个人中心
个人中心
添加客服WX
客服
添加客服WX
添加客服WX
关注微信公众号
公众号
关注微信公众号
关注微信公众号
升级会员
升级会员
返回顶部
湖南长沙文化艺术中心方案设计报告(136页)
湖南长沙文化艺术中心方案设计报告(136页).pdf
下载文档 下载文档
房策(其它)
上传人:故事 编号:822820 2023-11-27 136页 135.04MB
1、Studio London 10 Bowling Green Lane London EC1R 0BQ T +44 20 7253 5147 F+44 20 7251 8322mail zaha- www.zaha-Changsha Meixihu International Culture&Art Centre,Hunan,ChinaSchematic Design Stage 2nd July 2012Schematic Design Report Changsha Meixihu International Culture&Arts Centre-Schematic Design Rep2、ort-02.07.2012?-?-02.07.2012Zaha Hadid Architects?Changsha Meixihu International Culture&Arts Centre-Schematic Design Report-02.07.2012?-?-02.07.2012Zaha Hadid Architects?Changsha Meixihu International Culture&Arts Centre-Schematic Design Report-02.07.2012?-?-02.07.2012Zaha Hadid Architects?00.00 Sc3、hematic Design Stage-Contents?-?01.00 Introduction?01.01-General Introduction?01.02-Design Intent Description?01.03-Site Plan Description?01.04-Index Table of Key Data?01.05-Building Areas?02.00 Masterplan?02.01-Summary?02.02-Design?02.03-Logistics?03.00 Grand&Small Theatres/Restaurant?03.01-Buildin4、g Summary?03.02-GT Design?03.03-GT Circulation Diagram?03.04.GT Design Auditorium?03.05-ST Design?03.06 Retail Plaza?05.01-Summary?05.02-Program?04.00 Art Museum?04.01-Building Summary?04.02-Museum Design?04.03-Gallery Planning?04.04-Logistics?06.00 Structure?07.00 Mechanical Systems?08.00 Electrica5、l Systems?09.00 Acoustic Description?10.00 Technical Systems and Equipment?Changsha Meixihu International Culture&Arts Centre-Schematic Design Report-02.07.2012?-?-02.07.2012Zaha Hadid Architects?01-Introduction?Changsha Meixihu International Culture&Arts Centre-Schematic Design Report-02.07.2012?-?6、-02.07.2012Zaha Hadid Architects?01.01 General Introduction?Site Location?The Changsha International Culture&Arts Centre,is located at the southwest intersection of Leifeng Avenue West,and Meixi Lake Road on Plot I-01 of Meixi Lake,Dahexi District,Changsha.?Site Area:100,431.00 sqm?Site Conditions?T7、he site of the The Changsha International Culture&Arts Centre is generally level with an approximately 5m level difference between the 40m-wide main roadway Meixi Lake Road to the North,and Huanhu Road,a 22m-wide branch road which runs parallel along the South.West of the site is a mixed-use commerc8、ial development area Plot I-29,and east of the project site is Leifeng Avenue West-46m-wide urban roadway.A subway line(No 2 line)along Meixi Lake Road to the north of the site is being planned.The site notably faces Festival Island,a strip of land located approximately 120m south of the site across9、 Meixi lake.?Principles of Planning?The site conditions of the Changsha International Culture&Arts Centre,offers unique urban advantages and unrivalled natural views to its south.The impetus for the Changsha IC&AC design proposal is to harness the virtues of this remarkable context and in turn,aspir10、es to stimulate its immediate surroundings.A principle in the designs for the Changsha IC&AC,is composition and the importance of synergy between the variety of buildings,its complex functions and landscapes to create a vibrant and organically unified urban landscape of order and elegance.?Basis for11、 Design?Re:Project Approval for the Changsha Meixihu International Culture&Arts Centre?(Development&Reform Committee of the Changsha Pioneering Zone ref:(2011)79)?Changsha Dahexi Pioneering Zone,Meixihu Area Planning Control(optimised)?(I-01 Reference for Planning Drawing)?Changsha Dahexi Pioneering12、 Zone,Meixihu Area Planning Control(optimised)?(I-01 Reference for Planning Drawing)?Conditions for Planning Document?(The Changsha Township Planning Bureau?Case Ref:?20110307XDGH1?Changsha Meixi Lake International Culture&Art Centre,Design Brief R2.0?State and local legislation,regulations and proc13、edures.?Changsha Meixihu International Culture&Arts Centre-Schematic Design Report-02.07.2012?-?-02.07.2012Zaha Hadid Architects?01.02 Design Intent Description?Introduction?Changshas Meixi Lake(or Meixihu)district aspires to become one of Chinas premier spots for culture and high value business.A s14、timulating urban environment is a critical factor in fostering a vibrant community that provides synergies to all stakeholders.The provision of critical mass and density is the necessary starting point for the development of an effective urban environment.?Zaha Hadids visionary concept acknowledges 15、the strong presence of the Meixi Lake,creating a vibrant urban scheme and establishing an organic order and elegance that is akin to the beauty found in nature:?The International Culture&Arts Centre embodies a unique variety of civic nodes and spaces:A Grand Theatre,a Contemporary Art Museum,a Small16、 Theatre(Multipurpose Hall)and Retail facilities with restaurants and amenities.The central plaza is generated by the relative position of these separate buildings and offers a strong urban experience whereby the flow of pedestrian visitors that come from all sides of the site intersect and meet.In 17、parallel it also stretches outwards to the neighboring streets with unfettered and phenomenal views across Meixi lake with access towards Festival Island(introducing proposed pedestrian bridges).?The Grand Theatre is the focal point of the Changsha International Culture&Arts Centre.It is the largest18、 performance venue in the city with a total capacity of 1800 seats.Designed to host world-standard performances the building contains will contain all the necessary front of house functions,such as lobbies,cloakrooms,bars,restaurants,and VIP hospitality,as well as the required ancillary functions,su19、ch as administration,rehearsal rooms,backstage logistics,dressing and make-up rooms,and wardrobe.?The Museums composition of three fluid petals around its internal central atrium,juxtaposes of the various patchworks of gallery spaces in a truly seamless fashion.With outward views and balconies to it20、s exteriors,it aims to engage the sites unique location and surrounding views into some of its gallery spaces.An external plaza which faces Meixi Lake Road allows for outdoor sculptures,exhibitions and events to be extended to an expansive outdoor space which opens up to the street and welcomes its 21、visitors.?Changsha Meixihu International Culture&Arts Centre-Schematic Design Report-02.07.2012?-?-02.07.2012Zaha Hadid Architects?01.02 Design Intent Description?The Small Theatre(Multipurpose Hall)is characterized by its flexibility.With a maximum capacity of 500 seats,it can be adapted and transf22、ormed to different configurations.It can therefore accommodate a broad range of functions and shows that span from banquets and commercial events to small plays,fashion shows and music.A commercial attraction,this venue shares seamless public access to retail areas and restaurant facilities which ar23、e seated in an open,and gently sunken courtyard linking visitors to and from the basement level.?The retail area,which welcomes all visitors arriving from the underground parking and adjacent plazas,also works as a platform to provides key facilities that are shared by all venues;During the day,the 24、retail serves mainly the Museum,while during the evening it receives public from the two theatres as pre/post performance food and beverages outlets.?Although these civic institutions are uniquely defined and separate,they supply each other in all respects within its setting with plazas offering vis25、itors a tapestry-like sequence of urban ambiances that relate to the different institutions,inject the site with urban vitality.?The working hours of the different venues also overlap to ensure continuity during the full 24 hour cycle;Operated during the evening,the Grand Theatre becomes active as t26、he Museum begins to conclude its day-time operations whilst the Small theatre and retail/restaurants would be commercially available day and night.In this regard,they benefit from each others vicinity,ensuring that the site is lively 24 hours a day.?This dynamic composition further establishes a pow27、erful relationship with its surroundings which confers monumentality to the ensemble.?Embodying values of functionality,elegance and innovation,the Changsha Meixi Lake International Cul-ture&Arts Center aims to become the new cultural and civic node for the city of Changsha,and well as global cultur28、al destination.?Changsha Meixihu International Culture&Arts Centre-Schematic Design Report-02.07.2012?-?-02.07.2012Zaha Hadid Architects?01.03 Site Plan Description?Changsha Meixihu International Culture&Arts Centre-Schematic Design Report-02.07.2012?-?-02.07.2012Zaha Hadid Architects?01.00 Introduc29、tion 01.05.Building AreasArea?(sqm?)?1485Sub Total?1,627?1671?1821Sub Total?3,49251,249ART MUSEUM?(ABOVE GROUND?)First Floor?SUMMARY OF COMBINED PROJECT AREA?1,6275,119Basement Level?107,967COMBINED TOTAL?28,8434,98521,2631,62756,718SMALL THEATRE?(ABOVE GROUND?)SUB-TOTAL?(AREAS ABOVE GROUND?)TOTAL B30、ASEMENT AREA?(INCLUDING LOADING&PARKING?)RETAIL AREA?(ABOVE GROUND?)SCHEDULE OF PROGRAMMATIC AREAS?Schematic 2nd July 2012?2012?Changsha Meixihu International Culture&Arts Centre,Hunan,China?2SMALL THEATRE?Level?Programme?Programme?Level?GRAND THEATRE?(ABOVE GROUND?)4RETAIL AREA?Total?(Inclusive of 31、Associated Basement Facilities?)Second Floor?Total?(Above-Ground?)Total?(Above-Ground?)Total?(Inclusive of Associated Basement Facilities?)1234Area?(sqm?)?159?73?95?42?828?321Area?(sqm?)?570?69Sub Total?1587?1485?1362?622Sub Total?1,627?345?117?/?110?45?1671?1846?423?1821?192?871Sub Total?3,492?28?632、32?/?369?120?89Sub Total?3398?66?166?612?204Sub Total?1048?502Sub Total?8138?2814?499?227?1403?239?1253?436?201Sub Total?7072?186?617?2600?996Area?(sqm?)?1600?700Sub Total?2816?1600?2800?-Sub Total?6642?3400?-Sub Total?6066?1?22300?580?-Sub Total?6061Basement FloorSub Total?6,8026033First Floor?Base33、ment Level?49853Level?2SMALL THEATRE?Level?Programme?Total?(Inclusive of Associated Basement Facilities?)Second Floor?Total?(Above-Ground?)Total?(Above-Ground?)Total?(Inclusive of Associated Basement Facilities?)2884342829123421,263Total?(Above-Ground?)Total?(Inclusive of Associated Basement Facilit34、ies?)ART MUSEUM?28,065Programme?Fourth Floor?Third Floor?Second Floor?First Floor?Area?(sqm?)?305?85Sub Total?390?414?47?570Sub Total?1031?1362?345?93?392?1846?192?28Sub Total?4258?694?276?123?391?764?353?224?4314?497?502Sub Total?8138?2814?499?227?1403?239?1253?436?201Sub Total?7072?186?617?2600?9935、6?964?370?105?1733?108?275Sub Total?7954?181?1781?3762?137?201?1893?4221Sub Total?12176?777?1033Sub Total?18102884342829Total?(Inclusive of Associated Basement Facilities?)Programme?GRAND THEATRE?1Sixth Floor?Level?Fifth Floor?Second Floor?Total?(Above-Ground?)Fourth Floor?Basement Level?First Floor36、?Third Floor?Stage Pit?01.04 Index Table of Key Data?Changsha Meixihu International Culture&Arts Centre-Schematic Design Report-02.07.2012?-?-02.07.2012Zaha Hadid Architects?02-Masterplan?Changsha Meixihu International Culture&Arts Centre-Schematic Design Report-02.07.2012?-?-02.07.2012Zaha Hadid Ar37、chitects?01.02 Design Intent Description?Planning?Zaha Hadid Architects concept for the Culture&Arts Center is intrinsically urban,creating a network of venues that come together around a continually fluid and civic landscape that aims to draw in visitors from all directions.Organised around a centr38、al area or the Central Plaza,the venues are:1.Grand Theatre,with 1,800 seats capacity,2.Small Theatre(Multifunction Hall),with 500 seats capacity,3.Contemporary Art Museum,4.Retail,Facilities with restaurants and cafeConnectivity is one of the schemes prevailent features.Each building is accessible 39、through independent flows that organize different routes for different groups of users.Along these routes,the landscape rises gently to create individual forecourts and building lobbies which also work as communication hubs that enable flexible itineraries and ensure open accessibility for all users40、.?Changsha Meixihu International Culture&Arts Centre-Schematic Design Report-02.07.2012?-?-02.07.2012Zaha Hadid Architects?01.02 Design Intent Description?Transportation&Access?The vehicular circulation strategy employs different lanes for private cars,VIP and public transport,utilising separate rou41、tes for clear and intuitve access.There are pick-up/drop-off areas along the main thoroughfares to each building,with separate access for VIP,and passage access to basement level.Although the site can be accessed from all directions,drop-offs and pedestrian access are designated along the active mai42、n road to the North(Meixihu road)supporting direct access for VIP to the Museum,and along the lake-facing route to the South(Huanhu road)with direct VIP access(with predominant traffic travelling from the west)to the Grand Theatre and Small Theatre respectively.Underground vehicular routes runs west43、 of the site and perpindicular against Meixihu road and Huanpu road links these routes to direct visitors to basement-level parking(approx.475 parking bays),or as a drop-off towards an open courtyard area which to draw visitors towards the central plaza above.These also serve as underground loading 44、access for the Museum near the North,and the Small theatre loading to the south.There are 2 underground entrances/exits north-west and south-west of CMIC&AC,and an exit to the south-east.A further loading access for the occasional access of large items to the Museums Big-Box is designated above-grou45、nd,to the North West.Back of house access to the Grand Theatre(scenery,props and performers access)are located on ground level to the East of the site with designated parking for coaches and broadcasting vehicles.?Site Levelling?A gentle level difference exists between level roads;the Meixi Lake Roa46、d(at 41m)to the North and Huanhu Road and 36m to the South.The project capitalizes on the given characteristics of this leveling condition to naturally guide visitors accessing from the North and South towards the central plaza via a landscaped corridor.The landscape is in part raised gently to crea47、te open forecourts and plazas to the respective main entrances of each venue to thus,create a series of outdoor lobbies,which also raises the profile of each building;with the Grand theatre forecourt at 43m(back of house entry to the grand theatre at 39m),Museum at 41.5m and the Small theatre at 40m48、 to the south.A level VIP Access to the Grand Theatre at 39.15m guides visitors to a private designated entrance from the South,and similarly to the Museum at 41.5 from the North.Basement access to an underground level of 32m is anticipated to adjoin and facilitate the future business district west 49、of the site.?Environmental Landscape?The landscape design materializes in response to each building,carefully stitching the interface with the interweaving of green and water on the ground.The Meixi Lake Districts dominant green street typology is expanded into the site,creating spaces with varying 50、levels intimacy and also as buffer zones between busy hard-landscaped thoroughfares and building entrances.Picking up on the green quality of the urban landscape,the proposal looks forward to enhancing the unique and natural elegance in its immediate context by providing creating a system of green s51、paces in the vicinity with a view into interfacing with the Business development expanse to the adjacent West in anticipation of a fusion between business and culture.Changsha Meixihu International Culture&Arts Centre-Schematic Design Report-02.07.2012?-?-02.07.2012Zaha Hadid Architects?In line with52、 the fluid designs strategy of the landscape,grass turfs and water-features will line gradients to delineate routes with trees and scrubs to provide shading and maintain privacy.?Composition&Architecture?Our proposed Concept Design for the Changsha Meixi Lake International Culture&Arts Center aims a53、t the creation of a new cultural and civic node for the city of Changsha that embodies values of functionality,elegance and innovation.Zaha Hadids concept for the Culture&Arts Center is intrinsically urban,creating a network of venues that come together around a Central Plaza.The venues are:the Gran54、d Theatre,the Museum,the Small Theatre(Multifunction Hall),and Retail Facilities.The Centers design combines variation with coherence,establishing a strong identity for the whole institution while avoiding both the monotony and visual chaos.The 4 main buildings constitute a family of related individ55、uals.The individual physiognomy of each building relates to its program.This individual character delivers strong urban legibility and contributes to the orientation of its visitors.This way variety is combined with coherence the best way to create a strong urban identity.?01.02 Design Intent Descri56、ption?Changsha Meixihu International Culture&Arts Centre-Schematic Design Report-02.07.2012?-?-02.07.2012Zaha Hadid Architects?02-Grand&Small Theatres?Changsha Meixihu International Culture&Arts Centre-Schematic Design Report-02.07.2012?-?-02.07.2012Zaha Hadid Architects?03.00 Grand&Small Theatres/R57、estaurant?03.01 Building Summary?Changsha Meixihu International Culture&Arts Centre-Schematic Design Report-02.07.2012?-?-02.07.2012Zaha Hadid Architects?03.00 Grand&Small Theatres/Restaurant?03.01 Building Summary?Grand Theatre?The 1800 seat performing arts venue is designed and organised as a foca58、l point of the cultural centre.Organised around the traditional cruciform of the main,back,side stages and the main auditorium.The dedicated foyer of this venue provides primary orientation and access from a raised landscape shaded by the projected form of the building.An outdoor ticketing&informati59、on area is designated on the north west crevasse of the Grand Thea-tre,which can be accessed during all-day.Visitors are drawn to the venues outdoor forecourt,which acts as a precursor for visitors.The foyer,which leads visitors over 3 levels are is an expansive spatial repertoire of slopes which gu60、ides audiences over a journey throughout this expansive volume at different levels overlooking the lobbies,and with seamless access to balconies and bridges which extend outwards.The external bal-conies will offer guests stunning broad views and vistas over Meixi Lake,and aim to offer a mix of rest-61、ing areas,and belvederes.Access to the venue for VIP is located at the forms intersection at the buildings south east,with private lounge facilities and steps-free access to the main performance halls VIP seating area.Front of house(FOH)and Back of house(BOH)are notably separated with separate acces62、s and cir-culation between Designed to host world-standard performances the building contains will contain all the necessary front of house functions,such as lobbies,cloakrooms,bars etc.and ancillary functions,such as administration,rehearsal rooms,backstage logistics,dressing and make-up rooms,and 63、ward-robe,which are accessed from separate entrances from the East side of the building.All technical plant floors are also accessible through the BOH cores.Whilst skylights outline the buildings spatious foyer,shading is developed by introducing louvers in the depth of the faade shell which plays a64、 dynamic role in controlling the interior environment com-fort.The buildings skin is responsive to the orientation of the different faades,and designed to adopt a rainscreen composition using GRC as its surface material,the faade would aim to reduce high heat gains during Changshas hot summers.The r65、esponsive skin,together with water and waste management/recycling measures,constitute significant steps towards obtaining the desired Environmental Certification.The buildings faade morphology is corroborated by the lighting design concept,using different moods of light to produce a striking new con66、tribution to Meixi Lake District nightscape.Showcasing and promoting advanced design,engineering and innovative technology,The concept is generated through parametric design using form finding iterations and computer programming to set out the formal and structural rules that define the buildings.?C67、hangsha Meixihu International Culture&Arts Centre-Schematic Design Report-02.07.2012?-?-02.07.2012Zaha Hadid Architects?03.00 Grand&Small Theatres/Restaurant?03.01.GT Programatic Distribution?Area?(sqm?)Stage&Stage Machinery?305?85Sub Total?390?414MEP?47?570Sub Total?1031Lobby?1362Auditorium?345?93?68、392?1846Toilets?192Storage?28Sub Total?4258?694?276?123VIP?391Rehearsal Rooms?764Administration?353?224?4314?497?502Sub Total?8138?2814?499?227?1403?239?1253?436?201Sub Total?7072?186?617?2600?996?964?370?105?1733?108?275Sub Total?7954?181?1781?3762?137?201?1893?4221Sub Total?12176Upper Stage Pit?7769、7?1033Sub Total?18102884342829Total?(Inclusive of Associated Basement Facilities?)Programme?GRAND THEATRE?1Sixth Floor?Level?Fifth Floor?Second Floor?Total?(Above-Ground?)Fourth Floor?Basement Level?First Floor?Third Floor?Stage Pit?Front of HouseBack of HouseChangsha Meixihu International Culture&A70、rts Centre-Schematic Design Report-02.07.2012?-?-02.07.2012Zaha Hadid Architects?03.00 Grand&Small Theatres/Restaurant?03.03.GT Circulation Diagram?Changsha Meixihu International Culture&Arts Centre-Schematic Design Report-02.07.2012?-?-02.07.2012Zaha Hadid Architects?Internal shellInternal circulat71、ionFirst balcony circulationInternal terraceInternal terraceInternal terraceInternal terraceSecond balcony circulation AComplete internal circulationSecond balcony circulation BGrand TheatreTerraceExternal terraceExternal terraceInternal/External terraceInternal/External terraceTerracesInternal terr72、acesExternal terracesViewing platform?03.00 Grand&Small Theatres/Restaurant?03.03.GT Circulation Diagram?Changsha Meixihu International Culture&Arts Centre-Schematic Design Report-02.07.2012?-?-02.07.2012Zaha Hadid Architects?03.00 Grand&Small Theatres/Restaurant?03.03.GT Circulation Diagram?Changsh73、a Meixihu International Culture&Arts Centre-Schematic Design Report-02.07.2012?-?-02.07.2012Zaha Hadid Architects?03.00 Grand&Small Theatres/Restaurant?03.03.GT Circulation Diagram?Changsha Meixihu International Culture&Arts Centre-Schematic Design Report-02.07.2012?-?-02.07.2012Zaha Hadid Architect74、s?Grand TheatreInternal shellInternal circulationMain entrace/podiumPublic entrancePublic entranceVIP entranceService entrance?03.00 Grand&Small Theatres/Restaurant?03.03.GT Circulation Diagram?Changsha Meixihu International Culture&Arts Centre-Schematic Design Report-02.07.2012?-?-02.07.2012Zaha Ha75、did Architects?03.00 Grand&Small Theatres/Restaurant?03.03.GT Circulation Diagram?Changsha Meixihu International Culture&Arts Centre-Schematic Design Report-02.07.2012?-?-02.07.2012Zaha Hadid Architects?03.00 Grand&Small Theatres/Restaurant?03.02.GT Design?Changsha Meixihu International Culture&Arts76、 Centre-Schematic Design Report-02.07.2012?-?-02.07.2012Zaha Hadid Architects?03.00 Grand&Small Theatres/Restaurant?03.02.GT Design?Changsha Meixihu International Culture&Arts Centre-Schematic Design Report-02.07.2012?-?-02.07.2012Zaha Hadid Architects?View of the Grand Theatre from the Festival Isl77、and03.00 Grand&Small Theatres/Restaurant?03.02.GT Design?Changsha Meixihu International Culture&Arts Centre-Schematic Design Report-02.07.2012?-?-02.07.2012Zaha Hadid Architects?03.00 Grand&Small Theatres/Restaurant?03.04.GT Design Auditorium?Changsha Meixihu International Culture&Arts Centre-Schema78、tic Design Report-02.07.2012?-?-02.07.2012Zaha Hadid Architects?03.00 Grand&Small Theatres/Restaurant?03.04.GT Design Auditorium?Changsha Meixihu International Culture&Arts Centre-Schematic Design Report-02.07.2012?-?-02.07.2012Zaha Hadid Architects?View of the Art Museum from the Commercial CentreS79、mall Theatre(Multipurpose Hall)?The Small Theatre(Multipurpose Hall)is characterized by its flexibility.With a maximum capacity of 500 seats,it can be adapted and transformed to differ-ent configurations.It can therefore ac-commodate a broad range of functions and shows that span from banquets and c80、ommercial events to small plays,fashion shows and music.A commercial attrac-tion,this venue shares seamless public access to retail areas and restaurant fa-cilities which are seated in an open,and gently sunken courtyard linking visitors to and from the basement level.?03.00 Grand&Small Theatres/Res81、taurant?03.05.ST Design?Changsha Meixihu International Culture&Arts Centre-Schematic Design Report-02.07.2012?-?-02.07.2012Zaha Hadid Architects?03.00 Grand&Small Theatres/Restaurant?03.05.ST&Retail Programatic Distribution?Area?(sqm?)?Retail?1485Sub Total?1,627?1671?1821Sub Total?3,492First Floor?182、,6275,119Basement Level?Programme?Level?4RETAIL AREA?Total?(Above-Ground?)Total?(Inclusive of Associated Basement Facilities?)Front of HourseBack of HouseArea?(sqm?)?159?73?95?42?828?321?69Sub Total?1587?622?117Receiption/Cloak Room?/?110?45?423?871?632Caf/Lounge?/?369?120?89Sub Total?3398?66?166?6183、2?204Sub Total?10486033First Floor?Basement Level?49852SMALL THEATRE?Level?Programme?Total?(Inclusive of Associated Basement Facilities?)Second Floor?Total?(Above-Ground?)03.06 Retail Plaza?Retail Facilities?The retail area,which welcomes all visitors arriving from the underground park-ing and adjac84、ent plazas,also works as a platform to provides key facilities that are shared by all venues;During the day,the retail serves mainly the Museum,while during the evening it receives public from the two theatres as pre/post perfor-mance food and beverages outlets.?Changsha Meixihu International Cultur85、e&Arts Centre-Schematic Design Report-02.07.2012?-?-02.07.2012Zaha Hadid Architects?05.00 Retail Plaza?Changsha Meixihu International Culture&Arts Centre-Schematic Design Report-02.07.2012?-?-02.07.2012Zaha Hadid Architects?Retail SectionChangsha Meixihu International Culture&Arts Centre-Schematic D86、esign Report-02.07.2012?-?-02.07.2012Zaha Hadid Architects?03.00 Grand&Small Theatres/Restaurant?03.05.ST Design?Changsha Meixihu International Culture&Arts Centre-Schematic Design Report-02.07.2012?-?-02.07.2012Zaha Hadid Architects?04-Art Museum?Changsha Meixihu International Culture&Arts Centre-S87、chematic Design Report-02.07.2012?-?-02.07.2012Zaha Hadid Architects?View of the Art Museum from the Commercial Centre04.00 Art Museum?04.01.Building Summary-IntroductionThe Art Museum is located to the north of the Changsha Meixihu Cultural and Arts Centre site;it is part of a larger de-velopment c88、onsisting of a Grand Opera Building to the east of the Museum and a Small Theatre with Retail&Catering facilities to the south.To the south side of the building is the main plaza area which also links to the entrances to the other buildings and the basement parking and loading.The architectural desi89、gn of the Art Museum building has been taken from three fluid petals around a central foyer atri-um space.The three petal forms contain the gallery spaces at the various levels of the buildings.At the joining points of these petals there are three entrances to the building;1-the main entrance/exit f90、or the public,2 VIP drop-off/entry point and 3-an access to the external exhibition plaza(Cultural Plaza).The Atrium acts as the focal point of the museum and as a gathering space,which directs the public to galleries,it also can hold artworks.There are three vertical circulation cores taking place 91、within the three legs holding the three petals,those cores take the public to the upper levels.At the top level 4,there are additional two stairs to access the high level viewing platforms,which have panoramic views of the city,the festival island,the lake and the mountains beyond.The gallery spaces92、 vary in size,shape and location.The Big Box with its large volume and ground level 1 access requirements has been designed as a simple pure rectangular shape to assure maximum display flexibility.At a first floor balcony level and through a glass floor at level 4,the public can get glimpses of the 93、big box.A flexible exhibition space was required at ground level 1 so the applied arts gallery is located.The Special Exhibitions galleries are situated on the floor level 2,the Global Platforms with the China Hunan galleries on level 3 and the Permanent Collection gallery on level 4.On levels 3 and94、 4 the gallery shapes have rooflights with the possibility of having indirect natural light to the exhibition spaces.The external skin faade consists of rain-screen panel cladding(of either GRC or coated metal).An advantage of adopting these materials allow for 3-dimensional shaping of the faade.Som95、e of the solid cladding will be perforated for views out of the building where necessary.Other main materials will be glazing coverage at terrace levels,rooflights and the main atrium skylight.In coordination with GCAM,the exhibition consultants on the technical and programming aspects of the buildi96、ng has been undertaken to deliver a total construction floor area(CFA)of 31,634 square-metres(which includes 11,800m2 of exhibition gallery spaces),the building accommodates the exhibition areas,the reception facilities including the atrium space,a retail unit and counters,cafs at ground and roof le97、vels,a 200 seat auditorium,an education centre,VIP meeting rooms,Museum administration,an art library centre and a basement with all the technical facilities including the main loading area.A large lorry loading access is located on the ground level for artworks to the Big Box exhibition space.?Chan98、gsha Meixihu International Culture&Arts Centre-Schematic Design Report-02.07.2012?-?-02.07.2012Zaha Hadid Architects?04.00 Art Museum?04.01.Building Summary-Area ScheduleChangsha?Meixihu?International?Culture?&?Arts?CentreSchematic?Design?Museum?Program?AreasN*Room?Type?SD?120702LevelAEXHIBITION111799、01Exhibition Galleries100401.1Permanent Collection:Modern/Contemporary,Collectors?1.2Special Exhibitions?1.3Chinese/Hunan Galleries:Artists,History,Emerging?1.4Big Box:Experimental?1.5Global Platforms:(a)Asia,Far East;(b)Middle-East,Africa;(c)Europe,Americas?1.6Applied Arts Centre?2Lobby/Atrium1130?100、BNON-EXHIBITION:PUBLIC(Area Accessible to Visitors)39653Multifunctional:Cinemas/Screening Rooms/Auditoriums/Lecture Halls4193.5Auditorium 1-200 seats?3.6Backstage?3.7Auditorium Lobby(if separate from main)?3.8Technical Audio Control Room?3.9Technical Video Control Room?Store?4Education Center/Art Tr101、aining4584.1Lobby welcome desk?4.2Office 1?4.3Office 2?4.4Office 3?4.5Office 4?4.6Office 5?4.7Classroom 1?4.8Classroom 2?4.9Meeting Room 1?4.10Meeting Room 2?4.11Computer Lab?4.12Screening Room Small Theatre?4.13Storage?4.14Restrooms?5Art Library/Archive&Research Center580Library?Toilet?Kitchenette?102、6Primary Museum and Theater Retail315?6.1Retail Store?6.2Storage?6.3Retail Office7Museum Retail Counters1109.1Museum Retail Counter 1(For Galleries 1.1 and 1.3)?9.2Display9.3Storage9.4Museum Retail Counter 2(For Galleries 1.2 and 1.4)?9.5Display9.6Storage7Dining8897.1Restaurant-Fine Dining(150 peopl103、e:1.8sm/person)661?7.2Seating?7.3Kitchen,Storage?Staff Locker Room?Staff Toilet?7.10.Museum Caf 1(50 people:1.5sm/person)(2 Rooms)228?7.11Seating?7.12Kitchen,Storage?Toilets?9Visitor Services5708.1Admission/Ticketing(two rooms)?8.2Information Desk.Audio Guides?8.3Coat and Bag Check?8.4Large Items Ch104、eck?8.5Restrooms(Including Disable distributed)320?10Meeting Room/VIP62410.1Meeting Room(50 seats with table)a.k.a.VIP Room?10.23 Reception Rooms(no table)a.k.a.VIP Lounge?10.32 Waiting Rooms?VIP Toilet?VIP Toilet?Kitchenette?CBACK OF HOUSE:NON-PUBLIC(ASSIGNABLE)549612Offices92912.1Administration Of105、fices(Includes Director,Finance,Legal)?12.2Curatorial Offices?14.1Exhibition Design Office/Studio?14.2Graphic Design Studio and Workroom?12.3Marketing and Development Offices?12.4Executive Conference Room?12.5Shared Work Room,Copy Room,File Storage?Kitchenete?TOILETS?13Collections Storage and Manage106、ment307413.1Art Storage?13.2Crate Storage?13.3Temporary Exhibition Storage?13.4Lift truck storage?13.6Loading Dock?13.7Shipping/Receiving?13.8Uncrating/Staging Area?13.9Loading/Receiving Office?13.5Security Office?14Workshops105014.3Lighting Workshop and Storage?14.4Fabrication Workshop(Woodshop,Met107、alshop,etc)?14.5Photography Studio?14.6Conservation Labs and Office?14.7Storage(Shared,Supplies,Tools)?15Maintenance and Operations44315.1Staff Locker Room?15.2Staff Activity Room?15.3Staff Dining Hall?15.4Staff Dormitory(Overnight Shifts)?15.5Custodial(Storage)Office?15.6Janitorial(Guard)Room,Suppl108、ies?15.7Trash Disposal,Recycling Center?15.8IT Server Room,IT/Maintenance Work Room,Maintenance Staff Offices?15.9Supply,Equipment,and Seasonal Furniture Storage?15.10.Landscape Equipment Storage?TOILETS?DARCHITECTURAL/MECHANICAL(NON-ASSIGNABLE)743416Mechanical/General Equipment-To Be Detailed by En109、gineer1395Switch Room?Genset Room?Boiler Room?Fan Room?Pump Room?Refrigeration Room?17Above Ground Circulation Area5199Art and Visitor Circulation Paths3510?BOH Circulation1305?Space arround Big Box384?Basement Circulation Area840?Total?Area?Museum28065Total?Area?Above?Ground21263Total?Area?Basement110、6802Changsha Meixihu International Culture&Arts Centre-Schematic Design Report-02.07.2012?-?-02.07.2012Zaha Hadid Architects?04.00 Art Museum?04.01.Building Summary-Area Schedule Plans-Levels B1,L1&L2Level B01 Gross Area =7540 m2Outline Area =7540 m2Void Area =0 m2Level 01 Gross Area =7075 m2Outline111、 Area =7350 m2Void Area =275 m2Level 02 Gross Area =5750 m2Outline Area =7915m2Void Area =2165 m2Changsha Meixihu International Culture&Arts Centre-Schematic Design Report-02.07.2012?-?-02.07.2012Zaha Hadid Architects?04.00 Art Museum?04.01.Building Summary-Area Schedule Plans-Levels L2 Mezzanine,L3112、,L4&L5Level 02M Gross Area =1173 m2Outline Area =1285 m2Void Area =112 m2Level 03 Gross Area =7144 m2Outline Area =8684 m2Void Area =1540 m2Level 04 Gross Area =2858 m2Outline Area =2970 m2Void Area =112 m2Level 05 Gross Area =94 m2Outline Area =94 m2Void Area =0 m2Changsha Meixihu International Cul113、ture&Arts Centre-Schematic Design Report-02.07.2012?-?-02.07.2012Zaha Hadid Architects?View of the Main Entrance of the Art Museum 04.00 Art Museum?04.02.DesignChangsha Meixihu International Culture&Arts Centre-Schematic Design Report-02.07.2012?-?-02.07.2012Zaha Hadid Architects?04.00 Art Museum?04114、.02.Design-Ground Floor LayoutArt Museum-Level 1 Floor PlanChangsha Meixihu International Culture&Arts Centre-Schematic Design Report-02.07.2012?-?-02.07.2012Zaha Hadid Architects?Art Museum-Atrium View from Main Entrance04.00 Art Museum?04.02.Design-AtriumChangsha Meixihu International Culture&Arts115、 Centre-Schematic Design Report-02.07.2012?-?-02.07.2012Zaha Hadid Architects?Internal View of Big Box Space04.00 Art Museum?04.02.Design-Big BoxChangsha Meixihu International Culture&Arts Centre-Schematic Design Report-02.07.2012?-?-02.07.2012Zaha Hadid Architects?View of Applied Arts Gallery04.00 116、Art Museum?04.02.Design-Interior ViewChangsha Meixihu International Culture&Arts Centre-Schematic Design Report-02.07.2012?-?-02.07.2012Zaha Hadid Architects?Internal View of Auditorium Space04.00 Art Museum?04.02.Design-AuditoriumChangsha Meixihu International Culture&Arts Centre-Schematic Design R117、eport-02.07.2012?-?-02.07.2012Zaha Hadid Architects?04.00 Art Museum?04.02.Design-Auditorium Detail PlanChangsha Meixihu International Culture&Arts Centre-Schematic Design Report-02.07.2012?-?-02.07.2012Zaha Hadid Architects?Art Museum-Level 2 Floor Plan04.00 Art Museum?04.02.Design-PlanChangsha Mei118、xihu International Culture&Arts Centre-Schematic Design Report-02.07.2012?-?-02.07.2012Zaha Hadid Architects?View from Level 2 towards Atrium04.00 Art Museum?04.02.Design-Interior ViewChangsha Meixihu International Culture&Arts Centre-Schematic Design Report-02.07.2012?-?-02.07.2012Zaha Hadid Archit119、ects?04.00 Art Museum?04.02.Design-Interior ViewView of the Special Exhibitions Changsha Meixihu International Culture&Arts Centre-Schematic Design Report-02.07.2012?-?-02.07.2012Zaha Hadid Architects?Art Museum-Level 2 Mezzanine Floor Plan04.00 Art Museum?04.02.Design-PlanChangsha Meixihu Internati120、onal Culture&Arts Centre-Schematic Design Report-02.07.2012?-?-02.07.2012Zaha Hadid Architects?04.00 Art Museum?04.02.Design-VIP LoungeChangsha Meixihu International Culture&Arts Centre-Schematic Design Report-02.07.2012?-?-02.07.2012Zaha Hadid Architects?Art Museum-Level 3 Floor Plan04.00 Art Museu121、m?04.02.Design-PlanChangsha Meixihu International Culture&Arts Centre-Schematic Design Report-02.07.2012?-?-02.07.2012Zaha Hadid Architects?04.00 Art Museum?04.02.Design-Interior ViewView of the Global Platforms A&B GalleryChangsha Meixihu International Culture&Arts Centre-Schematic Design Report-02122、.07.2012?-?-02.07.2012Zaha Hadid Architects?04.00 Art Museum?04.02.Design-Interior ViewView of the Global Platforms from side gallery-seating area Changsha Meixihu International Culture&Arts Centre-Schematic Design Report-02.07.2012?-?-02.07.2012Zaha Hadid Architects?View of the China Hunan Exhibiti123、on 04.00 Art Museum?04.02.Design-Interior ViewChangsha Meixihu International Culture&Arts Centre-Schematic Design Report-02.07.2012?-?-02.07.2012Zaha Hadid Architects?View of the Atrium from Level 304.00 Art Museum?04.02.Design-Interior ViewChangsha Meixihu International Culture&Arts Centre-Schemati124、c Design Report-02.07.2012?-?-02.07.2012Zaha Hadid Architects?View of Grand Stairs from Level 0304.00 Art Museum?04.02.Design-Interior ViewChangsha Meixihu International Culture&Arts Centre-Schematic Design Report-02.07.2012?-?-02.07.2012Zaha Hadid Architects?Art Museum-Level 4 Floor Plan04.00 Art M125、useum?04.02.Design-PlanChangsha Meixihu International Culture&Arts Centre-Schematic Design Report-02.07.2012?-?-02.07.2012Zaha Hadid Architects?View of the Permanent Collections Gallery04.00 Art Museum?04.02.Design-Interior ViewChangsha Meixihu International Culture&Arts Centre-Schematic Design Repo126、rt-02.07.2012?-?-02.07.2012Zaha Hadid Architects?View of the Restuarant Space04.00 Art Museum 04.02.Design-Interior ViewChangsha Meixihu International Culture&Arts Centre-Schematic Design Report-02.07.2012?-?-02.07.2012Zaha Hadid Architects?Art Museum-Level 5 Floor Plan04.00 Art Museum?04.02.Design-127、PlanChangsha Meixihu International Culture&Arts Centre-Schematic Design Report-02.07.2012?-?-02.07.2012Zaha Hadid Architects?04.00 Art Museum?04.02.Design-PlanArt Museum-Basement Floor PlanChangsha Meixihu International Culture&Arts Centre-Schematic Design Report-02.07.2012?-?-02.07.2012Zaha Hadid A128、rchitects?Art Museum-Roof Plan04.00 Art Museum?04.02.Design-PlanChangsha Meixihu International Culture&Arts Centre-Schematic Design Report-02.07.2012?-?-02.07.2012Zaha Hadid Architects?Art Museum-Gallery Level 1 Floor Plan04.00 Art Museum?04.03.Gallery PlanningChangsha Meixihu International Culture&129、Arts Centre-Schematic Design Report-02.07.2012?-?-02.07.2012Zaha Hadid Architects?Art Museum-Gallery Level 2 Floor Plan04.00 Art Museum?04.03.Gallery PlanningChangsha Meixihu International Culture&Arts Centre-Schematic Design Report-02.07.2012?-?-02.07.2012Zaha Hadid Architects?Art Museum-Gallery Le130、vel 3 Floor Plan04.00 Art Museum?04.03.Gallery PlanningChangsha Meixihu International Culture&Arts Centre-Schematic Design Report-02.07.2012?-?-02.07.2012Zaha Hadid Architects?Art Museum-Gallery Level 4 Floor Plan04.00 Art Museum?04.03.Gallery PlanningChangsha Meixihu International Culture&Arts Cent131、re-Schematic Design Report-02.07.2012?-?-02.07.2012Zaha Hadid Architects?Art Museum-Sectional Perspective04.00 Art Museum?04.03.Gallery PlanningChangsha Meixihu International Culture&Arts Centre-Schematic Design Report-02.07.2012?-?-02.07.2012Zaha Hadid Architects?Art Museum-Section AA thro Big Box0132、4.00 Art Museum?04.03.Gallery PlanningAA?Changsha Meixihu International Culture&Arts Centre-Schematic Design Report-02.07.2012?-?-02.07.2012Zaha Hadid Architects?Art Museum-Section BB thro Auditorium04.00 Art Museum 04.03.Gallery PlanningBB?Changsha Meixihu International Culture&Arts Centre-Schemati133、c Design Report-02.07.2012?-?-02.07.2012Zaha Hadid Architects?Art Museum-Section FF 04.00 Art Museum?04.03.Gallery PlanningFF?Changsha Meixihu International Culture&Arts Centre-Schematic Design Report-02.07.2012?-?-02.07.2012Zaha Hadid Architects?Art Museum-View of Atrium from Main Entrance04.00 Art134、 Museum?04.03.Gallery PlanningChangsha Meixihu International Culture&Arts Centre-Schematic Design Report-02.07.2012?-?-02.07.2012Zaha Hadid Architects?View from Level 03 of Grand Stairs04.00 Art Museum?04.03.Gallery PlanningChangsha Meixihu International Culture&Arts Centre-Schematic Design Report-0135、2.07.2012?-?-02.07.2012Zaha Hadid Architects?View from Lift towards Atrium 04.00 Art Museum?04.03.Gallery PlanningChangsha Meixihu International Culture&Arts Centre-Schematic Design Report-02.07.2012?-?-02.07.2012Zaha Hadid Architects?04.00 Art Museum?04.03.Gallery Planning-ElevationsNorth and East 136、ElevationsNorth Elevation with VIP EntranceEast Elevation with Main EntranceChangsha Meixihu International Culture&Arts Centre-Schematic Design Report-02.07.2012?-?-02.07.2012Zaha Hadid Architects?04.00 Art Museum?04.03.Gallery PlanningSouth and West ElevationsSouth Elevation facing Main PlazaWest E137、levation with Entrance from External Exhibition AreaChangsha Meixihu International Culture&Arts Centre-Schematic Design Report-02.07.2012?-?-02.07.2012Zaha Hadid Architects?APPLIED ARTS CENTRELEVEL 1LEVEL 2BIG-BOXMULTIFUNCTIONAL AUDITORIUMSPECIAL EXHIBITIONSBIG-BOXSPECIAL EXHIBITIONS?04.00 Art Museu138、m?04.03.Gallery PlanningAxonometric Studies-Level 1&2Changsha Meixihu International Culture&Arts Centre-Schematic Design Report-02.07.2012?-?-02.07.2012Zaha Hadid Architects?04.00 Art Museum?04.03.Gallery PlanningAxonometric Studies-Level 2 Mezz,3&4VIP SUITELEVEL 2 MEZZANINELEVEL 3GLOBAL PLATFORMS B139、+CCHINA HUNANGLOBAL PLATFORMS APERMANENT COLLECTIONLEVEL 4?Changsha Meixihu International Culture&Arts Centre-Schematic Design Report-02.07.2012?-?-02.07.2012Zaha Hadid Architects?04.00 Art Museum?04.04.Logistics-Public-Staff-VIP Circulation at B1,L1&L2PublicStafVIPEducationChangsha Meixihu Internat140、ional Culture&Arts Centre-Schematic Design Report-02.07.2012?-?-02.07.2012Zaha Hadid Architects?04.00 Art Museum?04.04.Logistics-Public-Staff-VIP Circulation at L2 Mezzanine,L3,L4&L5PublicStafVIPEducationChangsha Meixihu International Culture&Arts Centre-Schematic Design Report-02.07.2012?-?-02.07.2141、012Zaha Hadid Architects?04.00 Art Museum?Changsha Meixihu International Culture&Arts Centre-Schematic Design Report-02.07.2012?-?-02.07.2012Zaha Hadid Architects?Schematic Design:Aerial View of the Culture&Arts SiteChangsha Meixihu International Culture&Arts Centre-Schematic Design Report-02.07.201142、2?-?-02.07.2012Zaha Hadid Architects?Changsha Meixihu International Culture&Arts Centre-Schematic Design Report-02.07.2012?-?-02.07.2012Zaha Hadid Architects?6.00 Structure?Changsha Meixihu International Culture&Arts Centre-Schematic Design Report-02.07.2012?-?-02.07.2012Zaha Hadid Architects?07.00-143、Mechanical Systems?Changsha Meixihu International Culture&Arts Centre-Schematic Design Report-02.07.2012?-?-02.07.2012Zaha Hadid Architects?07.00-Mechanical Systems?Changsha Meixihu International Culture&Arts Centre-Schematic Design Report-02.07.2012?-?-02.07.2012Zaha Hadid Architects?07.00-Mechanic144、al Systems?Changsha Meixihu International Culture&Arts Centre-Schematic Design Report-02.07.2012?-?-02.07.2012Zaha Hadid Architects?07.00-Mechanical Systems?Changsha Meixihu International Culture&Arts Centre-Schematic Design Report-02.07.2012?-?-02.07.2012Zaha Hadid Architects?08.00 Electrical Syste145、ms?Changsha Meixihu International Culture&Arts Centre-Schematic Design Report-02.07.2012?-?-02.07.2012Zaha Hadid Architects?09.00 Plumbing&Drainage?Changsha Meixihu International Culture&Arts Centre-Schematic Design Report-02.07.2012?-?-02.07.2012Zaha Hadid Architects?09.00 Plumbing&Drainage?Changsh146、a Meixihu International Culture&Arts Centre-Schematic Design Report-02.07.2012?-?-02.07.2012Zaha Hadid Architects?09.00 Plumbing&Drainage?Changsha Meixihu International Culture&Arts Centre-Schematic Design Report-02.07.2012?-?-02.07.2012Zaha Hadid Architects?09.00 Plumbing&Drainage?Changsha Meixihu 147、International Culture&Arts Centre-Schematic Design Report-02.07.2012?-?-02.07.2012Zaha Hadid Architects?09.00 Plumbing&Drainage?Changsha Meixihu International Culture&Arts Centre-Schematic Design Report-02.07.2012?-?-02.07.2012Zaha Hadid Architects?09.00 Plumbing&Drainage?Changsha Meixihu Internatio148、nal Culture&Arts Centre-Schematic Design Report-02.07.2012?-?-02.07.2012Zaha Hadid Architects?09.00 Plumbing&Drainage?Changsha Meixihu International Culture&Arts Centre-Schematic Design Report-02.07.2012?-?-02.07.2012Zaha Hadid Architects?10-Acoustic Design?Changsha Meixihu International Culture&Art149、s Centre-Schematic Design Report-02.07.2012?-?-02.07.2012Zaha Hadid Architects?10.00 Acoustic Systems?Acoustics&Theatre Design?The design intent on acoustics design will be based on natural acoustics,further equipped with sound systems selecting high fidelity professional audio systems.Multifunction150、al stage equipment would be selected to accom-modate;high-tech stage lighting and lighting systems;network internal use of advanced digital communications and audio and video monitoring(listening).?Acoustic Strategy?Our primary acoustic goal is to achieve a high level of clarity within a suitable re151、verberant field for all the audi-ence-seating areas for all performance types.This will enable the audience to easily hear detail of singers dic-tion,and also the detail of musical textures.All seats can be acoustically excellent.For performances with a full sized symphony orchestra,either in the pi152、t or on the main stage,a rich full sound quality is required.This is achieved by designing the auditorium with a full reverberation time.Variable acoustic features will reduce the reverberation to suit amplified events.?Acoustic Clarity?Useful reflections can be created from the wall surfaces.These 153、provide early lateral energy to the listener.Sound arriving at the sides of the audience increases the sense of being surrounded in the musical event.This is highly desirable especially for symphonic performances and concerts with a large orchestra.The first order wall reflec-tions are planned for t154、he Changsha Grand Theatre.The sidewalls of the auditorium have been shaped to provide good coverage of the stalls seats with early re-flected sound.For theatrical performances where the voice is important reflections arriving at the audience from above assist in localizing the sound and adding clari155、ty.The use of a variable forestage reflector is of great benefit.Reverberation?The sense of reverberation in the theatre is determined in the design process by creating a sufficient room vol-ume and controlling the amount and distribution of the acoustic absorption.The largest contribution to acoust156、ic absorption in any performing venue is from the seats and the audience.A full sound quality is developed by de-signing a generous volume in the auditorium to balance the absorption of the seats and the audience.Amplified Uses?The reverberation time of the Grand Theatre will be reduced for smaller 157、scale musical events,and performances requiring amplification.This will enable a more intimate sound quality to be produced as required.Reduction will be achieved with the use of variable amounts of acoustic absorption.This can take the form of retractable fabric banners or deployable panels.Changsh158、a Meixihu International Culture&Arts Centre-Schematic Design Report-02.07.2012?-?-02.07.2012Zaha Hadid Architects?10.00 Acoustic Systems?Changsha Meixihu International Culture&Arts Centre-Schematic Design Report-02.07.2012?-?-02.07.2012Zaha Hadid Architects?10.00 Acoustic Systems?Changsha Meixihu In159、ternational Culture&Arts Centre-Schematic Design Report-02.07.2012?-?-02.07.2012Zaha Hadid Architects?11.00 Technical Systems and Equipment?The Stage?The mechanised stage floor will incorporate four large performance elevators.Each elevator shall be able to travel from-4m(below stage level)to+4m(abo160、ve the stage level)to suit particular productions needs.Traps will be incorporated providing stage entrances from below stage.The left and right side stages will incorporate four motorised stage wagons of sizes to match those of the stage elevators.Compensating elevators shall facilitate the movemen161、t of wagons from side and rear stages.The rear stage will incorporate a wagon incorporating a motorised revolve turntable.The wagon will be driven downstage onto the stage elevators and lowered to align with the stage floor surface.The side and rear stage will be equipped with motorised beams with i162、ntegral lifting hoists to assist scenic assem-bly and transportation.Sound/fire curtains will be provided to seal the side and rear stages when required.A fire rated safety curtain will be provided complying with national and local fire codes.?Changsha Meixihu International Culture&Arts Centre-Schem163、atic Design Report-02.07.2012?-?-02.07.2012Zaha Hadid Architects?12.00 Green Building Strategy?Changsha Meixihu International Culture&Arts Centre-Schematic Design Report-02.07.2012?-?-02.07.2012Zaha Hadid Architects?13.00 Fire Safety?Based on the National Standard of the Peoples Republic of China“Co164、de for Fire Prevention of Building Design(GBJ16-87(ver.2001),the main auditorium hall and VIP areas of the Grand Theatre would be considered as a single fire compartment,stage areas are similarly considered under the concept of a single fire compartment.Each Petal unit of the Museum will respectivel165、y be treated as fire compartment in each.The dressing rooms,kitchen area of the Small Theatre would be considered as a fire compartment,with the thea-tre hall,lounge area and dining area as a fire compartment.Retail facilities area will be addressed as a fire compartment.?14.00 Accessibility and Bar166、rier-Free Design?This project will adopt designs for accessibility based on article 5.1.4 of the(China National standards)Codes for Design on Accessibility of Urban Roads and Buildings.Disabled parking areas are included on the basement level with elevator access to various areas on ground level.?15167、.00 Civil Defence?The civil air defense would be designed in accordance to Grade A-6,to an outlay area of 20,054 square meters?Changsha Meixihu International Culture&Arts Centre-Schematic Design Report-02.07.2012?-?-02.07.2012Zaha Hadid Architects?16-Estimation of Cost?Changsha Meixihu International168、 Culture&Arts Centre-Schematic Design Report-02.07.2012?-?-02.07.2012Zaha Hadid Architects?16.00 Estimation of Cost?1.01.1Foundation Pit&Tanking?Item?1600000006000.001.3Civil Enginnering Works for Basement?sqm?50700500025350.00Inclusive of Earthworks,Pile-Foundations,Basement Carpark and Understage 169、etc.?1.2High-low voltage substation Engineering Works?sqm?507002001014.001.4Electrical Engineering?sqm?507003001521.001.5Automatic Fire alarms,auto-alarm systems for large areas,electrical monitoring systems?sqm?5070080405.601.6Ventilation&Air Conditioning Works?sqm?507003001521.001.7Plumbing&Draina170、ge Works?sqm?50700150760.501.7Fire hydrants and sprinklers systems?sqm?50700126638.82(including gaseous fire Extinguishing equipment)?1.8Low-voltage Intelligent Systems?sqm?507002601318.2038529.1238529.122.02.12.1.1Building Works Above Ground?sqm?3058217005198.942.1.2Steel Structure Fabrication&Inst171、allation?sqm?7951.321380010972.82Estimated at 0.26t/per sqm?2.1.3External Faade&Structure?sqm?27829.6226507374.85Estimated at 0.91per sqm?2.1.4Interior Works?sqm?3058232009786.24Estimated at 3,200 CNY/per sqm?33332.852.22.2.1High-low voltage?sqm?30582200611.642.2.2Electrical Engineering Works?sqm?30172、5823701131.532.2.3Automatic Fire alarms,auto-alarm systems for large areas,electrical monitoring systems?sqm?3058295290.532.2.4Ventilation&Air Conditioning Works?sqm?305826802079.582.2.5Plumbing&Drainage Works(Incl.Syphonic Drainage Systems)?sqm?30582150458.732.2.6Wet-Fire Suppression Systems for La173、rge Spaces?sqm?3058270214.072.2.7Fire hydrants and sprinklers systems?sqm?30582110336.40(including gaseous fire Extinguishing equipment)?2.2.8Low-voltage Intelligent Systems?sqm?305827002140.742.2.9Elevator Works?sqm?30582110336.402.2.10Theatre Seating&Installation?Seats?18002500450.002.2.11Noise Co174、ntrol Engineering Works?sqm?305823091.758141.372.32.3.1Stage Machinery&Equipment Works?Item?432000004320.00Estimated at 24,000 CNY/per Seat?24000?2.3.2Stage Sound Equipment Works?Item?172800001728.00Estimated at 9,600 CNY/per Seat?9600?2.3.4Stage Lighting Works?Item?172800001728.00Estimated at 9,600175、 CNY/per Seat?9600?7776.0049250.223.03.13.1.1Building Works Above Ground?sqm?57301650945.453.1.2Steel Structure Fabrication&Installation?1146138001581.48Estimated at 0.20t/per sqm?3.1.3External Faade&Structure?sqm?4698.623501104.17Estimated at 0.82 per sqm?3.1.4Interior Works?sqm?573030001719.00Esti176、mated at 2,800 CNY/per sqm?5350.103.23.2.1High-low voltage?sqm?5730200114.603.2.2Electrical Engineering Works?sqm?5730370212.013.2.3Automatic Fire alarms,auto-alarm systems for large areas,electrical monitoring systems?sqm?57308045.843.2.4Ventilation&Air Conditioning Works?sqm?5730580332.343.2.5Plum177、bing&Drainage Works(Incl.Syphonic Drainage Systems)?sqm?573015085.953.2.6Fire hydrants and sprinklers systems?sqm?573014583.09(including gaseous fire Extinguishing equipment)?3.2.7Low-voltage Intelligent Systems?sqm?5730560320.883.2.8Elevator Works?sqm?57309051.573.2.9Theatre Seating&Installation?Se178、ats?5002500125.003.2.10Noise Control Engineering Works?sqm?57303017.191388.473.33.3.1Stage Machinery&Equipment Works?Item?1120000001200.00Estimated at 24,000 CNY/per Seat?24000?3.3.2Stage Sound Equipment Works?Item?14800000480.00Estimated at 9,600 CNY/per Seat?9600?3.3.3Stage Lighting Works?Item?148179、00000480.00Estimated at 9,600 CNY/per Seat?9600?2160.008898.574.04.14.1.1Building Works Above Ground?sqm?2126317503721.034.1.2Steel Structure Fabrication&Installation?5103.12138007042.31Estimated at 0.24t/per?4.1.3External Faade&Structure?sqm?18711.4426504958.53Estimated at 0.88 per sqm?4.1.4Interio180、r Works?sqm?2126332006804.16Estimated at 3,000 CNY/per sqm?22526.024.24.2.1High-low voltage?sqm?21263200425.264.2.2Electrical Engineering Works?sqm?21263360765.474.2.3Automatic Fire alarms,auto-alarm systems for large areas,electrical monitoring systems?sqm?2126395202.004.2.4Ventilation&Air Conditio181、ning Works?sqm?212635701211.994.2.5Plumbing&Drainage Works(Incl.Syphonic Drainage Systems)?sqm?21263130276.424.2.6Wet-Fire Suppression Systems for Large Spaces?sqm?2126370148.844.2.7Fire hydrants and sprinklers systems?sqm?21263110233.89(including gaseous fire Extinguishing equipment)?4.2.8Low-volta182、ge Intelligent Systems?sqm?212635001063.154.2.9Elevator Works?sqm?21263180382.734709.7527235.785.05.1Municiple Road Works?sqm?10000500500.005.2Plaza,Landscaping&Water Features?sqm?35651.007002495.575.3Greenery&Environmental Works?sqm?35150.00230808.455.4Outdoor flood lighting and landscape lighting?183、sqm?80801.001451171.615.5Outdoor Streetlighting?sqm?80801.0070565.615.6Drainage&Utilities within Site Boundary?sqm?80801.0090727.216268.456268.456.0130182.1371Changsha Meixihu International Culture&Arts Center-Estimation of Costs?No.?Project Works(Base Estimate)?Unit?Quantity?Unit?Estimated Cost(CNY184、 Million)?Notes?SMALL THEATRE(Inclusive of Retail Areas)?GRAND THEATRE?Sub-Total?Total?Sub-Total?Total?BASEMENT?ART MUSEUM?EXTERNAL WORKS?TOTAL CONSTRUCTION&INSTALLATION COSTS(1+2+3+4+5)?Sub-Total?Total?Sub-Total?Sub-Total?Sub-Total?Sub-Total?Sub-Total?Total?Sub-Total?Sub-Total?Total?Building Works-185、?Building Services Enginnerig&Installation Works-?Stage Engineering Works-?Building Works-?Building Services Enginnerig&Installation Works-?Stage Engineering Works-?Building Works-?Building Services Enginnerig&Installation Works-?Note?1.Civil engineering costs includes costs for building,and costs f186、or interior works.?2.Equipment and installation costs includes costs for equipment purchase and installation.?3.Costs for External Works include:External hard-landscaping of roads and plazas and integrated utilities.?4.Estimate has included stage equipment.?5.Contingency costs and other fees are not187、 included in this estimate.?Note?1.Civil engineering costs includes costs for building,and costs for interior works.?2.Equipment and installation costs includes costs for equipment purchase and installation.?3.Costs for External Works include:External hard-landscaping of roads and plazas and integra188、ted utilities.?4.Estimate has included stage equipment.?5.Contingency costs and other fees are not included in this estimate.?Changsha Meixihu International Culture&Arts Centre-Schematic Design Report-02.07.2012?-?-02.07.2012Zaha Hadid Architects?2.02.12.1.1Building Works Above Ground?sqm?3058217005189、198.942.1.2Steel Structure Fabrication&Installation?sqm?7951.321380010972.82Estimated at 0.26t/per sqm?2.1.3External Faade&Structure?sqm?27829.6226507374.85Estimated at 0.91per sqm?2.1.4Interior Works?sqm?3058232009786.24Estimated at 3,200 CNY/per sqm?33332.852.22.2.1High-low voltage?sqm?30582200611190、.642.2.2Electrical Engineering Works?sqm?305823701131.532.2.3Automatic Fire alarms,auto-alarm systems for large areas,electrical monitoring systems?sqm?3058295290.532.2.4Ventilation&Air Conditioning Works?sqm?305826802079.582.2.5Plumbing&Drainage Works(Incl.Syphonic Drainage Systems)?sqm?30582150458191、.732.2.6Wet-Fire Suppression Systems for Large Spaces?sqm?3058270214.072.2.7Fire hydrants and sprinklers systems?sqm?30582110336.40(including gaseous fire Extinguishing equipment)?2.2.8Low-voltage Intelligent Systems?sqm?305827002140.742.2.9Elevator Works?sqm?30582110336.402.2.10Theatre Seating&Inst192、allation?Seats?18002500450.002.2.11Noise Control Engineering Works?sqm?305823091.758141.372.32.3.1Stage Machinery&Equipment Works?Item?432000004320.00Estimated at 24,000 CNY/per Seat?24000?2.3.2Stage Sound Equipment Works?Item?172800001728.00Estimated at 9,600 CNY/per Seat?9600?2.3.4Stage Lighting W193、orks?Item?172800001728.00Estimated at 9,600 CNY/per Seat?9600?7776.0049250.223.03.13.1.1Building Works Above Ground?sqm?57301650945.453.1.2Steel Structure Fabrication&Installation?1146138001581.48Estimated at 0.20t/per sqm?3.1.3External Faade&Structure?sqm?4698.623501104.17Estimated at 0.82 per sqm?194、3.1.4Interior Works?sqm?573030001719.00Estimated at 2,800 CNY/per sqm?5350.103.23.2.1High-low voltage?sqm?5730200114.603.2.2Electrical Engineering Works?sqm?5730370212.013.2.3Automatic Fire alarms,auto-alarm systems for large areas,electrical monitoring systems?sqm?57308045.843.2.4Ventilation&Air Co195、nditioning Works?sqm?5730580332.343.2.5Plumbing&Drainage Works(Incl.Syphonic Drainage Systems)?sqm?573015085.953.2.6Fire hydrants and sprinklers systems?sqm?573014583.09(including gaseous fire Extinguishing equipment)?3.2.7Low-voltage Intelligent Systems?sqm?5730560320.883.2.8Elevator Works?sqm?5730196、9051.573.2.9Theatre Seating&Installation?Seats?5002500125.003.2.10Noise Control Engineering Works?sqm?57303017.191388.473.33.3.1Stage Machinery&Equipment Works?Item?1120000001200.00Estimated at 24,000 CNY/per Seat?24000?3.3.2Stage Sound Equipment Works?Item?14800000480.00Estimated at 9,600 CNY/per S197、eat?9600?3.3.3Stage Lighting Works?Item?14800000480.00Estimated at 9,600 CNY/per Seat?9600?2160.008898.574.04.14.1.1Building Works Above Ground?sqm?2126317503721.034.1.2Steel Structure Fabrication&Installation?5103.12138007042.31Estimated at 0.24t/per?4.1.3External Faade&Structure?sqm?18711.44265049198、58.53Estimated at 0.88 per sqm?4.1.4Interior Works?sqm?2126332006804.16Estimated at 3,000 CNY/per sqm?22526.024.24.2.1High-low voltage?sqm?21263200425.264.2.2Electrical Engineering Works?sqm?21263360765.474.2.3Automatic Fire alarms,auto-alarm systems for large areas,electrical monitoring systems?sqm199、?2126395202.004.2.4Ventilation&Air Conditioning Works?sqm?212635701211.994.2.5Plumbing&Drainage Works(Incl.Syphonic Drainage Systems)?sqm?21263130276.424.2.6Wet-Fire Suppression Systems for Large Spaces?sqm?2126370148.844.2.7Fire hydrants and sprinklers systems?sqm?21263110233.89(including gaseous f200、ire Extinguishing equipment)?4.2.8Low-voltage Intelligent Systems?sqm?212635001063.154.2.9Elevator Works?sqm?21263180382.734709.7527235.785.05.1Municiple Road Works?sqm?10000500500.005.2Plaza,Landscaping&Water Features?sqm?35651.007002495.575.3Greenery&Environmental Works?sqm?35150.00230808.455.4Out201、door flood lighting and landscape lighting?sqm?80801.001451171.615.5Outdoor Streetlighting?sqm?80801.0070565.615.6Drainage&Utilities within Site Boundary?sqm?80801.0090727.216268.456268.456.0130182.1371Changsha Meixihu International Culture&Arts Center-Estimation of Costs?No.?Project Works(Base Esti202、mate)?Unit?Quantity?Unit?Estimated Cost(CNY Million)?Notes?SMALL THEATRE(Inclusive of Retail Areas)?GRAND THEATRE?Sub-Total?Total?Sub-Total?Total?BASEMENT?ART MUSEUM?EXTERNAL WORKS?TOTAL CONSTRUCTION&INSTALLATION COSTS(1+2+3+4+5)?Sub-Total?Total?Sub-Total?Sub-Total?Sub-Total?Sub-Total?Sub-Total?Tota203、l?Sub-Total?Sub-Total?Total?Building Works-?Building Services Enginnerig&Installation Works-?Stage Engineering Works-?Building Works-?Building Services Enginnerig&Installation Works-?Stage Engineering Works-?Building Works-?Building Services Enginnerig&Installation Works-?Note?1.Civil engineering co204、sts includes costs for building,and costs for interior works.?2.Equipment and installation costs includes costs for equipment purchase and installation.?3.Costs for External Works include:External hard-landscaping of roads and plazas and integrated utilities.?4.Estimate has included stage equipment.205、?5.Contingency costs and other fees are not included in this estimate.?3.03.13.1.1Building Works Above Ground?sqm?57301650945.453.1.2Steel Structure Fabrication&Installation?1146138001581.48Estimated at 0.20t/per sqm?3.1.3External Faade&Structure?sqm?4698.623501104.17Estimated at 0.82 per sqm?3.1.4I206、nterior Works?sqm?573030001719.00Estimated at 2,800 CNY/per sqm?5350.103.23.2.1High-low voltage?sqm?5730200114.603.2.2Electrical Engineering Works?sqm?5730370212.013.2.3Automatic Fire alarms,auto-alarm systems for large areas,electrical monitoring systems?sqm?57308045.843.2.4Ventilation&Air Conditio207、ning Works?sqm?5730580332.343.2.5Plumbing&Drainage Works(Incl.Syphonic Drainage Systems)?sqm?573015085.953.2.6Fire hydrants and sprinklers systems?sqm?573014583.09(including gaseous fire Extinguishing equipment)?3.2.7Low-voltage Intelligent Systems?sqm?5730560320.883.2.8Elevator Works?sqm?57309051.5208、73.2.9Theatre Seating&Installation?Seats?5002500125.003.2.10Noise Control Engineering Works?sqm?57303017.191388.473.33.3.1Stage Machinery&Equipment Works?Item?1120000001200.00Estimated at 24,000 CNY/per Seat?24000?3.3.2Stage Sound Equipment Works?Item?14800000480.00Estimated at 9,600 CNY/per Seat?96209、00?3.3.3Stage Lighting Works?Item?14800000480.00Estimated at 9,600 CNY/per Seat?9600?2160.008898.574.04.14.1.1Building Works Above Ground?sqm?2126317503721.034.1.2Steel Structure Fabrication&Installation?5103.12138007042.31Estimated at 0.24t/per?4.1.3External Faade&Structure?sqm?18711.4426504958.53E210、stimated at 0.88 per sqm?4.1.4Interior Works?sqm?2126332006804.16Estimated at 3,000 CNY/per sqm?22526.024.24.2.1High-low voltage?sqm?21263200425.264.2.2Electrical Engineering Works?sqm?21263360765.474.2.3Automatic Fire alarms,auto-alarm systems for large areas,electrical monitoring systems?sqm?21263211、95202.004.2.4Ventilation&Air Conditioning Works?sqm?212635701211.994.2.5Plumbing&Drainage Works(Incl.Syphonic Drainage Systems)?sqm?21263130276.424.2.6Wet-Fire Suppression Systems for Large Spaces?sqm?2126370148.844.2.7Fire hydrants and sprinklers systems?sqm?21263110233.89(including gaseous fire Ex212、tinguishing equipment)?4.2.8Low-voltage Intelligent Systems?sqm?212635001063.154.2.9Elevator Works?sqm?21263180382.734709.7527235.785.05.1Municiple Road Works?sqm?10000500500.005.2Plaza,Landscaping&Water Features?sqm?35651.007002495.575.3Greenery&Environmental Works?sqm?35150.00230808.455.4Outdoor f213、lood lighting and landscape lighting?sqm?80801.001451171.615.5Outdoor Streetlighting?sqm?80801.0070565.615.6Drainage&Utilities within Site Boundary?sqm?80801.0090727.216268.456268.456.0130182.1371Changsha Meixihu International Culture&Arts Center-Estimation of Costs?No.?Project Works(Base Estimate)?214、Unit?Quantity?Unit?Estimated Cost(CNY Million)?Notes?SMALL THEATRE(Inclusive of Retail Areas)?GRAND THEATRE?Sub-Total?Total?Sub-Total?Total?BASEMENT?ART MUSEUM?EXTERNAL WORKS?TOTAL CONSTRUCTION&INSTALLATION COSTS(1+2+3+4+5)?Sub-Total?Total?Sub-Total?Sub-Total?Sub-Total?Sub-Total?Sub-Total?Total?Sub-215、Total?Sub-Total?Total?Building Works-?Building Services Enginnerig&Installation Works-?Stage Engineering Works-?Building Works-?Building Services Enginnerig&Installation Works-?Stage Engineering Works-?Building Works-?Building Services Enginnerig&Installation Works-?Note?1.Civil engineering costs in216、cludes costs for building,and costs for interior works.?2.Equipment and installation costs includes costs for equipment purchase and installation.?3.Costs for External Works include:External hard-landscaping of roads and plazas and integrated utilities.?4.Estimate has included stage equipment.?5.Con217、tingency costs and other fees are not included in this estimate.?1.01.1Foundation Pit&Tanking?Item?1600000006000.001.3Civil Enginnering Works for Basement?sqm?50700500025350.00Inclusive of Earthworks,Pile-Foundations,Basement Carpark and Understage etc.?1.2High-low voltage substation Engineering Wor218、ks?sqm?507002001014.001.4Electrical Engineering?sqm?507003001521.001.5Automatic Fire alarms,auto-alarm systems for large areas,electrical monitoring systems?sqm?5070080405.601.6Ventilation&Air Conditioning Works?sqm?507003001521.001.7Plumbing&Drainage Works?sqm?50700150760.501.7Fire hydrants and spr219、inklers systems?sqm?50700126638.82(including gaseous fire Extinguishing equipment)?1.8Low-voltage Intelligent Systems?sqm?507002601318.2038529.1238529.122.02.12.1.1Building Works Above Ground?sqm?3058217005198.942.1.2Steel Structure Fabrication&Installation?sqm?7951.321380010972.82Estimated at 0.26t220、/per sqm?2.1.3External Faade&Structure?sqm?27829.6226507374.85Estimated at 0.91per sqm?2.1.4Interior Works?sqm?3058232009786.24Estimated at 3,200 CNY/per sqm?33332.852.22.2.1High-low voltage?sqm?30582200611.642.2.2Electrical Engineering Works?sqm?305823701131.532.2.3Automatic Fire alarms,auto-alarm 221、systems for large areas,electrical monitoring systems?sqm?3058295290.532.2.4Ventilation&Air Conditioning Works?sqm?305826802079.582.2.5Plumbing&Drainage Works(Incl.Syphonic Drainage Systems)?sqm?30582150458.732.2.6Wet-Fire Suppression Systems for Large Spaces?sqm?3058270214.072.2.7Fire hydrants and 222、sprinklers systems?sqm?30582110336.40(including gaseous fire Extinguishing equipment)?2.2.8Low-voltage Intelligent Systems?sqm?305827002140.742.2.9Elevator Works?sqm?30582110336.402.2.10Theatre Seating&Installation?Seats?18002500450.002.2.11Noise Control Engineering Works?sqm?305823091.758141.372.32223、.3.1Stage Machinery&Equipment Works?Item?432000004320.00Estimated at 24,000 CNY/per Seat?24000?2.3.2Stage Sound Equipment Works?Item?172800001728.00Estimated at 9,600 CNY/per Seat?9600?2.3.4Stage Lighting Works?Item?172800001728.00Estimated at 9,600 CNY/per Seat?9600?7776.0049250.223.03.13.1.1Buildi224、ng Works Above Ground?sqm?57301650945.453.1.2Steel Structure Fabrication&Installation?1146138001581.48Estimated at 0.20t/per sqm?3.1.3External Faade&Structure?sqm?4698.623501104.17Estimated at 0.82 per sqm?3.1.4Interior Works?sqm?573030001719.00Estimated at 2,800 CNY/per sqm?5350.103.23.2.1High-low 225、voltage?sqm?5730200114.603.2.2Electrical Engineering Works?sqm?5730370212.013.2.3Automatic Fire alarms,auto-alarm systems for large areas,electrical monitoring systems?sqm?57308045.843.2.4Ventilation&Air Conditioning Works?sqm?5730580332.343.2.5Plumbing&Drainage Works(Incl.Syphonic Drainage Systems)226、?sqm?573015085.953.2.6Fire hydrants and sprinklers systems?sqm?573014583.09(including gaseous fire Extinguishing equipment)?3.2.7Low-voltage Intelligent Systems?sqm?5730560320.883.2.8Elevator Works?sqm?57309051.573.2.9Theatre Seating&Installation?Seats?5002500125.003.2.10Noise Control Engineering Wo227、rks?sqm?57303017.191388.473.33.3.1Stage Machinery&Equipment Works?Item?1120000001200.00Estimated at 24,000 CNY/per Seat?24000?3.3.2Stage Sound Equipment Works?Item?14800000480.00Estimated at 9,600 CNY/per Seat?9600?3.3.3Stage Lighting Works?Item?14800000480.00Estimated at 9,600 CNY/per Seat?9600?216228、0.008898.574.04.14.1.1Building Works Above Ground?sqm?2126317503721.034.1.2Steel Structure Fabrication&Installation?5103.12138007042.31Estimated at 0.24t/per?4.1.3External Faade&Structure?sqm?18711.4426504958.53Estimated at 0.88 per sqm?4.1.4Interior Works?sqm?2126332006804.16Estimated at 3,000 CNY/229、per sqm?22526.024.24.2.1High-low voltage?sqm?21263200425.264.2.2Electrical Engineering Works?sqm?21263360765.474.2.3Automatic Fire alarms,auto-alarm systems for large areas,electrical monitoring systems?sqm?2126395202.004.2.4Ventilation&Air Conditioning Works?sqm?212635701211.994.2.5Plumbing&Drainag230、e Works(Incl.Syphonic Drainage Systems)?sqm?21263130276.424.2.6Wet-Fire Suppression Systems for Large Spaces?sqm?2126370148.844.2.7Fire hydrants and sprinklers systems?sqm?21263110233.89(including gaseous fire Extinguishing equipment)?4.2.8Low-voltage Intelligent Systems?sqm?212635001063.154.2.9Elev231、ator Works?sqm?21263180382.734709.7527235.785.05.1Municiple Road Works?sqm?10000500500.005.2Plaza,Landscaping&Water Features?sqm?35651.007002495.575.3Greenery&Environmental Works?sqm?35150.00230808.455.4Outdoor flood lighting and landscape lighting?sqm?80801.001451171.615.5Outdoor Streetlighting?sqm232、?80801.0070565.615.6Drainage&Utilities within Site Boundary?sqm?80801.0090727.216268.456268.456.0130182.1371Changsha Meixihu International Culture&Arts Center-Estimation of Costs?No.?Project Works(Base Estimate)?Unit?Quantity?Unit?Estimated Cost(CNY Million)?Notes?SMALL THEATRE(Inclusive of Retail A233、reas)?GRAND THEATRE?Sub-Total?Total?Sub-Total?Total?BASEMENT?ART MUSEUM?EXTERNAL WORKS?TOTAL CONSTRUCTION&INSTALLATION COSTS(1+2+3+4+5)?Sub-Total?Total?Sub-Total?Sub-Total?Sub-Total?Sub-Total?Sub-Total?Total?Sub-Total?Sub-Total?Total?Building Works-?Building Services Enginnerig&Installation Works-?S234、tage Engineering Works-?Building Works-?Building Services Enginnerig&Installation Works-?Stage Engineering Works-?Building Works-?Building Services Enginnerig&Installation Works-?Note?1.Civil engineering costs includes costs for building,and costs for interior works.?2.Equipment and installation cos235、ts includes costs for equipment purchase and installation.?3.Costs for External Works include:External hard-landscaping of roads and plazas and integrated utilities.?4.Estimate has included stage equipment.?5.Contingency costs and other fees are not included in this estimate.?1.01.1Foundation Pit&Ta236、nking?Item?1600000006000.001.3Civil Enginnering Works for Basement?sqm?50700500025350.00Inclusive of Earthworks,Pile-Foundations,Basement Carpark and Understage etc.?1.2High-low voltage substation Engineering Works?sqm?507002001014.001.4Electrical Engineering?sqm?507003001521.001.5Automatic Fire ala237、rms,auto-alarm systems for large areas,electrical monitoring systems?sqm?5070080405.601.6Ventilation&Air Conditioning Works?sqm?507003001521.001.7Plumbing&Drainage Works?sqm?50700150760.501.7Fire hydrants and sprinklers systems?sqm?50700126638.82(including gaseous fire Extinguishing equipment)?1.8Lo238、w-voltage Intelligent Systems?sqm?507002601318.2038529.1238529.122.02.12.1.1Building Works Above Ground?sqm?3058217005198.942.1.2Steel Structure Fabrication&Installation?sqm?7951.321380010972.82Estimated at 0.26t/per sqm?2.1.3External Faade&Structure?sqm?27829.6226507374.85Estimated at 0.91per sqm?2239、.1.4Interior Works?sqm?3058232009786.24Estimated at 3,200 CNY/per sqm?33332.852.22.2.1High-low voltage?sqm?30582200611.642.2.2Electrical Engineering Works?sqm?305823701131.532.2.3Automatic Fire alarms,auto-alarm systems for large areas,electrical monitoring systems?sqm?3058295290.532.2.4Ventilation&240、Air Conditioning Works?sqm?305826802079.582.2.5Plumbing&Drainage Works(Incl.Syphonic Drainage Systems)?sqm?30582150458.732.2.6Wet-Fire Suppression Systems for Large Spaces?sqm?3058270214.072.2.7Fire hydrants and sprinklers systems?sqm?30582110336.40(including gaseous fire Extinguishing equipment)?2.241、2.8Low-voltage Intelligent Systems?sqm?305827002140.742.2.9Elevator Works?sqm?30582110336.402.2.10Theatre Seating&Installation?Seats?18002500450.002.2.11Noise Control Engineering Works?sqm?305823091.758141.372.32.3.1Stage Machinery&Equipment Works?Item?432000004320.00Estimated at 24,000 CNY/per Seat242、?24000?2.3.2Stage Sound Equipment Works?Item?172800001728.00Estimated at 9,600 CNY/per Seat?9600?2.3.4Stage Lighting Works?Item?172800001728.00Estimated at 9,600 CNY/per Seat?9600?7776.0049250.223.03.13.1.1Building Works Above Ground?sqm?57301650945.453.1.2Steel Structure Fabrication&Installation?11243、46138001581.48Estimated at 0.20t/per sqm?3.1.3External Faade&Structure?sqm?4698.623501104.17Estimated at 0.82 per sqm?3.1.4Interior Works?sqm?573030001719.00Estimated at 2,800 CNY/per sqm?5350.103.23.2.1High-low voltage?sqm?5730200114.603.2.2Electrical Engineering Works?sqm?5730370212.013.2.3Automat244、ic Fire alarms,auto-alarm systems for large areas,electrical monitoring systems?sqm?57308045.843.2.4Ventilation&Air Conditioning Works?sqm?5730580332.343.2.5Plumbing&Drainage Works(Incl.Syphonic Drainage Systems)?sqm?573015085.953.2.6Fire hydrants and sprinklers systems?sqm?573014583.09(including ga245、seous fire Extinguishing equipment)?3.2.7Low-voltage Intelligent Systems?sqm?5730560320.883.2.8Elevator Works?sqm?57309051.573.2.9Theatre Seating&Installation?Seats?5002500125.003.2.10Noise Control Engineering Works?sqm?57303017.191388.473.33.3.1Stage Machinery&Equipment Works?Item?1120000001200.00E246、stimated at 24,000 CNY/per Seat?24000?3.3.2Stage Sound Equipment Works?Item?14800000480.00Estimated at 9,600 CNY/per Seat?9600?3.3.3Stage Lighting Works?Item?14800000480.00Estimated at 9,600 CNY/per Seat?9600?2160.008898.574.04.14.1.1Building Works Above Ground?sqm?2126317503721.034.1.2Steel Structu247、re Fabrication&Installation?5103.12138007042.31Estimated at 0.24t/per?4.1.3External Faade&Structure?sqm?18711.4426504958.53Estimated at 0.88 per sqm?4.1.4Interior Works?sqm?2126332006804.16Estimated at 3,000 CNY/per sqm?22526.024.24.2.1High-low voltage?sqm?21263200425.264.2.2Electrical Engineering W248、orks?sqm?21263360765.474.2.3Automatic Fire alarms,auto-alarm systems for large areas,electrical monitoring systems?sqm?2126395202.004.2.4Ventilation&Air Conditioning Works?sqm?212635701211.994.2.5Plumbing&Drainage Works(Incl.Syphonic Drainage Systems)?sqm?21263130276.424.2.6Wet-Fire Suppression Syst249、ems for Large Spaces?sqm?2126370148.844.2.7Fire hydrants and sprinklers systems?sqm?21263110233.89(including gaseous fire Extinguishing equipment)?4.2.8Low-voltage Intelligent Systems?sqm?212635001063.154.2.9Elevator Works?sqm?21263180382.734709.7527235.785.05.1Municiple Road Works?sqm?10000500500.0250、05.2Plaza,Landscaping&Water Features?sqm?35651.007002495.575.3Greenery&Environmental Works?sqm?35150.00230808.455.4Outdoor flood lighting and landscape lighting?sqm?80801.001451171.615.5Outdoor Streetlighting?sqm?80801.0070565.615.6Drainage&Utilities within Site Boundary?sqm?80801.0090727.216268.456251、268.456.0130182.1371Changsha Meixihu International Culture&Arts Center-Estimation of Costs?No.?Project Works(Base Estimate)?Unit?Quantity?Unit?Estimated Cost(CNY Million)?Notes?SMALL THEATRE(Inclusive of Retail Areas)?GRAND THEATRE?Sub-Total?Total?Sub-Total?Total?BASEMENT?ART MUSEUM?EXTERNAL WORKS?T252、OTAL CONSTRUCTION&INSTALLATION COSTS(1+2+3+4+5)?Sub-Total?Total?Sub-Total?Sub-Total?Sub-Total?Sub-Total?Sub-Total?Total?Sub-Total?Sub-Total?Total?Building Works-?Building Services Enginnerig&Installation Works-?Stage Engineering Works-?Building Works-?Building Services Enginnerig&Installation Works-253、?Stage Engineering Works-?Building Works-?Building Services Enginnerig&Installation Works-?Note?1.Civil engineering costs includes costs for building,and costs for interior works.?2.Equipment and installation costs includes costs for equipment purchase and installation.?3.Costs for External Works in254、clude:External hard-landscaping of roads and plazas and integrated utilities.?4.Estimate has included stage equipment.?5.Contingency costs and other fees are not included in this estimate.?16.00 Estimation of Cost?Changsha Meixihu International Culture&Arts Centre-Schematic Design Report-02.07.2012?255、-?-02.07.2012Zaha Hadid Architects?16.00 Estimation of Cost?4.04.14.1.1Building Works Above Ground?sqm?2126317503721.034.1.2Steel Structure Fabrication&Installation?5103.12138007042.31Estimated at 0.24t/per?4.1.3External Faade&Structure?sqm?18711.4426504958.53Estimated at 0.88 per sqm?4.1.4Interior 256、Works?sqm?2126332006804.16Estimated at 3,000 CNY/per sqm?22526.024.24.2.1High-low voltage?sqm?21263200425.264.2.2Electrical Engineering Works?sqm?21263360765.474.2.3Automatic Fire alarms,auto-alarm systems for large areas,electrical monitoring systems?sqm?2126395202.004.2.4Ventilation&Air Conditioni257、ng Works?sqm?212635701211.994.2.5Plumbing&Drainage Works(Incl.Syphonic Drainage Systems)?sqm?21263130276.424.2.6Wet-Fire Suppression Systems for Large Spaces?sqm?2126370148.844.2.7Fire hydrants and sprinklers systems?sqm?21263110233.89(including gaseous fire Extinguishing equipment)?4.2.8Low-voltage258、 Intelligent Systems?sqm?212635001063.154.2.9Elevator Works?sqm?21263180382.734709.7527235.785.05.1Municiple Road Works?sqm?10000500500.005.2Plaza,Landscaping&Water Features?sqm?35651.007002495.575.3Greenery&Environmental Works?sqm?35150.00230808.455.4Outdoor flood lighting and landscape lighting?sq259、m?80801.001451171.615.5Outdoor Streetlighting?sqm?80801.0070565.615.6Drainage&Utilities within Site Boundary?sqm?80801.0090727.216268.456268.456.0130182.1371Changsha Meixihu International Culture&Arts Center-Estimation of Costs?No.?Project Works(Base Estimate)?Unit?Quantity?Unit?Estimated Cost(CNY M260、illion)?Notes?SMALL THEATRE(Inclusive of Retail Areas)?GRAND THEATRE?Sub-Total?Total?Sub-Total?Total?BASEMENT?ART MUSEUM?EXTERNAL WORKS?TOTAL CONSTRUCTION&INSTALLATION COSTS(1+2+3+4+5)?Sub-Total?Total?Sub-Total?Sub-Total?Sub-Total?Sub-Total?Sub-Total?Total?Sub-Total?Sub-Total?Total?Building Works-?B261、uilding Services Enginnerig&Installation Works-?Stage Engineering Works-?Building Works-?Building Services Enginnerig&Installation Works-?Stage Engineering Works-?Building Works-?Building Services Enginnerig&Installation Works-?Note?1.Civil engineering costs includes costs for building,and costs for262、 interior works.?2.Equipment and installation costs includes costs for equipment purchase and installation.?3.Costs for External Works include:External hard-landscaping of roads and plazas and integrated utilities.?4.Estimate has included stage equipment.?5.Contingency costs and other fees are not i263、ncluded in this estimate.?5.05.1Municiple Road Works?sqm?10000500500.005.2Plaza,Landscaping&Water Features?sqm?35651.007002495.575.3Greenery&Environmental Works?sqm?35150.00230808.455.4Outdoor flood lighting and landscape lighting?sqm?80801.001451171.615.5Outdoor Streetlighting?sqm?80801.0070565.615264、.6Drainage&Utilities within Site Boundary?sqm?80801.0090727.216268.456268.456.0130182.1371Changsha Meixihu International Culture&Arts Center-Estimation of Costs?No.?Project Works(Base Estimate)?Unit?Quantity?Unit?Estimated Cost(CNY Million)?Notes?SMALL THEATRE(Inclusive of Retail Areas)?GRAND THEATR265、E?Sub-Total?Total?Sub-Total?Total?BASEMENT?ART MUSEUM?EXTERNAL WORKS?TOTAL CONSTRUCTION&INSTALLATION COSTS(1+2+3+4+5)?Sub-Total?Total?Sub-Total?Sub-Total?Sub-Total?Sub-Total?Sub-Total?Total?Sub-Total?Sub-Total?Total?Building Works-?Building Services Enginnerig&Installation Works-?Stage Engineering W266、orks-?Building Works-?Building Services Enginnerig&Installation Works-?Stage Engineering Works-?Building Works-?Building Services Enginnerig&Installation Works-?Note?1.Civil engineering costs includes costs for building,and costs for interior works.?2.Equipment and installation costs includes costs 267、for equipment purchase and installation.?3.Costs for External Works include:External hard-landscaping of roads and plazas and integrated utilities.?4.Estimate has included stage equipment.?5.Contingency costs and other fees are not included in this estimate.?1.01.1Foundation Pit&Tanking?Item?1600000268、006000.001.3Civil Enginnering Works for Basement?sqm?50700500025350.00Inclusive of Earthworks,Pile-Foundations,Basement Carpark and Understage etc.?1.2High-low voltage substation Engineering Works?sqm?507002001014.001.4Electrical Engineering?sqm?507003001521.001.5Automatic Fire alarms,auto-alarm sys269、tems for large areas,electrical monitoring systems?sqm?5070080405.601.6Ventilation&Air Conditioning Works?sqm?507003001521.001.7Plumbing&Drainage Works?sqm?50700150760.501.7Fire hydrants and sprinklers systems?sqm?50700126638.82(including gaseous fire Extinguishing equipment)?1.8Low-voltage Intellig270、ent Systems?sqm?507002601318.2038529.1238529.122.02.12.1.1Building Works Above Ground?sqm?3058217005198.942.1.2Steel Structure Fabrication&Installation?sqm?7951.321380010972.82Estimated at 0.26t/per sqm?2.1.3External Faade&Structure?sqm?27829.6226507374.85Estimated at 0.91per sqm?2.1.4Interior Works271、?sqm?3058232009786.24Estimated at 3,200 CNY/per sqm?33332.852.22.2.1High-low voltage?sqm?30582200611.642.2.2Electrical Engineering Works?sqm?305823701131.532.2.3Automatic Fire alarms,auto-alarm systems for large areas,electrical monitoring systems?sqm?3058295290.532.2.4Ventilation&Air Conditioning W272、orks?sqm?305826802079.582.2.5Plumbing&Drainage Works(Incl.Syphonic Drainage Systems)?sqm?30582150458.732.2.6Wet-Fire Suppression Systems for Large Spaces?sqm?3058270214.072.2.7Fire hydrants and sprinklers systems?sqm?30582110336.40(including gaseous fire Extinguishing equipment)?2.2.8Low-voltage Int273、elligent Systems?sqm?305827002140.742.2.9Elevator Works?sqm?30582110336.402.2.10Theatre Seating&Installation?Seats?18002500450.002.2.11Noise Control Engineering Works?sqm?305823091.758141.372.32.3.1Stage Machinery&Equipment Works?Item?432000004320.00Estimated at 24,000 CNY/per Seat?24000?2.3.2Stage 274、Sound Equipment Works?Item?172800001728.00Estimated at 9,600 CNY/per Seat?9600?2.3.4Stage Lighting Works?Item?172800001728.00Estimated at 9,600 CNY/per Seat?9600?7776.0049250.223.03.13.1.1Building Works Above Ground?sqm?57301650945.453.1.2Steel Structure Fabrication&Installation?1146138001581.48Esti275、mated at 0.20t/per sqm?3.1.3External Faade&Structure?sqm?4698.623501104.17Estimated at 0.82 per sqm?3.1.4Interior Works?sqm?573030001719.00Estimated at 2,800 CNY/per sqm?5350.103.23.2.1High-low voltage?sqm?5730200114.603.2.2Electrical Engineering Works?sqm?5730370212.013.2.3Automatic Fire alarms,aut276、o-alarm systems for large areas,electrical monitoring systems?sqm?57308045.843.2.4Ventilation&Air Conditioning Works?sqm?5730580332.343.2.5Plumbing&Drainage Works(Incl.Syphonic Drainage Systems)?sqm?573015085.953.2.6Fire hydrants and sprinklers systems?sqm?573014583.09(including gaseous fire Extingu277、ishing equipment)?3.2.7Low-voltage Intelligent Systems?sqm?5730560320.883.2.8Elevator Works?sqm?57309051.573.2.9Theatre Seating&Installation?Seats?5002500125.003.2.10Noise Control Engineering Works?sqm?57303017.191388.473.33.3.1Stage Machinery&Equipment Works?Item?1120000001200.00Estimated at 24,000278、 CNY/per Seat?24000?3.3.2Stage Sound Equipment Works?Item?14800000480.00Estimated at 9,600 CNY/per Seat?9600?3.3.3Stage Lighting Works?Item?14800000480.00Estimated at 9,600 CNY/per Seat?9600?2160.008898.574.04.14.1.1Building Works Above Ground?sqm?2126317503721.034.1.2Steel Structure Fabrication&Ins279、tallation?5103.12138007042.31Estimated at 0.24t/per?4.1.3External Faade&Structure?sqm?18711.4426504958.53Estimated at 0.88 per sqm?4.1.4Interior Works?sqm?2126332006804.16Estimated at 3,000 CNY/per sqm?22526.024.24.2.1High-low voltage?sqm?21263200425.264.2.2Electrical Engineering Works?sqm?212633607280、65.474.2.3Automatic Fire alarms,auto-alarm systems for large areas,electrical monitoring systems?sqm?2126395202.004.2.4Ventilation&Air Conditioning Works?sqm?212635701211.994.2.5Plumbing&Drainage Works(Incl.Syphonic Drainage Systems)?sqm?21263130276.424.2.6Wet-Fire Suppression Systems for Large Spac281、es?sqm?2126370148.844.2.7Fire hydrants and sprinklers systems?sqm?21263110233.89(including gaseous fire Extinguishing equipment)?4.2.8Low-voltage Intelligent Systems?sqm?212635001063.154.2.9Elevator Works?sqm?21263180382.734709.7527235.785.05.1Municiple Road Works?sqm?10000500500.005.2Plaza,Landscap282、ing&Water Features?sqm?35651.007002495.575.3Greenery&Environmental Works?sqm?35150.00230808.455.4Outdoor flood lighting and landscape lighting?sqm?80801.001451171.615.5Outdoor Streetlighting?sqm?80801.0070565.615.6Drainage&Utilities within Site Boundary?sqm?80801.0090727.216268.456268.456.0130182.13283、71Changsha Meixihu International Culture&Arts Center-Estimation of Costs?No.?Project Works(Base Estimate)?Unit?Quantity?Unit?Estimated Cost(CNY Million)?Notes?SMALL THEATRE(Inclusive of Retail Areas)?GRAND THEATRE?Sub-Total?Total?Sub-Total?Total?BASEMENT?ART MUSEUM?EXTERNAL WORKS?TOTAL CONSTRUCTION&284、INSTALLATION COSTS(1+2+3+4+5)?Sub-Total?Total?Sub-Total?Sub-Total?Sub-Total?Sub-Total?Sub-Total?Total?Sub-Total?Sub-Total?Total?Building Works-?Building Services Enginnerig&Installation Works-?Stage Engineering Works-?Building Works-?Building Services Enginnerig&Installation Works-?Stage Engineering285、 Works-?Building Works-?Building Services Enginnerig&Installation Works-?Note?1.Civil engineering costs includes costs for building,and costs for interior works.?2.Equipment and installation costs includes costs for equipment purchase and installation.?3.Costs for External Works include:External har286、d-landscaping of roads and plazas and integrated utilities.?4.Estimate has included stage equipment.?5.Contingency costs and other fees are not included in this estimate.?1.01.1Foundation Pit&Tanking?Item?1600000006000.001.3Civil Enginnering Works for Basement?sqm?50700500025350.00Inclusive of Earth287、works,Pile-Foundations,Basement Carpark and Understage etc.?1.2High-low voltage substation Engineering Works?sqm?507002001014.001.4Electrical Engineering?sqm?507003001521.001.5Automatic Fire alarms,auto-alarm systems for large areas,electrical monitoring systems?sqm?5070080405.601.6Ventilation&Air C288、onditioning Works?sqm?507003001521.001.7Plumbing&Drainage Works?sqm?50700150760.501.7Fire hydrants and sprinklers systems?sqm?50700126638.82(including gaseous fire Extinguishing equipment)?1.8Low-voltage Intelligent Systems?sqm?507002601318.2038529.1238529.122.02.12.1.1Building Works Above Ground?sq289、m?3058217005198.942.1.2Steel Structure Fabrication&Installation?sqm?7951.321380010972.82Estimated at 0.26t/per sqm?2.1.3External Faade&Structure?sqm?27829.6226507374.85Estimated at 0.91per sqm?2.1.4Interior Works?sqm?3058232009786.24Estimated at 3,200 CNY/per sqm?33332.852.22.2.1High-low voltage?sqm290、?30582200611.642.2.2Electrical Engineering Works?sqm?305823701131.532.2.3Automatic Fire alarms,auto-alarm systems for large areas,electrical monitoring systems?sqm?3058295290.532.2.4Ventilation&Air Conditioning Works?sqm?305826802079.582.2.5Plumbing&Drainage Works(Incl.Syphonic Drainage Systems)?sqm291、?30582150458.732.2.6Wet-Fire Suppression Systems for Large Spaces?sqm?3058270214.072.2.7Fire hydrants and sprinklers systems?sqm?30582110336.40(including gaseous fire Extinguishing equipment)?2.2.8Low-voltage Intelligent Systems?sqm?305827002140.742.2.9Elevator Works?sqm?30582110336.402.2.10Theatre 292、Seating&Installation?Seats?18002500450.002.2.11Noise Control Engineering Works?sqm?305823091.758141.372.32.3.1Stage Machinery&Equipment Works?Item?432000004320.00Estimated at 24,000 CNY/per Seat?24000?2.3.2Stage Sound Equipment Works?Item?172800001728.00Estimated at 9,600 CNY/per Seat?9600?2.3.4Stag293、e Lighting Works?Item?172800001728.00Estimated at 9,600 CNY/per Seat?9600?7776.0049250.223.03.13.1.1Building Works Above Ground?sqm?57301650945.453.1.2Steel Structure Fabrication&Installation?1146138001581.48Estimated at 0.20t/per sqm?3.1.3External Faade&Structure?sqm?4698.623501104.17Estimated at 0294、.82 per sqm?3.1.4Interior Works?sqm?573030001719.00Estimated at 2,800 CNY/per sqm?5350.103.23.2.1High-low voltage?sqm?5730200114.603.2.2Electrical Engineering Works?sqm?5730370212.013.2.3Automatic Fire alarms,auto-alarm systems for large areas,electrical monitoring systems?sqm?57308045.843.2.4Ventil295、ation&Air Conditioning Works?sqm?5730580332.343.2.5Plumbing&Drainage Works(Incl.Syphonic Drainage Systems)?sqm?573015085.953.2.6Fire hydrants and sprinklers systems?sqm?573014583.09(including gaseous fire Extinguishing equipment)?3.2.7Low-voltage Intelligent Systems?sqm?5730560320.883.2.8Elevator Wo296、rks?sqm?57309051.573.2.9Theatre Seating&Installation?Seats?5002500125.003.2.10Noise Control Engineering Works?sqm?57303017.191388.473.33.3.1Stage Machinery&Equipment Works?Item?1120000001200.00Estimated at 24,000 CNY/per Seat?24000?3.3.2Stage Sound Equipment Works?Item?14800000480.00Estimated at 9,6297、00 CNY/per Seat?9600?3.3.3Stage Lighting Works?Item?14800000480.00Estimated at 9,600 CNY/per Seat?9600?2160.008898.574.04.14.1.1Building Works Above Ground?sqm?2126317503721.034.1.2Steel Structure Fabrication&Installation?5103.12138007042.31Estimated at 0.24t/per?4.1.3External Faade&Structure?sqm?18298、711.4426504958.53Estimated at 0.88 per sqm?4.1.4Interior Works?sqm?2126332006804.16Estimated at 3,000 CNY/per sqm?22526.024.24.2.1High-low voltage?sqm?21263200425.264.2.2Electrical Engineering Works?sqm?21263360765.474.2.3Automatic Fire alarms,auto-alarm systems for large areas,electrical monitoring299、 systems?sqm?2126395202.004.2.4Ventilation&Air Conditioning Works?sqm?212635701211.994.2.5Plumbing&Drainage Works(Incl.Syphonic Drainage Systems)?sqm?21263130276.424.2.6Wet-Fire Suppression Systems for Large Spaces?sqm?2126370148.844.2.7Fire hydrants and sprinklers systems?sqm?21263110233.89(includi300、ng gaseous fire Extinguishing equipment)?4.2.8Low-voltage Intelligent Systems?sqm?212635001063.154.2.9Elevator Works?sqm?21263180382.734709.7527235.785.05.1Municiple Road Works?sqm?10000500500.005.2Plaza,Landscaping&Water Features?sqm?35651.007002495.575.3Greenery&Environmental Works?sqm?35150.00230301、808.455.4Outdoor flood lighting and landscape lighting?sqm?80801.001451171.615.5Outdoor Streetlighting?sqm?80801.0070565.615.6Drainage&Utilities within Site Boundary?sqm?80801.0090727.216268.456268.456.0130182.1371Changsha Meixihu International Culture&Arts Center-Estimation of Costs?No.?Project Wor302、ks(Base Estimate)?Unit?Quantity?Unit?Estimated Cost(CNY Million)?Notes?SMALL THEATRE(Inclusive of Retail Areas)?GRAND THEATRE?Sub-Total?Total?Sub-Total?Total?BASEMENT?ART MUSEUM?EXTERNAL WORKS?TOTAL CONSTRUCTION&INSTALLATION COSTS(1+2+3+4+5)?Sub-Total?Total?Sub-Total?Sub-Total?Sub-Total?Sub-Total?Su303、b-Total?Total?Sub-Total?Sub-Total?Total?Building Works-?Building Services Enginnerig&Installation Works-?Stage Engineering Works-?Building Works-?Building Services Enginnerig&Installation Works-?Stage Engineering Works-?Building Works-?Building Services Enginnerig&Installation Works-?Note?1.Civil en304、gineering costs includes costs for building,and costs for interior works.?2.Equipment and installation costs includes costs for equipment purchase and installation.?3.Costs for External Works include:External hard-landscaping of roads and plazas and integrated utilities.?4.Estimate has included stage equipment.?5.Contingency costs and other fees are not included in this estimate.?
会员尊享权益 会员尊享权益 会员尊享权益
500万份文档
500万份文档 免费下载
10万资源包
10万资源包 一键下载
4万份资料
4万份资料 打包下载
24小时客服
24小时客服 会员专属
开通 VIP
升级会员
  • 周热门排行

  • 月热门排行

  • 季热门排行

  1. 2022城区自来水提质改造智慧水务建设项目设计方案(199页).pdf
  2. 小区人员配置档案建立保洁绿化物业管理服务投标方案(593页).docx
  3. 陕西化学工业公司招聘管理与职业发展管理手册30页.doc
  4. 动火作业安全告知卡(1页).docx
  5. 高处作业安全告知卡(1页).docx
  6. 广场工程建设项目施工招标评标报告表格(24页).pdf
  7. 建筑工程外脚手架专项施工方案(悬挑式脚手架、落地式脚手架)(25页).doc
  8. 2020柏向堂房地产公司材料标准化手册3.0(143页).pdf
  9. 2021柏向堂房地产公司材料标准化手册4.0(108页).pdf
  10. 土建、装饰、维修改造等零星工程施工组织设计方案(187页).doc
  11. 深圳装饰公司施工图纸会审及设计交底管理制度【13页】.doc
  12. 工程变形测量之基坑监测培训课件(155页).ppt
  13. 房地产开发企业拿地操作指引方案.pdf
  14. 新规下的户型增值秘籍.ppt(22页)
  15. 房地产开发贷款实操指南(5页).pdf
  16. 鄂尔多斯空港物流园区总体规划方案(2017-2030)环境影响评价报告书(23页).doc
  17. 规划兰园西路道路工程环境方案环境影响评价报告书(89页).pdf
  18. 屋面圆弧形穹顶结构高支模施工方案(40米)(47页).doc
  19. 埋石混凝土挡土墙施工方案(23页).doc
  20. 重庆市五小水利工程建设规划报告(64页).doc
  21. 厂区至矿区管网蒸汽管道系统扩容改造工程施工组织设计方案(105页).doc
  22. 超高纯氦气厂建设项目办公楼、变电站、水泵房及消防水池、门卫、厂房、仓库、配套工程施工组织设计方案(140页).doc
  1. 房地产交易环节契税减征申报表(首套填写)(2页).doc
  2. 2024大楼室内精装修工程专业分包投标文件(393页).docx
  3. 苏州水秀天地商业项目购物中心100%室内设计方案(158页).pptx
  4. 2022城区自来水提质改造智慧水务建设项目设计方案(199页).pdf
  5. 龙港市专业市场布局规划方案(2023-2035年)(草案)(61页).pdf
  6. 小区人员配置档案建立保洁绿化物业管理服务投标方案(593页).docx
  7. 室内移动式操作平台工程施工方案(19页).doc
  8. 地铁6号线区间盾构下穿管线专项施工方案(30页).doc
  9. 矿山治理工程施工组织设计方案(240页).docx
  10. 老旧小区改造工程施工方案及技术措施(364页).doc
  11. 北京科技园公寓建设项目整体报告方案.ppt
  12. 建筑工程三级安全教育内容(24页).doc
  13. 新疆风电十三间房二期工程49.5mw风电项目可行性研究报告(附表)(239页).pdf
  14. 土建、装饰、维修改造等零星工程施工组织设计方案(187页).doc
  15. 四川凉山攀西灵山国际度假区小镇活力中心商业业态规划方案建议书(33页).pdf
  16. 埋石混凝土挡土墙施工方案(23页).doc
  17. 地下停车场环氧地坪漆施工方案(45页).doc
  18. 深圳装饰公司施工图纸会审及设计交底管理制度【13页】.doc
  19. 地铁深基坑及钢筋笼吊装安全专项施工方案【98页】.doc
  20. 住宅定价策略及价格表制定培训课件.ppt
  21. 西安名京九合院商业项目招商手册(28页).pdf
  22. 2010-2030年湖北咸宁市城市总体规划(32页).doc
  1. 建筑工程夜间施工专项施工方案(18页).doc
  2. 赣州无动力亲子乐园景观设计方案(111页).pdf
  3. 2016泰安乡村旅游规划建设示范案例(165页).pdf
  4. 房地产交易环节契税减征申报表(首套填写)(2页).doc
  5. 龙山县里耶文化生态景区里耶古城片区旅游修建性详细规划2015奇创.pdf
  6. 连云港市土地利用总体规划2006-2020年调整方案文本图集(78页).pdf
  7. 850亩项目塑钢门窗工程施工组织设计方案(34页).doc
  8. 老旧小区改造工程施工方案及技术措施(364页).doc
  9. 城市更新项目地价公式测算表.xlsx
  10. 房地产项目规划前期投资收益测算模板带公式.xls
  11. 存储器基地项目及配套设施建筑工程临时用水施工方案(40页).docx
  12. 铁路客运枢纽项目站前框构中桥工程路基注浆加固专项施工方案(19页).doc
  13. 室内移动式操作平台工程施工方案(19页).doc
  14. 装配式结构工业厂房基础、主体结构、门窗及装饰工程施工方案(83页).doc
  15. 地铁6号线区间盾构下穿管线专项施工方案(30页).doc
  16. 施工工程安全教育培训技术交底(13页).doc
  17. 老旧小区改造施工方案及技术措施(365页).doc
  18. 新建贵广铁路线下工程沉降变形观测及评估监理实施细则(126页).doc
  19. 消防火灾应急疏散演练预案(12页).doc
  20. 矿山治理工程施工组织设计方案(240页).docx
  21. 崖城站悬臂式挡墙施工方案(92页).doc
  22. 北京科技园公寓建设项目整体报告方案.ppt