个人中心
个人中心
添加客服WX
客服
添加客服WX
添加客服WX
关注微信公众号
公众号
关注微信公众号
关注微信公众号
升级会员
升级会员
返回顶部
隔热膜施工工艺及过程(6页)
隔热膜施工工艺及过程(6页).doc
下载文档 下载文档
其它文档
上传人:正*** 编号:880744 2024-01-10 6页 350KB
1、WINDOW FILM CONSTRUCTION METHODS AND PROCESS太阳隔热膜施工工艺及过程1、 Preparation at the construction site 1、在施工现场准备1.1 Determine construction areas according to construction drawings and make preparation of construction in teams. 1.1 确定建筑面积按施工图纸,并在团队中的施工准备。1.2 Determine material stacking and blanking location2、s. 1.2确定材料堆放和下料位置。 1.3 Check construction tools and safety measures, such as ladder safety etc.1.3 检查施工机具和安全的措施,如梯子安全等, 1.4 Further make preparation for protection and prevention.1.4 进一步做好保护和预防的准备2、 Construction methods2、施工方法2.1 Glass cleaning 2.1 清洁窗户Check whether there are any dirty marks such as 3、soil dust, paints orsilicone glue on glasses before spraying and wetting glasses. Use scouring pad to remove the dirt as necessary and clear away the dust with brushes. Spray washing and installation liquid on the whole glass, and use the cleaning scouring pad to clean the whole window glass. Use th4、e clean dish cloth to clean the window frames.在喷湿窗子之前,先检查玻璃上是否有泥尘、油漆、或硅酮胶等污物。必要时用刀片将污物清除,然后用硬刷把尘埃扫去。将整快玻璃喷上清洗安装液,然后用清铲刀将整个窗玻璃刮铲。用一块柔软的毛巾擦洗窗框四周,把窗框边缘擦洗干净。2.2 Window film preparation2.2 准备窗膜Currently three common methods are used to prepare window film.目前有三种常用的方法准备窗膜2.2.1 Method 1: Use other glass as 5、the backer. 方法1:以其他窗户为垫板,Use a piece of glass that has been cleaned initially as the backer, sprinkle water on the window and place the window film to be installed on it. The protective film of the window film shall be placed towards yourself. 先找一个初步清洁的窗子做垫板,在窗上洒水后,把将要安装的窗膜置于其上,窗膜的保护膜面向自己。2.2.2 Meth6、od 2: Reversal roll method 方法2:反转卷轴法Roll the window film reversedly towards the box side carefully, with the protective film facing upwards. The rolling diameter of window film shall be about 2.5cm. While about 8cm long window film is left after rolling, cut the film along the box edge. Grip the rol7、led window film at hands, and then start to tear protective film. Tear the film carefully, and roll the protective fill towards the roll core. Spray installation liquid to glue it and prepare for installation.细心地将窗膜以保护膜向上的方式反卷至盒边,窗膜卷径应约为2.5cm。当窗膜卷剩8cm时,在窗膜的前后喷清洗安装液。把卷好的窗膜握在手中,然后开始撕下保护膜。小心地撕,让保护层卷向卷轴8、。在撕下保护膜的8cm范围,将清洗安装液喷洒在安装胶上,接着把窗膜卷暂时放置于一干净之处。2.2.3 Method 3: Double-person installation method 方法3;双人安装法One person will clean the window, and the other person will measure windows and prepare window films. When one person stretches the window films out of the box to appropriate length, the other per9、son can cut the window film. After having separating the protective film of the window film a little form the top of window films, staff A grips two top corner of the window film and staff B tear the protective film slowly and spray the washing and cleaning liquid on the installation glue at the sam10、e time. Staff B can continue spray washing and spraying liquid on the glass window and then staff A can install the window film on to the window glass.其中一人先清洁窗户,而另一人则度量窗户和准备窗膜。当一人把窗膜从盒中拉出至适当长度时,另一人可以把窗膜切下。把窗膜的保护膜从窗膜上端分开少许后,工作人员甲握住窗膜两个顶角,由乙则慢慢地把保护底膜撕下,同时在安装胶上喷洒清洗安装液。乙可以继续在玻璃窗上喷洒清洗安装液,之后甲可以把窗膜铺帖到窗玻璃上。11、2.3 “Final washing” before installation 2.3 铺帖前的“最后清洗”Spray cleaning and installation liquid evenly on the whole glass to form a layer of mist, and use the rubber wiper strip to scrape the window glass from the window top through S-shaped motion. Be very careful to avoid leaving any dust mark on the12、 glass while start dragging the scraping mop after it pauses. 将清洗安装液均匀地在整面玻璃上喷洒一层薄雾,用普通刮擦拖把由玻璃的上方以连续的横向动作挂擦窗玻璃。在挂擦拖把停顿后再开始拖动时,要格外小心,以免在玻璃上留下尘埃痕迹。2.4 Installation of window films2.4 铺帖窗膜Spray a proper amount of installation liquid on the whole glass except 5cm range on the top. There shall be no dry 13、places where no installation liquid is sprayed, or the window film will stick too early during installation, which will make you fail to slip the window film to appropriate positions. 除了最顶端的5cm范围之外,将整面玻璃均匀地喷上适量清洗安装液,玻璃上不能有没有喷到的地方,否则安装时窗膜会太早黏住,使你无法将窗膜滑向适当的地方。2.5 The first water squeezing2.5 挤压水份Spray14、 the washing and installation liquid on the film surface. Starting from the top in the middle of the window film, move the tough squeezing plate upwards, downwards, leftwards and rightwards, and use the same pressure and angle and overlapping motion to squeeze the whole glass, or there will be water15、 stain be left. Pay attention that no water squeezing is conducted within the 5cm range from the sides.再度向对着室内的膜面喷洒清洗安装液。由窗膜中上方开始,上下左右地移动坚硬挤压拖把,用相同的压力及角度、重叠的动作挤压整块玻璃,否则将会遗留水渍。2.6 Cutting the side window film2.6 裁切边部窗膜Use a pentagonal guide plate to stand over the glass vertically, and then use the b16、lade to cut four sides of the window film. The sides of window film must be cut before final squeezing operation. 将一个五边行导板垂直地立于玻璃上,或以一个你感到自然的角度竖立,然后用刀片裁切窗膜的四周,留下约1mm的边。一定要在最后的挤压操作前把窗膜边部裁切完毕。2.7 Final squeezing 2.7 最终挤压 安装液对膜的表面Spray washing and installation liquid on the film surface again. Squeeze 17、water within the remaining 5cm range from inside to outside of the window film, and use the same pressure and angle and overlapping motion to squeeze the whole glass, or there will be water stain be left.再度向对着室内的膜面喷洒清洗安装液。挤压在从内部范围外的剩余5cm窗膜的水,用相同的压力及角度、重叠的动作挤压整块玻璃,否则会有水渍留下。2.8 Squeezing of side areas18、2.8 边部吸水Use scrap-free towel to wrap the pentagonal guide plate or Teflon plate. Then starting from the position that is 15cm away from the window frame, squeeze the water between the glass and window film with a table force, and carry out the process of water release and sucking. Because the towel 19、can absorb water, change the positions continuously for absorb excess water completely and prevent the gravel from scratching the window films. 用无屑纸巾包住五行导板或特富龙板,由距窗框15cm左右开始,以平稳的力度,将留在玻璃与窗膜间的水份挤压出来,进行“放水”与“吮吸”工艺。由于纸巾可以吸水,应该不停地转换位置以求将多余的水分吸尽,同时防止沙砾刮花窗膜。2.9 Window cleaning2.9 窗户的清洁While all windows ar20、e installed with window films, spray a small amount of cleaner on the window glasses to remove installation liquid and other remainders. Use dry towels to wipe the window glasses to make the windows clean, smooth and glossy. 当所有的窗户都装好窗膜后,将少量不含阿摩尼亚的清洁剂喷洒于窗玻璃上,以清除安装液及其他残留物。用干的纸巾擦拭窗玻璃,令窗子清洁、光滑明亮。2.10 I21、nspection of visual quality 2.10 检查视觉质量Observe the glass surface from the point which is 60cm away from the observation point from the appropriate angle of view and under good natural light. The side area of 50mm range from the edge must be deducted from the observation area. Observe whether there a22、re dusts, particles, hairs and fibers, gum spots, bubbles, water frog (obscurity), stria and abrasion, visual deformation of thin films, jagged edge and notches, tilting at the edge and tearing within the observation area. 在室内合适的视角和良好的自然光下,从室内离观测点60cm处观测玻璃表面,观测区域应除去离边框50mm的边部,在观测区域内,观测尘埃、颗粒、头发与纤维、胶斑、指印、气泡、水雾(朦胧)、线痕和擦伤、薄膜视觉变形、折痕、边部锯齿状和缺口、边部翘起、戳破。
会员尊享权益 会员尊享权益 会员尊享权益
500万份文档
500万份文档 免费下载
10万资源包
10万资源包 一键下载
4万份资料
4万份资料 打包下载
24小时客服
24小时客服 会员专属
开通 VIP
升级会员
  • 周热门排行

  • 月热门排行

  • 季热门排行

  1. 2025商场地产夏日啤酒龙虾音乐嘉年华(吃货的夏天主题)活动策划方案-47页.pptx
  2. 2022城区自来水提质改造智慧水务建设项目设计方案(199页).pdf
  3. 陕西化学工业公司招聘管理与职业发展管理手册30页.doc
  4. 动火作业安全告知卡(1页).docx
  5. 高处作业安全告知卡(1页).docx
  6. 广场工程建设项目施工招标评标报告表格(24页).pdf
  7. 原油码头消防工程维保方案(39页).docx
  8. 建筑工程外脚手架专项施工方案(悬挑式脚手架、落地式脚手架)(25页).doc
  9. 2020柏向堂房地产公司材料标准化手册3.0(143页).pdf
  10. 2021柏向堂房地产公司材料标准化手册4.0(108页).pdf
  11. 土建、装饰、维修改造等零星工程施工组织设计方案(187页).doc
  12. 深圳装饰公司施工图纸会审及设计交底管理制度【13页】.doc
  13. 房地产开发贷款实操指南(5页).pdf
  14. 学校宿舍楼建设工程施工方案【153页】.docx
  15. 住宅小区工程施工方案【234页】.docx
  16. 鄂尔多斯空港物流园区总体规划方案(2017-2030)环境影响评价报告书(23页).doc
  17. 规划兰园西路道路工程环境方案环境影响评价报告书(89页).pdf
  18. 屋面圆弧形穹顶结构高支模施工方案(40米)(47页).doc
  19. 埋石混凝土挡土墙施工方案(23页).doc
  20. 重庆市五小水利工程建设规划报告(64页).doc
  21. 厂区至矿区管网蒸汽管道系统扩容改造工程施工组织设计方案(105页).doc
  22. 超高纯氦气厂建设项目办公楼、变电站、水泵房及消防水池、门卫、厂房、仓库、配套工程施工组织设计方案(140页).doc
  1. 房地产交易环节契税减征申报表(首套填写)(2页).doc
  2. 2025商场地产夏日啤酒龙虾音乐嘉年华(吃货的夏天主题)活动策划方案-47页.pptx
  3. 2024大楼室内精装修工程专业分包投标文件(393页).docx
  4. 苏州水秀天地商业项目购物中心100%室内设计方案(158页).pptx
  5. 2022城区自来水提质改造智慧水务建设项目设计方案(199页).pdf
  6. 小区人员配置档案建立保洁绿化物业管理服务投标方案(593页).docx
  7. 室内移动式操作平台工程施工方案(19页).doc
  8. 地铁6号线区间盾构下穿管线专项施工方案(30页).doc
  9. 矿山治理工程施工组织设计方案(240页).docx
  10. 老旧小区改造工程施工方案及技术措施(364页).doc
  11. 2021柏向堂房地产公司材料标准化手册4.0(108页).pdf
  12. 川主寺城镇风貌整治景观规划设计方案(60页).pdf
  13. 建筑工程三级安全教育内容(24页).doc
  14. 新疆风电十三间房二期工程49.5mw风电项目可行性研究报告(附表)(239页).pdf
  15. 土建、装饰、维修改造等零星工程施工组织设计方案(187页).doc
  16. 四川凉山攀西灵山国际度假区小镇活力中心商业业态规划方案建议书(33页).pdf
  17. 埋石混凝土挡土墙施工方案(23页).doc
  18. 地下停车场环氧地坪漆施工方案(45页).doc
  19. 深圳装饰公司施工图纸会审及设计交底管理制度【13页】.doc
  20. 住宅定价策略及价格表制定培训课件.ppt
  21. 西安名京九合院商业项目招商手册(28页).pdf
  22. 2010-2030年湖北咸宁市城市总体规划(32页).doc
  1. 建筑工程夜间施工专项施工方案(18页).doc
  2. 赣州无动力亲子乐园景观设计方案(111页).pdf
  3. 2016泰安乡村旅游规划建设示范案例(165页).pdf
  4. 房地产交易环节契税减征申报表(首套填写)(2页).doc
  5. 龙山县里耶文化生态景区里耶古城片区旅游修建性详细规划2015奇创.pdf
  6. 连云港市土地利用总体规划2006-2020年调整方案文本图集(78页).pdf
  7. 850亩项目塑钢门窗工程施工组织设计方案(34页).doc
  8. 老旧小区改造工程施工方案及技术措施(364页).doc
  9. 城市更新项目地价公式测算表.xlsx
  10. 房地产项目规划前期投资收益测算模板带公式.xls
  11. 存储器基地项目及配套设施建筑工程临时用水施工方案(40页).docx
  12. 铁路客运枢纽项目站前框构中桥工程路基注浆加固专项施工方案(19页).doc
  13. 室内移动式操作平台工程施工方案(19页).doc
  14. 装配式结构工业厂房基础、主体结构、门窗及装饰工程施工方案(83页).doc
  15. 地铁6号线区间盾构下穿管线专项施工方案(30页).doc
  16. 施工工程安全教育培训技术交底(13页).doc
  17. 老旧小区改造施工方案及技术措施(365页).doc
  18. 新建贵广铁路线下工程沉降变形观测及评估监理实施细则(126页).doc
  19. 消防火灾应急疏散演练预案(12页).doc
  20. 矿山治理工程施工组织设计方案(240页).docx
  21. 崖城站悬臂式挡墙施工方案(92页).doc
  22. 北京科技园公寓建设项目整体报告方案.ppt