个人中心
个人中心
添加客服WX
客服
添加客服WX
添加客服WX
关注微信公众号
公众号
关注微信公众号
关注微信公众号
升级会员
升级会员
返回顶部
脚手架搭设施工方案(中英文)(9页)
脚手架搭设施工方案(中英文)(9页).docx
下载文档 下载文档
通用施工
上传人:正*** 编号:490874 2022-07-26 9页 25.17KB
1、目录Directory 一、施工地点:Job location.1二、参照标准: Basis of compiling.2三、材料标准:Material streamlined specification.2(一)钢管:Steel pipe.2(二)扣件:Fastener.3(三)脚手板:Scaffold board.3(四)安全网:Protecting net.3四、施工工艺:Construction technique.4(一)施工准备:Preparations for construction.4(二)脚手架搭设的要求:Requirement of scaffold.4A、立杆构造要求:2、Vertical.5B、纵向水平杆的构造要求:Longitudinal horizontal bracing.6C、横向水平杆的构造要求:Transverse horizontal bracing.6D、脚手板的设置:Scaffold board laying.7E、剪刀撑:X-bracing.8F、扣件:Fastener.8(三)脚手架的使用:Requirement of use the scaffold.8(四)脚手架的拆除:Demolition the scaffold.9五、注意事项:Notice proceeding.9一、施工地点:Job location*化工区工业气体二期管道设3、备保温工程* caojing HYCO1 STEP-2 insulation project二、参照标准: Basis of compilingJGJ130-2001建筑施工扣件式钢管脚手架安全技术规范Steel pipe scaffold safety code of building construction with the fastener三、材料标准:Material streamlined specification (一)钢管:Steel pipe 1、脚手架钢管采用外径48mm,壁厚3.5mm,横向水平杆2200mm,其他杆6500mm,每根钢管不应大于25kg。2、钢管表面应4、平直光滑,不应有裂缝、结疤、分层、错位、硬弯、毛刺、压痕和深的划道。3、钢管的外径、壁厚、端面等的偏差,应分别符合建筑施工扣件式钢管脚手架安全技术规范(JGJ130-2001)的有关规定。1.The external diameter of the steel pipe is 48mm, and thickness ofpipe wall is 3.5mm. Transverse horizontal bracing shall be less than 2200mm,others less than 6500mm,and every steel pipe shall be less than5、25kg.2.The surface of the steel pipe shall be smoothness, and has not thecrack, dogs ear, delaminating, burr and deep nick etc.3.Thedeviation of the steel pipe,as the external diameter,thickness of pipe wall, port etc, shall be accord the code Steel pipe scaffold safety code of building construction6、 with the fastener(二)扣件:Fastener 1、扣件采用48型。扣件的类型包括:直角扣件、旋转扣件、对接扣件、防滑扣件。2、脚手架采用的扣件,其材质应符合国家现行标准。1.Fasteneradopt the type of 48,andthe types include the right-angle,circumgyrate, butt joint, and slip-resistance.2.The fastener of the scaffold shall be accord the GB code.(三)脚手板:Scaffold board 1、脚手板采用木质,7、每块质量不宜大于30kg。2、木脚手板应采用杉木或松木制作,其材质应符合国家现行标准。3、脚手板的宽度不宜小于200mm,厚度不应小于50mm,两端应各设直径4mm的镀锌铁丝绑扎两道。1.Every scaffolds quality shall be less than 30kg.2.Scaffold board shall be make of the fir or deal, and accord the GBcode.3.The width of the scaffold board shall be over 200mm and thicknessover 50mm. On the 8、ends with the 4mm galvanized wire fixing the board.(四)安全网:Protecting net 在脚手架施工操作面和护栏四周围上防护网。It shall be laying safety netting on the operating platform and protecting fence.四、施工工艺:Construction technique (一)施工准备:Preparations for construction 1、工程负责人应按施工组织设计中有关脚手架的要求,向架设和使用人员进行技术交底。2、应对所有进场材料按规范进行验收,9、不合格产品不得使用。3、经检验合格的构配件应按品种、规格分类、堆放整齐、平稳,堆放场地不得有积水。4、当脚手架基础下有设备基础、管沟时,必须采取加固措施。1.The project manager shall be show the regulations for technicaloperation on the operation worker, about scaffold in this scheme.2.Allthe material must be check and acceptance,and no qualification no use.3.Thequalification10、 material shall be stack-up regularity and firmness.The place shall be no water.4.Whenit has equipment foundation,pipe duct under the base of scaffold, it must to be consolidation.(二)脚手架搭设的要求:Requirement of scaffold 1、所搭设的脚手架要坚固、稳定,保证在施工期内及各种载荷和气候条件下不产生变形,不倾斜、不摇晃,安全可靠。2、根据搭设空间,选用适宜的脚手架钢管长度。必须有足够的空间,11、满足操作、材料堆放及行人的要求。3、脚手架的搭设宽度根据构造要求不能小于1-1.3m,作业层大横杆间隔La/2m,小横杆间隔不能大于纵距的立杆横距不能大于1-1.3m,立杆纵距不能大于1.5-2.0m。4、K201-K202整体脚手架重大约16T,搭设面长10.3米宽4.6米高度30米,搭设时层面和作业平台连接.支撑以减少整体负荷,施工人员上下可利用原有设施,作业平台和施工平面须使用梯子上下。1.The scaffold must be firmness, steadiness. During the useful time,it must be no deformation,no incli12、nation,no sway and safety on the kind of load and climate.2.The pipe of the scaffold must be select the suitable length by thebuilding space, and the space must be enough to suitable for operate,material stack-up and passage.3.Thewidth of the scaffold shall be more than 1-1.3m.In the operating lay,t13、he big traverse bar shall be distance La/2m,and the small traverse bar shall be less than of longitudinal distance.The traverse distance of vertical shall be less than 1-1.3m,and longitudinal less than 1.5-2.0m.4.The scaffold weight of the equipment K201-K202 is about 16T,lengthabout 10.3m, width 4.14、6m, and height about 30m. When its building, the operating lay join the platform to reduce the load.The worker may be use the device, when they up and down, but on operating lay must be use the ladder.A、立杆构造要求:Vertical 1、脚手架必须调协纵、横向扫地杆。纵向扫地杆应用直角扣件固定在距底座上皮不大于200mm处的立杆上,横向扫地杆应用直角扣件固定在紧靠纵向扫地杆下方的立杆上。2、当15、立杆基础不在同一高度上时,必须较高处的纵向杆向低处延长,与立杆固定,高低差不应大于1m。3、立杆接长除顶层顶步可采用搭接外,其余各层各步接头必须采用对接扣件连接。1.When the scaffold build, it shall be harmonize the vertically andhorizontally pipe. The vertically pipe shall be fix the base with the right-angle fastener and less than 200mm.The horizontally pipe shall be fix under 16、the vertically pipe tightly with the right-angle fastener.2.When the vertical base is not on the same plane, it shall be extendfrom highness to lowness, and the gap shall be less than 1m.3.When the vertical join each other, it must be use the butt jointfastener, but the top.B、纵向水平杆的构造要求:Longitudinal17、 horizontal bracing 1、纵向水平杆宜设置在立杆内侧,其长度不宜小于3跨。2、纵向水平杆接长宜采用对接扣件连接,也可采用搭接。3、当使用木脚手板时,纵向水平杆应作为横向水平杆的支座,用直角扣件固定在立杆上。1.Longitudinal horizontal bracing shall be inside the vertical andlength shall be more than 3 span.2.Longitudinal horizontal bracing may be use the butt joint or lapjoint with the fastener18、.3.Whenuse the scaffold board,longitudinal horizontal bracing is the base of the transverse horizontal bracing,and fix the vertical with the right-angle fastener.C、横向水平杆的构造要求:Transverse horizontal bracing 1、主节点处必须设置一根横向水平杆,用直角扣件扣紧且严禁拆除。2、主节点处两个直角扣件的中心距不应大于150mm。3、作业层上非主节点处的横向水平杆,宜根据支承脚手板的需要等间距设置,最大间19、距不应大于纵距的。1.The central node must be set one transverse horizontal bracing andforbid backout.2.Thetwo right-angle fastener of the central node shall be less than 150mm each other.3.Thetransverse horizontal bracing of the other node on the operating lay which is not the central, shall be set base on n20、eeds, and the max D、脚手板的设置:Scaffold board laying 1、作业层的脚手板应铺满、铺稳。2、脚手板应设置在三根横向水平杆上。当脚手板的长度小于2m时,可采用两根横向水平杆支承,但应将脚手板两端与其可靠固定,严防倾翻。3、脚手板可采用对接平铺或搭接铺设。4、作业层上端部脚手板探头长度应取150mm,其板长度两端均应与支承杆可靠固定,可用直径3.2mm的镀锌铁丝固定在支承杆杆上。1.The scaffold board of the operating lay shall be pave the all andfixedness.2.The scaffol21、d board shall be lay on three transverse horizontalbracing, when length less than 2m, it may be use the two, but must fix on the ends.3.The scaffold board may be butt joint or lap joint.4.Theends of the scaffold board on the operating lay shall be overstep about 150mm and fix it on the knighthead wi22、th the 3.2mm galvanized wire.E、剪刀撑:X-bracing 1、脚手架的两端、转角处及每隔5-7个立杆必须设剪刀撑,并由底至顶连续设置,斜杆与地面的夹角为45-60,中间各道剪刀撑之间的净距不应大于15mm。2、剪刀撑斜杆的接长宜采用搭接。1.Thescaffold must set the X-bracing on the ends,turns and alternation 5-7vertical.It must be from bottom to top.The diagonals angle is 45-60to the ground.Each X-bra23、cing distance shall be less than 15mm.2.The distance of X-bracing shall be use the lap joint.F、扣件:Fastener 1、扣件规格必须与钢管外径相同。2、对接扣件开口应向上或向内。3、各杆件端头伸出扣件盖板边缘的长度不应小于100mm。1.The specof fastener must be same as the external diameter of pipe.2.The open of butt joint fastener shall be up or entad.3.Thelength24、 shall be more than 100mm,which overstep the fastener on the ends of pipe.(三)脚手架的使用:Requirement of use the scaffold 1、没有经过验收的脚手架一律严禁使用。2、脚手架使用前,必须认真检查脚手架是否完好、牢固,如有异常应立即提出整改,合格后方能使用。3、应定期检查安全防护措施是否符合要求,扣件螺栓是否松动及是否超载等。1.The scaffold must be check and acceptance.2.Before use the scaffold, it must to ch25、ecked. If it has abnormity,it must to refit.3.It must check the means of safety termly, and must be up to themustard.(四)脚手架的拆除:Demolition the scaffold 1、应根据现场情况及业主要求,及时进行脚手架的拆除工作。2、脚手架拆除前,应清除脚手架上杂物及地面障碍物。3、拆除作业应由上而下逐层进行,严禁上下同时作业。4、拆下的脚手架材料应及时运走,不乱堆乱放。5、拆除后,应及时对现场清理,保持场地清洁。1.It shall be dismantle the26、 scaffold in time, by the requirement ofthe owner and case of the locale.2.Before dismantle the scaffold, it must be clean the sundries onscaffold and the abattis on the ground.3.Dismantlethe scaffold shall be from up to down.Prohibit labour at one time.4.The material which is dismantle shall be car27、ry out in time.5.After finish, it shall be clean the locale in time, keep up thecleanness.五、注意事项:Notice proceeding 1、安装钢脚手架时,禁止使用弯曲、压扁或有裂缝的钢管,连接部分要完整无损,以防倾倒或移动。2、钢脚手架的立杆,必须垂直稳放在垫木的钢板上,在安置垫木前要将地面夯实、整平,并采取防滑措施。3、搭设脚手架人员必须按规定穿戴好防护用品。4、安全网应按有关规定搭设和拆除。5、在脚手架使用期间,禁止拆除主节点处纵、横向水平杆和纵、横向扫地杆。6、搭拆脚手架时,地面应设围栏和警戒28、标志,并派专人看守,严禁非操作人员入内。1.Whenbuild the scaffold,that pipe which has bend,bruising or crack,is prohibit to use. And the part of join shall be intactness.2.When build the vertical, the ground shall be tamp, flattening andavoid slip.3.The workers, who build the scaffold shall be dress the protectivemeasur29、e that necessary.4.Safetynetting must be accord the code when it building and demolition.5.During the scaffold use, prohibit demolition the vertically andhorizontally bracing on the central node.6.When demolition the scaffold, it shall be set up the sign, andprohibit come into who is not the workers.2013年9月Sep.9.2013 9 / 9
会员尊享权益 会员尊享权益 会员尊享权益
500万份文档
500万份文档 免费下载
10万资源包
10万资源包 一键下载
4万份资料
4万份资料 打包下载
24小时客服
24小时客服 会员专属
开通 VIP
升级会员
  • 周热门排行

  • 月热门排行

  • 季热门排行

  1. 2025商场地产夏日啤酒龙虾音乐嘉年华(吃货的夏天主题)活动策划方案-47页.pptx
  2. 2022城区自来水提质改造智慧水务建设项目设计方案(199页).pdf
  3. 陕西化学工业公司招聘管理与职业发展管理手册30页.doc
  4. 动火作业安全告知卡(1页).docx
  5. 高处作业安全告知卡(1页).docx
  6. 广场工程建设项目施工招标评标报告表格(24页).pdf
  7. 原油码头消防工程维保方案(39页).docx
  8. 建筑工程外脚手架专项施工方案(悬挑式脚手架、落地式脚手架)(25页).doc
  9. 2020柏向堂房地产公司材料标准化手册3.0(143页).pdf
  10. 2021柏向堂房地产公司材料标准化手册4.0(108页).pdf
  11. 土建、装饰、维修改造等零星工程施工组织设计方案(187页).doc
  12. 深圳装饰公司施工图纸会审及设计交底管理制度【13页】.doc
  13. 房地产开发贷款实操指南(5页).pdf
  14. 学校宿舍楼建设工程施工方案【153页】.docx
  15. 住宅小区工程施工方案【234页】.docx
  16. 鄂尔多斯空港物流园区总体规划方案(2017-2030)环境影响评价报告书(23页).doc
  17. 规划兰园西路道路工程环境方案环境影响评价报告书(89页).pdf
  18. 屋面圆弧形穹顶结构高支模施工方案(40米)(47页).doc
  19. 埋石混凝土挡土墙施工方案(23页).doc
  20. 重庆市五小水利工程建设规划报告(64页).doc
  21. 厂区至矿区管网蒸汽管道系统扩容改造工程施工组织设计方案(105页).doc
  22. 超高纯氦气厂建设项目办公楼、变电站、水泵房及消防水池、门卫、厂房、仓库、配套工程施工组织设计方案(140页).doc
  1. 房地产交易环节契税减征申报表(首套填写)(2页).doc
  2. 2025商场地产夏日啤酒龙虾音乐嘉年华(吃货的夏天主题)活动策划方案-47页.pptx
  3. 2024大楼室内精装修工程专业分包投标文件(393页).docx
  4. 苏州水秀天地商业项目购物中心100%室内设计方案(158页).pptx
  5. 2022城区自来水提质改造智慧水务建设项目设计方案(199页).pdf
  6. 小区人员配置档案建立保洁绿化物业管理服务投标方案(593页).docx
  7. 室内移动式操作平台工程施工方案(19页).doc
  8. 地铁6号线区间盾构下穿管线专项施工方案(30页).doc
  9. 矿山治理工程施工组织设计方案(240页).docx
  10. 老旧小区改造工程施工方案及技术措施(364页).doc
  11. 2021柏向堂房地产公司材料标准化手册4.0(108页).pdf
  12. 川主寺城镇风貌整治景观规划设计方案(60页).pdf
  13. 建筑工程三级安全教育内容(24页).doc
  14. 新疆风电十三间房二期工程49.5mw风电项目可行性研究报告(附表)(239页).pdf
  15. 土建、装饰、维修改造等零星工程施工组织设计方案(187页).doc
  16. 四川凉山攀西灵山国际度假区小镇活力中心商业业态规划方案建议书(33页).pdf
  17. 埋石混凝土挡土墙施工方案(23页).doc
  18. 地下停车场环氧地坪漆施工方案(45页).doc
  19. 深圳装饰公司施工图纸会审及设计交底管理制度【13页】.doc
  20. 住宅定价策略及价格表制定培训课件.ppt
  21. 西安名京九合院商业项目招商手册(28页).pdf
  22. 2010-2030年湖北咸宁市城市总体规划(32页).doc
  1. 建筑工程夜间施工专项施工方案(18页).doc
  2. 赣州无动力亲子乐园景观设计方案(111页).pdf
  3. 2016泰安乡村旅游规划建设示范案例(165页).pdf
  4. 房地产交易环节契税减征申报表(首套填写)(2页).doc
  5. 龙山县里耶文化生态景区里耶古城片区旅游修建性详细规划2015奇创.pdf
  6. 连云港市土地利用总体规划2006-2020年调整方案文本图集(78页).pdf
  7. 850亩项目塑钢门窗工程施工组织设计方案(34页).doc
  8. 老旧小区改造工程施工方案及技术措施(364页).doc
  9. 城市更新项目地价公式测算表.xlsx
  10. 房地产项目规划前期投资收益测算模板带公式.xls
  11. 存储器基地项目及配套设施建筑工程临时用水施工方案(40页).docx
  12. 铁路客运枢纽项目站前框构中桥工程路基注浆加固专项施工方案(19页).doc
  13. 室内移动式操作平台工程施工方案(19页).doc
  14. 装配式结构工业厂房基础、主体结构、门窗及装饰工程施工方案(83页).doc
  15. 地铁6号线区间盾构下穿管线专项施工方案(30页).doc
  16. 施工工程安全教育培训技术交底(13页).doc
  17. 老旧小区改造施工方案及技术措施(365页).doc
  18. 新建贵广铁路线下工程沉降变形观测及评估监理实施细则(126页).doc
  19. 消防火灾应急疏散演练预案(12页).doc
  20. 矿山治理工程施工组织设计方案(240页).docx
  21. 崖城站悬臂式挡墙施工方案(92页).doc
  22. 北京科技园公寓建设项目整体报告方案.ppt