refer to ArupIndicative fireproofing expansion zoneRefer to RBS structural drawings1020390315315390120260Ceramic tiles,mould standardisation to be developed with Aru40、pStainless steel cap and gutterWeatherproof membraneSubstructure and attachments,see Arup drawingsIndicative fireproofing expansion zoneInsulation where neededSteel I Beam refer to RBS drawings3902500EQEQ5001203402230500120EQEQ97010202250EQEQ40022500500EQEQ500 R500 R1.51.5Type BType A0-25m High25m o41、r above340320Variable120370370Variable120A0Date Drawn356-364 Grays Inn Road,London WC1X 8BH|T:+44(0)20 7833 8800 |StatusSizeSheet NameClient/Project NameDrawn ByCheckedRevisionProject No.Sheet No.ScaleKey PlanRev Date PLOT DATE:FILE NAME:General NotesSheet NotesTHIS DRAWING IS FOR DESIGN INTENT PURP42、OSES ONLY,NOT FOR CONSTRUCTION.HEATHERWICK STUDIO TAKE NO RESPONSIBILITY FOR ANY DIMENSIONS OBTAINED BY MEASURING OR SCALING FROM THIS DRAWING.ALL DIMENSIONS AND LEVELS ARE TO BE CHECKED ON SITE BEFORE PROCEEDING.THIS DRAWING MUST BE READ IN CONJUNCTION WITH RELEVANT CONSULTANT AND SPECIALIST DRAWIN43、GS.ALL STRUCTURE,MEP,LIGHTING,PLANTING CIVILS&DRAINAGE ARE INDICATIVE ONLY.THE SIZING OF STRUCTURAL AND SERVICES ELEMENTS MUST BE CHECKED AGAINST THE RELEVANT ENGINEERS DRAWINGS.THIS DRAWING IS THE COPYRIGHT OF HEATHERWICK STUDIO AND IS NOT TO BE REPRODUCED IN ANY FORM WITHOUT PRIOR WRITTEN CONSENT.44、2018 Heatherwick Studio00As indicated30/11/2130/11/2021 22:14:23C:BIM0437-HS-XX-XX-M2-A-000001_AlfredoChavezFQXXH.rvtXian CCBDJNENLHS-XX-XX-DT-ASCHEMATIC DESIGN11/28/210437Yanta District,Qujiang New District,Xian,ChinaXX/XXEXTERNAL WALLS&CLADDING外部墙体及覆面Tension Cruciform Frame Cladding 十字柱覆面-EWS-201245、1-40-51CR LandSCALE 1:203Plan-Frame Type B BaseSCALE 1:202Plan-Typical Frame Type A Column BaseSCALE 1:206Section-Typical Tension Frame Type A BeamSCALE 1:207Section-Typical Tension Frame Type B BeamSCALE 1:1001Elevation-Frame Column Set-out PrinciplesSCALE 1:205Plan-Frame Type B Column TopSCALE 1:246、04Plan-Typical Frame Type A Column ColumnTopREVDATEDESCRIPTION0030/11/21 70%Schematic DesignMediumSmallLargeLargeMediumActual Compression columns as per SD 70%Actual Tension columns as per SD 70%实际方案70压力柱实际方案70拉力柱Note:70%SD Massing 方案70体量712000400440Ceramic tiles,mould standardisation to be develope47、d with ArupStainless steel cap and gutterWeatherproof membraneSubstructure and attachments,see Arup drawingsIndicative fireproofing expansion zoneOpen jointed shadow gap to allow tiles to rotate with roof planeInsulation where neededSteel I Beam refer to RBS drawings25007007402250500540Type CType BT48、ype A0-15m High15-25m High25m or above500 R500 R500 R1.51.51.5225025002000300400500EQEQEQEQEQEQ8001300170084013401740400Variable440500Variable540700Variable740A0Date Drawn356-364 Grays Inn Road,London WC1X 8BH|T:+44(0)20 7833 8800 |StatusSizeSheet NameClient/Project NameDrawn ByCheckedRevisionProjec49、t No.Sheet No.ScaleKey PlanRev Date PLOT DATE:FILE NAME:General NotesSheet NotesTHIS DRAWING IS FOR DESIGN INTENT PURPOSES ONLY,NOT FOR CONSTRUCTION.HEATHERWICK STUDIO TAKE NO RESPONSIBILITY FOR ANY DIMENSIONS OBTAINED BY MEASURING OR SCALING FROM THIS DRAWING.ALL DIMENSIONS AND LEVELS ARE TO BE CHE50、CKED ON SITE BEFORE PROCEEDING.THIS DRAWING MUST BE READ IN CONJUNCTION WITH RELEVANT CONSULTANT AND SPECIALIST DRAWINGS.ALL STRUCTURE,MEP,LIGHTING,PLANTING CIVILS&DRAINAGE ARE INDICATIVE ONLY.THE SIZING OF STRUCTURAL AND SERVICES ELEMENTS MUST BE CHECKED AGAINST THE RELEVANT ENGINEERS DRAWINGS.THIS51、 DRAWING IS THE COPYRIGHT OF HEATHERWICK STUDIO AND IS NOT TO BE REPRODUCED IN ANY FORM WITHOUT PRIOR WRITTEN CONSENT.2018 Heatherwick Studio01As indicated30/11/2130/11/2021 22:14:13C:BIM0437-HS-XX-XX-M2-A-000001_AlfredoChavezFQXXH.rvtXian CCBDJNENLHS-XX-XX-DT-ASCHEMATIC DESIGN30/06/210437Yanta Dist52、rict,Qujiang New District,Xian,ChinaXX/XXEXTERNAL WALLS&CLADDING外部墙体及覆面Compression Cruciform Frame Cladding 十字柱覆面-EWS-20121-40-50CR LandSCALE 1:203Plan-Frame Type B BaseSCALE 1:202Plan-Typical Frame Type A Column BaseSCALE 1:204Plan-Typical Frame Type C BaseSCALE 1:2010Section-Typical Frame Type C B53、eamSCALE 1:208Section-Typical Frame Type A BeamSCALE 1:209Section-Typical Frame Type B BeamSCALE 1:1001Elevation-Frame Column Set-out PrinciplesSCALE 1:207Plan-Typical Frame Type C Column TopSCALE 1:206Plan-Frame Type B Column TopSCALE 1:205Plan-Typical Frame Type A Column TopREVDATEDESCRIPTION0030/54、06/21 70%SD Facade0130/11/21 70%Schematic DesignCeramic tiles,mould standardisation to be developed with ArupStainless steel cap and gutterWeatherproof membraneSubstructure and attachments,see Arup drawingsIndicative fireproofing expansion zoneInsulation where neededSteel I Beam refer to RBS drawing55、s3902500EQEQ5001203402230500120EQEQ97010202250EQEQ40022500500EQEQ500 R500 R1.51.5Type BType A0-25m High25m or above340320Variable120370370Variable120A0Date Drawn356-364 Grays Inn Road,London WC1X 8BH|T:+44(0)20 7833 8800 |StatusSizeSheet NameClient/Project NameDrawn ByCheckedRevisionProject No.Sheet56、 No.ScaleKey PlanRev Date PLOT DATE:FILE NAME:General NotesSheet NotesTHIS DRAWING IS FOR DESIGN INTENT PURPOSES ONLY,NOT FOR CONSTRUCTION.HEATHERWICK STUDIO TAKE NO RESPONSIBILITY FOR ANY DIMENSIONS OBTAINED BY MEASURING OR SCALING FROM THIS DRAWING.ALL DIMENSIONS AND LEVELS ARE TO BE CHECKED ON SI57、TE BEFORE PROCEEDING.THIS DRAWING MUST BE READ IN CONJUNCTION WITH RELEVANT CONSULTANT AND SPECIALIST DRAWINGS.ALL STRUCTURE,MEP,LIGHTING,PLANTING CIVILS&DRAINAGE ARE INDICATIVE ONLY.THE SIZING OF STRUCTURAL AND SERVICES ELEMENTS MUST BE CHECKED AGAINST THE RELEVANT ENGINEERS DRAWINGS.THIS DRAWING I58、S THE COPYRIGHT OF HEATHERWICK STUDIO AND IS NOT TO BE REPRODUCED IN ANY FORM WITHOUT PRIOR WRITTEN CONSENT.2018 Heatherwick Studio00As indicated30/11/2130/11/2021 22:14:23C:BIM0437-HS-XX-XX-M2-A-000001_AlfredoChavezFQXXH.rvtXian CCBDJNENLHS-XX-XX-DT-ASCHEMATIC DESIGN11/28/210437Yanta District,Qujia59、ng New District,Xian,ChinaXX/XXEXTERNAL WALLS&CLADDING外部墙体及覆面Tension Cruciform Frame Cladding 十字柱覆面-EWS-20121-40-51CR LandSCALE 1:203Plan-Frame Type B BaseSCALE 1:202Plan-Typical Frame Type A Column BaseSCALE 1:206Section-Typical Tension Frame Type A BeamSCALE 1:207Section-Typical Tension Frame Type60、 B BeamSCALE 1:1001Elevation-Frame Column Set-out PrinciplesSCALE 1:205Plan-Frame Type B Column TopSCALE 1:204Plan-Typical Frame Type A Column ColumnTopREVDATEDESCRIPTION0030/11/21 70%Schematic Design*Note that these frames span between those columns types.*注:框架跨于不同立柱类型LargeMediumMediumSmallLargeAct61、ual“Compression”frames as per SD 70%Actual“Tension”frames as per SD 70%实际方案70压力柱实际方案70拉力柱Note:70%SD Massing 方案70体量72 柱头突出尺寸大,导致柱子显得粗壮。The protruding size of the capital is large,causing the column to appear chunky.高区露台近人区域,柱子的尺度也较大,需合理优化。The scale of the columns in the higher terrace zone that are c62、lose to people is also larger,which needs to be rationalised and optimized.CRLand Comment华润反馈73How can we reduce the capital size?如何减小柱头尺寸?74Frame TaperNote:Medium Compression 中型压力柱Fixed Dimension 尺寸相同Variable top width dependent on height顶部宽度根据高度不同Variable top width dependent on height顶部宽度根据高度不同Fix63、ed top width顶部宽度相同Fixed Dimension 尺寸相同Fixed Dimension 尺寸相同框架斜率Option 1Where we are 原有设计1.5o Taper斜率Option 2Reduced Taper 减少斜率0.75o Taper斜率Option 3Hybrid 混合柱Straight to 1.5o Taper直柱至斜柱75Strategy across types不同类别策略Disproportionate relationship between column and beam柱与梁的关系不成比例Disproportionate relation64、ship between column and beam柱与梁的关系不成比例Strong relationship between column and beam柱与梁之间强有力的关系Option 1Where we are 原有设计1.5o Taper斜率Option 2Reduced Taper 减少斜率0.75o Taper斜率Option 3Hybrid 混合柱Straight to 1.5o Taper直柱至斜柱76Option 3 Hybrid-RepetitionConsistent widthRepeatable elements宽度一致可重复元素变截面标准变截面Variabl65、e lengthVariable lengthVariable lengthTransition pointDictated by taper angle转换点由斜率决定Tapered sectionStandardised tapered section选项3-混合-重复77Frame Taper框架斜率HS Recommended 推荐Option 1Where we are 原有设计1.5o Taper斜率Option 2Reduced Taper 减少斜率0.75o Taper斜率Option 3Hybrid 混合柱Straight to 1.5o Taper直柱至斜柱78Frame 66、Taper框架斜率HS Recommended 推荐2.25m2m2.8m2.8m2m2.25mNote:Assumed cost savings-Arup&QS to confirm注:成本节约预判-请Arup&估料师确认Option 1Where we are 原有设计1.5o Taper斜率Option 2Reduced Taper 减少斜率0.75o Taper斜率Option 3Hybrid 混合柱Straight to 1.5o Taper直柱至斜柱79Frame TaperHS Recommended框架斜率Option 1Where we are 原有设计1.5o Taper斜67、率Option 3Hybrid 混合柱Straight to 1.5o Taper直柱至斜柱Option 2Reduced Taper 减少斜率0.75o Taper斜率80Frame TaperHS RecommendedVariable between columnsVariable between columnsStandardisedNote:Assumed cost savings-Arup&QS to confirm槽框架斜率Option 1Where we are 原有设计1.5o Taper斜率Option 3Hybrid 混合柱Straight to 1.5o Taper直柱68、至斜柱Option 2Reduced Taper 减少斜率0.75o Taper斜率81MEP Strategy机电策略82MEP Requirements&CRLand Comment70%SD Display Box Ventilation Strategy方案70展窗通风策略CRLand Comment-华润评论This design will attract dust and stain the glazing cavity,which is hard to clean设计易积尘,玻璃腔难以清洁Arup precedent-奥雅纳前例We must integrate a louvre69、 strategy within the facade system better须在立面系统中更好地整合百叶策略WSP Requirements-WSP要求机电要求及华润评论140475Vertical slot louvre in display box bird mouth -WSP coordination ongoingHigh level louvre required-Detail to be submitted in 100%SD820820Note:Typical North-South axis 11m Bay:2075mm210021002100110025011002570、01404751306509001000FFLPotential Signage zoneLevel 26000Level 311600Level 522800Level 417200Level 10FFLPotential Signage zoneFire shutter required-JZFZ to commentBalustrade fire rated-JZFZ to commentFFLPotential Signage zoneA0Date Drawn356-364 Grays Inn Road,London WC1X 8BH|T:+44(0)20 7833 8800 |Sta71、tusSizeSheet NameClient/Project NameDrawn ByCheckedRevisionProject No.Sheet No.ScaleKey PlanRev Date PLOT DATE:FILE NAME:General NotesSheet NotesTHIS DRAWING IS FOR DESIGN INTENT PURPOSES ONLY,NOT FOR CONSTRUCTION.HEATHERWICK STUDIO TAKE NO RESPONSIBILITY FOR ANY DIMENSIONS OBTAINED BY MEASURING OR 72、SCALING FROM THIS DRAWING.ALL DIMENSIONS AND LEVELS ARE TO BE CHECKED ON SITE BEFORE PROCEEDING.THIS DRAWING MUST BE READ IN CONJUNCTION WITH RELEVANT CONSULTANT AND SPECIALIST DRAWINGS.ALL STRUCTURE,MEP,LIGHTING,PLANTING CIVILS&DRAINAGE ARE INDICATIVE ONLY.THE SIZING OF STRUCTURAL AND SERVICES ELEM73、ENTS MUST BE CHECKED AGAINST THE RELEVANT ENGINEERS DRAWINGS.THIS DRAWING IS THE COPYRIGHT OF HEATHERWICK STUDIO AND IS NOT TO BE REPRODUCED IN ANY FORM WITHOUT PRIOR WRITTEN CONSENT.2018 Heatherwick Studio01As indicated30/11/2130/11/2021 22:12:36C:BIM0437-HS-XX-XX-M2-A-000001_AlfredoChavezFQXXH.rvt74、Xian CCBDJNENLHS-XX-XX-DT-ASCHEMATIC DESIGN30/06/210437Yanta District,Qujiang New District,Xian,ChinaXX/XXEXTERNAL WALLS&CLADDING外部墙体及覆面Main Faade Glazed Faade 主幕墙玻璃幕墙-EWS-10121-40-01CR LandSCALE 1:258Plan-Glazed Facade with SignageSCALE 1:257Plan-Glazed FaadeSCALE 1:253Section-Glazed Facade Head&Ba75、seSCALE13D view-Glazed FacadeSCALE 1:256Section-Glazed Facade TransomsSCALE 1:1002Elevation-Glazed FacadeFire Access PanelSCALE 1:255Section-Glazed Facade-Double Height UnitsOnlySCALE 1:254Section-Glazed Facade-Display Box-LouvreREVDATEDESCRIPTION0030/06/21 70%SD Facade0130/11/21 70%Schematic Design76、83Glass Facade-Spandrels increase to 1.8m 玻璃幕墙-玻璃拱肩尺寸1.8m84Double Height Retail Display Fire rated balustrade Fire curtainF&B F&B A0Date Drawn356-364 Grays Inn Road,London WC1X 8BH|T:+44(0)20 7833 8800 |StatusSizeSheet NameClient/Project NameDrawn ByCheckedRevisionProject No.Sheet No.ScaleKey PlanRe77、v Date PLOT DATE:FILE NAME:General NotesSheet NotesTHIS DRAWING IS FOR DESIGN INTENT PURPOSES ONLY,NOT FOR CONSTRUCTION.HEATHERWICK STUDIO TAKE NO RESPONSIBILITY FOR ANY DIMENSIONS OBTAINED BY MEASURING OR SCALING FROM THIS DRAWING.ALL DIMENSIONS AND LEVELS ARE TO BE CHECKED ON SITE BEFORE PROCEEDIN78、G.THIS DRAWING MUST BE READ IN CONJUNCTION WITH RELEVANT CONSULTANT AND SPECIALIST DRAWINGS.ALL STRUCTURE,MEP,LIGHTING,PLANTING CIVILS&DRAINAGE ARE INDICATIVE ONLY.THE SIZING OF STRUCTURAL AND SERVICES ELEMENTS MUST BE CHECKED AGAINST THE RELEVANT ENGINEERS DRAWINGS.THIS DRAWING IS THE COPYRIGHT OF 79、HEATHERWICK STUDIO AND IS NOT TO BE REPRODUCED IN ANY FORM WITHOUT PRIOR WRITTEN CONSENT.2018 Heatherwick Studio001:10030/11/2130/11/2021 22:15:19C:BIM0437-HS-XX-XX-M2-A-000001_AlfredoChavezFQXXH.rvtXian CCBDMRANLHS-XX-XX-DT-ASCHEMATIC DESIGN11/29/210437Yanta District,Qujiang New District,Xian,China80、XX/XXEXTERNAL WALLS&CLADDING外部墙体及覆面Central Plaza Terrace Section&Elevation21-40-80CR LandSCALE 1:1001Section-Central Plaza TerraceSCALE 1:1002Elevation-Central Plaza TerraceREVDATEDESCRIPTION0030/11/21 70%Schematic Design1:Soffit Ventilation2:Balcony/Terrace Edge3:Horizontal bird mouth around whole 81、building1:天花通风2:阳台/露台边缘3:环绕建筑的水平凹槽Terrace Section 露台剖面MEP Locations 机电落位MEP Glass Ventilation StrategyMEP玻璃通风策略Note:Strategy 1 subject to coordination with WSP&RBS 策略 1 需与 WSP 和 RBS 协调23185Glass Facade-Louvres integrated in horizontal birdmouth 百叶与水平凹槽整合Louvers integrated along horizontal birdmouth 82、detail at L2 and terraces at L3 沿着L2水平凹槽以及L3层露台整合百叶Note:Subject to WSP confirmation 以 WSP 确认为准Note:Detail to be further developed 细节待进一步完善86Option 1-Louvres integrated in terrace edge 选项1-百叶与露台边缘整合Louvres integrated along horizontal birdmouth detail at L2 and terraces at L1 and L3 沿着L2水平凹槽以及L1和L3层露台83、整合百叶Note:Subject to WSP confirmation 以 WSP 确认为准Note:Detail to be further developed 细节待进一步完善87Option 2-Louvres integrated in terrace edge 选项2-百叶与露台边缘整合Note:Subject to WSP confirmation 以 WSP 确认为准Note:Detail to be further developed 细节待进一步完善Louvres integrated along horizontal birdmouth detail at L2 and 84、terraces at L1 and L3 沿着L2水平凹槽以及L1和L3层露台整合百叶88Glass Facade Set-out玻璃幕墙设置89Glass set-out-Option 1-Cost Driven9m Bay11m Bay选项1-成本驱动1.75m1.7m3.2m3.2m1.8m1.8m1.9m1.9mProportion of glazing aesthetically compromised玻璃比例损失美学Glazing not aligned to slab level玻璃与楼板标高不对齐909m Bay11m BayGlass set-out-Option 1-Co85、st Driven选项1-成本驱动Note:Door design based on 70%SD Drawing No.21-40-02基于方案70%的出入口门设计图纸编号21-40-0291Glass set-out-Option 2-CRLand Preferred9m Bay11m Bay2.1m1.1m 2.1m3.2m3.2m1.8m1.8m3.8m3.8m选项2-华润倾向Glazing not aligned to slab level玻璃与楼板标高不对齐Large size fire access panel required需要大尺寸消防救援窗板Different set-ou86、t depending on building orientation根据建筑方向,有不同的设置929m Bay11m BayGlass set-out-Option 2-CRLand Preferred选项2-华润倾向Note:Door design based on 70%SD Drawing No.21-40-02基于方案70%的出入口门设计图纸编号21-40-0293Glass set-out-Option 3A-HS Preferred9m Bay11m Bay选项3A-HS倾向1.1m1.1m2.1m2.075m5.8m3.8m5.8m3.8m1.8m1.8m3.8m3.8mGla87、zing aligned to slab level的HS Recommended 推荐Smashable fire access可击碎救援窗Glazing aligned to slab level玻璃与楼板标高对齐Same set-out principles for 9m and 11m bays9米和11米分仓的设置原则相同Small size fire access panel required需要小尺寸消防救援窗板949m Bay11m BayGlass set-out-Option 3A-HS Preferred选项3A-HS倾向HS Recommended 推荐Note:Doo88、r design based on 70%SD Drawing No.21-40-02基于方案70%的出入口门设计图纸编号21-40-0295Glass set-out-Option 3B-HS Preferred9m Bay11m Bay选项3B-HS倾向1.1m1.1m2.1m2.075m5.8m1.9m5.8m1.9m1.8m1.8m1.9m1.9mHS Recommended 推荐Operable fire access可开合救援窗Glazing aligned to slab level玻璃与楼板标高对齐Same set-out principles for 9m and 11m b89、ays9米和11米分仓的设置原则相同Small size fire access panel required需要小尺寸消防救援窗板96Glass set-out-Option 3B-HS Preferred选项3B-HS倾向9m Bay11m BayHS Recommended 推荐97Opaque Facade不透明幕墙982,700 rmb/m22,400 rmb/m22,400 rmb/m22,250 rmb/m22,100 rmb/m2Opaque OptionsHS Recommended Type 1HS推荐类型1Simplified简化Value Engineering Opp90、ortunities可用价值工程HS Recommended Type 2HS推荐类型2Curved 弯曲Value Engineering Opportunities可用价值工程不透明选项Option 1Option 2Option 3Option 4Option 599Not CostedNot Costed2,500 rmb/m22,800 rmb/m22,100 rmb/m2Opaque OptionsOption 8Option 7Option 6Option 9Option 10不透明选项100Further Value-Engineering Opportunity-Opaque91、 Facade Type 1Rainscreen 雨幕Option 1Option 2Option 3Option 4Louvre2,400rmb/m2Note:70%SD Price方案70价格2,200rmb/m22,100rmb/m21,900rmb/m2No LouvreLouvreNo LouvreSealed Joint 密封接缝不透明幕墙类型1Facade type amended where no louvres required在不需要百叶的情况下,修改幕墙类型101Further Value-Engineering Opportunity-Opaque Facade Typ92、e 1 不透明幕墙类型1Rainscreen Arup to confirm 雨幕待Arup确定Louvre 百叶2,000rmb/m2Note:Only possible where no louvres required.HS not recommended只有在不需要百叶的情况下才可以使用HS 不建议Note:Only possible where no louvres required.HS not recommended只有在不需要百叶的情况下才可以使用HS 不建议1,800rmb/m2No Louvre 无百叶Facade type amended where no louvres93、 required在不需要百叶的情况下,修改幕墙类型HS not recommended102不透明幕墙类型1Further Value-Engineering Opportunity-Opaque Facade Type 2Rainscreen 雨幕Louvre2,700rmb/m2Note:70%SD PriceOption 1-Price Point方案70价格选项1-价格点2,500rmb/m22,400rmb/m22,200rmb/m2No LouvreLouvreNo LouvreSealed Joint 密封接缝不透明幕墙类型2Option 1Option 2Option 3Op94、tion 4Facade type amended where no louvres required在不需要百叶的情况下,修改幕墙类型Facade type amended where no louvres required在不需要百叶的情况下,修改幕墙类型103Average Facade Cost平均幕墙成本104Average Facade CostIndividual System CostsSystem Distribution平均幕墙成本A0Date Drawn356-364 Grays Inn Road,London WC1X 8BH|T:+44(0)20 7833 8800 95、|StatusSizeSheet NameClient/Project NameDrawn ByCheckedRevisionProject No.Sheet No.ScaleKey PlanRev Date PLOT DATE:FILE NAME:General NotesSheet NotesTHIS DRAWING IS FOR DESIGN INTENT PURPOSES ONLY,NOT FOR CONSTRUCTION.HEATHERWICK STUDIO TAKE NO RESPONSIBILITY FOR ANY DIMENSIONS OBTAINED BY MEASURING96、 OR SCALING FROM THIS DRAWING.ALL DIMENSIONS AND LEVELS ARE TO BE CHECKED ON SITE BEFORE PROCEEDING.THIS DRAWING MUST BE READ IN CONJUNCTION WITH RELEVANT CONSULTANT AND SPECIALIST DRAWINGS.ALL STRUCTURE,MEP,LIGHTING,PLANTING CIVILS&DRAINAGE ARE INDICATIVE ONLY.THE SIZING OF STRUCTURAL AND SERVICES 97、ELEMENTS MUST BE CHECKED AGAINST THE RELEVANT ENGINEERS DRAWINGS.THIS DRAWING IS THE COPYRIGHT OF HEATHERWICK STUDIO AND IS NOT TO BE REPRODUCED IN ANY FORM WITHOUT PRIOR WRITTEN CONSENT.2018 Heatherwick Studio001:50030/11/2101/12/2021 00:01:23C:BIM0437-HS-XX-XX-M2-A-000001_AlfredoChavezFQXXH.rvtXia98、n CCBDSBENLHS-CE-B2-PL-ASCHEMATIC DESIGN11/11/210437Yanta District,Qujiang New District,Xian,ChinaCE/B2EXTERNAL WALLS&CLADDING外部墙体及覆面3D-SCOPING FACADE-NW 立面类型-西北轴测图21-10-01CR LandREVDATEDESCRIPTION0030/11/21 70%Schematic DesignThe average cost of the facade is calculated using the distribution of ea99、ch type across the building and their associated individual system costs幕墙的平均成本是使用建筑物中每种类型的分布,及其相关的单个系统成本来计算的20单独系统成本系统分布105Facade System Cost Options幕墙系统成本选项106Display Box Facade展窗Opaque Facade Type 1不透明幕墙类型1N/AVision Glass Facade可视玻璃Ceramic Table Frame陶瓷玻璃框架Bird Mouth凹槽Shadow Box Facade阴影盒Opaque F100、acade Type 2不透明幕墙类型290001000Refer to RBS drawings for detailProfiled PVDF aluminium panel Refer to Arup for detailsInsulationWater barrierRail connecting rainscreen cladding back to facadeStud wallInterior liningClosure panelConcrete upstandLandscape buildup1000200Refert to 21-40-7010001000Level 260101、00Level 311600Level 522800Level 417200Level 103000Refer to 21-40-65Profiled PVDF aluminium panelRefer to Arup for detailsWeather louversA0Date Drawn356-364 Grays Inn Road,London WC1X 8BH|T:+44(0)20 7833 8800 |StatusSizeSheet NameClient/Project NameDrawn ByCheckedRevisionProject No.Sheet No.ScaleKey 102、PlanRev Date PLOT DATE:FILE NAME:General NotesSheet NotesTHIS DRAWING IS FOR DESIGN INTENT PURPOSES ONLY,NOT FOR CONSTRUCTION.HEATHERWICK STUDIO TAKE NO RESPONSIBILITY FOR ANY DIMENSIONS OBTAINED BY MEASURING OR SCALING FROM THIS DRAWING.ALL DIMENSIONS AND LEVELS ARE TO BE CHECKED ON SITE BEFORE PRO103、CEEDING.THIS DRAWING MUST BE READ IN CONJUNCTION WITH RELEVANT CONSULTANT AND SPECIALIST DRAWINGS.ALL STRUCTURE,MEP,LIGHTING,PLANTING CIVILS&DRAINAGE ARE INDICATIVE ONLY.THE SIZING OF STRUCTURAL AND SERVICES ELEMENTS MUST BE CHECKED AGAINST THE RELEVANT ENGINEERS DRAWINGS.THIS DRAWING IS THE COPYRIG104、HT OF HEATHERWICK STUDIO AND IS NOT TO BE REPRODUCED IN ANY FORM WITHOUT PRIOR WRITTEN CONSENT.2018 Heatherwick Studio01As indicated30/11/2130/11/2021 22:13:28C:BIM0437-HS-XX-XX-M2-A-000001_AlfredoChavezFQXXH.rvtXian CCBDJNENLHS-XX-XX-DT-ASCHEMATIC DESIGN30/06/210437Yanta District,Qujiang New Distri105、ct,Xian,ChinaXX/XXEXTERNAL WALLS&CLADDING外部墙体及覆面Main Faade Opaque Faade 主幕墙不透明幕墙-EWS-21021-40-05CR LandSCALE 1:257Plan-Opaque FacadeSCALE 1:258Plan-Opaque Facade LouversSCALE 1:253Section-Opaque Facade Base&BeamSCALE 1:255Section-Opaque Facade SectionSCALE13D View-Opaque FacadeSCALE 1:254Section-Opa106、que Facade LouvreSCALE 1:1002Elevation-Opaque FacadeSCALE 1:256Plan-Opaque Facade-Secondary Option fordiscreet areas onlyREVDATEDESCRIPTION0030/06/21 70%SD Facade0130/11/21 70%Schematic DesignOption 1-System Costs 系统成本1,700rmb/m22,570rmb/m2Note:2 Layers of frit and back panel on vision glazing syste107、m可视玻璃系统-烧结玻璃层和背板层Note:Rainscreen cladding system 雨幕覆层系统Note:HS preferred glass set-outHS 倾向玻璃设置Note:HS preferred glass set-outHS 倾向玻璃设置Note:Existing bird mouth depth现有凹槽深度2,100rmb/m21,900rmb/m21,400rmb/m22,370rmb/m22,700rmb/m22,600rmb/m23,000rmb/m2Laminated 夹胶Laminated 夹胶Laminated 夹胶Non-laminated 非夹108、胶Non-laminated 非夹胶Non-laminated 非夹胶20107Option 2-System Costs 系统成本1,700rmb/m21,400rmb/m22,600rmb/m2Laminated 夹胶Laminated 窗Non-laminated 非夹胶Non-laminated 窗N/ANote:Reduced bird mouth depth凹槽深度减小Note:Non-rainscreen cladding system sealed joints无雨幕覆层系统密封接缝Note:Non-rainscreen cladding system sealed joint109、s无雨幕覆层系统密封接缝90001000Refer to RBS drawings for detailProfiled PVDF aluminium panel Refer to Arup for detailsInsulationWater barrierRail connecting rainscreen cladding back to facadeStud wallInterior liningClosure panelConcrete upstandLandscape buildup1000200Refert to 21-40-7010001000Level 26000Level 110、311600Level 522800Level 417200Level 103000Refer to 21-40-65Profiled PVDF aluminium panelRefer to Arup for detailsWeather louversA0Date Drawn356-364 Grays Inn Road,London WC1X 8BH|T:+44(0)20 7833 8800 |StatusSizeSheet NameClient/Project NameDrawn ByCheckedRevisionProject No.Sheet No.ScaleKey PlanRev 111、Date PLOT DATE:FILE NAME:General NotesSheet NotesTHIS DRAWING IS FOR DESIGN INTENT PURPOSES ONLY,NOT FOR CONSTRUCTION.HEATHERWICK STUDIO TAKE NO RESPONSIBILITY FOR ANY DIMENSIONS OBTAINED BY MEASURING OR SCALING FROM THIS DRAWING.ALL DIMENSIONS AND LEVELS ARE TO BE CHECKED ON SITE BEFORE PROCEEDING.112、THIS DRAWING MUST BE READ IN CONJUNCTION WITH RELEVANT CONSULTANT AND SPECIALIST DRAWINGS.ALL STRUCTURE,MEP,LIGHTING,PLANTING CIVILS&DRAINAGE ARE INDICATIVE ONLY.THE SIZING OF STRUCTURAL AND SERVICES ELEMENTS MUST BE CHECKED AGAINST THE RELEVANT ENGINEERS DRAWINGS.THIS DRAWING IS THE COPYRIGHT OF HE113、ATHERWICK STUDIO AND IS NOT TO BE REPRODUCED IN ANY FORM WITHOUT PRIOR WRITTEN CONSENT.2018 Heatherwick Studio01As indicated30/11/2130/11/2021 22:13:28C:BIM0437-HS-XX-XX-M2-A-000001_AlfredoChavezFQXXH.rvtXian CCBDJNENLHS-XX-XX-DT-ASCHEMATIC DESIGN30/06/210437Yanta District,Qujiang New District,Xian,114、ChinaXX/XXEXTERNAL WALLS&CLADDING外部墙体及覆面Main Faade Opaque Faade 主幕墙不透明幕墙-EWS-21021-40-05CR LandSCALE 1:257Plan-Opaque FacadeSCALE 1:258Plan-Opaque Facade LouversSCALE 1:253Section-Opaque Facade Base&BeamSCALE 1:255Section-Opaque Facade SectionSCALE13D View-Opaque FacadeSCALE 1:254Section-Opaque Faca115、de LouvreSCALE 1:1002Elevation-Opaque FacadeSCALE 1:256Plan-Opaque Facade-Secondary Option fordiscreet areas onlyREVDATEDESCRIPTION0030/06/21 70%SD Facade0130/11/21 70%Schematic Design90001000Refer to RBS drawings for detailProfiled PVDF aluminium panel Refer to Arup for detailsInsulationWater barri116、erRail connecting rainscreen cladding back to facadeStud wallInterior liningClosure panelConcrete upstandLandscape buildup1000200Refert to 21-40-7010001000Level 26000Level 311600Level 522800Level 417200Level 103000Refer to 21-40-65Profiled PVDF aluminium panelRefer to Arup for detailsWeather louvers117、A0Date Drawn356-364 Grays Inn Road,London WC1X 8BH|T:+44(0)20 7833 8800 |StatusSizeSheet NameClient/Project NameDrawn ByCheckedRevisionProject No.Sheet No.ScaleKey PlanRev Date PLOT DATE:FILE NAME:General NotesSheet NotesTHIS DRAWING IS FOR DESIGN INTENT PURPOSES ONLY,NOT FOR CONSTRUCTION.HEATHERWIC118、K STUDIO TAKE NO RESPONSIBILITY FOR ANY DIMENSIONS OBTAINED BY MEASURING OR SCALING FROM THIS DRAWING.ALL DIMENSIONS AND LEVELS ARE TO BE CHECKED ON SITE BEFORE PROCEEDING.THIS DRAWING MUST BE READ IN CONJUNCTION WITH RELEVANT CONSULTANT AND SPECIALIST DRAWINGS.ALL STRUCTURE,MEP,LIGHTING,PLANTING CI119、VILS&DRAINAGE ARE INDICATIVE ONLY.THE SIZING OF STRUCTURAL AND SERVICES ELEMENTS MUST BE CHECKED AGAINST THE RELEVANT ENGINEERS DRAWINGS.THIS DRAWING IS THE COPYRIGHT OF HEATHERWICK STUDIO AND IS NOT TO BE REPRODUCED IN ANY FORM WITHOUT PRIOR WRITTEN CONSENT.2018 Heatherwick Studio01As indicated30/1120、1/2130/11/2021 22:13:28C:BIM0437-HS-XX-XX-M2-A-000001_AlfredoChavezFQXXH.rvtXian CCBDJNENLHS-XX-XX-DT-ASCHEMATIC DESIGN30/06/210437Yanta District,Qujiang New District,Xian,ChinaXX/XXEXTERNAL WALLS&CLADDING外部墙体及覆面Main Faade Opaque Faade 主幕墙不透明幕墙-EWS-21021-40-05CR LandSCALE 1:257Plan-Opaque FacadeSCAL121、E 1:258Plan-Opaque Facade LouversSCALE 1:253Section-Opaque Facade Base&BeamSCALE 1:255Section-Opaque Facade SectionSCALE13D View-Opaque FacadeSCALE 1:254Section-Opaque Facade LouvreSCALE 1:1002Elevation-Opaque FacadeSCALE 1:256Plan-Opaque Facade-Secondary Option fordiscreet areas onlyREVDATEDESCRIPT122、ION0030/06/21 70%SD Facade0130/11/21 70%Schematic Design2,100rmb/m22,400rmb/m22,600rmb/m22,100rmb/m21,900rmb/m2Display Box Facade展窗Opaque Facade Type 1不透明幕墙类型1Vision Glass Facade可视玻璃Bird Mouth凹槽Shadow Box Facade阴影盒Opaque Facade Type 2不透明幕墙类型2Note:HS preferred glass set-outHS 倾向玻璃设置Note:HS preferred 123、glass set-outHS 倾向玻璃设置10890001000Refer to RBS drawings for detailProfiled PVDF aluminium panel Refer to Arup for detailsInsulationWater barrierRail connecting rainscreen cladding back to facadeStud wallInterior liningClosure panelConcrete upstandLandscape buildup1000200Refert to 21-40-7010001000Leve124、l 26000Level 311600Level 522800Level 417200Level 103000Refer to 21-40-65Profiled PVDF aluminium panelRefer to Arup for detailsWeather louversA0Date Drawn356-364 Grays Inn Road,London WC1X 8BH|T:+44(0)20 7833 8800 |StatusSizeSheet NameClient/Project NameDrawn ByCheckedRevisionProject No.Sheet No.Scal125、eKey PlanRev Date PLOT DATE:FILE NAME:General NotesSheet NotesTHIS DRAWING IS FOR DESIGN INTENT PURPOSES ONLY,NOT FOR CONSTRUCTION.HEATHERWICK STUDIO TAKE NO RESPONSIBILITY FOR ANY DIMENSIONS OBTAINED BY MEASURING OR SCALING FROM THIS DRAWING.ALL DIMENSIONS AND LEVELS ARE TO BE CHECKED ON SITE BEFOR126、E PROCEEDING.THIS DRAWING MUST BE READ IN CONJUNCTION WITH RELEVANT CONSULTANT AND SPECIALIST DRAWINGS.ALL STRUCTURE,MEP,LIGHTING,PLANTING CIVILS&DRAINAGE ARE INDICATIVE ONLY.THE SIZING OF STRUCTURAL AND SERVICES ELEMENTS MUST BE CHECKED AGAINST THE RELEVANT ENGINEERS DRAWINGS.THIS DRAWING IS THE CO127、PYRIGHT OF HEATHERWICK STUDIO AND IS NOT TO BE REPRODUCED IN ANY FORM WITHOUT PRIOR WRITTEN CONSENT.2018 Heatherwick Studio01As indicated30/11/2130/11/2021 22:13:28C:BIM0437-HS-XX-XX-M2-A-000001_AlfredoChavezFQXXH.rvtXian CCBDJNENLHS-XX-XX-DT-ASCHEMATIC DESIGN30/06/210437Yanta District,Qujiang New D128、istrict,Xian,ChinaXX/XXEXTERNAL WALLS&CLADDING外部墙体及覆面Main Faade Opaque Faade 主幕墙不透明幕墙-EWS-21021-40-05CR LandSCALE 1:257Plan-Opaque FacadeSCALE 1:258Plan-Opaque Facade LouversSCALE 1:253Section-Opaque Facade Base&BeamSCALE 1:255Section-Opaque Facade SectionSCALE13D View-Opaque FacadeSCALE 1:254Sectio129、n-Opaque Facade LouvreSCALE 1:1002Elevation-Opaque FacadeSCALE 1:256Plan-Opaque Facade-Secondary Option fordiscreet areas onlyREVDATEDESCRIPTION0030/06/21 70%SD Facade0130/11/21 70%Schematic DesignOption 3-System Costs 系统成本1,700rmb/m21,950rmb/m21,400rmb/m22,600rmb/m22,100rmb/m21,800rmb/m2Laminated 夹130、胶Laminated 夹胶Non-laminated 非夹胶Non-laminated 非夹胶Note:Non-rainscreen cladding system sealed joints无雨幕覆层系统密封接缝N/AN/A2,600rmb/m2Note:Cost driven glass set-out成本驱动玻璃设置Note:Cost driven glass set-out成本驱动玻璃设置Note:Reduced bird mouth depth凹槽深度减小Display Box Facade展窗Opaque Facade Type 1不透明幕墙类型1Vision Glass Faca131、de可视玻璃Bird Mouth凹槽Shadow Box Facade阴影盒Opaque Facade Type 2不透明幕墙类型2109Facade System Distribution Options幕墙系统分布选项110Display Box 展窗 =Approx.4,734 sqmShadow Box 阴影盒 =Approx.16,683 sqmVision Glazing*可视玻璃=Approx.17,612 sqmBird Mouth 凹槽 =Approx.2,585 sqmOpaque Facade 02 不透明幕墙02=Approx.13,060 sqmFrames 框架 =132、Approx.29,663 sqmTotal Area 总面积 =Approx.84,338 sqmAverage Cost =2,466 rmb/m2平均价格 Facade Distribution Option 1*Inclusions:F&B Flagship Entrances Fire Escapes Bridge of Possibilities Entrances选项1Note:Laminated glass HS Preferred 夹胶HS推荐Some systems are included in base Vision Glazing until we have fina133、l costs for them.以下带星号系统成本按可视玻璃计入,待最终成本提资Note:Tower roof connections to be coordinated after 100SD presentation塔楼屋顶连接策略将在方案100汇报后进行协调Note:Billboard/LED screens will be addressed in 100SD drawing package广告牌/LED屏幕将在方案100图纸集中体现111Facade Distribution Option 1选项2Note:Non laminated glass HS not Preferred 134、非夹胶HS不推荐*Inclusions:F&B Flagship Entrances Fire Escapes Bridge of Possibilities EntrancesSome systems are included in base Vision Glazing until we have final costs for them.以下带星号系统成本按可视玻璃计入,待最终成本提资Display Box 展窗 =Approx.4,734 sqmShadow Box 阴影盒 =Approx.16,683 sqmVision Glazing*可视玻璃=Approx.17,612 sqmB135、ird Mouth 凹槽 =Approx.2,585 sqmOpaque Facade 02 不透明幕墙=Approx.13,060 sqmFrames 框架 =Approx.29,663 sqmTotal Area 总面积 =Approx.84,338 sqmAverage Cost =2,368 rmb/m2平均价格 Note:Tower roof connections to be coordinated after 100SD presentation塔楼屋顶连接策略将在方案100汇报后进行协调Note:Billboard/LED screens will be addressed i136、n 100SD drawing package广告牌/LED屏幕将在方案100图纸集中体现112Facade Distribution Option 2选项2Display Box 展窗 =Approx.21,417 sqmVision Glazing*可视玻璃=Approx.17,612 sqmBird Mouth 凹槽 =Approx.2,585 sqmOpaque Facade 01 不透明幕墙01=Approx.7,582 sqmOpaque Facade 02 不透明幕墙02=Approx.5,478 sqmFrames 框架 =Approx.29,663 sqmTotal Area137、 总面积 =Approx.84,338 sqmAverage Cost =2,209 rmb/m2平均价格 *Inclusions:F&B Flagship Entrances Fire Escapes Bridge of Possibilities EntrancesSome systems are included in base Vision Glazing until we have final costs for them.以下带星号系统成本按可视玻璃计入,待最终成本提资Note:Tower roof connections to be coordinated after 100SD138、 presentation塔楼屋顶连接策略将在方案100汇报后进行协调Note:Billboard/LED screens will be addressed in 100SD drawing package广告牌/LED屏幕将在方案100图纸集中体现Note:Laminated glass HS Preferred 夹胶HS推荐113Facade Distribution Option 2选项2*Inclusions:F&B Flagship Entrances Fire Escapes Bridge of Possibilities EntrancesSome systems are in139、cluded in base Vision Glazing until we have final costs for them.以下带星号系统成本按可视玻璃计入,待最终成本提资Display Box 展窗 =Approx.21,417 sqmVision Glazing*可视玻璃=Approx.17,612 sqmBird Mouth 凹槽 =Approx.2,585 sqmOpaque Facade 01 不透明幕墙01=Approx.7,582 sqmOpaque Facade 02 不透明幕墙02=Approx.5,478 sqmFrames 框架 =Approx.29,663 sqm140、Total Area 总面积 =Approx.84,338 sqmAverage Cost =2,091 rmb/m2平均价格 Note:Tower roof connections to be coordinated after 100SD presentation塔楼屋顶连接策略将在方案100汇报后进行协调Note:Billboard/LED screens will be addressed in 100SD drawing package广告牌/LED屏幕将在方案100图纸集中体现Note:Non laminated glass HS not Preferred 非夹胶HS不推荐114141、Facade Distribution Option 3Display Box 展窗 =Approx.21,417 sqmVision Glazing*可视玻璃=Approx.17,612 sqmBird Mouth 凹槽 =Approx.2,585 sqmOpaque Facade 01 不透明幕墙01=Approx.13,060 sqmFrames 框架 =Approx.29,663 sqmTotal Area 总面积 =Approx.84,338 sqmAverage Cost =2,158 rmb/m2平均价格 选项3*Inclusions:F&B Flagship Entrances142、 Fire Escapes Bridge of Possibilities EntrancesSome systems are included in base Vision Glazing until we have final costs for them.以下带星号系统成本按可视玻璃计入,待最终成本提资Note:Tower roof connections to be coordinated after 100SD presentation塔楼屋顶连接策略将在方案100汇报后进行协调Note:Billboard/LED screens will be addressed in 100SD143、 drawing package广告牌/LED屏幕将在方案100图纸集中体现Note:Laminated glass HS Preferred 夹胶HS推荐115Facade Distribution Option 3选项3*Inclusions:F&B Flagship Entrances Fire Escapes Bridge of Possibilities EntrancesSome systems are included in base Vision Glazing until we have final costs for them.以下带星号系统成本按可视玻璃计入,待最终成本提144、资Display Box 展窗 =Approx.21,417 sqmVision Glazing*可视玻璃=Approx.17,612 sqmBird Mouth 凹槽 =Approx.2,585 sqmOpaque Facade 01 不透明幕墙01=Approx.13,060 sqmFrames 框架 =Approx.29,663 sqmTotal Area 总面积 =Approx.84,338 sqmAverage Cost =2,050 rmb/m2平均价格 Note:Tower roof connections to be coordinated after 100SD presen145、tation塔楼屋顶连接策略将在方案100汇报后进行协调Note:Billboard/LED screens will be addressed in 100SD drawing package广告牌/LED屏幕将在方案100图纸集中体现Note:Non laminated glass HS not Preferred 非夹胶HS不推荐116Facade Cost Option Summary幕墙成本选项总结117Average Cost TargetCost OptionsFacade TypeDisplay Box 展窗Shadow Box 阴影盒Vision Glass*可视玻璃Bird146、 Mouth 凹槽3,000rmb/m2N/A2,700rmb/m22,600rmb/m22,100rmb/m21,700rmb/m22,100rmb/m21,700rmb/m21,950rmb/m2N/A1,700rmb/m21,900rmb/m22,370m22,570rmb/m21,400rmb/m21,900rmb/m2N/AN/A1,400rmb/m21,800rmb/m2N/A1,400rmb/m22,600rmb/m22,100rmb/m22,400rmb/m22,600rmb/m22,600rmb/m22,100rmb/m2N/A2,600rmb/m2Opaque Type 1147、 Simplified不透明类型1 简化Opaque Type 2 Curved不透明类型2 弧度Ceramic Table FrameExcluding Special Pieces陶瓷桌子框架特殊部件除外Option 1 2,466rmb/m22,368rmb/m22,500rmb/m22,209rmb/m22,091rmb/m22,200rmb/m22,158rmb/m22,050rmb/m22,000rmb/m2LaminatedLaminatedLaminatedNon-LaminatedNon-LaminatedNon-LaminatedOption 2Option 3Averag148、e Cost Target 平均成本目标Average Cost 平均成本成本选项HS Preferred Set-outHS Preferred Set-outCost Driven Set-outHS Preferred Set-outHS Preferred Set-outCost Driven Set-outHS Preferred Set-outArea=17,612 m2Area=16,683 m2Area=4,734 m2Area=2,585 m2Area=13,060 m2Area=29,663 m2Total Area=84,338 m2HS Preferred Set-ou149、tArea=17,612 m2Area=21,417 m2Area=2,585 m2Area=5,478 m2Area=29,663 m2Total Area=84,338 m2Area=7,582 m2Cost Driven Set-outArea=17,612 m2Area=21,417 m2Area=2,585 m2Area=29,663 m2Total Area=84,338 m2Area=13,060 m2HS Preferred Set-outHS Preferred Set-outCost Driven Set-outHS Preferred Set-outHS Preferre150、d Set-outCost Driven Set-outHS Preferred Set-outArea=17,612 m2Area=16,683 m2Area=4,734 m2Rainscreen SystemExisting depthVE reduced depthVE reduced depthVE non rainscreen SystemVE non rainscreen SystemVE non rainscreen SystemHS Preferred Set-outArea=17,612 m2Area=21,417 m2Cost Driven Set-outArea=17,6151、12 m2Area=21,417 m2*Inclusions:F&B Fire Escapes BoP EntrancesNote:All areas to be checked and confirmed by QS.所有面积待与测算师复核确认118Ceramic Area CalculationNote:Arup area calculated using different method Quantity surveyor to provide accurate area quantums Areas taken using WIP model 10/01/22 Arup to reca152、lculate areas using WIP model 21/01/22 Areas based on 1.5o taper columns 奥雅纳用不同方法计算面积 待工料测量师提供准确的面积数额 使用过程中模型计算面积 10/01/22 待奥雅纳使用过程中模型重新计算面积 21/01/22 基于1.5斜柱计算面积Column立柱Column Footing柱底Column Capital柱头Surface area used in HS calculationHS计算中使用的表面积Beam横梁陶瓷面积计算40040050050013001340540540100120200220700153、1700500700500Ceramic tiles,mould standardisation to be developed with ArupSubstructure and attachments,Arup to adviseIndicative fireproofing expansion zoneRefer to RBS structural drawings74017407401001202002204002004002008004404408401001202002202000400440Ceramic tiles,mould standardisation to be dev154、eloped with ArupStainless steel cap and gutterWeatherproof membraneSubstructure and attachments,see Arup drawingsIndicative fireproofing expansion zoneOpen jointed shadow gap to allow tiles to rotate with roof planeInsulation where neededSteel I Beam refer to RBS drawings25007007402250500540Type CTy155、pe BType A0-15m High15-25m High25m or above500 R500 R500 R1.51.51.5225025002000300400500EQEQEQEQEQEQ8001300170084013401740400Variable440500Variable540700Variable740A0Date Drawn356-364 Grays Inn Road,London WC1X 8BH|T:+44(0)20 7833 8800 |StatusSizeSheet NameClient/Project NameDrawn ByCheckedRevisionP156、roject No.Sheet No.ScaleKey PlanRev Date PLOT DATE:FILE NAME:General NotesSheet NotesTHIS DRAWING IS FOR DESIGN INTENT PURPOSES ONLY,NOT FOR CONSTRUCTION.HEATHERWICK STUDIO TAKE NO RESPONSIBILITY FOR ANY DIMENSIONS OBTAINED BY MEASURING OR SCALING FROM THIS DRAWING.ALL DIMENSIONS AND LEVELS ARE TO B157、E CHECKED ON SITE BEFORE PROCEEDING.THIS DRAWING MUST BE READ IN CONJUNCTION WITH RELEVANT CONSULTANT AND SPECIALIST DRAWINGS.ALL STRUCTURE,MEP,LIGHTING,PLANTING CIVILS&DRAINAGE ARE INDICATIVE ONLY.THE SIZING OF STRUCTURAL AND SERVICES ELEMENTS MUST BE CHECKED AGAINST THE RELEVANT ENGINEERS DRAWINGS158、.THIS DRAWING IS THE COPYRIGHT OF HEATHERWICK STUDIO AND IS NOT TO BE REPRODUCED IN ANY FORM WITHOUT PRIOR WRITTEN CONSENT.2018 Heatherwick Studio01As indicated30/11/2130/11/2021 22:14:13C:BIM0437-HS-XX-XX-M2-A-000001_AlfredoChavezFQXXH.rvtXian CCBDJNENLHS-XX-XX-DT-ASCHEMATIC DESIGN30/06/210437Yanta159、 District,Qujiang New District,Xian,ChinaXX/XXEXTERNAL WALLS&CLADDING外部墙体及覆面Compression Cruciform Frame Cladding 十字柱覆面-EWS-20121-40-50CR LandSCALE 1:203Plan-Frame Type B BaseSCALE 1:202Plan-Typical Frame Type A Column BaseSCALE 1:204Plan-Typical Frame Type C BaseSCALE 1:2010Section-Typical Frame Typ160、e C BeamSCALE 1:208Section-Typical Frame Type A BeamSCALE 1:209Section-Typical Frame Type B BeamSCALE 1:1001Elevation-Frame Column Set-out PrinciplesSCALE 1:207Plan-Typical Frame Type C Column TopSCALE 1:206Plan-Frame Type B Column TopSCALE 1:205Plan-Typical Frame Type A Column TopREVDATEDESCRIPTION161、0030/06/21 70%SD Facade0130/11/21 70%Schematic Design400400500500130013405405401001202002207001700500700500Ceramic tiles,mould standardisation to be developed with ArupSubstructure and attachments,Arup to adviseIndicative fireproofing expansion zoneRefer to RBS structural drawings7401740740100120200162、2204002004002008004404408401001202002202000400440Ceramic tiles,mould standardisation to be developed with ArupStainless steel cap and gutterWeatherproof membraneSubstructure and attachments,see Arup drawingsIndicative fireproofing expansion zoneOpen jointed shadow gap to allow tiles to rotate with r163、oof planeInsulation where neededSteel I Beam refer to RBS drawings25007007402250500540Type CType BType A0-15m High15-25m High25m or above500 R500 R500 R1.51.51.5225025002000300400500EQEQEQEQEQEQ8001300170084013401740400Variable440500Variable540700Variable740A0Date Drawn356-364 Grays Inn Road,London 164、WC1X 8BH|T:+44(0)20 7833 8800 |StatusSizeSheet NameClient/Project NameDrawn ByCheckedRevisionProject No.Sheet No.ScaleKey PlanRev Date PLOT DATE:FILE NAME:General NotesSheet NotesTHIS DRAWING IS FOR DESIGN INTENT PURPOSES ONLY,NOT FOR CONSTRUCTION.HEATHERWICK STUDIO TAKE NO RESPONSIBILITY FOR ANY DI165、MENSIONS OBTAINED BY MEASURING OR SCALING FROM THIS DRAWING.ALL DIMENSIONS AND LEVELS ARE TO BE CHECKED ON SITE BEFORE PROCEEDING.THIS DRAWING MUST BE READ IN CONJUNCTION WITH RELEVANT CONSULTANT AND SPECIALIST DRAWINGS.ALL STRUCTURE,MEP,LIGHTING,PLANTING CIVILS&DRAINAGE ARE INDICATIVE ONLY.THE SIZI166、NG OF STRUCTURAL AND SERVICES ELEMENTS MUST BE CHECKED AGAINST THE RELEVANT ENGINEERS DRAWINGS.THIS DRAWING IS THE COPYRIGHT OF HEATHERWICK STUDIO AND IS NOT TO BE REPRODUCED IN ANY FORM WITHOUT PRIOR WRITTEN CONSENT.2018 Heatherwick Studio01As indicated30/11/2130/11/2021 22:14:13C:BIM0437-HS-XX-XX-167、M2-A-000001_AlfredoChavezFQXXH.rvtXian CCBDJNENLHS-XX-XX-DT-ASCHEMATIC DESIGN30/06/210437Yanta District,Qujiang New District,Xian,ChinaXX/XXEXTERNAL WALLS&CLADDING外部墙体及覆面Compression Cruciform Frame Cladding 十字柱覆面-EWS-20121-40-50CR LandSCALE 1:203Plan-Frame Type B BaseSCALE 1:202Plan-Typical Frame Ty168、pe A Column BaseSCALE 1:204Plan-Typical Frame Type C BaseSCALE 1:2010Section-Typical Frame Type C BeamSCALE 1:208Section-Typical Frame Type A BeamSCALE 1:209Section-Typical Frame Type B BeamSCALE 1:1001Elevation-Frame Column Set-out PrinciplesSCALE 1:207Plan-Typical Frame Type C Column TopSCALE 1:20169、6Plan-Frame Type B Column TopSCALE 1:205Plan-Typical Frame Type A Column TopREVDATEDESCRIPTION0030/06/21 70%SD Facade0130/11/21 70%Schematic Design400400500500130013405405401001202002207001700500700500Ceramic tiles,mould standardisation to be developed with ArupSubstructure and attachments,Arup to a170、dviseIndicative fireproofing expansion zoneRefer to RBS structural drawings74017407401001202002204002004002008004404408401001202002202000400440Ceramic tiles,mould standardisation to be developed with ArupStainless steel cap and gutterWeatherproof membraneSubstructure and attachments,see Arup drawing171、sIndicative fireproofing expansion zoneOpen jointed shadow gap to allow tiles to rotate with roof planeInsulation where neededSteel I Beam refer to RBS drawings25007007402250500540Type CType BType A0-15m High15-25m High25m or above500 R500 R500 R1.51.51.5225025002000300400500EQEQEQEQEQEQ800130017008172、4013401740400Variable440500Variable540A0Date Drawn356-364 Grays Inn Road,London WC1X 8BH|T:+44(0)20 7833 8800 |StatusSizeSheet NameClient/Project NameDrawn ByCheckedRevisionProject No.Sheet No.ScaleKey PlanRev Date PLOT DATE:FILE NAME:General NotesSheet NotesTHIS DRAWING IS FOR DESIGN INTENT PURPOSE173、S ONLY,NOT FOR CONSTRUCTION.HEATHERWICK STUDIO TAKE NO RESPONSIBILITY FOR ANY DIMENSIONS OBTAINED BY MEASURING OR SCALING FROM THIS DRAWING.ALL DIMENSIONS AND LEVELS ARE TO BE CHECKED ON SITE BEFORE PROCEEDING.THIS DRAWING MUST BE READ IN CONJUNCTION WITH RELEVANT CONSULTANT AND SPECIALIST DRAWINGS.174、ALL STRUCTURE,MEP,LIGHTING,PLANTING CIVILS&DRAINAGE ARE INDICATIVE ONLY.THE SIZING OF STRUCTURAL AND SERVICES ELEMENTS MUST BE CHECKED AGAINST THE RELEVANT ENGINEERS DRAWINGS.THIS DRAWING IS THE COPYRIGHT OF HEATHERWICK STUDIO AND IS NOT TO BE REPRODUCED IN ANY FORM WITHOUT PRIOR WRITTEN CONSENT.201175、8 Heatherwick Studio01As indicated30/11/2130/11/2021 22:14:13C:BIM0437-HS-XX-XX-M2-A-000001_AlfredoChavezFQXXH.rvtXian CCBDJNENLHS-XX-XX-DT-ASCHEMATIC DESIGN30/06/210437Yanta District,Qujiang New District,Xian,ChinaXX/XXEXTERNAL WALLS&CLADDING外部墙体及覆面Compression Cruciform Frame Cladding 十字柱覆面-EWS-201176、21-40-50CR LandSCALE 1:203Plan-Frame Type B BaseSCALE 1:202Plan-Typical Frame Type A Column BaseSCALE 1:204Plan-Typical Frame Type C BaseSCALE 1:2010Section-Typical Frame Type C BeamSCALE 1:208Section-Typical Frame Type A BeamSCALE 1:209Section-Typical Frame Type B BeamSCALE 1:1001Elevation-Frame Co177、lumn Set-out PrinciplesSCALE 1:207Plan-Typical Frame Type C Column TopSCALE 1:206Plan-Frame Type B Column TopSCALE 1:205Plan-Typical Frame Type A Column TopREVDATEDESCRIPTION0030/06/21 70%SD Facade0130/11/21 70%Schematic Design119VMU视觉模型120VMU StrategyCRLand to verify Size/Scale Facade Types Composi178、tion华润请核实 尺寸/规模 幕墙类型 构成1.Display box facade system2.Shadow box facade system3.Opaque facade type 1 with and without louvre4.Opaque facade type 2 with and without louvre5.Vision glazing6.horizontal bird mouth potential louvre7.Bird mouth interface8.Glass interface9.Opaque facade interface10.Chamfered179、 corner11.Opaque facade corner12.Handrail13.Escape door Glass14.Escape door Opaque15.Entrance door Glass16.Ceramic table frame Small17.Ceramic table frame Medium18.Flagship retail19.Spandrel20.Bird mouth1.展窗幕墙系统2.阴影盒幕墙系统3.不透明幕墙系统1设或不设百叶4.不透明幕墙系统2设或不设百叶5.可视玻璃6.水平凹槽潜在百叶7.凹槽界面8.玻璃界面9.不透明幕墙界面10.切角11.不透明180、幕墙角部12.扶手13.疏散门玻璃14.疏散门不透明15.出入口门玻璃16.陶瓷桌子框架小17.陶瓷桌子框架中18.旗舰店商业19.玻璃拱肩20.凹槽视觉模型策略2161681712347918192051510111413Note:Soffit not yet included in mock-up model 天花未包括在内121Ceramic-Hete Technology陶瓷-和特科技Samples are really encouraging and offer good variation,in terms of glaze,tone and colour.Meeting requ181、ired between HS,Arup and Hete Technology,to provide feedback and more samples.1.Pearlescent effect on the glaze is good,nice tone of white Larger sample required&on a shaped extrusion2.Nice glaze on what is a more more typical white.Appears thick and glossy Larger sample required&on a shaped extrusi182、on3.Dappled effect is nice.Tonally were not sure it is quite right-but the effect is great.Offers tonal variety and provides a slight texture and hand crafted quality Larger sample required&on a shaped extrusion and testing different colours4.Nice effect,again were not sure the colour is quite right183、 Larger sample required&on a shaped extrusion and testing different colours5.Nice cracked glaze,nice effect-not sure colours are quite right Larger sample required&on a shaped extrusion and testing different colours样品效果较好,在釉面、色调和颜色方面提供了良好的变化。HS、Arup和和特科技之间需要举行会议,以提供反馈和更多的样品。1.釉面上的珠光效果很好,白色的色调很好 需要较大184、的样品,而且是在一个成型的挤压物上。2.在比较典型的白色上有很好的釉面。显得厚实而有光泽 需要更大的样品,并在一个成型的挤压物上。3.斑驳的效果很好。从色调上看,我们不确定它是否完全正确-但效果很好。提供了色调的多样性,并提供了轻微的纹理和手工质感需要更大的样品,并在一个成型的挤压物上测试不同的颜色。4.效果很好,但我们不确定颜色是否正确 需要更大的样品,并在一个成形的挤压物上测试不同的颜色。5.漂亮的裂纹釉,效果较好-不确定颜色是否正确需要更大的样品,并在一个成型的挤压物上测试不同的颜色12345122Ceramic-CN Terracotta陶瓷-CN TerracottaSamples 185、are really encouraging and offer good variation,in terms of glaze,tone and colour.Meeting required between HS,Arup and CN Terracotta to provide feedback and more samples.1.Nice effect,similar to the sample image we sent.White tone,is perhaps not thick enough.Tonal variation is good,glaze is good Fla186、t panel sample required2.Metallic finish not reflective of ceramic.Glaze not good.Though tonal variation is encouraging Better glaze required,along with different colour samples3.Nice glaze though the gradient transition is not gradual enough.Colours are not quite right either More gradual gradient 187、required,different colour range required4.Dappled effect is nice.Offers tonal variety and provides a slight texture and hand crafted quality Testing different colours/tones样品效果较好,在釉面、色调和颜色方面提供了良好的变化。HS、Arup和CN Terracotta之间需要举行会议,以提供反馈和更多的样品。1.效果不错,与我们发送的样本图片相似。白色调,也许不够厚。色调变化很好,釉面很好需要平板样品2.金属饰面不能反映陶瓷188、的特点。釉面不好,但色调变化较好需要更好的釉面,以及不同的颜色样本。3.釉面很好,但渐变过渡不够渐变。颜色也不太对需要更多的渐变,需要不同的颜色范围。4.斑驳的效果很好。提供色调的多样性,并提供轻微的纹理和手工质感测试不同的颜色/色调。1234123Ceramic-Fujian Huatai-Arup to Confirm陶瓷-Samples are not in line with HS aspirationShould we go with this manufacturer a meeting will be required to further explain our design 189、direction,aspirations and receive more custom samples 1.Poor glaze,extremely commercial aesthetic,bad streaking from colour application,no tonal variation,no texture Shaped extrusion required,custom glazes,different tones,this glaze2.Poor glaze,extremely commercial aesthetic,bad streaking from colou190、r application,no tonal variation,no texture Shaped extrusion required,custom glazes,different tones,this glaze样品与HS的创想不一致如果我们选择这家制造商,将需要举行会议,进一步解释我们的设计方向和愿景,并收到更多的定制样品。1.釉面不佳,极其商业化的审美,颜色应用带来的糟糕的条纹,没有色调变化,没有纹理需要成型的挤压,定制釉面,不同的色调,这种釉面。2.釉面不佳,极其商业化的审美,颜色应用带来的糟糕的条纹,没有色调变化,没有纹理需要成型的挤压,定制釉面,不同的色调,这种釉面。1212191、4Ceramic SummaryCN Terracotta 面Hete Technology 和特科技Fujian Huatai-Arup to confirm陶瓷总结Glaze:AverageVariation:GoodTexture:GoodHand-crafted quality:GoodPotential:Good釉面:一般变化:佳质感:佳手工质感:佳潜能:佳Glaze:GoodVariation:GoodTexture:GoodHand-crafted quality:GoodPotential:Good釉面:佳变化:佳质感:佳手工质感:佳潜能:佳Glaze:GoodVariatio192、n:GoodTexture:AverageHand-crafted quality:AveragePotential:Average釉面:佳变化:佳质感:一般手工质感:一般潜能:一般Glaze:GoodVariation:GoodTexture:GoodHand-crafted quality:GoodPotential:Good釉面:佳变化:佳质感:佳手工质感:佳潜能:佳Glaze:GoodVariation:AverageTexture:AverageHand-crafted quality:AveragePotential:Average釉面:佳变化:一般质感:一般手工质感:一般潜能:一193、般Glaze:GoodVariation:GoodTexture:AverageHand-crafted quality:AveragePotential:Average釉面:佳变化:佳质感:一般手工质感:一般潜能:一般Glaze:GoodVariation:GoodTexture:GoodHand-crafted quality:GoodPotential:Good釉面:佳变化:佳质感:佳手工质感:佳潜能:佳Glaze:AverageVariation:GoodTexture:AverageHand-crafted quality:AveragePotential:Average釉面:一般变194、化:佳质感:一般手工质感:一般潜能:一般Glaze:GoodVariation:GoodTexture:GoodHand-crafted quality:GoodPotential:Good釉面:佳变化:佳质感:佳手工质感:佳潜能:佳Glaze:PoorVariation:Poor Texture:PoorHand-crafted quality:PoorPotential:Poor釉面:弱变化:弱质感:弱手工质感:弱潜能:弱Glaze:PoorVariation:Poor Texture:PoorHand-crafted quality:PoorPotential:Poor釉面:弱变化:弱质195、感:弱手工质感:弱潜能:弱Option 01:Speckled斑点Option 08:Gradient渐变Option 02:Pearlescent珠光Option 09:Drip水波Option 03:White白色Option 10:Gradient渐变Option 04:Drip水波Option 11:Metallic金属Option 05:Gradient渐变Option 06:White白色Option 07:White白色125Ceramic Next StepsStep1Cost Analysis成本计算We must receive and review the cost im196、plications of each finish,to further understand how we might distribute each strategy.收到并复核每个饰面的成本影响,以进一步了解每个策略的分配方式。Manufacturer Meeting制造商会议We must meet with the manufacturers to further describe our aspirations and design direction while commenting on existing samples and how they can be improved197、.与制造商会谈,以进一步描述我们的愿景和设计方向,以及评论现有样品和改进方式。Produce more Samples制造更多样品Once we have established costs and commented and refined each design strategy,a series of new samples must be produced.确定成本,并对每个设计策略进行评论和改进后,须生产新样品。Specify Samples for VMU为视觉模型指定样品Once we have received and reviewed additional samples,w198、e will be able to specify which options are to be tested on the VMU.收到并审查了更多样品后,明确将在视觉模型上测试的选项。Step2Step3Step3陶瓷下一步工作126Metal Bird Mouth-Akzonobel金属凹槽-AkzonobelFollowing internal review of the metal samples HS would like to test three strategies on the VMU following render tests on 3D VMU model 1.Si199、ngle-tone,dark bronze KS2E901049Mullions and Bird mouth to match2.Single-tone,champagne Tone KS3E907498CMullions and Bird mouth to match3.Two-tone,warm metallic KD2E97040&KD2E907531 Mullions KD2E97040 Bird mouth KD2E907531在对金属样品进行内部审查后,HS希望在VMU上测试三种策略在对三维 VMU模型进行渲染测试后进行 1.单色调,深黄铜KS2E901049 竖框和凹槽颜色相同200、2.单色调,香槟色KS2E901049 竖框和凹槽颜色相同3.双色调,暖色金属 竖框KD2E97040 凹槽 KD2E907531132KS2E901049KS3E907498CKD2E907531KD2E97040127Metal Opaque Facade-Akzonobel不透明金属幕墙-AkzonobelFollowing internal review of the metal samples HS would like to test 2 opaque cladding colours which align to the previous colour selection of 201、the bird mouth and glass framing on the VMU following render tests on 3D VMU model 1.WHITE KW3E97722Adjacent to mullion/bird mouth KS2E901049&KS3E907498C2.WHITE KW3E97058Adjacent to mullion/bird mouth KD2E97040&KD2E907531在对金属样品进行内部审查后,HS希望测试两种不透明覆面颜色,这与之前选择的凹槽和VMU上的玻璃框架的颜色一致在对三维 VMU模型进行渲染测试后进行 1.白色 202、KW3E97722 接近竖框/凹槽 KS2E901049&KS3E907498C2.白色 接近竖框/凹槽 KD2E97040&KD2E90753112KS2E901049KS3E907498CKW3E97058KW3E97722KD2E907531KD2E97040128Frame Option框架选项Glass Set-out+MEP Strategy玻璃设置+机电策略Opaque Facade Types不透明幕墙类型Average Facade Cost平均幕墙成本VMU视觉模型Decisions RequiredHS RecommendedOption 3A/BHS Recommend203、edOption 1&2HS RecommendedOption 1/2HS RecommendedSee below请见下方HS RecommendedHybrid混合需要决策1291306.RoofDevelopment&Coordination屋顶发展及协调131 绿色覆盖率-规划要求Green Coverage-Planning Requirements Planning Requirements规划要求Roof Requirements屋顶要求Requirements要求Calculations计算 25%of Site Coverage 基地覆盖率 40%of Roof Cover204、age 屋顶覆盖率 30%Of Site Coverage can be fulfilled by converted Green Roofs30%基地覆盖率可由绿化屋顶 转化而来25%Site CoverageRoof30%=70%1/3 1m2 on the roof only converts to 1/3 m2 on L1屋顶1m2仅可转化为首层1/3m240%18,519 m225%22,985 m291,940 m23m2on roof1m2on level 1max.22,985 m2(eq.7,661 m2)min.15,324 m2=L1TowersExcluded132程序205、Intensive Roof System Counts towards Green AreaHard Landscape Does not count towardsGreen AreaExtensive Green Roof System Counts towards Green Area133What roof type counts as Green AreaGreen area per surfaceSkylight areasexcluded134XIAN CCBD-GREEN ROOF COVERAGE AREAS 西西安安CCBD-绿色屋顶覆盖面积(基基于于 20/01/202206、2 的的体体量量 MASSING)SURFACE NUMBER 面面层编号ROOF TYPE 屋顶类型ROOF CODE 屋顶编号TOTAL SURFACE AREA 总表面积(m2)GREEN COVER PERCENTAGE 绿地率(%)GREEN AREA 绿地面积(m2)01EXTENSIVE GREEN ROOF 分散布置绿色屋顶RFS-102302100%30202EXTENSIVE GREEN ROOF 分散布置绿色屋顶RFS-102206100%20603EXTENSIVE GREEN ROOF 分散布置绿色屋顶RFS-102367100%36704EXTENSIVE GREE207、N ROOF 分散布置绿色屋顶RFS-10296100%9605EXTENSIVE GREEN ROOF 分散布置绿色屋顶RFS-102486100%48606EXTENSIVE GREEN ROOF 分散布置绿色屋顶RFS-102574100%57407EXTENSIVE GREEN ROOF 分散布置绿色屋顶RFS-102312100%31208EXTENSIVE GREEN ROOF 分散布置绿色屋顶RFS-102531100%53109EXTENSIVE GREEN ROOF 分散布置绿色屋顶RFS-102497100%49710EXTENSIVE GREEN ROOF 分散布置绿色屋208、顶RFS-102204100%20411EXTENSIVE GREEN ROOF 分散布置绿色屋顶RFS-10299100%9912EXTENSIVE GREEN ROOF 分散布置绿色屋顶RFS-102307100%30713EXTENSIVE GREEN ROOF 分散布置绿色屋顶RFS-102702100%70214EXTENSIVE GREEN ROOF 分散布置绿色屋顶RFS-102404100%40415EXTENSIVE GREEN ROOF 分散布置绿色屋顶RFS-102421100%42116EXTENSIVE GREEN ROOF 分散布置绿色屋顶RFS-102330100209、%33017EXTENSIVE GREEN ROOF 分散布置绿色屋顶RFS-102315100%31518EXTENSIVE GREEN ROOF 分散布置绿色屋顶RFS-102306100%30619EXTENSIVE GREEN ROOF 分散布置绿色屋顶RFS-102340100%34020EXTENSIVE GREEN ROOF 分散布置绿色屋顶RFS-102330100%33021EXTENSIVE GREEN ROOF 分散布置绿色屋顶RFS-102561100%56122EXTENSIVE GREEN ROOF 分散布置绿色屋顶RFS-102358100%35823EXTENS210、IVE GREEN ROOF 分散布置绿色屋顶RFS-102330100%33024EXTENSIVE GREEN ROOF 分散布置绿色屋顶RFS-102600100%60025EXTENSIVE GREEN ROOF 分散布置绿色屋顶RFS-102702100%70226EXTENSIVE GREEN ROOF 分散布置绿色屋顶RFS-102129100%12927EXTENSIVE GREEN ROOF 分散布置绿色屋顶RFS-102494100%49428EXTENSIVE GREEN ROOF 分散布置绿色屋顶RFS-102821100%82129EXTENSIVE GREEN RO211、OF 分散布置绿色屋顶RFS-1021,381100%1,38130EXTENSIVE GREEN ROOF 分散布置绿色屋顶RFS-102371100%37131EXTENSIVE GREEN ROOF 分散布置绿色屋顶RFS-102560100%56032EXTENSIVE GREEN ROOF 分散布置绿色屋顶RFS-102245100%24533EXTENSIVE GREEN ROOF 分散布置绿色屋顶RFS-102606100%606 EXT.ROOF TOTAL 总计14,28714,28734INTENSIVE GREEN ROOF 集中布置绿色屋顶RFS-10189255%49212、135INTENSIVE GREEN ROOF 集中布置绿色屋顶*RFS-10149655%27336INTENSIVE GREEN ROOF 集中布置绿色屋顶*RFS-10192745%41737INTENSIVE GREEN ROOF 集中布置绿色屋顶*RFS-10170935%24838INTENSIVE GREEN ROOF 集中布置绿色屋顶*RFS-10125745%11639INTENSIVE GREEN ROOF 集中布置绿色屋顶*RFS-1011,17135%41040INTENSIVE GREEN ROOF集中布置绿色屋顶RFS-10111930%3641INTENSIVE 213、GREEN ROOF集中布置绿色屋顶*RFS-10112730%3842INTENSIVE GREEN ROOF集中布置绿色屋顶RFS-10113745%6243INTENSIVE GREEN ROOF集中布置绿色屋顶*RFS-1011,35540%54244INTENSIVE GREEN ROOF集中布置绿色屋顶*RFS-10144385%37745INTENSIVE GREEN ROOF集中布置绿色屋顶*RFS-10155880%44646INTENSIVE GREEN ROOF集中布置绿色屋顶*RFS-1011,05940%42447INTENSIVE GREEN ROOF集中布置绿色屋214、顶*RFS-1011,16340%46548INTENSIVE GREEN ROOF集中布置绿色屋顶*RFS-10187960%52749INTENSIVE GREEN ROOF集中布置绿色屋顶*RFS-10143370%30350INTENSIVE GREEN ROOF集中布置绿色屋顶*RFS-1011,09760%65851INTENSIVE GREEN ROOF集中布置绿色屋顶RFS-10157870%40552INTENSIVE GREEN ROOF集中布置绿色屋顶RFS-10144090%39653INTENSIVE GREEN ROOF集中布置绿色屋顶RFS-10197870%68215、554INTENSIVE GREEN ROOF集中布置绿色屋顶RFS-10196370%674INT.ROOF TOTAL 总计14,7817,991GREEN ROOF TOTAL绿色屋顶总面积22,278 m2required 22,985m210ABCDEFGHJKLMNPQRSTUVWXYAAABACADAEAFAGAHAJAKALAMANAPAQARAS1234567891112131415161718192021222324252627282938-257(45%)=11634-892(55%)=4901-30235-496(55%)=27336-927(45%)=41739-11216、71(35%)=41037-709(35%)=2482-2063-3674-965-4867-312Xian CCBDArea CalculationsL03-Second FloorProject Name1:750SURFACE COUNTSAS GROUND FLOORProject No.0437-HS-XX-XX-DR-XXXXA1356-364 Grays Inn Road,London WC1X 8BH|T:+44(0)20 7833 8800DRAINAGE ARE INDICATIVE ONLY.THE SIZING OF|Drawn ByRevisionSizeDateDr217、awing No.XX 2022Heatherwick StudioNOT FOR CONSTRUCTION.Sheet NotesSD Stage SubmissionALL DIMENSIONS AND LEVELS ARE TO BE CHECKED ON SITELSWITHOUT PRIOR WRITTEN CONSENT.FKDIMENSIONS OBTAINED BY MEASURING OR SCALING FROMRELEVANT CONSULTANT AND SPECIALIST DRAWINGS.ALL STRUCTURE,MEP,LIGHTING,PLANTING CI218、VILS&StatusBEFORE PROCEEDING.THIS DRAWING MUST BE READ IN CONJUNCTION WITHCheckedTHIS DRAWING IS THE COPYRIGHT OF HEATHERWICK20/01/2022CHECKED AGAINST THE RELEVANT ENGINEERS DRAWINGS.HEATHERWICK STUDIO TAKE NO RESPONSIBILITY FOR ANYKey Plan20/01/2022 6:20 PMTHIS DRAWING IS FOR DESIGN INTENT PURPOSES219、 ONLY,STRUCTURAL AND SERVICES ELEMENTS MUST BESheet NotesProject NameSTUDIO AND IS NOT TO BE REPRODUCED IN ANY FORMScale0454THIS DRAWING.REVDATEDESCRIPTIONDRAFTExtensive Green RoofKey:Intensive Green RoofSkylightMEP Trellis252429ABCDEFGHJKLMNPQRSTUVWXYAAABACADAEAFAGAHAJAKALAMANAPAQARAS12345678910111220、21314151617181920212223242526272829酒店及公寓塔楼公塔楼办HOTEL AMENITIES公寓塔楼公寓塔楼留机空预电间24-60025-70226-12927-49428-82133-60629-138130-37131-56032-245Xian CCBDRoof PlanGreen Areas20/01/2022 6:26 PMKey PlanXXDrawing No.Project No.DateBEFORE PROCEEDING.THIS DRAWING.CheckedDIMENSIONS OBTAINED BY MEASURING OR SCALING221、 FROMHEATHERWICK STUDIO TAKE NO RESPONSIBILITY FOR ANYNOT FOR CONSTRUCTION.WITHOUT PRIOR WRITTEN CONSENT.STUDIO AND IS NOT TO BE REPRODUCED IN ANY FORMTHIS DRAWING IS THE COPYRIGHT OF HEATHERWICK0437-HS-XX-XX-DR-XXXXSTRUCTURAL AND SERVICES ELEMENTS MUST BESD Stage Submission20/01/20220454ALL DIMENSI222、ONS AND LEVELS ARE TO BE CHECKED ON SITE1:750 2022Heatherwick StudioSheet NotesDRAINAGE ARE INDICATIVE ONLY.THE SIZING OFA1356-364 Grays Inn Road,London WC1X 8BH|T:+44(0)20 7833 8800FK|Drawn ByRELEVANT CONSULTANT AND SPECIALIST DRAWINGS.THIS DRAWING IS FOR DESIGN INTENT PURPOSES ONLY,RevisionScaleSi223、zeTHIS DRAWING MUST BE READ IN CONJUNCTION WITHLSProject NameCHECKED AGAINST THE RELEVANT ENGINEERS DRAWINGS.Project NameSheet NotesStatusALL STRUCTURE,MEP,LIGHTING,PLANTING CIVILS&DATEREVDESCRIPTIONDRAFTIntensive Green RoofSkylightMEP TrellisExtensive Green Roof429252135Green Areas-L03 PlanGREEN AR224、EASLEVEL 01-03 3,723 SQMLEVEL 04 2,875 SQMLEVEL 05 10,702 SQMROOF LEVEL 5,600 SQMTOTAL 22,920 SQMRequired 22,985 SQM10ABCDEFGHJKLMNPQRSTUVWXYAAABACADAEAFAGAHAJAKALAMANAPAQARAS123456789111213141516171819202122232425262728296-5748-53141-127(30%)=3842-137(45%)=6240-119(30%)=369-49710-20411-99Xian CCBDL225、04-Third FloorGreen AreasDIMENSIONS OBTAINED BY MEASURING OR SCALING FROM20/01/2022A1356-364 Grays Inn Road,London WC1X 8BH|T:+44(0)20 7833 8800LSHEATHERWICK STUDIO TAKE NO RESPONSIBILITY FOR ANYFKTHIS DRAWING.ALL DIMENSIONS AND LEVELS ARE TO BE CHECKED ON SITEBEFORE PROCEEDING.THIS DRAWING MUST BE 226、READ IN CONJUNCTION WITH0437-HS-XX-XX-DR-XXXXSheet NotesSD Stage SubmissionSheet NotesDrawn By20/01/2022 6:22 PMDRAINAGE ARE INDICATIVE ONLY.THE SIZING OFProject NameSTRUCTURAL AND SERVICES ELEMENTS MUST BEProject Name 2022Heatherwick StudioCHECKED AGAINST THE RELEVANT ENGINEERS DRAWINGS.XXDrawing N227、o.ALL STRUCTURE,MEP,LIGHTING,PLANTING CIVILS&THIS DRAWING IS THE COPYRIGHT OF HEATHERWICKProject No.StatusKey PlanSTUDIO AND IS NOT TO BE REPRODUCED IN ANY FORMDateSizeScaleWITHOUT PRIOR WRITTEN CONSENT.RevisionRELEVANT CONSULTANT AND SPECIALIST DRAWINGS.0454THIS DRAWING IS FOR DESIGN INTENT PURPOSE228、S ONLY,CheckedNOT FOR CONSTRUCTION|1:750DRAFTDESCRIPTIONREVDATEIntensive Green RoofSkylightMEP TrellisKey:Extensive Green Roof429252ABCDEFGHJKLMNPQRSTUVWXYAAABACADAEAFAGAHAJAKALAMANAPAQARAS1234567891011121314151617181920212223242526272829酒店及公寓塔楼公塔楼办HOTEL AMENITIES公寓塔楼公寓塔楼留机空预电间24-60025-70226-12927-4229、9428-82133-60629-138130-37131-56032-245Xian CCBDRoof PlanGreen Areas20/01/2022 6:26 PMKey PlanXXDrawing No.Project No.DateBEFORE PROCEEDING.THIS DRAWING.CheckedDIMENSIONS OBTAINED BY MEASURING OR SCALING FROMHEATHERWICK STUDIO TAKE NO RESPONSIBILITY FOR ANYNOT FOR CONSTRUCTION.WITHOUT PRIOR WRITTEN 230、CONSENT.STUDIO AND IS NOT TO BE REPRODUCED IN ANY FORMTHIS DRAWING IS THE COPYRIGHT OF HEATHERWICK0437-HS-XX-XX-DR-XXXXSTRUCTURAL AND SERVICES ELEMENTS MUST BESD Stage Submission20/01/20220454ALL DIMENSIONS AND LEVELS ARE TO BE CHECKED ON SITE1:750 2022Heatherwick StudioSheet NotesDRAINAGE ARE INDIC231、ATIVE ONLY.THE SIZING OFA1356-364 Grays Inn Road,London WC1X 8BH|T:+44(0)20 7833 8800FK|Drawn ByRELEVANT CONSULTANT AND SPECIALIST DRAWINGS.THIS DRAWING IS FOR DESIGN INTENT PURPOSES ONLY,RevisionScaleSizeTHIS DRAWING MUST BE READ IN CONJUNCTION WITHLSProject NameCHECKED AGAINST THE RELEVANT ENGINEE232、RS DRAWINGS.Project NameSheet NotesStatusALL STRUCTURE,MEP,LIGHTING,PLANTING CIVILS&DATEREVDESCRIPTIONDRAFTIntensive Green RoofSkylightMEP TrellisExtensive Green Roof429252136Green Areas-L04 PlanGREEN AREASLEVEL 01-03 3,723 SQMLEVEL 04 2,875 SQMLEVEL 05 10,702 SQMROOF LEVEL 5,600 SQMTOTAL 22,920 SQM233、Required 22,985 SQM10ABCDEFGHJKLMNPQRSTUVWXYAAABACADAEAFAGAHAJAKALAMANAPAQARAS12345678911121314151617181920212223242526272829PRE-FUNCTION留机空预电间公寓塔楼公寓塔楼HOTEL AMENITIESBALLROOMBALLROOMBALLROOM公塔楼办酒店及公寓塔楼12-30713-70214-40443-1355(40%)=54215-42145-558(80%)=44646-1059(40%)=42347-1163(40%)=46516-33017-315234、18-30650-1097(60%)=65851-578(70%)=40448-879(60%)=52749-433(70%)30352-440(90%)=39619-34020-33021-56153-978(70%)=68554-963(70%)=67422-35823-330Xian CCBDL05 PlanGreen Areas20/01/2022HEATHERWICK STUDIO TAKE NO RESPONSIBILITY FOR ANYA11:750LS356-364 Grays Inn Road,London WC1X 8BH|T:+44(0)20 7833 88000437235、-HS-XX-XX-DR-XXXXDIMENSIONS OBTAINED BY MEASURING OR SCALING FROMTHIS DRAWING.BEFORE PROCEEDING.SD Stage SubmissionRELEVANT CONSULTANT AND SPECIALIST DRAWINGS.Sheet NotesKey PlanFK20/01/2022 6:24 PMALL STRUCTURE,MEP,LIGHTING,PLANTING CIVILS&DRAINAGE ARE INDICATIVE ONLY.THE SIZING OFProject NameSTRUC236、TURAL AND SERVICES ELEMENTS MUST BEProject Name 2022Heatherwick StudioCHECKED AGAINST THE RELEVANT ENGINEERS DRAWINGS.XXDrawing No.THIS DRAWING IS THE COPYRIGHT OF HEATHERWICKProject No.StatusSheet NotesSTUDIO AND IS NOT TO BE REPRODUCED IN ANY FORMDateSizeScaleWITHOUT PRIOR WRITTEN CONSENT.Revision237、THIS DRAWING MUST BE READ IN CONJUNCTION WITH0454THIS DRAWING IS FOR DESIGN INTENT PURPOSES ONLY,CheckedALL DIMENSIONS AND LEVELS ARE TO BE CHECKED ON SITEDrawn ByNOT FOR CONSTRUCTION|DRAFTDESCRIPTIONREVDATEIntensive Green RoofSkylightMEP TrellisExtensive Green RoofKey:429252ABCDEFGHJKLMNPQRSTUVWXYA238、AABACADAEAFAGAHAJAKALAMANAPAQARAS1234567891011121314151617181920212223242526272829酒店及公寓塔楼公塔楼办HOTEL AMENITIES公寓塔楼公寓塔楼留机空预电间24-60025-70226-12927-49428-82133-60629-138130-37131-56032-245Xian CCBDRoof PlanGreen Areas20/01/2022 6:26 PMKey PlanXXDrawing No.Project No.DateBEFORE PROCEEDING.THIS DRAWING.Che239、ckedDIMENSIONS OBTAINED BY MEASURING OR SCALING FROMHEATHERWICK STUDIO TAKE NO RESPONSIBILITY FOR ANYNOT FOR CONSTRUCTION.WITHOUT PRIOR WRITTEN CONSENT.STUDIO AND IS NOT TO BE REPRODUCED IN ANY FORMTHIS DRAWING IS THE COPYRIGHT OF HEATHERWICK0437-HS-XX-XX-DR-XXXXSTRUCTURAL AND SERVICES ELEMENTS MUST240、 BESD Stage Submission20/01/20220454ALL DIMENSIONS AND LEVELS ARE TO BE CHECKED ON SITE1:750 2022Heatherwick StudioSheet NotesDRAINAGE ARE INDICATIVE ONLY.THE SIZING OFA1356-364 Grays Inn Road,London WC1X 8BH|T:+44(0)20 7833 8800FK|Drawn ByRELEVANT CONSULTANT AND SPECIALIST DRAWINGS.THIS DRAWING IS 241、FOR DESIGN INTENT PURPOSES ONLY,RevisionScaleSizeTHIS DRAWING MUST BE READ IN CONJUNCTION WITHLSProject NameCHECKED AGAINST THE RELEVANT ENGINEERS DRAWINGS.Project NameSheet NotesStatusALL STRUCTURE,MEP,LIGHTING,PLANTING CIVILS&DATEREVDESCRIPTIONDRAFTIntensive Green RoofSkylightMEP TrellisExtensive 242、Green Roof429252137Green Areas-L05 PlanGREEN AREASLEVEL 01-03 3,723 SQMLEVEL 04 2,875 SQMLEVEL 05 10,702 SQMROOF LEVEL 5,600 SQMTOTAL 22,920 SQMRequired 22,985 SQMABCDEFGHJKLMNPQRSTUVWXYAAABACADAEAFAGAHAJAKALAMANAPAQARAS1234567891011121314151617181920212223242526272829酒店及公寓塔楼公塔楼办HOTEL AMENITIES公寓塔楼公243、寓塔楼留机空预电间24-60025-70226-12927-49428-82133-60629-138130-37131-56032-245Xian CCBDRoof PlanGreen Areas20/01/2022 6:26 PMKey PlanXXDrawing No.Project No.DateBEFORE PROCEEDING.THIS DRAWING.CheckedDIMENSIONS OBTAINED BY MEASURING OR SCALING FROMHEATHERWICK STUDIO TAKE NO RESPONSIBILITY FOR ANYNOT FOR CONS244、TRUCTION.WITHOUT PRIOR WRITTEN CONSENT.STUDIO AND IS NOT TO BE REPRODUCED IN ANY FORMTHIS DRAWING IS THE COPYRIGHT OF HEATHERWICK0437-HS-XX-XX-DR-XXXXSTRUCTURAL AND SERVICES ELEMENTS MUST BESD Stage Submission20/01/20220454ALL DIMENSIONS AND LEVELS ARE TO BE CHECKED ON SITE1:750 2022Heatherwick Stud245、ioSheet NotesDRAINAGE ARE INDICATIVE ONLY.THE SIZING OFA1356-364 Grays Inn Road,London WC1X 8BH|T:+44(0)20 7833 8800FK|Drawn ByRELEVANT CONSULTANT AND SPECIALIST DRAWINGS.THIS DRAWING IS FOR DESIGN INTENT PURPOSES ONLY,RevisionScaleSizeTHIS DRAWING MUST BE READ IN CONJUNCTION WITHLSProject NameCHECK246、ED AGAINST THE RELEVANT ENGINEERS DRAWINGS.Project NameSheet NotesStatusALL STRUCTURE,MEP,LIGHTING,PLANTING CIVILS&DATEREVDESCRIPTIONDRAFTIntensive Green RoofKey:SkylightMEP TrellisExtensive Green Roof429252ABCDEFGHJKLMNPQRSTUVWXYAAABACADAEAFAGAHAJAKALAMANAPAQARAS123456789101112131415161718192021222247、3242526272829酒店及公寓塔楼公塔楼办HOTEL AMENITIES公寓塔楼公寓塔楼留机空预电间24-60025-70226-12927-49428-82133-60629-138130-37131-56032-245Xian CCBDRoof PlanGreen Areas20/01/2022 6:26 PMKey PlanXXDrawing No.Project No.DateBEFORE PROCEEDING.THIS DRAWING.CheckedDIMENSIONS OBTAINED BY MEASURING OR SCALING FROMHEATHERWICK STUDI248、O TAKE NO RESPONSIBILITY FOR ANYNOT FOR CONSTRUCTION.WITHOUT PRIOR WRITTEN CONSENT.STUDIO AND IS NOT TO BE REPRODUCED IN ANY FORMTHIS DRAWING IS THE COPYRIGHT OF HEATHERWICK0437-HS-XX-XX-DR-XXXXSTRUCTURAL AND SERVICES ELEMENTS MUST BESD Stage Submission20/01/20220454ALL DIMENSIONS AND LEVELS ARE TO 249、BE CHECKED ON SITE1:750 2022Heatherwick StudioSheet NotesDRAINAGE ARE INDICATIVE ONLY.THE SIZING OFA1356-364 Grays Inn Road,London WC1X 8BH|T:+44(0)20 7833 8800FK|Drawn ByRELEVANT CONSULTANT AND SPECIALIST DRAWINGS.THIS DRAWING IS FOR DESIGN INTENT PURPOSES ONLY,RevisionScaleSizeTHIS DRAWING MUST BE250、 READ IN CONJUNCTION WITHLSProject NameCHECKED AGAINST THE RELEVANT ENGINEERS DRAWINGS.Project NameSheet NotesStatusALL STRUCTURE,MEP,LIGHTING,PLANTING CIVILS&DATEREVDESCRIPTIONDRAFTIntensive Green RoofSkylightMEP TrellisExtensive Green Roof429252138Green Areas-Roof PlanGREEN AREASLEVEL 01-03 3,723 251、SQMLEVEL 04 2,875 SQMLEVEL 05 10,702 SQMROOF LEVEL 5,600 SQMTOTAL 22,920 SQMRequired 22,985 SQMABCDEFGHJKLMNPQRSTUVWXYAAABACADAEAFAGAHAJAKALAMANAPAQARAS1234567891011121314151617181920212223242526272829酒店及公寓塔楼公塔楼办HOTEL AMENITIES公寓塔楼公寓塔楼留机空预电间Xian CCBDRoof PlanRoof Levels429252+32.1+27.8+35.1+32.0+37.252、7+31.4+14.8+16.8+34.0+31.4+34.0+15.3+30.7+31.2+18.7+25.2+16.4+27.1+23.9+17.7+35.4+26.8+25.4+13.6+8.0+24.4+18.6+20.5+15.4+17.7+30.1+25.0+0.4+32.2+14.6+4.9+27.8+28.8+31.5+23.7+27.5+26.4+19.5+9.2+30.9+12.5+10.3+29.9+31.5+25.9+27.6+17.8+30.9+22.4+34.8+10.1+22.9+22.6+32.0+27.1+13.9+18.6+13.7+12.0+15.7+20253、.6+14.3+9.3+22.8+22.8ABCDEFGHJKLMNPQRSTUVWXYAAABACADAEAFAGAHAJAKALAMANAPAQARAS1234567891011121314151617181920212223242526272829酒店及公寓塔楼公塔楼办HOTEL AMENITIES公寓塔楼公寓塔楼留机空预电间Xian CCBDRoof PlanRoof LevelsSheet NotesHEATHERWICK STUDIO TAKE NO RESPONSIBILITY FOR ANYSTUDIO AND IS NOT TO BE REPRODUCED IN ANY FO254、RM1:7500454SD Stage SubmissionFKLSScale0437-HS-XX-XX-DR-XXXXProject NameDRAINAGE ARE INDICATIVE ONLY.THE SIZING OFSTRUCTURAL AND SERVICES ELEMENTS MUST BECHECKED AGAINST THE RELEVANT ENGINEERS DRAWINGS.THIS DRAWING IS THE COPYRIGHT OF HEATHERWICKWITHOUT PRIOR WRITTEN CONSENT.THIS DRAWING IS FOR DESI255、GN INTENT PURPOSES ONLY,NOT FOR CONSTRUCTION.DIMENSIONS OBTAINED BY MEASURING OR SCALING FROMALL STRUCTURE,MEP,LIGHTING,PLANTING CIVILS&THIS DRAWING.ALL DIMENSIONS AND LEVELS ARE TO BE CHECKED ON SITEBEFORE PROCEEDING.THIS DRAWING MUST BE READ IN CONJUNCTION WITHRELEVANT CONSULTANT AND SPECIALIST DR256、AWINGS.Sheet NotesKey P|13/01/2022 8:00 AMProject Name 2022Heatherwick Studio13/01/2022XXDrawing No.Project No.StatusDateSizeRevisionCheckedDrawn By356-364 Grays Inn Road,London WC1X 8BH|T:+44(0)20 7833 8800A1DRAFTDESCRIPTIONREVDATEHIGH TO LOW POINT DIRECTIONLOWEST ROOF POINT(SSL)HIGHEST ROOF POINT(257、SSL)429252+32.1+27.8+35.1+32.0+37.7+31.4+14.8+16.8+34.0+31.4+34.0+15.3+30.7+31.2+18.7+25.2+16.4+27.1+23.9+17.7+35.4+26.8+25.4+13.6+8.0+24.4+18.6+20.5+15.4+17.7+30.1+25.0+0.4+32.2+14.6+4.9+27.8+28.8+31.5+23.7+27.5+26.4+19.5+9.2+30.9+12.5+10.3+29.9+31.5+25.9+27.6+17.8+30.9+22.4+34.8+10.1+22.9+22.6+32.258、0+27.1+13.9+18.6+13.7+12.0+15.7+20.6+14.3+9.3+X.X+X.X139Green Areas-Roof levels10ABCDEFGHJKLMNPQRSTUVWXYAAABACADAEAFAGAHAJAKALAMANAPAQARAS12345678911121314151617181920212223242526272829PRE-FUNCTION留机空预电间公寓塔楼公寓塔楼HOTEL AMENITIESBALLROOMBALLROOMBALLROOM公塔楼办酒店及公寓塔楼Xian CCBDL05 PlanPodium AreasDRAINAGE A259、RE INDICATIVE ONLY.THE SIZING OFSTRUCTURAL AND SERVICES ELEMENTS MUST BESTUDIO AND IS NOT TO BE REPRODUCED IN ANY FORMDIMENSIONS OBTAINED BY MEASURING OR SCALING FROMRELEVANT CONSULTANT AND SPECIALIST DRAWINGS.HEATHERWICK STUDIO TAKE NO RESPONSIBILITY FOR ANYTHIS DRAWING MUST BE READ IN CONJUNCTION 260、WITHBEFORE PROCEEDING.THIS DRAWING.1:750CHECKED AGAINST THE RELEVANT ENGINEERS DRAWINGS.0454THIS DRAWING IS FOR DESIGN INTENT PURPOSES ONLY,XXDrawing No.Key PlanNOT FOR CONSTRUCTION.SizeScaleRevisionDrawn B|356-364 Grays Inn Road,London WC1X 8BH|T:+44(0)20 7833 8800ALL DIMENSIONS AND LEVELS ARE TO B261、E CHECKED ON SITEALL STRUCTURE,MEP,LIGHTING,PLANTING CIVILS&Sheet NotesA1SD Stage SubmissionProject NameLSDateTHIS DRAWING IS THE COPYRIGHT OF HEATHERWICKStatusProject No.FKCheckedWITHOUT PRIOR WRITTEN CONSENT.20/01/20220437-HS-XX-XX-DR-XXXX20/01/2022 6:51 PM 2022Heatherwick StudioProject NameSheet 262、NotesDATEREVDESCRIPTIONDRAFTSOUTH PODIUM AREA16,412 SQMNORTH PODIUM AREA 12,087 SQM252429North/South podium areas1401012345678911121314151617181920212223242526272829PRE-FUNCTION留机空预电间公寓塔楼公寓塔楼HOTEL AMENITIESBALLROOMBALLROOMBALLROOM公塔楼办酒店及公寓塔楼Xian CCBDL05 +23.3mHS Proposed MEP A|ALL STRUCTURE,MEP,LIGH263、TING,PLANTING CIVILS&XXDrawing No.Project No.1:750CheckedDate0454ScaleLSDrawn ByRevisionSD Stage SubmissionFK356-364 Grays Inn Road,London WC1X 8BH|T:+44(0)20 7833 8800DRAINAGE ARE INDICATIVE ONLY.THE SIZING OFA1STRUCTURAL AND SERVICES ELEMENTS MUST BE0437-HS-XX-XX-DR-XXXXCHECKED AGAINST THE RELEVAN264、T ENGINEERS DRAWINGS.THIS DRAWING IS THE COPYRIGHT OF HEATHERWICKSTUDIO AND IS NOT TO BE REPRODUCED IN ANY FORMWITHOUT PRIOR WRITTEN CONSENT.THIS DRAWING IS FOR DESIGN INTENT PURPOSES ONLY,NOT FOR CONSTRUCTION.HEATHERWICK STUDIO TAKE NO RESPONSIBILITY FOR ANYDIMENSIONS OBTAINED BY MEASURING OR SCALI265、NG FROMTHIS DRAWING.20/01/2022ALL DIMENSIONS AND LEVELS ARE TO BE CHECKED ON SITEBEFORE PROCEEDING.THIS DRAWING MUST BE READ IN CONJUNCTION WITHStatusRELEVANT CONSULTANT AND SPECIALIST DRAWINGS.Sheet NotesSheet NotesSizeKey Plan20/01/2022 6:55 PMProject Name 2022Heatherwick StudioProject NameDRAFTDE266、SCRIPTIONREVDATEDIESEL GENERATORKey:Oil Fume Exhaust-NET Height 3mPressure Fan RoomCooling TowersSmoke Exhaust RoomFire Water Tank&Pump RoomVRF Outdoor Units2524291012345678911121314151617181920212223242526272829PRE-FUNCTION留机空预电间公寓塔楼公寓塔楼HOTEL AMENITIESBALLROOMBALLROOMBALLROOM公塔楼办酒店及公寓塔楼Xian CCBDL05267、 +26.5mHS Proposed MEP ArrangementStatus 2022Heatherwick StudioRevisionDrawn ByTHIS DRAWING.356-364 Grays Inn Road,London WC1X 8BH|T:+44(0)20 7833 880020/01/2022 6:58 PMSheet NotesRELEVANT CONSULTANT AND SPECIALIST DRAWINGS.BEFORE PROCEEDING.DIMENSIONS OBTAINED BY MEASURING OR SCALING FROMHEATHERWIC268、K STUDIO TAKE NO RESPONSIBILITY FOR ANYSTUDIO AND IS NOT TO BE REPRODUCED IN ANY FORMTHIS DRAWING IS THE COPYRIGHT OF HEATHERWICKCHECKED AGAINST THE RELEVANT ENGINEERS DRAWINGS.WITHOUT PRIOR WRITTEN CONSENT.THIS DRAWING IS FOR DESIGN INTENT PURPOSES ONLY,THIS DRAWING MUST BE READ IN CONJUNCTION WITH269、ALL DIMENSIONS AND LEVELS ARE TO BE CHECKED ON SITEKey PlanProject NameProject NameSD Stage SubmissionLSFKNOT FOR CONSTRUCTION.20/01/20220454STRUCTURAL AND SERVICES ELEMENTS MUST BEDRAINAGE ARE INDICATIVE ONLY.THE SIZING OF1:750Sheet NotesA1ALL STRUCTURE,MEP,LIGHTING,PLANTING CIVILS&|CheckedScaleSiz270、e0437-HS-XX-XX-DR-XXXXDateDrawing No.XXProject No.DATEREVDESCRIPTIONDRAFTKey:DIESEL GENERATOROil Fume Exhaust-NET Height 3mPressure Fan RoomCooling TowersSmoke Exhaust RoomFire Water Tank&Pump RoomVRF Outdoor Units25242910ABCDEFGHJKLMNPQRSTUVWXYAAABACADAEAFAGAHAJAKALAMANAPAQARAS123456789111213141516271、17181920212223242526272829PRE-FUNCTION留机空预电间公寓塔楼公寓塔楼HOTEL AMENITIESBALLROOMBALLROOMBALLROOM公塔楼办酒店及公寓塔楼Xian CCBDL05 +26.5mHS Proposed MEP ArrangementStatus 2022Heatherwick StudioRevisionDrawn ByTHIS DRAWING.356-364 Grays Inn Road,London WC1X 8BH|T:+44(0)20 7833 880013/01/2022 8:10 AMSheet NotesRELEVA272、NT CONSULTANT AND SPECIALIST DRAWINGS.BEFORE PROCEEDING.DIMENSIONS OBTAINED BY MEASURING OR SCALING FROMHEATHERWICK STUDIO TAKE NO RESPONSIBILITY FOR ANYSTUDIO AND IS NOT TO BE REPRODUCED IN ANY FORMTHIS DRAWING IS THE COPYRIGHT OF HEATHERWICKCHECKED AGAINST THE RELEVANT ENGINEERS DRAWINGS.WITHOUT P273、RIOR WRITTEN CONSENT.THIS DRAWING IS FOR DESIGN INTENT PURPOSES ONLY,THIS DRAWING MUST BE READ IN CONJUNCTION WITHALL DIMENSIONS AND LEVELS ARE TO BE CHECKED ON SITEKey PlanProject NameProject NameSD Stage SubmissionLSFKNOT FOR CONSTRUCTION.13/01/20220454STRUCTURAL AND SERVICES ELEMENTS MUST BEDRAIN274、AGE ARE INDICATIVE ONLY.THE SIZING OF1:750Sheet NotesA1ALL STRUCTURE,MEP,LIGHTING,PLANTING CIVILS&|CheckedScaleSize0437-HS-XX-XX-DR-XXXXDateDrawing No.XXProject No.DATEREVDESCRIPTIONDRAFTKey:DIESEL GENERATOROil Fume Exhaust-NET Height 3mPressure Fan RoomCooling TowersSmoke Exhaust RoomFire Water Tan275、k&Pump RoomVRF Outdoor Units10ABCDEFGHJKLMNPQRSTUVWXYAAABACADAEAFAGAHAJAKALAMANAPAQARAS12345678911121314151617181920212223242526272829PRE-FUNCTION留机空预电间公寓塔楼公寓塔楼HOTEL AMENITIESBALLROOMBALLROOMBALLROOM公塔楼办酒店及公寓塔楼Xian CCBDL05 +26.5mHS Proposed MEP ArrangementStatus 2022Heatherwick StudioRevisionDrawn B276、yTHIS DRAWING.356-364 Grays Inn Road,London WC1X 8BH|T:+44(0)20 7833 880013/01/2022 8:10 AMSheet NotesRELEVANT CONSULTANT AND SPECIALIST DRAWINGS.BEFORE PROCEEDING.DIMENSIONS OBTAINED BY MEASURING OR SCALING FROMHEATHERWICK STUDIO TAKE NO RESPONSIBILITY FOR ANYSTUDIO AND IS NOT TO BE REPRODUCED IN A277、NY FORMTHIS DRAWING IS THE COPYRIGHT OF HEATHERWICKCHECKED AGAINST THE RELEVANT ENGINEERS DRAWINGS.WITHOUT PRIOR WRITTEN CONSENT.THIS DRAWING IS FOR DESIGN INTENT PURPOSES ONLY,THIS DRAWING MUST BE READ IN CONJUNCTION WITHALL DIMENSIONS AND LEVELS ARE TO BE CHECKED ON SITEKey PlanProject NameProject278、 NameSD Stage SubmissionLSFKNOT FOR CONSTRUCTION.13/01/20220454STRUCTURAL AND SERVICES ELEMENTS MUST BEDRAINAGE ARE INDICATIVE ONLY.THE SIZING OF1:750Sheet NotesA1ALL STRUCTURE,MEP,LIGHTING,PLANTING CIVILS&|CheckedScaleSize0437-HS-XX-XX-DR-XXXXDateDrawing No.XXProject No.DATEREVDESCRIPTIONDRAFTKey:D279、IESEL GENERATOROil Fume Exhaust-NET Height 3mPressure Fan RoomCooling TowersSmoke Exhaust RoomFire Water Tank&Pump RoomVRF Outdoor Units252429MEP as HS proposed 13/01/2021 under review by WSPLevel 05 MEP and Cores+23.3mLevel 05 MEP and Cores+26.5mAreas to be enclosed14110ABCDEFGHJKLMNPQRSTUVWXYAAABA280、CADAEAFAGAHAJAKALAMANAPAQARAS12345678911121314151617181920212223242526272829PRE-FUNCTION留机空预电间公寓塔楼公寓塔楼HOTEL AMENITIESBALLROOMBALLROOMBALLROOM公塔楼办酒店及公寓塔楼Xian CCBDL5-Roof PlanGeneral Arrangement PlanSTRUCTURAL AND SERVICES ELEMENTS MUST BEWITHOUT PRIOR WRITTEN CONSENT.ALL DIMENSIONS AND LEVELS ARE TO 281、BE CHECKED ON SITETHIS DRAWING IS FOR DESIGN INTENT PURPOSES ONLY,Sheet NotesRELEVANT CONSULTANT AND SPECIALIST DRAWINGS.THIS DRAWING MUST BE READ IN CONJUNCTION WITHDIMENSIONS OBTAINED BY MEASURING OR SCALING FROMTHIS DRAWING IS THE COPYRIGHT OF HEATHERWICK0454Project NameXX1:750BEFORE PROCEEDING.P282、roject No.ALL STRUCTURE,MEP,LIGHTING,PLANTING CIVILS&DRAINAGE ARE INDICATIVE ONLY.THE SIZING OFScaleRevisionC|CHECKED AGAINST THE RELEVANT ENGINEERS DRAWINGS.THIS DRAWING.Sheet NotesA1356-364 Grays Inn Road,London WC1X 8BH|T:+44(0)20 7833 8800SD Stage SubmissionLSSizeHEATHERWICK STUDIO TAKE NO RESPO283、NSIBILITY FOR ANYDateStatusFKDrawn ByDrawing No.STUDIO AND IS NOT TO BE REPRODUCED IN ANY FORM20/01/2022Project Name0437-HS-XX-XX-DR-XXXXKey Plan 2022Heatherwick Studio20/01/2022 7:00 PMNOT FOR CONSTRUCTION.DATEREVDESCRIPTIONDRAFTNORTH PODIUM AREA 1,994 SQMSOUTH PODIUM AREA2,428 SQM429252Final enclo284、sed areas142ABCDEFGHJKLMNPQRSTUVWXYAAABACADAEAFAGAHAJAKALAMANAPAQARAS1234567891011121314151617181920212223242526272829酒店及公寓塔楼公塔楼办HOTEL AMENITIES公寓塔楼公寓塔楼留机空预电间Xian CCBDRoof PlanAreas Above 24mRELEVANT CONSULTANT AND SPECIALIST DRAWINGS.CHECKED AGAINST THE RELEVANT ENGINEERS DRAWINGS.Sheet NotesSheet 285、NotesSD Stage Submission0454THIS DRAWING IS THE COPYRIGHT OF HEATHERWICKFKKey Plan1:750LS0437-HS-XX-XX-DR-XXXX20/01/2022WITHOUT PRIOR WRITTEN CONSENT.THIS DRAWING IS FOR DESIGN INTENT PURPOSES ONLY,Project NameProject NameBEFORE PROCEEDING| 2022Heatherwick StudioHEATHERWICK STUDIO TAKE NO RESPONSIBI286、LITY FOR ANYDrawing No.Project No.ALL STRUCTURE,MEP,LIGHTING,PLANTING CIVILS&DIMENSIONS OBTAINED BY MEASURING OR SCALING FROMStatusDateTHIS DRAWING.XXSizeScaleALL DIMENSIONS AND LEVELS ARE TO BE CHECKED ON SITENOT FOR CONSTRUCTION.RevisionCheckedDrawn BySTUDIO AND IS NOT TO BE REPRODUCED IN ANY FORM287、DRAINAGE ARE INDICATIVE ONLY.THE SIZING OFSTRUCTURAL AND SERVICES ELEMENTS MUST BE356-364 Grays Inn Road,London WC1X 8BH|T:+44(0)20 7833 8800THIS DRAWING MUST BE READ IN CONJUNCTION WITH20/01/2022 7:10 PMA1REVDATEDRAFTDESCRIPTIONSOUTH PODIUM3,606 SQM(22%)NORTH PODIUM2,482 SQM(20%)429252Total areas o288、ver 24mIncl.curved structural slabsFeature Space does not count because it has a skylight as roof.Confirmed by JZFZ.特色空间不算,因为它有一个天窗作为屋顶。由JZFZ证实。143How is GFA counted?GFA是如何计算的?JZFZ roof meeting 17/01/2022Structural Slabs over enclosed spaces count as Double GFA封闭空间上的结构板算作双倍的建筑面积6.1m6.1m6.1mStructura289、l Slabs over balconies do not count as Double GFA阳台上的结构板不计入双倍总建筑面积Structural Slabs that are 25%open do not count GFA25%开放的结构板不计入总建筑面积144Level 26000Level 311600Level 522800Level 417200Level 10Top of Roof40800385904331036350353504920045470600056005600560018000Table Frame-Ceramic CladdingDisplayBoxPane290、lVisionPanelVisionPanelDisplayBoxPanelVisionPanelVisionPanelDisplayBoxPanelTable Frame-Ceramic CladdingTable Frame-Ceramic Cladding1569092003271033650340203437043600Level 26000Level 311600Level 522800Level 417200Level 10Top of Roof4080026430360803782034010600056005600560018000Table Frame-Ceramic Cla291、ddingDisplayBoxPanelVisionPanelTable Frame-Ceramic CladdingDisplayBoxPanelVisionPanelVisionPanel38570433703635032750233501197092004343045430A0Date Drawn356-364 Grays Inn Road,London WC1X 8BH|T:+44(0)20 7833 8800 |StatusSizeSheet NameClient/Project NameDrawn ByCheckedRevisionProject No.Sheet No.Scale292、Key PlanRev Date PLOT DATE:FILE NAME:General NotesSheet NotesTHIS DRAWING IS FOR DESIGN INTENT PURPOSES ONLY,NOT FOR CONSTRUCTION.HEATHERWICK STUDIO TAKE NO RESPONSIBILITY FOR ANY DIMENSIONS OBTAINED BY MEASURING OR SCALING FROM THIS DRAWING.ALL DIMENSIONS AND LEVELS ARE TO BE CHECKED ON SITE BEFORE293、 PROCEEDING.THIS DRAWING MUST BE READ IN CONJUNCTION WITH RELEVANT CONSULTANT AND SPECIALIST DRAWINGS.ALL STRUCTURE,MEP,LIGHTING,PLANTING CIVILS&DRAINAGE ARE INDICATIVE ONLY.THE SIZING OF STRUCTURAL AND SERVICES ELEMENTS MUST BE CHECKED AGAINST THE RELEVANT ENGINEERS DRAWINGS.THIS DRAWING IS THE COP294、YRIGHT OF HEATHERWICK STUDIO AND IS NOT TO BE REPRODUCED IN ANY FORM WITHOUT PRIOR WRITTEN CONSENT.2018 Heatherwick StudioA2031:25009/12/2112/9/2021 6:46:48 PMC:BIM0437-HS-XX-XX-M2-A-000001_SimoneBerardelli.rvtXian CCBDSBENLHS-SB-XX-EL-ASCHEMATIC DESIGN04/22/210437Yanta District,Qujiang New District295、,Xian,ChinaSB/XXGENERAL ARRANGEMENT总体规划ELEVATION 11+12-SOUTH BLOCK-WEST立面11+12南区西00-33-10CR Land1:500Please refer to Supplementary Studies for South Podium Terrace Egress Study Please refer to Supplementary Studies for Banquet Hall Size and Egress Strategy StudyREVDATEDESCRIPTION0005/05/21 30%Schema296、tic Design0130/06/21 70%SD Facade0230/11/21 70%Schematic Design0309/12/21 70%SD-Addendum12Proposed Solution 建议的解决方案UpstandsStructural SlabL04 FFLL05 SSLL05L04L03L02max H6.1mExtensive Green RoofCreate a flat structural slab at L05 and infill above在L05创建一个平坦的结构板,并在上面填塞。Cover the roof buildup at L05 wi297、th Display Box type facade在L05的屋顶上用展示箱式外墙覆盖屋顶堆积物145Identified areas to be resolved 确定了需要解决的领域领域300 m2Northwestcorner10.1m10.9mSoutheastcorner335 m27.1mCentral Lifts75 m280 m2146FFL+26.0mFFL+23.8mMEP Roof Diagram MEP屋顶图14710ABCDEFGHJKLMNPQRSTUVWXYAAABACADAEAFAGAHAJAKALAMANAPAQARAS12345678911121314151298、617181920212223242526272829Xian CCBDL04HS Proposed MEP ArrangementSizeProject NameRevisionSheet NotesWITHOUT PRIOR WRITTEN CONSENT.356-364 Grays Inn Road,London WC1X 8BH|T:+44(0)20 7833 880019/01/2022 9:14 PMBEFORE PROCEEDING.HEATHERWICK STUDIO TAKE NO RESPONSIBILITY FOR ANYNOT FOR CONSTRUCTION.THIS299、 DRAWING IS FOR DESIGN INTENT PURPOSES ONLY,RELEVANT CONSULTANT AND SPECIALIST DRAWINGS.STUDIO AND IS NOT TO BE REPRODUCED IN ANY FORMTHIS DRAWING MUST BE READ IN CONJUNCTION WITHDIMENSIONS OBTAINED BY MEASURING OR SCALING FROMTHIS DRAWING.Key PlanSD Stage SubmissionLSFKTHIS DRAWING IS THE COPYRIGHT300、 OF HEATHERWICK19/01/20220454STRUCTURAL AND SERVICES ELEMENTS MUST BE1:7500437-HS-XX-XX-DR-XXXXA|ALL DIMENSIONS AND LEVELS ARE TO BE CHECKED ON SITEDrawn ByCheckedStatusSheet NotesDRAINAGE ARE INDICATIVE ONLY.THE SIZING OFScaleXXCHECKED AGAINST THE RELEVANT ENGINEERS DRAWINGS.Project Name 2022Heathe301、rwick StudioDateProject No.ALL STRUCTURE,MEP,LIGHTING,PLANTING CIVILS&Drawing No.DESCRIPTIONDRAFTDATEREVOil Fume Exhaust-NET Height 3mVRF Outdoor UnitsKey:Pressure Fan RoomDIESEL GENERATORCooling TowersSmoke Exhaust RoomFire Water Tank&Pump Room252429FFL+17.2m14810ABCDEFGHJKLMNPQRSTUVWXYAAABACADAEAF302、AGAHAJAKALAMANAPAQARAS12345678911121314151617181920212223242526272829PRE-FUNCTION留机空预电间公寓塔楼公寓塔楼HOTEL AMENITIESBALLROOMBALLROOMBALLROOM公塔楼办酒店及公寓塔楼Xian CCBDL05 +23.3mHS Proposed MEP A|ALL STRUCTURE,MEP,LIGHTING,PLANTING CIVILS&XXDrawing No.Project No.1:750CheckedDate0454ScaleLSDrawn ByRevisionSD Stage303、 SubmissionFK356-364 Grays Inn Road,London WC1X 8BH|T:+44(0)20 7833 8800DRAINAGE ARE INDICATIVE ONLY.THE SIZING OFA1STRUCTURAL AND SERVICES ELEMENTS MUST BE0437-HS-XX-XX-DR-XXXXCHECKED AGAINST THE RELEVANT ENGINEERS DRAWINGS.THIS DRAWING IS THE COPYRIGHT OF HEATHERWICKSTUDIO AND IS NOT TO BE REPRODU304、CED IN ANY FORMWITHOUT PRIOR WRITTEN CONSENT.THIS DRAWING IS FOR DESIGN INTENT PURPOSES ONLY,NOT FOR CONSTRUCTION.HEATHERWICK STUDIO TAKE NO RESPONSIBILITY FOR ANYDIMENSIONS OBTAINED BY MEASURING OR SCALING FROMTHIS DRAWING.20/01/2022ALL DIMENSIONS AND LEVELS ARE TO BE CHECKED ON SITEBEFORE PROCEEDI305、NG.THIS DRAWING MUST BE READ IN CONJUNCTION WITHStatusRELEVANT CONSULTANT AND SPECIALIST DRAWINGS.Sheet NotesSheet NotesSizeKey Plan20/01/2022 6:55 PMProject Name 2022Heatherwick StudioProject NameDRAFTDESCRIPTIONREVDATEDIESEL GENERATORKey:Oil Fume Exhaust-NET Height 3mPressure Fan RoomCooling Tower306、sSmoke Exhaust RoomFire Water Tank&Pump RoomVRF Outdoor Units25242914910ABCDEFGHJKLMNPQRSTUVWXYAAABACADAEAFAGAHAJAKALAMANAPAQARAS12345678911121314151617181920212223242526272829PRE-FUNCTION留机空预电间公寓塔楼公寓塔楼HOTEL AMENITIESBALLROOMBALLROOMBALLROOM公塔楼办酒店及公寓塔楼Xian CCBDL05 +26.5mHS Proposed MEP ArrangementSt307、atus 2022Heatherwick StudioRevisionDrawn ByTHIS DRAWING.356-364 Grays Inn Road,London WC1X 8BH|T:+44(0)20 7833 880020/01/2022 6:58 PMSheet NotesRELEVANT CONSULTANT AND SPECIALIST DRAWINGS.BEFORE PROCEEDING.DIMENSIONS OBTAINED BY MEASURING OR SCALING FROMHEATHERWICK STUDIO TAKE NO RESPONSIBILITY FOR 308、ANYSTUDIO AND IS NOT TO BE REPRODUCED IN ANY FORMTHIS DRAWING IS THE COPYRIGHT OF HEATHERWICKCHECKED AGAINST THE RELEVANT ENGINEERS DRAWINGS.WITHOUT PRIOR WRITTEN CONSENT.THIS DRAWING IS FOR DESIGN INTENT PURPOSES ONLY,THIS DRAWING MUST BE READ IN CONJUNCTION WITHALL DIMENSIONS AND LEVELS ARE TO BE 309、CHECKED ON SITEKey PlanProject NameProject NameSD Stage SubmissionLSFKNOT FOR CONSTRUCTION.20/01/20220454STRUCTURAL AND SERVICES ELEMENTS MUST BEDRAINAGE ARE INDICATIVE ONLY.THE SIZING OF1:750Sheet NotesA1ALL STRUCTURE,MEP,LIGHTING,PLANTING CIVILS&|CheckedScaleSize0437-HS-XX-XX-DR-XXXXDateDrawing No310、.XXProject No.DATEREVDESCRIPTIONDRAFTKey:DIESEL GENERATOROil Fume Exhaust-NET Height 3mPressure Fan RoomCooling TowersSmoke Exhaust RoomFire Water Tank&Pump RoomVRF Outdoor Units252429150ABCDEFGHJKLMNPQRSTUVWXYAAABACADAEAFAGAHAJAKALAMANAPAQARAS1234567891011121314151617181920212223242526272829酒店及公寓塔楼311、公塔楼办HOTEL AMENITIES公寓塔楼公寓塔楼留机空预电间24-60025-70226-12927-49428-82133-60629-138130-37131-56032-245Xian CCBDRoof PlanGreen Areas20/01/2022 6:26 PMKey PlanXXDrawing No.Project No.DateBEFORE PROCEEDING.THIS DRAWING.CheckedDIMENSIONS OBTAINED BY MEASURING OR SCALING FROMHEATHERWICK STUDIO TAKE NO RESPONSIBI312、LITY FOR ANYNOT FOR CONSTRUCTION.WITHOUT PRIOR WRITTEN CONSENT.STUDIO AND IS NOT TO BE REPRODUCED IN ANY FORMTHIS DRAWING IS THE COPYRIGHT OF HEATHERWICK0437-HS-XX-XX-DR-XXXXSTRUCTURAL AND SERVICES ELEMENTS MUST BESD Stage Submission20/01/20220454ALL DIMENSIONS AND LEVELS ARE TO BE CHECKED ON SITE1:313、750 2022Heatherwick StudioSheet NotesDRAINAGE ARE INDICATIVE ONLY.THE SIZING OFA1356-364 Grays Inn Road,London WC1X 8BH|T:+44(0)20 7833 8800FK|Drawn ByRELEVANT CONSULTANT AND SPECIALIST DRAWINGS.THIS DRAWING IS FOR DESIGN INTENT PURPOSES ONLY,RevisionScaleSizeTHIS DRAWING MUST BE READ IN CONJUNCTION314、 WITHLSProject NameCHECKED AGAINST THE RELEVANT ENGINEERS DRAWINGS.Project NameSheet NotesStatusALL STRUCTURE,MEP,LIGHTING,PLANTING CIVILS&DATEREVDESCRIPTIONDRAFTIntensive Green RoofKey:SkylightMEP TrellisExtensive Green Roof429252151152ABCDEFGHJKLMNPQRSTUVWXYAAABACADAEAFAGAHAJAKALAMANAPAQARAS123456315、7891011121314151617181920212223242526272829酒店及公寓塔楼公塔楼办HOTEL AMENITIES公寓塔楼公寓塔楼留机空预电间Xian CCBDRoof PlanRoof LevelsSheet NotesHEATHERWICK STUDIO TAKE NO RESPONSIBILITY FOR ANYSTUDIO AND IS NOT TO BE REPRODUCED IN ANY FORM1:7500454SD Stage SubmissionFKLSScale0437-HS-XX-XX-DR-XXXXProject NameDRAINAGE ARE316、 INDICATIVE ONLY.THE SIZING OFSTRUCTURAL AND SERVICES ELEMENTS MUST BECHECKED AGAINST THE RELEVANT ENGINEERS DRAWINGS.THIS DRAWING IS THE COPYRIGHT OF HEATHERWICKWITHOUT PRIOR WRITTEN CONSENT.THIS DRAWING IS FOR DESIGN INTENT PURPOSES ONLY,NOT FOR CONSTRUCTION.DIMENSIONS OBTAINED BY MEASURING OR SCA317、LING FROMALL STRUCTURE,MEP,LIGHTING,PLANTING CIVILS&THIS DRAWING.ALL DIMENSIONS AND LEVELS ARE TO BE CHECKED ON SITEBEFORE PROCEEDING.THIS DRAWING MUST BE READ IN CONJUNCTION WITHRELEVANT CONSULTANT AND SPECIALIST DRAWINGS.Sheet NotesKey P|19/01/2022 9:06 PMProject Name 2022Heatherwick Studio19/01/2318、022XXDrawing No.Project No.StatusDateSizeRevisionCheckedDrawn By356-364 Grays Inn Road,London WC1X 8BH|T:+44(0)20 7833 8800A1DRAFTDESCRIPTIONREVDATEHIGH TO LOW POINT DIRECTIONLOWEST ROOF POINT(SSL)Key:HIGHEST ROOF POINT(SSL)429252+32.1+27.8+35.1+32.0+37.7+31.4+14.8+16.8+34.0+31.4+34.0+15.3+30.7+31.2319、+18.7+25.2+16.4+27.1+23.9+17.7+35.4+26.8+25.4+13.6+8.0+24.4+18.6+20.5+15.4+17.7+30.1+25.0+0.4+32.2+14.6+4.9+27.8+28.8+31.5+23.7+27.5+26.4+19.5+9.2+30.9+12.5+10.3+29.9+31.5+25.9+27.6+17.8+30.9+22.4+34.8+10.1+22.9+22.6+32.0+27.1+13.9+18.6+13.7+12.0+15.7+20.6+14.3+9.3+X.X+X.X+22.8+22.81531547.Skylight 320、Development天窗发展155156Key Inspiration主要意向FeatherLayering 层次感Lightness 轻盈Nature 自然Curvature 线条Movement 动感Authenticity 在地文化Softness 柔和Elegance 优雅Luxurious 奢华RoofFabric羽毛屋顶布料157158Short Section短边剖面示意图159Long SectionGreat viewAmazing Interior experienceFree movement:)Large headroom space充足的头上空间优美的室内空间宽阔的321、视野自由的屋顶流线长边剖面示意图160主通廊天窗Concourse Skylight161主通廊天窗Concourse Skylight162North Atrium Skylight北中庭天窗163北中庭天窗North Atrium Skylight164South Atrium Skylight南中庭天窗165Material OptionsWhite PlasterBronzeTimberMatch with interior slab edge与室内装饰面保持一致Match with shopfront frame与店面设计保持一致Skylight as an individual o322、bject天窗拥有自我调性白石膏古铜木料材质选项166Key Dimension3800mm3800mm11400mm12000mm8000mm8000mm6600mm主要尺寸Translucent light panels with various luminosity拥有不同亮度的半透明背光面板Paint white steel structure that continues down to form part of the shopfront白色钢结构延伸成为店面的一部分2m*2m glass panels2m*2m 玻璃面板167Design Development since interior CD50 animation室内概念50影片之后的设计改良Proposed designCD50 animation最新方案概念50影片方案Altered profile geometry更改剖面线条细节Optimised structure interval优化结构间隔Improved shopfront pelmet design 改善店面门楣设计168屋顶景观Roof View169屋顶景观Roof View170