湖州市南浔区工程照明设计方案(45页).pdf
下载文档
上传人:偷****
编号:333539
2022-03-31
45页
4.72MB
1、HUZHOUNANXUNCD- 29ADIKUAIDESIGN湖州市南浔区湖州市南浔区CD-29A地块工程照明设计方案地块工程照明设计方案Huzhou NaHaixunOu CD -29 -a plot engineering lighting design schemeHUZHOUNANXUNCD- 29ADIKUAIDESIGN项目概况Project OverviewHUZHOUNANXUNCD- 29ADIKUAIDESIGN1 1、工程项目概况、工程项目概况/Project Overview/Project Overview南浔城东分区CD-29A地块东侧为现状绿地,南侧为河流,北侧为2、年丰路,西侧为南林路,土地面积16038平方米。其中A楼为综合办公楼,B楼为银行。位于湖州市南浔区南林路与年丰路交叉口。Nanxun east partition CD - 29 - a plot and the status quo to the green land, south river, the north for years feng road, on the west side of south road, the land area of 16038 square meters. Of A building for comprehensive office building, 3、B building for bank.Located in huzhou NaHaixunOu south road and years feng Lin road intersection 2 2、设计范围、设计范围/Design Range/Design RangeThe design scope is NaHaixunOu CD - 29 - A plot, A and B floor building lighting design. Design as a whole considering the overall design and unified, combined with the design concept and characteristics of the building, as well as the overall environment of the n