个人中心
个人中心
添加客服WX
客服
添加客服WX
添加客服WX
关注微信公众号
公众号
关注微信公众号
关注微信公众号
升级会员
升级会员
返回顶部
手持电动工具安全教育PPT课件(30页)
手持电动工具安全教育PPT课件(30页).ppt
下载文档 下载文档
培训课件
上传人:正*** 编号:826013 2023-11-30 30页 800.07KB
1、Hand and Power Tool Safety手持及电动工具安全,General Safety Precautions一般安全防范措施,Employees who use hand and power tools and who are exposed to the hazards of falling,flying,abrasive and splashing objects,or exposed to harmful dusts,fumes,mists,vapors,or gases must wear the particular personal equipment necess2、ary to protect them from the hazard.在使用手持及电动工具并暴露于落下、飞溅或碾磨的物体或者暴露于有害的粉尘、烟雾、蒸汽、气体等危害时,必须佩戴特定的劳保用品。If a hazardous situation is encountered,it should be brought to the attention of the proper individual immediately.如果碰到危险状况,应立即向有关人员报告。,Appropriate personal protective equipment should be worn due to haz3、ards that may be encountered while using portable power tools and hand tools.在使用手持和电动工具时,必须针对可能会遇到的危害,使用适当的劳动防护用品。Floors should be kept as clean and dry as possible to prevent accidental slips with or around dangerous hand tools.地面应尽可能保持清洁、干燥,以避免在危险的手持工具附近意外摔倒造成伤害。,General Safety Precautions一般安全防范措施4、,Hand Tools手持工具,Hand tools are non-powered.They include anything from axes to wrenches.The greatest hazards posed by hand tools result from misuse and improper maintenance.手持工具是非动力的。它包括从斧头到扳手等任何工具。手持工具所能造成的危险主要在于误用及保养不良。,Hand Tool Misuse误用手持工具,The greatest hazards posed by hand tools result from mis5、use and improper maintenance.。手持工具所能造成的危险主要在于误用及保养不良。例如:Using a screwdriver as a chisel may cause the tip of the screwdriver to break and fly,hitting the user or other employees.将螺丝刀当凿子使用可能会造成螺丝刀尖破裂飞溅,击中使用者或其他员工。If a wooden handle on a tool such as a hammer or an axe is loose,splintered,or cracked,t6、he head of the tool may fly off and strike the user or another worker.工具的木把手松动或裂开,工具的头可能会飞出击中使用者或其他员工。A wrench must not be used if its jaws are sprung,because it might slip.如果扳手的钳夹打滑时不要使用,因为它会滑动。Impact tools such as chisels,wedges,or drift pins are unsafe if they have mushroomed heads.The heads migh7、t shatter on impact,sending sharp fragments flying.冲击工具,例如凿子、楔子或冲钉等,如果其头部呈蘑菇状时是不安全的。其头部在冲击时可能会碎裂,造成一些尖锐的碎片飞溅。,Basic Hand Tool Safety Practices基本手持工具安全工作方法,Always wear safety goggles to protect eyes.永远使用安全防护眼镜Select the right tool for the job.针对工作选择合适的工具Keep tools in good condition保持工具处于良好的状态Use tool8、s correctly正确使用工具Keep tools in a safe place将工具放在安全的地方,Basic Hand Tool Safety Practices基本手持工具安全工作方法,Safety Use of Hammers 安全使用锤子Never use a hammer to strike another hammer.不要用锤子敲击锤子。Never use a hammer with a loose or damage handle.不要使用把手松动或损坏的锤子。Discard any hammer if it shows dents,cracks,chips,mushr9、ooms,or excessive wear.丢弃有凹陷、裂缝、碎片、蘑菇头或过度磨损的锤子。,Basic Hand Tool Safety Practices基本手持工具安全工作方法,Safety Use of Knives 安全使用刀Knives must be kept sharp.保持刀刃锋利The cutting stroke should be away from the body.切割动作应向远离身体的方向进行。When not in use,knives should be kept in racks with the edges guarded.不使用时,刀应放在架子上,并将10、刀刃防护起来。Never do Horseplay around knife operations.不要用刀嬉戏打闹。,Basic Hand Tool Safety Practices基本手持工具安全工作方法,Safety Use of Wrenches 安全使用扳手Always be alert for slip off the fastener.随时警惕扳手滑脱。Brace yourselves,never loss balance in case the wrench become free.将自己支撑处,在扳手滑动时不要失去平衡。Never overload the capacity 11、of a wrench by using a pipe extension or striking.不要用管套、敲打等方式超负荷使用扳手。Never make the wrong wrench fit by using shims.不要使用薄垫片来将不适用的扳手调整合适。Have open jaws facing users.Pull,dont push.将扳手的开口朝向使用者。使用时要拉而不是推。,Basic Hand Tool Safety Practices基本手持工具安全工作方法,Safety Use of Pliers 安全使用钳子Never use pliers as wrench12、es.不要将钳子当扳手使用。Wire should be cut with the cutter knives swung up and down.Dont bend wire back and forth.剪线材时刀口应上下摆动,不要将线材来回弯折。,Basic Hand Tool Safety Practices基本手持工具安全工作方法,Around flammable substances,sparks produced by iron and steel hand tools can be a dangerous ignition source.Where this hazard ex13、ists,spark-resistant tools made from brass,plastic,aluminum,or wood will provide for safety.周围有易燃物质时,由铁或钢造成的火花或成为危险的热源。当这种危害存在时,应使用由黄铜、塑料、铝或木头等材料制成的防火花工具以保证安全。,Some Non-Sparking Tools,Hazards of Power Tools手持动力工具的危害,All hazards involved in the use of power tools can be prevented by following five ba14、sic safety rules:遵守以下五条基本安全规则可以避免使用动力工具时的所有危害:Keep all tools in good condition with regular maintenance.保持所有工具完好并定期保养。Use the right tool for the job.按照任务所需使用正确的工具Examine each tool for damage before use.在使用前检查每一个工具Operate according to the manufacturers instructions.按照使用说明书正确使用。Provide and use the pro15、per protective equipment.使用劳保用品。,General Safety Guidelines for Power Tools手持动力工具一般安全导则,Know the power tool.理解动力工具Operators must read and understand the owners manual.使用者必须阅读并理解使用说明书。Labels affixed or included in the shipping container must be read and understood.包装上的其它标签也必须阅读并理解。Ground all tools unl16、ess double insulated.所有的动力工具都应该接地除非是双重绝缘Avoid dangerous environments.Do not use power tools in a damp,wet and/or explosive atmosphere-fumes,dust or flammable materials.避免危险环境.不要在潮湿或有爆炸性气体,易燃物品附近使用动力工具。,Be aware of all power lines and electrical circuits,water pipes,and other mechanical hazards in yo17、ur work area,particularly those below the work surface,hidden from the operators view,that may be contacted.注意工作场所附近可能会接触到的电线、水管及其它机械危害,特别是在工作平面以下,操作工视线以外的部分。,Wear proper apparel.Do not wear loose clothing,dangling objects or jewelry.Long hair must be restrained.Gloves should not be worn when operat18、ing certain power tools.Check appropriate tool manuals.正确着装。不要穿松散的衣服,悬挂的物品或珠宝。长头发必须扎起来。在使用某些工具时不要戴手套。,General Safety Guidelines for Power Tools手持动力工具一般安全导则,Never carry a tool by the cord or hose.不要提着工具的电线或软管。Never yank the cord or the hose to disconnect it from the receptacle.不要猛拉工具的电线或软管来使其脱离能源。Kee19、p cords and hoses away from heat,oil,and sharp edges.保持电线或软管远离热源、油污及锋利边缘。Disconnect tools when not in use,before servicing,and when changing accessories such as blades,bits and cutters.在不使用时,使用之前以及更换附件时,必须脱离能源。,General Safety Guidelines for Power Tools手持动力工具一般安全导则,All observers should be kept at a s20、afe distance away from the work area.所有的监护者应与工作区域保持一定的安全距离。Secure work with clamps or a vise,freeing both hands to operate the tool.用夹具将工件固定住,用双手来操作工具。Avoid accidental starting.Workers should not hold a finger on the switch button while carrying a plugged-in tool.避免意外启动。在搬运时,不要将手指放在开关按钮处。,General Sa21、fety Guidelines for Power Tools手持动力工具一般安全导则,Tools should be maintained with care.They should be kept sharp and clean for the best performance.Follow instructions in the users manual for lubricating and changing accessories.工具应保持良好,按照使用说明书加润滑油及更换附件。Be sure to keep good footing and maintain good balan22、ce.确保站姿正确并保持良好平衡。All portable electric tools that are damaged shall be removed from use and tagged“Do Not Use.”所有有损伤的电动工具都应该停止使用并标明“不得使用”,General Safety Guidelines for Power Tools手持动力工具一般安全导则,General Safety Precautions-Electric Tools电动工具一般安全防范措施,Employees using electric tools must be aware of severa23、l dangers;the most serious is the possibility of electrocution.手持电动工具会造成多种伤害,最严重的就是电死。Among the chief hazards of electric-powered tools are burns and slight shocks which can lead to injuries or even heart failure.,手持电动工具最常见的危害是灼伤及轻微电击。,Electric tools must either have a three-wire cord with ground an24、d be grounded,be double insulated,or be powered by a low-voltage isolation transformer.手持电动工具必须连接三相电并且接地,或者是双重绝缘或由隔离开的低压变压器供电。Double insulation is more convenient.双重绝缘更方便。,General Safety Precautions-Electric Tools电动工具一般安全防范措施,Electric tools should be operated within their design limitations.手持电动工具应在25、其设计范围以内使用。Gloves,if kept clear of rotating parts,and safety footwear are recommended during use of electric tools.使用过程中应佩戴安全手套和安全鞋。When not in use,tools should be stored in a dry place.不使用时,工具应存放在干燥的地方。Electric tools should not be used in damp or wet locations.不得在潮湿的地方使用手持电动工具。Work areas should be w26、ell lighted.工作区域应良好照明。,General Safety Precautions-Electric Tools电动工具一般安全防范措施,Power Tool Accessories and Attachments动力工具配/附件,Dont use an accessory or attachment unless:应使用如下配/附件:The power tool manufacturer recommends its use on the product;制造商推荐使用的;The accessory limitations and specifications match t27、he limitations and specifications of the power tool;附件的性能符合动力工具的特殊要求。The use of accessory does not require the removal of or defeating of any safety-related devices on the power tool;使用附件时不能拆除或破坏任何动力工具安全部件。Unplug tools before installing,adjusting and changing any accessory or attachment of any kind.28、在安装,调整或更换任何配/附件之间一定将动力工具脱离能源。,Powered Abrasive Wheel Tools 动力磨轮工具,Before an abrasive wheel is mounted,it should be inspected closely and sound-or ring-tested to be sure that it is free from cracks or defects.在安装砂轮以前,必须仔细检查,通过声音试验,以确保其没有裂缝或缺陷。To test,wheels should be tapped gently with a light non-me29、tallic instrument.A sound and undamaged wheel will give a clear metallic tone or“ring.”做声音试验时,可用一个非金属的工具轻轻敲打砂轮。好的砂轮会发出一种清晰的金属声。,Failure to Ring Test,Failure to ring test could result in a disintegrating wheel.未做声音测试可能会造成砂轮破裂。This could lead to serious injury or death.破裂的砂轮可能会造成严重的伤害或死亡。,Spindle guar30、d removed for better viewing,Powered Abrasive Wheel Tools 动力磨轮工具,To prevent the wheel from cracking,the user should be sure it fits freely on the spindle.为防止破裂,砂轮必须与轴相配。The spindle nut must be tightened enough to hold the wheel in place,without distorting the flange.轴的螺帽必须上紧,没有破坏凸缘。Assure that the s31、pindle wheel will not exceed the abrasive wheel specifications.确保轴轮不会超过砂轮的特殊要求。Never stand directly in front of the wheel.不要站在砂轮的正前方。,Portable Drill Safety Precautions手持电钻安全防范措施,Check carefully for loose power cord connections and frays or damage to the cord.Replace damaged tool and extension cords 32、immediately.仔细检查电线是否有磨损或损伤,连接是否松动。损伤的电线应立即更换。Be sure the chuck is tightly secured to the spindle.确保卡盘安装牢固。The chuck key must be removed from the chuck before starting the drill.在启动前,必须将卡盘钥匙取下。,Portable Drill Safety Precautions,Check auxiliary handles,if part of the tool.Be sure they are securely ins33、talled.Always use the auxiliary drill handle when provided.检查附加把手,确保其安装正确。如有提供,须使用附加把手Always hold or brace the tool securely.Brace against stationary objects for maximum control.工件必须固定牢靠,最好将其固定在永久性的物体上以获取最大控制。Dont force a drill.Apply enough pressure to keep the drill bit cutting smoothly.If the drill slows down,relieve the pressure.Forcing the drill can cause the motor to overheat,damage the bit and reduce operator control.不要用力压电钻。只要施加能让电钻平稳钻动的压力即可。如果电钻慢下来,应放松压力。用力压电钻,会造成马达过热,损坏钻头以及降低操作工的控制能力。,THANK YOU,
会员尊享权益 会员尊享权益 会员尊享权益
500万份文档
500万份文档 免费下载
10万资源包
10万资源包 一键下载
4万份资料
4万份资料 打包下载
24小时客服
24小时客服 会员专属
开通 VIP
升级会员
  • 周热门排行

  • 月热门排行

  • 季热门排行

  1. 2025商场地产夏日啤酒龙虾音乐嘉年华(吃货的夏天主题)活动策划方案-47页.pptx
  2. 2022城区自来水提质改造智慧水务建设项目设计方案(199页).pdf
  3. 陕西化学工业公司招聘管理与职业发展管理手册30页.doc
  4. 动火作业安全告知卡(1页).docx
  5. 高处作业安全告知卡(1页).docx
  6. 广场工程建设项目施工招标评标报告表格(24页).pdf
  7. 原油码头消防工程维保方案(39页).docx
  8. 建筑工程外脚手架专项施工方案(悬挑式脚手架、落地式脚手架)(25页).doc
  9. 2020柏向堂房地产公司材料标准化手册3.0(143页).pdf
  10. 2021柏向堂房地产公司材料标准化手册4.0(108页).pdf
  11. 土建、装饰、维修改造等零星工程施工组织设计方案(187页).doc
  12. 深圳装饰公司施工图纸会审及设计交底管理制度【13页】.doc
  13. 房地产开发贷款实操指南(5页).pdf
  14. 学校宿舍楼建设工程施工方案【153页】.docx
  15. 住宅小区工程施工方案【234页】.docx
  16. 鄂尔多斯空港物流园区总体规划方案(2017-2030)环境影响评价报告书(23页).doc
  17. 规划兰园西路道路工程环境方案环境影响评价报告书(89页).pdf
  18. 屋面圆弧形穹顶结构高支模施工方案(40米)(47页).doc
  19. 埋石混凝土挡土墙施工方案(23页).doc
  20. 重庆市五小水利工程建设规划报告(64页).doc
  21. 厂区至矿区管网蒸汽管道系统扩容改造工程施工组织设计方案(105页).doc
  22. 超高纯氦气厂建设项目办公楼、变电站、水泵房及消防水池、门卫、厂房、仓库、配套工程施工组织设计方案(140页).doc
  1. 房地产交易环节契税减征申报表(首套填写)(2页).doc
  2. 2025商场地产夏日啤酒龙虾音乐嘉年华(吃货的夏天主题)活动策划方案-47页.pptx
  3. 2024大楼室内精装修工程专业分包投标文件(393页).docx
  4. 苏州水秀天地商业项目购物中心100%室内设计方案(158页).pptx
  5. 2022城区自来水提质改造智慧水务建设项目设计方案(199页).pdf
  6. 小区人员配置档案建立保洁绿化物业管理服务投标方案(593页).docx
  7. 室内移动式操作平台工程施工方案(19页).doc
  8. 地铁6号线区间盾构下穿管线专项施工方案(30页).doc
  9. 矿山治理工程施工组织设计方案(240页).docx
  10. 老旧小区改造工程施工方案及技术措施(364页).doc
  11. 2021柏向堂房地产公司材料标准化手册4.0(108页).pdf
  12. 川主寺城镇风貌整治景观规划设计方案(60页).pdf
  13. 建筑工程三级安全教育内容(24页).doc
  14. 新疆风电十三间房二期工程49.5mw风电项目可行性研究报告(附表)(239页).pdf
  15. 土建、装饰、维修改造等零星工程施工组织设计方案(187页).doc
  16. 四川凉山攀西灵山国际度假区小镇活力中心商业业态规划方案建议书(33页).pdf
  17. 埋石混凝土挡土墙施工方案(23页).doc
  18. 地下停车场环氧地坪漆施工方案(45页).doc
  19. 深圳装饰公司施工图纸会审及设计交底管理制度【13页】.doc
  20. 住宅定价策略及价格表制定培训课件.ppt
  21. 西安名京九合院商业项目招商手册(28页).pdf
  22. 2010-2030年湖北咸宁市城市总体规划(32页).doc
  1. 建筑工程夜间施工专项施工方案(18页).doc
  2. 赣州无动力亲子乐园景观设计方案(111页).pdf
  3. 2016泰安乡村旅游规划建设示范案例(165页).pdf
  4. 房地产交易环节契税减征申报表(首套填写)(2页).doc
  5. 龙山县里耶文化生态景区里耶古城片区旅游修建性详细规划2015奇创.pdf
  6. 连云港市土地利用总体规划2006-2020年调整方案文本图集(78页).pdf
  7. 850亩项目塑钢门窗工程施工组织设计方案(34页).doc
  8. 老旧小区改造工程施工方案及技术措施(364页).doc
  9. 城市更新项目地价公式测算表.xlsx
  10. 房地产项目规划前期投资收益测算模板带公式.xls
  11. 存储器基地项目及配套设施建筑工程临时用水施工方案(40页).docx
  12. 铁路客运枢纽项目站前框构中桥工程路基注浆加固专项施工方案(19页).doc
  13. 室内移动式操作平台工程施工方案(19页).doc
  14. 装配式结构工业厂房基础、主体结构、门窗及装饰工程施工方案(83页).doc
  15. 地铁6号线区间盾构下穿管线专项施工方案(30页).doc
  16. 施工工程安全教育培训技术交底(13页).doc
  17. 老旧小区改造施工方案及技术措施(365页).doc
  18. 新建贵广铁路线下工程沉降变形观测及评估监理实施细则(126页).doc
  19. 消防火灾应急疏散演练预案(12页).doc
  20. 矿山治理工程施工组织设计方案(240页).docx
  21. 崖城站悬臂式挡墙施工方案(92页).doc
  22. 北京科技园公寓建设项目整体报告方案.ppt