个人中心
个人中心
添加客服WX
客服
添加客服WX
添加客服WX
关注微信公众号
公众号
关注微信公众号
关注微信公众号
升级会员
升级会员
返回顶部
杭州万象城景观改造项目酒店区域景观设计方案(36页)
杭州万象城景观改造项目酒店区域景观设计方案(36页).pdf
下载文档 下载文档
景观设计
上传人:故事 编号:825502 2023-11-29 36页 48.12MB
1、杭州柏悦酒店杭州柏悦酒店The current entry is too exposed and opened end at the back exit 目前的酒店车行入口过于开放,让访客对酒店范围直视无阻 The ground-cover planting looks so dry,suggest to change the planting species 现有的地被植物过于干旱,建议更换植物品种 杭州柏悦酒店The backside exit 后场出口-Exposed view to outside surrounding building过于开放,可直视周边环境及远处楼房-Need t2、he pedestrian access to the banquet需要在宴会厅入口门前增设人行通道-Need nice backdrop at the backside exit for the drop-off area需要在落客区的后场出口设置背景景观Drop off platform area 落客区等候平台-Not efficiency and proper turning car spot缺少合适的回转车场-CR Land and Hotel management would like to extend the waitingpedestrian footpath in fro3、nt of hotel building-华润高层及酒管部门希望扩大酒店门前的等候区杭州柏悦酒店Drop off backdrop area 落客区背景景观-Not well designed backdrop 背景景观欠缺妥善设计-Need some focal point 需要增添对景景观-Refer to Grand Hyatt Hotel Shenzhen 参考深圳君悦酒店风格 杭州柏悦酒店Case Study 案例分析-green island and planting backdrop 绿岛和植物背景景观-well planting arrangement with water f4、all as the feature 精致的植物设计搭配,融合瀑布水景以形成特色景观点 Case Study 案例分析-temporary parking lane at drop off area 落客区的临时停泊通道 杭州柏悦酒店Case Study 案例分析-Good signage at drop-off落可区的标识牌设计Case Study 案例分析-Nice planting arrangement用心的植物设计搭配Case Study 案例分析-Stone feature特色景石Case Study 案例分析-Water featurewater fall and bubble 5、糅合水幕与小型涌泉(喷泉)的水景 杭州柏悦酒店1.取消文本中庭院的设计,考虑以草坪和乔木种植为主 Cancel the current court design,replacing by lawn or trees mainly 2.酒店区车行入口处,缩窄车型通道的宽度至5.5-6M(双车单向驶入)车行+1.2M人行,两侧种植以规整灌木(不建议做草花)及乔木为主 Entrance of hotel area:reduce the width of car road to be 5.5 6 m(two car roads for single direction),and remain 1.2 6、m width for pavement.This entrance area shall be enlarged and extended to left side.Plus,the planting alongside will mainly be shrub(no grass/flowers)and trees,and the planting design should be tidy feeling 3.酒店入口对景水景设计需复核现状施工图,确认位置与其后的人防出入口不冲突,具备实施可能性。About water feature in front of the hotel main 7、entrance,we might have to reconfirm the location,according to the current construction drawings,ensure the location of it will not collide with the basement entrance,to consider about the feasibility of this design.孙工提供的修改意见 杭州柏悦酒店Park Hyatt Hotel 周周周周周周Reducing the driving lane to 5.5-6 m.wide 缩小车行8、道至 5.5 6 米 RE-design water feature as Grand Hyatt Shenzhen as reference and adding the sense of Hangzhou landscape by contemporary design way 以深圳君悦酒店为参考,重新设计水景,也融入富有杭州特色的现代景观设计 RE-design the proper access to the banquet and also decorating the space by movable huge potted tree pit to hide the view f9、rom outside 为宴会厅门前区域重新设计了合适的入口通道,以可移动树池的设置遮挡远处楼房 Provide 1.2 m.wide pedestrian walkway 预留 1.2米宽的人行道 Replace this central court by lawn,to increase the green area 取消原有的中心庭院设计,改为草坪以增加绿化区域 Add array of trees along side of the pavement in governmental area for now,but more renovated design will be adjus10、ted in next package 目前在市政区域的人行道旁增加行道树,该区域的改造设计会在下一轮修改文本中呈现 杭州柏悦酒店杭州柏悦酒店杭州柏悦酒店杭州柏悦酒店杭州柏悦酒店Feature stone 景石 Extended green space with landscape garden inspired Hangzhou culture garden.Transfer to the modern way.With feature stone and more nice planting 以杭州特色花园为灵感,扩大绿化空间,以更现代感的景观呈现。融入景石和精致植物设计 Willow T11、ree 柳树 杭州柏悦酒店杭州柏悦酒店Access pathway to the Office area 连接办公区的步行小径 Extended green space with landscape garden inspired Hangzhou culture garden.Transfer to the modern way.With feature stone and more nice planting 以杭州特色花园为灵感,扩大绿化空间,以更现代感的景观呈现。融入景石和精致植物设计 杭州柏悦酒店Water feature+water jet 水景与小型喷泉 Water featur12、e+feature stone 特色水景与景石的搭配 Extended green space with landscape garden inspired Hangzhou culture garden.Transfer to the modern way.With feature stone and more nice planting 以杭州特色花园为灵感,扩大绿化空间,以更现代感的景观呈现。融入景石和精致植物设计 杭州柏悦酒店Water jet 涌泉(喷泉)Feature stone 景石 杭州柏悦酒店杭州柏悦酒店杭州柏悦酒店杭州柏悦酒店RE-design the proper acc13、ess to the banquet and also decorating the space by movable huge potted tree pit to hide the view from outside 为宴会厅门前区域重新设计了合适的入口通道,以可移动树池的设置遮挡远处楼房 EVA Platform 消防登高面 杭州柏悦酒店杭州柏悦酒店Park Hyatt Hotel 周周周周周周Reducing the driving lane to 5.5-6 m.wide 缩小车行道至 5.5 6 米 RE-design water feature as Grand Hyatt Sh14、enzhen as reference and adding the sense of Hangzhou landscape by contemporary design way 以深圳君悦酒店为参考,重新设计水景,也融入富有杭州特色的现代景观设计 RE-design the proper access to the banquet and also decorating the space by movable huge potted tree pit to hide the view from outside 为宴会厅门前区域重新设计了合适的入口通道,以可移动树池的设置遮挡远处楼房 Pro15、vide 1.2 m.wide pedestrian walkway 预留 1.2米宽的人行道 Replace this central court by lawn,to increase the green area 取消原有的中心庭院设计,改为草坪以增加绿化区域 Provide car turning area in between welcome feature wall and hotel entrance 于迎宾景墙和酒店入口之间增设回转车场 Add array of trees along side of the pavement in governmental area for 16、now,but more renovated design will be adjusted in next package 目前在市政区域的人行道旁增加行道树,该区域的改造设计会在下一轮修改文本中呈现 杭州柏悦酒店杭州柏悦酒店杭州柏悦酒店杭州柏悦酒店改造区域改造区域 杭州柏悦酒店杭州柏悦酒店杭州柏悦酒店Extended green space with landscape garden inspired Hangzhou culture garden.Transfer to the modern way.With feature stone and more nice planting 以杭17、州特色花园为灵感,扩大绿化空间,以更现代感的景观呈现。融入景石和精致植物设计 杭州柏悦酒店杭州柏悦酒店杭州柏悦酒店杭州柏悦酒店杭州柏悦酒店Pump well will be ideally hided behind the feature wall and covered by plants.Central water feature will be connected with the feature wall water area by tubes underneath.To achieve the water recycle system 泵井将设置在景墙背面,以植物遮蔽。水景中断将通过18、地下管道与景墙水景连接,以此实现水循环的再生利用 杭州柏悦酒店杭州柏悦酒店10.00 m.0.50 m.Copper Sculpture 黄铜雕塑 Fountain bowl 鉢型涌泉 Pebble 鹅卵石 Newly design of water feature will be connected with the feature wall by tubes underneath,which would save the room between ground floor and basement structure and provide the water recycle system19、 新设计的水景中岛会通过地下管道,与对景景墙连接,实现水循环j节约资源,同时节省地面与地下顶板的空间 Central water feature will enhance the grand atmosphere of Park Hyatt Hotel,however,the engineers might have to assist with load calculation of central water feature 水景中岛设计更能体现柏悦酒店的气派,不过水景荷载计算还需水电工程师核实 杭州柏悦酒店杭州柏悦酒店杭州柏悦酒店杭州柏悦酒店杭州柏悦酒店杭州柏悦酒店Copper Boar20、der 黄铜装饰线 Travertine Mable wall 浪淘沙石墙 150 mm.Craft stone 石刻设计 A A A A A A A A A 杭州柏悦酒店杭州柏悦酒店17.50 m.Feature wall 景墙 4.5 m.tall 高 6.5 m.Signage 标识牌 0.30 m.杭州柏悦酒店杭州柏悦酒店Lighting mood feeling on the wall 景墙灯光渲染效果 杭州柏悦酒店杭州柏悦酒店Artificial trees or bamboos movable pot on the structure.No need the soil depth and less Maintenance 人造树或人在竹子盆栽将安置在此构筑地面上。无需土壤厚度,也便于后期维护管理。杭州柏悦酒店杭州柏悦酒店杭州柏悦酒店杭州柏悦酒店
会员尊享权益 会员尊享权益 会员尊享权益
500万份文档
500万份文档 免费下载
10万资源包
10万资源包 一键下载
4万份资料
4万份资料 打包下载
24小时客服
24小时客服 会员专属
开通 VIP
升级会员
  • 周热门排行

  • 月热门排行

  • 季热门排行

  1. 小区人员配置档案建立保洁绿化物业管理服务投标方案(593页).docx
  2. 陕西化学工业公司招聘管理与职业发展管理手册30页.doc
  3. 建筑工程外脚手架专项施工方案(悬挑式脚手架、落地式脚手架)(25页).doc
  4. 2020柏向堂房地产公司材料标准化手册3.0(143页).pdf
  5. 2021柏向堂房地产公司材料标准化手册4.0(108页).pdf
  6. 土建、装饰、维修改造等零星工程施工组织设计方案(187页).doc
  7. 深圳装饰公司施工图纸会审及设计交底管理制度【13页】.doc
  8. 桥梁工程深基坑开挖专项施工方案(24页).doc
  9. 深基坑土方开挖及基坑支护专项施工方案.doc
  10. 天碱商业区观山苑工程人防监理规划(43页).doc
  11. 工程变形测量之基坑监测培训课件(155页).ppt
  12. 房地产开发企业拿地操作指引方案.pdf
  13. 新规下的户型增值秘籍.ppt(22页)
  14. 房地产开发贷款实操指南(5页).pdf
  15. 鄂尔多斯空港物流园区总体规划方案(2017-2030)环境影响评价报告书(23页).doc
  16. 规划兰园西路道路工程环境方案环境影响评价报告书(89页).pdf
  17. 屋面圆弧形穹顶结构高支模施工方案(40米)(47页).doc
  18. 埋石混凝土挡土墙施工方案(23页).doc
  19. 重庆市五小水利工程建设规划报告(64页).doc
  20. 厂区至矿区管网蒸汽管道系统扩容改造工程施工组织设计方案(105页).doc
  21. 超高纯氦气厂建设项目办公楼、变电站、水泵房及消防水池、门卫、厂房、仓库、配套工程施工组织设计方案(140页).doc
  22. 园林景观投标方案施工组织设计方案技术标(115页).doc
  1. 房地产交易环节契税减征申报表(首套填写)(2页).doc
  2. 2024大楼室内精装修工程专业分包投标文件(393页).docx
  3. 苏州水秀天地商业项目购物中心100%室内设计方案(158页).pptx
  4. 龙港市专业市场布局规划方案(2023-2035年)(草案)(61页).pdf
  5. 小区人员配置档案建立保洁绿化物业管理服务投标方案(593页).docx
  6. 室内移动式操作平台工程施工方案(19页).doc
  7. 地铁6号线区间盾构下穿管线专项施工方案(30页).doc
  8. 矿山治理工程施工组织设计方案(240页).docx
  9. 老旧小区改造工程施工方案及技术措施(364页).doc
  10. 北京科技园公寓建设项目整体报告方案.ppt
  11. 川主寺城镇风貌整治景观规划设计方案(60页).pdf
  12. 建筑工程三级安全教育内容(24页).doc
  13. 新疆风电十三间房二期工程49.5mw风电项目可行性研究报告(附表)(239页).pdf
  14. 土建、装饰、维修改造等零星工程施工组织设计方案(187页).doc
  15. 四川凉山攀西灵山国际度假区小镇活力中心商业业态规划方案建议书(33页).pdf
  16. 埋石混凝土挡土墙施工方案(23页).doc
  17. 地下停车场环氧地坪漆施工方案(45页).doc
  18. 深圳装饰公司施工图纸会审及设计交底管理制度【13页】.doc
  19. 地铁深基坑及钢筋笼吊装安全专项施工方案【98页】.doc
  20. 住宅定价策略及价格表制定培训课件.ppt
  21. 西安名京九合院商业项目招商手册(28页).pdf
  22. 2010-2030年湖北咸宁市城市总体规划(32页).doc
  1. 建筑工程夜间施工专项施工方案(18页).doc
  2. 赣州无动力亲子乐园景观设计方案(111页).pdf
  3. 2016泰安乡村旅游规划建设示范案例(165页).pdf
  4. 房地产交易环节契税减征申报表(首套填写)(2页).doc
  5. 龙山县里耶文化生态景区里耶古城片区旅游修建性详细规划2015奇创.pdf
  6. 连云港市土地利用总体规划2006-2020年调整方案文本图集(78页).pdf
  7. 850亩项目塑钢门窗工程施工组织设计方案(34页).doc
  8. 老旧小区改造工程施工方案及技术措施(364页).doc
  9. 城市更新项目地价公式测算表.xlsx
  10. 房地产项目规划前期投资收益测算模板带公式.xls
  11. 存储器基地项目及配套设施建筑工程临时用水施工方案(40页).docx
  12. 铁路客运枢纽项目站前框构中桥工程路基注浆加固专项施工方案(19页).doc
  13. 室内移动式操作平台工程施工方案(19页).doc
  14. 装配式结构工业厂房基础、主体结构、门窗及装饰工程施工方案(83页).doc
  15. 地铁6号线区间盾构下穿管线专项施工方案(30页).doc
  16. 施工工程安全教育培训技术交底(13页).doc
  17. 老旧小区改造施工方案及技术措施(365页).doc
  18. 新建贵广铁路线下工程沉降变形观测及评估监理实施细则(126页).doc
  19. 消防火灾应急疏散演练预案(12页).doc
  20. 矿山治理工程施工组织设计方案(240页).docx
  21. 崖城站悬臂式挡墙施工方案(92页).doc
  22. 北京科技园公寓建设项目整体报告方案.ppt