2017房地产开发公司马来西亚森林城市工程建设进度报告(21页).pdf
下载文档
上传人:偷****
编号:473490
2022-07-22
21页
4.07MB
该文档所属资源包:
东南亚城市房地产市场投资研究报告
1、森林城市工程建设进度 2017.10.15Forest City Progress Update 海蓝湾Cerulean Bay:主体结构已封顶,目前装修施工阶段,铝窗已安装至19层,砌体施工至31层。Main structural works completed,decoration works in progress,Level 19 aluminium frame door and window completed,Level 31 masonry works completed.观澜海Regalia Park:主体结构施工阶段,最慢第4层、最快第7层;Plot 4:Main struc2、ture works in construction;the lowest is Level 4-the highest is Level 7海珀湾Peony Littoral:主体结构施工阶段,基础结构完成至70%,主体结构完成至40%。Main structure works in construction;foundation works completed 70%,main structure works completed 40%.星海湾Starview Bay:主体结构施工阶段,最慢第2层、最快第7层。In the construction of main structure wo3、rks;the lowest is Level 2-the highest is Level 7.海悦湾1、3:Ataraxia Park1,3:打桩完成;总包进场。Piling works completed;main contractor takes site possession.海悦湾4:Ataraxia Park4:打桩阶段,灌注桩完成34.9%,管桩完成26.9%;In the process of piling;bored pile completed 34.9%,spun piles completed 26.9%海之羽地标:Landmark Building:主体桩基完成,搅4、拌桩完成47%。Main structure piling completed;concrete mixer pile completed 47%.美国名校:International school:教学楼和文体中心主体结构施工阶段、宿舍楼和活动中心基础回填及首层施工中;Mainstructureworksforeducationbuildingandartcentre are in the constructionprogress;earth filling worksand Level 1 for hostel andactivity hall are in the process.森林城5、市二期建设进度Forest City Phase II Progress Update高尔夫酒店Golf Hotel:主体施工阶段,已施工至4层结构,砌筑进行中。Main structure works in the construction progress up to Level 4,masonry works in progress.高尔夫别墅展示区:Golf demonstration area主体结构已封顶,抹灰100%,装修25%。Main structure works completed,base coating works completed 100%,and decoration works completed 25%.建筑工业化产业园IBS Park建筑工业化产业园IBS Park岛一实景美图集Forest City Side View 滨海园林Coastal Beach婚庆广场Wedding Venue滨海风情商业街垂直绿化Vertical Greening海之贝国际会所Forest City Sales Gallery沙滩公园 Beach ParkWelcome Home北纬1 欢迎您归家
合同协议
上传时间:2022-07-12
148份