个人中心
个人中心
添加客服WX
客服
添加客服WX
添加客服WX
关注微信公众号
公众号
关注微信公众号
关注微信公众号
升级会员
升级会员
返回顶部
未来生态科技城社区概念规划设计方案(82页)
未来生态科技城社区概念规划设计方案(82页).pptx
下载文档 下载文档
地产前期
上传人:Le****97 编号:744992 2023-09-04 82页 144.58MB
1、 未未来来城城 概概念念规规划划Raycom Future City Conceptual Master Plan 2.21.2011内容内容CONTENTChallenges&OpportunitiesPositioning&Goals Design Responses&ProcessesConceptual FrameworkEcology&Open SpaceNeighborhoods TourCirculation&Accessibility 1.机遇与挑战2.定位与目标3.设计回应与过程概念框架生态基底和开放空间组团详解交通和可达性Challenges&Opportunities1.2、机遇与挑机遇与挑战1.区域区域发展机展机遇遇 PositioningNational level&Liaoning Province coastal development focusKey connection between the Northeast China and Shandong Peninsula across the Bohai Bay 国家层面的城市定位发展机遇;辽宁沿海经济带的核心城市;西拓北进和东部沿海大通道的重要节点;东北振兴的龙头东北亚国际航运中心2.产业机遇机遇 Development OpportunitiesDalian is at a critical pi3、vot point in the development of new industries.Raycom(Lenovo)has the great potential to lead this transformation and become a core of the regional coastal development.Strong synergies exist with the adjacent high tech districts and the Dalian Tiandi Software Park,creating an opportunity for a new Ec4、o-City that can operate independently from the existing core of Dalian.提升产业层级实现结构转型形成区域核心大连高新技术产业未来形成统一、相对独立的产业空间加强与沿海经济带及东北腹地的产业合作联系大连天地软件园,形成贯南北产业功能轴。3.地理和交通机遇地理和交通机遇 Location AdvantageThe site is located in the center of the new Eco-City Excellent access to regional transportation:High-speed rail5、;new airport,highway connection,subway,etc.生态科技创新城的空间焦点高铁车站、周水子国际机场、未来新机场、沈海高速等多种交通汇聚,地铁4.环境境资源源优势 Unique environmental assets Shi Mountain,forest park,topography and ravines,reservoir石山,森林公园,地形及山谷,水库等Opportunities&Challenges机遇与挑战机遇与挑战 Opportunities机遇1.树立核心区意向立核心区意向 Need to establish a clear identit6、y of a city center Urban function core,activity core,service core,landscape core and transition core五核心:功能中心,活力中心,服务中心,景观中心,交通中心2.不利不利环境境因素因素 Environmental concernsDeforestation&habitat loss,steep slopes&erosion,degraded drainage corridors&pollution 林地破碎栖息地丧失,水文破坏严重,溪流污染,水系水景匮乏,陡坡及水土流失,3.基地限制基地限制 Si7、te limitations展示面有限,土羊高速横穿基地,明珠路将基地一分为二,公共交通匮乏Limited roadway frontage,Tuyang Highway divides the site,limited accessibility,bisected site,lack of public transportationKey Challenges主要挑战Opportunities&Challenges机遇与挑战机遇与挑战Positioning&Goals2.定定位与目位与目标打造一个以 生生态 为本,以 科技科技 为核心,集 产业,功能功能,活力活力,服服务,景景观和交交通通 8、为一体的相对独立独立的区域中心中心,引导和带动大连以及更大区域的 产业 和 城市化城市化 转型和提升。Built upon an extensive Ecological Framework,establish a future City Center that integrates new R&D industries,knowledge and creativity,and diverse urban functions that serves beyond Eco-city or even Dalian.意向清晰的生态科技城中心及服务核心Strong identity of the Ec9、o-city center完善的生态基底Extensive ecological framework带动大连产业转型和提升Lead and facilitate regional economic transformation便捷的交通枢纽Diverse transportation network&easy accessPositioning&Goals定位与目标定位与目标Design Responses&Processes3.设计回回应与与过程程 THE SITETotal Area:8.7 sq kmSuggested Buildable Area:6 sq kmDivided by M10、ing Zhu Road基地基地总面积:8.7 平方公里建议开发建设面积:6 平方公里基地被明珠路(双向四车道)所分开Design Response&Process设计回应与过程设计回应与过程The Site基地4.7 sq km N O R T H E R N S I T ERelatively flat topography is appropriate for large development Close to the LRT/Subway stationDanda Expressway bifurcates through the siteThe adjacent site to t11、he northeast may have a golf course,which can be an amenity相对平坦的地形适合大面积的开发区靠近计划中地铁四号线车站单大高速道把基地分叉成两块紧邻东北角地块的计划中高尔夫球场可成为有价值的景观资源 Design Response&Process设计回应与过程设计回应与过程Northern Site北面基地4.0 sq km S O U T H E R N S I T EDramatic topography creates opportunities for views,natural boundaries,ecological pro12、tection/enhancement,etc.Reservoir can become an amenity丰富的地形变化创造了优良视野,自然边界,生态改进等潜值与机会现存水体/水库可以成为舒适的环境资源Design Response&Process设计回应与过程设计回应与过程Southern Site南面基地南南面基地面基地229 m12.6m高高程差:程差:12-229m Height Differences/12-229m高程 ElevationUtilize terrain model to study the pre-settlement land-cover pattern:fo13、rest on highland and stream/wetland on lowlandForest cover and village settlement correlated to elevation利用三维地形模型来研究在人为活动影响前的原生地被分布模式:高地为温带森林生态系统,低地为溪流和湿地生态系统。森林覆盖和自然村落模式与地势相吻合Design Response&Process设计回应与过程设计回应与过程Terrain地形北面基地北面基地南南面基地面基地%坡度 Slope/%Un-vegetated steep slopes are where erosion is curr14、ently occurring that contributes to stream and reservoir degradation裸露的大坡度地带是目前水土流失的主要地点,导致了溪流和水库的生态状况不断恶化Design Response&Process设计回应与过程设计回应与过程Slope Analysis坡度分析%坡度 Slope/%Slope beyond 25%is non-developableExtensively disturbed/fragmented slopes can be re-graded to maximize development area 原则上25%以上15、坡度不适合开发用地一些目前受破坏的地块及支离的破碎高坡地带可以通过整地来满足开发面积的需求Design Response&Process设计回应与过程设计回应与过程Developable Area可开发区Site sits over the ridge of two regional watersheds collecting minimal surface runoff from surrounding site upper watershedFeasible for full stormwater control and BMP in a self sustained future cit16、y基地横跨两个大流域间的山脊,从上游进入基地的地表径流非常少。从而使未来城可以完全控制和利用雨洪,成为一个独立可持续的系统。大范围大范围2流域分布流域分布 2 Context WatershedsRainfall infiltrated by the forest in the upper watershed and surface runoff further retained by the restored stream corridors in the lower watershedDiverse microclimate through the ravine and the plate17、au 在流域的上游利用森林吸收和净化降雨,下游有溪流湿地系统进一步过滤蓄养地表径流,做到水土涵养的最大化形成多元微气候系统Design Response&Process设计回应与过程设计回应与过程Watersheds流域RestorationStream restoration and riparian buffer Re-establishmentPublic green spaces connect highland forest ecosystem in the south to lowland stream corridor towards the sea生态恢复生态恢复溪流及水岸缓冲18、带生态恢复公共开放空间将南部的山地林带生态系统与北部的低地湿地生态系统连接Design Response&Process设计回应与过程设计回应与过程Riparian Buffer河流缓冲带LvShun North Rd 旅顺北路旅顺北路Qianhuang Rd.前黄路前黄路Mingzhu Rd 明珠路明珠路Danda Express Way 丹大高速丹大高速Mingzhu Rd 明珠路明珠路Buffer Green Along Mingzhu Rd.and Danda Expy.在明珠路和丹大路两侧加强景观带在明珠路和丹大路两侧加强景观带Design Response&Process设计回应与19、过程设计回应与过程Regional Road区域道路GridMost efficient&flexible traffic distribution modelDeformed to adapt the topography.Design Response&Process设计回应与过程设计回应与过程Primary Road主要道路格子网络格子网络最有效率与灵活性的交通布局模式顺在此基础上顺应地形而做相应变通城市公园城市公园 Urban Parks主要道路主要道路 Primary RoadLvShun North Rd 旅顺北路旅顺北路Qianhuang Rd.前黄路前黄路Mingzhu Rd 20、明珠路明珠路Danda Express Way 丹大高速丹大高速Mingzhu Rd 明珠路明珠路Yingcheng East Rd.Qianhuang Rd.Mingju RdDanda ExpyMingju RdDesign Response&Process设计回应与过程设计回应与过程Block Plan街区平面图Yingcheng East Rd.Qianhuang Rd.Mingju RdDanda ExpyMingju Rd用地面积 Parcel Area:1.4 km地上建筑面积 GFA:410 万平方米 居住居住 Residential:Located in the area w21、here physical&visual interaction with nature can be maximizedDesign Response&Process设计回应与过程设计回应与过程分布在自然景观视野最良好的区域Yingcheng East Rd.Qianhuang Rd.Mingju RdDanda ExpyMingju Rd用地面积 Parcel Area:1.4 km地上建筑面积 GFA:410 万平方米 居住居住 Residential:用地面积 Parcel Area:0.75 km地上建筑面积 GFA:262 万平方米 混合城市用地 Mixed Use(R&D/Off22、ice/Retail):-As a main image of the Future City,Distributed along the major regional roads.-Defines main civic/public urban parks.-Most of ground floors are used for retails to animate streetsDesign Response&Process设计回应与过程设计回应与过程分布在自然景观视野最良好的区域-作为未来城展示面的主要意象,分布于区域干道旁-用作于界定主要城市广场与公共公园-大部分的一层作为零售使用,以活23、络城市街道意象Yingcheng East Rd.Qianhuang Rd.Mingju RdDanda ExpyMingju Rd用地面积 Parcel Area:1.4 km地上建筑面积 GFA:410 万平方米 居住居住 Residential:-Located in the area where physical&visual interaction with nature can be maximized.用地面积 Parcel Area:0.75 km地上建筑面积 GFA:262 万平方米 混合商业 Mixed Use(R&D/Office/Retail):用地面积 Parcel 24、Area:0.25 km地上建筑面积 GFA:80 万平方米 商业零售 Commercial/Retail:Design Response&Process设计回应与过程设计回应与过程-作为未来城的主要入口意象,分布于区域干道旁-用作于界定主要市民广场与城市公园-大部分的地面层作为零售使用,以活络城市街道意象Yingcheng East Rd.Qianhuang Rd.Mingju RdDanda ExpyMingju Rd用地面积 Parcel Area:1.4 km地上建筑面积 GFA:410 万平方米 居住居住 Residential:-Located in the area where 25、physical&visual interaction with nature can be maximized.用地面积 Parcel Area:0.75 km地上建筑面积 GFA:262 万平方米 混合商业 Mixed Use(R&D/Office/Retail):用地面积 Parcel Area:0.25 km地上建筑面积 GFA:80 万平方米 商业零售 Commercial/Retail:用地面积 Parcel Area:0.1 km地上建筑面积 GFA:38 万平方米 酒店/会展中心 Hotel/Recreational-As a main image of the Future 26、City,Distributed along the major regional roads.-Defines main civic/public urban parks.-Most of ground floors are used for retails to animate streetsDesign Response&Process设计回应与过程设计回应与过程Yingcheng East Rd.Qianhuang Rd.Mingju RdDanda ExpyMingju Rd用地面积 Parcel Area:1.4 km地上建筑面积 GFA:410 万平方米 居住居住 Residen27、tial:-Located in the area where physical&visual interaction with nature can be maximized.用地面积 Parcel Area:0.75 km地上建筑面积 GFA:262 万平方米 混合商业 Mixed Use(R&D/Office/Retail):用地面积 Parcel Area:0.25 km地上建筑面积 GFA:80 万平方米 商业零售 Commercial/Retail:用地面积 Parcel Area:0.1 km地上建筑面积 GFA:38 万平方米 酒店/会展中心 Hotel/Recreationa28、l用地面积 Parcel Area:0.15 km地上建筑面积 GFA:38 万平方米 高等教育(大学)University:-As a main image of the Future City,Distributed along the major regional roads.-Defines main civic/public urban parks.-Most of ground floors are used for retails to animate streetsDesign Response&Process设计回应与过程设计回应与过程Yingcheng East Rd.Qi29、anhuang Rd.Mingju RdDanda ExpyMingju Rd用地面积 Parcel Area:1.4 km地上建筑面积 GFA:410 万平方米 居住居住 Residential:-Located in the area where physical&visual interaction with nature can be maximized.用地面积 Parcel Area:0.75 km地上建筑面积 GFA:262 万平方米 混合商业 Mixed Use(R&D/Office/Retail):-As a main image of the Future City,Dis30、tributed along the major regional roads.-Defines main civic/public urban parks.-Most of ground floors are used for retails to animate streets用地面积 Parcel Area:0.25 km地上建筑面积 GFA:80 万平方米 商业零售 Commercial/Retail:用地面积 Parcel Area:0.1 km地上建筑面积 GFA:38 万平方米 酒店/会展中心 Hotel/Recreational用地面积 Parcel Area:0.15 km地31、上建筑面积 GFA:38 万平方米 高等教育(大学)University:用地面积 Parcel Area:0.1 km地上建筑面积 GFA:12 万平方米 基础教育 Educational:用地面积 Parcel Area:0.1 km地上建筑面积 GFA:35 万平方米 政府/公共使用 Government/Civic:用地面积 Parcel Area:0.1 km地上建筑面积 GFA:12 万平方米 基础设施 Utilities:Design Response&Process设计回应与过程设计回应与过程Illustrative Plan平面渲染图Design Response&Proce32、ss设计回应与过程设计回应与过程“ECO-FUTURE CITY“高程 Elevation 90m坡度 Slope 25%流域保护 Watershed Stream Corridor Protection有效率的网络 Efficient Network土地使用战略性分布Strategic Program DistributionDesign Response&Process设计回应与过程设计回应与过程Site Specific&Analysis Informed Design Approach基地针对性和分析结论引导的设计方式Ecology&Open Space生态与开放空间生态与开放空间Ci33、rculation&Accessibility交通与交通与可达可达性性Neighborhoods Tour未来城未来城组团组团导览导览Future City Center未来城中心Intelligence Hub才智枢纽中心Gateway Business门户商务区Health Living Complex健康生活区Ravine Terrace幽谷山岸Green Heart翡翠之心Water Necklace&Green Ribbon水项链与生态轴Forested Slope城市森林坡Urban&Neighborhood Park城市社区公园Bike&Hiking Trail自行车与徒步环线R34、oad Configuration道路系统配置Public Transportation公交系统Daily Itineraries生活行程未来城整体开放空间与体量Overview of Open Space and Massing at Future CityEcology&Open Space生态与开放空间生态与开放空间未来城翡翠之心Future City Green Heart多种东北地区典型森林生态系统,营造景观季节性Diverse forest types for landscape seasonality Ecology&Open Space生态与开放空间生态与开放空间未来城水项链及35、生态轴Future City Water Necklace&Green Ribbon水项链四季呈现不同的形态和景致:雨季是连绵的溪流旱季是城市中点缀的水塘和湿地Water Necklace evolves through seasons:meandering streams in raining seasons and a string of ponds and wetlands embedded in the landscapeEcology&Open Space生态与开放空间生态与开放空间Central Landscape支路 Tertiary Road中央公园社区住宅Central Pa36、rk Residential Community陡坡山景Steep Slope Landscape树阵步行大道Tree Grove Path Way 大型公共活动草坪Public Event Grand LawnCentral Landscape室外演出场Amphitheatre基建整地土而成的地形艺术公园Earthwork Art Park with Construction Excavation Soil Central Landscape地形艺术公园Earthwork Art Park生态雨洪人工湖/冬季溜冰场Stormwater Retention Pond/Skating Rink中37、央水景公园Central Water Scape ParkCentral Landscape中央溪流Central Stream中央水景公园Central Water Scape Park河岸湿地Wetland Park雕塑公园Sculpture Park石墙阶梯公园Stonewall Terrace ParkCentral Landscape与中央公园连为一体的花园式办公庭院R&D Office Merging with Central Park 石墙阶梯公园Stonewall Terrace Park花园式研发办公区R&D Office With Garden Landscape次级路Se38、condary Road城市森林坡 Forested Slopes高坡度地带创造城市林地,可视性强防止水土流失提高周边地块价值Strong visibility on steep slopesPrevent erosionImprove adjacent land valueEcology&Open Space生态与开放空间生态与开放空间城市及社区公园Urban&Neighborhood ParksEcology&Open Space生态与开放空间生态与开放空间自行车和徒步环线系统Bike and Hiking TrialEcology&Open Space生态与开放空间生态与开放空间可持续开39、发&雨洪管理Low impact development&stormwater managementEcology&Open Space生态与开放空间生态与开放空间低环境影响开发Low Impact Development传统城市开发Traditional Urban Development减少洪泛的可能性与改善水质洪涝隐患与低质量水质15-80%的支出减少Water Necklace?|Ecological benefits summerCarbon sinkPollutant filterStormwater storage/bufferEphemeral habitatIndicator40、s of environmental healthNesting habitat水项水项链之生态益处链之生态益处 夏季夏季碳吸收竺巢生物生物棲息地污染过滤器生物棲息地雨洪储存/缓衝环境健康指标Ecology&Open Space生态与开放空间生态与开放空间Water Necklace|Ecological benefits winterPollutant filterStormwater storage/bufferWinter habitat&foodHibernation habitat雨洪储存/緩衝冬眠生物棲息地污染过滤器冬季生物棲息地及食物水项链之生态益处水项链之生态益处 冬季冬季Ec41、ology&Open Space生态与开放空间生态与开放空间Ecology&Open Space生态与开放空间生态与开放空间Circulation&Accessibility交通动线与便捷性交通动线与便捷性Neighborhoods Tour未来城社区导览未来城社区导览Future City Center未来城中心Intelligence Hub才智枢纽中心Gateway Business门户商务区Health Living Complex健康生活区Ravine Terrace幽谷山岸Green Heart平面渲染图Water Necklace&Green Ribbon才智枢纽中心Forest42、ed Slope门户商务区Urban&Neighborhood Park健康生活区Bike&Hiking Trail幽谷山岸Road Configuration道路系统配置Public Transportation公交系统Daily Itineraries生活行程Structure架构Neighborhoods Tours 未来城社区导览未来城社区导览Future City Center未来城中心Intelligence Hub才智枢纽中心Gateway Business门户商务区Health Service Complex健康生活区Ravine Terrace幽谷山岸Neighborhood43、 Tours 未来城社区导览未来城社区导览Future City Center未来城中心商业零售 Commercial/Retail:高等教育(大学)University:基础教育 Educational:酒店/会展中心 Hotel/Conference政府/公共使用 Government/Civic:混合 Mixed Use(R&D/Office/Retail):居住 Residential:Neighborhood Tours 未来城社区导览未来城社区导览Future City Center未来城中心Lake View NeighborhoodNeighborhood Center湖岸水景44、社区社区会所Business Hotel高端商务酒店International School国际中学Mountain View Neighborhood山景社区Neighborhood Retails社区零售中心International Research Complex跨国企业研发中心Civic Complex 市民中心Headquarter Office企业总部办公Courtyard Apartment中庭公寓Future City Central Park未来城中央公园Lake View Park水景公园Business Complex商贸中心Urban Living中心居住区中心居住区45、Future City Center未来城中城未来城中城Eco-City Committee生态科技城委员会Neighborhood Tours 未来城社区导览未来城社区导览Future City Center未来城中心Neighborhood Tours 未来城社区导览未来城社区导览Future City Center未来城中心社区休闲会所Community Club House湖景公寓Lake view Apartment社区湖景公园Lake View Ravine Park中央溪流Central Stream社区湖景公园Lake View Ravine Park社区湖景公园Lake Vi46、ew Ravine Park牧城驿水库Reservoir道路分流 与 缓衝景观带Carriage lane w/landscape buffer湖岸商务 与 中庭零售街Lake side Business w/courtyard retailNeighborhood Tours 未来城社区导览未来城社区导览Intelligence Hub才智枢纽中心商业零售 Commercial/Retail:高等教育(大学)University:基础教育 Educational:酒店/会展中心 Hotel/Conference政府/公共使用 Government/Civic:混合 Mixed Use(R&D47、/Office/Retail):居住 Residential:Neighborhood Tours 未来城社区导览未来城社区导览Intelligence Hub才智枢纽中心Urban High-end ApartmentsTechnology Institute Future City Branch中央水景高端公寓国际科技大学未来城分校Business Hotel高端商务酒店Rental Apartment Complex出租型公寓R&D Complex纵合性研发专属园区Knowledge Hub知知识枢纽识枢纽Business Research Hub企业研发枢纽企业研发枢纽Neighbor48、hood Club House社区会所West Residential Neighborhood西部门户社区Neighborhood Tours 未来城社区导览未来城社区导览Intelligence Hub才智枢纽中心Neighborhood Tours 未来城社区导览未来城社区导览Intelligence Hub才智枢纽中心Neighborhood Tours 未来城社区导览未来城社区导览Gateway Business门户商务区商业零售 Commercial/Retail:高等教育(大学)University:基础教育 Educational:酒店/会展中心 Hotel/Conferenc49、e政府/公共使用 Government/Civic:混合 Mixed Use(R&D/Office/Retail):居住 Residential:Neighborhood Tours 未来城社区导览未来城社区导览Gateway Business门户商务区Convention Center+Exhibition Hall国际会议展览中心International Business Complex国际企业办公中心Business Hotel高端商务酒店成长型企业办公楼Star-up BusinessWater view Leisure Retail Street水景休闲娱乐商街Courtyard/50、Lakeview Restaurant湖景中庭餐饮街International Convention Hall国国际会展区际会展区Lakeside Business湖湖岸商务岸商务Business Research Complex商业办公中心Future City Commercial Complex未来城未来城商商业娱乐中业娱乐中心心Gateway Business门门户商务户商务Retails/Movie Theaters零售商场/电影院装备制造办公楼Manufacturing Research OfficePedestrian Shopping District徒步商业区金融企业办公楼F51、inancial BusinessNeighborhood Tours 未来城社区导览未来城社区导览Gateway Business门户商务区Neighborhood Tours 未来城社区导览未来城社区导览Gateway Business门户商务区Neighborhood Tours 未来城社区导览未来城社区导览Health Living Complex健康生活区商业零售 Commercial/Retail:高等教育(大学)University:基础教育 Educational:酒店/会展中心 Hotel/Conference政府/公共使用 Government/Civic:混合 Mixed52、 Use(R&D/Office/Retail):居住 Residential:Neighborhood Tours 未来城社区导览未来城社区导览Health Living Complex健康生活区Fire station/LibraryNorth Gateway Neighborhood(Settlement Relocation)High SchoolNeighborhood Retails消防局 /图书馆北部门户社区(回迁区)中学社区零售中心North Gateway北部门户区北部门户区Mix-Use Office Complex混合型商业办公楼Medical ComplexRetail+53、Office零售+办公楼区域医疗中心Service Complex区域服务中区域服务中心心Logistic Service Office现代物流办公楼Wholesale Market大型商业卖场Electricity Facility发电厂中继站Neighborhood Tours 未来城社区导览未来城社区导览Health Living Complex健康生活区Neighborhood Tours 未来城社区导览未来城社区导览Ravine Terrace幽谷山岸商业零售 Commercial/Retail:高等教育(大学)University:基础教育 Educational:酒店/会展中心 54、Hotel/Conference政府/公共使用 Government/Civic:混合商业 Mixed Use(R&D/Office/Retail):居住 Residential:Neighborhood Tours 未来城社区导览未来城社区导览Ravine Terrace幽谷山岸Neighborhood Retails社区零售中心Ravine Neighborhood Family Community高高端端幽谷幽谷社区社区-家庭社区家庭社区International School双语学校Club House社区会所Ravine South Neighborhood幽谷南岸幽谷南岸High-55、end Mt.View Neighborhood社区主街Arboretum植物园Neighborhood Retails社区零售中心Business Complex商务办公楼Ravine North Neighborhood幽谷北岸幽谷北岸Mt View Apartment-Young Professional Community山景公寓山景公寓-年轻白领社区年轻白领社区Ravine Terrace幽谷幽谷园园Club House社区会所High-end Ravine Villa Neighborhood Executive Community高高端端幽谷幽谷社区社区-别墅社区别墅社区Neig56、hborhood Tours 未来城社区导览未来城社区导览Ravine Terrace幽谷山岸Neighborhood Tours 未来城社区导览未来城社区导览Ravine Terrace幽谷山岸社区零售Neighborhood Retail社区零售Neighborhood Retail翡翠之心Green Heart幽谷水岸Ravine Terrace Park幽谷林道Ravine Blvd幽谷水岸Ravine Terrace Park社区会所Community Club House山景公寓Mt View Apartment社区阶梯中庭Community Terrace 公寓Apartment57、山景公寓Mt View Apartment公寓Apartment公寓Apartment社区阶梯中庭Community Terrace支路Tertiary Road支路Tertiary RoadNeighborhood Tours 未来城社区导览未来城社区导览Phase I:Catalyst District启动区Neighborhood Tours 未来城社区导览未来城社区导览Phase I:Catalyst District启动区居住 Residential:混合 Mixed Use(R&D/Office/Retail):商业零售 Commercial/Retail:政府/公共使用 Gove58、rnment/Civic:基础教育 Educational:Ecology&Open Space生态与开放空间生态与开放空间Circulation&Accessibility交通动线与便捷性交通动线与便捷性Neighborhoods Tour未来城小区导览未来城小区导览Future City Center未来城中心Intelligence Hub才智枢纽中心Gateway Business门户商务区Health Living Complex健康生活区Ravine Terrace幽谷山岸Green Heart平面渲染图Water Necklace&Green Ribbon才智枢纽中心Forest59、ed Slope门户商务区Urban&Neighborhood Park健康生活区Bike&Hiking Trail幽谷山岸Road Configuration道路系统配置Public Transportation公交系统Circulation&Accessibility道路动线与便捷性道路动线与便捷性Internal Road Configuration道路系统配置Public Transportation Hub公交系统Daily Itineraries日常路线Circulation&Accessibility道路动线与便捷性道路动线与便捷性Road Configuration道路配置Lv60、Shun North Rd.Qianhuang Rd.Mingju RdDanda ExpyExisting Regional Roads现现有区域级道路有区域级道路Circulation&Accessibility道路动线与便捷性道路动线与便捷性Primary Road Network主要道路系统700m900m700m450m250m650m500m250m350m350m300m800mDeformed Grid System Reflecting Topography反映地形变化的反映地形变化的格子网络格子网络Urban BoulevardResidential Parkway城市林荫61、道住宅绿园道Major Traffic Carrier主要交通承载动线Primary Road Network主要道路Circulation&Accessibility道路动线与便捷性道路动线与便捷性Secondary Road次级道路Deformed Grid System+Loop System格子网络格子网络 Secondary Road次级道路Main Access Point主要动线出入点Major Traffic Carrier主要交通承载动线Primary Road Network主要道路Circulation&Accessibility道路动线与便捷性道路动线与便捷性Terti62、ary Road支路Enclosed Internal Loop封闭的内部环络封闭的内部环络Secondary Road次级道路Main Access Point主要动线出入点Major Traffic Carrier主要交通承载动线Primary Road Network主要道路Tertiary Road支路Circulation&Accessibility道路动线与便捷性道路动线与便捷性Potential External Connection未来外部动线连接Circulation&Accessibility道路动线与便捷性道路动线与便捷性Public Transportation公交系统63、Proposed Subway Stop建议的地铁车站Internal Shuttle Bus Route未来城内部公交路线Shuttle Bus Stops公交停留站Proposed extended Subway alignmentGoing through the major neighborhood centers on site.Connected with internal district-wide shuttle bus route to provide a low carbon emission life style.建议新的地铁路线,设置车站于在未来城中的主要中心并连接未来64、城内部公交系统提供一个低碳的交通生活模式10 mins walk十分钟步行距离10 mins walk十分钟步行距离Circulation&Accessibility道路动线与便捷性道路动线与便捷性Transportation Hub交通动线核心Secondary Road次级道路Primary Road Network主要道路Proposed Subway Stop建议的地铁车站Internal Shuttle Bus Route未来城内部公交路线Shuttle Bus Stops公交停留站支路Tertiary RoadGFA per the FAR given by RaycomGFA&F65、AR Proposal 1-居住-Residential:4.1 百万平方米-5 Story-混合使用-Mixed Use(R&D/Office/Retail):1.24 百万平方米-2.5 Story-商业/零售-Commercial/Retail:52.5 万平方米-3 Story-政府/公共使用-Government/Civic:18 万平方米-3 Story-基础教育-Educational:12 万平方米-3 Story-高等教育-University:22.5 万平方米-3 Story-酒店/会展中心-Hotel/Conference:22.5 万平方米-3 Story-休闲娱乐/66、文化设施-Recreational/Cultural:15 万平方米-3 Story-FAR:1.1-Total GFA:676.5 万万平方米平方米 (million m)-居住-Residential:4.1 百万平方米-5 Story-混合使用-Mixed Use(R&D/Office/Retail):2.62 百万平方米-5 Story-商业/零售-Commercial/Retail:58 万平方米-4 Story-政府/公共使用-Government/Civic:35 万平方米 5 Story-基础教育-Educational:12 万平方米-3 Story-高等教育-Univers67、ity:38 万平方米-5 Story-酒店/会展中心-Hotel/Conference:38 万平方米-5 Story-休闲娱乐/文化设施-Recreational/Cultural:15万平方米-3 Story-FAR:1.45-Total GFA:890 万万平方平方米米 (million m)GFA&FAR 提案提案融科建议融科建议 GFA&FARTotal Development Land:6.15 km 总开发用总开发用地面积地面积:6.15 平方公里平方公里 Total Parcel Area:3 km基地建筑用地面积基地建筑用地面积 :3 kmTotal Development68、 Land:6.15 km 总开发用总开发用地面积地面积:6.15 平方公里平方公里 Total Parcel Area:3 km基地建筑用地面积基地建筑用地面积 :3 kmPreliminary numbers,further adjustment calculation will be done as the project continues.初步统计初步统计,详细面积计算将会随着方案调整详细面积计算将会随着方案调整Average 3 story for programs other than residential use居住用地以外的指标,平均3层楼Stronger perception of City Center by additional GFA on the same land coverage利用增加地上总建筑面积来加强核心区的个性谢谢!Thank You!2.21.2011
会员尊享权益 会员尊享权益 会员尊享权益
500万份文档
500万份文档 免费下载
10万资源包
10万资源包 一键下载
4万份资料
4万份资料 打包下载
24小时客服
24小时客服 会员专属
开通 VIP
升级会员
  • 周热门排行

  • 月热门排行

  • 季热门排行

  1. 高速公路路基填筑边坡填料运输水土保持施工设计方案30页.doc
  2. 2023年县乡村振兴示范带新建农旅融合项目可行性研究报告(117页).pdf
  3. 2023城镇19个老旧小区改造项目可行性研究报告(附表)(273页).pdf
  4. 2023西路3个老旧小区改造项目可行性研究报告(199页).pdf
  5. 兰新铁路工程施工测量技术方案(22页).doc
  6. 装饰装修施工项目管理人员岗位职责(19页).doc
  7. 尤庄子小学教学楼施工组织设计方案(155页).doc
  8. 网络机房工程施工组织设计方案(132页).doc
  9. 制药总厂厂区及家属区道路维修施工工程施工组织设计方案(84页).doc
  10. 国际机械城会展中心项目钢结构工程钢筋桁架楼层板施工专项方案(22页).docx
  11. 北京CBD核心区z6地块地质勘察工程高层超高勘察方案(71页).doc
  12. 大厦项目工程承包人实施方案(195页).doc
  13. 赫山区乡镇污水处理设施建设及运营PPP项目泥江口镇污水处理厂及管网工程可行性研究报告(212页).docx
  14. 桃渚风景名胜区总体规划方案文本+图集(2021-2035年).pdf
  15. 春晓家园高层施工组织设计方案(177页).doc
  16. 扬子石化年产20万吨乙二醇项目可行性研究报告(169页).docx
  17. 施工现场建筑垃圾处置方案(7页).doc
  18. 颍泉区国民经济和社会发展第十四个五年规划和2035年远景目标纲要方案(2021-2025年)(119页).pdf
  19. 江西省庐山西海风景名胜区湖岛旅游开发概念性规划设计方案(107页).pdf
  20. 2020两江人才公寓营销推广方案(83页).pptx
  21. 人才公寓日常物业管理方案(158页).doc
  22. 市政污水管工程安全文明施工专项方案(25页).doc
  1. 南风花园二期开口工程施工组织设计方案(23页).doc
  2. 2024党建红色市集(红色市集惠民声主题)活动策划方案-53页.ppt
  3. 电子信息产业园道路路基工程监理项目施工监理细则103页.doc
  4. 高速公路路基填筑边坡填料运输水土保持施工设计方案30页.doc
  5. 学生宿舍施工钢筋混凝土砖砌体涂刷水电施工方案74页.doc
  6. 2023年县乡村振兴示范带新建农旅融合项目可行性研究报告(117页).pdf
  7. 2023古镇旅游景区基础设施配套工程可行性研究报告(184页).pdf
  8. 2023城镇19个老旧小区改造项目可行性研究报告(附表)(273页).pdf
  9. 2023西路3个老旧小区改造项目可行性研究报告(199页).pdf
  10. 中央商务区360米超高层建筑幕墙施工专项方案(219页).doc
  11. 脚手架、配电箱等设施设备设施风险分级管控清单汇编(2页).doc
  12. 施工现场常见隐患培训课件(46页).ppt
  13. 洋房、商业工程淋水试验专项施工方案(15页).doc
  14. 兰新铁路工程施工测量技术方案(22页).doc
  15. 外立面改造装饰工程施工组织设计方案(177页).doc
  16. 杭州金地41外墙防水淋水施工方案(12页).doc
  17. 电力工程(电缆、电力设备安装、配电室安装)施工组织设计方案(76页).doc
  18. 10KV及以下电力工程施工组织设计方案(88页).doc
  19. 武汉超高层豪宅项目前期策划.ppt
  20. 2020中南工程材料管理制度、精装修管理制度修订方案.ppt
  21. 地产项目开盘定价体系-定价工具.xlsx
  22. 2019年时光PARK湿地公园文旅小镇招商及运营推广方案(215页).pdf
  1. 2024长隆北加油站建设项目可行性研究报告(145页).pdf
  2. 客专铁路建设声屏障安装工程施工技术交底书.doc
  3. 48MW风电项目工程风机设备吊装专项施工方案86页.doc
  4. 2025商场地产夏日啤酒龙虾音乐嘉年华(吃货的夏天主题)活动策划方案-47页.pptx
  5. 铁路声屏障工程路基非金属声屏障搭设操作平台单元板安装施工方案27页.docx
  6. 2022城区自来水提质改造智慧水务建设项目设计方案(199页).pdf
  7. 小区人员配置档案建立保洁绿化物业管理服务投标方案(593页).docx
  8. 2023古镇旅游景区基础设施配套工程可行性研究报告(184页).pdf
  9. 南风花园二期开口工程施工组织设计方案(23页).doc
  10. 土建、装饰、维修改造等零星工程施工组织设计方案(187页).doc
  11. 2021柏向堂房地产公司材料标准化手册4.0(108页).pdf
  12. 弱电工程维保合同(15页).doc
  13. 黄埔区广州开发区城市更新专项总体规划方案(2020-2035年)(46页).pdf
  14. 农业种植公司甘草GAP种植基地建设项目可行性研究报告(76页).doc
  15. 公路工程雨季施工专项施工方案(38页).doc
  16. 榆林市档案馆消防工程施工组织设计方案(58页).doc
  17. 阳泽河水库清淤工程建设项目可行性研究报告47页.doc
  18. 襄樊电厂二期主厂房施工方案【202页】.doc
  19. 煤矿与建设机械装备生产制造基地项目锻压、下料厂房、热处理厂房、返修及涂装厂房吊车梁、屋架等预制构件制作及吊装工程施工方案【128页】.doc
  20. 深圳装饰公司施工图纸会审及设计交底管理制度【13页】.doc
  21. 房地产开发全流程培训.ppt
  22. 2010-2030年湖北咸宁市城市总体规划(32页).doc