华师大文科楼施工工程量预算表.xls
下载文档
上传人:正***
编号:856357
2023-12-22
176页
1.26MB
1、独独立立基基础础工工程程量量计计算算表表垫层厚:0.1垫层出边:0.1室内外地坪高差:0.1基础底标高:放坡系数:0.5工作面:0.3序号基础编号基础类型独立基础(m)构件数量(件)基底标高(m)挖土深度(m)基础砼(m3)承台模板(m2)垫层砼(m3)垫层模板(m2)挖土工程量(m3)土方回填(m3)余土外运(m3)Aa1a2a3a4Bb1b2b3b4Hh1h2h3h4清单量边坡工作面定额量清单量定额量1Azj113.100.300.953.100.300.950.800.400.4014.004.006.348.961.091.3243.56101.01144.5736.13137.1472、.43Azj113.100.300.953.100.300.950.800.400.4012.302.306.348.961.091.3225.0534.6259.6717.6152.247.432Azj213.600.401.103.600.401.101.000.500.5024.004.0020.8025.602.893.04115.52222.83338.3591.83314.6623.693Azj314.300.400.750.704.300.400.750.701.300.500.400.4034.004.0047.2452.206.085.40243.00377.92620.923、189.69567.6153.314Azj413.300.400.953.300.400.950.900.500.4044.004.0031.7842.404.905.60196.00420.69616.69159.32580.0136.685Azj515.000.800.700.703.200.000.400.901.300.500.400.4012.602.6014.2717.001.771.7245.9753.3399.3029.9383.2616.04C-a单体合计126.78155.1217.8118.40669.101210.411879.51524.511734.92144.584、6Bzj113.200.400.500.454.200.400.750.701.100.400.400.3022.802.8018.8825.082.993.1283.78113.42197.1961.91175.3321.87Bzj113.200.400.500.454.200.400.750.701.100.400.400.3013.003.009.4412.541.501.5644.8864.62109.5033.9598.5710.93Bzj113.200.400.500.454.200.400.750.701.100.400.400.3014.004.009.4412.541.5015、.5659.84113.49173.3348.91162.4010.93Bzj113.200.400.500.454.200.400.750.701.100.400.400.3014.504.509.4412.541.501.5667.32144.18211.5056.39200.5710.937Bzj215.500.400.700.700.605.500.400.700.700.601.500.400.400.400.3052.502.50131.88113.7016.2511.40406.13312.92719.04258.01570.92148.128Bzj315.300.400.6506、.650.654.400.400.500.500.501.400.400.400.300.3013.003.0019.2218.772.532.0275.9079.11155.0154.15133.2621.75Bzj315.300.400.650.650.654.400.400.500.500.501.400.400.400.300.3014.004.0019.2218.772.532.02101.20137.41238.6179.45216.8721.759Bzj413.000.400.853.000.400.850.700.400.3025.005.0010.1014.882.052.57、6102.40315.33417.7390.25405.5812.1510Bzj514.300.400.750.704.300.400.750.701.100.400.400.3053.503.5067.4874.4010.139.00354.38484.63839.01276.77761.4077.61Bzj514.300.400.750.704.300.400.750.701.100.400.400.3013.503.5013.5014.882.031.8070.8896.93167.8055.35152.2815.5211Bzj612.900.300.902.300.300.650.608、0.300.3013.103.103.175.520.781.1224.0354.1478.1620.0874.213.9512Bzj747.450.608.440.601.300.650.6513.103.1070.2838.196.613.26204.90125.39330.28128.00253.3976.8913Bzj813.700.503.700.501.000.500.5012.802.8010.4912.801.521.5642.5956.7199.3030.5887.2912.01C-b2单体合计392.52374.6151.8942.541638.202098.283736.9、481193.793292.06444.4114Czj211.800.701.500.550.500.5022.602.602.706.600.681.4817.6858.2675.9414.3072.563.3815Czj312.201.800.700.600.6042.602.609.5019.201.923.5249.92130.35180.2738.50168.8411.4216Czj411.900.751.600.600.500.5022.602.603.047.000.761.5619.6660.2379.8915.8676.093.8017Czj511.700.551.700.510、50.500.5022.602.602.896.800.721.5218.7759.2578.0215.1674.413.6118Czj612.400.902.400.900.600.6022.602.606.9111.521.352.0835.1573.08108.2326.8999.978.2619Czj612.400.902.400.900.600.6023.203.206.9111.521.352.0843.26109.65152.9235.00144.658.2619Czj711.800.601.800.600.500.5022.602.603.247.200.801.6020.8011、61.2282.0216.7677.984.0420Czj812.700.602.700.600.800.400.4022.602.607.6313.441.682.3243.7379.01122.7434.42113.429.3121Czj912.100.802.100.800.600.6023.203.205.2910.081.061.8433.86101.21135.0627.51128.716.3522Czj1012.000.752.000.750.500.5022.602.604.008.000.971.7625.1765.1790.3420.2085.374.97C-c单体合计5212、.12101.3611.2919.76308.00797.421105.42244.591042.0163.4123Dzj112.100.802.100.800.500.5042.302.308.8216.802.123.6848.67106.29154.9637.73144.0210.9424Dzj212.501.002.501.000.500.5022.302.306.2510.001.462.1633.5359.5993.1225.8385.417.71C-d单体合计15.0726.803.575.8482.20165.88248.0863.56229.4318.64250.000.0013、0.000.000.000.000.000.000.000.00260.000.000.000.000.000.000.000.000.000.00270.000.000.000.000.000.000.000.000.000.00280.000.000.000.000.000.000.000.000.000.00290.000.000.000.000.000.000.000.000.000.00本本表表合合计计586.49586.49657.89657.8984.5684.5686.5486.542697.502697.504271.984271.986969.486969.482026.414、52026.456298.436298.43671.05671.05有有梁梁带带形形基基础础工工程程量量计计算算表表垫层厚:0.1垫层出边:0.1室内外地坪高差:0.1基底标高:放坡系数:0.5工作面:0.3序号轴线编号基梁编号带基尺寸(m)带基数据(m)基梁尺寸(m)带基数据(m)构件数量(件)基底标高(m)挖土深度(m)基础砼(m3)基础模板(m2)垫层砼(m3)垫层模板(m2)挖土工程量(m3)土方回填(m3)余土外运(m3)Bh1h2J左a1J右a2长度净长1宽高L左a1L右a2长度净长2清单量定额量清单量定额量11,2JL1,22.000.300.200.000.009.839.8315、0.501.500.000.009.839.8322.502.5026.7455.522.164.89108.13199.0679.23170.1628.9023JL32.000.300.200.000.0012.6912.690.501.500.000.0012.6912.6912.502.5017.2635.192.793.0269.80128.4949.74108.4420.0534JL42.600.400.200.000.0012.6912.690.601.500.000.0012.6912.6912.502.5024.2436.153.553.1488.83147.5261.041116、9.7327.7945,6JL42.600.400.200.000.0012.9912.990.601.500.000.0012.9912.9922.502.5049.6273.873.646.40181.86302.02128.60248.7653.2657JL42.600.400.200.000.0012.9912.990.601.500.000.0012.9912.9912.302.3024.8136.933.643.2083.66135.9455.21107.4928.4568JL42.600.400.200.000.0012.9912.990.601.500.000.0012.99117、2.9912.802.8024.8136.933.643.20101.84174.5973.39146.1428.4579JL52.600.400.200.000.0014.2414.240.601.500.000.0014.2414.2413.303.3027.2040.183.993.45131.58237.31100.39206.1231.19811JL52.600.400.200.000.0014.2414.240.601.500.000.0014.2414.2413.903.9027.2040.183.993.45155.50297.12124.32265.9331.19912JL618、2.400.400.200.000.007.307.300.501.500.000.007.307.3014.504.5012.4821.801.902.0285.41179.0371.03164.6514.38Y Y向向梁梁合合计计234.36376.7729.2932.761006.601801.07742.951537.42263.6510AJL62.400.400.2020.000.0057.2537.250.501.504.600.0057.2552.6512.802.8075.25127.399.698.01271.18479.78186.25394.8584.9311A+201019、JL52.000.300.202.001.009.196.190.501.500.500.309.198.3912.502.5010.0922.691.361.7234.0562.6722.5951.2211.4512A+3810JL42.000.300.202.002.005.691.690.501.500.500.505.694.6912.802.804.5812.590.370.8210.4119.875.4614.924.95132/AJL32.400.400.208.700.0024.6515.950.501.501.800.0024.6522.8513.903.9032.4556.20、714.153.75161.73320.36125.14283.7636.6014BJL22.600.400.2020.300.0054.9934.690.601.504.800.0054.9950.1912.502.5079.74121.259.717.54242.83403.27153.37313.8289.4615B+2700JL12.400.400.206.100.0016.8510.750.501.501.300.0016.8515.5513.603.6021.9839.412.802.71100.62193.5075.84168.7224.7816X X向向梁梁合合计计224.0921、380.0528.0724.54820.821479.46568.651227.29252.1717扣扣锥锥坡坡接接口口砼砼(2.6-0.6)*0.2*0.5+0.2*0.1)*235.0618增增级级差差接接口口砼砼0.5*(2.4*2.6*5+2.6*2.6*2)+0.6*2.4*2.4*539.64C-b1C-b1单单体体合合计计493.03756.8257.3757.301827.423280.521311.612764.71515.8119c c单单体体A-cJL1A-cJL11.000.400.000.0018.6018.600.401.000.000.0018.6018.601122、.301.3011.9038.482.234.0029.0259.2414.8845.1114.14202122本本表表合合计计504.93504.93795.30795.3059.6059.6061.3061.301856.441856.443339.763339.761326.491326.492809.812809.81529.95529.95基基 础础 层层 柱柱 工工 程程 量量 计计 算算 表表序号基础名或轴线号柱编号截面尺寸柱类型(圆=0,矩=1,异=2,构=3)基础高度(m)基底标高(m)柱高(m)数量砼(m3)模板(m2)矩形柱模板(m2)异形柱模板(m2)圆形柱模板(m2)23、BD(m)H(m)1.8m内1.8m外1Azj1C-aZ10.6000.804.003.2010.906.030.000.000.006.032Azj1C-aZ10.6000.802.301.5010.422.830.000.000.002.833Azj2C-aZ20.6001.004.003.0021.7011.300.000.000.0011.304Azj3C-aZ30.600.6011.304.002.7010.976.480.006.480.000.005Azj3C-aZ40.600.6011.304.002.7021.9412.960.0012.960.000.006Azj4C-aZ24、50.600.6010.904.003.1044.4629.760.0029.760.000.007Azj5C-aZ30.600.6011.302.601.3010.473.120.003.120.000.008C-a单体合计1210.8772.480.0052.320.0020.169Bzj1BZ10.400.5011.102.801.7020.686.126.120.000.000.0010Bzj1C-BZ20.400.6011.103.001.9010.463.800.003.800.000.0011Bzj1BZ100.500.5011.104.002.9010.735.800.005.25、800.000.0012Bzj1BZ20.600.6011.104.503.4011.228.160.008.160.000.0013Bzj2BZ60.600.8011.502.501.0052.4014.000.0014.000.000.0014Bzj3C-BZ30.600.7011.403.001.6010.674.160.004.160.000.0015Bzj3BZ90.600.6011.404.002.6010.946.240.006.240.000.0016Bzj4BZ110.500.5010.705.004.3022.1517.200.0017.200.000.0017Bzj5BZ26、50.600.6011.103.502.4054.3228.800.0028.800.000.0018Bzj5BZ20.600.6011.103.502.4010.865.760.005.760.000.0019Bzj6BZ10.400.5010.603.102.5010.504.504.500.000.000.0020Bzj7BZ10.400.5011.303.101.8010.363.243.240.000.000.0021Bzj7BZ20.600.6011.303.101.8010.654.320.004.320.000.0022Bzj7C-BZ10.350.8011.303.101.827、021.018.280.008.280.000.0023Bzj8C-BZ30.600.7011.002.801.8010.764.680.004.680.000.0024C-b2单体合计2617.70125.0613.86111.200.000.0025Czj2CZ10.400.4010.502.602.1020.676.726.720.000.000.0026Czj3CZ10.400.4010.602.602.0041.2812.8012.800.000.000.0027Czj4CZ10.400.4010.502.602.1020.676.726.720.000.000.0028Czj5CZ28、20.600.6010.502.602.1021.5110.080.0010.080.000.0029Czj6C-CZ10.600.6010.602.602.0021.449.600.009.600.000.0030Czj6CZ40.600.6010.603.202.6021.8712.480.0012.480.000.0031Czj7CZ20.600.6010.502.602.1021.5110.080.0010.080.000.0032Czj8C-CZ20.600.6010.802.601.8021.308.640.008.640.000.0033Czj9CZ50.5000.603.20229、.6021.028.160.000.000.008.1634Czj10CZ60.500.5010.502.602.1021.058.400.008.400.000.0035C-c单体合计2212.3393.6826.2459.280.008.1636Dzj1DZ10.5000.502.301.8041.4111.300.000.000.0011.3037Dzj2DZ10.5000.502.301.8020.715.650.000.000.005.6538C-d单体合计62.1216.960.000.000.0016.96391,2BZ10.400.5011.502.501.0051.009.030、09.000.000.000.00403BZ20.600.6011.502.501.0010.362.400.002.400.000.0041C-BZ10.350.8011.502.501.0010.282.300.002.300.000.0042BZ40.500.7011.502.501.0010.352.400.002.400.000.004347BZ50.600.6011.502.501.0041.449.600.009.600.000.0044BZ60.600.8011.502.501.0041.9211.200.0011.200.000.00458BZ50.600.6011.502.31、801.3010.473.120.003.120.000.0046BZ60.600.8011.502.801.3010.623.640.003.640.000.00479BZ20.600.6011.503.301.8010.654.320.004.320.000.0048C-BZ30.600.7011.503.301.8010.764.680.004.680.000.0049C-BZ20.400.6011.503.301.8010.433.600.003.600.000.005011BZ20.600.6011.503.902.4010.865.760.005.760.000.0051BZ90.32、600.6011.503.902.4010.865.760.005.760.000.0052BZ100.500.5011.503.902.4010.604.800.004.800.000.005312BZ110.500.5011.504.503.0021.5012.000.0012.000.000.0054C-b1单体合计2612.1184.589.0075.580.000.005556本本表表合合计计929255.1255.12392.76392.7649.1049.10298.38298.380.000.0045.2845.28基基 础础 层层 墙墙 工工 程程 量量 计计 算算 表表序号33、基础名墙类型(直=1,弧=2)轴线号剪力墙尺寸(m)数量(件)砼(m3)直形墙模板(m2)弧形墙模板(m2)下底长上底长长度基底标高基础高扣梁高高度墙厚1Bzj71c31.833.101.300.001.800.2410.796.590.0021c3-22202.633.101.300.001.800.2411.149.470.00312/cG-26402.103.101.300.001.800.2410.917.560.00412/cG-8002.103.101.300.001.800.2410.917.560.005本本表表合合计计3.743.7431.1831.180.000.00文文科34、科楼楼 C C 基基础础层层工工程程量量汇汇总总表表序号 构件名称砼(m3)模板(m2)垫层砼(m3)垫层模板(m2)挖土工程量(m3)土方回填(m3)余土外运(m3)清单量边坡工作面定额量清单量定额量1独立基础586.49657.8984.5686.542697.504271.986969.482026.456298.43671.052带形基础504.93795.3059.6061.301856.441483.333339.761326.492809.81529.95基基础础合合计计1091.421091.421453.191453.19144.16144.16147.84147.8445535、3.934553.935755.315755.3110309.2410309.243352.933352.939108.249108.241201.001201.003基础层柱4基础层墙3.7431.18汇汇总总合合计计1150.291150.291877.131877.13144.16144.16147.84147.844553.934553.935755.315755.3110309.2410309.243352.933352.939108.249108.241201.001201.00一一 层层 柱柱 工工 程程 量量 计计 算算 表表序号柱编号截面尺寸柱类型(圆=0,矩=1,异=2,构36、=3)下标高(m)上标高(m)板厚(m)柱高(m)数量BD(m)H(m)1Z10.500.601-1.105.300.106.3062Z20.700.701-1.105.300.106.3023Z30.700.801-1.105.300.106.3064Z40.600.601-1.105.300.106.3025Z50.700.701-1.105.300.106.3066Z60.500.501-1.105.300.106.3047Z70.500.601-1.105.300.106.3028Z80.700.801-1.105.300.106.3029Z90.600.601-1.105.300.137、06.30210Z100.500.601-1.105.300.106.30111aAZ10.801.002-1.105.300.106.301-aAZ10.50-0.507-1.105.300.106.30112aAZ20.300.401-1.105.300.106.30013aAZ30.301.202-1.105.300.106.30314aAZ40.301.202-1.105.300.106.30115aAZ50.300.902-1.105.300.106.30016aAZ60.301.202-1.105.300.106.30117aAZ71.000.802-1.105.300.106.338、01-aAZ70.50-0.507-1.105.300.106.30118aAZ80.301.302-1.105.300.106.30219aAZ90.301.202-1.105.300.106.30120aAZ100.300.902-1.105.300.106.30021aAZ110.301.202-1.105.300.106.30122aAZ120.301.202-1.105.300.106.301232425261层层C35砼砼合合计计4733砼(m3)模板(m2)矩形柱模板(m2)异形柱模板(m2)圆形柱模板(m2)构造柱模板(m3)支模高度3.6m(m2)柱头面积(m2)1.8m内139、.8m外11.3483.160.0083.160.000.000.0083.161.806.1735.280.0035.280.000.000.0035.280.9821.17113.400.00113.400.000.000.00113.403.364.5430.240.0030.240.000.000.0030.240.7218.52105.840.00105.840.000.000.00105.842.946.3050.400.0050.400.000.000.0050.401.003.7827.720.0027.720.000.000.0027.720.607.0637.800.00340、7.800.000.000.0037.801.124.5430.240.0030.240.000.000.0030.240.721.8913.860.0013.860.000.000.0013.860.305.0422.680.000.0022.680.000.0022.680.80-1.580.000.000.000.000.000.000.00-0.250.000.000.000.000.000.000.000.000.006.8056.700.000.0056.700.000.0056.701.082.2718.900.000.0018.900.000.0018.900.360.000.41、000.000.000.000.000.000.000.002.2718.900.000.0018.900.000.0018.900.365.0422.680.000.0022.680.000.0022.680.80-1.580.000.000.000.000.000.000.00-0.254.9140.320.000.0040.320.000.0040.320.782.2718.900.000.0018.900.000.0018.900.360.000.000.000.000.000.000.000.000.002.2718.900.000.0018.900.000.0018.900.36242、.2718.900.000.0018.900.000.0018.900.36115.29764.820.00527.94236.880.000.00764.8218.30一一 层层 柱柱 工工 程程 量量 计计 算算 表表2 层层 柱柱 工工 程程 量量 计计 算算 表表序号柱编号截面尺寸柱类型(圆=0,矩=1,异=2,构=3)下标高(m)上标高(m)板厚(m)柱高(m)数量BD(m)H(m)1bAZ10.201.1025.308.300.102.9082bAZ20.201.4025.308.300.102.9043bAZ30.900.8025.308.300.102.902-bAZ30.7043、-0.5575.308.300.102.9024bAZ40.201.2025.308.300.102.9015bAZ50.800.7525.308.300.102.901-bAZ50.60-0.5075.308.300.102.9016bAZ60.800.9025.308.300.102.902-bAZ60.55-0.7075.308.300.102.9027bAZ70.601.0025.308.300.102.901-bAZ70.30-0.8075.308.300.102.9018bAZ80.200.4015.308.300.102.9009bAZ90.201.1025.308.300.1044、2.90310bAZ100.201.1025.308.300.102.90111bAZ110.201.1525.308.300.102.90112bAZ120.200.8025.308.300.102.90013bAZ130.201.1525.308.300.102.90114bAZ141.000.6025.308.300.102.901-bAZ140.80-0.3075.308.300.102.90115bAZ150.750.8025.308.300.102.901-bAZ150.50-0.6075.308.300.102.90116bAZ160.201.2025.308.300.102.945、0317bAZ170.900.8025.308.300.102.904-bAZ170.70-0.5575.308.300.102.90418bAZ180.800.7525.308.300.102.902-bAZ180.60-0.5075.308.300.102.90219bAZ190.601.0025.308.300.102.902-bAZ190.30-0.8075.308.300.102.90220bAZ200.201.1525.308.300.102.90121bAZ210.201.1525.308.300.102.90122Z60.400.4015.308.300.102.90423Z146、00.400.6015.308.300.102.90124Z110.400.6015.308.300.102.90125262层层C35砼砼合合计计6224合合计计C35砼(m3)模板(m2)矩形柱模板(m2)异形柱模板(m2)圆形柱模板(m2)构造柱模板(m3)支模高度3.6m(m2)柱头面积(m2)1.8m内1.8m外5.1060.320.000.0060.320.000.000.001.763.2537.120.000.0037.120.000.000.001.124.1819.720.000.0019.720.000.000.001.44-2.230.000.000.000.000.047、00.000.00-0.770.708.120.000.008.120.000.000.000.241.748.990.000.008.990.000.000.000.60-0.870.000.000.000.000.000.000.00-0.304.1819.720.000.0019.720.000.000.001.44-2.230.000.000.000.000.000.000.00-0.771.749.280.000.009.280.000.000.000.60-0.700.000.000.000.000.000.000.00-0.240.000.000.000.000.000.000.48、000.000.001.9122.620.000.0022.620.000.000.000.660.647.540.000.007.540.000.000.000.220.677.830.000.007.830.000.000.000.230.000.000.000.000.000.000.000.000.000.677.830.000.007.830.000.000.000.231.749.280.000.009.280.000.000.000.60-0.700.000.000.000.000.000.000.00-0.241.748.990.000.008.990.000.000.000.49、60-0.870.000.000.000.000.000.000.00-0.302.0924.360.000.0024.360.000.000.000.728.3539.440.000.0039.440.000.000.002.88-4.470.000.000.000.000.000.000.00-1.543.4817.980.000.0017.980.000.000.001.20-1.740.000.000.000.000.000.000.00-0.603.4818.560.000.0018.560.000.000.001.20-1.390.000.000.000.000.000.000.050、0-0.480.677.830.000.007.830.000.000.000.230.677.830.000.007.830.000.000.000.231.8618.5618.560.000.000.000.000.000.640.705.800.005.800.000.000.000.000.240.705.800.005.800.000.000.000.000.2435.03373.5218.5611.60343.360.000.000.0012.083.003.003.003.003.003.003.003.003.00105.10105.101120.561120.5655.68551、5.6834.8034.801030.081030.080.000.000.000.000.000.0036.2436.242 层层 柱柱 工工 程程 量量 计计 算算 表表5 层层 柱柱 工工 程程 量量 计计 算算 表表序号柱编号截面尺寸柱类型(圆=0,矩=1,异=2,构=3)下标高(m)上标高(m)板厚(m)柱高(m)数量BD(m)H(m)1bAZ10.201.1025.308.300.102.9082bAZ20.201.4025.308.300.102.9043bAZ30.900.8025.308.300.102.902-bAZ30.70-0.5575.308.300.102.902452、bAZ40.201.2025.308.300.102.9015bAZ50.800.7525.308.300.102.901-bAZ50.60-0.5075.308.300.102.9016bAZ60.800.9025.308.300.102.902-bAZ60.55-0.7075.308.300.102.9027bAZ70.601.0025.308.300.102.901-bAZ70.30-0.8075.308.300.102.9018bAZ80.200.4015.308.300.102.9009bAZ90.201.1025.308.300.102.90310bAZ100.201.1025.353、08.300.102.90111bAZ110.201.1525.308.300.102.90112bAZ120.200.8025.308.300.102.90013bAZ130.201.1525.308.300.102.90114bAZ141.000.6025.308.300.102.901-bAZ140.80-0.3075.308.300.102.90115bAZ150.750.8025.308.300.102.901-bAZ150.50-0.6075.308.300.102.90116bAZ160.201.2025.308.300.102.90317bAZ170.900.8025.308.54、300.102.904-bAZ170.70-0.5575.308.300.102.90418bAZ180.800.7525.308.300.102.902-bAZ180.60-0.5075.308.300.102.90219bAZ190.601.0025.308.300.102.902-bAZ190.30-0.8075.308.300.102.90220bAZ200.201.1525.308.300.102.90121bAZ210.201.1525.308.300.102.90122Z60.400.4015.308.300.102.90423Z100.400.6015.308.300.102.55、90124Z110.400.6015.308.300.102.90125265层层C30砼砼合合计计6259合合计计C30砼(m3)模板(m2)矩形柱模板(m2)异形柱模板(m2)圆形柱模板(m2)构造柱模板(m3)支模高度3.6m(m2)柱头面积(m2)1.8m内1.8m外5.1060.320.000.0060.320.000.000.001.763.2537.120.000.0037.120.000.000.001.124.1819.720.000.0019.720.000.000.001.44-2.230.000.000.000.000.000.000.00-0.770.708.120.56、000.008.120.000.000.000.241.748.990.000.008.990.000.000.000.60-0.870.000.000.000.000.000.000.00-0.304.1819.720.000.0019.720.000.000.001.44-2.230.000.000.000.000.000.000.00-0.771.749.280.000.009.280.000.000.000.60-0.700.000.000.000.000.000.000.00-0.240.000.000.000.000.000.000.000.000.001.9122.620.00057、.0022.620.000.000.000.660.647.540.000.007.540.000.000.000.220.677.830.000.007.830.000.000.000.230.000.000.000.000.000.000.000.000.000.677.830.000.007.830.000.000.000.231.749.280.000.009.280.000.000.000.60-0.700.000.000.000.000.000.000.00-0.241.748.990.000.008.990.000.000.000.60-0.870.000.000.000.00058、.000.000.00-0.302.0924.360.000.0024.360.000.000.000.728.3539.440.000.0039.440.000.000.002.88-4.470.000.000.000.000.000.000.00-1.543.4817.980.000.0017.980.000.000.001.20-1.740.000.000.000.000.000.000.00-0.603.4818.560.000.0018.560.000.000.001.20-1.390.000.000.000.000.000.000.00-0.480.677.830.000.007.59、830.000.000.000.230.677.830.000.007.830.000.000.000.231.8618.5618.560.000.000.000.000.000.640.705.800.005.800.000.000.000.000.240.705.800.005.800.000.000.000.000.2435.03373.5218.5611.60343.360.000.000.0012.085.005.005.005.005.005.005.005.005.00175.16175.161867.601867.6092.8092.8058.0058.001716.8017160、6.800.000.000.000.000.000.0060.4060.405 层层 柱柱 工工 程程 量量 计计 算算 表表10 层层 柱柱 工工 程程 量量 计计 算算 表表序号柱编号截面尺寸柱类型(圆=0,矩=1,异=2,构=3)下标高(m)上标高(m)板厚(m)柱高(m)数量BD(m)H(m)1bAZ10.201.1025.308.300.102.9082bAZ20.201.4025.308.300.102.9043bAZ30.900.8025.308.300.102.902-bAZ30.70-0.5575.308.300.102.9024bAZ40.201.2025.308.300.61、102.9015bAZ50.800.7525.308.300.102.901-bAZ50.60-0.5075.308.300.102.9016bAZ60.800.9025.308.300.102.902-bAZ60.55-0.7075.308.300.102.9027bAZ70.601.0025.308.300.102.901-bAZ70.30-0.8075.308.300.102.9018bAZ80.200.4015.308.300.102.9009bAZ90.201.1025.308.300.102.90310bAZ100.201.1025.308.300.102.90111bAZ110.62、201.1525.308.300.102.90112bAZ120.200.8025.308.300.102.90013bAZ130.201.1525.308.300.102.90114bAZ141.000.6025.308.300.102.901-bAZ140.80-0.3075.308.300.102.90115bAZ150.750.8025.308.300.102.901-bAZ150.50-0.6075.308.300.102.90116bAZ160.201.2025.308.300.102.90317bAZ170.900.8025.308.300.102.904-bAZ170.70-063、.5575.308.300.102.90418bAZ180.800.7525.308.300.102.902-bAZ180.60-0.5075.308.300.102.90219bAZ190.601.0025.308.300.102.902-bAZ190.30-0.8075.308.300.102.90220bAZ200.201.1525.308.300.102.90121bAZ210.201.1525.308.300.102.90122Z60.400.4015.308.300.102.90423Z100.400.6015.308.300.102.90124Z2610层层C25砼砼合合计计6264、砼(m3)模板(m2)矩形柱模板(m2)异形柱模板(m2)圆形柱模板(m2)构造柱模板(m3)支模高度3.6m(m2)柱头面积(m2)1.8m内1.8m外5.1060.320.000.0060.320.000.000.001.763.2537.120.000.0037.120.000.000.001.124.1819.720.000.0019.720.000.000.001.44-2.230.000.000.000.000.000.000.00-0.770.708.120.000.008.120.000.000.000.241.748.990.000.008.990.000.000.000.665、0-0.870.000.000.000.000.000.000.00-0.304.1819.720.000.0019.720.000.000.001.44-2.230.000.000.000.000.000.000.00-0.771.749.280.000.009.280.000.000.000.60-0.700.000.000.000.000.000.000.00-0.240.000.000.000.000.000.000.000.000.001.9122.620.000.0022.620.000.000.000.660.647.540.000.007.540.000.000.000.22066、.677.830.000.007.830.000.000.000.230.000.000.000.000.000.000.000.000.000.677.830.000.007.830.000.000.000.231.749.280.000.009.280.000.000.000.60-0.700.000.000.000.000.000.000.00-0.241.748.990.000.008.990.000.000.000.60-0.870.000.000.000.000.000.000.00-0.302.0924.360.000.0024.360.000.000.000.728.3539.67、440.000.0039.440.000.000.002.88-4.470.000.000.000.000.000.000.00-1.543.4817.980.000.0017.980.000.000.001.20-1.740.000.000.000.000.000.000.00-0.603.4818.560.000.0018.560.000.000.001.20-1.390.000.000.000.000.000.000.00-0.480.677.830.000.007.830.000.000.000.230.677.830.000.007.830.000.000.000.231.8618.68、5618.560.000.000.000.000.000.640.705.800.005.800.000.000.000.000.240.705.800.005.800.000.000.000.000.2435.03373.5218.5611.60343.360.000.000.0012.0810 层层 柱柱 工工 程程 量量 计计 算算 表表11 层层 柱柱 工工 程程 量量 计计 算算 表表序号柱编号截面尺寸柱类型(圆=0,矩=1,异=2,构=3)下标高(m)上标高(m)板厚(m)柱高(m)数量BD(m)H(m)1cAZ10.201.1025.308.300.102.9082cAZ20.269、01.4025.308.300.102.9043cAZ30.250.6015.308.300.102.9074cAZ40.201.2025.308.300.102.9015cAZ50.250.8015.308.300.102.9046cAZ60.250.6015.308.300.102.9017cAZ70.200.4015.308.300.102.9008cAZ80.201.1025.308.300.102.9049cAZ90.201.1525.308.300.102.90110cAZ100.200.2015.308.300.102.90011cAZ110.201.1525.308.300.170、02.90112cAZ120.201.2025.308.300.102.90313cAZ130.201.1525.308.300.102.90114cAZ140.201.1525.308.300.102.90115Z60.400.4015.308.300.102.90416Z100.400.6015.308.300.102.90117Z110.400.6015.308.300.102.901181911层层C25砼砼合合计计42砼(m3)模板(m2)矩形柱模板(m2)异形柱模板(m2)圆形柱模板(m2)构造柱模板(m3)支模高度3.6m(m2)柱头面积(m2)1.8m内1.8m外5.1060.71、320.000.0060.320.000.000.001.763.2537.120.000.0037.120.000.000.001.123.0534.5134.510.000.000.000.000.001.050.708.120.000.008.120.000.000.000.242.3224.360.0024.360.000.000.000.000.800.444.934.930.000.000.000.000.000.150.000.000.000.000.000.000.000.000.002.5530.160.000.0030.160.000.000.000.880.677.83072、.000.007.830.000.000.000.230.000.000.000.000.000.000.000.000.000.677.830.000.007.830.000.000.000.232.0924.360.000.0024.360.000.000.000.720.677.830.000.007.830.000.000.000.230.677.830.000.007.830.000.000.000.231.8618.5618.560.000.000.000.000.000.640.705.800.005.800.000.000.000.000.240.705.800.005.80073、.000.000.000.000.2425.40285.3658.0035.96191.400.000.000.008.7611 层层 柱柱 工工 程程 量量 计计 算算 表表12 层层 柱柱 工工 程程 量量 计计 算算 表表序号柱编号截面尺寸柱类型(圆=0,矩=1,异=2,构=3)下标高(m)上标高(m)板厚(m)柱高(m)数量BD(m)H(m)1dAZ10.201.1025.308.300.102.9042dAZ20.201.4025.308.300.102.9043dAZ30.250.6015.308.300.102.9074dAZ40.201.2025.308.300.102.90174、5dAZ50.200.6015.308.300.102.9026dAZ60.250.8015.308.300.102.9047dAZ70.250.6015.308.300.102.9018dAZ80.201.1525.308.300.102.9019dAZ90.200.4015.308.300.102.90010dAZ100.201.1025.308.300.102.90411dAZ110.201.1525.308.300.102.90112dAZ120.201.2025.308.300.102.90313dAZ130.200.6015.308.300.102.90214dAZ140.201.75、1525.308.300.102.90215Z60.400.4015.308.300.102.90416Z100.400.6015.308.300.102.90117Z110.400.6015.308.300.102.901181912层层C25砼砼合合计计42砼(m3)模板(m2)矩形柱模板(m2)异形柱模板(m2)圆形柱模板(m2)构造柱模板(m3)支模高度3.6m(m2)柱头面积(m2)1.8m内1.8m外2.5530.160.000.0030.160.000.000.000.883.2537.120.000.0037.120.000.000.001.123.0534.5134.510.76、000.000.000.000.001.050.708.120.000.008.120.000.000.000.240.709.289.280.000.000.000.000.000.242.3224.360.0024.360.000.000.000.000.800.444.934.930.000.000.000.000.000.150.677.830.000.007.830.000.000.000.230.000.000.000.000.000.000.000.000.002.5530.160.000.0030.160.000.000.000.880.677.830.000.007.830.77、000.000.000.232.0924.360.000.0024.360.000.000.000.720.709.289.280.000.000.000.000.000.241.3315.660.000.0015.660.000.000.000.461.8618.5618.560.000.000.000.000.000.640.705.800.005.800.000.000.000.000.240.705.800.005.800.000.000.000.000.2424.24273.7676.5635.96161.240.000.000.008.3612 层层 柱柱 工工 程程 量量 计计 78、算算 表表13 层层 柱柱 工工 程程 量量 计计 算算 表表序号柱编号截面尺寸柱类型(圆=0,矩=1,异=2,构=3)下标高(m)上标高(m)板厚(m)柱高(m)数量BD(m)H(m)1eAZ10.250.6015.308.300.102.9072eAZ20.201.2025.308.300.102.9013eAZ30.250.6015.308.300.102.9014eAZ40.201.1525.308.300.102.9015eAZ50.200.4015.308.300.102.9006eAZ60.201.2025.308.300.102.9047eAZ70.201.1525.308.379、00.102.9018eAZ80.201.2025.308.300.102.9039eAZ90.201.1525.308.300.102.90210Z1913层层C25砼砼合合计计24砼(m3)模板(m2)矩形柱模板(m2)异形柱模板(m2)圆形柱模板(m2)构造柱模板(m3)支模高度3.6m(m2)柱头面积(m2)1.8m内1.8m外3.0534.5134.510.000.000.000.000.001.050.708.120.000.008.120.000.000.000.240.444.934.930.000.000.000.000.000.150.677.830.000.007.83080、.000.000.000.230.000.000.000.000.000.000.000.000.002.7832.480.000.0032.480.000.000.000.960.677.830.000.007.830.000.000.000.232.0924.360.000.0024.360.000.000.000.721.3315.660.000.0015.660.000.000.000.461.8618.5618.560.000.000.000.000.000.640.000.000.000.000.000.000.000.000.000.000.000.000.000.000.00081、.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.0013.57154.2858.000.0096.280.000.000.004.6813 层层 柱柱 工工 程程 量量 计计 算算 表表14 层层 柱柱 工工 程程 量量 计计 算算 表表序号柱编号截面尺寸柱类型(圆=082、,矩=1,异=2,构=3)下标高(m)上标高(m)板厚(m)柱高(m)数量BD(m)H(m)1fAZ10.201.1525.308.300.102.9012fAZ20.200.4015.308.300.102.9003fAZ30.201.1015.308.300.102.9044fAZ40.201.1525.308.300.102.9015fAZ50.201.1525.308.300.102.9026789101112131414层层C25砼砼合合计计8砼(m3)模板(m2)矩形柱模板(m2)异形柱模板(m2)圆形柱模板(m2)构造柱模板(m3)支模高度3.6m(m2)柱头面积(m2)1.8m83、内1.8m外0.677.830.000.007.830.000.000.000.230.000.000.000.000.000.000.000.000.002.5530.160.0030.160.000.000.000.000.880.677.830.000.007.830.000.000.000.231.3315.660.000.0015.660.000.000.000.460.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.84、000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.005.2261.480.0030.1631.320.000.000.001.8014 层层 柱柱 工工 程程 量量 计计 算算 表表1.5 层层 梁梁 工工 程程 量量 计计 算算 表表序号轴线编号梁编号梁类型(矩形=1,异弧=2,圈过=3)梁截面(m)梁支座(m)梁跨度(m)梁净长(m)板厚(m)数量(件)宽(b)85、高(h)左a1右a218,10,24,261KL110.300.900.000.001.201.200.00428,10,24,261KL210.301.350.000.000.600.600.0043F1KL310.300.800.000.001.101.100.0024J1KL410.301.300.000.002.002.000.0025G+2000KL2-110.300.250.100.102.602.400.122671.5梁梁合合计计梁砼(m3)梁侧模板(m2)梁底模板(m3)矩形梁模(m2)异弧形梁模(m2)圈过梁模(m2)25cm内25cm外1.308.641.440.001086、.080.000.000.976.480.720.007.200.000.000.533.520.660.004.180.000.001.5610.401.200.0011.600.000.000.191.251.440.002.690.000.004.544.5430.2930.295.465.460.000.0035.7535.750.000.000.000.001.5 层层 梁梁 工工 程程 量量 计计 算算 表表2 层层 梁梁 工工 程程 量量 计计 算算 表表序号轴线编号梁编号梁类型(矩形=1,异弧=2,圈过=3)梁截面(m)梁支座(m)梁跨度(m)梁净长(m)板厚(m)宽(b)高(87、h)左a1右a2112L1-110.200.400.100.103.002.800.1022L1-P10.200.400.100.000.500.400.10322KL110.300.800.500.606.605.500.104232KL210.300.800.100.103.062.860.10532KL310.300.800.700.804.803.300.1063+20002L2-110.200.600.100.152.001.750.1072L2-210.200.600.150.153.002.700.1082L2-310.200.600.150.101.801.550.10942K88、L4-110.250.600.500.105.004.400.10102KL4-210.250.600.600.154.603.850.10112KL4-310.250.600.150.204.804.450.101252KL5-110.300.800.400.704.803.700.10132KL5-P10.300.800.10-0.201.301.400.101462KL610.250.500.100.205.004.700.101572KL710.300.500.700.001.801.100.10168-8002L310.150.400.100.101.701.500.10178,1089、2KL910.300.900.000.001.201.200.10182KL1010.201.650.000.000.600.600.101992KL8-110.300.600.200.105.004.700.10202KL8-210.300.600.700.002.601.900.1021162KL1110.300.600.500.606.605.500.102216152KL1210.300.600.100.103.062.860.1023152KL1310.300.600.700.504.803.600.1024172L410.200.500.100.103.002.800.10251990、2KL14-110.300.600.700.504.803.600.10262KL14-P10.300.550.100.002.902.800.1027212KL15-010.300.65-0.200.101.301.400.10282KL15-110.300.800.700.404.803.700.10292KL15-P10.300.550.100.002.902.800.1030222KL1610.250.500.100.205.004.700.1031232KL1710.300.500.500.001.801.300.103224-8002L510.150.400.100.101.70191、.500.1033242KL1810.300.600.000.001.801.800.1034252KL19-110.300.600.200.105.004.700.10352KL19-P10.300.550.500.002.602.100.1036282KL2010.250.500.200.105.004.700.1037292KL21-010.300.65-0.200.101.301.400.10382KL21-110.300.800.700.404.803.700.10392KL21-P10.300.550.100.002.902.800.104031322KL2210.300.800.92、100.103.062.860.1041312KL23-110.300.800.700.504.803.600.10422KL23-P10.300.550.100.002.902.800.1043322KL2410.300.800.700.506.605.400.1044332L6-110.200.600.150.156.956.650.10452L6-210.200.600.150.153.162.860.10462L6-310.200.600.150.155.054.750.10472L6-410.200.600.150.103.052.800.1048A-L2110.200.400.1093、0.000.550.450.1049L2220.200.400.000.003.203.200.1050A2KL25-110.300.800.400.403.803.000.10512KL25-P10.300.700.100.001.551.450.1052A2KL26-110.300.800.400.403.803.000.10532KL26-210.300.800.100.103.102.900.10542KL26-310.300.800.400.403.803.000.1055A2KL2710.300.800.400.403.803.000.1056A+18002L16,17-110.294、00.500.100.002.802.700.10572L16,17-220.200.500.300.155.004.550.10582L16,17-320.200.500.150.305.004.550.10592L16,17-410.200.500.100.102.802.600.1060B2KL28-110.300.600.100.204.003.700.10612KL28-210.300.600.200.104.003.700.10622KL2910.801.400.100.108.007.800.1063B+13002L8,910.200.600.200.153.803.450.1095、64C2KL3010.200.500.600.102.802.100.1065D2KL31-110.300.600.150.603.803.050.10662KL31-P10.300.600.100.001.201.100.1067D2KL32-110.300.600.150.603.803.050.10682KL32-210.300.600.100.102.402.200.10692KL32-310.300.600.600.153.803.050.1070D2KL35-110.300.600.150.603.803.050.10712KL35-P10.200.450.100.001.301.96、200.1072E2KL33,34-110.300.600.100.152.001.750.10732KL33,34-210.300.600.150.104.304.050.1074F2KL36-110.300.800.600.605.204.000.10752KL36-P10.300.800.100.001.641.540.1076F2KL37-110.300.600.600.605.204.000.10772KL37-210.300.600.100.103.293.090.10782KL37-310.300.600.600.605.204.000.1079F2KL39-110.300.8097、0.600.605.204.000.10802KL39-P10.200.500.100.001.801.700.1081F+11002KL3810.300.800.000.001.101.100.1082F+16002L10,11,1210.200.600.150.203.202.850.1083F+31002L1310.300.250.000.002.402.400.1084H-12002L14,1510.200.400.100.202.001.700.1085H2KL40-110.300.800.200.104.304.000.10862KL40-210.300.800.400.505.298、04.300.10872KL40-P10.300.700.100.001.401.300.1088H2K41-110.300.800.200.104.304.000.10892K41-210.300.800.400.505.204.300.10902K41-310.300.800.100.102.782.580.10912K41-410.300.800.500.405.204.300.10922K41-510.300.800.100.204.304.000.1093H2KL44-110.300.800.500.405.204.300.10942KL44-210.300.800.100.204.99、304.000.1095J2KL43,4610.301.550.000.002.202.200.1096J2KL42,4510.200.400.200.000.900.700.1097J+12002L18-110.200.500.200.205.204.800.10982L18-220.200.500.100.204.404.100.10992L18-320.200.500.100.102.802.600.101002L18-420.200.500.200.104.404.100.101012L18-510.200.500.200.205.204.800.101022L18-P10.200.5100、00.100.001.351.250.101031042梁梁合合计计313.50313.5010.20数量(件)梁砼(m3)梁侧模板(m2)梁底模板(m3)矩形梁模(m2)异弧形梁模(m2)圈过梁模(m2)25cm内25cm外10.171.680.562.240.000.000.0010.020.240.080.320.000.000.0011.167.701.650.009.350.000.0010.604.000.860.004.860.000.0010.694.620.990.005.610.000.0040.707.001.408.400.000.000.0041.0810.802.1101、612.960.000.000.0040.626.201.247.440.000.000.0042.2017.604.4022.000.000.000.0041.9315.403.8519.250.000.000.0042.2317.804.4522.250.000.000.0021.5510.362.220.0012.580.000.0020.593.920.840.004.760.000.0020.947.522.359.870.000.000.0020.261.760.660.002.420.000.0020.141.800.452.250.000.000.0041.157.681.44102、0.009.120.000.0040.747.440.487.920.000.000.0010.714.701.410.006.110.000.0010.291.900.570.002.470.000.0021.6511.003.300.0014.300.000.0020.865.721.720.007.440.000.0010.543.601.080.004.680.000.0010.222.240.562.800.000.000.0010.543.601.080.004.680.000.0010.382.520.840.003.360.000.0010.231.540.420.001.96103、0.000.0010.785.181.110.006.290.000.0010.382.520.840.003.360.000.0010.473.761.184.940.000.000.0020.312.080.780.002.860.000.0020.141.800.452.250.000.000.0020.543.601.080.004.680.000.0010.714.701.410.006.110.000.0010.281.890.630.002.520.000.0010.473.761.184.940.000.000.0010.231.540.420.001.960.000.0010104、.785.181.110.006.290.000.0010.382.520.840.003.360.000.0010.604.000.860.004.860.000.0010.765.041.080.006.120.000.002 层层 梁梁 工工 程程 量量 计计 算算 表表10.382.520.840.003.360.000.0011.137.561.620.009.180.000.0010.676.651.337.980.000.000.0010.292.860.573.430.000.000.0010.484.750.955.700.000.000.0010.282.800.563.3105、60.000.000.0080.222.160.722.880.000.000.0040.777.682.560.000.0010.240.0010.634.200.900.005.100.000.0010.261.740.440.002.180.000.0010.634.200.900.005.100.000.0010.614.060.870.004.930.000.0010.634.200.900.005.100.000.0010.634.200.900.005.100.000.0020.434.321.085.400.000.000.0020.737.281.820.000.009.10106、0.0020.737.281.820.000.009.100.0020.424.161.045.200.000.000.0010.563.701.110.004.810.000.0010.563.701.110.004.810.000.0018.1120.286.240.0026.520.000.0041.3813.802.7616.560.000.000.0040.676.721.688.400.000.000.0010.463.050.920.003.970.000.0010.171.100.330.001.430.000.0010.463.050.920.003.970.000.0010107、.332.200.660.002.860.000.0010.463.050.920.003.970.000.0010.463.050.920.003.970.000.0010.080.840.241.080.000.000.0041.057.002.100.009.100.000.0042.4316.204.860.0021.060.000.0010.845.601.200.006.800.000.0010.322.160.460.002.620.000.0010.604.001.200.005.200.000.0010.463.090.930.004.020.000.0010.604.001108、.200.005.200.000.0010.845.601.200.006.800.000.0010.141.360.341.700.000.000.0020.463.080.660.003.740.000.0041.1411.402.2813.680.000.000.0020.221.441.440.002.880.000.0040.414.081.365.440.000.000.0010.845.601.200.006.800.000.0010.906.021.290.007.310.000.0010.231.560.390.001.950.000.0010.845.601.200.006109、.800.000.0010.906.021.290.007.310.000.0010.543.610.770.004.390.000.0010.906.021.290.007.310.000.0010.845.601.200.006.800.000.0010.906.021.290.007.310.000.0010.845.601.200.006.800.000.0021.9112.761.320.0014.080.000.0040.171.680.562.240.000.000.0010.383.840.964.800.000.000.0010.333.280.820.000.004.100110、.0010.212.080.520.000.002.600.0010.333.280.820.000.004.100.0010.383.840.964.800.000.000.0010.101.000.251.250.000.000.00174.0073.6473.64517.50517.50128.18128.18223.72223.72382.72382.7239.2439.240.000.003 层层 梁梁 工工 程程 量量 计计 算算 表表序号轴线编号梁编号梁类型(矩形=1,异弧=2,圈过=3)梁截面(m)梁支座(m)梁跨度(m)梁净长(m)板厚(m)数量(件)宽(b)高(h)左a1右111、a2113L1-110.200.400.100.103.002.800.10123L1-P10.200.400.100.000.500.400.101323KL210.200.600.500.706.605.400.104433KL310.200.600.700.604.803.500.10153+20003L2-110.200.600.100.102.001.800.10463L2-210.200.600.100.103.002.800.10473L2-310.200.600.100.101.801.600.104843KL4-110.200.600.500.105.004.400.1019112、3KL4-210.200.600.600.104.603.900.101103KL4-310.200.600.100.104.804.600.1011153KL6-110.200.600.300.704.803.800.104123KL6-P10.200.600.10-0.101.301.300.1041363KL510.200.500.100.105.004.800.1041473KL710.200.500.500.001.801.300.101158-8003L310.150.400.100.101.701.500.104168,103KL910.200.900.000.001.201.2113、00.104173KL1010.201.650.000.000.600.600.1041893KL8-110.200.600.100.105.004.800.102193KL8-210.200.550.500.002.602.100.10220113KL1110.200.500.500.001.801.300.10121143KL12-110.200.600.500.105.004.400.103223KL12-210.200.600.600.104.603.900.103233KL12-310.200.600.100.104.804.600.10324153KL1310.200.600.70114、0.504.803.600.10325173L4-110.200.500.100.103.002.800.101263L4-P10.200.500.100.000.500.400.10127233KL1410.200.500.500.001.801.300.10228333L5-110.200.500.100.103.162.960.101293L5-P10.200.500.100.000.500.400.10130A-3KL110.200.400.100.000.550.450.108313L1420.200.400.000.003.203.200.10432A3KL1510.200.500115、.500.503.802.800.10433A+18003L15,16-110.200.500.100.002.802.700.102343L15,16-220.200.500.200.105.004.700.102353L15,16-320.200.500.100.205.004.700.102363L15,16-410.200.500.000.102.802.700.10237B3KL16,17-110.200.500.100.204.003.700.102383KL16,17-210.200.500.200.104.003.700.10239B+13003L7,810.200.600.1116、00.103.803.600.10440C3KL1810.200.500.600.102.802.100.10441D3KL19,23-110.200.600.100.603.803.100.102423KL19,23-P10.200.500.100.001.201.100.10243D3KL20-110.200.600.100.603.803.100.101443KL20-210.200.500.100.102.402.200.101453KL20-310.200.600.600.103.803.100.10146E3KL21,22-110.200.600.100.102.001.800.1117、04473KL21,22-210.200.600.100.104.304.100.10448F3KL24-110.200.600.700.705.203.800.101493KL24-P10.200.500.100.001.641.540.10150F3KL25-110.200.600.700.705.203.800.101513KL25-210.200.500.100.103.293.090.101523KL25-310.200.600.700.705.203.800.10153F3KL27-110.200.600.700.705.203.800.101543KL27-P10.200.450118、.100.001.801.700.10155F+11003KL2610.200.800.000.001.101.100.10256F+16003L9,1010.200.600.100.103.203.000.10457F+31003L1110.200.400.100.102.602.400.10258H-12003L1210.200.500.100.102.001.800.10359H-12003L1310.200.400.100.102.001.800.10160H3KL28-110.200.500.100.104.304.100.102613KL28-210.200.500.300.605119、.204.300.10262H3KL29-110.200.500.100.104.304.100.101633KL29-210.200.500.300.605.204.300.101643KL29-310.250.500.100.102.782.580.101653KL29-410.200.500.600.305.204.300.101663KL29-510.200.500.100.104.304.100.10167J3KL3110.201.200.000.002.202.200.10268J3KL3010.200.400.100.000.900.800.10469703梁梁合合计计193.5120、26.80155.00梁砼(m3)梁侧模板(m2)梁底模板(m3)矩形梁模(m2)异弧形梁模(m2)圈过梁模(m2)25cm内25cm外0.171.680.562.240.000.000.000.020.240.080.320.000.000.002.1621.604.3225.920.000.000.000.353.500.704.200.000.000.000.727.201.448.640.000.000.001.1211.202.2413.440.000.000.000.646.401.287.680.000.000.000.444.400.885.280.000.000.000.39121、3.900.784.680.000.000.000.464.600.925.520.000.000.001.5215.203.0418.240.000.000.000.525.201.046.240.000.000.001.5415.363.8419.200.000.000.000.101.040.261.300.000.000.000.273.600.904.500.000.000.000.777.680.968.640.000.000.000.747.440.487.920.000.000.000.969.601.9211.520.000.000.000.383.780.844.620.0122、00.000.000.101.040.261.300.000.000.001.3213.202.6415.840.000.000.001.1711.702.3414.040.000.000.001.3813.802.7616.560.000.000.001.0810.802.1612.960.000.000.000.222.240.562.800.000.000.000.030.320.080.400.000.000.000.212.080.522.600.000.000.000.242.370.592.960.000.000.000.030.320.080.400.000.000.000.2123、22.160.722.880.000.000.000.777.682.560.000.0010.240.000.908.962.2411.200.000.000.000.434.321.085.400.000.000.000.757.521.880.000.009.400.000.757.521.880.000.009.400.000.434.321.085.400.000.000.000.595.921.487.400.000.000.000.595.921.487.400.000.000.001.4414.402.8817.280.000.000.000.676.721.688.400.0124、00.000.000.626.201.247.440.000.000.003 层层 梁梁 工工 程程 量量 计计 算算 表表0.181.760.442.200.000.000.000.313.100.623.720.000.000.000.181.760.442.200.000.000.000.313.100.623.720.000.000.000.727.201.448.640.000.000.001.6416.403.2819.680.000.000.000.383.800.764.560.000.000.000.121.230.311.540.000.000.000.383.800.76125、4.560.000.000.000.252.470.623.090.000.000.000.383.800.764.560.000.000.000.383.800.764.560.000.000.000.121.190.341.530.000.000.000.313.080.443.520.000.000.001.2012.002.4014.400.000.000.000.292.880.963.840.000.000.000.434.321.085.400.000.000.000.111.080.361.440.000.000.000.666.561.648.200.000.000.000.126、696.881.728.600.000.000.000.333.280.824.100.000.000.000.343.440.864.300.000.000.000.262.060.652.710.000.000.000.343.440.864.300.000.000.000.333.280.824.100.000.000.000.979.680.8810.560.000.000.000.191.920.642.560.000.000.0039.0139.01390.45390.4583.9483.94445.35445.350.000.0029.0429.040.000.004 层层 梁梁127、 工工 程程 量量 计计 算算 表表序号轴线编号梁编号梁类型(矩形=1,异弧=2,圈过=3)梁截面(m)梁支座(m)梁跨度(m)梁净长(m)板厚(m)数量(件)宽(b)高(h)左a1右a2114L1-110.200.400.100.103.002.800.10124L1-P10.200.400.100.000.500.400.101323KL210.200.600.500.706.605.400.104433KL310.200.600.700.604.803.500.10153+20003L2-110.200.600.100.102.001.800.10463L2-210.200.600.10128、0.103.002.800.10473L2-310.200.600.100.101.801.600.104843KL4-110.200.600.500.105.004.400.10193KL4-210.200.600.600.104.603.900.101103KL4-310.200.600.100.104.804.600.1011153KL6-110.200.600.300.704.803.800.104123KL6-P10.200.600.10-0.101.301.300.1041363KL510.200.500.100.105.004.800.1041474KL710.200.500.5129、0-0.101.501.100.103157114L310.200.300.100.201.501.200.008168-8004L410.150.400.100.101.701.500.104178,103KL910.200.900.000.001.201.200.104183KL1010.201.650.000.000.600.600.1041993KL8-110.200.600.100.105.004.800.102203KL8-210.200.600.500.002.602.100.00221113KL1110.200.500.500.001.501.000.10122143KL12-130、110.200.600.500.105.004.400.102233KL12-210.200.600.600.104.603.900.102243KL12-310.200.600.100.104.804.600.10225153KL1310.200.600.700.504.803.600.10326174L5-110.200.500.100.103.002.800.101274L5-P10.200.500.100.000.500.400.10128203KL14-110.200.600.500.105.004.400.101293KL14-210.200.600.600.104.603.900131、.101303KL14-310.200.600.100.104.804.600.10131334L6-110.200.500.100.103.162.960.101324L6-P10.200.500.100.000.500.400.10133A-3KL110.200.400.100.000.550.450.108344L1520.200.400.000.003.203.200.10435A3KL1510.200.500.500.503.802.800.10436A+18004L7-110.200.500.100.103.603.400.102374L7-220.300.300.100.104.132、003.800.002384L7-320.300.300.100.104.003.800.002394L7-410.200.500.100.103.603.400.10240B3KL16,17-110.200.500.100.204.003.700.102413KL16,17-210.200.500.200.104.003.700.10242B+13004L8,910.200.600.100.103.803.600.10443C3KL1810.200.500.600.102.802.100.10444D3KL19,23-110.200.600.100.603.803.100.102453KL1133、9,23-P10.200.500.100.001.201.100.10246D3KL20-110.200.600.100.603.803.100.101473KL20-210.200.500.100.102.402.200.101483KL20-310.200.600.600.103.803.100.10149E3KL21,22-110.200.600.100.102.001.800.104503KL21,22-210.200.600.100.104.304.100.10451F3KL24-110.200.600.700.705.203.800.101523KL24-P10.200.500.1134、00.001.641.540.10153F3KL25-110.200.600.700.705.203.800.101543KL25-210.200.500.100.103.293.090.101553KL25-310.200.600.700.705.203.800.10156F3KL27-110.200.600.700.705.203.800.101573KL27-P10.200.450.100.001.801.700.10158F+11003KL2610.200.800.000.001.101.100.10259F+16004L10,1110.200.600.100.103.203.000.135、10460F+31004L1210.200.400.100.102.602.400.10261H-12004L1310.200.500.100.102.001.800.10362H-12004L1410.200.400.100.102.001.800.10163H3KL28-110.200.500.100.104.304.100.102643KL28-210.200.500.300.605.204.300.10265H3KL29-110.200.500.100.104.304.100.101663KL29-210.200.500.300.605.204.300.101673KL29-310.2136、50.500.100.102.782.580.101683KL29-410.200.500.600.305.204.300.101693KL29-510.200.500.100.104.304.100.10170J4KL3110.201.500.000.002.202.200.10271J3KL3010.200.400.100.000.900.800.10472734梁梁合合计计205.426.70163.00梁砼(m3)梁侧模板(m2)梁底模板(m3)矩形梁模(m2)异弧形梁模(m2)圈过梁模(m2)25cm内25cm外0.171.680.562.240.000.000.000.020.24137、0.080.320.000.000.002.1621.604.3225.920.000.000.000.353.500.704.200.000.000.000.727.201.448.640.000.000.001.1211.202.2413.440.000.000.000.646.401.287.680.000.000.000.444.400.885.280.000.000.000.393.900.784.680.000.000.000.464.600.925.520.000.000.001.5215.203.0418.240.000.000.000.525.201.046.240.000.138、000.001.5415.363.8419.200.000.000.000.262.640.663.300.000.000.000.585.761.927.680.000.000.000.273.600.904.500.000.000.000.777.680.968.640.000.000.000.747.440.487.920.000.000.000.969.601.9211.520.000.000.000.505.040.845.880.000.000.000.080.800.201.000.000.000.000.888.801.7610.560.000.000.000.787.801.139、569.360.000.000.000.929.201.8411.040.000.000.001.0810.802.1612.960.000.000.000.222.240.562.800.000.000.000.030.320.080.400.000.000.000.444.400.885.280.000.000.000.393.900.784.680.000.000.000.464.600.925.520.000.000.000.242.370.592.960.000.000.000.030.320.080.400.000.000.000.222.160.722.880.000.000.0140、00.777.682.560.000.0010.240.000.908.962.2411.200.000.000.000.545.441.366.800.000.000.000.684.562.280.000.006.840.000.684.562.280.000.006.840.000.545.441.366.800.000.000.000.595.921.487.400.000.000.000.595.921.487.400.000.000.004 层层 梁梁 工工 程程 量量 计计 算算 表表1.4414.402.8817.280.000.000.000.676.721.688.400.141、000.000.000.626.201.247.440.000.000.000.181.760.442.200.000.000.000.313.100.623.720.000.000.000.181.760.442.200.000.000.000.313.100.623.720.000.000.000.727.201.448.640.000.000.001.6416.403.2819.680.000.000.000.383.800.764.560.000.000.000.121.230.311.540.000.000.000.383.800.764.560.000.000.000.252.47142、0.623.090.000.000.000.383.800.764.560.000.000.000.383.800.764.560.000.000.000.121.190.341.530.000.000.000.313.080.443.520.000.000.001.2012.002.4014.400.000.000.000.292.880.963.840.000.000.000.434.321.085.400.000.000.000.111.080.361.440.000.000.000.666.561.648.200.000.000.000.696.881.728.600.000.000.143、000.333.280.824.100.000.000.000.343.440.864.300.000.000.000.262.060.652.710.000.000.000.343.440.864.300.000.000.000.333.280.824.100.000.000.001.2312.320.8813.200.000.000.000.191.920.642.560.000.000.0039.9939.99395.71395.7187.0487.04458.83458.830.000.0023.9223.920.000.005 层层 梁梁 工工 程程 量量 计计 算算 表表序号轴线编144、号梁编号梁类型(矩形=1,异弧=2,圈过=3)梁截面(m)梁支座(m)梁跨度(m)梁净长(m)板厚(m)数量(件)宽(b)高(h)左a1右a2115L1-110.200.400.100.103.002.800.10125L1-P10.200.400.100.000.500.400.101323KL210.200.600.500.706.605.400.104433KL310.200.600.700.604.803.500.10153+20005L2,4-110.200.600.100.102.001.800.10465L2,4-210.200.600.100.103.002.800.10475145、L2,4-310.200.600.100.101.801.600.104845KL4,13-110.200.600.500.105.004.400.10495KL4,13-210.200.600.600.104.603.900.104105KL4,13-310.200.600.100.104.804.600.1041153KL6-110.200.600.300.704.803.800.104123KL6-P10.200.600.10-0.101.301.300.1041363KL510.200.500.100.105.004.800.1041474KL710.200.500.50-0.101.146、501.100.103158-8005L310.150.400.100.101.701.500.104168,105KL810.200.900.000.001.201.200.104175KL910.201.650.000.000.600.600.1041895KL1010.200.600.100.105.004.800.10219113KL1110.200.500.500.001.501.000.10120155KL1410.200.600.700.504.803.600.10321174L5-110.200.500.100.103.002.800.101224L5-P10.200.500.147、100.000.500.400.10123334L6-110.200.500.100.103.162.960.101244L6-P10.200.500.100.000.500.400.10125A-3KL110.200.400.100.000.550.450.108264L1520.200.400.000.003.203.200.10427A3KL1510.200.500.500.503.802.800.10428A+18005L710.200.500.100.103.603.400.10429B3KL16,17-110.200.500.100.204.003.700.102303KL16,1148、7-210.200.500.200.104.003.700.10231B+13004L8,910.200.600.100.103.803.600.10432C3KL1810.200.500.600.102.802.100.10433D3KL19,23-110.200.600.100.603.803.100.102343KL19,23-P10.200.500.100.001.201.100.10235D3KL20-110.200.600.100.603.803.100.101363KL20-210.200.500.100.102.402.200.101373KL20-310.200.600.60149、0.103.803.100.10138E3KL21,22-110.200.600.100.102.001.800.104393KL21,22-210.200.600.100.104.304.100.10440F3KL24-110.200.600.700.705.203.800.101413KL24-P10.200.500.100.001.641.540.10142F3KL25-110.200.600.700.705.203.800.101433KL25-210.200.500.100.103.293.090.101443KL25-310.200.600.700.705.203.800.1014150、5F3KL27-110.200.600.700.705.203.800.101463KL27-P10.200.450.100.001.801.700.10147F+11003KL2610.200.800.000.001.101.100.10248F+16004L10,1110.200.600.100.103.203.000.10449F+31004L1210.200.400.100.102.602.400.10250H-12004L1310.200.500.100.102.001.800.10351H-12004L1410.200.400.100.102.001.800.10152H3KL28151、-110.200.500.100.104.304.100.102533KL28-210.200.500.300.605.204.300.10254H3KL29-110.200.500.100.104.304.100.101553KL29-210.200.500.300.605.204.300.101563KL29-310.250.500.100.102.782.580.101573KL29-410.200.500.600.305.204.300.101583KL29-510.200.500.100.104.304.100.10159J4KL3110.201.500.000.002.202.20152、0.00260J3KL3010.200.400.100.000.900.800.00461625梁梁合合计计165.325.80149.00梁砼(m3)梁侧模板(m2)梁底模板(m3)矩形梁模(m2)异弧形梁模(m2)圈过梁模(m2)25cm内25cm外0.171.680.562.240.000.000.000.020.240.080.320.000.000.002.1621.604.3225.920.000.000.000.353.500.704.200.000.000.000.727.201.448.640.000.000.001.1211.202.2413.440.000.000.000153、.646.401.287.680.000.000.001.7617.603.5221.120.000.000.001.5615.603.1218.720.000.000.001.8418.403.6822.080.000.000.001.5215.203.0418.240.000.000.000.525.201.046.240.000.000.001.5415.363.8419.200.000.000.000.262.640.663.300.000.000.000.273.600.904.500.000.000.000.777.680.968.640.000.000.000.747.440.4154、87.920.000.000.000.969.601.9211.520.000.000.000.080.800.201.000.000.000.001.0810.802.1612.960.000.000.000.222.240.562.800.000.000.000.030.320.080.400.000.000.000.242.370.592.960.000.000.000.030.320.080.400.000.000.000.222.160.722.880.000.000.000.777.682.560.000.0010.240.000.908.962.2411.200.000.000.155、001.0910.882.7213.600.000.000.000.595.921.487.400.000.000.000.595.921.487.400.000.000.001.4414.402.8817.280.000.000.000.676.721.688.400.000.000.000.626.201.247.440.000.000.000.181.760.442.200.000.000.000.313.100.623.720.000.000.000.181.760.442.200.000.000.000.313.100.623.720.000.000.000.727.201.448.156、640.000.000.001.6416.403.2819.680.000.000.000.383.800.764.560.000.000.000.121.230.311.540.000.000.005 层层 梁梁 工工 程程 量量 计计 算算 表表0.383.800.764.560.000.000.000.252.470.623.090.000.000.000.383.800.764.560.000.000.000.383.800.764.560.000.000.000.121.190.341.530.000.000.000.313.080.443.520.000.000.001.2012.157、002.4014.400.000.000.000.292.880.963.840.000.000.000.434.321.085.400.000.000.000.111.080.361.440.000.000.000.666.561.648.200.000.000.000.696.881.728.600.000.000.000.333.280.824.100.000.000.000.343.440.864.300.000.000.000.262.060.652.710.000.000.000.343.440.864.300.000.000.000.333.280.824.100.000.000158、.001.3213.200.8814.080.000.000.000.262.560.643.200.000.000.0037.6937.69377.31377.3179.7279.72446.79446.790.000.0010.2410.240.000.00610 层层 梁梁 工工 程程 量量 计计 算算 表表序号轴线编号梁编号梁类型(矩形=1,异弧=2,圈过=3)梁截面(m)梁支座(m)梁跨度(m)梁净长(m)板厚(m)宽(b)高(h)左a1右a2115L1-110.200.400.100.103.002.800.1025L1-P10.200.400.100.000.500.400.10159、323KL210.200.600.500.706.605.400.10433KL310.200.600.700.604.803.500.1053+200011L210.200.600.100.102.001.800.1065L2,4-210.200.600.100.103.002.800.1075L2,4-310.200.600.100.101.801.600.10846KL4-110.200.600.500.105.004.400.1096KL4-210.200.600.600.104.603.900.10106KL4-310.200.600.100.104.804.600.101156KL160、6,13-110.200.600.300.704.803.800.10126KL6,13-P10.200.600.10-0.101.301.300.101363KL510.200.500.100.105.004.800.101474KL710.200.500.50-0.101.501.100.10158-8005L310.150.400.100.101.701.500.10168,105KL810.200.900.000.001.201.200.10175KL910.201.650.000.000.600.600.101895KL1010.200.600.100.105.004.800.101161、9113KL1110.200.500.500.001.501.000.1020156KL1510.200.600.700.504.803.600.1021174L5-110.200.500.100.103.002.800.10224L5-P10.200.500.100.000.500.400.102330+12006L6-110.200.400.100.102.001.800.10246L6-210.200.400.100.103.002.800.10256L6-310.200.400.100.101.801.600.1026336L7-110.200.500.100.103.162.960.162、10276L7-P10.200.500.100.000.500.400.1028A-3KL110.200.400.100.000.550.450.10296L1720.200.400.000.003.203.200.1030A6KL1810.200.500.500.503.802.800.1031A+18006L810.200.500.100.103.603.400.1032B6KL19,20-110.200.500.100.204.003.700.10336KL19,20-210.200.500.200.104.003.700.1034B+13006L9,1010.200.600.100.1163、03.803.600.1035C6KL2110.200.500.600.102.802.100.1036D6KL22,26-110.200.600.100.603.803.100.10376KL22,26-P10.200.500.100.001.201.100.1038D6KL23-110.200.600.100.603.803.100.10396KL23-210.200.500.100.102.402.200.10406KL23-310.200.600.600.103.803.100.1041E6KL24,25-110.200.600.100.102.001.800.10426KL24,25164、-210.200.600.100.104.304.100.1043F6KL27-110.200.600.700.705.203.800.10446KL27-P10.200.500.100.001.641.540.1045F6KL28-110.200.600.700.705.203.800.10466KL28-210.200.500.100.103.293.090.10476KL28-310.200.600.700.705.203.800.1048F6KL28a-110.200.600.700.705.203.800.10496KL28a-P10.200.450.100.001.801.700.165、1050F+11006KL2910.200.800.000.001.101.100.1051F+16006L11,1210.200.600.100.103.203.000.1052F+31006L1310.200.400.100.102.602.400.1053H-12006L1410.200.500.100.102.001.800.1054H-12006L1510.200.400.100.102.001.800.1055H6KL31-110.200.500.100.104.304.100.10566KL31-210.200.500.300.605.204.300.1057H6KL32-110166、.200.500.100.104.304.100.10586KL32-210.200.500.300.605.204.300.10596KL32-310.250.500.100.102.782.580.10606KL32-410.200.500.600.305.204.300.10616KL32-510.200.500.100.104.304.100.1062J6KL3410.201.500.000.002.202.200.0063J6KL3310.200.400.100.000.900.800.006465610梁梁合合计计171.526.10数量(件)梁砼(m3)梁侧模板(m2)梁底模板(167、m3)矩形梁模(m2)异弧形梁模(m2)圈过梁模(m2)25cm内25cm外10.171.680.562.240.000.000.0010.020.240.080.320.000.000.0042.1621.604.3225.920.000.000.0010.353.500.704.200.000.000.0030.545.401.086.480.000.000.0030.848.401.6810.080.000.000.0030.484.800.965.760.000.000.0041.7617.603.5221.120.000.000.0041.5615.603.1218.720.000.168、000.0041.8418.403.6822.080.000.000.0041.5215.203.0418.240.000.000.0040.525.201.046.240.000.000.0041.5415.363.8419.200.000.000.0030.262.640.663.300.000.000.0040.273.600.904.500.000.000.0040.777.680.968.640.000.000.0040.747.440.487.920.000.000.0020.969.601.9211.520.000.000.0010.080.800.201.000.000.000169、.0031.0810.802.1612.960.000.000.0010.222.240.562.800.000.000.0010.030.320.080.400.000.000.0010.111.080.361.440.000.000.0010.171.680.562.240.000.000.0010.100.960.321.280.000.000.0010.242.370.592.960.000.000.0010.030.320.080.400.000.000.0080.222.160.722.880.000.000.0040.777.682.560.000.0010.240.0040.9170、08.962.2411.200.000.000.0041.0910.882.7213.600.000.000.0020.595.921.487.400.000.000.0020.595.921.487.400.000.000.0041.4414.402.8817.280.000.000.0040.676.721.688.400.000.000.0020.626.201.247.440.000.000.0020.181.760.442.200.000.000.0010.313.100.623.720.000.000.0010.181.760.442.200.000.000.0010.313.10171、0.623.720.000.000.0040.727.201.448.640.000.000.00610 层层 梁梁 工工 程程 量量 计计 算算 表表41.6416.403.2819.680.000.000.0010.383.800.764.560.000.000.0010.121.230.311.540.000.000.0010.383.800.764.560.000.000.0010.252.470.623.090.000.000.0010.383.800.764.560.000.000.0010.383.800.764.560.000.000.0010.121.190.341.530.172、000.000.0020.313.080.443.520.000.000.0041.2012.002.4014.400.000.000.0020.292.880.963.840.000.000.0030.434.321.085.400.000.000.0010.111.080.361.440.000.000.0020.666.561.648.200.000.000.0020.696.881.728.600.000.000.0010.333.280.824.100.000.000.0010.343.440.864.300.000.000.0010.262.060.652.710.000.000.173、0010.343.440.864.300.000.000.0010.333.280.824.100.000.000.0021.3213.200.8814.080.000.000.0040.262.560.643.200.000.000.00149.0037.4437.44374.83374.8379.7279.72444.31444.310.000.0010.2410.240.000.0011 层层 梁梁 工工 程程 量量 计计 算算 表表序号轴线编号梁编号梁类型(矩形=1,异弧=2,圈过=3)梁截面(m)梁支座(m)梁跨度(m)梁净长(m)板厚(m)宽(b)高(h)左a1右a2115L1-1174、10.200.400.100.103.002.800.1025L1-P10.200.400.100.000.500.400.103211KL210.200.600.500.706.605.400.104311KL310.200.600.700.604.803.500.1053+200011L210.200.600.100.102.001.800.10646KL4-110.200.600.500.105.004.400.1076KL4-210.200.600.600.104.603.900.1086KL4-310.200.600.100.104.804.600.1094+120011L310.2175、00.500.100.103.303.100.1010511KL6-110.200.600.300.704.803.800.101111KL6-P10.200.600.10-0.101.301.300.101263KL510.200.500.100.105.004.800.1013711KL710.200.500.50-0.101.501.100.101471111L410.200.300.100.202.101.800.00158-80011L510.150.400.100.101.701.500.10168,1011L910.200.900.000.001.201.200.101711L1176、010.201.650.000.000.600.600.1018911KL8-110.200.600.100.105.004.800.101911KL8-P10.200.400.50-0.202.402.100.00201711L6-110.200.500.100.103.002.800.102111L6-P10.200.500.100.000.500.400.1022336L7-110.200.500.100.103.162.960.10236L7-P10.200.500.100.000.500.400.1024A-3KL110.200.400.100.000.550.450.102511L177、11,1220.200.400.000.003.203.200.1026A11KL13-110.200.500.500.503.802.800.102711KL13-P10.200.500.10-0.101.201.200.1028A+180011L13-110.300.300.100.102.402.200.102911L13-220.300.300.100.104.103.900.103011L13-320.300.300.100.104.103.900.103111L13-410.300.300.100.102.402.200.1032B11KL14,15-110.200.500.100178、.903.602.600.103311KL14,15-210.200.500.100.204.003.700.103411KL14,15-310.200.500.200.104.003.700.103511KL14,15-410.200.500.900.103.602.600.1036B+13006L9,1010.200.600.100.103.803.600.1037C11KL1610.200.500.600.102.802.100.1038D11KL17-110.200.600.100.603.803.100.103911KL17-P10.200.500.100.001.201.100.1179、040D11KL18-110.200.600.100.603.803.100.104111KL18-210.200.500.100.102.402.200.104211KL18-310.200.600.600.103.803.100.1043D11KL21-110.200.600.100.603.803.100.104411KL21-P10.200.450.100.001.201.100.1045E11KL19,20-110.200.600.100.102.001.800.104611KL19,20-210.200.600.100.104.304.100.1047F11KL22-110.200180、.600.700.705.203.800.104811KL22-P10.200.500.100.001.641.540.1049F11KL23-110.200.600.700.705.203.800.105011KL23-210.200.500.100.103.293.090.105111KL23-310.200.600.700.705.203.800.1052F11KL25-110.200.600.700.705.203.800.105311KL25-P10.200.400.100.001.801.700.1054F+110011KL2410.200.800.000.001.101.100.181、1055F+310011L1410.200.400.100.102.602.400.1056H11KL26,30-110.200.500.100.104.304.100.105711KL26,30-210.200.500.300.605.204.300.1058H11KL27-110.200.500.100.104.304.100.105911KL27-210.200.500.300.605.204.300.106011KL27-310.250.500.100.102.782.580.106111KL27-410.200.500.600.305.204.300.106211KL27-510.2182、00.500.100.104.304.100.1063J11KL2910.201.500.000.002.202.200.0064J11KL2810.200.400.100.000.900.800.00656611梁梁合合计计176.126.00数量(件)梁砼(m3)梁侧模板(m2)梁底模板(m3)矩形梁模(m2)异弧形梁模(m2)圈过梁模(m2)25cm内25cm外10.171.680.562.240.000.000.0010.020.240.080.320.000.000.0042.1621.604.3225.920.000.000.0041.4014.002.8016.800.000.0183、00.0040.727.201.448.640.000.000.0041.7617.603.5221.120.000.000.0041.5615.603.1218.720.000.000.0041.8418.403.6822.080.000.000.0040.999.922.4812.400.000.000.0041.5215.203.0418.240.000.000.0040.525.201.046.240.000.000.0041.5415.363.8419.200.000.000.0040.353.520.884.400.000.000.0040.434.321.445.760.000.184、000.0040.273.600.904.500.000.000.0040.777.680.968.640.000.000.0040.747.440.487.920.000.000.0020.969.601.9211.520.000.000.0020.343.360.844.200.000.000.0010.222.240.562.800.000.000.0010.030.320.080.400.000.000.0010.242.370.592.960.000.000.0010.030.320.080.400.000.000.0080.222.160.722.880.000.000.0040.185、777.682.560.000.0010.240.0040.908.962.2411.200.000.000.0040.383.840.964.800.000.000.0020.261.761.320.003.080.000.0020.473.122.340.000.005.460.0020.473.122.340.000.005.460.0020.261.761.320.003.080.000.0020.424.161.045.200.000.000.0020.595.921.487.400.000.000.0020.595.921.487.400.000.000.0020.424.161.186、045.200.000.000.0041.4414.402.8817.280.000.000.0040.676.721.688.400.000.000.0010.313.100.623.720.000.000.0010.090.880.221.100.000.000.0010.313.100.623.720.000.000.0010.181.760.442.200.000.000.0011 层层 梁梁 工工 程程 量量 计计 算算 表表10.313.100.623.720.000.000.0010.313.100.623.720.000.000.0010.080.770.220.990.000187、.000.0040.727.201.448.640.000.000.0041.6416.403.2819.680.000.000.0010.383.800.764.560.000.000.0010.121.230.311.540.000.000.0010.383.800.764.560.000.000.0010.252.470.623.090.000.000.0010.383.800.764.560.000.000.0010.383.800.764.560.000.000.0010.101.020.341.360.000.000.0020.313.080.443.520.000.000.002188、0.292.880.963.840.000.000.0020.666.561.648.200.000.000.0020.696.881.728.600.000.000.0010.333.280.824.100.000.000.0010.343.440.864.300.000.000.0010.262.060.652.710.000.000.0010.343.440.864.300.000.000.0010.333.280.824.100.000.000.0021.3213.200.8814.080.000.000.0040.262.560.643.200.000.000.00155.0037.189、4937.49370.45370.4584.7284.72427.85427.856.166.1621.1621.160.000.0012 层层 梁梁 工工 程程 量量 计计 算算 表表序号轴线编号梁编号梁类型(矩形=1,异弧=2,圈过=3)梁截面(m)梁支座(m)梁跨度(m)梁净长(m)板厚(m)宽(b)高(h)左a1右a21112L110.200.400.100.103.303.100.102212KL1,810.200.600.500.606.605.500.103312KL2,910.200.600.600.504.503.400.1043+200012L210.200.500.100190、.101.801.600.105412KL3-110.200.600.500.105.004.400.10612KL3-210.200.600.500.104.904.300.1074+120012L3-110.200.500.100.103.303.100.10812L3-210.200.500.100.105.004.800.109512KL4-110.200.600.300.704.503.500.101012KL4-P10.200.550.10-0.101.601.600.10118-80012L410.150.400.100.101.701.500.10128,1012KL510.2191、00.900.000.001.201.200.101312KL610.201.650.000.000.600.600.1014912KL710.200.600.100.105.004.800.10151712L510.200.500.100.103.303.100.1016A12KL10-110.200.500.500.503.802.800.101712KL10-P10.200.500.10-0.101.201.200.1018B12KL11,12-110.200.500.100.207.607.300.101912KL11,12-210.200.500.200.107.607.300.10192、20B+130012L610.200.500.100.103.803.600.1021D12KL13-110.200.500.100.603.803.100.102212KL13-P10.200.450.100.001.201.100.1023D12KL14-110.200.500.100.603.803.100.102412KL14-210.200.500.100.102.402.200.102512KL14-310.200.500.600.103.803.100.1026E12KL15,16-110.200.500.100.102.001.800.102712KL15,16-210.200193、.500.100.104.304.100.1028F12KL17-110.200.500.100.104.304.100.102912KL17-210.200.600.100.105.205.000.103012KL17-P10.200.450.100.001.641.540.1031F12KL18-110.200.500.100.104.304.100.103212KL18-210.200.600.100.105.205.000.103312KL18-310.200.500.100.103.293.090.103412KL18-410.200.600.100.105.205.000.1035194、12KL18-510.200.500.100.104.304.100.1036F12KL20-110.200.500.100.104.304.100.103712KL20-210.200.600.100.105.205.000.103812KL20-P10.200.450.100.001.801.700.1039F+110012KL1910.200.800.000.001.101.100.1040F+180012L7,810.200.500.100.105.205.000.1041F+310011L910.200.400.100.102.602.400.1042H12KL21-110.200.195、500.100.104.304.100.104312KL21-210.200.500.300.505.204.400.1044J12KL2310.201.500.000.002.202.200.0045J12KL2210.200.400.100.000.900.800.00464712梁梁合合计计149.934.30数量(件)梁砼(m3)梁侧模板(m2)梁底模板(m3)矩形梁模(m2)异弧形梁模(m2)圈过梁模(m2)25cm内25cm外20.373.721.244.960.000.000.0042.2022.004.4026.400.000.000.0041.3613.602.7216.32196、0.000.000.0040.515.121.286.400.000.000.0041.7617.603.5221.120.000.000.0041.7217.203.4420.640.000.000.0040.999.922.4812.400.000.000.0041.5415.363.8419.200.000.000.0041.4014.002.8016.800.000.000.0040.585.761.287.040.000.000.0040.273.600.904.500.000.000.0040.777.680.968.640.000.000.0040.747.440.487.920197、.000.000.0020.969.601.9211.520.000.000.0010.252.480.623.100.000.000.0040.908.962.2411.200.000.000.0040.383.840.964.800.000.000.0021.1711.682.9214.600.000.000.0021.1711.682.9214.600.000.000.0041.1511.522.8814.400.000.000.0020.504.961.246.200.000.000.0020.151.540.441.980.000.000.0010.252.480.623.100.0198、00.000.0010.181.760.442.200.000.000.0010.252.480.623.100.000.000.0040.585.761.447.200.000.000.0041.3113.123.2816.400.000.000.0010.333.280.824.100.000.000.0010.505.001.006.000.000.000.0010.111.080.311.390.000.000.0010.333.280.824.100.000.000.0010.505.001.006.000.000.000.0010.252.470.623.090.000.000.0199、010.505.001.006.000.000.000.0010.333.280.824.100.000.000.0010.333.280.824.100.000.000.0010.505.001.006.000.000.000.0010.121.190.341.530.000.000.0020.313.080.443.520.000.000.0041.6016.004.0020.000.000.000.0020.292.880.963.840.000.000.0012 层层 梁梁 工工 程程 量量 计计 算算 表表41.3113.123.2816.400.000.000.0041.4114.200、083.5217.600.000.000.0021.3213.200.8814.080.000.000.0040.262.560.643.200.000.000.00117.0033.6733.67337.64337.6474.1574.15411.79411.790.000.000.000.000.000.0013 层层 梁梁 工工 程程 量量 计计 算算 表表序号轴线编号梁编号梁类型(矩形=1,异弧=2,圈过=3)梁截面(m)梁支座(m)梁跨度(m)梁净长(m)板厚(m)宽(b)高(h)左a1右a21112L110.200.400.100.103.303.100.102213KL1,910201、.200.600.500.606.605.500.103313KL2,1010.200.600.600.504.503.400.1043+200012L210.200.500.100.101.801.600.105412KL3-110.200.700.100.105.004.800.10612KL3-210.200.700.500.104.904.300.1074+120013L310.200.500.100.103.303.100.108512KL4-110.200.600.300.704.503.500.10912KL4-P10.200.550.10-0.101.601.600.10105202、+290013L4,610.200.400.100.102.702.500.10118-80013L510.150.400.100.101.701.500.10128,1013KL5-110.200.600.100.102.402.200.101313KL5-210.200.900.000.001.201.200.101412KL610.201.650.000.000.600.600.1015912KL710.200.600.100.105.004.800.10161713L710.200.400.100.103.303.100.1017A13KL12-110.200.500.500.503.203、802.800.101813KL12-P10.200.500.10-0.101.201.200.1019B-13L1310.200.500.10-0.100.900.900.102013L1420.200.500.100.103.403.200.1021B13KL13,14-110.200.600.100.207.607.300.102213KL13,14-210.200.600.200.107.607.300.1023BGJL110.200.400.100.103.803.600.1024D13KL15,19-110.200.500.100.603.803.100.102513KL15,19204、-P10.200.450.100.001.201.100.1026D13KL16-110.200.500.100.603.803.100.102713KL16-210.200.500.100.102.402.200.102813KL16-310.200.500.600.103.803.100.1029E13KL17,18-110.200.500.100.102.001.800.103013KL17,18-210.200.500.100.104.304.100.1031F13KL20-110.200.500.100.104.304.100.103213KL20-210.200.600.100.1205、05.205.000.103313KL20-P10.200.450.100.001.641.540.1034F13KL21-110.200.500.100.104.304.100.103513KL21-210.200.600.100.105.205.000.103613KL21-310.200.500.100.103.293.090.103713KL21-410.200.600.100.105.205.000.103813KL21-510.200.500.100.104.304.100.1039F13KL23-110.200.500.100.104.304.100.104013KL23-210206、.200.600.100.105.205.000.104113KL23-P10.200.450.100.001.801.700.1042F+110013KL2210.200.800.000.001.101.100.1043F+180013L8,910.200.500.100.105.205.000.1044F+270013L10,1110.200.500.100.104.304.100.1045F+310013L1210.200.400.100.102.602.400.1046H13KL24-110.200.500.100.104.304.100.104713KL24-210.200.500.207、300.505.204.400.1048J13KL2710.201.500.000.002.202.200.004913KL2610.200.900.000.002.202.200.0050J13KL2510.200.400.100.000.900.800.00515213梁梁合合计计160.634.70数量(件)梁砼(m3)梁侧模板(m2)梁底模板(m3)矩形梁模(m2)异弧形梁模(m2)圈过梁模(m2)25cm内25cm外20.373.721.244.960.000.000.0042.2022.004.4026.400.000.000.0041.3613.602.7216.320.000.208、000.0040.515.121.286.400.000.000.0042.3023.043.8426.880.000.000.0042.0620.643.4424.080.000.000.0040.999.922.4812.400.000.000.0041.4014.002.8016.800.000.000.0040.585.761.287.040.000.000.0040.606.002.008.000.000.000.0040.273.600.904.500.000.000.0040.888.801.7610.560.000.000.0040.777.680.968.640.000.00209、0.0040.747.440.487.920.000.000.0020.969.601.9211.520.000.000.0010.191.860.622.480.000.000.0040.908.962.2411.200.000.000.0040.383.840.964.800.000.000.0040.292.880.723.600.000.000.0020.515.121.280.000.006.400.0021.4614.602.9217.520.000.000.0021.4614.602.9217.520.000.000.0040.868.642.8811.520.000.000.0210、020.504.961.246.200.000.000.0020.151.540.441.980.000.000.0010.252.480.623.100.000.000.0010.181.760.442.200.000.000.0010.252.480.623.100.000.000.0040.585.761.447.200.000.000.0041.3113.123.2816.400.000.000.0010.333.280.824.100.000.000.0010.505.001.006.000.000.000.0010.111.080.311.390.000.000.0010.333.211、280.824.100.000.000.0010.505.001.006.000.000.000.0010.252.470.623.090.000.000.0010.505.001.006.000.000.000.0010.333.280.824.100.000.000.0010.333.280.824.100.000.000.0010.505.001.006.000.000.000.0010.121.190.341.530.000.000.0013 层层 梁梁 工工 程程 量量 计计 算算 表表20.313.080.443.520.000.000.0041.6016.004.0020.000212、.000.000.0041.3113.123.2816.400.000.000.0020.292.880.963.840.000.000.0041.3113.123.2816.400.000.000.0041.4114.083.5217.600.000.000.0010.666.600.447.040.000.000.0010.403.960.444.400.000.000.0040.262.560.643.200.000.000.00131.0036.5936.59366.78366.7879.6779.67440.05440.050.000.006.406.400.000.0014 层层 213、梁梁 工工 程程 量量 计计 算算 表表序号轴线编号梁编号梁类型(矩形=1,异弧=2,圈过=3)梁截面(m)梁支座(m)梁跨度(m)梁净长(m)板厚(m)宽(b)高(h)左a1右a21314KL110.200.500.500.404.803.900.102414L210.200.500.100.101.301.100.103514KL2-110.200.500.300.704.803.800.10414KL2-210.200.500.10-0.101.301.300.1058,1014KL3-110.200.600.100.102.402.200.10614KL3-210.200.900.00214、0.001.201.200.10714KL410.200.600.000.000.600.600.1081514KL510.200.600.500.404.803.900.109E14KL6,7-P10.200.50-0.100.102.002.000.101014KL6,7-110.200.500.100.104.304.100.1011F14KL8-110.200.500.100.104.304.100.101214KL8-210.200.500.100.105.205.000.1013F14KL9-110.200.500.100.104.304.100.101414KL9-210.200215、.500.100.105.205.000.101514KL9-310.200.500.100.103.293.090.101614KL9-410.200.500.100.105.205.000.101714KL9-510.200.500.100.104.304.100.1018F14KL11-110.200.500.100.104.304.100.101914KL11-210.200.500.100.105.205.000.1020F+110014KL1010.200.800.000.001.101.100.1021F+180014L310.200.500.100.103.203.000.10216、22F+2700GJL210.200.400.100.105.205.000.1023F+310014L110.200.400.100.102.602.400.1024H14KL12-110.200.500.100.104.304.100.102514KL12-210.200.500.300.505.204.400.1026J14KL1310.201.500.000.002.202.200.00272814梁梁合合计计85.792.50数量(件)梁砼(m3)梁侧模板(m2)梁底模板(m3)矩形梁模(m2)异弧形梁模(m2)圈过梁模(m2)25cm内25cm外20.626.241.567.800217、.000.000.0040.353.520.884.400.000.000.0041.2212.163.0415.200.000.000.0040.424.161.045.200.000.000.0040.888.801.7610.560.000.000.0040.777.680.968.640.000.000.0040.242.400.482.880.000.000.0020.787.801.569.360.000.000.0040.646.401.608.000.000.000.0041.3113.123.2816.400.000.000.0010.333.280.824.100.000.218、000.0010.404.001.005.000.000.000.0010.333.280.824.100.000.000.0010.404.001.005.000.000.000.0010.252.470.623.090.000.000.0010.404.001.005.000.000.000.0010.333.280.824.100.000.000.0010.333.280.824.100.000.000.0010.404.001.005.000.000.000.0020.313.080.443.520.000.000.0010.242.400.603.000.000.000.0041.2219、012.004.0016.000.000.000.0020.292.880.963.840.000.000.0041.3113.123.2816.400.000.000.0041.4114.083.5217.600.000.000.0021.3213.200.8814.080.000.000.0064.0016.4616.46164.63164.6337.7437.74202.37202.370.000.000.000.000.000.0014 层层 梁梁 工工 程程 量量 计计 算算 表表15 层层 梁梁 工工 程程 量量 计计 算算 表表序号轴线编号梁编号梁类型(矩形=1,异弧=2,圈过=220、3)梁截面(m)梁支座(m)梁跨度(m)梁净长(m)板厚(m)宽(b)高(h)左a1右a218,10WKL110.200.600.000.001.201.200.102WKL210.200.600.000.000.600.600.103FWKL310.200.600.000.001.101.100.104WKL910111213141515梁梁合合计计5.100.40数量(件)梁砼(m3)梁侧模板(m2)梁底模板(m3)矩形梁模(m2)异弧形梁模(m2)圈过梁模(m2)25cm内25cm外40.484.800.965.760.000.000.0040.242.400.482.880.000.0221、00.0020.222.200.442.640.000.000.0020.444.400.885.280.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000222、.000.000.000.0012.001.381.3813.8013.802.762.7616.5616.560.000.000.000.000.000.0015 层层 梁梁 工工 程程 量量 计计 算算 表表114 层层 柱柱 工工 程程 量量 汇汇 总总 表表序号楼层编号砼(m3)模板(m2)矩形柱模板(m2)异形柱模板(m2)圆形柱模板(m2)构造柱模板(m3)1.8m内1.8m外11层115.29764.820.00527.94236.880.000.00224层105.101120.5655.6834.801030.080.000.00C35220.39359层175.161867223、.6092.8058.001716.800.000.004C30510层35.03373.5218.5611.60343.360.000.00611层25.40285.3658.0035.96191.400.000.00712层24.24273.7676.5635.96161.240.000.00813层13.57154.2858.000.0096.280.000.00914层5.2261.480.0030.1631.320.000.0010C25103.471112合合 计计499.024901.38359.60734.423807.360.000.00支模高度3.6m(m2)柱头面积(m2224、)764.8218.300.0036.240.0060.400.0012.080.008.760.008.360.004.680.001.80764.82150.62剪剪 力力 墙墙 工工 程程 量量 计计 算算 表表序号轴线位置构件编号墙类型(直=1,弧=2)剪 力 墙 尺 寸(m)长度下标高上标高板厚高度端宽墙厚1 层层 C3518,10,24,26aQ112.40-1.105.300.106.300.300.3028,10,24,26aQ212.45-1.105.300.106.300.000.303EaQ312.20-1.105.300.106.300.000.3024 层层 C354225、8,10,24,26bQ112.405.308.300.102.900.000.2058,10,24,26bQ212.405.308.300.102.900.000.206EbQ312.205.308.300.102.900.000.2014 层层 C3559 层层 C3078,10,24,26bQ112.405.308.300.102.900.000.2088,10,24,26bQ212.405.308.300.102.900.000.209EbQ312.205.308.300.102.900.000.2059 层层 C3010 层层 C25108,10,24,26bQ112.405.308226、.300.102.900.000.20118,10,24,26bQ212.405.308.300.102.900.000.2012EbQ312.205.308.300.102.900.000.2011 层层 C25138,10,24,26cQ112.405.308.300.102.900.000.20148,10,24,26cQ212.405.308.300.102.900.000.2015EcQ312.205.308.300.102.900.000.2012 层层 C25168,10,24,26dQ112.405.308.300.102.900.000.2017EdQ212.605.308.227、300.102.900.000.2013 层层 C25188,10,24,26dQ112.405.308.300.102.900.000.2019EdQ212.605.308.300.102.900.000.2014 层层 C25208,10,24,26dQ112.405.308.300.102.900.000.201014 层层 C25114层层剪剪力力墙墙合合计计数量(件)砼(m3)直形墙模板(m2)弧形墙模板(m2)支模高度3.6m墙头面积(m2)44.98315.000.00315.007.14418.14136.080.00136.082.88418.52123.480.00123.228、482.9428.3255.440.0055.441.3213.69136.880.000.004.7245.5755.680.000.001.9245.5755.680.000.001.9222.5525.520.000.000.8886.0586.05725.64725.640.000.00315.00315.0021.3021.3013.69136.880.000.004.7245.5755.680.000.001.9245.5755.680.000.001.9222.5525.520.000.000.8868.4468.44684.40684.400.000.000.000.0023.229、6023.6013.69136.880.000.004.7245.5755.680.000.001.9245.5755.680.000.001.9222.5525.520.000.000.8813.69136.880.000.004.7245.5755.680.000.001.9245.5755.680.000.001.9222.5525.520.000.000.888.5885.840.000.002.9645.5755.680.000.001.9223.0230.160.000.001.048.5885.840.000.002.9645.5755.680.000.001.9223.0230230、.160.000.001.045.5755.680.000.001.9245.5755.680.000.001.9250.1150.11501.12501.120.000.000.000.0017.2817.28204.60204.601911.161911.160.000.00315.00315.0062.1862.18剪剪 力力 墙墙 工工 程程 量量 计计 算算 表表楼楼 层层 梁梁 汇汇 总总 表表板工程量汇总表楼层梁砼(m3)梁侧模板(m2)梁底模板(m3)梁模25内(m2)梁模25外(m2)异弧形梁模(m2)圈过梁模(m2)梁支模高度3.6m(m2)未扣前板砼(m3)1.5层梁4.231、5430.295.460.0035.750.000.001.152层梁73.64517.50128.18223.72382.7239.240.00645.6882.333层梁39.01390.4583.94445.350.0029.040.0069.054层梁39.99395.7187.04458.830.0023.920.0065.115层梁37.69377.3179.72446.790.0010.240.0065.11C?194.871711.24384.351574.69418.46102.440.00645.680.00282.766层梁37.44374.8379.72444.310.232、0010.240.0065.117层梁37.44374.8379.72444.310.0010.240.0065.118层梁65.119层梁37.44374.8379.72444.310.0010.240.0065.1110层梁37.44374.8379.72444.310.0010.240.0065.1111层梁37.49370.4584.72427.856.1621.160.0065.2212层梁33.67337.6474.15411.790.000.000.0040.6913层梁36.59366.7879.67440.050.006.400.0071.9614层梁16.46164.633233、7.74202.370.000.000.0031.9115层梁1.3813.802.7616.560.000.000.003.76C25312.823127.43677.653720.166.1678.760.000.000.00539.08合合计计507.69507.694838.674838.671062.001062.005294.855294.85424.62424.62181.20181.200.000.00645.68645.680.000.00821.84821.84板边增加梁模合计未扣前板面积(m2)板砼(m3)板模板(m2)梁底模(m2)柱头(m2)墙头(m2)平均板厚(m)234、外梁模板增加(m2)板周长(m)洞口周长(m)9.601.154.145.460.000.000.120734.1279.48580.50128.1818.307.140.112623.1367.19522.3883.9412.084.720.111583.6863.23479.8487.0412.084.720.112583.6863.23487.1679.7212.084.720.1122534.21274.292074.02384.3554.5421.300.570.000.000.000.00583.6863.23487.1679.7212.084.720.112583.6863.23235、487.1679.7212.084.720.112583.6863.23487.1679.7212.084.720.112583.6863.23487.1679.7212.084.720.112583.6863.23487.1679.7212.084.720.112582.0463.34480.5284.7212.084.720.112384.3239.26296.6974.158.764.720.106577.7070.55486.7279.678.362.960.125257.7630.96212.3837.744.682.960.12431.363.3224.882.761.801.92236、0.1204751.58523.603936.98677.6596.0840.881.140.000.000.000.007285.797285.79797.90797.906011.006011.001062.001062.00150.62150.6262.1862.181.711.710.000.000.000.000.000.000.000.00板工程量汇总表1.5,2 板板 工工 程程 量量 计计 算算 表表序号轴线位置板板编编号号板尺寸(m)数量未扣前砼(m3)扣柱墙砼(m3)板砼(m4)板模板(m2)面积(m2)扣柱头(m2)扣梁底(m2)扣墙头(m2)长宽厚11.5层层1.159237、.602810*F+1100F+31001B12.402.000.1221.159.6012层层82.33734.12212*DF2B11.203.200.1010.383.843A-2B463.000.650.1040.787.80424*AC-4002B23.904.700.1248.8073.32524*C-400F2B363.905.000.1047.8078.00634*FF+18002B7,83.301.700.1042.2422.44734*F+1800H2B93.303.100.1244.9140.92846*A+1800C2B142.803.300.1043.7036.969238、46*CE2B102.803.300.1244.4436.961045*EH2B11132.006.200.1044.9649.6011612*A+900A+18002B15,198.201.000.1021.6416.4112612*A+1800B2B15,199.601.500.1022.8828.801369*BE2B164.805.000.13412.4896.001458*EH2B174.406.200.12413.09109.1215810*F+1100F+31002B182.602.200.1221.3711.44161618*AD2B452.556.700.1212.0517.239、09171618*DF2B25,272.203.000.1010.666.60181519*FH2B262.714.900.1211.5913.28191921*HJ+12002B29,405.302.900.1023.0730.74202124*HJ+12002B35,384.302.900.1022.4924.94212426*JJ+12002B362.601.200.1010.313.122224-200026+2000*6002B363.271.000.1010.333.27233133*AD2B411.386.700.1010.929.21243133*DF2B421.063.000240、.1010.323.18253133*FH2B431.464.800.1010.706.98263133*HJ+12002B441.302.800.1010.363.632730+133333*3352B441.430.340.1010.050.48280.000.002930支模高度3.6m(m2)3 板板 工工 程程 量量 计计 算算 表表序号轴线位置板板编编号号板尺寸(m)数量未扣前砼(m3)扣柱墙砼(m3)板砼(m4)板模板(m2)面积(m2)扣柱头(m2)扣梁底(m2)扣墙头(m2)长宽厚13层层69.05623.13212*DF3B41.203.200.1241.7715.363A241、-3B273.000.650.1040.787.80424*AC-4003B73.32524*C-400D3B2,33.902.000.1043.1231.20624-1200*DF3B42.703.000.1243.7332.4074-12004*DF3B51.203.000.1041.4414.40834*FF+18003B6,73.301.700.1042.2422.44934*F+1800H3B83.303.100.1044.0940.921046*A+1800C3B112.803.300.1043.7036.961146*CE3B92.803.300.1043.7036.961245242、*EH3B7,102.006.200.1044.9649.6013612*A+900A+18003B14,168.201.000.1021.6416.4114612*A+1800B3B14,169.601.500.1022.8828.801569*BE3B124.805.000.13412.4896.001658*EH3B134.406.200.12413.09109.1217810*F+1100F+31003B152.602.200.1221.3711.44180.000.001920支模高度3.6m(m2)4 板板 工工 程程 量量 计计 算算 表表序号轴线位置板板编编号号板尺寸(m)数量243、未扣前砼(m3)扣柱墙砼(m3)板砼(m4)板模板(m2)面积(m2)扣柱头(m2)扣梁底(m2)扣墙头(m2)长宽厚14层层65.11583.68212*DF4B41.203.200.1241.7715.363A-4B243.000.650.1040.787.80424*AC-4004B13.904.700.1148.0773.32524*C-400D4B2,33.902.000.1043.1231.20624-1200*DF4B42.703.000.1243.7332.4074-12004*DF4B51.203.000.1041.4414.40834*FF+18004B6,73.301.7244、00.1042.2422.44934*F+1800H4B83.303.100.1044.0940.921046*A+1800C4B112.803.300.1043.7036.961146*CE4B92.803.300.1043.7036.961245*EH4B7,102.006.200.1044.9649.601367*A+1800B4B110.901.600.1040.585.761469*BE4B124.805.000.13412.4896.001558*EH4B134.406.200.12413.09109.1216810*F+1100F+31004B142.602.200.1221.3245、711.44170.000.001819支模高度3.6m(m2)5 板板 工工 程程 量量 计计 算算 表表序号轴线位置板板编编号号板尺寸(m)数量未扣前砼(m3)扣柱墙砼(m3)板砼(m4)板模板(m2)面积(m2)扣柱头(m2)扣梁底(m2)扣墙头(m2)长宽厚15层层65.11583.68212*DF5B41.203.200.1241.7715.363A-5B243.000.650.1040.787.80424*AC-4005B73.32524*C-400D5B2,33.902.000.1043.1231.20624-1200*DF5B42.703.000.1243.7332.4074-246、12004*DF5B51.203.000.1041.4414.40834*FF+18005B6,73.301.700.1042.2422.44934*F+1800H5B83.303.100.1044.0940.921046*A+1800C5B112.803.300.1043.7036.961146*CE5B92.803.300.1043.7036.961245*EH5B7,102.006.200.1044.9649.601367*A+1800B5B110.901.600.1040.585.761469*BE5B124.805.000.13412.4896.001558*EH5B134.406.247、200.12413.09109.1216810*F+1100F+31005B142.602.200.1221.3711.44170.000.001819支模高度3.6m(m2)610 板板 工工 程程 量量 计计 算算 表表序号轴线位置板板编编号号板尺寸(m)数量未扣前砼(m3)扣柱墙砼(m3)板砼(m4)板模板(m2)面积(m2)扣柱头(m2)扣梁底(m2)扣墙头(m2)长宽厚1610层层65.11583.68212*DF6B41.203.200.1241.7715.363A-6B243.000.650.1040.787.80424*AC-4006B13.904.700.1148.0773.248、32524*C-400D6B2,33.902.000.1043.1231.20624-1200*DF6B42.703.000.1243.7332.4074-12004*DF6B51.203.000.1041.4414.40834*FF+18006B6,73.301.700.1042.2422.44934*F+1800H6B83.303.100.1044.0940.921046*A+1800C6B112.803.300.1043.7036.961146*CE6B92.803.300.1043.7036.961245*EH6B7,102.006.200.1044.9649.601367*A+180249、0B6B110.901.600.1040.585.761469*BE6B124.805.000.13412.4896.001558*EH6B134.406.200.12413.09109.1216810*F+1100F+31006B142.602.200.1221.3711.44170.000.001819325.54325.542918.402918.40支模高度3.6m(m2)11 板板 工工 程程 量量 计计 算算 表表序号轴线位置板板编编号号板尺寸(m)数量未扣前砼(m3)扣柱墙砼(m3)板砼(m4)板模板(m2)面积(m2)扣柱头(m2)扣梁底(m2)扣墙头(m2)长宽厚111层层6250、5.22582.04212*DF11B51.203.200.1241.7715.363A-11B13.000.650.1040.787.80424*AC-40011B23.904.700.1148.0773.32524*C-400D11B3,31.20624*DF11B53.903.000.1245.3846.80734*FH11B63.304.900.1046.4764.68844+1200*AB11B71.303.400.1041.7717.68946*BE11B10,112.805.100.1045.7157.121045*EH11B8,92.006.200.1044.9649.6011251、69*BE11B124.805.100.13412.7397.921258*EH11B134.406.200.12413.09109.1213810*F+1100F+310011B142.602.200.1221.3711.44140.000.001516支模高度3.6m(m2)12 板板 工工 程程 量量 计计 算算 表表序号轴线位置板板编编号号板尺寸(m)数量未扣前砼(m3)扣柱墙砼(m3)板砼(m4)板模板(m2)面积(m2)扣柱头(m2)扣梁底(m2)扣墙头(m2)长宽厚112层层40.69384.32212*DF+30012B31.203.500.1241.9316.80324*AC252、-40012B13.904.700.1148.0773.32424*C-400D12B23.902.000.1043.1231.20524*DF+30012B33.903.300.1245.9251.48635*F+300H12B4,9,55.304.600.1049.7597.52744+1200*AB12B61.303.400.1041.7717.68844+1200*BE12B71.305.000.1042.6026.00948*EF+30012B8,106.301.800.1044.5445.3610810*EF+110012B112.602.600.1221.6213.5211810253、*F+1100F+310011B142.602.200.1221.3711.44120.000.001314支模高度3.6m(m2)13 板板 工工 程程 量量 计计 算算 表表序号轴线位置板板编编号号板尺寸(m)数量未扣前砼(m3)扣柱墙砼(m3)板砼(m4)板模板(m2)面积(m2)扣柱头(m2)扣梁底(m2)扣墙头(m2)长宽厚113层层71.96577.70212*DF+30013B21.203.500.1242.0216.80324*AD13B13.906.700.12412.54104.52424*DF+30013B23.903.300.1246.1851.48535*F+300H254、13B3,4,97.52644+1200*AB13B51.303.400.1041.7717.68749*BE13B87.605.100.14421.71155.04848*EF+30013B6,96.301.800.1245.4445.3698-14008*F+300F+270013B151.402.300.1241.5512.881058*F+2700H13B104.302.200.1244.5437.84119-16009+1600*B-1400B-90013B141.371.000.1220.332.74129-16009+1600*B-900B13B143.400.800.1220.255、655.4413810*EF+110013B122.602.600.1221.6213.5214810*F+1100F+310013B132.602.200.1221.3711.44158-8008*HJ13B110.801.700.1040.545.441617支模高度3.6m(m2)14,15 板板 工工 程程 量量 计计 算算 表表序号轴线位置板板编编号号板尺寸(m)数量未扣前砼(m3)扣柱墙砼(m3)板砼(m4)板模板(m2)面积(m2)扣柱头(m2)扣梁底(m2)扣墙头(m2)长宽厚114层层31.91257.76235*FH14B15.304.600.13412.6897.5234256、8*EF+30014B2,36.301.800.1245.4445.36458*FH14B44.304.900.12410.1184.285810*EF+110014B52.602.600.1221.6213.526810*F+1100F+310014B62.602.200.1221.3711.4471519*F+300F+210014B72.822.000.1210.685.6488+140010+1400*E-1500E-100014BT2.191.000.1220.534.3898+140010+1400*E-1000E14BT5.201.000.1221.2510.4010111215257、层层3.7631.3613810*FJWB12.805.600.1223.7631.3614支模高度3.6m(m2)1 层层 墙墙 及及 抹抹 灰灰 工工 程程 量量 计计 算算 表表序号轴线编号梁编号属性(有=1,无=0)墙类型(外=1,内=2,)墙厚(m)梁截面(m)梁支座(m)梁跨度(m)墙净长(m)宽(b)高(h)左a1右a2112L1-1020.200.200.400.100.103.002.8022L1-P020.200.200.400.100.000.500.40322KL1020.200.300.800.500.606.605.504232KL2020.200.300.800.258、100.103.062.86532KL3020.100.300.800.700.804.803.3063+20002L2-1020.200.200.600.100.152.001.7572L2-2020.200.200.600.150.153.002.7082L2-3020.200.200.600.150.101.801.55942KL4-1020.200.250.600.500.105.004.40102KL4-2020.200.250.600.600.154.603.85112KL4-3020.200.250.600.150.204.804.451252KL5-1020.200.300.8259、00.400.704.803.70132KL5-P020.200.300.800.10-0.201.301.401462KL6020.200.250.500.100.205.004.701572KL7020.200.300.500.700.001.801.10168-1500110.200.000.100.000.002.002.00178-8002L3110.200.150.400.100.101.701.50188-8002L3020.200.150.400.100.101.701.50198,102KL9120.200.300.900.000.001.201.20208,102KL902260、0.200.300.900.000.001.201.20218,102KL10120.200.201.650.000.000.600.60228,102KL10020.200.201.650.000.000.600.602392KL8-1020.200.300.600.200.105.004.70242KL8-2020.200.300.600.700.002.601.9025162KL11020.200.300.600.500.606.605.502616152KL12020.200.300.600.100.103.062.8627152KL13020.200.300.600.700.504.261、803.6028172L4020.200.200.500.100.103.002.8029192KL14-1020.200.300.600.700.504.803.60302KL14-P020.200.300.550.100.002.902.8031212KL15-0020.200.300.65-0.200.101.301.40322KL15-1020.200.300.800.700.404.803.70332KL15-P020.200.300.550.100.002.902.8034222KL16020.200.250.500.100.205.004.7035232KL17020.200.3262、00.500.500.001.801.303624-8002L5110.200.150.400.100.101.701.5037242KL18020.200.300.600.000.001.801.8038252KL19-1020.200.300.600.200.105.004.70392KL19-P020.200.300.550.500.002.602.1040282KL20020.200.250.500.200.105.004.7041292KL21-0020.200.300.65-0.200.101.301.40422KL21-1020.200.300.800.700.404.803.7263、0432KL21-P020.200.300.550.100.002.902.804431322KL22020.200.300.800.100.103.062.8645312KL23-1020.200.300.800.700.504.803.60462KL23-P020.200.300.550.100.002.902.8047322KL24020.200.300.800.700.506.605.4048332L6-1020.200.200.600.150.156.956.65492L6-2020.200.200.600.150.153.162.86502L6-3020.200.200.600.1264、50.155.054.75512L6-4020.200.200.600.150.103.052.8052A-L21020.200.200.400.100.000.550.4553L22020.200.200.400.000.003.203.2054A2KL25-1020.200.300.800.400.403.803.00552KL25-P020.200.300.700.100.001.551.4556A2KL26-1020.200.300.800.400.403.803.00572KL26-2020.200.300.800.100.103.102.90582KL26-3020.200.300265、.800.400.403.803.0059A2KL27020.200.300.800.400.403.803.0060A+18002L16,17-1020.200.200.500.100.002.802.70612L16,17-2020.200.200.500.300.155.004.55622L16,17-3020.200.200.500.150.305.004.55632L16,17-4020.200.200.500.100.102.802.6064B2KL28-1020.200.300.600.100.204.003.70652KL28-2020.200.300.600.200.104.266、003.70662KL29020.200.801.400.100.108.007.8067B+13002L8,9020.200.200.600.200.153.803.4568C2KL30020.200.200.500.600.102.802.1069D2KL31-1020.200.300.600.150.603.803.05702KL31-P020.200.300.600.100.001.201.1071D2KL32-1020.200.300.600.150.603.803.05722KL32-2020.200.300.600.100.102.402.20732KL32-3020.200.3267、00.600.600.153.803.0574D2KL35-1020.200.300.600.150.603.803.05752KL35-P020.200.200.450.100.001.301.2076E2KL33,34-1020.200.300.600.100.152.001.75772KL33,34-2020.200.300.600.150.104.304.0578F2KL36-1020.200.300.800.600.605.204.00792KL36-P020.100.300.800.100.001.641.5480F2KL37-1020.200.300.600.600.605.20268、4.00812KL37-2020.200.300.600.100.103.293.09822KL37-3020.200.300.600.600.605.204.0083F2KL39-1020.200.300.800.600.605.204.00842KL39-P020.200.200.500.100.001.801.7085F+11002KL38020.200.300.800.000.001.101.1086F+1600 2L10,11,12020.200.200.600.150.203.202.8587F+31002L13020.200.300.250.000.002.402.4088H-1269、2002L14,15020.200.200.400.100.202.001.7089H2KL40-1020.200.300.800.200.104.304.00902KL40-2020.200.300.800.400.505.204.30912KL40-P020.200.300.700.100.001.401.3092H2K41-1020.200.300.800.200.104.304.00932K41-2020.200.300.800.400.505.204.30942K41-3020.200.300.800.100.102.782.58952K41-4020.200.300.800.500270、.405.204.30962K41-5020.200.300.800.100.204.304.0097H2KL44-1020.200.300.800.500.405.204.30982KL44-2020.200.300.800.100.204.304.0099J2KL43,46110.200.301.550.000.002.202.20100J2KL42,45110.200.200.400.200.000.900.70101J2KL42,45020.200.200.400.200.000.900.70102J+12002L18-1020.200.200.500.200.205.204.8010271、32L18-2020.200.200.500.100.204.404.101042L18-3020.200.200.500.100.102.802.601052L18-4020.200.200.500.200.104.404.101062L18-5020.200.200.500.200.205.204.801072L18-P020.200.200.500.100.001.351.251081091层墙合计319.50层高(m)墙净高(m)板厚(m)数量(件)墙面积(m3)180外墙工程量180内墙工程量面积(m2)体积(m3)面积(m2)体积(m3)5.300.000.1010.000.000272、.000.000.005.300.000.1010.000.000.000.000.005.300.000.1010.000.000.000.000.005.300.000.1010.000.000.000.000.005.300.000.1010.000.000.000.000.005.300.000.1040.000.000.000.000.005.300.000.1040.000.000.000.000.005.300.000.1040.000.000.000.000.005.300.000.1040.000.000.000.000.005.300.000.1040.000.000.00273、0.000.005.300.000.1040.000.000.000.000.005.300.000.1020.000.000.000.000.005.300.000.1020.000.000.000.000.005.300.000.1020.000.000.000.000.005.300.000.1020.000.000.000.000.005.305.200.10220.8020.804.160.000.005.304.900.1017.357.351.470.000.005.300.000.1010.000.000.000.000.005.304.400.10210.560.000.00274、10.562.115.300.000.1020.000.000.000.000.005.303.650.1024.380.000.004.380.885.300.000.1020.000.000.000.000.005.300.000.1010.000.000.000.000.005.300.000.1010.000.000.000.000.005.300.000.1020.000.000.000.000.005.300.000.1020.000.000.000.000.005.300.000.1010.000.000.000.000.005.300.000.1010.000.000.000.275、000.005.300.000.1010.000.000.000.000.005.300.000.1010.000.000.000.000.005.300.000.1010.000.000.000.000.005.300.000.1010.000.000.000.000.005.300.000.1010.000.000.000.000.005.300.000.1010.000.000.000.000.005.300.000.1020.000.000.000.000.005.304.900.10214.7014.702.940.000.005.300.000.1020.000.000.000.0276、00.005.300.000.1010.000.000.000.000.005.300.000.1010.000.000.000.000.005.300.000.1010.000.000.000.000.005.300.000.1010.000.000.000.000.005.300.000.1010.000.000.000.000.001 层层 墙墙 及及 抹抹 灰灰 工工 程程 量量 计计 算算 表表5.300.000.1010.000.000.000.000.005.300.000.1010.000.000.000.000.005.300.000.1010.000.000.000.000277、.005.300.000.1010.000.000.000.000.005.300.000.1010.000.000.000.000.005.300.000.1010.000.000.000.000.005.300.000.1010.000.000.000.000.005.300.000.1010.000.000.000.000.005.300.000.1010.000.000.000.000.005.300.000.1080.000.000.000.000.005.300.000.1040.000.000.000.000.005.300.000.1010.000.000.000.000.00278、5.300.000.1010.000.000.000.000.005.300.000.1010.000.000.000.000.005.300.000.1010.000.000.000.000.005.300.000.1010.000.000.000.000.005.300.000.1010.000.000.000.000.005.300.000.1020.000.000.000.000.005.300.000.1020.000.000.000.000.005.300.000.1020.000.000.000.000.005.300.000.1020.000.000.000.000.005.3279、00.000.1010.000.000.000.000.005.300.000.1010.000.000.000.000.005.300.000.1010.000.000.000.000.005.300.000.1040.000.000.000.000.005.300.000.1040.000.000.000.000.005.300.000.1010.000.000.000.000.005.300.000.1010.000.000.000.000.005.300.000.1010.000.000.000.000.005.300.000.1010.000.000.000.000.005.300.280、000.1010.000.000.000.000.005.300.000.1010.000.000.000.000.005.300.000.1010.000.000.000.000.005.300.000.1040.000.000.000.000.005.300.000.1040.000.000.000.000.005.300.000.1010.000.000.000.000.005.300.000.1010.000.000.000.000.005.300.000.1010.000.000.000.000.005.300.000.1010.000.000.000.000.005.300.000281、.1010.000.000.000.000.005.300.000.1010.000.000.000.000.005.300.000.1010.000.000.000.000.005.300.000.1020.000.000.000.000.005.300.000.1040.000.000.000.000.005.300.000.1020.000.000.000.000.005.300.000.1040.000.000.000.000.005.300.000.1010.000.000.000.000.005.300.000.1010.000.000.000.000.005.300.000.10282、10.000.000.000.000.005.300.000.1010.000.000.000.000.005.300.000.1010.000.000.000.000.005.300.000.1010.000.000.000.000.005.300.000.1010.000.000.000.000.005.300.000.1010.000.000.000.000.005.300.000.1010.000.000.000.000.005.300.000.1010.000.000.000.000.005.303.750.10216.5016.503.300.000.005.304.900.103283、10.2910.292.060.000.005.300.000.1010.000.000.000.000.005.300.000.1010.000.000.000.000.005.300.000.1010.000.000.000.000.005.300.000.1010.000.000.000.000.005.300.000.1010.000.000.000.000.005.300.000.1010.000.000.000.000.005.300.000.1010.000.000.000.000.0084.5869.6413.9314.942.99120内墙工程量墙净长墙截面积外抹灰(m2)内284、抹灰(m2)天棚抹灰(m2)面积(m2)体积(m3)外墙线内墙线外墙外墙内墙0.000.000.000.000.000.000.000.002.240.000.000.000.000.000.000.000.000.320.000.000.000.000.000.000.000.009.350.000.000.000.000.000.000.000.004.860.000.000.000.000.000.000.000.005.610.000.000.000.000.000.000.000.008.400.000.000.000.000.000.000.000.0012.960.000.000285、.000.000.000.000.000.007.440.000.000.000.000.000.000.000.0022.000.000.000.000.000.000.000.000.0019.250.000.000.000.000.000.000.000.0022.250.000.000.000.000.000.000.000.0012.580.000.000.000.000.000.000.000.004.760.000.000.000.000.000.000.000.009.870.000.000.000.000.000.000.000.002.420.000.004.000.000286、.8020.8020.000.000.000.000.001.500.000.307.807.730.000.000.000.000.000.000.000.000.000.001.130.000.000.002.400.480.000.0025.200.000.000.000.000.000.000.000.000.004.560.000.000.001.200.240.000.0012.480.000.000.000.000.000.000.000.000.003.960.000.000.000.000.000.000.000.006.110.000.000.000.000.000.000287、.000.002.470.000.000.000.000.000.000.000.0014.300.000.000.000.000.000.000.000.007.440.000.000.000.000.000.000.000.004.680.000.000.000.000.000.000.000.002.800.000.000.000.000.000.000.000.004.680.000.000.000.000.000.000.000.003.360.000.000.000.000.000.000.000.001.960.000.000.000.000.000.000.000.006.29288、0.000.000.000.000.000.000.000.003.360.000.000.000.000.000.000.000.004.940.000.000.000.000.000.000.000.002.860.000.003.000.000.6015.6015.450.000.000.000.000.000.000.000.000.000.004.680.000.000.000.000.000.000.000.006.110.000.000.000.000.000.000.000.002.520.000.000.000.000.000.000.000.004.940.000.000.289、000.000.000.000.000.001.960.000.000.000.000.000.000.000.006.290.000.000.000.000.000.000.000.003.360.000.000.000.000.000.000.000.004.860.000.000.000.000.000.000.000.006.120.000.000.000.000.000.000.000.003.360.000.000.000.000.000.000.000.009.180.000.000.000.000.000.000.000.007.980.000.000.000.000.000.290、000.000.003.430.000.000.000.000.000.000.000.005.700.000.000.000.000.000.000.000.003.360.000.000.000.000.000.000.000.002.880.000.000.000.000.000.000.000.0010.240.000.000.000.000.000.000.000.005.100.000.000.000.000.000.000.000.002.180.000.000.000.000.000.000.000.005.100.000.000.000.000.000.000.000.004291、.930.000.000.000.000.000.000.000.005.100.000.000.000.000.000.000.000.005.100.000.000.000.000.000.000.000.005.400.000.000.000.000.000.000.000.009.100.000.000.000.000.000.000.000.009.100.000.000.000.000.000.000.000.005.200.000.000.000.000.000.000.000.004.810.000.000.000.000.000.000.000.004.810.000.000292、.000.000.000.000.000.0026.520.000.000.000.000.000.000.000.0016.560.000.000.000.000.000.000.000.008.400.000.000.000.000.000.000.000.003.970.000.000.000.000.000.000.000.001.430.000.000.000.000.000.000.000.003.970.000.000.000.000.000.000.000.002.860.000.000.000.000.000.000.000.003.970.000.000.000.000.0293、00.000.000.003.970.000.000.000.000.000.000.000.001.080.000.000.000.000.000.000.000.009.100.000.000.000.000.000.000.000.0021.060.000.000.000.000.000.000.000.006.800.000.000.000.000.000.000.000.002.620.000.000.000.000.000.000.000.005.200.000.000.000.000.000.000.000.004.020.000.000.000.000.000.000.000.294、005.200.000.000.000.000.000.000.000.006.800.000.000.000.000.000.000.000.001.700.000.000.000.000.000.000.000.003.740.000.000.000.000.000.000.000.0013.680.000.000.000.000.000.000.000.002.880.000.000.000.000.000.000.000.005.440.000.000.000.000.000.000.000.006.800.000.000.000.000.000.000.000.007.310.000295、.000.000.000.000.000.000.001.950.000.000.000.000.000.000.000.006.800.000.000.000.000.000.000.000.007.310.000.000.000.000.000.000.000.004.390.000.000.000.000.000.000.000.007.310.000.000.000.000.000.000.000.006.800.000.000.000.000.000.000.000.007.310.000.000.000.000.000.000.000.006.800.000.004.400.000296、.8822.8823.320.000.000.000.002.100.000.4210.9210.920.000.000.000.000.000.000.000.000.000.000.560.000.000.000.000.000.000.000.004.800.000.000.000.000.000.000.000.004.100.000.000.000.000.000.000.000.002.600.000.000.000.000.000.000.000.004.100.000.000.000.000.000.000.000.004.800.000.000.000.000.000.000297、.000.001.250.000.0015.003.603.7278.0077.4237.68618.022 层层 墙墙 及及 抹抹 灰灰 工工 程程 量量 计计 算算 表表序号轴线编号梁编号属性(有=1,无=0)墙类型(外=1,内=2,)墙厚(m)梁截面(m)梁支座(m)梁跨度(m)墙净长(m)层高(m)宽(b)高(h)左a1右a2113L1-1110.200.200.400.100.103.002.803.0023L1-P110.200.200.400.100.000.500.403.00323KL2110.200.200.600.500.706.605.403.00433KL3110.2298、00.200.600.700.604.803.503.0053+20003L2-1120.120.200.600.100.102.001.803.0063L2-2120.120.200.600.100.103.002.803.0073L2-3120.120.200.600.100.101.801.603.00843KL4-1110.200.200.600.500.105.004.403.0093KL4-2a120.120.200.600.600.003.302.703.00103KL4-2020.120.200.600.000.101.301.203.00103KL4-3a120.120.20299、0.600.100.103.603.403.00113KL4-3b110.200.200.60-0.100.101.201.203.001253KL6-1a020.200.200.600.300.001.200.903.001353KL6-1b120.120.200.600.000.703.602.903.00143KL6-P020.200.200.600.10-0.101.301.303.001563KL5120.120.200.500.100.105.004.803.001673KL7020.200.200.500.500.001.801.303.00178-1400120.120.000300、.100.000.002.302.303.00188-8003L3110.200.150.400.100.101.701.503.00198,103KL9010.200.200.900.000.001.201.203.00203KL10010.200.201.650.000.000.600.603.002193KL8-1120.200.200.600.100.105.004.803.00223KL8-2110.200.200.550.500.002.602.103.0023113KL11020.200.200.500.500.001.801.303.0024143KL12-1110.200.2301、00.600.500.105.004.403.00253KL12-2120.120.200.600.600.104.603.903.00263KL12-3a120.120.200.600.100.103.603.403.00273KL12-3b110.200.200.60-0.100.101.201.203.0028153KL13110.200.200.600.700.504.803.603.0029173L4-1120.200.200.500.100.103.002.803.00303L4-P120.200.200.500.100.000.500.403.0031233KL14020.200302、.200.500.500.001.801.303.0032333L5-1120.200.200.500.100.103.162.963.00333L5-P120.200.200.500.100.000.500.403.0034A-3KL1020.200.200.400.100.000.550.453.00353L14020.200.200.400.000.003.203.203.0036A3KL15110.200.200.500.500.503.802.803.0037A+18003L15,16-1020.200.200.500.100.002.802.703.00383L15,16-2020303、.200.200.500.200.105.004.703.00393L15,16-3020.200.200.500.100.205.004.703.00403L15,16-4010.200.200.500.000.102.802.703.0041B3KL16,17-1110.200.200.500.100.204.003.703.00423KL16,17-2110.200.200.500.200.104.003.703.0043B+13003L7,8a120.120.200.600.10-0.102.602.603.0044B+13003L7,8b020.200.200.600.100.101304、.201.003.0045C3KL18110.200.200.500.600.102.802.103.0046D3KL19,23-1120.120.200.600.100.603.803.103.00473KL19,23-P020.200.200.500.100.001.201.103.0048D3KL20-1120.120.200.600.100.603.803.103.00493KL20-2110.200.200.500.100.102.402.203.00503KL20-3120.120.200.600.600.103.803.103.0051E3KL21,22-1120.120.200305、.600.100.102.001.803.00523KL21,22-2a120.120.200.600.10-0.100.800.803.00533KL21,22-2b020.200.200.600.100.103.503.303.0054F3KL24-1120.120.200.600.700.705.203.803.00553KL24-P110.200.200.500.100.001.641.543.0056F3KL25-1120.120.200.600.700.705.203.803.00573KL25-2110.200.200.500.100.103.293.093.00583KL25-306、3120.120.200.600.700.705.203.803.0059F3KL27-1120.120.200.600.700.705.203.803.00603KL27-P110.200.200.450.100.001.801.703.0061F+400120.120.000.100.000.001.401.403.0062F+11003KL26020.200.200.800.000.001.101.103.0063F+16003L9,10120.120.200.600.100.103.203.003.0064F+2700120.120.000.100.000.002.902.903.00307、65F+31003L11020.200.200.400.100.102.602.403.0066H-12003L12110.200.200.500.100.102.001.803.0067H-12003L13110.200.200.400.100.102.001.803.0068H3KL28-1a020.200.200.500.100.103.503.303.0069H3KL28-1b120.120.200.50-0.100.100.800.803.00703KL28-2a020.200.200.500.300.002.001.703.00713KL28-2b110.200.200.500.0308、00.603.202.603.0072H3KL29-1a020.200.200.500.100.103.503.303.0073H3KL29-1b120.120.200.50-0.100.100.800.803.00743KL29-2a020.200.200.500.300.602.001.103.00753KL29-2b110.200.200.500.300.603.202.303.00763KL29-3020.200.250.500.100.102.782.583.00773KL29-4a110.200.200.500.600.303.202.303.00783KL29-4b020.200309、.200.500.600.302.001.103.00793KL29-5a020.200.200.500.100.103.503.303.00803KL29-5b120.120.200.50-0.100.100.800.803.0081J3KL31110.200.201.200.000.002.202.203.0082J3KL30110.200.200.400.100.000.900.803.0083842层墙合计198.32墙净高(m)板厚(m)数量(件)梁砼(m3)梁侧模板(m2)梁底模板(m3)墙面积(m3)180外墙工程量180内墙工程量面积(m2)体积(m3)面积(m2)2.600.310、1010.171.680.567.287.281.460.002.600.1010.020.240.081.041.040.210.002.400.1042.1621.604.3251.8451.8410.370.002.400.1010.353.500.708.408.401.680.002.400.1040.727.201.4417.280.000.000.002.400.1041.1211.202.2426.880.000.000.002.400.1040.646.401.2815.360.000.000.002.400.1010.444.400.8810.5610.562.110.00311、2.400.1010.272.700.546.480.000.000.000.000.1010.121.200.240.000.000.000.002.400.1010.343.400.688.160.000.000.002.400.1010.121.200.242.882.880.580.000.000.1040.363.600.720.000.000.000.002.400.1041.1611.602.3227.840.000.000.000.000.1040.525.201.040.000.000.000.002.500.1041.5415.363.8448.000.000.000.00312、0.000.1010.101.040.260.000.000.000.002.900.1040.000.000.0026.680.000.000.002.600.1040.273.600.9015.6015.603.120.000.000.1040.777.680.960.000.000.000.000.000.1040.747.440.480.000.000.000.002.400.1020.969.601.9223.040.000.0023.042.450.1020.383.780.8410.2910.292.060.000.000.1010.101.040.260.000.000.000313、.002.400.1031.3213.202.6431.6831.686.340.002.400.1031.1711.702.3428.080.000.000.002.400.1031.0210.202.0424.480.000.000.002.400.1030.363.600.728.648.641.730.002.400.1031.0810.802.1625.9225.925.180.002.500.1010.222.240.567.000.000.007.002.500.1010.030.320.081.000.000.001.000.000.1020.212.080.520.000.0314、00.000.002.500.1010.242.370.597.400.000.007.402.500.1010.030.320.081.000.000.001.000.000.1080.222.160.720.000.000.000.000.000.1040.777.682.560.000.000.000.002.500.1040.908.962.2428.0028.005.600.000.000.1020.434.321.080.000.000.000.000.000.1020.757.521.880.000.000.000.000.000.1020.757.521.880.000.000315、.000.000.000.1020.434.321.080.000.000.000.002.500.1020.595.921.4818.5018.503.700.002 层层 墙墙 及及 抹抹 灰灰 工工 程程 量量 计计 算算 表表2.500.1020.595.921.4818.5018.503.700.002.400.1041.0410.402.0824.960.000.000.000.000.1040.404.000.800.000.000.000.002.500.1040.676.721.6821.0021.004.200.002.400.1020.626.201.2414.880.0316、00.000.000.000.1020.181.760.440.000.000.000.002.400.1010.313.100.627.440.000.000.002.500.1010.181.760.445.505.501.100.002.400.1010.313.100.627.440.000.000.002.400.1040.727.201.4417.280.000.000.002.400.1040.323.200.647.680.000.000.000.000.1041.3213.202.640.000.000.000.002.400.1010.383.800.769.120.000317、.000.002.500.1010.121.230.313.853.850.770.002.400.1010.383.800.769.120.000.000.002.500.1010.252.470.627.737.731.550.002.400.1010.383.800.769.120.000.000.002.400.1010.383.800.769.120.000.000.002.550.1010.121.190.344.344.340.870.002.9040.0016.240.000.000.000.000.1020.313.080.440.000.000.000.002.400.10318、41.2012.002.4028.800.000.000.002.9040.0033.640.000.000.000.000.1020.292.880.960.000.000.000.002.500.1030.434.321.0813.5013.502.700.002.600.1010.111.080.364.684.680.940.000.000.1020.535.281.320.000.000.000.002.500.1020.131.280.324.000.000.000.000.000.1020.272.720.680.000.000.000.002.500.1020.424.161.319、0413.0013.002.600.000.000.1010.262.640.660.000.000.000.002.500.1010.060.640.162.000.000.000.000.000.1010.090.880.220.000.000.000.002.500.1010.181.840.465.755.751.150.000.000.1010.262.060.650.000.000.000.002.500.1010.181.840.465.755.751.150.000.000.1010.090.880.220.000.000.000.000.000.1010.262.640.66320、0.000.000.000.002.500.1010.060.640.162.000.000.000.001.800.1020.979.680.887.927.921.580.002.600.1040.191.920.648.328.321.660.0019238.86389.0183.58811.98340.4668.0939.44120内墙工程量墙净长墙截面积外抹灰(m2)内抹灰(m2)体积(m3)面积(m2)体积(m3)外墙线内墙线外墙外墙内墙0.000.000.002.800.000.568.128.120.000.000.000.000.400.000.081.161.160.000321、.000.000.0021.600.004.3262.6462.640.000.000.000.003.500.000.7010.1510.150.000.0017.282.070.007.200.860.000.0042.340.0026.883.230.0011.201.340.000.0065.860.0015.361.840.006.400.770.000.0037.630.000.000.004.400.000.8812.7612.760.000.006.480.780.002.700.320.000.0015.880.000.000.000.000.000.000.000.000.322、000.008.160.980.003.400.410.000.0019.990.000.000.001.200.000.243.483.480.000.000.000.000.000.000.000.000.000.000.0027.843.340.0011.601.390.000.0068.210.000.000.000.000.000.000.000.000.000.0048.005.760.0019.202.300.000.00112.900.000.000.000.000.000.000.000.000.000.0026.683.200.009.201.100.000.0052.26323、0.000.000.006.000.001.2017.4017.100.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.004.610.000.000.009.601.920.000.0055.680.000.000.004.200.000.8412.1812.180.000.000.000.000.000.000.000.000.000.000.000.000.0013.200.002.6438.2838.280.000.0028.083.370.0011.701.400.000.0068.800324、.0024.482.940.0010.201.220.000.0059.980.000.000.003.600.000.7210.4410.440.000.000.000.0010.800.002.1631.3231.320.001.400.000.000.002.800.560.000.0016.240.200.000.000.000.400.080.000.002.320.000.000.000.000.000.000.000.000.001.480.000.000.002.960.590.000.0017.170.200.000.000.000.400.080.000.002.320.0325、00.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.0011.200.002.2432.4832.480.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.007.400.001.4821.4621.460.002 层层 墙墙 及及326、 抹抹 灰灰 工工 程程 量量 计计 算算 表表180内墙工程量0.000.000.007.400.001.4821.4621.460.000.0024.963.000.0010.401.250.000.0061.150.000.000.000.000.000.000.000.000.000.000.000.008.400.001.6824.3624.360.000.0014.881.790.006.200.740.000.0036.460.000.000.000.000.000.000.000.000.000.007.440.890.003.100.370.000.0018.230.000.327、000.002.200.000.446.386.380.000.007.440.890.003.100.370.000.0018.230.0017.282.070.007.200.860.000.0042.340.007.680.920.003.200.380.000.0018.820.000.000.000.000.000.000.000.000.000.009.121.090.003.800.460.000.0022.340.000.000.001.540.000.314.474.470.000.009.121.090.003.800.460.000.0022.340.000.000.00328、3.090.000.628.968.960.000.009.121.090.003.800.460.000.0022.340.009.121.090.003.800.460.000.0022.340.000.000.001.700.000.344.934.930.000.0016.241.950.005.600.670.000.0031.810.000.000.000.000.000.000.000.000.000.0028.803.460.0012.001.440.000.0070.560.0033.644.040.0011.601.390.000.0065.890.000.000.000.329、000.000.000.000.000.000.000.000.005.400.001.0815.6615.660.000.000.000.001.800.000.365.225.220.000.000.000.000.000.000.000.000.000.000.004.000.480.001.600.190.000.009.410.000.000.000.000.000.000.000.000.000.000.000.005.200.001.0415.0815.080.000.000.000.000.000.000.000.000.000.000.002.000.240.000.800.330、100.000.004.700.000.000.000.000.000.000.000.000.000.000.000.002.300.000.466.676.670.000.000.000.000.000.000.000.000.000.000.000.000.002.300.000.466.676.670.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.002.000.240.000.800.100.000.004.700.000.000.004.400.000.8812.7612.76331、0.000.000.000.003.200.000.649.289.280.007.89432.0851.85139.23189.7651.91403.77403.471109.22天棚抹灰(m2)外抹灰(m2)内抹灰(m2)外墙柱外墙柱内墙柱0.000.000.000.000.0011.600.003.190.000.000.000.000.000.000.001.160.000.001.440.000.000.000.000.004.320.000.000.006.240.000.000.001.300.000.000.000.000.008.640.007.920.000.000.000332、.002.321.300.000.003.480.000.000.000.000.000.000.008.700.000.000.000.002.600.000.000.000.000.002.880.0010.240.000.009.285.400.009.400.009.400.005.400.000.000.580.000.580.000.004.800.000.005.800.000.002.200.000.000.000.000.000.000.000.000.000.000.0015.840.000.000.000.000.000.000.000.000.000.000.000.0333、00.000.000.000.000.003.520.000.000.000.000.003.840.000.000.000.000.006.600.000.000.003.400.000.002.903.300.000.000.001.100.000.002.032.710.000.002.031.100.003.300.000.000.000.000.000.000.00128.1953.653 层层 墙墙 及及 抹抹 灰灰 工工 程程 量量 计计 算算 表表序号轴线编号梁编号属性(有=1,无=0)墙类型(外=1,内=2,)墙厚(m)梁截面(m)梁支座(m)梁跨度(m)墙净长(m)层高(m)宽(b)高(h)左a1右a2114L1-1110.200.200.400.100.103.002.803.0024L1-P110.200.200.400.100.000.500.403.00323K
CAD图纸
上传时间:2023-12-28
23份
CAD图纸
上传时间:2023-11-23
24份