贝赛思国际学校室内装饰设计方案(161页).pptx
下载文档
上传人:十二
编号:948058
2024-07-11
161页
36.56MB
1、SCHEMATIC DESIGN|INTERIORS方案设计|室内,CR Xiaojingwan BASIS INTERNATIONAL SCHOOL|Shenzhen华润小径湾贝赛思国际学校|深圳,Design Principles,设计原则1,创造协调的建筑和室内关系室内外的联系,最大化视觉通透通过建筑室内和色彩增强空间标识性CREATE A HARMONIOUS DESIGN BETWEEN INTERIOR AND EXTERIOR ARCHITECTUREHIGHLIGHT CONNECTION BETWEEN INTERIOR AND OUTDOOR ENVIRONMENT(MAX2、IMIZING DAYLIGHT AND VIEWS)ENHANCE WAYFINDING THROUGH INTERIOR ARCHITECTURE AND COLOR,INTERIOR DESIGN PRINCIPLES,室内设计原则,为贝赛思国际学校的课程和教学方式量身定制的设计保持并增强“贝赛思”的品牌-提高对于数学和理科科学 的重视以及全球化的趋势达到国际高端学校标准以提高学习效果CREATE DESIGN TO FOSTER NEEDS OF“BASIS”CURRICULUM AND TEACHING METHODOLOGYMAINTAIN AND ENHANCE“BASIS”BR3、AND IDENTITY-PRESENT A GLOBAL SENSIBILITY OF AN INTERNATIONAL SCHOOL WITH EMPHASIS ON MATH AND SCIENCEMEET INTERNATIONAL STANDARDS OF QUALITY,COMFORT AND DESIGN TO ENHANCE LEARNING.,INTERIOR DESIGN PRINCIPLES,室内设计原则,Program Plans,功能平面2,ACADEMIC ZONE,STUDENT LIFEFood ServiceSports,Fitness&Wellness,RE4、SIDENTIAL ZONE,PLAN 建筑平面图 LG,NOTE:Floor plans in the process of coordination with architectural CD drawings.,PLAN 建筑平面图 L1,NOTE:Floor plans in the process of coordination with architectural CD drawings.,PLAN 建筑平面图 L2,NOTE:Floor plans in the process of coordination with architectural CD drawings.,PLA5、N 建筑平面图 L3,NOTE:Floor plans in the process of coordination with architectural CD drawings.,PLAN 建筑平面图 L4,NOTE:Floor plans in the process of coordination with architectural CD drawings.,PLAN 建筑平面图 L5,CR XIAOJINGWAN,BASIS INTERNATIONAL SCHOOL|Perkins Eastman,NOTE:Floor plans in the process of coordina6、tion with architectural CD drawings.,PLAN 建筑平面图 L6,PLAN 建筑平面图 L7,PLAN 建筑平面图 L8,Overall Color Strategy,整体色彩方案3,OPTION 1:Single Color Strategy,选项一:单色导向色彩方案,3F:MUSIC&ART 音乐艺术4F:GRADE 5-12|ART 5-12年级 艺术5F:OFFICE 办公6F:OFFICE 办公7F:OFFICE 办公,5F:GRADE 5-12 年级6F:GRADE 5-12 年级7F:GRADE 5-12 年级8F:GRADE 5-12 年级,7、4F:GRADE 5-12年级5F:GRADE 5-12年级,1F:GRADE 1-4年级2F:GRADE 1-4年级3F:GRADE 1-4年级4F:GRADE 5-12年级,FOOD SERVICE 食堂,THEATER&LIBRARY黑匣子图书馆,GYM&FITNESS 体育馆,OPTION 2:Differentiated Color Strategy for Wayfinding,选项二:多色导向色彩方案,5F:GRADE 5-12 年级6F:GRADE 5-12 年级7F:GRADE 5-12 年级8F:GRADE 5-12 年级,SHADE OF YELLOW 黄色调,To re8、present warmth,energy and optimism of youth代表年轻人的温暖,能量和乐观,SHADE OF BLUE 蓝色调,To represent wisdom&maturity(These corridors are internal and do not need to have synergy with landscape and exterior architecture表达智慧和成熟(这些走廊为内部空间,不需要与外部景观和建筑协 同),4F:GRADE 5-12年级5F:GRADE 5-12年级,1F:GRADE 1-4年级2F:GRADE 1-4年级39、F:GRADE 1-4年级4F:GRADE 5-12年级,NATURAL-MATERIAL 天然材料To embody organic nature of architecture体现建筑的有机特性,FOOD SERVICE,BASIS BLUE 贝塞思标志蓝,GYM&FITNESS,To promote school spirit以推广学校精神,SHADE OF ORANGE 橘色调,To blend with architectural elements和建筑元素相融合,THEATER&LIBRARY黑匣子图书馆,3F:MUSIC&ART 音乐艺术4F:GRADE 5-12|ART 5-110、2年级 艺术5F:OFFICE 办公6F:OFFICE 办公7F:OFFICE 办公,Color Strategy,色彩方案,OPTION 1,OPTION 2,OPTION 1,Color Strategy,OPTION 2,色彩方案,OPTION 1,OPTION 2,Color Strategy,色彩方案,Geometry as Overall Inspiration for Design Features,几何形体作为整体设计特色的灵感4,Geometry as Inspiration for Design Features,几何作为整体设计特色的灵感,FEATURE WALLS EX11、AMPLES景观墙范例,TILE 瓷砖,FIBER CEMENT PANEL 纤维水泥面板,WOOD 木头,ACOUSTIC PANEL 吸音面板,MDF|WOOD 中密度纤维板|木质,FIBERBOARD 纤维板,Geometry as Inspiration for Design Features,LIGHT FIXTURE AND FURNITURE EXAMPLES灯具和家具范例,几何形体作为整体设计特色的灵感,Typical Space Walk Thru|LEARNING SPACES,典型空间概览|学习空间5,Welcome Center,接待中心5.1,Welcome Cent12、er|FLOOR PLAN,接待中心|平面图,PROGRAMMATIC ELEMENTS,A RECEPTION 接待B GALLERY 校史展示C WAITING LOUNGE 等待区 D DIGITAL DISPLAY 数字显示 E STORE 储藏F OFFICE 办公收银G TEACHER PROFILE DISPLAY 教师简介,LOCATION KEY位置示意图,A,B,C,D,E,F,G,Welcome Center|VIEWS接待中心|视图,Welcome Center|VIEWS,接待中心|视图,Option to use wall for rotating exhibit 13、of exemplary student work or curated artists此处可设计成用于轮流展示学生的模范作品或者策划过的艺术家作品的墙面,Welcome Center|REFERENCE IMAGES接待中心|参考图片,Welcome Center|MATERIAL FINISHES,接待中心|材料,FS01,PT01,SS01,WC01,WTP,WD01,CMB01,FS01Flooring:Stone,600 x 1200mm地面:600 x 1200mm石板,PT01Wall Finish:Paint墙面:涂料,WD01Wall Finish:Wood Veneer墙面14、:木质面层,WC01Wall Finish:Vinyl-backed wallcovering with custom supergraphics墙面:定制图案乙烯墙板,CMB01Ceiling:Metal Baffle天花:金属格栅,WTPWall Finish:Thin Format Porcelain Tile墙面:薄款陶瓷板,SS01Counter:Engineered Quartz Surface柜台:人造石英表面,FT01Flooring OPTION:Porcelain Tile,600 x 1200mm地面选择:600 x 1200mm 瓷砖,Welcome Center|FU15、RNITURE,接待中心|视图,SF01|Curved Fully-Upholstered Lounge Seating/Sofa|弧形软垫座椅/沙发,CH01|Lounge Chair Wood leg,fully upholstered|全软垫木腿休闲沙发,TA01|Lounge Round Table Wood table top,white leg|白色支架,木质桌面的休闲桌,Corridor,走道5.2,Corridor|TYPICAL FLOOR PLAN&ELEVATION,LOCATION KEY位置示意图,PROGRAMMATIC|MATERIAL ELEMENTS,POWD16、ER-COATED METAL LOCKER(FOREXTERIOR)室外喷涂或塑料储物柜PAINTED ACCENT SIGNAGE WALL涂料或金属板亮色标示墙CEILING:SUSPENDED EXTERIOR METAL CEILING PANELS WITH RECESSED LIGHTS天花:金属室外吊顶,内嵌灯具ROOM SIGNAGE 房间标牌COMMUNAL 3D DISPLAY 三维作品展示COMMUNAL 2D DISPLAY 二维作品展示,走道|典型平面和立面,PARTIAL FLOOR PLAN局部平面,A,C,D B,ELEVATION立面,D B,A,Occas17、ional condition in lieu of lockers标准教室储物柜的位置的另一方案,EF,Corridor|VIEWS走道|视图,Corridor|VIEWS走道|视图,Corridor|VIEWS,走道|视图,OPTION WITH A 2-STOREY ORANGE WALL两层橘色墙的选项,Suggestion for landscape:increase permeable surface and include trenches to reduce rainwater runoff景观建议:增加透水表面并使用水槽减少雨水径流,Suggest to provide in18、terest in 2-storey high retaining wall建议在两层楼高的护墙上 增加趣味,Suggest to incorporate benches建议添加长凳,Corridor|VIEWS,走道|视图,OPTION WITH A 2-STOREY ORANGE WALL两层橘色墙的选项,Suggest to provide interest in 2-storey high retaining wall such as textured or colored material and green wall建议在两层楼高的护 墙上增加趣味,比如有纹理或颜色的材料或植物墙,19、Corridor|REFERENCE IMAGES,走道|参考图片,OPTION 3:TEAL BLUE ATRIUM CORRIDOR方案3:青色中庭走道,OPTION 2:ORANGE CORRIDOR方案2:橘色走道,OPTION 1:YELLOW CORRIDOR方案1:黄色走道,Corridor|MATERIAL FINISH,走道|材料,PT04,CP,FS02,FZ01,Flooring:Self-Levelling Concrete Coating,Slip Resistant地面:自流平混凝土 图层,防滑,PT05,Paint_Orange 2 to match LDI or20、 as defined by exterior architect橘色涂料2,与设计院相符合或 依照建筑室外色彩,PT01,FZ01,FS02Stone Trench Cover with Linear Slot Drain条形水槽石板盖,CPCeiling:Fiber-cement Ceiling Panels,for exterior use天花:纤维水泥板,用于室外,PT04Wall Finish Paint墙面:涂料,PT05,RAL9006Window and Door Frame finish or as defined by exterior architect门窗框表面或与建筑21、室外颜色相符,Typical Stairs,典型楼梯5.3,Stairs|VIEWS,LOCATION KEY位置示意图,楼梯|视图,Stairs|MATERIAL FINISH,楼梯|材料,FZ02,FZ01,地面:自流平混凝土 图层,防滑,深灰 地面:自流平混凝土 图层,防滑,浅灰,PT07,PT04,FZ02Flooring:Self-Levelling Concrete Coating,Slip Resistant,Light Grey,FZ01Flooring:Self-Levelling Concrete Coating,Slip Resistant,Medium-to-Dark 22、Grey,PT04Wall Finish Paint,yellow墙面:涂料,黄色,CP,PT07Wall Finish Paint,dark grey墙面:涂料,深灰,CPCeiling:Fiber-cement Ceiling Panels,for exterior use天花:纤维水泥板,用于室外,Atrium,中庭5.4,Atrium|VIEWS,中庭|视图,OPTION 1COLOR STRATEGY方案色彩备选1,Atrium|VIEWS,中庭|视图,OPTION 1COLOR STRATEGY方案色彩备选1,With Stair Flooring:Self-Levelling C23、oncrete Coating,Slip Resistant楼梯地面:自流平混凝土 图层,防滑,Atrium|VIEWS,中庭|视图,OPTION 1COLOR STRATEGY方案色彩备选1,Atrium|VIEWS,OPTION 2COLOR STRATEGY方案色彩备选2,中庭|视图,Atrium|VIEWS,中庭|视图,OPTION 2COLOR STRATEGY方案色彩备选2,Stair Floor OPTION:Wood-look porcelain tile for stair treads w/groove at nosing楼梯备选:踏步铺设木纹瓷砖,收口处有凹槽,Atriu24、m|VIEWS,中庭|视图,OPTION 2COLOR STRATEGY方案色彩备选2,Atrium|MATERIAL FINISH,中庭|材料,OPTION:PT06Wall:Paint-Teal Blue option墙面:蓝绿色涂料选择,FZ01Flooring:Self-Levelling Concrete Coating,Slip Resistant,Medium-to-Dark Grey地面:自流平混凝土 图层,防滑,CPCeiling:Fiber-cement Ceiling Panels,for exterior use天花:纤维水泥板,用于室外,WM02Wall Finish25、:Perforated Metal Panel with Tree Pattern墙面:树状图案的穿孔金属板,OPTION:PT04Wall Finish Paint,yellow option墙面:涂料,黄色选择,WM01Wall Finish:Perforated Metal Planks(used for display)墙面:多孔金属板(展示用),MB-PTWall:Marker board Paint Finish墙面:白板涂料,FT01Stair Floor OPTION:Wood-look porcelain tile for stair treads w/groove at n26、osing楼梯备选:踏步铺设木纹瓷砖,收口处有凹槽,Stair Floor OPTION:Polyurethane Coating,Slip Resistant,Medium-to-Dark Grey楼梯备选:自流平混凝土涂层,防滑,中灰深灰色。,Atrium|FURNITURE,中庭|家具,CH02|Chair 椅子Lightweight,upholstered seat,white shell&leg轻巧,软垫座椅,白色框架,TA02|Table 桌子Wood-look laminate table top,white leg木纹层压板桌面,白色支架,Typical Classroom,核27、心教室5.5,Typical Classroom|FLOOR PLAN,核心教室|平面,LOCATION KEY位置示意图,PROGRAMMATIC ELEMENTS功能区块,A LOCKER 储物柜B TACKABLE BOARD 展示墙C CLOCK 时钟D MARKER BOARD 白板E TEACHERS DESK 讲桌F STUDENT CUBBIES 学生储物架G STORAGE 储藏空间,TYPICAL ELEMENTARY SCHOOL CLASSROOM核心小学教室,TYPICAL MIDDLE SCHOOL/HIGH SCHOOL CLASSROOM核心中学教室,A,B,B28、,C,C,D,D,E,E,F,G,Typical Classroom|VIEW核心教室|视图,Typical Classroom|CEILING PLAN,LOCATION KEY位置示意图,REFERENCE IMAGE SUSPENDED ACOUSTIC CEILING参考图片吸音吊顶,核心教室|天花平面,TYPICAL CLASSROOM CEILING PLAN核心教室天花平面,REFERENCE IMAGE SUSPENDED INDIRECT/DIRECT LINEAR LIGHTING FIXTURE参考图片间接悬吊或直接悬吊的线性灯,Typical Classroom|MAT29、ERIAL FINISH,核心教室|材料,FR01,FR01,PT02,PT01B,ACT01,PT01BWall:Paint-Off White墙面:灰白色涂料,Resilient Floor Linoleum弹性地面亚麻地板,PT02Wall:Paint Greige墙面:灰褐色,ACT01600X1200MM Acoustic Tiles600X1200MM吸音板,RAL9006Window and Door Frame finish or as defined by exterior architect门窗框表面或与建筑室外颜色相符,WD01Wall Finish:Wood Venee30、r墙面:木板,TB01Wall Finish:Tack-able Linoleum Surface墙面:展示亚麻表面,Typical Classroom|FURNITURE,核心教室|家具,CH03|Classroom Chair,Stackable,seat height as appropriate for age group教室座椅,可堆叠,座椅高度应根据不同年龄段,TA03|Classroom Table-White Top,Stainless Steel Leg,option to be table for 2 or table for 1,table height as appro31、priate for age group教室学习桌-白色桌面,不锈钢桌腿,可选两人桌或一人桌,桌子高度应根据不同年龄段,CH04|Task Chair for Teacher:with swivel movement and casters教师办公椅:可旋转有转轮,Science Lab,实验室5.6,Science Lab|FLOOR PLAN,实验室|平面,LOCATION KEY位置示意图,PROGRAMMATIC ELEMENTS功能区块,A SHELVING 储物架B SINK 水槽C EXPERIMENT TABLE 实验桌D CLOCK 时钟E MARKER BOARD 白板F 32、TEACHERS DESK 讲桌G STORAGE&COUNTER 储藏和柜台H EMERGENCY WASH/SHOWER 紧急洗浴室J COMBINATION WRITEABLE PAINT WALLAND TACK SURFACES 结合可书写墙面和软 墙表面(可钉图钉)的墙体,TYPICAL CHEMISTRY LAB典型化学实验室,TYPICAL PHYSICS AND GENERAL SCIENCE LAB典型物理和通用科学实验室,A,A,A,A,B,B,B,C,C,D,D,E,E,F,F,G,H,H,J,J,B,C,B,C,B,B,B,G,G,Science Room|VIEW实33、验室|视图,Science Lab|CEILING PLAN,LOCATION KEY位置示意图,TYPICAL SCIENCE LAB CEILING PLAN典型科学实验室天花平面,REFERENCE IMAGE SUSPENDED ACOUSTICCEILING 参考图片吸音吊顶,实验室|天花平面,REFERENCE IMAGE SUSPENDED INDIRECT/DIRECT LINEAR LIGHTING FIXTURE参考图片间接悬吊或直接悬吊的线性灯,Science Room|MATERIAL FINISH,SS02,FZ01,实验室|材料ACT01PT06,WD01,PLAM34、01Millwork Finish Option:Plastic Laminate,Grey,SS02Epoxy or phenolic resin chemical-resistant laboratory countertop with integral sink自带水槽的环氧或酚醛树脂的化学实验室桌面,FZ01Flooring:Self-Levelling Concrete Coating,Slip Resistant地面:自流平混凝土 图层,防滑,ACT01600X1200MM Acoustic Tiles600X1200MM吸音板,PT01BWall:Paint-Off White墙35、面:灰白色涂料,WD01Wall Finish:Wood Veneer墙面:木板,PT06Wall:Paint,Teal Blue墙面:青色涂料,RAL7030Millwork Finish Option:Metal,Stone Grey,固定家具备选:塑料板,灰色 固定家具备选:金属,,石灰色,CH05|High Stool高脚凳,Art Studio,艺术教室5.7,Art Studio|FLOOR PLAN,艺术教室|平面,LOCATION KEY位置示意图,PROGRAMMATIC ELEMENTS,A CABINET 储物柜B WORKSHOP TABLE 协作室桌子C SINK/L36、ONG TROUGH 长水槽D MARKER BOARD 白板E TEACHERS DESK 讲桌F TACKABLE BOARD 展示墙G STORAGE&COUNTER 储藏和柜台,A,B,C,D,E,F,G,A,A,Art Studio|VIEW,美术教室|视图,LOCATION KEY位置示意图,Art Studio|CEILING PLAN,LOCATION KEY位置示意图,美术教室|天花平面,Reference image for exposed ceiling with suspended light fixture参考图片:悬挂有灯具的露出的天花板,CEILING FINIS37、H:Acoustic Ceiling Spray墙面:吸音天花板喷雾,Art Studio|REFERENCE IMAGES艺术教室|参考图片,SCHOOL|Perkins Eastman,Art Studio|MATERIAL FINISH,PT01BPT02Paint-Off WhitePaint_Greige,FR01,SS02WD01,WM03,PLAM01,TB01,艺术教室|材料PT01B,FR01Resilient Floor Linoleum弹性地面亚麻地板,PT01BWall:Paint-Off White墙面:灰白色涂料,WD01Wall Finish:Wood Venee38、r墙面:木板,TB01Wall Finish:Tack-able Linoleum Surface墙面:展示亚麻表面,PLAM01Millwork Finish:Plastic Laminate,Grey固定家具表面:塑料板,灰色,WM03Millwork Finish:Perforated Metal,Grey to match millworkbody 固定家具表面:多孔金,CR XIAOJINGWAN BASIS INTERNATIONAL 属,灰色与固定家具相配,SS02Epoxy or phenolic resin chemical-resistant laboratory coun39、tertop with integral sink自带水槽的环氧或酚醛树脂的化学实验室桌面,Kindergarten,幼儿园5.8,Kindergarten|FLOOR PLAN,LOCATION KEY位置示意图,幼儿园|平面PROGRAMMATIC ELEMENTS功能区块,A CUBBIES 储物架B SINK 水池C ACTIVITY AREA 活动区 D STORYTELLING 故事区 E ROLE PLAYING 扮演区 F STORAGE 储藏G MARKER BOARD 白板H TACKABLE BOARD 展示墙,A,B,C,D,E,F,F,G,H,H,Kindergart40、en|VIEW幼儿园|视图,Kindergarten|VIEW,幼儿园|视图,Suggest to remove fritted graphics on the glass or opt for image that will make sense from within the interior room建议删去玻璃上的图案或 者使用对于适宜室内的图 案,Kindergarten|REFERENCE IMAGES幼儿园|参考图片,Kindergarten|MATERIAL FINISH,幼儿园|材料,ACT01600X1200MM Acoustic Tiles600X1200MM吸音板,FR41、01Resilient Floor Linoleum弹性地面亚麻地板,FC02,FC04,FC05,FC07,FC06Flooring:Carpet Tiles地面:拼块地毯,WD01Wall Finish:Wood Veneer墙面:木板,TB01Wall Finish:Tack-able Linoleum Surface墙面:展示亚麻表面,PT01Wall:Paint-Off White墙面:灰白色涂料,Kindergarten|FURNITURE,幼儿园|家具,CHxx|Kindergarten Student Chairs,Wood幼儿园学生椅,木质,TAxx|Kindergarten42、 Student Tables,Wood幼儿园学生椅,木质,ACxx|Role-playing Furniture 角色扮演家具,STxx|Cubbies 储物柜,STxx|Shelves 架子,Music Room,音乐教室5.9,Music Room|FLOOR PLAN,音乐教室|平面,LOCATION KEY位置示意图,PROGRAMMATIC ELEMENTS功能区块,MUSIC ROOM 音乐教室INSTRUMENT STORAGE ROOM 乐器储藏室MARKERBOARD WITH MUSIC STAFF画有五线谱的白板STORAGE WITH ACOUSTIC TREATME43、NT ABOVE顶部做吸音处理的储物空间CURTAIN AT ALL WINDOWS 所有窗户都有窗帘TEACHER DESK 讲台,A,B,C,D,E,F,A,D,D,D,E,F C,Suggest architectural design to provide wall treatment to tall exterior retaining wall that is easily maintained and pleasing view to music room 建议建筑设计部门对于这面高挡土墙进行处理,从而使其可以被很 好地维护,并且从音乐教室区域可以获得令人愉悦的景观。,Music44、 Room|VIEW音乐教室|视图,Music Room|REFERENCE IMAGES音乐教室|参考图片,Lecture Hall,演讲厅5.10,Lecture Hall|FLOOR PLAN,演讲厅|平面,LOCATION KEY位置示意图,UPPER LEVEL上层,LOWER LEVEL下层,Lecture Hall|VIEW报告厅|视图,Lecture Hall|MATERIAL FINISH,WA01Acoustic Wall and Ceiling Panel like Autex Cube吸音墙板和天花吊板使用类似AutexCube的产品,PT02Wall and Ceil45、ing:Paint Greige墙面和天花板涂料:灰褐色,FC01Flooring OPTION:Carpet Tile地面备选:拼块地毯,FC01,WA01 PT02,PLAM,Auditorium Seating Wood Back,Upholstered Seat and Backrest报告厅椅背面木材,软垫座椅及座椅靠背,报告厅|材料WA01 PT02,Acoustic Consultant to provide recommendations for approach in absorptive and reflective surface requirements声学顾问将就吸 46、音和反射平面的 材料选择提供相 关建议。,PLAMWall:Plastic Laminate墙面:塑料薄压片,Library,图书馆5.11,ES Library|FLOOR PLAN,小学图书馆|平面,UPATE-YUJI,LOCATION KEY位置示意图,PROGRAMMATIC ELEMENTS 功能区块SECURITY DETECTION 安检CIRCULATION DESK/INFORMATION WALL 接待台/信息标识墙BOOK COLLECTIONREQUIRED:20,000 BOOK VOLUME MAXPROVIDED:16,785(see footnote)(3-647、 HIGH SHELVING)TO 21,230(see footnote)(4-6 HIGH SHELVING)藏书要求:最多两万本书提供:16,785(参考脚注(3-6个高书架)21,230(参考脚注(4-6个高书架),STORY CORNER 故事角READING TABLES 阅读书桌LIBRARY WORKROOM&STORAGE(NOTE FLOOR PLAN REVISIONS TO TOILETS IN ORDER TO ACCOMMODATE WORKROOM)图书馆工作室和储藏室(指出平面上对卫生间的修改以容 纳工作室),Footnote:Volume calculatio48、n is based on average 60 books per linear meter(an allowance of 17mm per book).Depending on whether what type of book(from a childrens picture book that is typically thinner than this to reference books)or actual display strategy(with some books facing out for better readership)actual volume may var49、y.Spacing between shelves is 900-1000mm,脚注:容量计算是根据1m容纳40本书(每本书25mm厚)来计算。根据书的 种类(从通常比25mm薄很多的儿童插画读物到参考书)或者实际摆放的策略(有些书面朝外以便更好的阅读),实际容量可能会有出入。书架之间的间 距为9001000毫米。,A,B,C,D,E,F,C,Suggest to have partial solid wall as backdrop for circulation desk,ES Library|VIEW,小学图书馆|视图,Option to use painted wall instead50、 of wood wall用艺术图画墙代替木质墙的设计选项,ES Library|MATERIAL FINISH,FR01Resilient Floor Linoleum弹性地面亚麻地板,ACT01600X1200MM Acoustic Tiles600X1200MM吸音板,FR01,WD01Wall Finish:Wood Veneer墙面:木板,Wall Finish:Vinyl-backed wallcovering with custom supergraphics墙面:定制图案乙烯墙板,WC02,WC02,WD01,PT01,Wall:Paint-Off White墙面:灰白色涂料,51、FR03 for reading nookResilient Floor Linoleum 弹性地 面亚麻地板,FC02FLOORING OPTION:CarpetPlank or Tiles地板选择:条形地板块,FC03 for reading nookFLOORINGOPTION:Carpet Tile地板选择:块毯,REFERENCE IMAGE:Architecture asInspiration 参考图片:以建筑物本身 为灵感,小学图书馆|材料,Lower School Library|FURNITURE,下层图书馆|家具,CH0 x|Chair,Wood,seat height f52、or lower school椅子,木质,高度适合低年级学生,CH0 x|Upholstered Ottoman软凳,SF0 x|Upholstered Bench/Riser软垫长椅/踏步,MS&HS Library|FLOOR PLAN,LOCATION KEY位置示意图,中学图书馆|平面,PROGRAMMATIC ELEMENTS功能区块,BOOK COLLECTIONREQUIRED:40,000 BOOK VOLUMEPROVIDED:40,140 VOLUME(4 6 HIGH SHELVING)to 46,080 VOLUME(ALL 6-HIGH SHELVING)藏书要求:四53、万本书提供:40,140(参考脚注)(4-6个高书架)46,080(参考脚注)(全为6个高书架)READING/STUDY AREA 阅读/学习区INDIVIDUAL CARRELS|COMPUTER STATIONS 个人阅览桌|电脑站SMALL GROUP ROOMS 小组讨论室,Footnote:Volume calculation is based on average 50 books per linear meter(an allowance of 20mm per book).Depending on whether what type of book(from a childr54、ens picture book that is typically thinner than this to reference books)or actual display strategy(with some books facing out for better readership)actual volume may vary.Spacing between shelves is 900mm-1000mm,脚注:容量计算是根据1m容纳40本书(每本书25mm厚)来计算。根据书的种类(从通常比25mm薄很多的儿童插画 读物到参考书)或者实际摆放的策略(有些书面朝外以便 更好的阅读),55、实际容量可能会有出入。书架之间的间距 为9001000毫米。,MEZZANINE PLAN夹层平面,A,A,A,B,C,D,D,D,B,B,B,B,B,B,B,A,Library|CEILING PLAN,LOCATION KEY位置示意图,UPPER LEVEL上层,LOWER LEVEL下层,图书馆|天花平面,MS&HS Library|VIEW中学图书馆|视图,MS&HS Library|VIEW中学图书馆|视图,MS&HS Library|VIEW中学图书馆|视图,Library|VIEW图书馆|视图,Library|VIEW,FR03 or FC03,FR01 or FC02,图书馆56、|视图PT03,FR01Resilient Floor Linoleum弹性地面亚麻地板,At group roomsFR03Resilient Floor Linoleum 弹性地 面亚麻地板,FC02FLOORING OPTION:CarpetPlank or Tiles地面备选:拼块或拼条地毯,REFERENCE IMAGE:Architecture as Inspiration参考图片:以建筑物本身为灵感,PT01Wall:Paint-Off White墙面:灰白色涂料,At group roomsFC03FLOORINGOPTION:Carpet Plank or Tiles地面备选57、:拼块 或拼条地毯,PT04Wall Finish Paint,yellow option墙面:涂料,黄色选择,Upper School Library|FURNITURE,上层图书馆|家具,CH01|Lounge Chair,fully upholstered 休闲椅,全软垫,CH0 x|Reading Table Chair 学习椅,CH02|Lightweight,upholstered seat,white shell&leg 轻巧,软垫座椅,白色框架,TA02|TableWood-look laminate table top,white leg木纹层压板桌面,白色支架,TA0 x|58、Lounge Table 休闲桌,TA0 x|Reading Table 学习桌,Group Rooms and Computer Stations|FURNITURE,CH0 x|Chair with Casters 滚轮椅,TA0 x|Computer Stations 电脑室,小组讨论室及电脑室|家具,Library|FURNITURE,图书馆|家具,BS01|White Metal Book Shelves with Wood Ends and Top 白色金属书架,外包木质表皮,Gym,体育馆5.12,Gym|FLOOR PLAN,体育馆|平面,LOCATION KEY位置示意图,F59、IRST FLOOR PLAN一层平面,UPPER LEVEL上层平面,PROGRAMMATIC ELEMENTS 功能区块LOBBY 门厅MAIN GYM 主体育场GYM STORAGE 器材储存BLEACHERS 看台GYM DIVIDER 体育馆隔离幕LOCKERS&RESTROOMS 更衣间和卫生间G POOL 泳池H WEIGHT/FITNESS ROOM 健身房J DANCE/MOVEMENT STUDIO 舞蹈室K PING-PONG ROOM 乒乓球室,A,B,C,D,D,E,F,G,H,F,Gym|VIEWS体育馆|视图,Gym|MATERIAL FINISH,PT01BWa60、ll:Paint-Off White墙面:灰白色涂料,PT07Ceiling Finish Paint,dark grey天花板做法:深灰涂料,Sound absorbing concrete block吸音水泥砌块,Telescopic Bleacher seating可伸缩看台座椅,WB01,WP01Wall Safety Pads(to be in very light grey color)墙面安全防撞垫(非常浅的灰色),体育馆|材料,FW01Athletic wood floor地面:运动木地板,WB01,PT01,PT07,FW01,PT07WP01,Gym|REFERENCE I61、MAGE,PARTIAL ACOUSTIC BLOCK WALL区域隔音砌块墙,体育馆|参考图片,Gym Lobby|VIEWS体育馆大厅|视图,Gym Lobby|MATERIAL FINISH,PT01Wall:Paint-Off White墙面:灰白色涂料,FZ01Flooring:Self-Levelling Concrete Coating,Slip Resistant地面:自流平混凝土 图层,防滑,WA02 thru WA06,Reference Image for Pattern Acoustic Wall Panel(5 different colors)吸音墙板的图案参考图片62、(五种不同的颜色),FZ01,PT01,WD01,体育馆大厅|材料CMB02WA02 thru WA06,Acoustic Wall and Ceiling Panel:high density fiberglass with impact resistant glass fiber fabric of perforated metal 吸音墙板和天花 板:高密度玻璃纤维结合拥有防 爆玻璃纤维的穿孔金属板,FZ02Flooring:Self-Levelling Concrete Coating,Slip Resistant,Light Grey地面:自流平混凝土 图层,防滑,浅灰,Pool|P63、LAN,游泳池|平面,SECTION剖面图,Suggest architectural design to provide wall treatment to tall exterior retaining wall that is easily maintained and pleasing view to pool area 建议建筑设计部门对于这面高挡土墙进行处理,从而使其可以被 很好地维护,并且从游泳池区域可以获得令人愉悦的景观。,POOL|VIEW,游泳池|视图,Suggest architectural design to provide wall treatment to tal64、l exterior retaining wall that is easily maintained and pleasing view to pool area建议建筑设计部门对于 这面高挡土墙进行处理,从而使其可以被很好地 维护,并且从游泳池区 域可以获得令人愉悦的 景观。,POOL|REFERENCE IMAGE游泳池|参考图片,Weight Room|PLAN,健身房|平面,健身房,疏散楼梯,Cardio Zone 有氧健身区,Weight Zone 器械区,Stretching Area/Open Floor/Exercise Balls伸展区域/开放楼面/健身球运动,BENCHE65、S 长凳,Weight Room|Reference Image健身房|参考图,Dance Room|PLAN,舞蹈室|平面,PROGRAMMATIC ELEMENTS 功能区块,A MIRROR WALL 玻璃墙面,WALL-MOUNTED BALLET BAR固定在墙面上的芭蕾扶手FLOOR-MOUNTED(POSSIBLY PORTABLE)BALLET BAR BY GLASS WALL固定在玻璃墙面上的(也可能是可移动的)芭蕾扶手,A,B,B,C,Dance Room|Reference Image,舞蹈室|参考图,PRIMARILY WHITE WALLS WITH PARTIAL66、 MIRROR WALLS,ACOUSTIC GYPSUM CEILING WITH LINEAR LIGHTS白墙为主,部分使用镜子,声学吊顶以及内嵌灯具,WOOD BALLET BARSCUBBIES FOR TEMPORARY BAG PARKING POSSIBLE WOOD/WALL MATERIAL ACCENT AT DOORSLINEAR LIGHTING木质芭蕾舞扶手 储物架在入口处可能的木质墙面 线性灯具,WOOD FLOORING ACOUSTIC GYPSUM CEILING木地板吸音石膏吊顶,Blackbox,黑匣子5.13,Blackbox|FLOOR PLAN,黑67、匣子|平面,LOCATION KEY位置示意图,NOTE RECOMMENDED CHANGES IN FLOOR PLAN TO SEPARATE BACK-OF-HOUSE WITH PUBLIC TOILETS平面上的修改建议来将建筑背部与公共厕所分开,PROGRAMMATIC ELEMENTS功能区块,A BLACKBOX 黑匣子B WORKSHOP/STORAGE 协作室/储藏室C DRESSING ROOM 更衣室,A,B,C,C,Blackbox|REFERENCE IMAGES,FLOORING:WOOD FLOOR WITH CERAMIC URETHANE FINISH(V68、ERIFY WITH THEATER CONSULTANT RECOMMENDATIONS)地面:木地板覆以陶瓷聚氨酯(与剧场顾问确认)CEILING:EXPOSED STRUCTURE WITH EQUIPMENT&LIGHTING PIPE GRID+ACOUSTIC SEPARATION CONSTRUCTION IF REQUIRED(THEATER CONSULTANT TO PROVIDE INFORMATION)天花:外露的结构包括器材,灯具网格管,如有必要外加隔音构造(剧院顾问提供信息),黑匣子|参考图片,Blackbox|FURNITURE,CHxx|Stackable Ch69、air with Upholstered Seat 可堆叠软垫座椅,黑匣子|家具,WA07Acoustic Wall Panel吸音墙板,PT09Wall:Paint Dark Grey墙面:深灰色涂料,Portable Risers便携梯台,Typical Space Walk Thru|WORK&LIVING SUPPORT SPACES,典型空间概览|工作生活辅助空间6,Offices,办公室6.1,5th Floor Level Offices|FLOOR PLAN,五层办公室|平面,LOCATION KEY位置示意图,PROPOSED 2-STOREY HEIGHT LOBBY建议的70、2层通高大厅设计,RECEPTION WAITING AREA接待等候区,PRINTER/COPY AREA 打印复印区,HEAD OF SCHOOL 60SM校长HEAD OF SCHOOL 44SM校长,ELECTRICAL RM电力间FILE STORAGE档案储藏,PROPOSE PANTRY TO FACE WINDOW面向窗的茶水间COLLABORATION|INTERACTION AREA BY WINDOW幕墙旁边的讨论区ALTERNATE PRINTER/COPY AREA 可作打印复印区,Offices Lobby|VIEW,办公室门厅|视图,Wall to display71、 student work or photos of school community life用于展示学生作品或者校园生活照片的墙面,Offices Lobby|VIEW 2 STOREY ENTRY OPTION,办公室门厅|两层通高的入口选项,Wall to display student work or photos of school community life用于展示学生作品或者校园生活照片的墙面,Open Office|VIEW开放办公区|视图,Offices|REFERENCE IMAGES,办公室|参考图片,REFERENCE IMAGE|Interaction Area 72、by Window 参考图片|窗一侧的讨论区,DIFFERENTIATED CEILING FINISH AND PENDANT LIGHTING ALONG WINDOW WALL靠窗侧的天花和吊灯有 别于他处,COLLABORATION AREA/IMPROMPTU WORK AREA:BENCH SEATING ALONG WINDOW WALL,TABLES&CHAIRS讨论区/即兴工作区:靠 窗的长椅,桌子和椅子,6th Floor Level Offices|FLOOR PLAN,LOCATION KEY位置示意图,THIS LAYOUT PROPOSES TO LOCATE TH73、E RECEPTION AREA CLOSE TO ELEVATOR/MAIN STAIRS SO VISITORS DO NOT HAVE TO PASS THRU ADMINISTRATION OFFICES TO GET THERE这个平面意在把接待室移动到更靠近前台接待区域和楼梯的位置,所以家长无需先通过开放 办公而抵达。,RECEPTION 接待室,PROPOSED ARCHIVE RM LOCATION建议的档案室位置,PANTRY 茶水间,PROPOSED OPEN TO BELOW建议的向下开放的区域,CONFERENCE ROOM/GALLERY会议室/画廊,GALLERY 74、WALL艺术展示墙,PRINT COPY 打印复印OPEN OFFICE FOR 21 PEOPLE21人的开放办公室,六层办公室|平面,Offices Lobby|VIEW,办公室门厅|视图,Archive Room located above lobby(per CD drawing)档案室位于门厅的正上方(根据建筑的CD图纸),Offices Lobby|VIEW 2-STOREY ENTRY OPTION办公室门厅|两层通高的入口选项,Open Office|VIEW开放办公区|视图,7th Floor Level Offices|FLOOR PLAN,ACCOUNTING 财务,WA75、ITING LOUNGE等待休息区,SCHOOL AFAIRS DIRECTOR学校教务主任,TYPICAL PRIVATE OFFICE MADE SMALLER TO IMPROVE PROPORTION AND ALLOW FOR WAITING LOUNGE/DISPLAY ALONG THE CORRIDOR.PROPOSED FLOOR AREA=22SM典型私人办公室面积减少以腾出走道上 的等待区和展示区的面积LOCATION KEY位置示意图,CEO OFFICE首席执行官办公室GALLERY WALL艺术展示墙,七层办公室|平面,Offices|REFERENCE IMAGE76、S,REFERENCE IMAGES|Transparency to Private Offices and Conference Rooms参考图片|私人办公室和会议室的通透性,办公室|参考图片,Offices|MATERIAL FINISH,办公室|材料,FS01Flooring:Stone,600 x 1200mm地板:600 x 1200mm石板,FT01Flooring OPTION:Porcelain Tile,600 x 1200mm地板备选:600 x 1200mm瓷砖,PT01Wall:Paint-Off White墙面:灰白色涂料,FT01 or FS01,FT01 or 77、FS01,PT10Wall:Paint Medium Grey墙面:中度灰,DET01Wall Detail:James Turrell(artist)inspired colored LED framed area墙面细部:受詹姆斯特瑞尔(艺术家)的作品启发而设计的彩色LED框选区域,PTxWall:Paint Medium Grey墙面:中度灰,PT10,PT10,PTx,PTx,PT01,DET01,Offices Waiting Areas|FURNITURE,CH01|Lounge Chair,fully upholstered 休闲椅,全软垫,TAxx|Coffee Table W78、ood 木质咖啡桌,办公室-等候区|家具,Offices|MATERIAL FINISH,办公室|材料,SS01,FR01Resilient Floor Linoleum弹性地面亚麻地板,PT01Wall:Paint-Off White墙面:灰白色涂料,WD01Wall Finish:Wood Veneer墙面:木板,Counter:Engineered QuartzSurface 柜台,人造石英表面,ACT01600X1200MM Acoustic Tiles600X1200MM吸音板,FC03FLOORING OPTION:Carpet Plank orTiles地面备选:拼块或拼条地毯,79、FR01,FC03,FC03,WD01,SS01,Open Offices|FURNITURE开放式办公室|家具,Dormitory,宿舍6.2,Typical Dormitory Room|PLAN,典型宿舍|平面,LUGGAGE STORAGE(FOR 2)ON EACH SIDE每侧有两人的行李储藏,TACKABLE WALL 展板,WOOD STUDY DESK 木质学习桌BOOK SHELF 书架,CLOSET 衣柜,MIRROR 镜子STORAGE FOR(4 PEOPLE)四人的储藏,LADDER TO BED 床爬梯,Typical Dormitory Room|VIEW典型宿80、舍|视图,TANDEM LADDER RUNG串联爬梯,COMBINATION STUDY DESK AND STORAGE储藏和课桌结合,GENERAL PALETTE OF MATERIALS WITH FLOORING OPTIONS(1)WOOD,(2)VINYL/LINOLEUM一般地面处理(1)木材(2)橡胶(2)乙烯/亚麻,Typical Dormitory Room|REFERENCE IMAGES,PROVIDE READING LIGHT阅读灯COMBINATION OF MATERIALS:DARK GREY METAL FRAME,WOOD ELEMENTS,PAINT81、ED WHITE WALL AND CEILING,TACK-SURFACE AT BACK WALL多材料构成:深色金属框,木材,白色墙 面,天花,背墙展板,典型宿舍|参考图片,Typical Dormitory Room|MATERIAL FINISH,PT01Wall&Ceiling:Paint-Off White墙面和天花:灰白色涂料,WD01Wall Finish:Wood Veneer墙面:木板,FT04,SS02Counter:Solid Surface(Corian)柜台:实体表面(可丽耐板),PT09Wall:Paint Dark Grey墙面:深灰,TB01Wall Fin82、ish:Tack-able Linoleum Surface墙面:展示亚麻表面,Flooring:Porcelain Tile,600 x 600mm地板:600 x 600mm瓷砖,FT04,SS02,典型宿舍|材料PT01PT01,TB01,WD01,Typical Dormitory Corridor|VIEW,典型宿舍走道|视图,Material Information by Exterior/Building Architect此处材料需征询建筑或外立面单位,OPTION:with Glazed Brick or Glazed Ceramic Tile选择:玻璃砖或瓷砖,OPTION83、:with Painted Wall选择:灰白色涂料,Typical Dormitory Corridor|MATERIAL FINISH,PT01Wall:Paint-Off White墙面:灰白色涂料,WD01Wall Finish:Wood Veneer墙面:木板,SS02Counter:Solid Surface(Corian)柜台:实体表面(可丽耐板),PT09Wall:Paint Dark Grey墙面:深灰,典型宿舍走道|材料,PT10Wall:Paint Medium Grey墙面:中度灰,FT01Flooring:Porcelain Tile,600 x 1200mm地板:684、00 x 1200mm瓷砖,PT04Wall Finish Paint,yellow墙面:涂料,黄色,WT03Wall OPTION:Glazed Brick or Glazed Ceramic Tile墙面选择:光面砖或瓷砖,FT01,PT04,PT10,PT01,WD01,Faculty Housing,教工宿舍6.3,Teacher Housing|PLAN教室住房|平面,Teacher Housing Unit|OPTION 1教室住房单元|选择1,Teacher Housing Unit|OPTION 1教室住房单元|选择1,Teacher Housing Unit|OPTION 185、教室住房单元|选择1,Teacher Housing Unit|MATERIAL FINISHES,PT01Wall:Paint-Off White墙面:灰白色涂料,WD01Wall Finish:Wood Veneer墙面:木板,FW02,SS02Counter:Solid Surface(Corian)柜台:实体表面(可丽耐板),PT10Wall:Paint Medium Grey墙面:中度灰,PT09Wall:Paint Dark Grey墙面:深灰,教室住房单元|材料,PT10,PT01,FW02Engineered Wood Floor木地板,WD01,Teacher Housing86、 Unit|OPTION 2教室住房单元|选择2,Teacher Housing Unit|OPTION 2教室住房单元|选择2,Teacher Housing Unit|OPTION 2教室住房单元|选择2,Teacher Housing Unit|MATERIAL FINISHES,PT01Wall:Paint-Off White墙面:灰白色涂料,WD01Wall Finish:Wood Veneer墙面:木板,SS02Counter:Solid Surface(Corian)柜台:实体表面(可丽耐板),PT10Wall:Paint Medium Grey墙面:中度灰,FW02Engine87、ered Wood Floor木地板,教室住房单元|材料,WD01,PT01,PT10,FW02,Teacher Housing Corridor|VIEW,OPTION:with Glazed Brick or Glazed Ceramic Tile选择:光面砖或瓷砖,OPTION:with Painted Wall徐州呢:涂料,教室住房走道|视角,Teacher Housing Unit|MATERIAL FINISHES,PT01Wall:Paint-Off White墙面:灰白色涂料,Wall Finish:Wood Veneer墙面:木板,WD01,SS02Counter:Solid88、 Surface(Corian)柜台:实体表面(可丽耐板),PT10Wall:Paint Medium Grey墙面:中度灰,FT01Flooring OPTION:Porcelain Tile,600 x 1200mm地板备选:600 x 1200mm瓷砖,WT03Wall OPTION:Glazed Brick or Glazed Ceramic Tile墙面:光面砖或瓷砖,教室住房走道|材料,WT03,PT01,WD01,FT01,Canteen,餐厅6.4,Dining|PLAN餐厅|平面,餐厅,取餐,Dining|REFERENCE IMAGES餐厅|参考图片,Dining|MATE89、RIAL FINISH,餐厅|材料,PT01Wall:Paint-Off White墙面:灰白色涂料,WD01Wall Finish:Wood Veneer墙面:木板,SS02Counter:Solid Surface(Corian)柜台:实体表面(可丽耐板),FZ02Flooring:Self-Levelling Concrete Coating,Slip Resistant,Light Grey地面:自流平混凝土 图层,防滑,浅灰,CMW,Ceiling Finish:Wood-look Metal Panel,Perforated with Acoustic Felt天花:木纹吸音穿孔金属板,WT02,Wall:Glazed Brick or Glazed Ceramic Tile 墙面:玻璃砖或瓷砖,END,
CAD图纸
上传时间:2023-11-24
29份