商品知识指南-Apparel服装(55页).doc
下载文档
上传人:焦**
编号:70948
2021-03-23
69页
305KB
1、 Merchandise Knowledge Manuel 商品知识指南商品知识指南 Apparel (服装服装) Training & Development 培训与发展培训与发展 Copyright 2001 版权声明 by Wal-Mart China CO., LTD. 沃尔玛中国有限公司 All rights reserved. The reproduction or use of this work in any form or by any electronic, mechanical, or other means, now known or hereafter invente2、d, including photocopying and recording, and including republication as or in connection with instructional or training seminars, and in any storage and retrieval system, is forbidden to anyone except an authorized Wal-Mart associate doing so for the sole purpose of training Wal-Mart associates on t3、he material contained within. Copies of this document, in any form, cannot be distributed to non-Wal-Mart associates without the written permission of the Global Training Manager for Wal-Mart Stores, Inc. 所有权利受到保护。除非出于培训目的而获特别授权,否则任何人,不论出于任何目 的,都不能将此文件的任何部分以任何形式通过任何方式,如电子或机械印刷等,进 行复制或传播,包括影印、抄录,或使用其他信息储存与回收系统。此文件任何形式 的复印件,未经沃尔玛百货有限公司国际培训部书面许可,不得泄露给沃尔玛外部人 员。 序序 言言 随着沃尔玛在中国的快速发展,我们的同事面临着前所未有的挑战。丰富、专