个人中心
个人中心
添加客服WX
客服
添加客服WX
添加客服WX
关注微信公众号
公众号
关注微信公众号
关注微信公众号
升级会员
升级会员
返回顶部
ConstructionStatementforPVC真空预压发处理软土地基施工方案样本(14页)
ConstructionStatementforPVC真空预压发处理软土地基施工方案样本(14页).doc
下载文档 下载文档
其它文档
上传人:正*** 编号:697984 2023-07-10 14页 108KB
1、Proposed Design Philosophy,Construction,Installation and Monitoring Method ( as per 22.1.7 of section 1.0)1. Source of borrows pit indicating the location and quantityWe have license given by Vietnam authority to exploit a quantity of 8,400,000 m3 in Nha Be river and the location is in Nhon Trach di2、strict,Dong Nai province.2. Physical proprieties of proposed fill materialThe sampling test of sand proposed to use is carried out according to AASHTO M45-89,C144-88 (see Test Result of Analyses of Sand component). The specific weight of the sand is 2.634,unit weight 1.5g/cm3,organic content 2.87% a3、nd modules 2.52.3. Proposed method of statement and monitoring devices3.1 Method statementAccording to the geotechnical report of the site,the void ratio of the soft silty clay (e) is 2.377,and the permeability coefficient (Kv) 5.5*10-7cm/s. If we adopt “wick drains and pre-loading” method to reach 4、a soil bearing capacity of 50Kpa,75Kpa,100Kpa under the sites conditions,the consolidation period would be far beyond the proposed work period. For the purpose of reducing the consolidation period of foundation soil an overload should be added,though the loading would be 7.30m high to fulfill the be5、aring capacity of 100Kpa. Obviously,this technique would bear a tremendous number of loading and unloading,which would also mean a high construction cost. The stability of side slope would also be difficult to monitor.Based on our previous experience of soft soil improvement of China coastal and Hie6、p Phuoc Power Plant in Nha Be,15km Southeast of Hochiminh City,the pre-loading method is appropriate only for general area. In process area we suggest to adopted the following method (details see drawings “Proposed Process Area Plan” and “Proposed Process Area Zone” in page 6,7):f = 50 Kpa,vacuum pr7、ecompression method;f = 75 Kpa,vacuum precompression and filling water (2.0m) on membrane method;f = 100 Kpa,vacuum precompression compound with loading method.The hydraulic filling of sea sand should be adopted under the elevation +2.80,which is specified in the tender documents. But based on our s8、ite investigation report,we propose to use sweet water sand instead of sea sand for these following reasons:(1) Fine grade and high mud content of the sea sand;(2) No local facilities available such as hydraulic filling mud absorption. The backfill material (sweet water sand) will be delivered by ba9、rges to the nearest dock and then carried by trucks to the site.3.2 Monitoring devicesAccording to the requirement of the tender documents,settlement gauge should be installed at 50mx50m grid and be measured by leveling instruments.In accordance with the requirement of the owner,the static penetrati10、on test should be carried out at the 10 specified points and the penetration instruments should be buried through the whole depth of the compressible soil layers.The compaction test of filling materials in site should be carried out with heavy compactor. 4. Design philosophy to achieve the requireme11、nt of the specification for soil improvement4.1 philosophy of vacuum precompression methodThe vacuum precompression method is used to consolidate foundation soil. This method consists in laying on the surface of foundation soil a sand bed,and in installing a drainage system with wick drains. The san12、d bed drain line is buried and connected with vacuum system to form an air exhaust and a dewatering system. A set of airtight seal membranes is laid on the surface of the sand bed with its edge buried in soil. Thus,a negative pressure area within sand bed and foundation soil can be formed from air e13、xhaust and dewaturing pumps. The vacuum method can reach a soil bearing capacity of 80KPa. Under the vacuum condition,soil is in the state of consolidating and pore water is discharged from soil under the pressure difference. The consolidation is completed when pressure of soil to be consolidated is14、 reaching the same pressure of the drainage system.The philosophy of vacuum recompression method is that under the pressure difference (Pa-Pv),soil can be consolidated;Pa indicates atmospheric pressure and Pv indicates air pressure in the sand bed and the vertical drains. In the calculation of conso15、lidation of the foundation soil,the RENDULIC-TERZAGE Theory and BICOT Theory of Consolidation can be adopted which are the same of those adopted in loading recompression method. The drop of the ground water table may also accelerate the consolidation of foundation soil beside the pressure difference16、. The effective stress in the soil increases successively during the period of consolidation of the foundation soil with vacuum recompression method. The horizontal displacement of the soil is toward the center of the consolidation area from the beginning of the period of vacuum recompression,which 17、is different from the loading recompression method. So the stability of the foundation soil will not become a problem,and the required vacuum capacity can immediately be obtained and consequently,the period of vacuum recompression can be curtailed. Details is shown in drawings “Design Philosophy for18、 Vacuum Precompression “ and “Flow Diagram of Vacuum Precompression Method” in page 8,9.Regarding the short work period of this project,the vacuum compound with loading recompression method is used in the process area where the required bearing capacity of the foundation soil is 100 Kpa. It has been19、 proved from the theoretical calculation and our previous experience that the effects of vacuum and loading recompression methods on the consolidation can be coaxed. For this purpose,a soil capacity of 150 Kpa had been obtained in one of our previous project in the turbine house of Hiep Phuoc power 20、plant located at Nha Be district in Hochiminh city. During the vacuum process and under the pressure difference (Pa Pv),the pore water permeates into the vertical drains and the consolidation occurs. On the other hand,when using pre-loading method,the air pressure raises to Pp and the consolidation 21、occurs under the pressure difference (Pp Pa). Therefore,by using the vacuum compound with pre-loading method,the pressure can be increased to (Pp PV) and the consolidation effect would be improved as a result.The process of vacuum compound with pre-loading method is shown in drawing “The Process dra22、wing of Vacuum Precompression combined with Loading Method” in page 10.4.2 Monitoring method The loading height and loading period of each step of general area is mainly controlled by the stability of the foundation soil. The settlement monitoring should be mainly concerned in this area.Because the 23、vacuum precompression method will not cause a soil stability problem,the site measurements have less significance comparable to pre-loading method. According to the requirement of the tender documents,settlement gauges should be installed at 50mx50m grid and be measured by leveling instruments. The 24、total settlement and settlement speed of the foundation in the loading area as well as the settlement or the rising height in the surrounded area must be monitored.The final settlement S can be calculated from the site monitoring data. The consolidation settlement Sc and the average consolidation ra25、tio are obtained from this value. Moreover,the b value can also be calculated as well as the average consolidation coefficient Cv.According to the requirement of the owner,the static penetration test should be carried out at the 10 specified points and the penetration instruments should be buried th26、rough the whole depth of the compressible soil layers.4.3 Preliminary geotechnical design for vertical drains and soil dischargeThe type SPB plastic drainage plate is adopted as the vertical drains in this project. The vertical drains would be distributed accordingly to an equilateral triangle patte27、rn.Based on our previous experiences of soft soil improvement in the Mekong delta area and according to the work requirements from the project,we believe that the bearing capacity of processed foundation soil can be reached. However,it is arduous to reach the same requirement for the deformation. It28、 needs a comparatively long period to attain a stable state of foundation soil settlement.In accordance with the tender document for the general area,the filling materials have to be well compacted to meet the building standard. Still,there are no relevant requirements of bearing capacity,so the ins29、erting depth of the vertical drains should be less than the thickness of the soft soil layers to avoid the occurrence of extreme settlement. In the opposite case,that would imply a large additional quantity of loading materials and a soaring construction cost.Combining vacuum technique with loading 30、method,the different requirements of bearing capacity of process area can be firmly met. Obviously,the airtight condition during vacuum precompression is a critical factor to ensure a sufficient vacuum level. The depth of vertical drains in the process area is estimated to be 10m to ensure that the 31、end of vertical drains is within the soft soil layer which is about 14m depth. This will avoid any leakage from lower sand layer.The interval of the vertical drains in general area:L = 1.20mFor process area:f =5 t/m2,L = 1.2m.f =7.5 t/m2,L = 1.1m.f =10 t/m2,L = 0.7m.The initial geotechnical design i32、s shown in two tables:“ Geotechnical Design of Vacuum Precompression Method of Process Area” and “ Geotechnical Design of Pre-loading Method of General Area” in page 11,12.5. Proposed vertical drains materialsThe SPB0-II type vertical drain is adopted from CHINA. The proprieties of the production me33、et the requirements of Chinese standard DB3201Q18-87 (details is shown below in table “Quality Standard of SPB Vertical Drains “ ).uality Standard of SPB Vertical DrainsParameterUnitTypeRemarksSPB-1SPB-2SPB-3MaterialsPlastic strip core coated with a membrane filterSectiondimensionsWidthmm1002100210034、2Thicknessmm3.54.04.5Longitudinal drain capacitym3/s15*10-625*10-6Side pressure 350KN/m2Tension strengthKN/10cm1.01.3Elongation is 100%Elongation1010Permeability coefficientcm/s5*10-45*10-4Capacity of insulating soilmm751530Elongation is 10%WetN/cm1020Elongation is 15%Linear weightg/m90-10090-100Uni35、t lengthm200200Site clearingGeotextile layingPreparation of wick drainsinserting equipmentSite office andcontrol centerVacuum pipes installWick drains insertionSecond sand beddingFirst sand beddingMembrane layingAir extracting equipmentVacuum gauge and relay installAir extraction testPrecompression 36、by air extractionVacuum pressure and settlement readingsin the process areaEquipment removal of the precompression methodRefill and levelingWeir construc-tionControl and operation centerElectrical and light circuitRecheck the vacuum pumpsTemporary water pumps installationVacuum pipe preparationMembr37、ane preparationSettlement gaugesInitial reading of settlement and relayResilience reading of ground settlementLeakage repair of membraneResults verification Flow Diagram of Vacuum Precompression MethodGeotechnical design of vacuum precompression methods of process areaProcess Area(m2)Average depth o38、f soft soil(m)Bearing Capacity of foundation soil (t/m2)Interval of vertical drains(m)Depth of vertical drains(m)CalculatedFinal consolida-tion settlement(m)Depth of vertical drains(m)CalculatedFinal consolida-tion settlement (m)Estimated Settlement(m)Depth of vertical drains(m)CalculatedFinal conso39、lida-tion settlement (m)128254 *_2528614.4151.213.42.8210.02.101.608.01.697.51.113.42.9510.02.301.808.01.90100.813.43.6010.02.692.408.02.35241428.00 *_37450.0013.3251.212.32.5910.02.101.608.01.697.51.112.32.7210.02.301.808.01.90100.812.33.3010.02.692.408.02.15354313.00 *_49603.0013.0551.0212.02.531040、.02.101.608.01.697.51.112.02.6510.02.301.808.01.90100.812.03.2310.02.692.408.02.15Note:The “ *” shows that the numerator means the proposed process area,which is extended from the area specified in the tender documents (denominator) by extending edge to 4.0 m.When f = 7.5t/m2,the settlement (1.8) is41、 calculated by using the average settlement after vacuum precompression of the main building of Hiep Phouc power plant (1.55) added settlement occurred in consolidation period (90days) which is (90* 3)mm. Geotechnical design of vacuum precompression method in process areaSchemeProcess Area(m2)Averag42、e depth of soft soil(m)Bearing Capacity of foundation soil (t/m2)Interval of vertical drains(m)Treatment Depth (m)Estimated Settlement(m)1 28254 *_2528614.4151.210.01.607.51.110.01.80100.710.02.402 41428*_3745013.3251.210.01.607.51.110.01.80100.710.02.403 54313 *_4960313.0551.210.01.607.51.110.01.8043、100.710.02.40 Note:1) “ * ” :the numerator indicates the proposed process area,which is extended from the area specified in the tender documents (denominator). The edge of the specified area is extended by 4.0 m. 2) The length of vertical drains = treatment depth + sand bed thickness ( 2.0m) + end m44、argin (0.20m) = 12.20m.Geotechnical design of pre-loading method in general areaSchemegeneral Area(m2)Average depth of soft soil(m)Interval of vertical drains(m)Single films drainageTreatment Depth (m)Estimated settlement (m)111093414.631.2010.01.029877015.221.2010.01.038861715.711.2010.01.0 Note:Th45、e length of vertical drains = treatment depth + sand bed thickness ( 2.0m) + end margin (0.20m) = 12.20m.Geotechnical design of vacuum precompression method of general areaSchemeProcess Area(m2)Average depth of soft soil(m)Interval of vertical drains(m)Double films drainageSingle films drainageDepth46、 of vertical drains(m)CalculatedFinal consolidation settlement (m)Depth of vertical drains(m)CalculatedFinal consolidation settlement (m)111093414.631.2014.601.76 / (0.5)10.0/ 8.01.30/ 1.0229877015.221.2015.202.1010.0/ 8.01.30/ 1.0238861715.711.2015.702.3110.0/ 8.01.30/ 1.02 Note:The length of vertical drains = soft soil depth + sand bed thickness ( 2.0m) + end margin (0.20m) = 12.20m.
会员尊享权益 会员尊享权益 会员尊享权益
500万份文档
500万份文档 免费下载
10万资源包
10万资源包 一键下载
4万份资料
4万份资料 打包下载
24小时客服
24小时客服 会员专属
开通 VIP
升级会员
  • 周热门排行

  • 月热门排行

  • 季热门排行

  1. 2025商场地产夏日啤酒龙虾音乐嘉年华(吃货的夏天主题)活动策划方案-47页.pptx
  2. 2022城区自来水提质改造智慧水务建设项目设计方案(199页).pdf
  3. 动火作业安全告知卡(1页).docx
  4. 高处作业安全告知卡(1页).docx
  5. 道路改造工程围墙宣传栏改造各类雕塑等土建施工方案53页.doc
  6. 广场工程建设项目施工招标评标报告表格(24页).pdf
  7. 原油码头消防工程维保方案(39页).docx
  8. 2020柏向堂房地产公司材料标准化手册3.0(143页).pdf
  9. 2021柏向堂房地产公司材料标准化手册4.0(108页).pdf
  10. 深圳装饰公司施工图纸会审及设计交底管理制度【13页】.doc
  11. 住宅小区工程施工方案【234页】.docx
  12. 屋面圆弧形穹顶结构高支模施工方案(40米)(47页).doc
  13. 埋石混凝土挡土墙施工方案(23页).doc
  14. 结构加固专项施工方案(28页).doc
  15. 土方开挖及地下室施工方案(21页).doc
  16. 家园工程项目雨季及防台防汛施工方案(29页).doc
  17. 重庆市五小水利工程建设规划报告(64页).doc
  18. 超高纯氦气厂建设项目办公楼、变电站、水泵房及消防水池、门卫、厂房、仓库、配套工程施工组织设计方案(140页).doc
  19. 邛崃市牟礼镇初级中学校学生宿舍建设工程施工组织设计方案(259页).doc
  20. 高层住宅工程施工方案(249页).doc
  21. 园林工程质量通病控制方案及防治措施(27页).doc
  22. 珠海市三灶镇二级生活污水处理厂工程技术标书方案说明书(135页).doc
  1. 房地产交易环节契税减征申报表(首套填写)(2页).doc
  2. 2025商场地产夏日啤酒龙虾音乐嘉年华(吃货的夏天主题)活动策划方案-47页.pptx
  3. 2024大楼室内精装修工程专业分包投标文件(393页).docx
  4. 苏州水秀天地商业项目购物中心100%室内设计方案(158页).pptx
  5. 2022城区自来水提质改造智慧水务建设项目设计方案(199页).pdf
  6. 小区人员配置档案建立保洁绿化物业管理服务投标方案(593页).docx
  7. 室内移动式操作平台工程施工方案(19页).doc
  8. 地铁6号线区间盾构下穿管线专项施工方案(30页).doc
  9. 矿山治理工程施工组织设计方案(240页).docx
  10. 老旧小区改造工程施工方案及技术措施(364页).doc
  11. 化工公司20000吨/年甲醛工程安全评价预评价报告(97页).doc
  12. 建筑工程外脚手架专项施工方案(悬挑式脚手架、落地式脚手架)(25页).doc
  13. 2020柏向堂房地产公司材料标准化手册3.0(143页).pdf
  14. 2021柏向堂房地产公司材料标准化手册4.0(108页).pdf
  15. 川主寺城镇风貌整治景观规划设计方案(60页).pdf
  16. 新疆风电十三间房二期工程49.5mw风电项目可行性研究报告(附表)(239页).pdf
  17. 土建、装饰、维修改造等零星工程施工组织设计方案(187页).doc
  18. 埋石混凝土挡土墙施工方案(23页).doc
  19. 地下停车场环氧地坪漆施工方案(45页).doc
  20. 深圳装饰公司施工图纸会审及设计交底管理制度【13页】.doc
  21. 住宅定价策略及价格表制定培训课件.ppt
  22. 2010-2030年湖北咸宁市城市总体规划(32页).doc
  1. 建筑工程夜间施工专项施工方案(18页).doc
  2. 赣州无动力亲子乐园景观设计方案(111页).pdf
  3. 2016泰安乡村旅游规划建设示范案例(165页).pdf
  4. 房地产交易环节契税减征申报表(首套填写)(2页).doc
  5. 龙山县里耶文化生态景区里耶古城片区旅游修建性详细规划2015奇创.pdf
  6. 连云港市土地利用总体规划2006-2020年调整方案文本图集(78页).pdf
  7. 850亩项目塑钢门窗工程施工组织设计方案(34页).doc
  8. 老旧小区改造工程施工方案及技术措施(364页).doc
  9. 城市更新项目地价公式测算表.xlsx
  10. 房地产项目规划前期投资收益测算模板带公式.xls
  11. 存储器基地项目及配套设施建筑工程临时用水施工方案(40页).docx
  12. 铁路客运枢纽项目站前框构中桥工程路基注浆加固专项施工方案(19页).doc
  13. 室内移动式操作平台工程施工方案(19页).doc
  14. 装配式结构工业厂房基础、主体结构、门窗及装饰工程施工方案(83页).doc
  15. 地铁6号线区间盾构下穿管线专项施工方案(30页).doc
  16. 施工工程安全教育培训技术交底(13页).doc
  17. 老旧小区改造施工方案及技术措施(365页).doc
  18. 新建贵广铁路线下工程沉降变形观测及评估监理实施细则(126页).doc
  19. 消防火灾应急疏散演练预案(12页).doc
  20. 矿山治理工程施工组织设计方案(240页).docx
  21. 崖城站悬臂式挡墙施工方案(92页).doc
  22. 北京科技园公寓建设项目整体报告方案.ppt