个人中心
个人中心
添加客服WX
客服
添加客服WX
添加客服WX
关注微信公众号
公众号
关注微信公众号
关注微信公众号
升级会员
升级会员
返回顶部
板坯连铸机液压润滑系统管线的酸洗钝化施工方案(6页)
板坯连铸机液压润滑系统管线的酸洗钝化施工方案(6页).doc
下载文档 下载文档
其它文档
上传人:正*** 编号:470339 2022-07-21 6页 54KB
1、关于不锈钢二期板坯连铸机液压、润滑系统管线的酸洗钝化施工方案Pickling and Passivation Solution For The Hydraulic and Lubrication System of Con-caster一、 清洗目的I. Purpose of Cleaning管线在生产、运输会使管线内产生微量油污、金属粒子,特别是氧气管线内金属粒子可能与高纯氧高压氧化、撞击,产生电火花而发生不堪设想的严重后果,历史上这样惨重的事故很多,因此清洗钝化是必不可少的。Durin g the production and transportation of pipes,oil res2、idue,metal particals,especially the metal particals would react with high purity oxygen under high pressure, producing electric sparkling and leading to catastrophic result.Infact, it happened times again in the past.Therfore, it is highly necessary to cleaning and passivating the piping lines.项目名称:3、不锈钢专项炼钢分项板坯连铸机液压、润滑系统管线酸洗、钝化II. Project name: Pickling and Passivation Solution For The Hydraulic and Lubrication System of Con-caster1、 氧化管线:Oxydized pipelinesSpec.LengthSpec.Length483.578m34327m603.545m48720m76464m60845m114416m385500m101.564m422.570m12236m893.2100m163500m203422.5m2531104m304328m2、4、 施工人员:6人,在双方达到协议开工后,我方将派出由项目负责人带队的有实践经验的专业清洗工4人和一个安全员组成的队伍到现场实施清洗工作,可视工期及施工进度适当增加或减少人员。3、 Operators:6 operators. Before the agreed date of start-up of cleaning, we will dispatch 4 experienced cleaning workers and a safety inspector led by project manager to JISCOsite for pipeline cleaning .Personnel5、 arrangement is flexible according to the actual demand of project proceeding.4、 施工机具:清洗泵、4只耐酸清洗槽、吊车、加热器、水管、玻璃钢等。5、 Operating tools: cleaning pumps, 4 anti-acid cleaning tank, crane,heaters, water pipe.6、 安全措施:涉酸碱作业,所有工作人员配备安全帽、护目镜、防毒面具、耐酸碱手套、雨靴、穿戴齐全方可作业,现场配有5%的苏打水。7、 Safety measurement: For all wor6、ks involving acid or alkaline, the operators need to be equipped with safety helmet,eye-protection glasses,mask,anti-acid/alkaline gloves,rain bootsetc. Any operator who is not safely equipped is forbidden to get into the site. 5% soda water is available on site.8、 废液收集处理:清洗完毕后,清洗废液在槽内中和后经业主确认后排放。9、7、 Collection of waste liquid: After cleaning procedure, the waste will be neutrolized in the tank and discharged after safety confirmation of JISCO.二、 具体施工方案三、 Specific operation procedure1、 酸洗钝化工艺:采用脱脂、酸洗钝化三步分开进行法2、 Pickling and passivation procedure: degreasingpicklingpassivation.脱脂-高压水-酸洗-漂洗-钝化-高压8、水冲洗-吹干-封存To be specific: degreasinghigh pressure water flushingpickling rinsingpassivationhigh pressure water flushingblowing to dry-covered up.脱脂剂配方:氢氧化钠10%、碳酸钠50%、表面活性剂5%Recipe of degreasing agent:NaOH:10%; NaCH50%; surface activation agent 5%.酸洗剂配方:盐酸20%、硝酸50%、缓蚀剂1%Recipe of pickling agent: HCL209、%, Nitric acid 50%, anti-corrosion agent 1%钝化剂配方:磷酸50%、氧化锌35%、亚硝酸钠2%Passivation agent recipe: Phosphoric acid 50%, Oxydized zinc 35%,亚硝酸钠2%3、 施工质量目标:有效去除管道内表面、油渍、锈渍、铁屑等杂物,形成钝化膜。4、 Target: Remove the impurities,oil residues, rust etc. on the inner surface of the pipeline.5、 温度控制:脱脂-常温、酸洗-常温、钝化-加温506、10、 Temperature control:degreasing-ambient temp.;pickling-ambient temp.;passivation-heat up to 507、 施工质量检验:目视法,管线内壁无明显锈渍、杂物、油渍,形成完整的钝化膜。8、 Quality inspection:by naked eyes,to see if there is obvious rust,impurity,oil residue,and whether the complete passivation film has been formed.9、 施工工期进度:从进现场共计5天1011、 Time consumption: 5 days all together 1) 准备工作1天1 day for preparation.2) 清洗3天3days for cleaning,3) 退场1天1 day for retreat 11、 工程清场及验收退场Project clearance ,inspection and withdrawal;1) 清场:所有工具运出现场、废液中和排放Clearance; all tool get out of site, waste liquid being neutralisedand discharged.2) 退场:检验合格,带管子缝墙运12、回现场,工程达标完成关于不锈钢二期板坯连铸机液压、润滑系统管线的焊接施工方案Welding solution for the piping of hydraulic and lubrication system of Con-caster我单位油管焊接采取两个方案,一个是插入式焊接如下图所示2 options:one is insert welding,see following drawing:由于此对接属于插入式,不会导致氧化皮进入管内,所以,只需要直接焊接即可。By insert connection,the scale will not get into the pipe,then, 13、just weld them.另一种焊接方式属于对接式焊接,如下图所示Another is butt welding , as shown in the following drawing:由于此对接方式,管内易产生氧化皮,故将管内充满氮气,将管内空气排净,且焊缝处,氩弧焊打底,再进行正常焊接。AS for this solution, scale will be produced.So, nitrogen is to be filled in the pipe to discharge oxygen completely.At the seam, argon-arc welding will be implemented before normal welding.
会员尊享权益 会员尊享权益 会员尊享权益
500万份文档
500万份文档 免费下载
10万资源包
10万资源包 一键下载
4万份资料
4万份资料 打包下载
24小时客服
24小时客服 会员专属
开通 VIP
升级会员
  • 周热门排行

  • 月热门排行

  • 季热门排行

  1. 2025商场地产夏日啤酒龙虾音乐嘉年华(吃货的夏天主题)活动策划方案-47页.pptx
  2. 2022城区自来水提质改造智慧水务建设项目设计方案(199页).pdf
  3. 陕西化学工业公司招聘管理与职业发展管理手册30页.doc
  4. 动火作业安全告知卡(1页).docx
  5. 高处作业安全告知卡(1页).docx
  6. 广场工程建设项目施工招标评标报告表格(24页).pdf
  7. 原油码头消防工程维保方案(39页).docx
  8. 建筑工程外脚手架专项施工方案(悬挑式脚手架、落地式脚手架)(25页).doc
  9. 2020柏向堂房地产公司材料标准化手册3.0(143页).pdf
  10. 2021柏向堂房地产公司材料标准化手册4.0(108页).pdf
  11. 土建、装饰、维修改造等零星工程施工组织设计方案(187页).doc
  12. 深圳装饰公司施工图纸会审及设计交底管理制度【13页】.doc
  13. 房地产开发贷款实操指南(5页).pdf
  14. 学校宿舍楼建设工程施工方案【153页】.docx
  15. 住宅小区工程施工方案【234页】.docx
  16. 鄂尔多斯空港物流园区总体规划方案(2017-2030)环境影响评价报告书(23页).doc
  17. 规划兰园西路道路工程环境方案环境影响评价报告书(89页).pdf
  18. 屋面圆弧形穹顶结构高支模施工方案(40米)(47页).doc
  19. 埋石混凝土挡土墙施工方案(23页).doc
  20. 重庆市五小水利工程建设规划报告(64页).doc
  21. 厂区至矿区管网蒸汽管道系统扩容改造工程施工组织设计方案(105页).doc
  22. 超高纯氦气厂建设项目办公楼、变电站、水泵房及消防水池、门卫、厂房、仓库、配套工程施工组织设计方案(140页).doc
  1. 房地产交易环节契税减征申报表(首套填写)(2页).doc
  2. 2025商场地产夏日啤酒龙虾音乐嘉年华(吃货的夏天主题)活动策划方案-47页.pptx
  3. 2024大楼室内精装修工程专业分包投标文件(393页).docx
  4. 苏州水秀天地商业项目购物中心100%室内设计方案(158页).pptx
  5. 2022城区自来水提质改造智慧水务建设项目设计方案(199页).pdf
  6. 小区人员配置档案建立保洁绿化物业管理服务投标方案(593页).docx
  7. 室内移动式操作平台工程施工方案(19页).doc
  8. 地铁6号线区间盾构下穿管线专项施工方案(30页).doc
  9. 矿山治理工程施工组织设计方案(240页).docx
  10. 老旧小区改造工程施工方案及技术措施(364页).doc
  11. 2021柏向堂房地产公司材料标准化手册4.0(108页).pdf
  12. 川主寺城镇风貌整治景观规划设计方案(60页).pdf
  13. 建筑工程三级安全教育内容(24页).doc
  14. 新疆风电十三间房二期工程49.5mw风电项目可行性研究报告(附表)(239页).pdf
  15. 土建、装饰、维修改造等零星工程施工组织设计方案(187页).doc
  16. 四川凉山攀西灵山国际度假区小镇活力中心商业业态规划方案建议书(33页).pdf
  17. 埋石混凝土挡土墙施工方案(23页).doc
  18. 地下停车场环氧地坪漆施工方案(45页).doc
  19. 深圳装饰公司施工图纸会审及设计交底管理制度【13页】.doc
  20. 住宅定价策略及价格表制定培训课件.ppt
  21. 西安名京九合院商业项目招商手册(28页).pdf
  22. 2010-2030年湖北咸宁市城市总体规划(32页).doc
  1. 建筑工程夜间施工专项施工方案(18页).doc
  2. 赣州无动力亲子乐园景观设计方案(111页).pdf
  3. 2016泰安乡村旅游规划建设示范案例(165页).pdf
  4. 房地产交易环节契税减征申报表(首套填写)(2页).doc
  5. 龙山县里耶文化生态景区里耶古城片区旅游修建性详细规划2015奇创.pdf
  6. 连云港市土地利用总体规划2006-2020年调整方案文本图集(78页).pdf
  7. 850亩项目塑钢门窗工程施工组织设计方案(34页).doc
  8. 老旧小区改造工程施工方案及技术措施(364页).doc
  9. 城市更新项目地价公式测算表.xlsx
  10. 房地产项目规划前期投资收益测算模板带公式.xls
  11. 存储器基地项目及配套设施建筑工程临时用水施工方案(40页).docx
  12. 铁路客运枢纽项目站前框构中桥工程路基注浆加固专项施工方案(19页).doc
  13. 室内移动式操作平台工程施工方案(19页).doc
  14. 装配式结构工业厂房基础、主体结构、门窗及装饰工程施工方案(83页).doc
  15. 地铁6号线区间盾构下穿管线专项施工方案(30页).doc
  16. 施工工程安全教育培训技术交底(13页).doc
  17. 老旧小区改造施工方案及技术措施(365页).doc
  18. 新建贵广铁路线下工程沉降变形观测及评估监理实施细则(126页).doc
  19. 消防火灾应急疏散演练预案(12页).doc
  20. 矿山治理工程施工组织设计方案(240页).docx
  21. 崖城站悬臂式挡墙施工方案(92页).doc
  22. 北京科技园公寓建设项目整体报告方案.ppt