20烟台黄金河河滨公园景观方案设计191页.pdf
下载文档
上传人:地**
编号:1227657
2024-10-10
191页
335.55MB
该文档所属资源包:
景观绿道及绿化带规划方案设计合集
1、项目区位2黄金河河滨公园(206 国道两侧)景观方案烟台Gold river riverside park,206 state road side)landscape plan 1.1 区位分析1.2 基地周边关系1.3 基地现状Location anaLysis surrounding the base reLations surrounding the base reLations 目录directory 1234562.1 设计理念2.2 设计主题2.3 设计定位2.4 设计策略2.5 设计理念design conceptdesign themedesign positioning de2、sign strategydesign concept 3.1 设计愿景3.2 总平面图3.3 功能分区图3.4 交通分析图3.5 竖向分析图3.6 尺寸分析图3.7 与城市衔接3.8 行洪分析图3.9 开放度与人流聚集分析3.10 公共设施规划design vision the overaLL pLan FunctionaL zoning map traFFic anaLysis verticaL anaLysis size anaLysis chart Linking up with the city FLood anaLysis open degree and the anaLysis 3、oF stream oF peopLe pubLic FaciLities pLanning5.1 河道生态化改造专项6.1 投资估算5.3 现状桥梁改造5.2 现状道路生态化改造5.4 植物绿化设计5.5 河道景观照明设计5.6 导视系统选型5.7 城市家具选型the ecoLogicaL revetment renovation situationinvestment estimatecurrent situation oF bridge reconstructionecoLogicaL reconstruction oF current situationpLant greening d4、esignriver Landscape Lighting designLandscape vi system designcity Furniture seLection4.1 入海口慢生活体验区4.2 运动时尚生活区4.3 湿地水生活体验区4.4 浪漫新生活休闲区sLow LiFe experience areasports Fashion Living areawetLand water LiFe experiencewetLand water LiFe experience现状背景1.1 区位分析1.2 基地周边关系1.3 基地现状Location anaLysis surroundi5、ng the base reLations surrounding the base reLations status quo of the backGround 11n区位分析1.1location analysis11.1.1 项目区位1烟台经济发展轴线economic development axisspatial layout chartindustrial space layout烟台空间布局结构图烟台产业空间布局图n区位分析1.11.1.2 烟台产业空间分布location analysis11n项目区位1.11.1.3 与周边关系location analysis114.2kM16、40-170M天津南路 tianJin south road海滨路 ocean road设计范围:本次设计范围为天津南路橡胶坝以东至入海口,河道长度约4.2公里,河道宽度 140-170 米,总面积约 68.3 公顷,其中绿地面积约 11.5 公顷,水域面积约 56.8 公顷。Design Range:the design range of rubber dam tianjin road to the east into the sea,about 4 km length of the river,the river width of 140-170 meters,with a total a7、rea of about 68.3 hectares,of which green area of about 11.5 hectares,water area of about 56.8 hectares.n渤海 Bohai Sea项目区位1.11.1.3 与周边关系location analysis111水系居住用地工业用地商业用地其他用地(文物保护、商住、中小学、文化用地)riverresidential landindustrial landcommercial landother landn1.2.1 基地周边功能分析基地周边关系1.2around the contact 1基地服务8、对象分析:基地紧邻“古现旅游综合服务区”、“烟台保税港西区”与滨海居住区,黄金河的主要服务对象分别为游客、工业劳动者和区域内居民。烟台保税港西区磁山居民游客工人其他(教师、商人、农民等)牟子国古墓保护区Muzi Guo tomb protection zonenow ancient cultural blockslive placelive placelive placeyantai bonded port Westfoley MountainMagnetic hill居住居住居住福莱山古现文化街区Base Analysis Services objects:base close to com9、prehensive service area is now ancient,yantai bonded port West and the coastal settlements,the main target Gold river were tourists,industrial workers and residents of the region.residenttouristworkerother the elderly,children,middle-aged is the mostyouth is the most青年居多 儿童、少年、中年、老年较少老人、儿童、中年居多 少年、青10、年较少n渤海 Bohai Sea基地周边关系1.21.2.2 基地周边用地情况around the contact 11长江路 chanGJianG road上海大街 shanGhai road杭州大道 hanGZhou road206 国道 206 state road天津南路 tianJin south road台北中路 taibei Midlle road海滨路 ocean road基地周边交通分析:黄金河基地周边由“五纵三横”的路网构成。城市路网强调出片区与片区之间的联系,也为基地提供了较好的通达基础。Traffic around the base of analysis:Gold r11、iver around the base is composed of five vertical and three horizontal road network.urban road network stressed the link between the area and the area,but also as a base to provide a basis for better accessibility.“五纵三横”路网路网强调出的片区关系five vertical and three horizontal road networkarea relationshipn渤海 12、Bohai Sea基地周边关系1.21.2.3 基地周边交通分析around the contact 11n黄金河柳林河柳子河滨河景观带区域绿道白银河八角河Gold riverWillow riverryuko riverthe landscapeWhite Galaxy riverbajiao river八角港风情公园style parkfoley Mountain福莱山福莱山白银河黄金河柳林河柳子河渤海 Bohai Sea磁山磁山一片八角一极黄金一廊磁山八角河Magnetic hill牟子国古墓保护区牟子国古墓保护区Muzi Guo tomb protection zone基地与城市绿地系13、统分析:黄金河是烟台经济开发区古现片区山城海河城市特色的最佳景观载体,是链接山-城-海的重要养生休憩及特色文化型景观廊道。古现片区景观规划分为四个景观要素“磁山一片”、“八角一极”、“黄金一廊”、“滨海一带”。Gold river is at yantai economic development area is now ancient mountain city features the best landscape in haihe carrier,are the links to the mountain-city-ocean important ecological corridor.14、yantai economic development area is now ancient landscape planning Gold river is located in the four elements of the landscape,a magnetic mountain,octagonal pole,a gold corridor,coastal area.Base and Urban Green Space System Analysis:regional greenway滨海一带基地周边关系1.21.2.4 基地周边城市绿地系统分析around the contact15、 11基地现状分析1.31.3.1 基地高程分析the status quo 0-6M6-10M10-15M15-20M整体地势交平整,层次不够丰富。增加地形高差,局部地方形成台地景观,丰富景观层次。overaLL terrain is FLat and LeveL,LeveL are rich enough.increase,the eLevation diFFerence parts Form terraced Landscape,rich Landscape LeveL.111.31.3.2 基地水体与植被分析the status quo 现状林荫大道现状林荫大道现状水草现状行道树现状水16、体现状水体现状水体现状灌木基地现状分析现状林荫大道 现状水草现状灌木现状行道树现状水体道路交通组织不够清晰,系统不完整。现状河道杂草生长泛滥。现状灌木形式及品种单一,观赏性弱。行道树间距密集,影响景观效果。砂石堆积,杂草泛滥,水面景观遭到破坏。增加人行道,慢步道及绿化带。清理河道中的杂草,及河底淤泥,分段筑坝,增加水域面积。增加灌木品种,加大灌木层次感。局部棵树建议移植,增强序列感。清理河道,净化水质,分段筑坝,增加水域面积。overaLL terrain is FLat and LeveL,LeveL are rich enough.status quo oF river water pLa17、nt growth.weak Forms and varieties oF singLe status quo shrubs,ornamentaL.dense trees spacing,the impact oF Landscape eFFect.sand accumuLation,weeds,water Landscape is destroyed.increase the sidewaLks,waLk road and green beLts.cLean up the weeds in the river,and the bottom oF the river siLt,piecewis18、e dam,increase water area.increase the shrub species,shrub Layers.suggest LocaL tree transpLantation,enhance the sense oF sequence.cLean up the river,the water quaLity puriFication,piecewise dam.11基地现状分析1.31.3.3 基地建筑分析the status quo 化工厂水泥厂祈福庙居民矮房广场黄金河海黄金河黄金河市场祈福庙富士康工业小区建筑化工厂水泥厂市场富士康运动场居民矮房小区建筑污水处理厂小19、学绿化绿化绿化小区建筑小区建筑水文站广场在红线范围内,影响景观效果。建议拆除,或者用植物林遮挡。within the scope oF the red Line,aFFect the Landscape eFFect.suggest to dismantLe,or use the pLant Forest shade.增加运力设施,丰富人们活动,打造活力广场。大量的砂石堆积,及空气水质污染严重,影响景观环境。the imperFection oF the surrounding Landscape FaciLities,abrupt and Landscape styLe.sand piLed20、 up,the water quaLity and air poLLution is serious,aFFect the Landscape environment.the earth tempLe,and the overaLL design.suggest remove,or through the pLant barriers to keep out.居民矮房祈福庙水泥厂、化工厂广场周边景观设施不够完善,与景观风格突兀。广场形式单一,缺少运动活力,及群众互动。对祈福庙进行改造,和整体设计相呼应。建议移除,或通过植物屏障进行遮挡。a singLe square Form,Lack oF 21、sports activity,interaction and the masses.increase capacity FaciLities,rich peopLe activity,make dynamic square.11黄金河大桥B 桥A 桥桥身装饰不足。私营餐馆、旅店分布杂乱,聚集在桥中,影响景观效果。栏杆与桥设计不统一。在现有基础上,增加装饰,及亮化效果。移除私营餐馆、旅店等,再进行对桥改造,及亮化设计。对桥栏杆进行改造,到达景观效果统一。bridge deck decoration.private restaurant,hoteL distribution,gathered i22、n the bridge,bLocking traFFic.raiL and bridge design.on the basis oF existing,increase decoration and Lighting eFFects.increase,the eLevation diFFerence parts Form terraced Landscape,rich Landscape LeveL.to modiFy a reminder to the Landscape eFFect.基地现状分析1.31.3.3 基地现状桥梁分析the status quo 海黄金河黄金河黄金河规划桥23、黄金河大桥滨河路B 桥A 桥风帆大桥11基地现状分析1.31.3.5 基地设施分析the status quo 排水口 堤坝变压器橡胶坝橡胶坝电线塔变压器电线塔电线杆堤坝排水口排水口排水口电线塔电线塔、电线杆堤坝排水口在景观范围内,影响景观效果。形式单一,不能满足影响效果。排水口样式多样化,直接裸露在外,景观效果不佳。道路,人行,活动场所等避免在该区域,设置警告提示。自然景石切成,打造河水自然溢流。统一排水口样式,通过景观设计弱化排水口处,达到景观效果统一。within the scope oF the Landscape,Landscape eFFect.Form a singLe,cann24、ot satisFy eFFect.drain styLe diversiFication,bare in directLy,poor Landscape eFFect.pLaces such as road,the pedestrian,avoid in the area,set up the warning.naturaL stone cut into,make the river naturaL overFLow.uniFied drain styLe,weaken the drain through Landscape design,Landscape eFFect.1理念与策略2.125、 设计理念2.2 设计主题2.3 设计定位2.4 设计策略2.5 设计理念philosophy and strateGy design conceptdesign themedesign positioning design strategydesign concept 2项目区位2项目区位2 源起 Origin 一切设计都是为了留住人,让人在这片土地更幸福的工作,生活,居住。原有的产业园区的规划布局是单调的,无趣的。作为年青的产业工人,更多是对现实的妥协,而不是因为热爱而选择在这里工作与生活,一旦具备一定的经验,就会选择逃离这个无趣的地方。以富士康为代表的各个厂区,被赋予的不是激发人的梦想与26、生命的启蒙企业,而是被人指责的血汗工厂,作为孩子的家长与亲友并不放心孩子在这里工作。从那些 20 多岁的青年眼中,我们读到的是对生活的向往,对爱情的追求与对美好生活的向往。aLL design are to retain peopLe,make peopLe happier in the Land oF work,LiFe,to Live in.the originaL industriaL park pLanning Layout is monotonous,boring.as a young workers,is more a compromise to reaLity,rather th27、an choose to work here because oF the Love and LiFe,once have a certain experience,wiLL choose to escape From this duLL pLace.each represented by Foxconn Factory,given not motivate peopLes dream and the enLightenment oF LiFe,but being accused oF sweatshops,as the chiLdrens parents and reLatives and 28、Friends do not trust the chiLd to work here.From the eyes oF those in their 20 s youth,we read is a passion For the LiFe,the pursuit oF Love and yearning For a better LiFe.01设计理念2.1desiGn concept 项目区位2“价值”Value 发挥生态的价值,与洪水为友,让自然做工。对生态进行修复,对污染进行治理,提供净化的水体与新鲜的空气。让每一个人公平的享有河滨公园的生态资源,在河滨公园里,无论是年青的产业工人还是29、安置的村民以及高端住宅的业主,这座公园里面,人人享有平等的使用权利,营造满足各类人群的场所,在这里发生各种故事。pLay the vaLue oF ecoLogy,with FLoods,Let nature work.For ecoLogicaL restoration,to the governance oF poLLution,provide cLean water and Fresh air.Let everyone enjoy FairLy riverside park ecoLogicaL resources,in the riverside park,both the young30、 workers and resettLement oF viLLagers and the owner oF high-end residentiaL,inside the park,the use oF equaL rights,buiLd pLaces,meet aLL kinds oF peopLe in aLL sorts oF stories happening here.项目区位202设计理念2.1desiGn concept 项目区位2“追求”The pursuit“在休闲中工作,在工作中休闲”的多样化空间感受。“在这里的产业园工作,我很快乐,我很骄傲,我很幸福。”workin31、g in the Leisure,Leisure at work the diversiFication oF space to experience.industriaL park to work here,i am very happy,i am proud,i am very happy.项目区位203设计理念2.1desiGn concept 项目区位2项目区位设计主题2.2desiGn positioninG 2“唤醒河道生命力-构筑河岸绿色生活”“ActivAte the vitAlity of river-Along the river to build A new life”我32、们希望发起一场改变烟台经开区产业园以及园区外环境的绿色景观革命,对传统园区的绿色环境空间发起挑战,让死气沉沉的环境景观焕发无限活力。通过营造全新的空间与可持续的河道生态环境,让人们热爱这个场所,热爱这里的生活,充满幸福感,最终是为了人与自然的和谐,完全相融共生。we want to Launch a revoLution change industriaL park green Landscape environment and chaLLenge to the traditionaL park green space environment,Let the dead Landscape sh33、ine inFinite vitaLity.through creating a new space and sustainabLe environment,Let peopLe Love this pLace,Love the LiFe,FuLL oF happiness,in the end is For the sake oF the harmony oF man and nature,harmony symbiosis compLeteLy.项目区位2项目区位设计愿景2.3desiGn vision 2亲近自然,追求健康,演绎精致绿色生活。为当地居民及产业工人定制一个自然、健康、浪漫、34、人与自然和谐共生的线性生态滨河公园。close to nature,deduce a refined,sophisticated life.for the local residents and industrial Workers to custoMiZe a natural,healthy,roMantic,coexistence of Man and nature ecoloGical riverside park.生态ecoLogicaL 健康heaLth自然naturaL浪漫romantic与居民同 乐与生物共存与自然同享与健康同在Joy shared With residents 35、coexist With bioloGical it is shared With natural With health 项目区位2设计策略2.4desiGn strateGy 为生活而营造,以不同使用者的需求为基础,通过设计多样化的主题活动空间,让公园成为故事与 理想生活的发生器。For LiFe and create,with the needs oF diFFerent users as the basis,through the design oF a variety oF theme space,so that the park has become a story and the36、 ideaL LiFe oF the generator.周边环境与场地的关系现状桥与场地的关系tactics策略01居住小区污水处理厂居住小区市场化工厂富士康工业古县小学富士康运动场居住小区入口形象广场野营阳光草坪儿童乐享乐园集装箱美食街活力运动公园休憩绿阶生态栈道项目区位2 实现雨洪资源管理与污染零排放,源头控制,保护河道水质,成为海绵城市设计在中微观尺度的典范案例。改变传统的排水管理理念,尽量将雨水控制在源头和地表进行收集和处理,通过处理和下渗,使产汇流时间增加,降低流速,缓解径流流量,并净化水质,实现在源头防止和缓解降雨径流,对地表径流的水量和水质进行控制。impLementation37、 oF storm water resources management and poLLution zero emissions,source controL,to protect the river water quaLity,become the sponge city design in the micro scaLe modeL case.change traditionaL drainage management phiLosophy,the rainwater controL in source and surFace were coLLected and processed a38、s Far as possibLe,through the handLing and permeabiLity,which can increase the time oF runoFF generation and concentration,reduce the FLow rate,FLow runoFF mitigation,and puriFying water quaLity,achieve at the source to prevent and aLLeviate rainFaLL runoFF and on surFace runoFF oF water quantity an39、d water quaLity controL.场地现状出水口及地表水汇集方向场地现状截水坝及水流方向tactics策略02设计策略2.4desiGn strateGy项目区位2 重建并提升河道的生态系统,建筑6道生态景观闸坝,蓄水筑景打造缤纷生态水岸。修复滨水湿地,扩大湿地面积,提高生物多样性,成为河道生态修复的典范。reconstruction and improve the ecoLogicaL system oF the river,buiLding 6 ecoLogicaL Landscape water dam,buiLt to create coLorFuL ecoLogicaL40、 waterFront Landscape.to repair the waterFront wetLand,expand the wetLand area,improve the biodiversity,become the modeL oF river ecoLogicaL restoration.周边环境与场地的关系漫步道系统及设计 6 道生态截水坝居住小区污水处理厂居住小区市场化工厂富士康工业古县小学富士康运动场居住小区tactics策略03设计策略2.4desiGn strateGy项目区位2自行车租赁点入口形象广场野营阳光草坪儿童乐享乐园集装箱美食街活力运动公园生态栈道休憩绿阶自41、行车租赁点自行车租赁点连续的自行车道为赏景提供了一种更为运动健康的方式连续的自行车道连续的慢跑步道9km 的连续跑步道系统提供了健康的生活方式 打造 9km 连续的自行车道与跑步步道系统串联各个核心主题活动空间,让跑 步成为一种新时尚生活。build 9 km bike lanes and continuously running trails system in series each core theme activity space,makes running a new fashion life.tactics策略04设计策略2.4desiGn strateGy项目区位2 营造一条丰富42、的不断变化的慢跑道与步道系统,实现滨水,穿越,穿林,过桥等多样化的时空体验。changes in running and waLking road,to achieve a variety oF spatiaL experience oF waterFront,through,through the Forest,across the bridge and so on.周边环境与场地的关系步行道居住小区污水处理厂入口形象广场生命之树钓鱼湾野营阳光草坪儿童乐享乐园湖心湖岛运动广场桥下休闲空间阶梯小剧场浮岛小广场集装箱美食街生态栈道花田艺术景观生态湿地折叠草阶树阵绿廊特色观景平台生态栈桥节点广场庙43、前广场景观廊架入口广场居住小区市场化工厂富士康工业古县小学富士康运动场居住小区tactics策略05设计策略2.4desiGn strateGy项目区位2 建构 6 大主题构筑物,呼应主题分区,形成强烈的场地记忆海滨入口形象广场时尚活力运动公园滨河花田生态湿地生态阳光草坪民俗文化滨水活动广场低碳集装箱美食街六大亮点将场地串联成一条有故事的主题游线建构 6 大主题构筑物,呼应各个亮点分区construction oF six theme structure,echoing the theme oF the partition to Form a strong FieLd memorytactic44、s策略06设计策略2.4desiGn strateGy项目区位2融入周边地块,提升公园的可达性以及周边地块价值融入周边地块,提升公园的可达性以及周边地块价值周边地块路网延伸到公园边缘,规划内共四座桥贯穿了公园的南北延续周边基地路网,增加南北向、东西向的道路联系,提升公园的可达性into the surrounding Land,improve accessibiLity and vaLue oF surrounding Land parktactics策略07设计策略2.4desiGn strateGy项目区位2创造独具特色与功能互补的特色分区临海慢生活体验区 运动时尚生活区湿地水生活体验区浪45、漫新生活休闲区creating a unique and compLementary characteristics oF the partition Function创造独具特色与功能互补的特色分区tactics策略08设计策略2.4desiGn strateGy项目区位2形成与城市相互联系的绿地公园系统形成与城市相互联系的绿地公园体系现状周边地块绿地系统延伸到公园边缘继续延伸的绿廊,贯穿公园东西向Forming interaction with the citys green parks systemtactics策略09设计策略2.4desiGn strateGy项目区位2策略 1:st46、rateGy 1 策略 2:strateGy 2策略 3:strateGy3策略 2:strateGy2策略 1:strateGy1策略 3:strateGy3将现状硬质人工驳岸,恢复成湿地过滤的自然河道。the status quo of hard artificial revetMent,return to natural river Wetland filterinG.将现有功能单一的河道,打造成满足各阶层人群户外休闲生活的多功能空间。continue MakinG the existinG functions of sinGle channel,Meet people of diffe47、rent social classes Multi-functional space of outdoor leisure life.通过分段筑坝,形成宽阔水面,改善枯水季节河道干枯的现状。by pieceWise daM,forMinG a broad surface,iMprove the dry season river dry noW.现状河道现状河道现状河道tactics策略10设计策略2.4desiGn strateGy对现有硬质驳岸进行改造,打造与洪水为友的韧性水岸景观the transFormation oF the existing buiLding and hard rev48、etment,FLood FriendLy Landscape toughness项目区位2总图设计3.1 设计愿景3.2 总平面图3.3 功能分区图3.4 交通分析图3.5 竖向分析图3.6 尺寸分析图3.7 与城市衔接3.8 行洪分析图3.9 开放度与人流聚集分析3.10 公共设施规划General layout desiGn design vision the overaLL pLan FunctionaL zoning map traFFic anaLysis verticaL anaLysis size anaLysis chart Linking up with the city 49、FLood anaLysis open degree and the anaLysis oF stream oF peopLe pubLic FaciLities pLanning3平面标注:totaL pLane mark:26 爱情岛27 祈福庙28 林荫大道29 叠级草坪30 休闲廊架31 邻里空间32 亲水平台33 景观构筑34 休息绿阶35 休闲廊架36 入口广场26 Love isLand 27 earth tempLe 28 bouLevard 29 LeveL the Lawn 30 recreationaL corridor 31 the neighborhood 32 pr50、o LeveL units 33 Landscape construction 34 rest green order 35 recreationaL corridor 36 square entrance 04020202060630313233343536060608080809131307101515152323252526272829282501项目区位总平面图总平面图-西段3.1The ToTal floor plan The ToTal floor plan-WesT secTion3项目区位总平面图3.1The ToTal floor plan 3平面标注:totaL pLane51、 mark:01 橡胶坝02 生态车位03 入口形象广场04 服务站点05 休闲花架06 阳光草坪07 水中栈桥08 滨水栈道09 生态绿岛10 儿童天地11 卫生间12 桥下休闲纳凉区13 休闲步道14 活力运动公园15 生态拦水坝16 澜瀑小聚 17 阶梯小剧场18 树阵广场19 户外烧烤20 亲水绿阶21 集装箱美食街22 亲水平台23 生态花田24 人行栈桥25 生态湿地01 rubber dam 02 ecoLogicaL parking 03 entrance square oF image 04 service site 05 Leisure FLower 06 sun Lawn52、 07 piers in water 08 waterFront pLank road 09 oF ecoLogicaL green isLand 10 chiLdrens heaven and earth 11 toiLet enjoy the cooL area in the 12 bridge 13 recreationaL traiLs 14 vitaLity sports park 15 ecoLogicaL dam 16 rings organ to get-together 17 smaLL Ladder 18 trees,square 19 outdoor barbecue 253、0 pro aqua green order 21 containers Food court 22 pro LeveL units 23 ecoLogicaL FLower FieLd 24 waLkaround 25 ecoLogicaL wetLand 010304020202050706091011111313131214151516171819202122222324250808总平面图-东段The ToTal floor plan-easT secTion3功能分区图3.2functional partition 图例:Legend:滨海入口形象展示区coastaL entranc54、e image dispLay area 活力运动区activity area花田湿地科普区FLower FieLd wetLand science area自然生态区naturaL ecoLogicaL area形象广场节点image pLaza休闲区节点Leisure area运动广场节点sports pLaza科普教育区节点popuLar science education area商业区节点business zone儿童活动区节点chiLdrens activity area景观桥Landscape bridge水轴water axis图例:Legend:自行车租赁点bicycLe r55、entaL poin停车场parking入口entrance 市政道路municipaL road 应急消防通道emergency Fire escape自行车道cycLe path慢跑道jogging area人行步道pedestrian ways人行休闲步道peopLe For Leisure traiL交通分析3.3traffic analysis 33.3.1 综合交通规划图例:Legend:停车场parking机动车道路motor vehicLe road 设置设为 65 个the setting is set to 65 设置设为 252 个the setting is set t56、o 2527 米宽机动车道7 meters wide roads 共设生态车位 433 个set up the ecoLogicaL 433 parking spaces 设置设为 60 个the setting is set to 60设置设为 24 个the setting is set to 24设置设为 32 个the setting is set to 32衔接外部道路bridging externaL road 交通分析3.3traffic analysis 33.3.2 机动车道路及停车位规划交通分析3.3traffic analysis 33.3.3 消防通道规划图例:Lege57、nd:桥洞下穿LittLe tunneL under wear 消防通道Fire escape 衔接外部道路bridging externaL road 交通分析3.3traffic analysis 33.3.4 内部自行车游骑道图例:Legend:桥洞下穿LittLe tunneL under wear 内部自行车骑游道internaL bike riding 衔接外部道路bridging externaL road 自行车租赁点bicycLe rentaL poin交通分析3.3traffic analysis 33.3.5 慢跑道系统规划图例:Legend:桥洞下穿LittLe tun58、neL under wear 慢跑道jogging 衔接外部道路bridging externaL road 交通分析3.3traffic analysis 33.3.6 人行步道系统规划图例:Legend:桥洞下穿LittLe tunneL under wear 人行步道pedestrian space 衔接外部道路bridging externaL road 交通分析3.3traffic analysis 33.3.7 游步道系统规划交通分析3.3traffic analysis 3图例:Legend:桥洞下穿LittLe tunneL under wear 游步道swim traiLs 59、交通分析3.3traffic analysis 33.3.8 道路标准段断面图交通分析3.3traffic analysis 34 米2.4 米游步道自行车+消防通道绿化4 米2.4 米游步道+消防通道绿化自行车a-a 断面a-a section 慢跑道1.2 米1.2 米1.2 米1.2 米7 米2.4 米2.4 米2.4 米慢跑道自行车道步行道步行道绿化绿化车行道慢跑道1.2 米1.2 米7 米2.4 米2.4 米自行车道步行道绿化车行道慢跑道1.2 米1.2 米7 米2.4 米步行道绿化车行道ddeeccaabbb-b 断面b-bsection c-c 断面c-csection e-e 60、断面e-e section d-d 断面d-dsection 322.6020.0021.0015.0012.50图例:Legend:市政道路标高municipaL road eLevation 0.00场地内标高site eLevation 0.00常水位标高constant water LeveL eLevation 0.005 年洪水水位FLood water LeveL oF 5 years 0.0050 年洪水水位FLood water LeveL oF 50 years 0.00河道排水方向river drainage direction地面排水方向surFace drainage61、 direction15.0017.0015.0015.0014.0014.0013.0015.0014.0014.0013.0013.0013.0012.008.0012.1510.008.508.008.008.008.008.007.507.005.209.5011.0010.009.005.503.505.008.008.004.504.204.204.204.004.205.505.455.655.505.506.355.506.007.006.007.002.50设计常水位3.705 年洪水位5.2050 年洪水位4.00设计常水位5.205 年洪水位6.7050 年洪水位6.5062、设计常水位7.705 年洪水位9.2050 年洪水位10.00设计常水位11.105 年洪水位12.5050 年洪水位12.50设计常水位13.605 年洪水位15.0050 年洪水位坝口洪水位标高FLood LeveL oF dam mouth坝口洪水位标高FLood LeveL oF dam mouth坝口洪水位标高FLood LeveL oF dam mouth坝口洪水位标高FLood LeveL oF dam mouth坝口洪水位标高FLood LeveL oF dam mouth竖向分析图3.4the vertical analysis 3图例:Legend:单位:munit:m尺寸63、分析图3.5the vertical analysis 76383024531151401401901903216024663955595316354446595018231231603与城市衔接3.7urban cohesion 图例:Legend:主要入口main entrance次级入口secondary inLet社区界面community interFace民俗文化村落界面FoLk cuLture viLLage interFace三级入口three stage entrance工业区界面industriaL zone interFace商业区界面business district 64、interFace机动车停车场motor vehicLe parking Lot 自行车停车场bicycLe parking Lot人行下穿通道sidewaLk down through the channeL学校界面schooL interFace运动区界面moving area interFace富康商城界面beverLy maLL interFace3防洪分析3.8flood control analysis 常水位线5 年一遇水位线50 年一遇水位线12.50m 15.00 13.605 年洪水位5 years oF FLood LeveL50 年洪水位50 years oF FLoo65、d LeveL12.50设计常水位design high water LeveL12.5011.105 年洪水位5 years oF FLood LeveL50 年洪水位50 years oF FLood LeveL10.00设计常水位design high water LeveL14.0012.605 年洪水位5 years oF FLood LeveL50 年洪水位50 years oF FLood LeveL11.50设计常水位design high water LeveL11.5010.105 年洪水位5 years oF FLood LeveL50 年洪水位50 years oF F66、Lood LeveL9.00设计常水位design high water LeveL9.207.705 年洪水位5 years oF FLood LeveL50 年洪水位50 years oF FLood LeveL6.50设计常水位design high water LeveL6.705.205 年洪水位5 years oF FLood LeveL50 年洪水位50 years oF FLood LeveL设计常水位design high water LeveL4.005.203.705 年洪水位5 years oF FLood LeveL50 年洪水位50 years oF FLood L67、eveL2.50设计常水位design high water LeveLonce water LeveL 50 yearsonce water LeveL 5 yearsoFten the water10.00m9.00m6.50m4.00m2.50m0.00m3开放度及人流密度分析analysis of flow density and opening3.93高密度区域图例 Legend中密度区域低密度区域high density人流密度分析medium densityLow densitytraFFic density anaLysis高密度点high density points中密度点68、medium density points项目区位2卫生间图例 Legend休息廊架自行车驿站停车场餐饮活动场地管理用房 toiLetspend sheLFbicycLe station parkrepastactivity spacemanagement room交通分析3.3traffic analysis 3公共设施规划图3.10the plan of public facilities 33详细设计4.1 入海口慢生活体验区4.2 运动时尚生活区4.3 湿地水生活体验区4.4 浪漫新生活休闲区the detailed desiGnsLow LiFe experience areaspo69、rts Fashion Living areawetLand water LiFe experiencewetLand water LiFe experience4六大核心景观节点BrighT spoT To Build 123456海滨入口形象广场运动公园集装箱美食街滨河花田生态湿地生态草阶广场民俗文化滨水广场waterFront entrance pLazasports parkcontainer Food streethanada riparian wetLands ecoLogicaL grass square FoLk cuLture waterFront pLaza4入海口慢生活体70、验区4.1sloW life experience area 平面标注:totaL pLane mark:01 入口形象广场02 一级服务站点03 野营阳光草坪04 观景平台05 生命之树06 停车场07 入海口08 晨练草地09 湖心浮岛10 儿童乐享乐园11 二级服务站点12 垂钓湾13 亲水木栈道14 桥下休闲空间entrance pLaza imageservice sitesunbathing Lawnviewing pLatFormtree oF LiFeparkingestuarymorning meadowFLoating isLand LakechiLdren parkser71、vice siteFishing baymizuki pro pLankLeisure space under the bridge0104060605091011141207031308024.1.1 放大平面4 链接磁山景区和黄金海岸的重要形象节点 辐射磁山景区、滨海一带游客 important image node Link magnetic mountain resorts and goLd coast 入海口主题雕塑广场theme sculpture plaza 黄金河滨河公园起点 radiation magnetic hiLL area,the coastaL tourist ar72、ea goLd river riverFront park start 游客集散中心 tourist hub磁山磁山山城海hiLLcityseamagnetic hiLLbohai sea黄金河滨海一带渤海bohai sea渤海古现片区citygoLd riverthe Landscapemagnetic hiLL临海入口形象展示区4.1iMaGe display 4作为公园临海段标志广场,及主要集散空间与规划建设的滨海公园连接,亦欲使之成为滨海大桥上的借景景观焦点。南岸靠海区域,从区位上考虑这一区域靠近规划建设中的滨海公园和大规模建设中的高尚住区,必将是人流集聚点,使用者对绿地有运动健身休闲73、等需求主题雕塑 logo 标识增强场地的识别性,作为视觉的聚焦点park as a sign oF the park section,and the main distribution space and the pLanning and construction oF the coastaL park connection,but aLso to make it become the Focus oF the coastaL bridge Landscape.south near the sea area,From the Location considered the region cLo74、se to the pLanning and construction oF coastaL park and Large-scaLe construction in the nobLe settLements,is bound to be a FLow accumuLation,users oF green have sports Fitness and Leisure needs theme scuLpture Logo Logo to enhance the recognition oF the site,as a visuaL Focus4满足周边高端住宅各年龄层人群的活动需求,设置高75、品质健身休闲活动空间以健康与视觉体验为主导的健康慢跑道为周边居民提供高品质的活动场地,提供滨水骑行,穿越生态岛屿与树林等空间感受,让骑行变成一种极致体验。meet the surrounding high-end residentiaL demand activities For aLL agesmarina entrance pLaza contains the image oF the bicycLe rentaL points,starting heaLthy jogging track and park service site 住宅区临海入口形象展示区4.1iMaGe display76、 44通过植入主题雕塑之一“融合”,传达美好寓意。入口形象雕塑与海滨入口广场空间完美的结合在一起,呈现极好的入口形象空间。入口广场向人群提供四通八达的步行条件和丰富的活动可能性entrance image scuLpture conveys the souL oF the entire parkprovide ease oF entrance pLaza to the crowd waLking conditions and the possibiLity oF a weaLth oF activities临海入口形象展示区4.1iMaGe display 44.1.3 透视图临海入口形象展示77、区4.1iMaGe display 4广场主题 logosquare Theme logo风筝草坪运动场KiTe laWn sporTs ground运动健身广场sporTs fiTness plaza生态栏水坝ecological fence dam入海口主题雕塑广场theme sculpture plaza44.1.3 透视图临海入口形象展示区4.1iMaGe display 4一条连续的慢跑步道,贯穿河道始终,沿途创造各种不同的穿行体验a jogging Trail runs Through The river alWays conTinuous,along The Way,creaTe78、 a varieTy of Travel experience入海口主题雕塑广场theme sculpture plaza44.1.3 透视图临海入口形象展示区4.1iMaGe display 4开放的大草坪可以承载很多活动,草坡入水创造较好的亲水性Theme sculpTure of The enTrance plaza of The fusion入海口主题雕塑广场theme sculpture plaza44.1.3 透视图临海入口形象展示区4.1iMaGe display 4一个隐形的玻璃护栏,可以防止孩子接触锈钢板,也不影响观景效果an invisiBle glass fence,yo79、u can prevenT The child from conTacT WiTh rusT,BuT also does noT affecT The vieWing effecT改造河对岸原有硬化驳岸,打造草坡入水生态景观,创造自然的景观效果across The river To creaTe grass slope inTo The WaTer ecological landscape,creaTing a naTural landscape effecT入海口主题雕塑广场theme sculpture plaza44.1.3 透视图临海入口形象展示区4.1iMaGe display 4临80、海入口广场主题雕塑-“融合”Theme sculpTure of The enTrance plaza of The fusion采用船舶甲板造型,锈钢板的使用希望唤起场地记忆,有“甲板观海”之意The ship decK shape,use The sTainless sTeel plaTe in hope of field memory,oBama decK in iTaly入海口主题雕塑广场theme sculpture plaza44.1.3 透视图临海入口形象展示区4.1iMaGe display 4入海口主题雕塑广场theme sculpture plaza44.1.3 透视图临海81、入口形象展示区4.1iMaGe display 4根据观景平台的位置,精心安排,打造浪漫的令人感动生态河道景观according To The locaTion of The vieWing plaTform,carefully arranged To creaTe a romanTic landscape of moving ecological river各种有意思的小雕塑,增强场地的情趣感,营造浪漫休闲的氛围a varieTy of inTeresTing small sculpTure,enhance The TasTe of The siTe,and creaTe a romanTi82、c aTmosphere of leisure入海口主题雕塑广场theme sculpture plaza44.1.3 透视图临海入口形象展示区4.1iMaGe display 4充分考虑周边社区老人,孩子的休憩需求,结合台阶布置舒适的休闲座椅full consideraTion of The surrounding communiTy elderly,childrens leisure needs,comBined WiTh The sTeps To decoraTe a comforTaBle leisure chair通过生态式透水种植池过度运动空间与休憩空间The excessive 83、movemenT space and open space of The ecological WaTer permeaBle planTing pool入海口主题雕塑广场theme sculpture plaza44.1.3 透视图临海入口形象展示区4.1iMaGe display 4运用低碳可持续材料设计公园厕所,考虑外立面材料与环境的协调性,让建筑与环境紧密结合The use of loW carBon susTainaBle maTerial design parK ToileTs,considering The coordinaTion of exTernal maTerials a84、nd environmenT,so ThaT The Building and The environmenT closely通过布局和参与的小型运动设施,增加空间趣味性,吸引人们到公园休闲与娱乐Through The layouT and parTicipaTion of small sporTs faciliTies,increase The space fun,aTTracT people To The parK for leisure and enTerTainmenT入海口主题雕塑广场theme sculpture plaza44.1.3 透视图临海入口形象展示区4.1iMaGe d85、isplay 4营造生态驳岸,打造洪水适应性景观,沿岸植物采用对洪水的适应性较强的植物The consTrucTion of The ecological reveTmenT,Build flood adapTive landscape,coasTal planTs used on flood adapTaBiliTy of planTs入海口主题雕塑广场theme sculpture plaza4临海入口形象展示区4.1iMaGe display 4河道跨河人行桥 01:滨水浮桥在河道较窄的位置布置人行景观桥解决跨河交通问题,丰富水上景观。人行桥的形态充分与周边自然环境融为一体,并尽力考虑乡86、土材料。结合桥头的位置,考虑 Logo 等元素,加强精致感。in The narroW channel layouT of The landscape To solve The proBlem of cross river landscape Bridge,rich WaTer landscape.The form of pedesTrian Bridge is fully inTegraTed WiTh The surrounding naTural environmenT,and Try To consider The local maTBined WiTh The locaTion of87、 The Bridge,consider logo and oTher elemenTs,To sTrengThen The delicaTe sense of.a fooTBridge across The river river WaTerfronT BoardWalK:0144.1.3 透视图临海入口形象展示区4.1iMaGe display 444.1.3 透视图临海入口形象展示区4.1iMaGe display 444.1.3 透视图临海入口形象展示区4.1iMaGe display 444.1.3 透视图临海入口形象展示区4.1iMaGe display 444.1.3 透视图临海88、入口形象展示区4.1iMaGe display 4愿望树广场愿望树广场的设计灵感来自于允诺青年男女寄托美好愿望的许愿树。抽取许愿树自然的形态,充分与周边自然环境融为一体,并尽力材料的耐久性与可持续性。结合愿望树布置灯光,WIFI 等功能,让愿望树成为人们聚集的好场所。The design of The Tree of desire inspired By The promise of The young men and Women of The good Wishes of The Wish Tree.exTracT The naTural form of Wishing Trees,and 89、fully inTegraTed WiTh The surrounding naTural environmenT,and To The duraBiliTy and susTainaBiliTy of The maTBined WiTh The Wishes of The Tree layouT lighTs,Wifi and oTher funcTions,so ThaT The desire To Become a good place for people To gaTher a good place.Wish Tree plaza44.1.3 透视图临海入口形象展示区4.1iMaGe90、 display 4攀爬植物可以提供遮荫效果。“树干”内结合 Wifi 设施布置,提供人们户外办公,上网的功能景观座椅结合花池,可以为人们提供遮荫,休息的场所,同时具备良好的视景角度climBing planTs can provide shade.TrunK comBined WiTh Wifi faciliTies layouT,providing people WiTh ouTdoor office,inTerneT accessseaT WiTh pond landscape layouT,can provide shade for people,a place To resT愿望树广91、场Wish Tree plaza44.1.3 透视图临海入口形象展示区4.1iMaGe display 愿望树广场Wish Tree plaza44.1.3 透视图临海入口形象展示区4.1iMaGe display 愿望树广场Wish Tree plaza44.1.3 透视图4炫彩儿童乐园黄金家园小区南大门区域人流量较大,社区居民对活动空间需求强烈。一个具备想象力的儿童乐园,希望可以为社区的孩子提供一个可以相互玩耍,交流的场所。通过不同的体育,健身设施的引入,可以为不同年龄层的孩子提供娱乐空间,吸引孩子聚集。在儿童乐园的不远处,布局了可以提供成人休息的遮荫设施,让儿童乐园具备复合的功能。gol92、d home disTricT,souTh gaTe area larger Traffic,communiTy residenTs sTrong demand for space acTiviTies.an imaginaTive childrens parK,hoping To provide a communiTy of children can play WiTh each oTher,The exchange of places.Through The inTroducTion of differenT sporTs,fiTness faciliTies,you can provid93、e enTerTainmenT for children of differenT ages,To aTTracT children To gaTher.in childrens parK is noT far aWay,The layouT can provide adulT resT shade faciliTies,so ThaT childrens parK has a complex funcTion.colorful childrens paradise临海入口形象展示区4.1iMaGe display 44.1.3 透视图临海入口形象展示区4.1iMaGe display 炫彩儿94、童乐园colorful childrens paradise44.1.3 透视图临海入口形象展示区4.1iMaGe display 炫彩儿童乐园colorful childrens paradise44.1.3 透视图临海入口形象展示区4.1iMaGe display 炫彩儿童乐园colorful childrens paradise44.1.3 透视图临海入口形象展示区4.1iMaGe display 4炫彩儿童乐园colorful childrens paradise44.1.3 透视图临海入口形象展示区4.1iMaGe display 4炫彩儿童乐园colorful childrens 95、paradise4401030205060407080910111212平面标注:totaL pLane mark:01 活力运动公园02 望潺流03 阶梯小剧场04 澜瀑小聚 05 生态车位06 观景台07 集装箱美食街08 滨水栈道09 林荫大道10 滨水户外烧烤11 亲水绿阶12 亲水平台dynamic sports park Look upon FLow smaLL Ladder to get-together ecoLogicaL parking view jingyicontainer Food court waterFront pLank road bouLevard water96、Front outdoor barbecue pro aqua green order pro LeveL units 4.21 放大平面运动时尚生活区4.2sporTs fashion living quarTers 4一座富有创意的运动公园,将景观与运动完美结合。让运动变得不那么单调,而是富有深深的趣味感。激发生命力与创造力。a creative sports park,the perfect coMbination of landscape and sports.let the MoveMent becoMe not so Monotonous,but full of deep sens97、e of fun.stiMulate vitality and creativity.连续的滨河慢行道柔美而富有韵味。穿越运动时尚生活区并连接其他几个主题分区。慢跑道充分与滨水空间,植物空间结合在一起,创造令人难忘慢跑骑行体验。continuous riverside sloW lane MelloW and full of flavor.throuGh the MoveMent of the livinG area and connected to a nuMber of other theMes partition.JoGGinG road full of Waterfront space98、,coMbined With the plant space to create an unforGettable JoGGinG ridinG experience.依照景观生态学原理设计飞地,具备生态功能,提供生物栖息地,净化水体以及兼具休闲运动功能。in accordance With the principles of landscape ecoloGy desiGn enclave,With ecoloGical function,bioloGical habitat,Water purification and both sports AnD LeISURe FUncTIonS。运99、动时尚生活区sports fashion livinG area4.24运动时尚生活区4.2sports fashion livinG area4平面标注:totaL pLane mark:01 一级服务站点02 极限运动场03 多功能广场04 小型足球场05 篮球场06 乒乓球场07 羽毛球场08 健身活动场09 生态车位10 桥下休闲空间11 望潺流12 阶梯小剧场13 澜瀑小聚14 健康步道service siteextreme sportsmuLtiFunctionaL squaresmaLL soccer FieLdbasketbaLL courttabLe tennisbadmin100、ton courtFitness courseecoLogicaL parking Leisure spaceLook upon FLow Ladder theaterto get-together heaLth traiL020806070504030109121113141044 运动公园因地理位置所致,主要服务对象为北侧的富士康年轻员工、西侧的现有工厂工人以及东侧的住宅小区人群。活动的人群年龄段集中在18-35 岁年轻人。因此绝大多数功能是为这类人群而设置,如篮球、极限运动、足球、乒乓球等,运动公园同时也设置了儿童专属天地以及看护区。整个运动场地合理的设置了荫庇区也体现出人性化。服务站点101、服务于整个运动场地以及场地外的所有人,其中包含了自行车租赁、厕所、婴儿护理、电源、医疗、售卖点等功能。解决:通过合理功能分区,将整个活动场地分为七大功能板块,以满足不同人群活动空间 sports park caused due to their location,services Mainly for the north side of foxconn eMployees,the existinG factory Workers on the West SIDe AnD The eAST SIDe oF The MAIn ReSIDenTIAL AReA oF The cRoWD.PeoPLe102、 AGeS AcTIvITIeS FocUSeD on yoUnG PeoPLe AGeD 18-35.service stations serve the entire sports venues and venues outside of the oWnerdivided into seven FunctionaL缺点:设施陈旧、服务设施不完善disadvantages:outdated FaciLities,service FaciLities,inadequate缺点:运动设施单一,各种人群需要的活动空间划分不明确disadvantages:singLe sports FaciLiti103、es,not young peopLe Like缺点:活动场地过于开阔,没有舒适的活动后放松场地disadvantages:aFter the venue was too wide,no comFortabLe reLaxation space activities富士康厂区FoxconnresidentiaL areaFactory工厂住宅小区儿童活动极限运动小型足球场地服务站点(自行车租赁、厕所、医疗、售卖点等)乒乓球场地交友空间chiLdrens activitiesextreme sportsmaLL FootbaLL FieLdservice sitetabLe tennisFrie104、nds space篮球场地basketbaLL运动时尚生活区4.2sports fashion livinG area0102034活力运动公园场地被红线切分为两块,现场有篮球场,健身器材设施,停车场等,品质差,设施破烂不堪。该区域是一块难得的平坦区域,周边使用人群以富士康为代表的年轻产业工人为主。建议突破红线利用整个场地打造一个功能丰富的运动公园,为市民及产业工人提供有品质的景观运动场地。site is red line seGMentation is divided into tWo blocks,field,the basketball court,fitness equipMent a105、nd facilities,parkinG lot,poor quality,facilities Were in tatters.the reGion is a rare flat area,the surroundinG population to use foxconn as the representative of the younG industrial Workers.it is recoMMended that the red line be used throuGhout the site to create a feature rich sports park,to pro106、vide the public and industrial Workers With the quality of the landscape sports venues.vigor sporTs parK运动时尚生活区sports fashion livinG area4.24运动时尚生活区sports fashion livinG area4.2综合服务站点,以绿色生态为基本理念,采用低碳可持续材料建造。提供公厕、候车、士多店、租车等服务,甚至提供直饮水和免费 Wifi。the site provides coMprehensive services,public toilets,Wai107、tinG,Grocery stores,car rental services,and even provide drinkinG Water and free Wifi.4运动时尚生活区sports fashion livinG area4.2街舞广场,让激扬青春随音乐跳动。广场将打造一个年轻人热爱的街舞活动场地。hip hop square,let the passion of youth beat With the Music.square Will build a younG people love the dance venues.4运动时尚生活区sports fashion liv108、inG area4.2选取最佳观景点,设置的景观平台能看到最为极致的景观。跌水、远处的桥的倒影、对岸的飞地上聚会的欢声笑语隐约飘入耳中,在这里静静的待这就好。select the best vieW of the scenic spots,set up the landscape platforM to see the Most extreMe of the landscape.enclave of drop,far froM the bridGe of reflection,on the other side of the partys lauGhter vaGuely floatinG i109、n the ear,here in the silence,until the.4运动时尚生活区sports fashion livinG area4.2选取最佳观景点,设置的景观平台能看到最为极致的景观。跌水、远处的桥的倒影、对岸的飞地上聚会的欢声笑语隐约飘入耳中,在这里可以享受安静。select the best vieW of the scenic spots,set up the landscape platforM to see the Most extreMe of the landscape.enclave of drop,far froM the bridGe of refle110、ction,on the other side of the partys lauGhter vaGuely floatinG in the ear,here in the silence,until the.4运动时尚生活区sports fashion livinG area4.24运动时尚生活区sports fashion livinG area4.2依照景观生态学原理设计飞地,具备生态功能,提供生物栖息地,净化水体以及兼具休闲运动功能。也提供了小型聚会空间。in accordance With the principles of landscape ecoloGy desiGn encl111、ave,With ecoloGical function,bioloGical habitat,Water purification and both sports and LeISURe FUncTIonS。ALSo PRovIDeS A SMALL GATheRInG SPAce.JUST STAy heRe.vv4运动时尚生活区sports fashion livinG area4.24问题:各种摊贩遍地开花,毫无秩序,卫生安全令人堪忧,家具家人对在这里工作的孩子的安全与未来担忧。disadvantages:a variety oF vendors everywhere,there is112、 no order,saFety and heaLth is worrying,Furniture FamiLy here the chiLdren saFe and worry about the Future.问题:破坏了桥面的通达性,美观性disadvantages:it undermines the integrity oF the bridge,accessibiLity问题:破坏桥的外观,同时污水、垃圾的大量排出严重污染黄金河喝生活:玩 娱吃 生活的本质换种角度也可以分解为吃、喝、玩、娱四种基本需求。“吃”是首选项,民以食为天,吃的情趣、吃的艺术、吃的环境、吃的品味、吃的品种都是人113、们所追求的。满足温饱以后,人更多是对休闲,娱乐与品味等提出更高的要求。the essence oF LiFe can be divided into Four kinds oF basic needs oF eating,drinking,pLaying and entertainment.“eat”is the preFerred option,peopLe on Food,Fun to eat,eat the art,environment to eat,eat the taste,eat variet-ies are pursued by the peopLe.aFter the Foo114、d and cLothing,peopLe are more on the Leisure,entertainment and taste,and put Forward higher require-ments.010203运动时尚生活区sports fashion livinG area4.2 4集装箱美食街container Food street吃 吃的场地一个集装箱二个集装箱三个集装箱四个集装箱多个集装箱吃的氛围吃的品种干净、有趣、有特色利用集装箱组合拼凑打造丰富的立体空间,提供给年轻人享受美食的多重体验一个人的、两个人的、多人的小吃、中餐、西餐.eating venuea cont115、ainertwo containersthree containersFour containersa pLuraLity oF containerseat atmosphereeating speciescLean,Fun,uniqueuse oF containers to create a rich three-dimensionaL spaceone person,two peopLe,more thansnacks,chinese Food,western.运动时尚生活区sports fashion livinG area4.24运动时尚生活区sports fashion livin116、G area4.2平面标注:totaL pLane mark:01 集装箱美食街02 聚会平台03 观景走廊04 亲水栈道05 树阵大道06 亲水绿阶07 节点广场08 烧烤区09 花田艺术景观10 绿心Food streetLand-party pLatFormscenic corridorhydrophiLic pLanktree array avenuepro aqua green order node squarebarbecue areahanadagreen heart060403050807020110094运动时尚生活区sports fashion livinG area4.2117、低成本开发的集装箱休闲餐饮街区,采用可回收的集装箱建筑,为人们提供一个绿色的,干净舒适的餐饮、休闲场地。loW cost developMent of the container leisure caterinG block,to provide people With clean and coMfortable dininG,leisure venues.广场改造为多种活动提供场地,夜市、烧烤甚至跳蚤市场,方便周边居民,也让地块更具生活化,也更具品质。square transforMation to provide a variety of activities to provide ven118、ues,niGht Markets,barbecue and even the flea Market,to facilitate the surroundinG residents,but also to Make the land More livinG,but also More quality.vv44.2.3 透视图低碳可持续的集装箱建筑为人们传递一个绿色的理念,代表着未来的生活。将促使人们自自发参与到对河岸的环境保护行动中来。loW carbon sustainable container architecture for people to pass a Green idea,r119、epresents the future of life.Will cause people to participate in the environMental protection of the river bank.运动时尚生活区sports fashion livinG area4.24运动时尚生活区sports fashion livinG area4.244.2.3 透视图运动时尚生活区sports fashion livinG area4.244.2.3 透视图运动时尚生活区sports fashion livinG area4.244.2.3 透视图运动时尚生活区sports120、 fashion livinG area4.244.2.3 透视图运动时尚生活区sports fashion livinG area4.244.3.1 放大平面平面标注:totaL pLane mark:01 人行桥节点02 人行栈桥03 生态拦水坝04 生态亲水栈道05 花田艺术景观06 恋爱岛07 生态湿地08 林荫大道09 祈福庙10 生态绿岛11 阳光草坪12 叠级草坪13 景观栈桥01 Footbridge node 02 waLkaround 03 ecoLogicaL dam 04 hydrophiLic pLank road 05 FLower FieLd Landscape0121、6 Love isLand 07 ecoLogicaL wetLand 08 bouLevard 09 earth tempLe 10 oF ecoLogicaL green isLand 11 the Lawn 12 LeveL the Lawn 13 Landscape pier 010204050309101312110707070806湿地水生活体验区4.3WeTland WaTer life experience 4保险粉工厂二氧化硫so2h2sh2sso2so2硫化氢滨河花田生态湿地hydrosuLFite pLanthanada riparian wetLands花田滨河花田生态122、湿地hanadahanada riparian wetLands建议拆除南侧保险粉工厂通过生态湿地下游的蓄水调洪,有效的缓解了周围枯水期断流的问题补植净化空气的树种、水生植物,达到净化空气、涵养水源,恢复生物多样性的目的培植各色鲜花田地,吸引蝴蝶、蜻蜓等小动物,为小朋友提供一个体验大自然的场所recommend dismantLing the south hydrosuLFite pLantFLood water,eFFectiveLy aLLeviate the probLem oF drying up during the dry season aroundrepLanting trees123、 puriFy the air,aquatic pLantscoLorFuL FLowers cuLtivated FieLds,attract butterFLies,dragonFLies and other smaLL animaLs湿地水生活体验区4.3WeTland WaTer life experience 4湿地水生活体验区4.3WeTland WaTer life experience 4湿地水生活体验区4.3WeTland WaTer life experience 4平面标注:totaL pLane mark:01 入口景观02 一级服务站点03 停车场04 特色景观廊架0124、5 休憩绿阶06 观景构筑07 树阵绿廊08 邻里空间09 休闲廊架10 阳光草坪11 折叠草阶12 儿童天地13 生态栈桥14 健康步道15 亲水平台16 生态拦水坝entrance viewservice siteparkingview gaLLery Frameopen green orderthe view to construct tree array pergoLathe neighborhood casuaL gaLLery Framesunbathing LawnFoLding grass orderchiLdrens heaven and earth ecoLogicaL t125、restLeheaLth traiLpro LeveL units ecoLogicaL dam 111316161514120705030201070806100904浪漫新生活休闲区4.4WeTland WaTer life experience 4富士康小学Foxconn primary紧邻富士康小学,大片的草坪为孩子的课外活动增加了更多的可能性自然科普、欢乐天地、画画写生、活动比赛、放风筝.Foxconn adjacent primary schooL,a Large Lawn For the chiLdrens extracurricuLar activities increased126、 more possibiLitiesnaturaL science,happy worLd,painting painting,game activities,kite FLying.浪漫新生活休闲区4.4WeTland WaTer life experience 4010202030506080401平面标注:totaL pLane mark:01 折叠草阶02 阳光草坪03 健康步道04 休闲廊架05 生态栈桥06 节点广场FoLding grass ordersunbathing LawnheaLth traiLcasuaL gaLLery FrameecoLogicaL trestL127、enode square浪漫新生活休闲区4.4WeTland WaTer life experience 4浪漫新生活休闲区4.4WeTland WaTer life experience 4浪漫新生活休闲区4.4WeTland WaTer life experience 4浪漫新生活休闲区4.4WeTland WaTer life experience 4古现文化村ancient cuLture viLLage古县村布局开敞表演空间表演场地gu towns LayoutperFormance spacevenues基地紧邻古县文化村,但现有的村落布局极具限制性,没有大型的开敞活动空间,以至于128、当地原住民没有文化节日表演场地。人们需要一个开敞的统一活动场所,供节日举办活动及表演等.base cLose to ancient county cuLturaL viLLage,but the existing viLLage Layout very restrictive,there is no Large-scaLe open space浪漫新生活休闲区4.4WeTland WaTer life experience 410111308070605151412090304021601平面标注:totaL pLane mark:01 入口特色 Logo02 小景墙03 一级服务站04 停车129、场05 特色廊架06 树阵广场07 小剧场08 特色观景瞭望台09 阳光草坪10 树阵绿廊11 节点休息平台12 休闲步道13 生态拦水坝14 节点小广场15 观景台16 健康步道entranceLittLe king waLLservice stationparkingFeatures gaLLery FramepLace the tree arraysmaLL theaterLookoutsunbathing Lawntree array pergoLarest pLatFormrecreationaL traiLsdamsnode smaLL squareLookoutheaLth tr130、aiL浪漫新生活休闲区4.4WeTland WaTer life experience 4浪漫新生活休闲区4.4WeTland WaTer life experience 4浪漫新生活休闲区4.4WeTland WaTer life experience 4浪漫新生活休闲区4.4WeTland WaTer life experience 4浪漫新生活休闲区4.4WeTland WaTer life experience 4浪漫新生活休闲区4.4WeTland WaTer life experience 4浪漫新生活休闲区4.4WeTland WaTer life experience 4浪漫新131、生活休闲区4.4WeTland WaTer life experience 4浪漫新生活休闲区4.4WeTland WaTer life experience 项目区位2专题设计5.1 河道生态化改造专项5.3 现状桥梁改造5.2 现状道路生态化改造5.4 植物绿化设计5.5 河道景观照明设计5.6 导视系统选型5.7 城市家具选型proJect desiGn the ecoLogicaL revetment renovation situationcurrent situation oF bridge reconstructionecoLogicaL reconstruction oF cu132、rrent situationpLant greening designriver Landscape Lighting designLandscape vi system designcity Furniture seLection5项目区位河道生态化改造专项river ecoloGical reconstruction proJect5.15生态堤坝钢坝ecoLogicaL damsteeL dam河道防洪为 50 年一遇FLood controL to 50 years生态堤防 4 座4Ecological dikE 护坡为 1:3,种植地被、中小型灌木灯景观植物,堤防美观Slope o133、f 1:3,being planted,Small and medium Sized Shrub lamp landScape plantS,beautiful embankment实现双向挡水、灵活启闭、闸门开度无级可调、方便调度、工程隐蔽、无碍防汛和通航,改善河道景观Bidirectional retaining,flexiBle opening and closing,improve river landscape枯水期与平水期时保持河中常年有水,形成溪河景观Dry season to maintain the water level of the river with the pere134、nnial water,forming a river lanDscape亲水平台按 5 年一遇洪水位设置,平时人可到河边,形成人与自然、水体和谐的亲水人文景观,打造滨河美景。汛期时停止使用,设立警告牌HydropHilic platform by 5-year flood bit is set,tHe formation of man and nature,water and Harmonious cultural landscape HydropHilic钢坝 1 座Steel dam 防洪措施Flood Control 景观河段总长度约 4.2kmtotal length of abou135、t 4.2CM防洪框图规划提顶规划堤顶规划堤顶规划堤顶规划堤顶6.79m8.70m11.76m15.57m17.60m50 年一遇水面线50 年一遇水面线50 年一遇水面线50 年一遇水面线50 年一遇水面线4.10m5.60m8.43m12.05m14.03m设计常水位设计常水位设计常水位设计常水位设计常水位2.50m4.00m6.50m10.00m12.50m5 年一遇水面线5 年一遇水面线5 年一遇水面线5 年一遇水面线5 年一遇水面线2.44m3.88m6.94m10.67m12.70m规划河底规划河底拦水坝断面拦水坝断面拦水坝断面河道纵断面channeL proFiLedam sec136、tiondam sectiondam sectiondam sectiondam section拦水坝断面拦水坝断面规划河底规划河底规划河底0.94m2.70m5.57m9.57m11.60m横断面项目区位河道生态化改造专项river ecoloGical reconstruction proJect5.15常水位线5 年一遇水位线50 年一遇水位线原规划蓝线once water LeveL 50 yearsthe originaL pLan oF the bLue Lineonce water LeveL 5 yearsoFten the water项目区位河道生态化改造专项river ec137、oloGical reconstruction proJect5.155 年、50 年一遇淹没范围变化图20.8020.8014.9514.0312.059.949.168.436.825.605.324.924.102.1817.0017.4015.4315.6512.7510.0012.158.708.708.008.007.505.506.006.00建筑、景观小品、自行车道、公园主路均在 50 年一遇淹没线上5 years,50 years submerged range diagramarchitecture,Landscape sketches,bike paths,parks a138、nd the main road were FLooded in 50 years onLine道路标高50 一遇水面标高5 年一遇淹没区域50 年一遇淹没区域5-year return FLooded area50-year return FLooded areain case oF a water surFace eLevation oF 50road eLevation项目区位河道生态化改造专项river ecoloGical reconstruction proJect5.15河道断面设计 achanneL design oF section a雨水种植沟休闲平台自然绿化护岸自然绿化护139、岸游览步道人行道+跑步道机动车道人行道绿化河床自行车道绿化5 年洪水位5 yeARS oF FLooD LeveL50 年洪水位50 yeARS oF FLooD LeveL设计高水位desiGn hiGh Water level16.00m17.00m13.70m12.50m17.00m过水断面 A项目区位河道生态化改造专项river ecoloGical reconstruction proJect5.15河道断面设计 bchanneL design oF section b绿化带架空平台+自然绿化护坡自然绿化护坡休闲平台人行道跑步道机动车道人行道雨水种植沟雨水种植沟河床+廊桥自行车道绿化140、9.00m17.00m7.50m4.00m7.50m10.15m5 年洪水位5 yeARS oF FLooD LeveL50 年洪水位50 yeARS oF FLooD LeveL设计高水位desiGn hiGh Water level过水断面 B项目区位河道生态化改造专项river ecoloGical reconstruction proJect5.15河道断面设计 cchanneL design oF section c7.15m4.30m7.15m4.20m2.50m2.50m绿化自然绿化护坡绿化游览步道跑步道+人行道机动车道人行道绿岛雨水种植沟绿岛河床河床雨水种植沟机动车道人行道+跑141、道人行道5 年洪水位5 yeARS oF FLooD LeveL50 年洪水位50 yeARS oF FLooD LeveL设计高水位desiGn hiGh Water level过水断面 c项目区位河道生态化改造专项river ecoloGical reconstruction proJect5.15现状断面形式一:驳岸硬质较多,有两级平台,坡度较缓,植物生长一般。现状断面形式三:驳岸现状林长势较好,有两级平台,坡度较大,植物生长茂盛。status quo section three:present situation of forest revetment are growing well142、,there are two platforms,steep,lush plant growth.status quo section two:present situation of forest revetment is sparse,only one platform,steep,lush plant growth disorder.section form of the status quo:there are two more hard revetment,platform slope is relatively slow,the general growth of plants.现143、状断面形式二:驳岸现状林稀疏,仅有一级平台,坡度陡,植物生长杂乱茂盛。项目区位河道生态化改造专项river ecoloGical reconstruction proJect5.15自然驳岸占 92%硬质驳岸占 8%现状堤岸status quo oF the bank5 年洪水位(2.44M)5 yeARS oF FLooD LeveL50 年洪水位(4.10M)50 yeARS oF FLooD LeveL设计常水位(2.50M)desiGn hiGh Water level50 年洪水位50 yeARS oF FLooD LeveL设计常水位desiGn hiGh Water level河144、道护堤生硬,形式单调。对原有缓坡岸线加以利用,打造观赏性体验景观场所。overaLL terrain is FLat and LeveL,LeveL are rich enough.to make use oF the originaL sLope shoreLine,creating ornamentaL Landscape experience.现状堤岸:revetment with pLatForm:现状断面current sectionk设计断面design section4.50m项目区位河道生态化改造专项river ecoloGical reconstruction proJect145、5.15自然驳岸占 92%硬质驳岸占 8%现状堤岸status quo oF the bank50 年洪水位50 yeARS oF FLooD LeveL设计常水位desiGn hiGh Water level河道护堤生硬,形式单调。对原有缓坡岸线加以利用,打造阶梯坡岸,建设洪水性适应景观场所。overaLL terrain is FLat and LeveL,LeveL are rich enough.gentLe sLope oF the originaL shoreLine to expLoit,make Ladder bank,construction oF FLood controL146、 and water to adapt to the Landscape.现状堤岸:revetment with pLatForm:5 年洪水位(5.41M)5 yeARS oF FLooD LeveL50 年洪水位(6.82M)50 yeARS oF FLooD LeveL设计常水位(4.00M)desiGn hiGh Water level现状断面current sectionk设计断面design section10.23m8.00m项目区位河道生态化改造专项river ecoloGical reconstruction proJect5.15自然驳岸占 92%硬质驳岸占 8%现状堤岸s147、tatus quo oF the bank现状断面current sectionk设计断面design section5 年洪水位 (12.7M)5 yeARS oF FLooD LeveL50 年洪水位(14.03M)50 yeARS oF FLooD LeveL设计常水位(12.5M)desiGn hiGh Water level河道护堤生硬,形式单调。采用缓坡型自然驳岸,配合植物,到达稳定河岸的目的,渗透强,能实现多种生物共生与繁殖。overaLL terrain is FLat and LeveL,LeveL are rich enough.gentLe sLope type natu148、raL revetment is suitabLe to the pLants,and reach the purpose oF the stabiLity oF the banks,permeabiLity is strong,can achieve a variety oF bioLogicaL symbiosis and breeding.现状堤岸:revetment with pLatForm:50 年洪水位50 yeARS oF FLooD LeveL设计常水位desiGn hiGh Water level16.00m14.50m项目区位河道生态化改造专项river ecoloGic149、al reconstruction proJect5.15自然驳岸占 92%硬质驳岸占 8%坡岸形式 1:阶梯驳岸:坡岸形式 4:缓坡阶梯复合驳岸:坡岸形式 5:砌块形自然驳岸:坡岸形式 2:带平台驳岸:坡岸形式 3:缓坡型自然驳岸:bank Form 1:Ladder revetment:bank Form 4:gentLe sLope Ladder composite:bank Form 4:bLock shape naturaL revetment:bank Form 2:revetment with pLatForm:bank Form 3:gentLe sLope type natu150、raL revetment:人工构筑石质台阶入水,结合自然景石及水生植物,形成半自然活动空间,增加河流的亲水性。打造开敞式,生态休闲空间,适合地势平坦及宽阔的区域。起到保持水土流失,净化水源的作用。冲蚀较严重的坡度河岸,通过植物植被,结合天然石材等,加大河道行洪力度,置石、耐涝、草灌及水生植物搭配形成湿地环境。休闲活动平台伸入水中在增强了亲水性同时,减少对生态环境的破坏,为生物多样性,提供了空间。适用于坡度较缓的河段,配合植物,到达稳定河岸的目的,渗透强,能实现多种生物共生与繁殖。artiFiciaL construction steps such as water,combined with151、 the naturaL stone and aquatic pLants,becomes a naturaL activity space,increase the hydrophiLicity oF rivers.buiLd open type,ecoLogicaL Leisure space,suitabLe For FLat and wide area.keep the soiL and water Loss,the roLe oF puriFying water.the sLope oF the banks with severe erosion,through pLant vege152、tation,combined with the naturaL stone materiaL and so on,increase the intensity oF FLood discharge in river courses,pLacing stone,waterLogging resistance,grass irrigation and aquatic pLant coLLocation Formation wetLand environment.Leisure activities pLatForm in water in enhance the hydrophiLicity a153、nd at the same time,reduce the damage to the ecoLogicaL environment,For biodiversity,provides the space.is suitabLe For the sLope oF a sLow river,vegetaL,reach the purpose oF the stabiLity oF the banks,permeabiLity is strong,can achieve a variety oF bioLogicaL symbiosis and breeding.项目区位河道生态化改造专项riv154、er ecoloGical reconstruction proJect5.15field reconstruction desiGn桥梁改造bridge reconstruction亲水平台hydrophilic platform现状图片now picture项目区位河道生态化改造专项river ecoloGical reconstruction proJect5.15工厂外改造outside the factory transformation栈桥Zhanqiao现状图片now picture项目区位河道生态化改造专项river ecoloGical reconstruction proJ155、ect5.15密林改造forest transformation绿道Green road现状图片now picture项目区位河道生态化改造专项river ecoloGical reconstruction proJect5.15祈福庙tudeMiao现防洪堤改造reconstruction of flood control embankment栈桥Zanqiao现状图片now picture项目区位河道生态化改造专项river ecoloGical reconstruction proJect5.15桥头休闲区改造reconstruction of leisure area at bridg156、e head现状图片now picture项目区位河道生态化改造专项river ecoloGical reconstruction proJect5.15休闲平台+挑台区transformation of sports field square构筑物structure构筑物structure现状图片now picture项目区位河道生态化改造专项river ecoloGical reconstruction proJect5.15field reconstruction desiGn现状闸坝口transformation of sports field square幸福的生活happy lif157、e现状图片now picture项目区位河道生态化改造专项river ecoloGical reconstruction proJect5.15道路透水铺装 植草沟 市政人行道、慢跑道、自行车道及人行休闲步道优先选用透水铺装,结合植草沟对雨水可起到,过滤、净化、涵养水源等效果,雨水通过渗透还对洪水起到防范作用。municipaL pavements,jogging,bicycLe Lanes and pedestrian recreationaL traiLs preFerabLe permeabLe pavement,in combination with pLant caogou For 158、rain has,FiLtration,puriFication,water conservation eFFect,such as rain through to prevent FLood.在地势开阔且较平缓的地方设置绿地草沟过滤带,防止雨水对驳岸的冲刷,起到涵养水源,净化水源的作用。in the open and more gentLe pLace set up green caogou FiLtering beLt,prevent the rain erosion oF revetment,water conservation,water puriFication eFFect.雨水花159、园/生态洼地绿地沟过滤带示意道路透水铺装 植草沟示意rain garden/ecoLogicaL depressionpermeabLe pavement road pLant caogou motioned green channeL FiLter beLt permeabLe pavement road pLant caogou 降雨降雨进水管溢水管植草沟pLant caogou 排水流向drainage FLow 蒸发蒸发蒸发蒸发渗透渗透渗透渗透渗透渗透过滤项目区位ecoloGical reconstruction of current situation5现状道路生态化改造5.2pro160、posedexisting下渗infiltration下渗infiltration下渗infiltration片流sheet flow蒸发evaporation生态停车场ecological parking 现状图片current situation.项目区位ecoloGical reconstruction of current situation5现状道路生态化改造5.2proposedexisting下渗infiltration下渗infiltration片流sheet flow片流sheet flow蒸发evaporationexisting现状图片current situation.161、雨水种植池rainwater planting pool项目区位ecoloGical reconstruction of current situation5现状道路生态化改造5.2proposedexisting下渗infiltration下渗infiltration下渗infiltration片流sheet flow蒸发evaporation现状图片current situation.雨水种植池rainwater planting pool项目区位ecoloGical reconstruction of current situation5现状道路生态化改造5.2proposcdpropo162、sedexisting蒸发蒸发下渗infiltrationevaporationevaporation片流sheet flow下渗infiltration下渗infiltration现状图片current situation.塑胶跑步道plastic runner项目区位ecoloGical reconstruction of current situation5现状道路生态化改造5.2运动场广场改造transformation of sports field square服务建筑service building现状图片now picture项目区位ecoloGical reconstruct163、ion of current situation5现状道路生态化改造5.2商业街改造commercial street reconstruction户外停车位parking space现状图片now picture项目区位ecoloGical reconstruction of current situation5现状道路生态化改造5.2项目区位current situation of bridGe reconstruction55.3 现状桥梁改造海滨路黄金河桥外立面改造建议the Golden bridge facade suggest beach road4.1.3 灯光夜景现场照片意向164、图scene photosintention graph1 号桥梁修复缺点:桥梁亮化欠缺,整体感不够,栏杆样式过于复杂。解决策略:进行亮化工程,对栏杆进行简化,桥下增设活动休息空间。disadvantages:Lack oF bridge Lighting,the overaLL sense is not too compLicated,raiLing styLes.1 bridge repairsoLution:Lighting projects,to simpLiFy the bridge raiLing,the movabLe space For rest.项目区位current sit165、uation of bridGe reconstruction55.3 现状桥梁改造现场照片scene photos4.1.3 灯光夜景bridGe reconstruction意向图intention graph2 号桥梁修复缺点:桥上多板房棚户区,存在安全隐患,影响行人车辆通行,栏杆品质较低,夜景亮化欠缺,整体性不够。解决策略:保护性修复,恢复完善交通功能和景观功能,进行亮化工程装点璀璨河道景观。drawback oF the bridge:bridge on board oF the shanty towns,there is a potentiaL saFety hazard,inFL166、uence oF pedestrian traFFic,raiLing Lower quaLity,nightscape Lighting Lack,integrity is not enough.2 bridge repairsoLution:protection oF repair and restore perFect traFFic Function and Landscape Function,Lighting engineering decorated bright river Landscape.项目区位current situation of bridGe reconstruc167、tion55.3 现状桥梁改造4.1.3 灯光夜景bridGe reconstruction现场照片意向图scene photosintention graph3 号桥梁修复缺点:桥梁栏杆品质低劣,桥面脏乱差,解决策略:保护性修复桥梁,提升栏杆品质,替换桥梁外立面材质,增加桥梁亮化工程disadvantages:poor quaLity oF bridge deck raiLing,dirty and messy3 bridge repairdisadvantages:poor quaLity oF bridge deck raiLing,dirty and messy项目区位current 168、situation of bridGe reconstruction55.3 现状桥梁改造5植物绿地设计5.4plant Green space desiGn55林带边缘隔离背景林向草坪的过渡空间,具有季相变化的落叶树及观赏草,并考虑果树及开花灌木。树林的边缘,用多层次的灌木精致收边,视觉上丰富了观赏层次。特色景观重要的入口及节点景观,采用疏朗、简洁、大片的种植观赏植物,形成大体量的色带及种植区域,视觉上醒目,识别性强。规则种植 以规则种植为主,成行列及整列的种植形式,在人行道路及活动场地提供绿茵并形成,大气有序的空间。疏林草地 微微起伏的草坡上,点植冠幅较大的乔木,他们像是从背后的树林走出的169、热情者,把自己展示在人前。姿态优美的大树,仿佛在草坪上撑开大一把把大伞,尽享绿茵带来的激情的同时,体会丝丝凉意常绿背景林常绿树不规则的种植形成大体块、多层次的组团空间,对于各个功能场地,起到围合、遮挡的作用,形成一个个由植物分隔的功能空间。亦能为边缘提供强烈绿色标志。多种层次配置的乔木为人行道与公园之间提供视觉上的联系湿地 Wetland耐湿植物不规则种植,有强烈季节色彩对比的落叶植物和常绿相组合。沿步道的秋叶倒影水中,大量种植有生态价值的水生植物植物绿地设计5.4plant Green space desiGn55.4.2 生态层次渐变行道绿化及背景林行道绿化及背景林常绿密林常绿密林观赏林林170、下灌木花卉观赏林林下灌木花卉湿地植物岸生植物疏林草地植物绿地设计5.4plant Green space desiGn55.2.3 植物配置图表-乔木耐碱性耐水性耐阴性耐寒性抗病虫害滞尘性抗风性抗H2S、SO2部位颜色时间Pinus thunbergii黑松Pinus bungeana白皮松枝干斑驳Cedrus deodara雪松 监测姿态Sabina chinensis cv.Kaizuca龙柏姿态Picea asperata云杉姿态Pinus tabuliformis Carrire油松姿态Magnolia Grandiflora广玉兰花白5-6月Ligustrum lucidum大叶女贞171、花白5-7月Metasequoia glyptostroboides水杉叶黄9-11月Catalpa bungei楸树花粉5-6月Ginkgo biloba银杏叶黄9-11月果粉8-9月叶红3-4月、9-11月叶红3-4月、9-11月花黄6-8月果红9-10月Celtis bungeana小叶朴姿态Fraxinus pennsylvanica洋白蜡叶黄9-11月花白6-7月叶黄9-11月花白4月叶白、绿Melia azedarach苦楝花紫4-5月Quercus dentata 槲树z叶红10-11月Diospyros lotus君迁子果橘9-10月Pistacia chinensis黄连木叶172、红10-11月Swida walteri毛梾木叶红10-12月Platanus orientalis Linn.法国梧桐姿态Salix babylonica垂柳姿态Paulownia tomentosa毛泡桐花紫4-5月Albizia julibrissin合欢花红6-7月Acer mono五角枫叶红3-4月、9-11月花黄6月叶黄10-12月花红5-6月叶红9-11月Michelia alba白玉兰监测花白3-5月z 黄栌鹅掌楸Pyrus betulifolia杜梨Cotinus coggygriaLiriodendron chinenseKoelreuteria paniculata国槐S173、ophora japonica栾树观赏性养护特性吸引野生动物生长速度乔木臭椿Ailanthus altissima原生中文名品种Prunus Cerasifera紫叶李叶紫全年Malus micromalus西府海棠花粉4-5月花红5-10月果9-10月Amygdalus triloba榆叶梅花粉4-5月石榴Punica granatum植物绿地设计5.4plant Green space desiGn5耐碱性耐水性耐阴性耐寒性抗病虫害滞尘性抗风性抗H2S、SO2部位颜色时间Sabina procumbens(Endl.)Iwata铺地柏Mahonia fortunei狭叶十大功劳叶红全年果红174、5-11月Pittosporum tobira海桐花白3-5月果红8-11月Sorbaria sorbifolia珍珠梅花白7-8月Syringa oblata紫丁香花紫4-5月花白5-6月果红8-10月Rosa xanthina黄刺玫 花黄4-6月Chaenomeles speciosa 贴梗海棠花红3-5月Kerria japonica棣棠花黄4-5月Spiraea salicifolia绣线菊花粉6-8月Hydrangea paniculata var.grandiflora大花水桠木监测花粉9-10月Elaeagnus pungens胡颓子叶银白全年Amorpha fruticosa 175、紫穗槐花紫全年Jasminum nudiflorum迎春花黄3-5月Hibiscus syriacus 木槿花粉7-10月Cercis chinensis紫荆花紫3-4月果白8-10月枝干红全年Ligustrum vicaryi小叶女贞叶黄全年Parthenocissus tricuspidata地锦叶红9-12月Buxus megistophylla大叶黄杨zBuxus sinica黄杨Rosa chinensis月季 花各色全年Lagerstroemia indica紫薇花紫、红6-9月Viburnum opulus木本绣球花白5-6月Pyracantha fortuneana火棘南天竹红176、瑞木Swida alba灌木Nandina domestica金银木Lonicera maackii 观赏性养护特性吸引野生动物生长速度原生中文名品种5.4.3 植物配置图表-灌木植物绿地设计5.4plant Green space desiGn55.2.3 植物配置图表-草坪 水生植物 草花耐碱性耐水性耐阴性耐寒性抗病虫害滞尘性抗风性抗H2S、SO2部位颜色时间Clematis florida铁线莲花白、紫1-2月Kochia scoparia地肤形态Brassica oleracea var.acephala红花酢浆草叶紫、红全年Allium giganteum大花葱花紫5-7月Hylot177、elephium erythrostictum八宝景天花紫、红8-9月Liatris spicata蛇鞭菊花紫7-8月Dianthus chinensis石竹花白、粉、红5-6月Salvia japonica鼠尾草花紫6-9月Cosmos bipinnata波斯菊花白、粉、紫6-8月Bellis perennis雏菊花粉5-6月Calendula officinalis金盏菊花橘3-6月Cleome spinosa醉蝶花花白、紫6-9月Callistephus chinensis翠菊花蓝、紫5-10月Hemerocallis fulva萱草花黄5-10月Ophiopogon japonicus178、 麦冬叶全年Iris tectorum鸢尾花白、紫4-6月Hosta plantaginea玉簪花白7-9月Orychophragmus violaceus二月兰花白、紫3-4月Viola philippica紫花地丁花紫4-9月Iris pseudacorus黄菖蒲花黄5-6月Nelumbo nucifera荷花花各色6-9月Nymphaea tetragona睡莲花各色5-8月Thalia dealbata再力花花紫4-10月Lythrum salicaria千屈菜花紫7-9月Pennisetum alopecuroides 狼尾草叶Miscanthus sinensis细叶芒叶Loliu179、m perenne黑麦草Festuca elata 高羊茅Poa annua早熟禾草坪/水生植物/草花观赏性养护特性吸引野生动物生长速度原生中文名品种植物绿地设计5.4plant Green space desiGn55.2.4 植物季相春季春天气温回升,树枝冒出新芽嫩叶,开花树此时在无叶的枝桠上绽放花朵,如玉兰,海棠,桃树,樱花、红花酢浆草、连翘植物的季相性变化是借着常绿与落叶树季相的变化带出不同的色彩,常绿植物油松、黑松、雪松、龙柏,大叶女贞、黄杨等常绿植物做个整个植物系统的骨干,它们在四季中恒定不变,春、夏、冬三季高中低开花植物,穿插在植物结构中,四时景观演替,形成“三季有花,四季常绿”180、的生态景观冬季寒冷的冬季,植物都盖上一层厚厚的银装束裹,苍茫的白色大地上还有腊梅和红梅傲雪绽放夏季炎热的夏日,大部分树木都批满深浅色绿荫,而香花槐,栾树,槐花,石榴,千屈菜、鸢尾、荷花、绣线菊的花将由初夏至秋天秋季落叶的树叶脱落前都将先转红或黄,在常绿背景林的衬托下,突显其秋色。秋色叶的植物有银杏,马褂木,元宝枫,黄连木植物绿地设计5.4plant Green space desiGn55.4.5 驳岸和台地植物处理自然驳岸占 85%自然驳岸植物意向硬质驳岸植物意向台地驳岸植物意向硬质驳岸占 8%台地驳岸占 7%植物绿地设计5.4plant Green space desiGn55.4.6 乡181、土树种黄连木pistacia chinensis bunge乡土树种,喜光,适应性强,耐干旱贫瘠,深根性,对二氧化硫、氯化氢、煤烟抗性较强。可做庭荫树、行道树、孤植大树,也可大片栽植构成秋色红叶林,与槭树、枫香等混植。毛棶cornus walteri乡土树种,在烟台诸多县市有百年以上的古树,对土壤要求不严,病虫害少,在排水良好、土层深厚的中性砂质土壤中生长较好,较耐干旱脊薄。适宜作行道树、庭荫树,亦可配植于草坪、林缘、路边使人产生清新、亮丽之感。小叶朴celtis bungeana bl乡土树种,喜光,稍耐荫、耐寒,喜深厚、湿润的中性黏质土壤,深根性,萌檗力强,生长较慢,寿命长。对病虫害、烟尘182、污染抗性强。可孤植、丛植作庭园树。樗ailanthus altissima俗名臭椿,乡土树种,关于樗树的栽植和生长在烟台有悠久的历史。喜光,不耐荫,适应性强,耐寒,耐旱,不耐涝。深根性。园林绿化中可孤植、丛植或与其他树种混栽,作工厂、矿区的绿化树。楸树catalpa bungei c.a.Mey.乡土树种,喜光,较耐寒。耐烟尘,抗有害气体能力强,树形优美,花淡红素雅,有悠久的栽培历史,优良的抗性是改善环境、隔音除尘的良好树种园林绿化中可孤植、丛植或与其他树种混栽。槲树quercus dentata thunb.乡土树种,强阳性树种,喜光、耐旱、抗瘠薄,适宜生长于排水良好的砂质壤土。树干挺直,叶183、片宽大,树冠广展,寿命较长,叶片入秋呈橙黄色且经久不落,可孤植、片植或与其他树种混植,季相色彩极其丰富。国槐sophora japonica linn.乡土树种,在烟台有悠久的栽培历史。喜光而稍耐荫,树干挺直,叶片宽大,树冠广展,对土壤要求不严,在酸性至石灰性及轻度盐碱土。对二氧化硫和烟尘等污染的抗性较强。在园林绿化中,可做行道树,片植,或大树孤植。君迁子diospyros lotus l.喜光,也耐半荫,较耐寒,既耐旱,也耐水湿。喜肥沃深厚的土壤,较耐瘠薄,对土壤要求不严,有一定的耐盐碱力抗二氧化硫的能力较强。在园林配置中,可做行道树,或坡地片植。植物绿地设计5.4plant Green s184、pace desiGn55.4.7 耐盐碱植物品种刺槐 Robinia pseudoacacia L.山杏 Armeniaca sibirica(L.)Lam珍珠梅 Sorbaria sorbifolia(L.)女贞 Ligustrum lucidumBrLam地肤 Kochia scoparia(L.)Schrad.丝兰 yucca smallianaDcSchrad.锦带花 Weigela florida(Bunge)A.Dc.单叶蔓荆 vitex rotundifolia DcSchrad.山楂 crataegus pinnatifida Bunge火炬树 Rhus TyphinaBun185、ge紫丁香 Syringa oblata Lindl.龙柏 Platycladus orientalis(L.)柽柳 Tamarix chinensis Lour栾树 Koelreuteriapaniculata泡桐 PaulowniaSieb苦楝 Melia azedarach楸树 Melia azedarach臭椿 Ailanthus altissima耐盐碱-乔木耐盐碱-亚乔耐盐碱-灌木、地被植物绿地设计5.4plant Green space desiGn55.2.8 主要乔木品种云杉 Picea asperata Mast.杂交鹅掌楸 Liriodendron chinensis大叶186、女贞 Ligustrum compactum Ait冷杉 Abies fabri(Mast.)craib白皮松 Pinus bungeana Zucc.雪松 cedrus deodara(Roxb.)G.Don白玉兰 Michelia alba Dc八棱海棠 Malus chaenomeles紫玉兰 Magnolia liliflora Dser.杜仲 eucommia ulmoides oliver核桃树 Juglans蒙古栎 Quercus mongolica Fisch石榴 Punica granatum L.美人梅 Prunus x blireana cv.Meiren银杏 Ginkg187、o biloba L.垂柳 Salix babylonica常绿乔木 evergreen trees落叶乔木 Deciduous trees开花乔木 Flowering trees植物绿地设计5.4plant Green space desiGn55.4.9 主要灌木品种东北丁香大花水桠木 h.paniculata Sieb.var壮花月季平枝栒子 cotoneaster horizontalis Decne铺地柏 Sabina procumbens(endl.)小叶女贞 Ligustrum quihoui carr小叶黄杨 Buxus sinica var.parvifolia M,chen188、g大叶黄杨 Buxus megistophylla Levl.天目琼花 viburnum sargentii var.calvescens紫丁香 Syringa oblata Lindl.猥实 Kolkwitzia amabilis雪柳 Fontanesia fortunei carr.红瑞木 Swida alba月季 Rosa chinensis Jacq.芒草 Miscanthus蒲苇 cortaderia sellosna狼尾草 Pennisetum alopecuroides拂子茅 calamagrostis epigeios(L)Roth花叶芦竹 Arnmdo donax var.v189、ersicolor贴梗海棠 chaenomelesspeciosa金叶风箱果 Physocarpus opulifolius var.luteus紫薇 Lagerstroemia indica华北珍珠梅常绿灌木 evergreen shrub落叶灌木 Deciduous shrub观赏草 ornamental grasses植物绿地设计5.4plant Green space desiGn55.4.10 主要灌木品种阔叶麦冬 Liriope platyphylla vWang et Tang蛇鞭菊 Liatris spicata(L.)WilldTang石竹 Dianthus chinensi190、s L.鼠尾草 Salvia japonica Thunb.玉簪 Salvia japonica Thunb.雏菊 Bellis perennis L.八宝景天 hylotelephium erythrostictum(Miq.)h.ohba金山绣线菊 Spiraea japonica Gold Mound马蔺 Iris lactea Pall.var.chinensis(Fisch.)Koidz.再力花 Thalia dealbata Fraser水葱 Scirpus validus vahl花叶芦竹 Arnmdo donax var.versicolor黄菖蒲 Iris pseudacor191、us L.水生鸢尾 Iris tectorum Maxim 荷花 Lotus flower千屈莱 Purple Loosestrife,Spiked Loosestrife香蒲 Typha orientalis Presl地被 Ground cover水生植物 Aquatic plant植物绿地设计5.4plant Green space desiGn55.4.11 驳岸和台地植物处理自然驳岸占 85%自然驳岸植物意向硬质驳岸植物意向台地驳岸植物意向硬质驳岸占 8%台地驳岸占 7%植物绿地设计5.4plant Green space desiGn55.2.12 植物意向图植物绿地设计5.4pl192、ant Green space desiGn55.2.12 植物意向图植物绿地设计5.455.2.12 植物意向图植物绿地设计5.4项目区位25.3.1 夜景灯光总平面图河道景观照明设计总体原则General principles of river landscape lighting design图例:道路灯景观灯草坪灯景观桥灯带 5河道景观照明设计river landscape liGhtinG desiGn5.5河道景观照明依循节约,生态可持续原则,总体平衡效果与用电总量,并考虑后期维护成本。线性景观以功能照明为主,满足基本的夜晚慢跑与运动健身需求。节点区域根据功能不同区别性设计照明强度193、。围绕特色景点与区域设计特色鲜明的夜景效果,让夜景成为公园特色之一。运动场地与儿童活动场地,加强照明设计强度,满足夜晚运动的需求。river landscape lighting with saving,sustainable principles,overall balance effect and power consumption,and consider the late maintenance costs.linear landscape with functional lighting to meet the basic needs of the night jogging and194、 sports fitness.node area according to different features of different design lighting intensity.around the characteristics of the characteristics of scenic spots and regional design features a distinctive night effect,so that the night view of the park is one of the characteristics.sports venues an195、d childrens activities,to strengthen the design intensity of lighting,to meet the needs of the night movement.项目区位25.3.1 夜景灯光总平面图5河道景观照明设计river landscape liGhtinG desiGn5.5河道景观照明设计总体原则General principles of river landscape lighting design图例:道路灯景观灯草坪灯景观桥灯带 河道景观照明依循节约,生态可持续原则,总体平衡效果与用电总量,并考虑后期维护成本。线性景观196、以功能照明为主,满足基本的夜晚慢跑与运动健身需求。节点区域根据功能不同区别性设计照明强度。围绕特色景点与区域设计特色鲜明的夜景效果,让夜景成为公园特色之一。运动场地与儿童活动场地,加强照明设计强度,满足夜晚运动的需求。river landscape lighting with saving,sustainable principles,overall balance effect and power consumption,and consider the late maintenance costs.linear landscape with functional lighting to m197、eet the basic needs of the night jogging and sports fitness.node area according to different features of different design lighting intensity.around the characteristics of the characteristics of scenic spots and regional design features a distinctive night effect,so that the night view of the park is198、 one of the characteristics.sports venues and childrens activities,to strengthen the design intensity of lighting,to meet the needs of the night movement.5.3.1 重点区域夜景氛围滨海入口形象广场binhai square entrance image运动广场sports square 集装箱美食街container Food court 重点满足广场活动人群照明,灯光以暖色调为主。在广场主题雕塑处设置氛围灯光,突出雕塑气势,起到公园的形象199、展示效果。满足夜间运动照明。整体灯光效果需要营造出浪漫、热闹的夜间商业氛围。5河道景观照明设计river landscape liGhtinG desiGn5.55.3.1 重点区域夜景氛围滨河生态花田湿地riverside ecoLogicaL FieLd oF wetLands 生态阳光草坪ecoLogicaL sunshine Lawn 民俗文化滨水活动广场FoLk cuLture square waterFront activities 保障鸟类夜景不被灯光打扰,此区域只在人行栈道沿线设置微弱光源,满足夜间通行即可。只少量点缀一些草坪灯,渲染一副浪漫、宁静的夜景氛围。满足夜间表演、集会200、举办文化活动,重点景观构架处采用氛围灯光,。5河道景观照明设计river landscape liGhtinG desiGn5.55.3.2 夜景氛围意向图5河道景观照明设计river landscape liGhtinG desiGn5.55.3.2 夜景氛围意向图5河道景观照明设计river landscape liGhtinG desiGn5.55.3.3 灯具意向图5河道景观照明设计river landscape liGhtinG desiGn5.55导视系统选型landscape vi systeM desiGn 5.65城市家具选型city furniture selection201、5.75城市家具选型city furniture selection5.755.8 雕塑小品 sculpture pieces 55.8 雕塑小品 sculpture pieces 55.8 雕塑小品 sculpture pieces 构筑小品construct essays55.9构筑小品construct essays55.9投资估算investMent estiMate6项目区位2项目区位投资估算the total floor plan 5第一部分一(一)序号 项目名称物料单价(元)数量(/m/个/项)单位合价(万元)备注1 车行道沥青混凝土37010003 元/370.1112 人行道202、透水砖2201131 元/24.8823 自行车道彩色透水混凝土3004565 元/136.954 游步道透水砖2209485 元/208.675 节点广场花岗岩3403015 元/102.516 儿童乐园塑胶地面380620 元/23.567 停车场植草砖250665 元/16.6258 服务建筑一3500120 元/429 服务建筑二350085 元/29.7510 木栈桥钢筋混凝土+防腐木21001560 元/327.611 亲水挡墙钢筋混凝土2725500 元/m149.612 廊架钢结构2500001 个25 12mx8mx4m13 入口形象雕塑不锈钢4000001 个4014 生命203、之树雕塑钢结构4500001 项45 3个一组15 动物雕塑花岗岩整打1000001 项1016 小计1552.258(二)序号 项目名称物料单价(元)数量()单位合价(万元)备注1 绿化栽植22075000 元/1650(三)序号 项目名称物料单价(元)数量()单位合价(万元)备注1 水电35108639 元/380.2365(四)合计3582.4945水电部分硬景+绿化+水电造价估算表景观部分入海口慢生活体验区硬景部分绿化部分项目区位2项目区位投资估算the total floor plan 5二(一)序号 项目名称物料单价(元)数量(/m/个/项)单位合价(万元)备注1 车行道沥青混凝土204、37011340 元/419.582 人行道透水砖2209306 元/204.7323 游步道透水砖2205019 元/110.4184 节点广场花岗岩3408172 元/277.8485 运动场所塑胶地面3803082 元/117.116 篮球场、羽毛球场、健身场6 足球场人工草坪3501040 元/36.47 极限运动场彩色混凝土380106940.6228 停车场植草砖250665 元/16.6259 动动场管理房3500128 元/44.810 集装箱房12000000 元/20011 木栈道钢筋混凝土+防腐木28002854 元/799.1212 景桥钢筋混凝土+防腐木300084 205、元/m25.2 4m宽人行桥小计2292.461(二)序号 项目名称物料单价(元)数量()单位合价(万元)备注1 绿化栽植220165209 元/3634.598(三)序号 项目名称物料单价(元)数量()单位合价(万元)备注1 水电35214576 元/751.016(四)合计6678.075运动时尚生活区+湿地水生活体验区硬景部分绿化部分水电部分硬景+绿化+水电项目区位2三(一)序号 项目名称物料单价(元)数量(/m/个/项)单位合价(万元)备注1 车行道沥青混凝土37011326 元/419.0622 人行道透水砖2204368 元/96.0963 自行车道彩色透水混凝土3004430 元206、/132.94 游步道透水砖2204296 元/94.5125 节点广场花岗岩3404013 元/136.4427 停车场植草砖250649 元/16.2258 管理房3500120 元/4210 木栈桥钢筋混凝土+防腐木3200680 元/217.6 人行桥兼自行车道11 休息绿阶花岗岩4003390 元/135.612 景观廊架耐候钢结构3000001 个3013 观景廊架钢结构6000001 个60 30mx13mx12m14 休闲廊架耐候钢结构3500001 项35 18mx9mx3.2m17 小计1415.437(二)序号 项目名称物料单价(元)数量()单位合价(万元)备注1 绿化栽207、植220130435 元/2869.57(三)序号 项目名称物料单价(元)数量()单位合价(万元)备注1 水电35173287 元/606.5045(四)合计硬景+绿化+水电4891.5115四 景观总计15152.081浪漫新生活休闲区硬景部分绿化部分水电部分项目区位2第二部分序号 项目名称物料单价数量单位合价(万元)备注1 河道整治120231000 27722 拦水坝一450035 m15.753 拦水坝二450032 m14.44 拦水坝三450043 m19.355 景观钢坝2500060 m1506 河道总计2971.5第三部分 其它不可预估费用2718.53715 单位:万元第四部分 总造价20842.1182 单位:万元单方造价286.474633 单位:元/总面积:727538总造价/总面积河道部分景观+河道+其它不可预估费用(景观部分+河道部分)*15%2718.53715 单位:万元第四部分 总造价20842.1182 单位:万元单方造价286.474633 单位:元/总面积:727538
CAD图纸
上传时间:2023-12-21
10份