深圳卓越前海壹号一号办公塔楼公区室内精装修设计方案(63页).pdf
下载文档
上传人:十二
编号:869233
2024-01-02
63页
7.65MB
1、|1T01塔楼室内精装修设计阶段成果报告T1 Lobby Interior Design Schematic Design Report卓越集团|前海0075地块项目室内设计Excellence Group|Qianhai Plot 0075 Interior Design|2一层大堂L1 Lobby卓越集团|前海0075地块项目室内设计Excellence Group|Qianhai Plot 0075 Interior Design18.07.2016|3卓越集团|前海0075地块项目室内设计Excellence Group|Qianhai Plot 0075 Interior Desig2、n18.07.2016|4一层大堂概念参考图L1 Lobby Mood Images卓越集团|前海0075地块项目室内设计Excellence Group|Qianhai Plot 0075 Interior Design18.07.2016|5一层大堂设计概念L1 Lobby Concept Images卓越集团|前海0075地块项目室内设计Excellence Group|Qianhai Plot 0075 Interior Design18.07.2016|6卓越集团|前海0075地块项目室内设计Excellence Group|Qianhai Plot 0075 Interior De3、sign18.07.2016|721.神秘灰色意大利花岗岩Mystic Grey Italian Granite2.银色喷砂面不锈钢Silver B-Shot Finish Stainless Steel3.黑色发纹面不锈钢Black Hairline finish Stainless Steel4.鎳銀喷砂面不锈钢Nickel Silver G-Shot Finish Stainless Steel5.土耳其银灰色大理石Turkish Silver Grey Marble6.Calacatta白色大理石Calacatta White Marble7.黑色镜面不锈钢Black Mirror F4、inish Stainless Steel8.鎳色镜面不锈钢Nickel Mirror Finish Stainless Steel13.彷古大理石Antique Marble35132784注意 Note:材料2-为符合防火要求,Farrells 将提供替代金属或其他包板,并於初步设计阶段调整板块尺寸及扣件做法For Material 2 Farrells to propose alternate metal/architectural claddings that fulfil fire requirements and drawfixing details and panel sizes5、 accordingly in PD stage一层大堂材料板Material Palette L1 Lobby16卓越集团|前海0075地块项目室内设计Excellence Group|Qianhai Plot 0075 Interior Design18.07.2016|8CAEBD土耳其银灰色大理石Turkish Silver Grey鎳銀不锈钢装饰条Nickel Silver SS Strips13彷古大理石Antique Marble135一层大堂地面布局L1 Lobby Tiling Layout明白甲方的忧虑,觉得后期维护困难,并容易变色。所以最终方案为用带浅灰大理石代替原方案的6、白色大理石。用渐变的方式,让浅灰色大理石转蜕变成银灰色大理石。石块用800*800作基础,蜕变成小块长条尺寸,加强感受性应并营造方向感。We understand clients s concern for themaintenance and discoloring,so for this final optionwe introduce a light grey marble in replacement ofthe white marble in the original option.The transformation and pattern layout remains thesa7、me as Option 1 in order to maintain a similar levelof contrast and spatial feeling.Initially the bigger square panels will be in the sizeof 800*800,slowly scattered into thinner tile size atthe same time enhancing the repetitiveness of thegrey tile which create a sense of direction andreceptiveness.8、5卓越集团|前海0075地块项目室内设计Excellence Group|Qianhai Plot 0075 Interior Design18.07.2016|9一层大堂家具概念参考图L1 Lobby Furniture mood images卓越集团|前海0075地块项目室内设计Excellence Group|Qianhai Plot 0075 Interior Design18.07.2016|10一层大堂灯光效果概念参考图L1 Lobby Lighting mood images卓越集团|前海0075地块项目室内设计Excellence Group|Qianhai Plot 00759、 Interior Design18.07.2016|11一层大堂电梯厅 旧方案L1 Lift Lobby End Wall Previous Concept旧方案中的背景墙因体积过大并且太靠近等待电梯的乘客显得过于夸张吓人。在附录中我们提出一个更为高雅和吸引的设计,同时也更适合又高又窄的电梯厅区域。This is the previous option where the backwall of the lobby is thought to be toointimidating due to the large panel size inclose proximity to waiting10、 lift users.In the appendix we propose an option thatis elegant and dramatic,and a lot moresuitable to the tall narrow lift lobby area.*楼层显示器+到站灯*Floor Indicator+Arrival Light一层大堂电梯厅L1 Lift lobby14尼禄珍珠亚光表面大理石Nero Pearl Honed Finish Marble5土耳其银灰色大理石Turkish Silver Grey3黑色发纹面不锈钢Black Hairline finish SS11、4鎳銀喷砂面不锈钢Nickel Silver B-Shot Finish SS2银色喷砂面不锈钢Silver B-Shot Finish SS卓越集团|前海0075地块项目室内设计Excellence Group|Qianhai Plot 0075 Interior Design18.07.2016|124144含蚀刻线性花样with etchedlinear pattern地下室电梯和低/中区电梯厅Basement lift and Low/Mid-zone lobbies立面FElevation F立面BElevation B尼禄珍珠亚光表面大理石Nero Pearl Honed Fini12、sh Marble4鎳銀喷砂面不锈钢Nickel Silver G-Shot Finish SS145土耳其银灰色大理石Turkish Silver Grey45电梯厅背景墙Lift Lobby End Wall*楼层显示器+到站灯*Floor Indicator+Arrival Light电梯厅Lift Lobby Key plan图示的电梯厅背景墙是自上次递交方案册后的最新设计。但在附录中我们提出一个改进的背景墙设计。请参考。Shown here is the latest design fromlast submission,this has beenfurther developed.13、For the back wallin Ground Floor Lift Lobby we haveproposed improved options,seeappendix.BF6or参考附录See Appendix卓越集团|前海0075地块项目室内设计Excellence Group|Qianhai Plot 0075 Interior Design18.07.2016|1314543on幕墙金属外包板/竖框Metal cladding to matchfacade地下室电梯和低/中区电梯厅Basement lift and Low/Mid-zone lobbies电梯厅立面 A-背景墙14、Elevation A End wall at Lift Lobby222参考附录See Appendix金属包板材质参照卓越集团|前海0075地块项目室内设计Excellence Group|Qianhai Plot 0075 Interior Design18.07.2016|14143on215接待处立面Reception elevation电梯厅立面 C-背景墙Elevation C End wall at Lift Lobby金属包板材质参照幕墙金属外包板/竖框Metal cladding to matchfacade2225卓越集团|前海0075地块项目室内设计Excellence15、 Group|Qianhai Plot 0075 Interior Design18.07.2016|15效果图加上光感及改善了材质整体效果去标达梭心筒及天花设计,更丰戏剧性。Materials and shadows have been manipulatedto convey drama and monumentalize of thearchitectural core and feature ceiling.一层穿梭电梯厅及扶梯(达二层商业)T1 shuttle lifts and escalator to L2 retail mall卓越集团|前海0075地块项目室内设计Excell16、ence Group|Qianhai Plot 0075 Interior Design18.07.2016|16电梯轿厢内饰Lift Car Interiors卓越集团|前海0075地块项目室内设计Excellence Group|Qianhai Plot 0075 Interior Design18.07.2016|17BCA立面 BElevation B含蚀刻线性花样with etched linear pattern立面 CElevation C8457立面 AElevation A785天花图RCP平面图Plan灯箱Light box地下室和低/中区电梯轿厢内饰Basement an17、d Low/Mid-zone Lift Car Interiors*轿厢侧壁中间是规定导轨的地方,检修门确定开在侧后壁*Access Door confirm location at the back卓越集团|前海0075地块项目室内设计Excellence Group|Qianhai Plot 0075 Interior Design18.07.2016|18标准层电梯大堂Typical Lift Lobbies卓越集团|前海0075地块项目室内设计Excellence Group|Qianhai Plot 0075 Interior Design18.07.2016|19标准层电梯厅概念参18、考图Typical Lift Lobby Mood Images卓越集团|前海0075地块项目室内设计Excellence Group|Qianhai Plot 0075 Interior Design18.07.2016|20标准层电梯厅设计概念Typical Lift Lobby Concept Images卓越集团|前海0075地块项目室内设计Excellence Group|Qianhai Plot 0075 Interior Design18.07.2016|2133242.银色喷砂面不锈钢Silver B-Shot Finish Stainless Steel3.黑色发纹面不锈钢B19、lack Hairline finish Stainless Steel4.鎳銀喷砂面不锈钢Nickel Silver G-Shot Finish Stainless Steel5.土耳其银灰色大理石Turkish Silver Grey Marble6.Calacatta白色大理石Calacatta White Marble7.黑色镜面不锈钢Black Mirror Finish Stainless Steel9.奥特曼石材Altman10.黑色木皮Black Wood veneer11.安哥拉棕石材Angola Brown Black Granite12.安哥拉棕石材Elm Wood Ve20、neer1151012标准层电梯大材料板Material Palette Typical Lift Lobbies96卓越集团|前海0075地块项目室内设计Excellence Group|Qianhai Plot 0075 Interior Design18.07.2016|22标准层地面布局Typical Floor Tiling PlanBA土耳其银灰色大理石Turkish Silver Grey鎳銀不锈钢装饰条Nickel Silver SS Strips奥特曼 Altman卓越集团|前海0075地块项目室内设计Excellence Group|Qianhai Plot 0075 In21、terior Design18.07.2016|23走廊Corridor14454含蚀刻线性花样with etchedlinear pattern电梯到站灯Lift indicatorstrip light立面 AElevation A3黑色发纹面不锈钢Black Hairline finish SS4鎳銀喷砂面不锈钢Nickel Silver G-Shot Finish SS14尼禄珍珠亚光表面大理石Nero Pearl Honed Finish Marble12卓越集团|前海0075地块项目室内设计Excellence Group|Qianhai Plot 0075 Interior De22、sign18.07.2016|24後勤走廊BOH doors211亚光面Honed11公共设施门11抛光面Polished安哥拉棕石材(抛光面)Angola Brown Black Granite(polished finish)12榆木木皮Elm Wood Veneer3黑色发纹面不锈钢Black Hairline finish SS2银色喷砂面不锈钢Silver B-Shot Finish SS3立面 BElevation B10Public amenities doors方案一Option 1方案二Option 2卓越集团|前海0075地块项目室内设计Excellence Group|Q23、ianhai Plot 0075 Interior Design18.07.2016|25标准层电梯厅Typical Lift Lobbies奥特曼石材Altman Marble11安哥拉棕石材(抛光面)Angola Brown Black Granite(polished finish)14尼禄珍珠亚光表面大理石Nero Pearl Honed Finish Marble3黑色发纹面不锈钢Black Hairline Finish SS4鎳銀喷砂面不锈钢Nickel Silver G-Shot Finish SS9跟首层电梯厅一样,之前方案的方案颜色上对比较大,黑+金的配搭感党有点像国际饭店24、。所以(此)最终方案合并为之前方案;还是有一定的对比性,但选材及配色方案较企业,较专业及低调,对日後用户的企业品牌发展比较适合。Similar to L1 lift lobby,we feel the color scheme for previous option is too strong,and it feels like a hotel setting.For thisOption,we have incorporate the two previous options,and we feel this color scheme is more suitable for corpora25、te brandingwhich is more professional and subtle and still maintain a suitable level of contrast.标准层电梯厅Typical lift lobby*到站灯*Arrival Light only见28页See page 28卓越集团|前海0075地块项目室内设计Excellence Group|Qianhai Plot 0075 Interior Design18.07.2016|26标准层电梯厅Typical Lift Lobbies奥特曼石材Altman Marble11安哥拉棕石材(抛光面)An26、gola Brown Black Granite(polished finish)14尼禄珍珠亚光表面大理石Nero Pearl Honed Finish Marble3黑色发纹面不锈钢Black Hairline Finish SS4鎳銀喷砂面不锈钢Nickel Silver G-Shot Finish SS9跟首层电梯厅一样,之前方案的方案颜色上对比较大,黑+金的配搭感党有点像国际饭店。所以(此)最终方案合并为之前方案;还是有一定的对比性,但选材及配色方案较企业,较专业及低调,对日後用户的企业品牌发展比较适合。Similar to L1 lift lobby,we feel the col27、or scheme for previous option is too strong,and it feels like a hotel setting.For thisOption,we have incorporate the two previous options,and we feel this color scheme is more suitable for corporate brandingwhich is more professional and subtle and still maintain a suitable level of contrast.标准层电梯厅T28、ypical lift lobby*到站灯*Arrival Light only见28页See page 28卓越集团|前海0075地块项目室内设计Excellence Group|Qianhai Plot 0075 Interior Design18.07.2016|27标准层电梯厅Typical Lift Lobbies奥特曼石材Altman Marble11安哥拉棕石材(抛光面)Angola Brown Black Granite(polished finish)14尼禄珍珠亚光表面大理石Nero Pearl Honed Finish Marble3黑色发纹面不锈钢Black Hairl29、ine Finish SS4鎳銀喷砂面不锈钢Nickel Silver G-Shot Finish SS9跟首层电梯厅一样,之前方案的方案颜色上对比较大,黑+金的配搭感党有点像国际饭店。所以(此)最终方案合并为之前方案;还是有一定的对比性,但选材及配色方案较企业,较专业及低调,对日後用户的企业品牌发展比较适合。Similar to L1 lift lobby,we feel the color scheme for previous option is too strong,and it feels like a hotel setting.For thisOption,we have inc30、orporate the two previous options,and we feel this color scheme is more suitable for corporate brandingwhich is more professional and subtle and still maintain a suitable level of contrast.标准层电梯厅Typical lift lobby*到站灯*Arrival Light only见28页See page 28卓越集团|前海0075地块项目室内设计Excellence Group|Qianhai Plot 31、0075 Interior Design18.07.2016|28标准层走廊专利吊顶系统Proprietary Ceiling System for typical floor corridors尤骨夹金属板吊顶系统Clip in Metal Panel Ceiling system单边灯凹槽Linear light trough at one/two side暂时正在深化两边灯槽的方案。Currently studying both side light trough option.有关消防安全所需设备(喷淋水装置,应急照明/音响系统,安全及紧急出口标志,检收口,CCTV和类似系统的要求。)32、跟据华阳机电图纸作基础Farrells建议用通过SAS国际/Linder/阿姆斯壮公司使用专有的金属吊顶系统。Subject to co-ordination of fire safety(sprinklers,emergency lighting/sound system,security,emergency exit signage,access panels,CCTV andsimilar systems with LDI.Farrells proposes to use proprietary metal ceiling system by SAS International/Lind33、ner/Armstrong.卓越集团|前海0075地块项目室内设计Excellence Group|Qianhai Plot 0075 Interior Design18.07.2016|29卫生间Washroom卓越集团|前海0075地块项目室内设计Excellence Group|Qianhai Plot 0075 Interior Design18.07.2016|30卫生间概念参考图Washroom Mood Images卓越集团|前海0075地块项目室内设计Excellence Group|Qianhai Plot 0075 Interior Design18.07.2016|31卫34、生间设计概念Washroom Concept Images卓越集团|前海0075地块项目室内设计Excellence Group|Qianhai Plot 0075 Interior Design18.07.2016|329334卫生间材料板Washroom Material Palette67113.黑色发纹面不锈钢Black Hairline finish Stainless Steel4.鎳銀喷砂面不锈钢Nickel Silver G-Shot Finish Stainless Steel5.土耳其银灰色大理石Turkish Silver Grey Marble6.Calacatta白色35、大理石Calacatta White Marble7.黑色磨光层压材料Black Satin Finish Laminate8.鎳色镜面不锈钢Nickel Mirror Finish Stainless Steel9.奥特曼石材Altman Marble10.深灰色木皮(方案一)Dark Wood veneer(for Option 1)11.安哥拉棕石材Angola Brown Black Granite12.榆木木皮(方案二)Elm Wood Veneer(for Option 2)51012卓越集团|前海0075地块项目室内设计Excellence Group|Qianhai Plot 36、0075 Interior Design18.07.2016|33奥特曼石材Altman Marble5土耳其银灰色大理石Turkish Silver Grey鎳銀不锈钢装饰条Nickel Silver SS Strips959卫生间地面布局男生及VIPWashroom Tiling Plan Mens and VIP卫坐间空间有限,所以地面不再采用灰色+米龟组含的布局。现可选方案为单色石材平面图 低区5-6,8-12楼层Plan 1:50 Low Zone Level 5-6,8-12卓越集团|前海0075地块项目室内设计Excellence Group|Qianhai Plot 0075 37、Interior Design18.07.2016|34标准卫生间隔间男生及VIPTypical Washroom Layout Mens and VIP图例Key台下盆Under mount Sink卫生纸架Toilet roll holder台上盆Over counter basin擦手纸巾架Paper towel dispenser隐藏式水箱落地式坐便器Floor standing WC壁挂式小便器Wall mounted urinal平面图 低区5-6,8-12楼层Plan 1:50 Low Zone Level 5-6,8-12熱水器Water Heater卓越集团|前海0075地块38、项目室内设计Excellence Group|Qianhai Plot 0075 Interior Design18.07.2016|35男生卫生间-最终方案Male WashroomFinal Option卓越集团|前海0075地块项目室内设计Excellence Group|Qianhai Plot 0075 Interior Design18.07.2016|36男生卫生间Male Washroom5亚光面漆Honed finish5765FFL 0FCL+2750311黑色发纹面不锈钢Black Hairline finish SS6Calacatta白色大理石Calacatta Wh39、ite Marble5土耳其银灰色大理石Turkish Silver Grey11安哥拉棕石材Angola Brown Black Granite3卓越集团|前海0075地块项目室内设计Excellence Group|Qianhai Plot 0075 Interior Design18.07.2016|37565亚光面漆Honed finish105男生卫生间Male Washroom31135FCL+2750土耳其银灰色大理石Turkish Silver Grey11安哥拉棕石材Angola Brown Black Granite3黑色发纹面不锈钢Black Hairline finis40、h SS6Calacatta白色大理石Calacatta White MarbleFFL 0带锁门把手-用户会有钥匙Tube lever handle with lock-each male and female toilet will beaccessible with respective male&female keys for tenants only12方案一Option 1方案二Option 210木皮Dark Wood veneer12 详见37页For 12 please refer to page37卓越集团|前海0075地块项目室内设计Excellence Group|Qi41、anhai Plot 0075 Interior Design18.07.2016|38标准男生及女生卫生间设备及配件Main Sanitary fixtures and fittings Male and Female WC*从批准的产品名单B*from approved product list B乐家 sprint 断流龙头Roca Sprint built in shut offcock乐家Euret小便器Roca Euret Urinal乐家L20 台上感应脸盆龙头Roca L20 counter-mountedautomatic faucet乐家Diverta台下盆Roca Div42、erta under-counterbasin乐家冲洗控制面板Roca Brushed SS dual flushplate乐家落地式坐便器(隐藏式水箱)Roca floor standing WC保固刷饰面不锈钢卷纸架Bonco Brushed SS Jumbo Rollholder美标不锈钢地漏 CF9202American Standard Floor drain卓越集团|前海0075地块项目室内设计Excellence Group|Qianhai Plot 0075 Interior Design18.07.2016|39乐家Diverta台上盆Roca Diverta over-co43、unterbasin镀铬淋浴花洒及,手持花洒Chrome rain shower with handset标准VIP卫生间设备及配件Main Sanitary fixtures and fittings VIP WC*从批准的产品名单*from approved product schedule乐家冲洗控制面板Roca Brushed SS dual flushplate乐家落地式坐便器(隐藏式水箱)Roca floor standing WC乐家L20 台上感应脸盆龙头Roca L20 counter-mountedautomatic faucet保固刷饰面不锈钢卷纸架Bonco Brush44、ed SS Jumbo Rollholder美标不锈钢地漏 CF9202American Standard Floor drain卓越集团|前海0075地块项目室内设计Excellence Group|Qianhai Plot 0075 Interior Design18.07.2016|40附录Appendix前台,吊灯及L1大堂背景墙Reception Desk,Pendant light and L1 Lobby back wall卓越集团|前海0075地块项目室内设计Excellence Group|Qianhai Plot 0075 Interior Design18.07.201645、|41前台 概念参考图Reception Desk Concept and Mood images卓越集团|前海0075地块项目室内设计Excellence Group|Qianhai Plot 0075 Interior Design18.07.2016|42前台 细节研究Reception Desk detail studies立面Elevation截面Section卓越集团|前海0075地块项目室内设计Excellence Group|Qianhai Plot 0075 Interior Design18.07.2016|43前台 方案AReception Desk Option A卓越46、集团|前海0075地块项目室内设计Excellence Group|Qianhai Plot 0075 Interior Design18.07.2016|44前台 方案BReception Desk Option B卓越集团|前海0075地块项目室内设计Excellence Group|Qianhai Plot 0075 Interior Design18.07.2016|45前台 方案CReception Desk Option C卓越集团|前海0075地块项目室内设计Excellence Group|Qianhai Plot 0075 Interior Design18.07.2016|47、46吊灯-概念参考图Pendant Light Concept&Mood Images卓越集团|前海0075地块项目室内设计Excellence Group|Qianhai Plot 0075 Interior Design18.07.2016|47吊灯 方案APendant Lights Option A卓越集团|前海0075地块项目室内设计Excellence Group|Qianhai Plot 0075 Interior Design18.07.2016|48吊灯 方案BPendant Lights Option B卓越集团|前海0075地块项目室内设计Excellence Group48、|Qianhai Plot 0075 Interior Design18.07.2016|49吊灯 方案CPendant Lights Option C卓越集团|前海0075地块项目室内设计Excellence Group|Qianhai Plot 0075 Interior Design18.07.2016|50吊灯 方案DPendant Lights Option D卓越集团|前海0075地块项目室内设计Excellence Group|Qianhai Plot 0075 Interior Design18.07.2016|51吊灯 方案EPendant Lights Option E卓越49、集团|前海0075地块项目室内设计Excellence Group|Qianhai Plot 0075 Interior Design18.07.2016|52吊灯 方案FPendant Lights Option F卓越集团|前海0075地块项目室内设计Excellence Group|Qianhai Plot 0075 Interior Design18.07.2016|53吊灯 方案GPendant Lights Option G卓越集团|前海0075地块项目室内设计Excellence Group|Qianhai Plot 0075 Interior Design18.07.2016|50、54吊灯 方案HPendant Lights Option H卓越集团|前海0075地块项目室内设计Excellence Group|Qianhai Plot 0075 Interior Design18.07.2016|5512黑色发纹面不锈钢Black Hairline finish Stainless Steel鎳銀喷砂面不锈钢Nickel Silver G-Shot Finish Stainless Steel1GreenPerform Highbay LED灯25800 AFFL截面Section12类型灯光功率照明角度光通量色温显色指数寿命室温要求吊灯细节图及照明设备Pendant51、 Light details and light fittings参数大小可更换式LED30度(窄光束)或45度(中等光束)50,000小时(25C)卓越集团|前海0075地块项目室内设计Excellence Group|Qianhai Plot 0075 Interior Design18.07.2016|56电梯厅背景墙Lift Lobby End Wall卓越集团|前海0075地块项目室内设计Excellence Group|Qianhai Plot 0075 Interior Design18.07.2016|57一层大堂电梯厅 旧方案L1 Lift Lobby End Wall Pr52、evious Concept旧方案中的背景墙因体积过大并且太靠近等待电梯的乘客显得过于夸张吓人。我们在下一页中提出一个更为高雅和吸引的设计,同时也更适合又高又窄的电梯厅区域。This is the previous option where the backwall of the lobby is thought to be toointimidating due to the large panel size inclose proximity to waiting lift users.On the following page we propose anoption that is el53、egant and dramatic,and alot more suitable to the tall narrow liftlobby area.*楼层显示器+到站灯*Floor Indicator+Arrival Light一层大堂电梯厅L1 Lift lobby14尼禄珍珠亚光表面大理石Nero Pearl Honed Finish Marble5土耳其银灰色大理石Turkish Silver Grey3黑色发纹面不锈钢Black Hairline finish SS4鎳銀喷砂面不锈钢Nickel Silver B-Shot Finish SS2银色喷砂面不锈钢Silver B-Sh54、ot Finish SS卓越集团|前海0075地块项目室内设计Excellence Group|Qianhai Plot 0075 Interior Design18.07.2016|58银色喷砂面不锈钢Silver B-Shot Finish SS14尼禄珍珠亚光表面大理石Nero Pearl Honed Finish Marble5土耳其银灰色大理石Turkish Silver Grey一层大堂电梯厅 新方案L1 Lift Lobby End Wall New Proposal新方案中我们整合之前两个设计方案。现在的选*楼层显示器+到站灯*Floor Indicator+Arrival L55、ight一层大堂电梯厅L1 Lift lobby材和配色方案在保留一定的对比度的同时,更加适合打造专业高档的企业品牌。For this Option,we have incorporated thetwo previous options,and we feel thiscolor scheme is more suitable for corporatebranding which is more professional andsubtle while still maintaining a suitablelevel of contrast.凿刻石材Chiseled Stone3黑色发纹56、面不锈钢Black Hairline finish SS4鎳銀喷砂面不锈钢Nickel Silver B-Shot Finish SS2卓越集团|前海0075地块项目室内设计Excellence Group|Qianhai Plot 0075 Interior Design18.07.2016|594144含蚀刻线性花样with etchedlinear pattern地下室电梯和低/中区电梯厅Basement lift and Low/Mid-zone lobbiesBF立面FElevation F立面BElevation B尼禄珍珠亚光表面大理石Nero Pearl Honed Finis57、h Marble4鎳銀喷砂面不锈钢Nickel Silver B-Shot Finish SS145土耳其银灰色大理石Turkish Silver Grey15电梯厅背景墙Lift Lobby End Wall*楼层显示器+到站灯*Floor Indicator+Arrival Light电梯厅Lift Lobby Key plan白/灰色纵向纹石材+香槟色镍装钸条White/Grey stonewith silver nickel trim15凿刻石材Chiseled Stone卓越集团|前海0075地块项目室内设计Excellence Group|Qianhai Plot 0075 Int58、erior Design18.07.2016|60立面FElevation F立面F-石墙固定夹示意图Elevation F This elevation shows the fixing cliplocation behind the stone panels.电梯厅背景墙方案1Lift Lobby End Wall Option 1石墙面板模组Panel Module.石墙固定夹截面图Detail Section of Stone fixing to the wall卓越集团|前海0075地块项目室内设计Excellence Group|Qianhai Plot 0075 Interior59、 Design18.07.2016|61立面FElevation F立面F-石墙固定夹示意图Elevation F This elevation shows the fixing cliplocation behind the stone panels.电梯厅背景墙方案2Lift Lobby End Wall Option 2石墙面板模组Panel Module.石墙固定夹截面图Detail Section of Stone fixing to the wall卓越集团|前海0075地块项目室内设计Excellence Group|Qianhai Plot 0075 Interior Desi60、gn18.07.2016|62立面FElevation F立面F-石墙固定夹示意图Elevation F This elevation shows the fixing cliplocation behind the stone panels.石墙固定夹截面图Detail Section of Stone fixing to the wall电梯厅背景墙方案3Lift Lobby End Wall Option 3石墙面板模组Panel Module.卓越集团|前海0075地块项目室内设计Excellence Group|Qianhai Plot 0075 Interior Design18.07.2016|63立面FElevation F立面F 石墙固定夹示意图Elevation F This elevation shows the fixing cliplocation behind the stone panels.电梯厅背景墙方案4Lift Lobby End Wall Option 4石墙面板模组Panel Module.石墙固定夹截面图Detail Section of Stone fixing to the wall
CAD图纸
上传时间:2024-12-11
50份