金鸡湖2、3住宅小区设计导则方案(35页).pdf
下载文档
上传人:故事
编号:410491
2022-06-14
35页
18.32MB
1、DISTRICTS 2A AND 3 D E V E L O P M E N T G U I D E L I N E SI金鸡湖第2A及3区城市设计原则TA B L E O F C O N T E N T S目录SITE ANALYSIScontext mapproject area defi nitionillustrative planDISTRICTS 2A & 3concept planparcelisation mapland use frameworkbuilding heightsfl oor area ratioopen spacecanalscirculationstreet2、 sectionssite sections3d massing diagramsNEIGHBORHOODSA - Promenade NeighborhoodB - Wind Garden NeighborhoodC - Grand Canal NeighborhoodD - Tower NeighborhoodE - Canal NeighborhoodF - Lake Front NeighborhoodG - Marina Village NeighborhoodOPEN SPACEwind gardenmarina villagefi shing piernature parksho3、reline cut / fi lledge conditionsIMAGESPROJECT TEAM地段分析 区位图 项目范围 平面渲染图第2A区和第3区 概念平面图 地块划分 用地分区 建筑高度控制 容积率分布图 开放空间 河道分布 交通规划 道路剖面 景观剖面 三维建筑体量分析邻里小区 A.滨湖步行道小区 B. 风苑小区 C.主干河道小区 123334455667911131415161718192224242527283133D.高层住宅小区 E.水巷邻里小区 F.滨湖小区 G.码头村落社区开放空间 风之园码头村落中的垂钓码头 自然公园 湖岸调整填挖 湖岸处理参考图像设计人员DISTR4、ICTS 2A AND 3 D E V E L O P M E N T G U I D E L I N E S1金鸡湖第2A及3区城市设计原则区位图 C O N T E X T M A PJINJI LAKE DISTRICTS 2A AND 3The Jinji Lake Master Plan was developed to provdie direction for the development of 513 hectares of alnd surrounding Jinji Lake. The Master Plan envisioned eight different dist5、ricts surrounding the lake and provided programmatic recommendations of appropriate land uses, recreational uses and general urban design direction. The neighborhood character for the neighborhoods was further defi ned in subsequent studies. This study Districts 2A and 3 Development Guidelines focus6、es on two of those districts: the Districts 2A and 3 Development Guidelines focuses on two of those districts: the Districts 2A and 3 Development Guidelinessouthern half of the Grand Promenade (District 2A) and the Marina Cove (District 3). 金鸡湖第2A及3区金鸡湖总体规划用以引导沿湖513公顷土地的开发方向。总体规划包括沿湖的8个区,并整体性的建议了适宜的7、土地用途,娱乐用途,以及总体的城市设计方向。其中各居住小区的特征将在随后章节中进行深入探讨。本方案 - 第2A及3区城市设计原则 - 集中描述其中的两个区,它们是沿湖步行道的南半部份(2A区)以及位于港湾附近的地段(3区)。The Jinji Lake Master Plan envisioned the Grand Promenade district to be a medium to high density residential neighborhood adjacent to the Business District. The northern half of this dist8、rict has been constructed or is currently under construction. The design for the southern part of this district is being refi ned as part of this study. The Marina Village was assumed to be a predominantly residential structures around a series of interconnected canals refl ecting the existing urban9、 fabric of Suzhou with higher density residential towers fl anking the neighborhoods entrance boulevard. A marina, swimming lagoon and a large playground were planned for this neighborhood. The historic pier was proposed to be developed into a pedestrian promenade featuring artists workshops and gal10、leries.金鸡湖总体规划中的设想是使滨湖步行道地区成为邻近商业区的中、高密度住宅小区。这一区的北半部份已经施工完毕或正在施工建设中。本规划设计对该区的南半部份进行了深入设计,而方案中的码头村落社区则被设计为以体现苏州城市肌理的“水巷” 为架构的、以居住为主的社区,并伴有矗立于小区入口大道旁的高层住宅。社区中还配有港口码头,游泳场和儿童游乐区。历史码头将被开发成以艺术家创造室及画廊为特色的散步道。DISTRICTS 2A AND 3 D E V E L O P M E N T G U I D E L I N E S2金鸡湖第2A及3区城市设计原则PROJECT AREA 项目范围I L L 11、U S T R AT I V E P L A N平面渲染图DISTRICTS 2A AND 3 D E V E L O P M E N T G U I D E L I N E S3金鸡湖第2A及3区城市设计原则DISTRICTS 2A AND 3 CONCEPT PLANDistricts 2A and 3 are envisioned to be a series of smaller neighborhoods, each with a distinct character. These districts will include seven distinct neighborhoods12、: Promenade Neighborhood, Wind Garden Neighborhood, Grand Canal Neighborhood, Tower Neighborhood, Canal Neighborhood, Lakefront Neighborhood, all of which surround the centrally located Marina Village Neighborhood. The residential neighborhoods will be designed to refl ect an intimate residential sc13、ale and be pedestrian-oriented. The Marina Village neighborhood is envisioned to be the vibrant mixed use village center that provides a place for community events and gatherings and is anchored by a marina. Major and minor gateways are identifi ed at entries to the site.The land immediately adjacen14、t to the waterfront is designed to include community uses, public open spaces and continuous pedestrian pathway. Three distinct types of open spaces are provided along the waterfront the wind garden, the nature park and the fi shing pier. A greenbelt is included along the south and west sides of the15、 site to provide an adequate buffer between the residential development and Airport Road to the south and Xing Gang Road to the west.第2A及3区规划理念第2A及3区的设想是一系列各具特色的小规模居住区。规划方案中主要由有七个各具特色的小区组成,它们是: 滨湖步行道小区,风苑小区,主干河道小区,高层住宅小区,水巷邻里小区,滨湖小区以及码头村落社区。它们都环绕着位於中央的码头村落区。这些邻里小区都将被设计为亲切宜人的住宅尺度且适于步行者使用。而码头村落社区则将成为活16、跃的多功能村落中心并提供节庆聚集场所。大小入口标志物将设立于社区各个入口处。紧邻湖滨的土地将包括社区公共用途,公用开放空间和连续的步行通路。方案中包含有三个特色鲜明的滨水开放空间,它们是风之园、自然公园和垂钓码头。位于整个地段的南边和西边的绿化隔离带提供了与南边的机场路和西边的星港路之间的屏障。概念平面图CONCEPT PLANPA R C E L I S AT I O N M A P地块划分DISTRICTS 2A AND 3 D E V E L O P M E N T G U I D E L I N E S4金鸡湖第2A及3区城市设计原则LAND USE FRAMEWORK用地分区建筑高度17、控制B U I L D I N G H E I G H T SDISTRICTS 2A AND 3 D E V E L O P M E N T G U I D E L I N E S5金鸡湖第2A及3区城市设计原则FLOOR AREA RATIO容积率分布图 开放空间O P E N S PAC EDISTRICTS 2A AND 3 D E V E L O P M E N T G U I D E L I N E S6金鸡湖第2A及3区城市设计原则河道分布C ANALSC I R C U L AT I O N交通规划DISTRICTS 2A AND 3 D E V E L O P M E N T18、 G U I D E L I N E S7金鸡湖第2A及3区城市设计原则道路剖面S T R E E T S E C T I O N SDISTRICTS 2A AND 3 D E V E L O P M E N T G U I D E L I N E S8金鸡湖第2A及3区城市设计原则S T R E E T S E C T I O N S道路剖面DISTRICTS 2A AND 3 D E V E L O P M E N T G U I D E L I N E S9金鸡湖第2A及3区城市设计原则S I T E S E C T I O N S景观剖面DISTRICTS 2A AND 3 D E 19、V E L O P M E N T G U I D E L I N E S10金鸡湖第2A及3区城市设计原则S I T E S E C T I O N S景观剖面DISTRICTS 2A AND 3 D E V E L O P M E N T G U I D E L I N E S11金鸡湖第2A及3区城市设计原则三维建筑体量分析3 D M A S S I N G D I AG R A M SDISTRICTS 2A AND 3 D E V E L O P M E N T G U I D E L I N E S12金鸡湖第2A及3区城市设计原则三维建筑体量分析3 D M A S S I N G20、 D I AG R A M SDISTRICTS 2A AND 3 D E V E L O P M E N T G U I D E L I N E S13金鸡湖第2A及3区城市设计原则滨湖步行道小区滨湖步行道小区是现在建设中的第2区的延伸,它将延续原规划中的双户住宅、别墅住宅和公寓住宅的格式。社区内未来的住宅开发将包含步行和视觉上与水滨和滨湖步行大道之间的联络。这一地段的东面是”社区文化活动区”,作为滨湖步行大道的南端终点。而公共的步行小路将沿着河道两侧把这一区与滨水开放空间联系起来。滨湖步行道小区PRO M E N A D E N E I G H B O R H O O DILLUSTRAT21、IVE PLAN平面渲染图PROMENADE NEIGHBORHOODThe promenade neighborhood is essentially an extension of District 2 that is currently under construction and will continue the pattern of development with duplexes, single family residences and apartments. Future residential developments in this neighborhood will 22、accommodate pedestrian and visual connections to the promenade and the waterfront. To the east of this neighborhood is the “cultural/community district”, a use that is at the southern terminus of the grand promenade. A publid pedestrian path is included on either side of the canal, linking the neigh23、borhood to the public open space along the waterfront.TOTAL AREA: 8.81 HADISTRICTS 2A AND 3 D E V E L O P M E N T G U I D E L I N E S14金鸡湖第2A及3区城市设计原则风苑小区WIND G A R D E N N E I G H B O R H O O D风苑小区这一区占地10公顷,包括环绕着一系列开放空间的公寓住宅、双户住宅和住宅楼排。这些开放空间将包括一系列社区活动内容,如幼儿园,小区活动中心,健身娱乐中心等。这一区中还包括了联结几个开放空间的步行通路,它们提24、供了与“风之园” 以及水滨的直接联系。WIND GARDEN NEIGHBORHOODThis neighborhood is an approximately 10 hectare parcel that will include apartments, duplexes and row houses located around a series of open spaces. These open spaces will include community amenities such as day care centers, community rooms, fi tness and 25、recreation centers. This neighborhood will include pedestrian pathways that link the several open spaces and provide direct connections to the Wind Garden and the waterfront beyond.TOTA L A R E A : 1 0 . 2 6 H ADISTRICTS 2A AND 3 D E V E L O P M E N T G U I D E L I N E S15金鸡湖第2A及3区城市设计原则主干河道小区GRAND 26、C A N A L N E I G H B O R H O O DGRAND CANAL NEIGHBORHOODThe Grand Canal Neighborhood will include 3 to 4 story tall apartments and row houses that directly front onto and address the canal. Pedestrian connections will be provided from this neighborhood to the Marina Village Center.主干河道小区这一区包括了三至四层高27、的公寓楼和直接滨邻河道的住宅楼排,而河道将作为主要的兴趣中心。步行通路向东通往码头村落社区中心。TOTA L A R E A : 3 . 9 8 H ADISTRICTS 2A AND 3 D E V E L O P M E N T G U I D E L I N E S16金鸡湖第2A及3区城市设计原则高层住宅小区TOW E R N E I G H B O R H O O D高层住宅小区这一区地处整个地段的西南角,也是楼层最高的一区。建筑高度将是4至12层或更高。建筑将环绕着包含有社区活动内容的小区公共绿地而建。这一区的范围是由一条河道和位於西面和南面的、宽30米的绿化隔离带来界定。TOWE28、R NEIGHBORHOODThe Tower Neighborhood is located at the southwest corner of District 3 and is envisioned to include the tallest buildings in the District. Building heights will range from 4 to 12 stories (or taller). The buildings will be designed around common green space that will become the commun29、ity open spaces and will include community amenities. This district is bounded by a canal and a 30 meter wide green belt on its west and south sides. TOTA L A R E A : 8 . 4 0 H ADISTRICTS 2A AND 3 D E V E L O P M E N T G U I D E L I N E S17金鸡湖第2A及3区城市设计原则水巷邻里小区CANAL NEIGHBORHOODThe Canal Neighborhoo30、d incorporates the elements of urban fabric of the old town Suzhou with a series of interconnected canals that are the primary form-giver to the neighborhood. The widths of the canals at six meters and eight meters are refl ective of the existing canal sections in the old town. Along the central axi31、s is a wider “free-form” canal that connects the neighborhood to the lake. Around this central canal will be located the community amenities such as the day care center, library, and recreation and fi tness centers. Access to this neighborhood is provided at two points on the east-west road from whi32、ch internal streets provide access to the individual homes.水巷邻里小区水巷邻里小区结合了体现苏州古城城市肌理的元素,表现为一系列相互交织的“水巷” 而作为小区的主题形式。其中河道的宽度为六米和八米,这样的宽度是最为体现古城河道尺度的。而沿着这一区中央轴线的是一条宽一些的、形式较为自由的河道,把这一小区和金鸡湖联结起来。在这个中央河道周围是社区活动场所,如幼儿园、图书馆、娱乐中心、健身中心等。这一区有东、西两个主要入口,内部道路将由此通向各户住宅。C A N A L N E I G H B O R H O O DDISTRICTS 2A33、 AND 3 D E V E L O P M E N T G U I D E L I N E S18金鸡湖第2A及3区城市设计原则LAKE F RO N T N E I G H B O R H O O D滨湖小区滨湖小区这一区地处湖滨,并享有绝好的临湖景色。这里规划了别墅住宅并有步行联系通往“自然公园”、东面的水滨和北面的码头村落中心。每栋别墅将设计为二至二层半高的建筑。LAKEFRONT NEIGHBORHOODThis parcel of land is adjacent to the lake and provides great views of the waterfront. It 34、is envisioned to include single family residences with pedestrian connections to both the Nature Park and the waterfront to the east and to the Marina Village Center to its north. The houses will be predominantly two to two and one half stories.DISTRICTS 2A AND 3 D E V E L O P M E N T G U I D E L I 35、N E S19金鸡湖第2A及3区城市设计原则码头村落社区MARINA V I L L AG E N E I G H B O R H O O DMARINA VILLAGE NEIGHBORHOODThe Marina Village is a mixed use district that is intended to become a vibrant, visually-distinctive center of the District with a wide range of activities. The southern part of the Marina Village coul36、d include mixed use buildings residential units above street level storefronts. The core of the Village includes mixed use residential buildings which then lead to a series of small scale retail buildings that are restaurants, stores and boutiques. These buildings are clustered around plazas and ope37、n spaces, all of which take advantage of the proximity and views of the water. Linked to this district will be the existing pier that will remain a historical marker in Jinji Lake.码头村落社区码头村落是一个多功能区,作为一个提供多种社区活动的、鲜活而显眼的社区中心。这一区的南面部分可包含有多功能建筑-具有临街底层商业的住宅楼。社区的核心是几栋多功能住宅楼以及一系列小尺度的零售建筑包括餐厅、商店和精品店。这些建筑都环绕38、着近水且拥有湖景的市民广场和开放空间。现有的码头将被保留而成为金鸡湖历史的象征。DISTRICTS 2A AND 3 D E V E L O P M E N T G U I D E L I N E S20金鸡湖第2A及3区城市设计原则码头村落社区MARINA V I L L AG E N E I G H B O R H O O DDISTRICTS 2A AND 3 D E V E L O P M E N T G U I D E L I N E S21金鸡湖第2A及3区城市设计原则码头村落社区MARINA V I L L AG E N E I G H B O R H O O DThe Mari39、na Village consists of several developable parcels all linked together with public pedestrian easements and public plazas and open spaces. The northern end of the Marina Village will be anchored by a “signature” building that will be used as a community facility. The two large parcels on the western40、 end (closest to the Grand Canal Neighborhood) are intended to be designed as 4 story residential buildings (with potential retail along the street). To the east of this area, there will be a series of one and two story retail buildings located around landscaped and hardscaped plazas lending the fee41、l of a “village center” with restaurants, cafes and boutique stores. This area is intended to become the heart of the District.The southern part of the Marina Village Neighborhood, across the Grand Canal Marina, will include residential buildings with potentially some mixed use buildings with street42、-facing retail uses adjacent to the pedestrian bridge that connects across the Grand Canal Marina. This neighborhood terminates at an intimately scaled marina with slips for boats at the eastern end.Located at the eastern end of the Village Center is the historic pier. The existing structures on the43、 pier will be removed and the pier will be reused as a fi shing pier. Several viewing decks will be added to the pier. Two markers will also be added to the pier one at the terminus and another on axis with the canal and marina. These markers could either be two of the existing structures or other s44、culptural/structural element.码头村落社区包括了一些与公共步行通道、市民广场和开放空间相联系的可开发地段。码头村落的北端由一栋用作社区服务设施的标志性建筑所界定。位于社区西端的两个较大的地段(紧邻主干河道社区)将被设计为四层的住宅楼(底层邻街部份可用作零售)。这一区域的东面是一系列的一、二层商业建筑,四面环绕着绿化和铺地的市民广场,由周围的餐厅、茶馆和精品店营造出村落中心的氛围。这一地区将成为整个区域的中心。村落中心的东边即是历史码头。在码头村落社区靠南侧、位于主干河道码头对面的部份将包括一些住宅楼和几栋多功能建筑。这些建筑有临街的零售店,并靠近与主干河道码头相连的45、步行桥。码头村落社区终止于一个尺度亲切的港口,港口内设有供船支停靠的泊位。历史码头位于村落中心的东边。在码头上现存的构筑物将被拆除,而码头本身将用于垂钓。码头上将加建观景平台和两个标志性构筑物:一个在码头的东端,另一个在码头与“水巷邻里小区”轴线的交点上。这两个标志物既可以是现存的构筑物,也可以是新建的雕塑小品或构筑元素。DISTRICTS 2A AND 3 D E V E L O P M E N T G U I D E L I N E S22金鸡湖第2A及3区城市设计原则W I N D G A R D E N风之园WIND GARDENThe Wind Garden is envisaged46、 as being a celebration of the wind, and a place where adults and children can play in unison. The form of the park is derived from the actions of wind on water, and is an abstraction of the ripples and waves that result from this action. Planting is envisaged as being a blend of ornamental species 47、and those which capture the wind, transpose it, and translate it in sound, action, and scent. Structural elements will include look-out or viewing platforms, water pools and a possible small interactive childrens playground.风之园“风之园”的设计意图是感受风的存在,并提供一个成人与孩童可以共同嬉戏的场所。“风之园”的平面源自于风拂过水面的情景,也是水波纹的抽象形式。植物的设48、计是多种开花植物的混合,用它们来捕捉无形的风,用声音,香味以及摇曳的姿态来传达风的讯息。公园中的构筑元素有观景平台,水池和一个小的、可随时更新的儿童游乐区。DISTRICTS 2A AND 3 D E V E L O P M E N T G U I D E L I N E S23金鸡湖第2A及3区城市设计原则W I N D G A R D E N风之园Site FurnitureSite MaterialsSite SectionThe current arc of the Waterfront Promenade will be continued through light masts p49、laced in the Lake, and a more serpentine shoreline confi guration that follows the existing condition. A walkway of variable width is envisioned against the Lake edge, and interwoven paths that rise and fall in grade will link the Garden with the Wind Garden Neighborhood to the west.At the northern 50、end of the Garden, a stair will descend to a fl oating pontoon where cruise boats can dock. This will be fronted by a paved forecourt allowing outdoor dining, performances by musicians and other cultural and social events.现有滨湖步行大道的曲线形式将以置于湖中的灯柱来延续。而湖岸本身将遵循现有的湖岸曲线而呈现蜿蜒的形式。一条宽度变化的步行小路倚着湖岸布置,而交织在曲线之间的小51、路则随地形上下起伏,把风之园与西面的风苑小区联结起来。在风之园的北端,由一部台阶转至一处供游船停靠的浮动码头,这个码头面对一个铺装平台,供室外就餐、音乐表演或其它文娱活动使用。DISTRICTS 2A AND 3 D E V E L O P M E N T G U I D E L I N E S24金鸡湖第2A及3区城市设计原则WIND GARDEN风之园Pre l i m i n a r y Plant List主要植物列表乔木灌木草本植被MARINA VILLAGE OPEN SPACEThe Open Spaces interwoven through the Marina Villag52、e are envisioned as an intricate urban environment where the smaller scale building forms of the district are refl ected in an intimate The form of these open spaces is deliberately simple, and is confi gured as a simple ground plain that forms a base to the adjacent commercial and cultural faciliti53、es. Level changes are introduced to allow varied interactions with the Lake and the boats that will likely dock at the Marina Village.The shoreline is envisioned as being largely a structured wall, with signifi cant areas of hard paving as a means of proving for multiple users and service access alo54、ng the water front. Planting and materials palettes will be simple, allowing the spaces to be enlivened by the adjacent activities.FISHING PIER (LEVEE)The Fishing Pier occupies the existing levee, and is envisioned as an elongated natural regeneration zone. The alignment of the levee is considered a55、 signifi cant historic feature of Jinji Lake, while the existing structures are not. The proposal calls for the demolition of the existing structures, together with a structural evaluation and repair of the existing seawalls to establish a land level close to the lake. Paths shall be a well detailed56、 yet simple timber deck, with the remainder of the levee area re-vegetated with naturally occurring grasses and other species that promote wildlife, and in particular, the nesting of water bird species.At a mid-point along the Fishing Pier, at the crossing of the diagonal axis of the Canal Neighborh57、ood, a taller light pagoda is envisaged to terminate that vista and provide a destination to those walking along the length of the fi shing pier. A smaller structure of similar detailing will be erected at the end of the fi shing pier to aid night-time navigation and clearly demarcate the end of the58、 fi shing Pier.码头村落中的开放空间码头村落社区中交织的开放空间将被安排为小规模建筑和谐布置的、形式较为复杂的城市环境。这些开放空间的形式本身被有意设计的简单明了,主要以平地作为周围商业和文娱设施的基底。仅在需要泊船停靠和近水设计的位置作了高差变化的处理。这里的湖岸处理多采用人工驳岸墙的形式,地面也大多采用硬质材料,用以配合容纳多种用途以及服务通道。开放空间中植物和用材的选择虽然简单,但人们的活动才真正为场所赋予无限生机。垂钓码头(长堤)垂钓码头就建在现有的长堤上,并作为延长的“自然再生区”。长堤是金鸡湖历史的象征,而现存的构筑物则不具备历史价值。因此,方案中建议拆除堤上现存的构59、筑物。并需对长堤的基础进行评估,整修挡水墙从而使地面更接近湖面。而路面采用简单的甲板铺装,但细部需进行深入设计。在堤旁的区域应很好培植自然生的草本和其它植物,从而促进野生生物,特别是水鸟筑巢。在垂钓码头的中部,并与水巷邻里小区中轴线的交点处,有一座塔形构筑物用以作为视线焦点,并提供沿堤散步的目的地。另有一个类似但高度稍矮的塔立于码头堤岸的东端,作为灯塔帮助夜航的船只明确垂钓码头的终点。O P E N S PAC E的开放空间DISTRICTS 2A AND 3 D E V E L O P M E N T G U I D E L I N E S25金鸡湖第2A及3区城市设计原则自然公园N AT 60、U R E PA R KNATURE PARKThe Nature Park is envisioned as a passive linear open space that links the Lake Front Neighborhood to the Lake. The shoreline will be an extension into the lake beyond the existing limit of the lake edge, and will be a constructed wetland to develop a more passive and natural61、 edge with the lake that may also provide habitat potential for water birds. Small fi shing and boat docking piers are proposed at the end of streets within the Lakefront neighborhood as a means of extending the streets into the lake and establishing interaction with the lake.The planting and materi62、als palettes are simple, and are seen as a refl ection of the landscape that surround Lake Jinji. Lighting will be simple, low in intensity, and be used as a guide to traffi c routes, rather than an intensively lit open space.自然公园自然公园是一处相对保持天然的狭长形的开放空间,把滨湖小区与金鸡湖联系起来。方案中的湖岸相对于现有的边界被部份的延伸了,湖岸将是人工修复的沼泽63、地,从而使湖岸保持天然的边缘,并可能为野生水鸟提供栖息场所。小型的垂钓和船坞码头作为滨湖小区内街道的延续,用来促进与水面的沟通。植物和用材的选择都简单明了用以反映金鸡湖沿岸的景观状况。照明设施同样简单且亮度较暗,仅用于引导路线而绝非过度的广场照明。DISTRICTS 2A AND 3 D E V E L O P M E N T G U I D E L I N E S26金鸡湖第2A及3区城市设计原则N AT U R E PA R K自然公园乔木草本植被P re l i m i n a r y P l a n t L i s t主要植物列表灌木DISTRICTS 2A AND 3 D E V E64、 L O P M E N T G U I D E L I N E S27金鸡湖第2A及3区城市设计原则湖岸调整填挖S H O R E L I N E C U T / F I L LDISTRICTS 2A AND 3 D E V E L O P M E N T G U I D E L I N E S28金鸡湖第2A及3区城市设计原则湖岸处理SHOR E L I N E E D G E C O N D I T I O N SDISTRICTS 2A AND 3 D E V E L O P M E N T G U I D E L I N E S29金鸡湖第2A及3区城市设计原则H a rd e d65、 g e S e c t i o n D - D驳岸剖面D-D Hard edge Section B-B驳岸剖面B-B H a rd e d g e S e c t i o n C - C驳岸剖面C-C Hard edge Section A-A驳岸剖面A-A 湖岸处理剖面图ED G E C O N D I T I O N S E C T I O N SDISTRICTS 2A AND 3 D E V E L O P M E N T G U I D E L I N E S30金鸡湖第2A及3区城市设计原则湖岸处理剖面图ED G E C O N D I T I O N S E C T I O 66、N SH a rd e d g e S e c t i o n E - E驳岸剖面E-E S o f t e d g e S e c t i o n A - A自然湖岸剖面A-A S o f t e d g e S e c t i o n B - B自然湖岸剖面B-B DISTRICTS 2A AND 3 D E V E L O P M E N T G U I D E L I N E S31金鸡湖第2A及3区城市设计原则IMAGES - B U I L D I N G P R E C E D E NT S参考图像-建筑部分DISTRICTS 2A AND 3 D E V E L O P M E N T G U I D E L I N E S32金鸡湖第2A及3区城市设计原则参考图像-建筑部分IMAGES - B U I L D I N G P R E C E D E NT S