上传人:正***
编号:856035
2023-12-21
150页
763KB
1、第 1 页旋旋喷喷桩桩施施工工记记录录工程名称:真美花园二期 设计桩径:600mm 序号桩号施工日期工作时间施工桩长(m)旋转速度(r/min)提升速度(cm/min)高压水泥浆空压机水灰比水泥用量(kg/桩)备注开始时间(h min)终止时间(h min)压力(Mpa)流量(L/min)压力(Mpa)流量(L/min)112013.10.157:3010:00221010-1220-250.5-11:155001-1剖面222013.10.1510:3013:00221010-1220-250.5-11:155001-1剖面332013.10.1513:3016:00221010-1220-2、250.5-11:155001-1剖面442013.10.1516:3019:00221010-1220-250.5-11:155001-1剖面552013.10.1519:3022:00221010-1220-250.5-11:155001-1剖面662013.10.1522:301:00221010-1220-250.5-11:155001-1剖面772013.10.158:0010:30221010-1220-250.5-11:155001-1剖面882013.10.1511:0013:30221010-1220-250.5-11:155001-1剖面992013.10.1514:0013、6:30221010-1220-250.5-11:155001-1剖面10102013.10.1517:0019:30221010-1220-250.5-11:155001-1剖面11112013.10.1520:0022:30221010-1220-250.5-11:155001-1剖面12122013.10.1523:001:30221010-1220-250.5-11:155001-1剖面13132013.10.1512:0014:30221010-1220-250.5-11:155001-1剖面14142013.10.1515:0017:30221010-1220-250.5-11:14、55001-1剖面15152013.10.1518:0020:30221010-1220-250.5-11:155001-1剖面16162013.10.1521:0023:30221010-1220-250.5-11:155001-1剖面17172013.10.1523:552:25221010-1220-250.5-11:155001-1剖面18182013.10.1514:0016:30221010-1220-250.5-11:155001-1剖面19192013.10.1517:0019:30221010-1220-250.5-11:155001-1剖面20202013.10.1520:5、0022:30221010-1220-250.5-11:155001-1剖面21212013.10.1523:001:30221010-1220-250.5-11:155001-1剖面22222013.10.1517:0019:30221010-1220-250.5-11:155001-1剖面23232013.10.1520:0022:30221010-1220-250.5-11:155001-1剖面24242013.10.1523:001:30221010-1220-250.5-11:155001-1剖面25252013.10.1517:5020:20221010-1220-250.5-116、:155001-1剖面26262013.10.1520:5023:20221010-1220-250.5-11:155001-1剖面27272013.10.1523:502:20221010-1220-250.5-11:155001-1剖面机长:施工员:监理工程师:第 2 页28282013.10.1517:5020:20221010-1220-250.5-11:155001-1剖面29292013.10.1520:5023:20221010-1220-250.5-11:155001-1剖面30302013.10.1523:502:20221010-1220-250.5-11:155001-17、剖面317512013.10.157:3010:2025.51010-1220-250.5-11:163754-4剖面327522013.10.1510:4013:3025.51010-1220-250.5-11:163754-4剖面337532013.10.1513:5016:4025.51010-1220-250.5-11:163754-4剖面347542013.10.1517:0019:5025.51010-1220-250.5-11:163754-4剖面357552013.10.1520:1023:0025.51010-1220-250.5-11:163754-4剖面3675620138、.10.1523:202:1025.51010-1220-250.5-11:163754-4剖面377572013.10.157:3010:2025.51010-1220-250.5-11:163754-4剖面387582013.10.1510:4013:3025.51010-1220-250.5-11:163754-4剖面397592013.10.1513:5016:4025.51010-1220-250.5-11:163754-4剖面407602013.10.1517:0019:5025.51010-1220-250.5-11:163754-4剖面417612013.10.1520:1029、3:0025.51010-1220-250.5-11:163754-4剖面427622013.10.1523:202:1025.51010-1220-250.5-11:163754-4剖面437632013.10.1520:4023:3025.51010-1220-250.5-11:163754-4剖面44312013.10.167:3010:00221010-1220-250.5-11:155001-1剖面45322013.10.1610:3013:00221010-1220-250.5-11:155001-1剖面46332013.10.1613:3016:00221010-1220-25010、.5-11:155001-1剖面47342013.10.1616:3019:00221010-1220-250.5-11:155001-1剖面48352013.10.1619:3022:00221010-1220-250.5-11:155001-1剖面49362013.10.1622:301:00221010-1220-250.5-11:155001-1剖面50372013.10.1617:3020:00221010-1220-250.5-11:155001-1剖面51382013.10.1620:3023:00221010-1220-250.5-11:155001-1剖面52392013.111、0.1623:302:00221010-1220-250.5-11:155001-1剖面53402013.10.1618:0020:30221010-1220-250.5-11:155001-1剖面54412013.10.1621:0023:30221010-1220-250.5-11:155001-1剖面55422013.10.1619:3022:00221010-1220-250.5-11:155001-1剖面旋旋喷喷桩桩施施工工记记录录工程名称:真美花园二期 设计桩径:600mm 序号桩号施工日期工作时间施工桩长(m)旋转速度(r/min)提升速度(cm/min)高压水泥浆空压机水灰比水12、泥用量(kg/桩)备注开始时间(h min)终止时间(h min)压力(Mpa)流量(L/min)压力(Mpa)流量(L/min)机长:施工员:监理工程师:第 3 页56432013.10.1622:301:00221010-1220-250.5-11:155001-1剖面57442013.10.1623:001:30221010-1220-250.5-11:155001-1剖面587642013.10.167:3010:2025.51010-1220-250.5-11:163754-4剖面597652013.10.1610:4013:3025.51010-1220-250.5-11:163713、54-4剖面607662013.10.1613:5016:4025.51010-1220-250.5-11:163754-4剖面617672013.10.1617:0019:5025.51010-1220-250.5-11:163754-4剖面627682013.10.1620:1023:0025.51010-1220-250.5-11:163754-4剖面637692013.10.1623:202:1025.51010-1220-250.5-11:163754-4剖面647702013.10.167:3010:2025.51010-1220-250.5-11:163754-4剖面65771214、013.10.1610:4013:3025.51010-1220-250.5-11:163754-4剖面667722013.10.1613:5016:4025.51010-1220-250.5-11:163754-4剖面677732013.10.1617:0019:5025.51010-1220-250.5-11:163754-4剖面687742013.10.1620:1023:0025.51010-1220-250.5-11:163754-4剖面697752013.10.23:202:1025.51010-1220-250.5-11:163754-4剖面707762013.10.167:3015、10:2025.51010-1220-250.5-11:163754-4剖面717772013.10.1610:4013:3025.51010-1220-250.5-11:163754-4剖面727782013.10.1613:5016:4025.51010-1220-250.5-11:163754-4剖面737792013.10.1617:0019:5025.51010-1220-250.5-11:163754-4剖面74452013.10.177:3010:00221010-1220-250.5-11:155001-1剖面75462013.10.1710:3013:00221010-12216、0-250.5-11:155001-1剖面76472013.10.1713:3016:00221010-1220-250.5-11:155001-1剖面77482013.10.1716:3019:00221010-1220-250.5-11:155001-1剖面78492013.10.1719:3022:00221010-1220-250.5-11:155001-1剖面79502013.10.1722:301:00221010-1220-250.5-11:155001-1剖面80512013.10.178:0010:30221010-1220-250.5-11:155001-1剖面81522017、13.10.1711:0013:30221010-1220-250.5-11:155001-1剖面82532013.10.1714:0016:30221010-1220-250.5-11:155001-1剖面83542013.10.1717:0019:30221010-1220-250.5-11:155001-1剖面旋旋喷喷桩桩施施工工记记录录工程名称:真美花园二期 设计桩径:600mm 序号桩号施工日期工作时间施工桩长(m)旋转速度(r/min)提升速度(cm/min)高压水泥浆空压机水灰比水泥用量(kg/桩)备注开始时间(h min)终止时间(h min)压力(Mpa)流量(L/min)压18、力(Mpa)流量(L/min)机长:施工员:监理工程师:第 4 页84552013.10.1720:0022:30221010-1220-250.5-11:155001-1剖面85562013.10.1723:001:30221010-1220-250.5-11:155001-1剖面86572013.10.1712:0014:30221010-1220-250.5-11:155001-1剖面87582013.10.1715:0017:30221010-1220-250.5-11:155001-1剖面88592013.10.1718:0020:30221010-1220-250.5-11:15519、001-1剖面89602013.10.1721:0023:30221010-1220-250.5-11:155001-1剖面90612013.10.1723:552:25221010-1220-250.5-11:155001-1剖面91622013.10.177:3010:00221010-1220-250.5-11:155001-1剖面92632013.10.1710:3013:00221010-1220-250.5-11:155001-1剖面93642013.10.1713:3016:00221010-1220-250.5-11:155001-1剖面94652013.10.1716:30120、9:00221010-1220-250.5-11:155001-1剖面95662013.10.1719:3022:00221010-1220-250.5-11:155001-1剖面96672013.10.1722:301:00221010-1220-250.5-11:155001-1剖面97682013.10.178:0010:30221010-1220-250.5-11:155001-1剖面98692013.10.1711:0013:30221010-1220-250.5-11:155001-1剖面99702013.10.1714:0016:30221010-1220-250.5-11:1521、5001-1剖面100712013.10.1717:0019:30221010-1220-250.5-11:155001-1剖面101722013.10.1720:0022:30221010-1220-250.5-11:155001-1剖面102732013.10.1723:001:30221010-1220-250.5-11:155001-1剖面103742013.10.1712:0014:30221010-1220-250.5-11:155001-1剖面104752013.10.1715:0017:30221010-1220-250.5-11:155001-1剖面105762013.10.22、1718:0020:30221010-1220-250.5-11:155001-1剖面106772013.10.1721:0023:30221010-1220-250.5-11:155001-1剖面107782013.10.1723:552:25221010-1220-250.5-11:155001-1剖面1087802013.10.177:3010:2025.51010-1220-250.5-11:163754-4剖面1097812013.10.1710:4013:3025.51010-1220-250.5-11:163754-4剖面1107822013.10.1713:5016:4025.23、51010-1220-250.5-11:163754-4剖面1117832013.10.1717:0019:5025.51010-1220-250.5-11:163754-4剖面旋旋喷喷桩桩施施工工记记录录工程名称:真美花园二期 设计桩径:600mm 序号桩号施工日期工作时间施工桩长(m)旋转速度(r/min)提升速度(cm/min)高压水泥浆空压机水灰比水泥用量(kg/桩)备注开始时间(h min)终止时间(h min)压力(Mpa)流量(L/min)压力(Mpa)流量(L/min)机长:施工员:监理工程师:第 5 页1127842013.10.1720:1023:0025.51010-1224、20-250.5-11:163754-4剖面1137852013.10.1723:202:1025.51010-1220-250.5-11:163754-4剖面1147862013.10.177:3010:2025.51010-1220-250.5-11:163754-4剖面1157872013.10.1710:4013:3025.51010-1220-250.5-11:163754-4剖面1167882013.10.1713:5016:4025.51010-1220-250.5-11:163754-4剖面1177892013.10.1717:0019:5025.51010-1220-250.25、5-11:163754-4剖面1187902013.10.1720:1023:0025.51010-1220-250.5-11:163754-4剖面1197912013.10.1723:202:1025.51010-1220-250.5-11:163754-4剖面1207922013.10.177:3010:2025.51010-1220-250.5-11:163754-4剖面1217932013.10.1710:4013:3025.51010-1220-250.5-11:163754-4剖面1227942013.10.1713:5016:4025.51010-1220-250.5-11:1626、3754-4剖面1237952013.10.1717:0019:5025.51010-1220-250.5-11:163754-4剖面1247962013.10.1720:1023:0025.51010-1220-250.5-11:163754-4剖面1257972013.10.1723:202:1025.51010-1220-250.5-11:163754-4剖面1267982013.10.177:3010:2025.51010-1220-250.5-11:163754-4剖面1277992013.10.1710:4013:3025.51010-1220-250.5-11:163754-4剖27、面1288002013.10.1713:5016:4025.51010-1220-250.5-11:163754-4剖面1298012013.10.1717:0019:5025.51010-1220-250.5-11:163754-4剖面1308022013.10.1720:1023:0025.51010-1220-250.5-11:163754-4剖面1318032013.10.1723:202:1025.51010-1220-250.5-11:163754-4剖面1328042013.10.177:3010:2025.51010-1220-250.5-11:163754-4剖面13380528、2013.10.1710:4013:3025.51010-1220-250.5-11:163754-4剖面1348062013.10.1713:5016:4025.51010-1220-250.5-11:163754-4剖面1358072013.10.1717:0019:5025.51010-1220-250.5-11:163754-4剖面1368082013.10.1720:1023:0025.51010-1220-250.5-11:163754-4剖面1378092013.10.1723:202:1025.51010-1220-250.5-11:163754-4剖面1388102013.129、0.177:3010:2025.51010-1220-250.5-11:163754-4剖面1398112013.10.1710:4013:3025.51010-1220-250.5-11:163754-4剖面旋旋喷喷桩桩施施工工记记录录工程名称:真美花园二期 设计桩径:600mm 序号桩号施工日期工作时间施工桩长(m)旋转速度(r/min)提升速度(cm/min)高压水泥浆空压机水灰比水泥用量(kg/桩)备注开始时间(h min)终止时间(h min)压力(Mpa)流量(L/min)压力(Mpa)流量(L/min)机长:施工员:监理工程师:第 6 页1408122013.10.1713:5030、16:4025.51010-1220-250.5-11:163754-4剖面1418132013.10.1717:0019:5025.51010-1220-250.5-11:163754-4剖面1428142013.10.1720:1023:0025.51010-1220-250.5-11:163754-4剖面143792013.10.187:3010:00221010-1220-250.5-11:155001-1剖面144802013.10.1810:3013:00221010-1220-250.5-11:155001-1剖面145812013.10.1813:3016:00221010-131、220-250.5-11:155001-1剖面146822013.10.1816:3019:00221010-1220-250.5-11:155001-1剖面147832013.10.1819:3022:00221010-1220-250.5-11:155001-1剖面148842013.10.1822:301:00221010-1220-250.5-11:155001-1剖面149852013.10.187:3010:00221010-1220-250.5-11:155001-1剖面150862013.10.1810:3013:00221010-1220-250.5-11:155001-1剖32、面151872013.10.1813:3016:00221010-1220-250.5-11:155001-1剖面152882013.10.1816:3019:00221010-1220-250.5-11:155001-1剖面153892013.10.1819:3022:00221010-1220-250.5-11:155001-1剖面154902013.10.1822:301:00221010-1220-250.5-11:155001-1剖面155912013.10.187:3010:0522.51010-1220-250.5-11:156252-2剖面156922013.10.1810:233、513:0022.51010-1220-250.5-11:156252-2剖面157932013.10.1813:2015:5522.51010-1220-250.5-11:156252-2剖面158942013.10.1816:1518:5022.51010-1220-250.5-11:156252-2剖面159952013.10.1819:1021:4522.51010-1220-250.5-11:156252-2剖面160962013.10.1822:050:4022.51010-1220-250.5-11:156252-2剖面161972013.10.187:3010:0522.51034、10-1220-250.5-11:156252-2剖面162982013.10.1810:2513:0022.51010-1220-250.5-11:156252-2剖面163992013.10.1813:2015:5522.51010-1220-250.5-11:156252-2剖面1641002013.10.1816:1518:5022.51010-1220-250.5-11:156252-2剖面1651012013.10.1819:1021:4522.51010-1220-250.5-11:156252-2剖面1661022013.10.1822:050:4022.51010-1220-35、250.5-11:156252-2剖面1671032013.10.187:3010:0522.51010-1220-250.5-11:156252-2剖面旋旋喷喷桩桩施施工工记记录录工程名称:真美花园二期 设计桩径:600mm 序号桩号施工日期工作时间施工桩长(m)旋转速度(r/min)提升速度(cm/min)高压水泥浆空压机水灰比水泥用量(kg/桩)备注开始时间(h min)终止时间(h min)压力(Mpa)流量(L/min)压力(Mpa)流量(L/min)机长:施工员:监理工程师:第 7 页1681042013.10.1810:2513:0022.51010-1220-250.5-11:36、156252-2剖面1691052013.10.1813:2015:5522.51010-1220-250.5-11:156252-2剖面1701062013.10.1816:1518:5022.51010-1220-250.5-11:156252-2剖面1711072013.10.1819:1021:4522.51010-1220-250.5-11:156252-2剖面1721082013.10.1822:050:4022.51010-1220-250.5-11:156252-2剖面1731092013.10.187:3010:0522.51010-1220-250.5-11:156252-37、2剖面1741102013.10.1810:2513:0022.51010-1220-250.5-11:156252-2剖面1751112013.10.1813:2015:5522.51010-1220-250.5-11:156252-2剖面1761122013.10.1816:1518:5022.51010-1220-250.5-11:156252-2剖面1771132013.10.1819:1021:4522.51010-1220-250.5-11:156252-2剖面1788152013.10.187:3010:2025.51010-1220-250.5-11:163754-4剖面17938、8162013.10.1810:4013:3025.51010-1220-250.5-11:163754-4剖面1808172013.10.1813:5016:4025.51010-1220-250.5-11:163754-4剖面1818182013.10.1817:0019:5025.51010-1220-250.5-11:163754-4剖面1828192013.10.1820:1023:0025.51010-1220-250.5-11:163754-4剖面1838202013.10.1823:202:1025.51010-1220-250.5-11:163754-4剖面18482120139、3.10.187:3010:2025.51010-1220-250.5-11:163754-4剖面1858222013.10.1810:4013:3025.51010-1220-250.5-11:163754-4剖面1868232013.10.1813:5016:4025.51010-1220-250.5-11:163754-4剖面1878242013.10.1817:0019:5025.51010-1220-250.5-11:163754-4剖面1888252013.10.1820:1023:0025.51010-1220-250.5-11:163754-4剖面1898262013.10.140、823:202:1025.51010-1220-250.5-11:163754-4剖面1908272013.10.187:3010:2025.51010-1220-250.5-11:163754-4剖面1918282013.10.1810:4013:3025.51010-1220-250.5-11:163754-4剖面1928292013.10.1813:5016:4025.51010-1220-250.5-11:163754-4剖面1938302013.10.1817:0019:5025.51010-1220-250.5-11:163754-4剖面1948312013.10.1820:10241、3:0025.51010-1220-250.5-11:163754-4剖面1958322013.10.1823:202:1025.51010-1220-250.5-11:163754-4剖面旋旋喷喷桩桩施施工工记记录录工程名称:真美花园二期 设计桩径:600mm 序号桩号施工日期工作时间施工桩长(m)旋转速度(r/min)提升速度(cm/min)高压水泥浆空压机水灰比水泥用量(kg/桩)备注开始时间(h min)终止时间(h min)压力(Mpa)流量(L/min)压力(Mpa)流量(L/min)机长:施工员:监理工程师:第 8 页1968332013.10.187:3010:2025.51042、10-1220-250.5-11:163754-4剖面1978342013.10.1810:4013:3025.51010-1220-250.5-11:163754-4剖面1988352013.10.1813:5016:4025.51010-1220-250.5-11:163754-4剖面1998362013.10.1817:0019:5025.51010-1220-250.5-11:163754-4剖面2008372013.10.1820:1023:0025.51010-1220-250.5-11:163754-4剖面2018382013.10.1823:202:1025.51010-12243、0-250.5-11:163754-4剖面2028392013.10.187:3010:2025.51010-1220-250.5-11:163754-4剖面2038402013.10.1810:4013:3025.51010-1220-250.5-11:163754-4剖面2048412013.10.1813:5016:4025.51010-1220-250.5-11:163754-4剖面2058422013.10.1817:0019:5025.51010-1220-250.5-11:163754-4剖面2068432013.10.1820:1023:0025.51010-1220-250.44、5-11:163754-4剖面2078442013.10.1823:202:1025.51010-1220-250.5-11:163754-4剖面2088452013.10.187:3010:2025.51010-1220-250.5-11:163754-4剖面2098462013.10.1810:4013:3025.51010-1220-250.5-11:163754-4剖面2108472013.10.1813:5016:4025.51010-1220-250.5-11:163754-4剖面2111142013.10.197:3010:0522.51010-1220-250.5-11:15645、252-2剖面2121152013.10.1910:2513:0022.51010-1220-250.5-11:156252-2剖面2131162013.10.1913:2015:5522.51010-1220-250.5-11:156252-2剖面2141172013.10.1916:1518:5022.51010-1220-250.5-11:156252-2剖面2151182013.10.1919:1021:4522.51010-1220-250.5-11:156252-2剖面2161192013.10.1922:050:4022.51010-1220-250.5-11:156252-2剖46、面2171202013.10.197:3010:0522.51010-1220-250.5-11:156252-2剖面2181212013.10.1910:2513:0022.51010-1220-250.5-11:156252-2剖面2191222013.10.1913:2015:5522.51010-1220-250.5-11:156252-2剖面2201232013.10.1916:1518:5022.51010-1220-250.5-11:156252-2剖面2211242013.10.1919:1021:4522.51010-1220-250.5-11:156252-2剖面2221247、52013.10.1922:050:4022.51010-1220-250.5-11:156252-2剖面2231262013.10.197:3010:0522.51010-1220-250.5-11:156252-2剖面旋旋喷喷桩桩施施工工记记录录工程名称:真美花园二期 设计桩径:600mm 序号桩号施工日期工作时间施工桩长(m)旋转速度(r/min)提升速度(cm/min)高压水泥浆空压机水灰比水泥用量(kg/桩)备注开始时间(h min)终止时间(h min)压力(Mpa)流量(L/min)压力(Mpa)流量(L/min)机长:施工员:监理工程师:第 9 页2241272013.10.148、910:2513:0022.51010-1220-250.5-11:156252-2剖面2251282013.10.1913:2015:5522.51010-1220-250.5-11:156252-2剖面2261292013.10.1916:1518:5022.51010-1220-250.5-11:156252-2剖面2271302013.10.1919:1021:4522.51010-1220-250.5-11:156252-2剖面2281312013.10.1922:050:4022.51010-1220-250.5-11:156252-2剖面2291322013.10.197:30149、0:0522.51010-1220-250.5-11:156252-2剖面2301332013.10.1910:2513:0022.51010-1220-250.5-11:156252-2剖面2311342013.10.1913:2015:5522.51010-1220-250.5-11:156252-2剖面2321352013.10.1916:1518:5022.51010-1220-250.5-11:156252-2剖面2331362013.10.1919:1021:4522.51010-1220-250.5-11:156252-2剖面2341372013.10.1922:050:402250、.51010-1220-250.5-11:156252-2剖面2351382013.10.197:3010:0522.51010-1220-250.5-11:156252-2剖面2361392013.10.1910:2513:0022.51010-1220-250.5-11:156252-2剖面2371402013.10.1913:2015:5522.51010-1220-250.5-11:156252-2剖面2381412013.10.1916:1518:5022.51010-1220-250.5-11:156252-2剖面2391422013.10.1919:1021:4522.5101051、-1220-250.5-11:156252-2剖面2401432013.10.1922:050:4022.51010-1220-250.5-11:156252-2剖面2411442013.10.1913:2015:5522.51010-1220-250.5-11:156252-2剖面2421452013.10.1916:1518:5022.51010-1220-250.5-11:156252-2剖面2438482013.10.197:3010:2025.51010-1220-250.5-11:163754-4剖面2448492013.10.1910:4013:3025.51010-1220-252、50.5-11:163754-4剖面2458502013.10.1913:5016:4025.51010-1220-250.5-11:163754-4剖面2468512013.10.1917:0019:5025.51010-1220-250.5-11:163754-4剖面2478522013.10.1920:1023:0025.51010-1220-250.5-11:163754-4剖面2488532013.10.1923:202:1025.51010-1220-250.5-11:163754-4剖面2498542013.10.197:3010:2025.51010-1220-250.5-1153、:163754-4剖面2508552013.10.1910:4013:3025.51010-1220-250.5-11:163754-4剖面2518562013.10.1913:5016:4025.51010-1220-250.5-11:163754-4剖面旋旋喷喷桩桩施施工工记记录录工程名称:真美花园二期 设计桩径:600mm 序号桩号施工日期工作时间施工桩长(m)旋转速度(r/min)提升速度(cm/min)高压水泥浆空压机水灰比水泥用量(kg/桩)备注开始时间(h min)终止时间(h min)压力(Mpa)流量(L/min)压力(Mpa)流量(L/min)机长:施工员:监理工程师:第 54、10 页2528572013.10.1917:0019:5025.51010-1220-250.5-11:163754-4剖面2538582013.10.1920:1023:0025.51010-1220-250.5-11:163754-4剖面2548592013.10.1923:202:1025.51010-1220-250.5-11:163754-4剖面2558602013.10.197:3010:2025.51010-1220-250.5-11:163754-4剖面2568612013.10.1910:4013:3025.51010-1220-250.5-11:163754-4剖面25755、8622013.10.1913:5016:4025.51010-1220-250.5-11:163754-4剖面2588632013.10.1917:0019:5025.51010-1220-250.5-11:163754-4剖面2598642013.10.1920:1023:0025.51010-1220-250.5-11:163754-4剖面2608652013.10.1923:202:1025.51010-1220-250.5-11:163754-4剖面2618662013.10.197:3010:2025.51010-1220-250.5-11:163754-4剖面262867201356、.10.1910:4013:3025.51010-1220-250.5-11:163754-4剖面2638682013.10.1913:5016:4025.51010-1220-250.5-11:163754-4剖面2648692013.10.1917:0019:5025.51010-1220-250.5-11:163754-4剖面2651462013.10.207:3010:0522.51010-1220-250.5-11:156252-2剖面2661472013.10.2010:2513:0022.51010-1220-250.5-11:156252-2剖面2671482013.10.2057、13:2015:5522.51010-1220-250.5-11:156252-2剖面2681492013.10.2016:1518:5022.51010-1220-250.5-11:156252-2剖面2691502013.10.2019:1021:4522.51010-1220-250.5-11:156252-2剖面2701512013.10.2022:050:4022.51010-1220-250.5-11:156252-2剖面2711522013.10.207:3010:0522.51010-1220-250.5-11:156252-2剖面2721532013.10.2010:251358、:0022.51010-1220-250.5-11:156252-2剖面2731542013.10.2013:2015:5522.51010-1220-250.5-11:156252-2剖面2741552013.10.2016:1518:5022.51010-1220-250.5-11:156252-2剖面2751562013.10.2019:1021:4522.51010-1220-250.5-11:156252-2剖面2761572013.10.2022:050:4022.51010-1220-250.5-11:156252-2剖面2771582013.10.207:3010:0522.559、1010-1220-250.5-11:156252-2剖面2781592013.10.2010:2513:0022.51010-1220-250.5-11:156252-2剖面2791602013.10.2013:2015:5522.51010-1220-250.5-11:156252-2剖面旋旋喷喷桩桩施施工工记记录录工程名称:真美花园二期 设计桩径:600mm 序号桩号施工日期工作时间施工桩长(m)旋转速度(r/min)提升速度(cm/min)高压水泥浆空压机水灰比水泥用量(kg/桩)备注开始时间(h min)终止时间(h min)压力(Mpa)流量(L/min)压力(Mpa)流量(L/m60、in)机长:施工员:监理工程师:第 11 页2801612013.10.2016:1518:5022.51010-1220-250.5-11:156252-2剖面2811622013.10.2019:1021:4522.51010-1220-250.5-11:156252-2剖面2821632013.10.2022:050:4022.51010-1220-250.5-11:156252-2剖面2831642013.10.207:3010:0522.51010-1220-250.5-11:156252-2剖面2841652013.10.2010:2513:0022.51010-1220-250.61、5-11:156252-2剖面2851662013.10.2013:2015:5522.51010-1220-250.5-11:156252-2剖面2861672013.10.2016:1518:5022.51010-1220-250.5-11:156252-2剖面2871682013.10.2019:1021:4522.51010-1220-250.5-11:156252-2剖面2881692013.10.2022:050:4022.51010-1220-250.5-11:156252-2剖面2891702013.10.207:3010:0522.51010-1220-250.5-11:1562、6252-2剖面2901712013.10.2010:2513:0022.51010-1220-250.5-11:156252-2剖面2911722013.10.2013:2015:5522.51010-1220-250.5-11:156252-2剖面2921732013.10.2016:1518:5022.51010-1220-250.5-11:156252-2剖面2931742013.10.2019:1021:4522.51010-1220-250.5-11:156252-2剖面2941752013.10.2022:050:4022.51010-1220-250.5-11:156252-263、剖面2951762013.10.207:3010:0522.51010-1220-250.5-11:156252-2剖面2961772013.10.2010:2513:0022.51010-1220-250.5-11:156252-2剖面2971782013.10.2013:2015:5522.51010-1220-250.5-11:156252-2剖面2981792013.10.2016:1518:5022.51010-1220-250.5-11:156252-2剖面2998702013.10.207:3010:2025.51010-1220-250.5-11:163754-4剖面3008764、12013.10.2010:4013:3025.51010-1220-250.5-11:163754-4剖面3018722013.10.2013:5016:4025.51010-1220-250.5-11:163754-4剖面3028732013.10.2017:0019:5025.51010-1220-250.5-11:163754-4剖面3038742013.10.2020:1023:0025.51010-1220-250.5-11:163754-4剖面3048752013.10.2023:202:1025.51010-1220-250.5-11:163754-4剖面3058762013.65、10.207:3010:2025.51010-1220-250.5-11:163754-4剖面3068772013.10.2010:4013:3025.51010-1220-250.5-11:163754-4剖面3078782013.10.2013:5016:4025.51010-1220-250.5-11:163754-4剖面旋旋喷喷桩桩施施工工记记录录工程名称:真美花园二期 设计桩径:600mm 序号桩号施工日期工作时间施工桩长(m)旋转速度(r/min)提升速度(cm/min)高压水泥浆空压机水灰比水泥用量(kg/桩)备注开始时间(h min)终止时间(h min)压力(Mpa)流量(L66、/min)压力(Mpa)流量(L/min)机长:施工员:监理工程师:第 12 页3088792013.10.2017:0019:5025.51010-1220-250.5-11:163754-4剖面3098802013.10.2020:1023:0025.51010-1220-250.5-11:163754-4剖面3108812013.10.2023:202:1025.51010-1220-250.5-11:163754-4剖面3118822013.10.207:3010:2025.51010-1220-250.5-11:163754-4剖面3128832013.10.2010:4013:3067、25.51010-1220-250.5-11:163754-4剖面3138842013.10.2013:5016:4025.51010-1220-250.5-11:163754-4剖面3148852013.10.2017:0019:5025.51010-1220-250.5-11:163754-4剖面3158862013.10.2020:1023:0025.51010-1220-250.5-11:163754-4剖面3168872013.10.2023:202:1025.51010-1220-250.5-11:163754-4剖面3178882013.10.207:3010:2025.510168、0-1220-250.5-11:163754-4剖面3188892013.10.2010:4013:3025.51010-1220-250.5-11:163754-4剖面3198902013.10.2013:5016:4025.51010-1220-250.5-11:163754-4剖面3208912013.10.2017:0019:5025.51010-1220-250.5-11:163754-4剖面3218922013.10.2020:1023:0025.51010-1220-250.5-11:163754-4剖面3228932013.10.2023:202:1025.51010-122069、-250.5-11:163754-4剖面3238942013.10.207:3010:2025.51010-1220-250.5-11:163754-4剖面3248952013.10.2010:4013:3025.51010-1220-250.5-11:163754-4剖面3258962013.10.2013:5016:4025.51010-1220-250.5-11:163754-4剖面3268972013.10.2017:0019:5025.51010-1220-250.5-11:163754-4剖面3278982013.10.2020:1023:0025.51010-1220-250.570、-11:163754-4剖面3288992013.10.2023:202:1025.51010-1220-250.5-11:163754-4剖面3299002013.10.207:3010:2025.51010-1220-250.5-11:163754-4剖面3301802013.10.217:3010:0522.51010-1220-250.5-11:156252-2剖面3311812013.10.2110:2513:0022.51010-1220-250.5-11:156252-2剖面3321822013.10.2113:2015:5522.51010-1220-250.5-11:156271、52-2剖面3331832013.10.2116:1518:5022.51010-1220-250.5-11:156252-2剖面3341842013.10.2119:1021:4522.51010-1220-250.5-11:156252-2剖面3351852013.10.2122:050:4022.51010-1220-250.5-11:156252-2剖面旋旋喷喷桩桩施施工工记记录录工程名称:真美花园二期 设计桩径:600mm 序号桩号施工日期工作时间施工桩长(m)旋转速度(r/min)提升速度(cm/min)高压水泥浆空压机水灰比水泥用量(kg/桩)备注开始时间(h min)终止时间(72、h min)压力(Mpa)流量(L/min)压力(Mpa)流量(L/min)机长:施工员:监理工程师:第 13 页3361862013.10.217:3010:0522.51010-1220-250.5-11:156252-2剖面3371872013.10.2110:2513:0022.51010-1220-250.5-11:156252-2剖面3381882013.10.2113:2015:5522.51010-1220-250.5-11:156252-2剖面3391892013.10.2116:1518:5022.51010-1220-250.5-11:156252-2剖面3401902073、13.10.2119:1021:4522.51010-1220-250.5-11:156252-2剖面3411912013.10.2122:050:4022.51010-1220-250.5-11:156252-2剖面3421922013.10.217:3010:0522.51010-1220-250.5-11:156252-2剖面3431932013.10.2110:2513:0022.51010-1220-250.5-11:156252-2剖面3441942013.10.2113:2015:5522.51010-1220-250.5-11:156252-2剖面3451952013.10.274、116:1518:5022.51010-1220-250.5-11:156252-2剖面3461962013.10.2119:1021:4522.51010-1220-250.5-11:156252-2剖面3471972013.10.2122:050:4022.51010-1220-250.5-11:156252-2剖面3481982013.10.217:3010:0522.51010-1220-250.5-11:156252-2剖面3491992013.10.2110:2513:0022.51010-1220-250.5-11:156252-2剖面3502002013.10.2113:20175、5:5522.51010-1220-250.5-11:156252-2剖面3512012013.10.2116:1518:5022.51010-1220-250.5-11:156252-2剖面3522022013.10.2119:1021:4522.51010-1220-250.5-11:156252-2剖面3532032013.10.2122:050:4022.51010-1220-250.5-11:156252-2剖面3542042013.10.217:3010:0522.51010-1220-250.5-11:156252-2剖面3552052013.10.2110:2513:0022.76、51010-1220-250.5-11:156252-2剖面3562062013.10.2113:2015:5522.51010-1220-250.5-11:156252-2剖面3572072013.10.2116:1518:5022.51010-1220-250.5-11:156252-2剖面3582082013.10.2119:1021:4522.51010-1220-250.5-11:156252-2剖面3592092013.10.2122:050:4022.51010-1220-250.5-11:156252-2剖面3602102013.10.217:3010:0522.51010-177、220-250.5-11:156252-2剖面3612112013.10.2110:2513:0022.51010-1220-250.5-11:156252-2剖面3622122013.10.2113:2015:5522.51010-1220-250.5-11:156252-2剖面3632132013.10.2116:1518:5022.51010-1220-250.5-11:156252-2剖面旋旋喷喷桩桩施施工工记记录录工程名称:真美花园二期 设计桩径:600mm 序号桩号施工日期工作时间施工桩长(m)旋转速度(r/min)提升速度(cm/min)高压水泥浆空压机水灰比水泥用量(kg/桩)78、备注开始时间(h min)终止时间(h min)压力(Mpa)流量(L/min)压力(Mpa)流量(L/min)机长:施工员:监理工程师:第 14 页3642142013.10.2119:1021:4522.51010-1220-250.5-11:156252-2剖面3659012013.10.217:3010:2025.51010-1220-250.5-11:163754-4剖面3669022013.10.2110:4013:3025.51010-1220-250.5-11:163754-4剖面3679032013.10.2113:5016:4025.51010-1220-250.5-11:79、163754-4剖面3689042013.10.2117:0019:5025.51010-1220-250.5-11:163754-4剖面3699052013.10.2120:1023:0025.51010-1220-250.5-11:163754-4剖面3709062013.10.2123:202:1025.51010-1220-250.5-11:163754-4剖面3719072013.10.217:3010:2025.51010-1220-250.5-11:163754-4剖面3729082013.10.2110:4013:3025.51010-1220-250.5-11:163754-80、4剖面3739092013.10.2113:5016:4025.51010-1220-250.5-11:163754-4剖面3749102013.10.2117:0019:5025.51010-1220-250.5-11:163754-4剖面3759112013.10.2120:1023:0025.51010-1220-250.5-11:163754-4剖面3769122013.10.2123:202:1025.51010-1220-250.5-11:163754-4剖面3779132013.10.217:3010:2025.51010-1220-250.5-11:163754-4剖面378981、142013.10.2110:4013:3025.51010-1220-250.5-11:163754-4剖面3799152013.10.2113:5016:4025.51010-1220-250.5-11:163754-4剖面3809162013.10.2117:0019:5025.51010-1220-250.5-11:163754-4剖面3819172013.10.2120:1023:0025.51010-1220-250.5-11:163754-4剖面3829182013.10.2123:202:1025.51010-1220-250.5-11:163754-4剖面383919201382、.10.217:3010:2025.51010-1220-250.5-11:163754-4剖面3849202013.10.2110:4013:3025.51010-1220-250.5-11:163754-4剖面3859212013.10.2113:5016:4025.51010-1220-250.5-11:163754-4剖面3869222013.10.2117:0019:5025.51010-1220-250.5-11:163754-4剖面3872152013.10.227:3010:0522.51010-1220-250.5-11:156252-2剖面3882162013.10.22183、0:2513:0022.51010-1220-250.5-11:156252-2剖面3892172013.10.2213:2015:5522.51010-1220-250.5-11:156252-2剖面3902182013.10.2216:1518:5022.51010-1220-250.5-11:156252-2剖面3912192013.10.2219:1021:4522.51010-1220-250.5-11:156252-2剖面旋旋喷喷桩桩施施工工记记录录工程名称:真美花园二期 设计桩径:600mm 序号桩号施工日期工作时间施工桩长(m)旋转速度(r/min)提升速度(cm/min)高压84、水泥浆空压机水灰比水泥用量(kg/桩)备注开始时间(h min)终止时间(h min)压力(Mpa)流量(L/min)压力(Mpa)流量(L/min)机长:施工员:监理工程师:第 15 页3922202013.10.2222:050:4022.51010-1220-250.5-11:156252-2剖面3932212013.10.227:3010:0522.51010-1220-250.5-11:156252-2剖面3942222013.10.2210:2513:0022.51010-1220-250.5-11:156252-2剖面3952232013.10.2213:2015:5522.5185、010-1220-250.5-11:156252-2剖面3962242013.10.2216:1518:5022.51010-1220-250.5-11:156252-2剖面3972252013.10.2219:1021:4522.51010-1220-250.5-11:156252-2剖面3982262013.10.2222:050:4022.51010-1220-250.5-11:156252-2剖面3992272013.10.227:3010:0522.51010-1220-250.5-11:156252-2剖面4002282013.10.2210:2513:0022.51010-12286、0-250.5-11:156252-2剖面4012292013.10.2213:2015:5522.51010-1220-250.5-11:156252-2剖面4022302013.10.2216:1518:5022.51010-1220-250.5-11:156252-2剖面4032312013.10.2219:1021:4522.51010-1220-250.5-11:156252-2剖面4042322013.10.2222:050:4022.51010-1220-250.5-11:156252-2剖面4052332013.10.227:3010:0522.51010-1220-250.587、-11:156252-2剖面4062342013.10.2210:2513:0022.51010-1220-250.5-11:156252-2剖面4072352013.10.2213:2015:5522.51010-1220-250.5-11:156252-2剖面4082362013.10.2216:1518:5022.51010-1220-250.5-11:156252-2剖面4092372013.10.2219:1021:4522.51010-1220-250.5-11:156252-2剖面4102382013.10.2222:050:4022.51010-1220-250.5-11:1588、6252-2剖面4112392013.10.227:3010:0522.51010-1220-250.5-11:156252-2剖面4122402013.10.2210:2513:0022.51010-1220-250.5-11:156252-2剖面4132412013.10.2213:2015:5522.51010-1220-250.5-11:156252-2剖面4142422013.10.2216:1518:5022.51010-1220-250.5-11:156252-2剖面4152432013.10.2219:1021:4522.51010-1220-250.5-11:156252-289、剖面4162442013.10.2222:050:4022.51010-1220-250.5-11:156252-2剖面4172452013.10.227:3010:0522.51010-1220-250.5-11:156252-2剖面4182462013.10.2210:2513:0022.51010-1220-250.5-11:156252-2剖面4192472013.10.2213:2015:5522.51010-1220-250.5-11:156252-2剖面旋旋喷喷桩桩施施工工记记录录工程名称:真美花园二期 设计桩径:600mm 序号桩号施工日期工作时间施工桩长(m)旋转速度(r/m90、in)提升速度(cm/min)高压水泥浆空压机水灰比水泥用量(kg/桩)备注开始时间(h min)终止时间(h min)压力(Mpa)流量(L/min)压力(Mpa)流量(L/min)机长:施工员:监理工程师:第 16 页4209232013.10.227:3010:2025.51010-1220-250.5-11:163754-4剖面4219242013.10.2210:4013:3025.51010-1220-250.5-11:163754-4剖面4229252013.10.2213:5016:4025.51010-1220-250.5-11:163754-4剖面4239262013.1091、.2217:0019:5025.51010-1220-250.5-11:163754-4剖面4249272013.10.2220:1023:0025.51010-1220-250.5-11:163754-4剖面4259282013.10.2223:202:1025.51010-1220-250.5-11:163754-4剖面4269292013.10.227:3010:2025.51010-1220-250.5-11:163754-4剖面4279302013.10.2210:4013:3025.51010-1220-250.5-11:163754-4剖面4289312013.10.2213:592、016:4025.51010-1220-250.5-11:163754-4剖面4299322013.10.2217:0019:5025.51010-1220-250.5-11:163754-4剖面4309332013.10.2220:1023:0025.51010-1220-250.5-11:163754-4剖面4319342013.10.2223:202:1025.51010-1220-250.5-11:163754-4剖面4329352013.10.227:3010:2025.51010-1220-250.5-11:163754-4剖面4339362013.10.2210:4013:30293、5.51010-1220-250.5-11:163754-4剖面4349372013.10.2213:5016:4025.51010-1220-250.5-11:163754-4剖面4359382013.10.2217:0019:5025.51010-1220-250.5-11:163754-4剖面4369392013.10.2220:1023:0025.51010-1220-250.5-11:163754-4剖面4379402013.10.2223:202:1025.51010-1220-250.5-11:163754-4剖面4389412013.10.227:3010:2025.5101094、-1220-250.5-11:163754-4剖面4399422013.10.2210:4013:3025.51010-1220-250.5-11:163754-4剖面4409432013.10.2213:5016:4025.51010-1220-250.5-11:163754-4剖面4419442013.10.2217:0019:5025.51010-1220-250.5-11:163754-4剖面4429452013.10.2220:1023:0025.51010-1220-250.5-11:163754-4剖面4439462013.10.2223:202:1025.51010-1220-95、250.5-11:163754-4剖面4449472013.10.227:3010:2025.51010-1220-250.5-11:163754-4剖面4459482013.10.2210:4013:3025.51010-1220-250.5-11:163754-4剖面4469492013.10.2213:5016:4025.51010-1220-250.5-11:163754-4剖面4479502013.10.2217:0019:5025.51010-1220-250.5-11:163754-4剖面旋旋喷喷桩桩施施工工记记录录工程名称:真美花园二期 设计桩径:600mm 序号桩号施工日期工96、作时间施工桩长(m)旋转速度(r/min)提升速度(cm/min)高压水泥浆空压机水灰比水泥用量(kg/桩)备注开始时间(h min)终止时间(h min)压力(Mpa)流量(L/min)压力(Mpa)流量(L/min)机长:施工员:监理工程师:第 17 页4489512013.10.2220:1023:0025.51010-1220-250.5-11:163754-4剖面4499522013.10.2223:202:1025.51010-1220-250.5-11:163754-4剖面4509532013.10.227:3010:2025.51010-1220-250.5-11:16375497、-4剖面4519542013.10.2210:4013:3025.51010-1220-250.5-11:163754-4剖面4529552013.10.2213:5016:4025.51010-1220-250.5-11:163754-4剖面4539562013.10.2217:0019:5025.51010-1220-250.5-11:163754-4剖面4549572013.10.2220:1023:0025.51010-1220-250.5-11:163754-4剖面4559582013.10.2223:202:1025.51010-1220-250.5-11:163754-4剖面4598、69592013.10.227:3010:2025.51010-1220-250.5-11:163754-4剖面4579602013.10.2210:4013:3025.51010-1220-250.5-11:163754-4剖面4589612013.10.2213:5016:20221010-1220-250.5-11:155005-5剖面4599622013.10.2216:4019:10221010-1220-250.5-11:155005-5剖面4602482103.10.237:3010:0522.51010-1220-250.5-11:156252-2剖面4612492103.1099、.2310:2513:0022.51010-1220-250.5-11:156252-2剖面4622502103.10.2313:2015:5522.51010-1220-250.5-11:156252-2剖面4632512103.10.2316:1518:5022.51010-1220-250.5-11:156252-2剖面4642522103.10.2319:1021:4522.51010-1220-250.5-11:156252-2剖面4652532103.10.2322:050:4022.51010-1220-250.5-11:156252-2剖面4662542103.10.237:3100、010:0522.51010-1220-250.5-11:156252-2剖面4672552103.10.2310:2513:0022.51010-1220-250.5-11:156252-2剖面4682562103.10.2313:2015:5522.51010-1220-250.5-11:156252-2剖面4692572103.10.2316:1518:5022.51010-1220-250.5-11:156252-2剖面4702582103.10.2319:1021:4522.51010-1220-250.5-11:156252-2剖面4712592103.10.2322:050:40101、22.51010-1220-250.5-11:156252-2剖面4722602103.10.237:3010:0522.51010-1220-250.5-11:156252-2剖面4732612103.10.2310:2513:0022.51010-1220-250.5-11:156252-2剖面4742622103.10.2313:2015:5522.51010-1220-250.5-11:156252-2剖面4752632103.10.2316:1518:5022.51010-1220-250.5-11:156252-2剖面旋旋喷喷桩桩施施工工记记录录工程名称:真美花园二期 设计桩径:6102、00mm 序号桩号施工日期工作时间施工桩长(m)旋转速度(r/min)提升速度(cm/min)高压水泥浆空压机水灰比水泥用量(kg/桩)备注开始时间(h min)终止时间(h min)压力(Mpa)流量(L/min)压力(Mpa)流量(L/min)机长:施工员:监理工程师:第 18 页4762642103.10.2319:1021:4522.51010-1220-250.5-11:156252-2剖面4772652103.10.2322:050:4022.51010-1220-250.5-11:156252-2剖面4782662103.10.237:3010:0522.51010-1220-2103、50.5-11:156252-2剖面4792672103.10.2310:2513:0022.51010-1220-250.5-11:156252-2剖面4802682103.10.2313:2015:5522.51010-1220-250.5-11:156252-2剖面4812692103.10.2316:1518:5022.51010-1220-250.5-11:156252-2剖面4822702103.10.2319:1021:4522.51010-1220-250.5-11:156252-2剖面4832712103.10.2322:050:4022.51010-1220-250.5-1104、1:156252-2剖面4842722103.10.237:3010:0522.51010-1220-250.5-11:156252-2剖面4852732103.10.2310:2513:0022.51010-1220-250.5-11:156252-2剖面4862742103.10.2313:2015:5522.51010-1220-250.5-11:156252-2剖面4872752103.10.2316:1518:5022.51010-1220-250.5-11:156252-2剖面4882762103.10.2319:1021:4522.51010-1220-250.5-11:1562105、52-2剖面4892772103.10.2322:050:4022.51010-1220-250.5-11:156252-2剖面4902782103.10.237:3010:0522.51010-1220-250.5-11:156252-2剖面4912792103.10.2310:2513:0022.51010-1220-250.5-11:156252-2剖面4922802103.10.2313:2015:5522.51010-1220-250.5-11:156252-2剖面4932812103.10.2316:1518:5022.51010-1220-250.5-11:156252-2剖面4106、942822103.10.2319:1021:4522.51010-1220-250.5-11:156252-2剖面4959632103.10.237:3010:00221010-1220-250.5-11:155005-5剖面4969642103.10.2310:2012:50221010-1220-250.5-11:155005-5剖面4979652103.10.2313:1015:40221010-1220-250.5-11:155005-5剖面4989662103.10.2316:0018:30221010-1220-250.5-11:155005-5剖面4999672103.10.2107、318:5021:20221010-1220-250.5-11:155005-5剖面5009682103.10.2321:400:10221010-1220-250.5-11:155005-5剖面5019692103.10.237:3010:00221010-1220-250.5-11:155005-5剖面5029702103.10.2310:2012:50221010-1220-250.5-11:155005-5剖面5039712103.10.2313:1015:40221010-1220-250.5-11:155005-5剖面旋旋喷喷桩桩施施工工记记录录工程名称:真美花园二期 设计桩径:6108、00mm 序号桩号施工日期工作时间施工桩长(m)旋转速度(r/min)提升速度(cm/min)高压水泥浆空压机水灰比水泥用量(kg/桩)备注开始时间(h min)终止时间(h min)压力(Mpa)流量(L/min)压力(Mpa)流量(L/min)机长:施工员:监理工程师:第 19 页5049722103.10.2316:0018:30221010-1220-250.5-11:155005-5剖面5059732103.10.2318:5021:20221010-1220-250.5-11:155005-5剖面5069742103.10.2321:400:10221010-1220-250.5-109、11:155005-5剖面5079752103.10.237:3010:00221010-1220-250.5-11:155005-5剖面5089762103.10.2310:2012:50221010-1220-250.5-11:155005-5剖面5099772103.10.2313:1015:40221010-1220-250.5-11:155005-5剖面5109782103.10.2316:0018:30221010-1220-250.5-11:155005-5剖面5119792103.10.2318:5021:20221010-1220-250.5-11:155005-5剖面512110、9802103.10.2321:400:10221010-1220-250.5-11:155005-5剖面5139812103.10.237:3010:00221010-1220-250.5-11:155005-5剖面5149822103.10.2310:2012:50221010-1220-250.5-11:155005-5剖面5159832103.10.2313:1015:40221010-1220-250.5-11:155005-5剖面5169842103.10.2316:0018:30221010-1220-250.5-11:155005-5剖面5179852103.10.2318:5111、021:20221010-1220-250.5-11:155005-5剖面5189862103.10.2321:400:10221010-1220-250.5-11:155005-5剖面5199872103.10.237:3010:00221010-1220-250.5-11:155005-5剖面5209882103.10.2310:2012:50221010-1220-250.5-11:155005-5剖面5219892103.10.2313:1015:40221010-1220-250.5-11:155005-5剖面5229902103.10.2316:0018:30221010-1220112、-250.5-11:155005-5剖面5239912103.10.2318:5021:20221010-1220-250.5-11:155005-5剖面5249922103.10.2321:400:10221010-1220-250.5-11:155005-5剖面5259932103.10.237:3010:00221010-1220-250.5-11:155005-5剖面5269942103.10.2310:2012:50221010-1220-250.5-11:155005-5剖面5279952103.10.2313:1015:40221010-1220-250.5-11:155005-113、5剖面5282832103.10.247:3010:00221010-1220-250.5-11:155002-2剖面5292842103.10.2410:2012:50221010-1220-250.5-11:155002-2剖面5302852103.10.2413:1015:40221010-1220-250.5-11:155002-2剖面5312862103.10.2416:0018:30221010-1220-250.5-11:155002-2剖面旋旋喷喷桩桩施施工工记记录录工程名称:真美花园二期 设计桩径:600mm 序号桩号施工日期工作时间施工桩长(m)旋转速度(r/min)提升速114、度(cm/min)高压水泥浆空压机水灰比水泥用量(kg/桩)备注开始时间(h min)终止时间(h min)压力(Mpa)流量(L/min)压力(Mpa)流量(L/min)机长:施工员:监理工程师:第 20 页5322872103.10.2418:5021:20221010-1220-250.5-11:155002-2剖面5332882103.10.2421:400:10221010-1220-250.5-11:155002-2剖面5342892103.10.2410:2012:50221010-1220-250.5-11:155002-2剖面5352902103.10.2413:1015:4115、0221010-1220-250.5-11:155002-2剖面5362912103.10.247:3010:2025.51010-1220-250.5-11:163753-3剖面5372922103.10.2410:4013:3025.51010-1220-250.5-11:163753-3剖面5382932103.10.2413:5016:4025.51010-1220-250.5-11:163753-3剖面5392942103.10.2417:0019:5025.51010-1220-250.5-11:163753-3剖面5402952103.10.2420:1023:0025.5101116、0-1220-250.5-11:163753-3剖面5412962103.10.2423:202:1025.51010-1220-250.5-11:163753-3剖面5422972103.10.247:3010:2025.51010-1220-250.5-11:163753-3剖面5432982103.10.2410:4013:3025.51010-1220-250.5-11:163753-3剖面5442992103.10.2413:5016:4025.51010-1220-250.5-11:163753-3剖面5453002103.10.2417:0019:5025.51010-1220-117、250.5-11:163753-3剖面5463012103.10.2420:1023:0025.51010-1220-250.5-11:163753-3剖面5473022103.10.2423:202:1025.51010-1220-250.5-11:163753-3剖面5483032103.10.247:3010:2025.51010-1220-250.5-11:163753-3剖面5493042103.10.2410:4013:3025.51010-1220-250.5-11:163753-3剖面5503052103.10.2413:5016:4025.51010-1220-250.5-1118、1:163753-3剖面5513062103.10.2417:0019:5025.51010-1220-250.5-11:163753-3剖面5523072103.10.2420:1023:0025.51010-1220-250.5-11:163753-3剖面5533082103.10.2423:202:1025.51010-1220-250.5-11:163753-3剖面5543092103.10.247:3010:2025.51010-1220-250.5-11:163753-3剖面5553102103.10.2410:4013:3025.51010-1220-250.5-11:16375119、3-3剖面5563112103.10.2413:5016:4025.51010-1220-250.5-11:163753-3剖面5573122103.10.2417:0019:5025.51010-1220-250.5-11:163753-3剖面5583132103.10.2420:1023:0025.51010-1220-250.5-11:163753-3剖面5593142103.10.2423:202:1025.51010-1220-250.5-11:163753-3剖面旋旋喷喷桩桩施施工工记记录录工程名称:真美花园二期 设计桩径:600mm 序号桩号施工日期工作时间施工桩长(m)旋转速度120、(r/min)提升速度(cm/min)高压水泥浆空压机水灰比水泥用量(kg/桩)备注开始时间(h min)终止时间(h min)压力(Mpa)流量(L/min)压力(Mpa)流量(L/min)机长:施工员:监理工程师:第 21 页5603152103.10.247:3010:2025.51010-1220-250.5-11:163753-3剖面5613162103.10.2410:4013:3025.51010-1220-250.5-11:163753-3剖面5623172103.10.2413:5016:4025.51010-1220-250.5-11:163753-3剖面563996210121、3.10.247:3010:00221010-1220-250.5-11:155005-5剖面5649972103.10.2410:2012:50221010-1220-250.5-11:155005-5剖面5659982103.10.2413:1015:40221010-1220-250.5-11:155005-5剖面5669992103.10.2416:0018:30221010-1220-250.5-11:155005-5剖面56710002103.10.2418:5021:20221010-1220-250.5-11:155005-5剖面56810012103.10.2421:400:122、10221010-1220-250.5-11:155005-5剖面56910022103.10.247:3010:00221010-1220-250.5-11:155005-5剖面57010032103.10.2410:2012:50221010-1220-250.5-11:155005-5剖面57110042103.10.2413:1015:40221010-1220-250.5-11:155005-5剖面57210052103.10.2416:0018:30221010-1220-250.5-11:155005-5剖面57310062103.10.2418:5021:20221010-12123、20-250.5-11:155005-5剖面57410072103.10.2421:400:10221010-1220-250.5-11:155005-5剖面57510082103.10.247:3010:00221010-1220-250.5-11:155005-5剖面57610092103.10.2410:2012:50221010-1220-250.5-11:155005-5剖面57710102103.10.2413:1015:40221010-1220-250.5-11:155005-5剖面57810112103.10.2416:0018:30221010-1220-250.5-11:124、155005-5剖面57910122103.10.2418:5021:20221010-1220-250.5-11:155005-5剖面58010132103.10.2421:400:10221010-1220-250.5-11:155005-5剖面58110142103.10.247:3010:00221010-1220-250.5-11:155005-5剖面58210152103.10.2410:2012:50221010-1220-250.5-11:155005-5剖面58310162103.10.2413:1015:40221010-1220-250.5-11:155005-5剖面58125、43182103.10.257:3010:2025.51010-1220-250.5-11:163753-3剖面5853192103.10.2510:4013:3025.51010-1220-250.5-11:163753-3剖面5863202103.10.2513:5016:4025.51010-1220-250.5-11:163753-3剖面5873212103.10.2517:0019:5025.51010-1220-250.5-11:163753-3剖面旋旋喷喷桩桩施施工工记记录录工程名称:真美花园二期 设计桩径:600mm 序号桩号施工日期工作时间施工桩长(m)旋转速度(r/min)126、提升速度(cm/min)高压水泥浆空压机水灰比水泥用量(kg/桩)备注开始时间(h min)终止时间(h min)压力(Mpa)流量(L/min)压力(Mpa)流量(L/min)机长:施工员:监理工程师:第 22 页5883222103.10.2520:1023:0025.51010-1220-250.5-11:163753-3剖面5893232103.10.2523:202:1025.51010-1220-250.5-11:163753-3剖面5903242103.10.257:3010:2025.51010-1220-250.5-11:163753-3剖面5913252103.10.251127、0:4013:3025.51010-1220-250.5-11:163753-3剖面5923262103.10.2513:5016:4025.51010-1220-250.5-11:163753-3剖面5933272103.10.2517:0019:5025.51010-1220-250.5-11:163753-3剖面5943282103.10.2520:1023:0025.51010-1220-250.5-11:163753-3剖面5953292103.10.2523:202:1025.51010-1220-250.5-11:163753-3剖面5963302103.10.257:3010:128、2025.51010-1220-250.5-11:163753-3剖面5973312103.10.2510:4013:3025.51010-1220-250.5-11:163753-3剖面5983322103.10.2513:5016:4025.51010-1220-250.5-11:163753-3剖面5993332103.10.2517:0019:5025.51010-1220-250.5-11:163753-3剖面6003342103.10.2520:1023:0025.51010-1220-250.5-11:163753-3剖面6013352103.10.2523:202:1025.5129、1010-1220-250.5-11:163753-3剖面6023362103.10.257:3010:2025.51010-1220-250.5-11:163753-3剖面6033372103.10.2510:4013:3025.51010-1220-250.5-11:163753-3剖面6043382103.10.2513:5016:4025.51010-1220-250.5-11:163753-3剖面6053392103.10.2517:0019:5025.51010-1220-250.5-11:163753-3剖面6063402103.10.2520:1023:0025.51010-1130、220-250.5-11:163753-3剖面6073412103.10.2523:202:1025.51010-1220-250.5-11:163753-3剖面6083422103.10.257:3010:2025.51010-1220-250.5-11:163753-3剖面6093432103.10.2510:4013:3025.51010-1220-250.5-11:163753-3剖面6103442103.10.2513:5016:4025.51010-1220-250.5-11:163753-3剖面6113452103.10.2517:0019:5025.51010-1220-250131、.5-11:163753-3剖面6123462103.10.2520:1023:0025.51010-1220-250.5-11:163753-3剖面6133472103.10.2523:202:1025.51010-1220-250.5-11:163753-3剖面6143482103.10.257:3010:2025.51010-1220-250.5-11:163753-3剖面6153492103.10.2510:4013:3025.51010-1220-250.5-11:163753-3剖面旋旋喷喷桩桩施施工工记记录录工程名称:真美花园二期 设计桩径:600mm 序号桩号施工日期工作时间施132、工桩长(m)旋转速度(r/min)提升速度(cm/min)高压水泥浆空压机水灰比水泥用量(kg/桩)备注开始时间(h min)终止时间(h min)压力(Mpa)流量(L/min)压力(Mpa)流量(L/min)机长:施工员:监理工程师:第 23 页6163502103.10.2513:5016:4025.51010-1220-250.5-11:163753-3剖面6173512103.10.2517:0019:5025.51010-1220-250.5-11:163753-3剖面6183522103.10.2520:1023:0025.51010-1220-250.5-11:163753-3133、剖面61910172103.10.257:3010:00221010-1220-250.5-11:155005-5剖面62010182103.10.2510:2012:50221010-1220-250.5-11:155005-5剖面62110192103.10.2513:1015:40221010-1220-250.5-11:155005-5剖面62210202103.10.2516:0018:30221010-1220-250.5-11:155005-5剖面62310212103.10.2518:5021:20221010-1220-250.5-11:155005-5剖面624102221134、03.10.2521:400:10221010-1220-250.5-11:155005-5剖面62510232103.10.257:3010:00221010-1220-250.5-11:155005-5剖面62610242103.10.2510:2012:50221010-1220-250.5-11:155005-5剖面62710252103.10.2513:1015:40221010-1220-250.5-11:155005-5剖面62810262103.10.2516:0018:30221010-1220-250.5-11:155005-5剖面62910272103.10.2518:5135、021:20221010-1220-250.5-11:155005-5剖面63010282103.10.2521:400:10221010-1220-250.5-11:155005-5剖面63110292103.10.257:3010:00221010-1220-250.5-11:155005-5剖面63210302103.10.2510:2012:50221010-1220-250.5-11:155005-5剖面63310312103.10.2513:1015:40221010-1220-250.5-11:155005-5剖面63410322103.10.2516:0018:30221010136、-1220-250.5-11:155005-5剖面63510332103.10.2518:5021:20221010-1220-250.5-11:155005-5剖面63610342103.10.2521:400:10221010-1220-250.5-11:155005-5剖面63710352103.10.257:3010:00221010-1220-250.5-11:155005-5剖面63810362103.10.2510:2012:50221010-1220-250.5-11:155005-5剖面63910372103.10.2513:1015:40221010-1220-250.5-137、11:155005-5剖面64010382103.10.2516:0018:30221010-1220-250.5-11:155005-5剖面64110392103.10.2518:5021:20221010-1220-250.5-11:155005-5剖面64210402103.10.2521:400:10221010-1220-250.5-11:155005-5剖面64310412103.10.2516:0018:30221010-1220-250.5-11:155005-5剖面旋旋喷喷桩桩施施工工记记录录工程名称:真美花园二期 设计桩径:600mm 序号桩号施工日期工作时间施工桩长(m)138、旋转速度(r/min)提升速度(cm/min)高压水泥浆空压机水灰比水泥用量(kg/桩)备注开始时间(h min)终止时间(h min)压力(Mpa)流量(L/min)压力(Mpa)流量(L/min)机长:施工员:监理工程师:第 24 页6443532103.10.267:3010:2025.51010-1220-250.5-11:163753-3剖面6453542103.10.2610:4013:3025.51010-1220-250.5-11:163753-3剖面6463552103.10.2613:5016:4025.51010-1220-250.5-11:163753-3剖面64735139、62103.10.2617:0019:5025.51010-1220-250.5-11:163753-3剖面6483572103.10.2620:1023:0025.51010-1220-250.5-11:163753-3剖面6493582103.10.2623:202:1025.51010-1220-250.5-11:163753-3剖面6503592103.10.267:3010:2025.51010-1220-250.5-11:163753-3剖面6513602103.10.2610:4013:3025.51010-1220-250.5-11:163753-3剖面6523612103.1140、0.2613:5016:4025.51010-1220-250.5-11:163753-3剖面6533622103.10.2617:0019:5025.51010-1220-250.5-11:163753-3剖面6543632103.10.2620:1023:0025.51010-1220-250.5-11:163753-3剖面6553642103.10.2623:202:1025.51010-1220-250.5-11:163753-3剖面6563652103.10.267:3010:2025.51010-1220-250.5-11:163753-3剖面6573662103.10.2610:141、4013:3025.51010-1220-250.5-11:163753-3剖面6583672103.10.2613:5016:4025.51010-1220-250.5-11:163753-3剖面6593682103.10.2617:0019:5025.51010-1220-250.5-11:163753-3剖面6603692103.10.2620:1023:0025.51010-1220-250.5-11:163753-3剖面6613702103.10.2623:202:1025.51010-1220-250.5-11:163753-3剖面6623712103.10.2617:0019:5142、025.51010-1220-250.5-11:163753-3剖面6633722103.10.2620:1023:0025.51010-1220-250.5-11:163753-3剖面66410422103.10.267:3010:00221010-1220-250.5-11:155005-5剖面66510432103.10.2610:2012:50221010-1220-250.5-11:155005-5剖面66610442103.10.2613:1015:40221010-1220-250.5-11:155005-5剖面66710452103.10.2616:0018:30221010-143、1220-250.5-11:155005-5剖面66810462103.10.2618:5021:20221010-1220-250.5-11:155005-5剖面66910472103.10.2621:400:10221010-1220-250.5-11:155005-5剖面67010482103.10.267:3010:00221010-1220-250.5-11:155005-5剖面67110492103.10.2610:2012:50221010-1220-250.5-11:155005-5剖面旋旋喷喷桩桩施施工工记记录录工程名称:真美花园二期 设计桩径:600mm 序号桩号施工日期工144、作时间施工桩长(m)旋转速度(r/min)提升速度(cm/min)高压水泥浆空压机水灰比水泥用量(kg/桩)备注开始时间(h min)终止时间(h min)压力(Mpa)流量(L/min)压力(Mpa)流量(L/min)机长:施工员:监理工程师:第 25 页67210502103.10.2613:1015:40221010-1220-250.5-11:155005-5剖面67310512103.10.2616:0018:30221010-1220-250.5-11:155005-5剖面6743732103.10.277:3010:2025.51010-1220-250.5-11:163753-145、3剖面6753742103.10.2710:4013:3025.51010-1220-250.5-11:163753-3剖面6763752103.10.2713:5016:4025.51010-1220-250.5-11:163753-3剖面6773762103.10.2717:0019:5025.51010-1220-250.5-11:163753-3剖面6783772103.10.2720:1023:0025.51010-1220-250.5-11:163753-3剖面6793782103.10.2723:202:1025.51010-1220-250.5-11:163753-3剖面680146、3792103.10.277:3010:2025.51010-1220-250.5-11:163753-3剖面6813802103.10.2710:4013:3025.51010-1220-250.5-11:163753-3剖面6823812103.10.2713:5016:4025.51010-1220-250.5-11:163753-3剖面6833822103.10.2717:0019:5025.51010-1220-250.5-11:163753-3剖面6843832103.10.2720:1023:0025.51010-1220-250.5-11:163753-3剖面685384210147、3.10.2723:202:1025.51010-1220-250.5-11:163753-3剖面6863852103.10.277:3010:2025.51010-1220-250.5-11:163753-3剖面6873862103.10.2710:4013:3025.51010-1220-250.5-11:163753-3剖面6883872103.10.2713:5016:4025.51010-1220-250.5-11:163753-3剖面68910522103.10.277:3010:00221010-1220-250.5-11:155005-5剖面69010532103.10.271148、0:2012:50221010-1220-250.5-11:155005-5剖面69110542103.10.2713:1015:40221010-1220-250.5-11:155005-5剖面69210552103.10.2716:0018:30221010-1220-250.5-11:155005-5剖面69310562103.10.2718:5021:20221010-1220-250.5-11:155005-5剖面69410572103.10.2721:400:10221010-1220-250.5-11:155005-5剖面69510582103.10.277:3010:00221149、010-1220-250.5-11:155005-5剖面69610592103.10.2710:2012:50221010-1220-250.5-11:155005-5剖面69710602103.10.2713:1015:40221010-1220-250.5-11:155005-5剖面69810612103.10.2716:0018:30221010-1220-250.5-11:155005-5剖面69910622103.10.2718:5021:20221010-1220-250.5-11:155005-5剖面旋旋喷喷桩桩施施工工记记录录工程名称:真美花园二期 设计桩径:600mm 序号桩150、号施工日期工作时间施工桩长(m)旋转速度(r/min)提升速度(cm/min)高压水泥浆空压机水灰比水泥用量(kg/桩)备注开始时间(h min)终止时间(h min)压力(Mpa)流量(L/min)压力(Mpa)流量(L/min)机长:施工员:监理工程师:第 26 页70010632103.10.2721:400:10221010-1220-250.5-11:155005-5剖面70110642103.10.277:3010:00221010-1220-250.5-11:155005-5剖面70210652103.10.2710:2012:50221010-1220-250.5-11:155151、005-5剖面70310662103.10.2713:1015:40221010-1220-250.5-11:155005-5剖面70410672103.10.2716:0018:30221010-1220-250.5-11:155005-5剖面70510682103.10.2718:5021:20221010-1220-250.5-11:155005-5剖面70610692103.10.2721:400:10221010-1220-250.5-11:155005-5剖面70710702103.10.277:3010:00221010-1220-250.5-11:155005-5剖面70810152、712103.10.2710:2012:50221010-1220-250.5-11:155005-5剖面70910722103.10.2713:1015:40221010-1220-250.5-11:155005-5剖面71010732103.10.2716:0018:30221010-1220-250.5-11:155005-5剖面71110742103.10.2718:5021:20221010-1220-250.5-11:155005-5剖面71210752103.10.2721:400:10221010-1220-250.5-11:155005-5剖面71310762103.10.2153、77:3010:00221010-1220-250.5-11:155005-5剖面71410772103.10.2710:2012:50221010-1220-250.5-11:155005-5剖面71510782103.10.2713:1015:40221010-1220-250.5-11:155005-5剖面7163882103.10.287:3010:2025.51010-1220-250.5-11:163753-3剖面7173892103.10.2810:4013:3025.51010-1220-250.5-11:163753-3剖面7183902103.10.2813:5016:40154、25.51010-1220-250.5-11:163753-3剖面7193912103.10.2817:0019:5025.51010-1220-250.5-11:163753-3剖面7203922103.10.2820:1023:0025.51010-1220-250.5-11:163753-3剖面7213932103.10.2823:202:1025.51010-1220-250.5-11:163753-3剖面7223942103.10.287:3010:2025.51010-1220-250.5-11:163753-3剖面7233952103.10.2810:4013:3025.5101155、0-1220-250.5-11:163753-3剖面7243962103.10.2813:5016:4025.51010-1220-250.5-11:163753-3剖面7253972103.10.2817:0019:5025.51010-1220-250.5-11:163753-3剖面7263982103.10.2820:1023:0025.51010-1220-250.5-11:163753-3剖面7273992103.10.2823:202:1025.51010-1220-250.5-11:163753-3剖面旋旋喷喷桩桩施施工工记记录录工程名称:真美花园二期 设计桩径:600mm 序号156、桩号施工日期工作时间施工桩长(m)旋转速度(r/min)提升速度(cm/min)高压水泥浆空压机水灰比水泥用量(kg/桩)备注开始时间(h min)终止时间(h min)压力(Mpa)流量(L/min)压力(Mpa)流量(L/min)机长:施工员:监理工程师:第 27 页7284002103.10.287:3010:2025.51010-1220-250.5-11:163753-3剖面7294012103.10.2810:4013:3025.51010-1220-250.5-11:163753-3剖面7304022103.10.2813:5016:4025.51010-1220-250.5-1157、1:163753-3剖面7314032103.10.2817:0019:5025.51010-1220-250.5-11:163753-3剖面7324042103.10.2820:1023:0025.51010-1220-250.5-11:163753-3剖面7334052103.10.2823:202:1025.51010-1220-250.5-11:163753-3剖面7344062103.10.287:3010:2025.51010-1220-250.5-11:163753-3剖面7354072103.10.2810:4013:3025.51010-1220-250.5-11:16375158、3-3剖面7364082103.10.2813:5016:4025.51010-1220-250.5-11:163753-3剖面7374092103.10.2817:0019:5025.51010-1220-250.5-11:163753-3剖面7384102103.10.2820:1023:0025.51010-1220-250.5-11:163753-3剖面7394112103.10.2823:202:1025.51010-1220-250.5-11:163753-3剖面7404122103.10.287:3010:2025.51010-1220-250.5-11:163753-3剖面74159、14132103.10.2810:4013:3025.51010-1220-250.5-11:163753-3剖面7424142103.10.2813:5016:4025.51010-1220-250.5-11:163753-3剖面7434152103.10.2817:0019:5025.51010-1220-250.5-11:163753-3剖面7444162103.10.2820:1023:0025.51010-1220-250.5-11:163753-3剖面7454172103.10.2823:202:1025.51010-1220-250.5-11:163753-3剖面74641821160、03.10.287:3010:2025.51010-1220-250.5-11:163753-3剖面7474192103.10.2810:4013:3025.51010-1220-250.5-11:163753-3剖面7484202103.10.2813:5016:4025.51010-1220-250.5-11:163753-3剖面7494212103.10.2817:0019:5025.51010-1220-250.5-11:163753-3剖面7504222103.10.2820:1023:0025.51010-1220-250.5-11:163753-3剖面75110792103.10161、.287:3010:00221010-1220-250.5-11:155005-5剖面75210802103.10.2810:2012:50221010-1220-250.5-11:155005-5剖面75310812103.10.2813:1015:40221010-1220-250.5-11:155005-5剖面75410822103.10.2816:0018:30221010-1220-250.5-11:155005-5剖面75510832103.10.2818:5021:20221010-1220-250.5-11:155005-5剖面旋旋喷喷桩桩施施工工记记录录工程名称:真美花园二期162、 设计桩径:600mm 序号桩号施工日期工作时间施工桩长(m)旋转速度(r/min)提升速度(cm/min)高压水泥浆空压机水灰比水泥用量(kg/桩)备注开始时间(h min)终止时间(h min)压力(Mpa)流量(L/min)压力(Mpa)流量(L/min)机长:施工员:监理工程师:第 28 页75610842103.10.2821:400:10221010-1220-250.5-11:155005-5剖面75710852103.10.287:3010:00221010-1220-250.5-11:155005-5剖面75810862103.10.2810:2012:50221010-12163、20-250.5-11:155005-5剖面75910872103.10.2813:1015:40221010-1220-250.5-11:155005-5剖面76010882103.10.2816:0018:30221010-1220-250.5-11:155005-5剖面76110892103.10.2818:5021:20221010-1220-250.5-11:155005-5剖面76210902103.10.2821:400:10221010-1220-250.5-11:155005-5剖面76310912103.10.287:3010:00221010-1220-250.5-11:164、155005-5剖面76410922103.10.2810:2012:50221010-1220-250.5-11:155005-5剖面76510932103.10.2813:1015:40221010-1220-250.5-11:155005-5剖面76610942103.10.2816:0018:30221010-1220-250.5-11:155005-5剖面76710952103.10.2818:5021:20221010-1220-250.5-11:155005-5剖面76810962103.10.2821:400:10221010-1220-250.5-11:155005-5剖面7165、6910972103.10.287:3010:00221010-1220-250.5-11:155005-5剖面77010982103.10.2810:2012:50221010-1220-250.5-11:155005-5剖面77110992103.10.2813:1015:40221010-1220-250.5-11:155005-5剖面77211002103.10.2816:0018:30221010-1220-250.5-11:155005-5剖面77311012103.10.2818:5021:20221010-1220-250.5-11:155005-5剖面77411022103.166、10.2821:400:10221010-1220-250.5-11:155005-5剖面77511032103.10.287:3010:00221010-1220-250.5-11:155005-5剖面77611042103.10.2810:2012:50221010-1220-250.5-11:155005-5剖面77711052103.10.2813:1015:40221010-1220-250.5-11:155005-5剖面77811062103.10.2816:0018:30221010-1220-250.5-11:155005-5剖面77911072103.10.2818:5021167、:20221010-1220-250.5-11:155005-5剖面78011082103.10.2821:400:10221010-1220-250.5-11:155005-5剖面7814232103.10.297:3010:2025.51010-1220-250.5-11:163753-3剖面7824242103.10.2910:4013:3025.51010-1220-250.5-11:163753-3剖面7834252103.10.2913:5016:4025.51010-1220-250.5-11:163753-3剖面旋旋喷喷桩桩施施工工记记录录工程名称:真美花园二期 设计桩径:60168、0mm 序号桩号施工日期工作时间施工桩长(m)旋转速度(r/min)提升速度(cm/min)高压水泥浆空压机水灰比水泥用量(kg/桩)备注开始时间(h min)终止时间(h min)压力(Mpa)流量(L/min)压力(Mpa)流量(L/min)机长:施工员:监理工程师:第 29 页7844262103.10.2917:0019:5025.51010-1220-250.5-11:163753-3剖面7854272103.10.2920:1023:0025.51010-1220-250.5-11:163753-3剖面7864282103.10.2923:202:1025.51010-1220-2169、50.5-11:163753-3剖面7874292103.10.297:3010:2025.51010-1220-250.5-11:163753-3剖面7884302103.10.2910:4013:3025.51010-1220-250.5-11:163753-3剖面7894312103.10.2913:5016:4025.51010-1220-250.5-11:163753-3剖面7904322103.10.2917:0019:5025.51010-1220-250.5-11:163753-3剖面7914332103.10.2920:1023:0025.51010-1220-250.5-1170、1:163753-3剖面7924342103.10.2923:202:1025.51010-1220-250.5-11:163753-3剖面7934352103.10.297:3010:2025.51010-1220-250.5-11:163753-3剖面7944362103.10.2910:4013:3025.51010-1220-250.5-11:163753-3剖面7954372103.10.2913:5016:4025.51010-1220-250.5-11:163753-3剖面7964382103.10.2917:0019:5025.51010-1220-250.5-11:16375171、3-3剖面7974392103.10.2920:1023:0025.51010-1220-250.5-11:163753-3剖面7984402103.10.2923:202:1025.51010-1220-250.5-11:163753-3剖面7994412103.10.297:3010:2025.51010-1220-250.5-11:163753-3剖面8004422103.10.2910:4013:3025.51010-1220-250.5-11:163753-3剖面8014432103.10.2913:5016:4025.51010-1220-250.5-11:163753-3剖面80172、24442103.10.2917:0019:5025.51010-1220-250.5-11:163753-3剖面8034452103.10.2920:1023:0025.51010-1220-250.5-11:163753-3剖面8044462103.10.2923:202:1025.51010-1220-250.5-11:163753-3剖面8054472103.10.297:3010:2025.51010-1220-250.5-11:163753-3剖面8064482103.10.2910:4013:3025.51010-1220-250.5-11:163753-3剖面807449210173、3.10.2913:5016:4025.51010-1220-250.5-11:163753-3剖面8084502103.10.2917:0019:5025.51010-1220-250.5-11:163753-3剖面8094512103.10.2920:1023:0025.51010-1220-250.5-11:163753-3剖面81011092103.10.297:3010:00221010-1220-250.5-11:155005-5剖面81111102103.10.2910:2012:50221010-1220-250.5-11:155005-5剖面旋旋喷喷桩桩施施工工记记录录工程名174、称:真美花园二期 设计桩径:600mm 序号桩号施工日期工作时间施工桩长(m)旋转速度(r/min)提升速度(cm/min)高压水泥浆空压机水灰比水泥用量(kg/桩)备注开始时间(h min)终止时间(h min)压力(Mpa)流量(L/min)压力(Mpa)流量(L/min)机长:施工员:监理工程师:第 30 页81211112103.10.2913:1015:40221010-1220-250.5-11:155005-5剖面81311122103.10.2916:0018:30221010-1220-250.5-11:155005-5剖面81411132103.10.2918:5021:2175、0221010-1220-250.5-11:155005-5剖面81511142103.10.2921:400:10221010-1220-250.5-11:155005-5剖面81611152103.10.297:309:4520.51010-1220-250.5-11:151256-6剖面81711162103.10.2910:0512:2020.51010-1220-250.5-11:151256-6剖面81811172103.10.2912:4014:5520.51010-1220-250.5-11:151256-6剖面81911182103.10.2915:1517:3020.510176、10-1220-250.5-11:151256-6剖面82011192103.10.2917:5020:0520.51010-1220-250.5-11:151256-6剖面82111202103.10.2920:2522:4020.51010-1220-250.5-11:151256-6剖面82211212103.10.2923:001:1520.51010-1220-250.5-11:151256-6剖面82311222103.10.297:309:4520.51010-1220-250.5-11:151256-6剖面82411232103.10.2910:0512:2020.51010-177、1220-250.5-11:151256-6剖面82511242103.10.2912:4014:5520.51010-1220-250.5-11:151256-6剖面82611252103.10.2915:1517:3020.51010-1220-250.5-11:151256-6剖面82711262103.10.2917:5020:0520.51010-1220-250.5-11:151256-6剖面8284522103.10.307:3010:2025.51010-1220-250.5-11:163753-3剖面8294532103.10.3010:4013:3025.51010-122178、0-250.5-11:163753-3剖面8304542103.10.3013:5016:4025.51010-1220-250.5-11:163753-3剖面8314552103.10.3017:0019:5025.51010-1220-250.5-11:163753-3剖面8324562103.10.3020:1023:0025.51010-1220-250.5-11:163753-3剖面8334572103.10.3023:202:1025.51010-1220-250.5-11:163753-3剖面8344582103.10.307:3010:2025.51010-1220-250.5179、-11:163753-3剖面8354592103.10.3010:4013:3025.51010-1220-250.5-11:163753-3剖面8364602103.10.3013:5016:4025.51010-1220-250.5-11:163753-3剖面8374612103.10.3017:0019:5025.51010-1220-250.5-11:163753-3剖面8384622103.10.3020:1023:0025.51010-1220-250.5-11:163753-3剖面8394632103.10.3023:202:1025.51010-1220-250.5-11:16180、3753-3剖面旋旋喷喷桩桩施施工工记记录录工程名称:真美花园二期 设计桩径:600mm 序号桩号施工日期工作时间施工桩长(m)旋转速度(r/min)提升速度(cm/min)高压水泥浆空压机水灰比水泥用量(kg/桩)备注开始时间(h min)终止时间(h min)压力(Mpa)流量(L/min)压力(Mpa)流量(L/min)机长:施工员:监理工程师:第 31 页8404642103.10.307:3010:2025.51010-1220-250.5-11:163753-3剖面8414652103.10.3010:4013:3025.51010-1220-250.5-11:163753-3剖面181、8424662103.10.3013:5016:4025.51010-1220-250.5-11:163753-3剖面8434672103.10.3017:0019:5025.51010-1220-250.5-11:163753-3剖面8444682103.10.3020:1023:0025.51010-1220-250.5-11:163753-3剖面8454692103.10.3023:202:1025.51010-1220-250.5-11:163753-3剖面8464702103.10.307:3010:2025.51010-1220-250.5-11:163753-3剖面8474712182、103.10.3010:4013:3025.51010-1220-250.5-11:163753-3剖面8484722103.10.3013:5016:4025.51010-1220-250.5-11:163753-3剖面8494732103.10.3017:0019:5025.51010-1220-250.5-11:163753-3剖面8504742103.10.3020:1023:0025.51010-1220-250.5-11:163753-3剖面8514752103.10.3023:202:1025.51010-1220-250.5-11:163753-3剖面8524762103.10183、.307:3010:2025.51010-1220-250.5-11:163753-3剖面8534772103.10.3010:4013:3025.51010-1220-250.5-11:163753-3剖面8544782103.10.3013:5016:4025.51010-1220-250.5-11:163753-3剖面8554792103.10.3017:0019:5025.51010-1220-250.5-11:163753-3剖面8564802103.10.3020:1023:0025.51010-1220-250.5-11:163753-3剖面8574812103.10.3023:184、202:1025.51010-1220-250.5-11:163753-3剖面8584822103.10.307:3010:2025.51010-1220-250.5-11:163753-3剖面8594832103.10.3010:4013:3025.51010-1220-250.5-11:163753-3剖面8604842103.10.3013:5016:4025.51010-1220-250.5-11:163753-3剖面86111272103.10.307:309:4520.51010-1220-250.5-11:151256-6剖面86211282103.10.3010:0512:20185、20.51010-1220-250.5-11:151256-6剖面86311292103.10.3012:4014:5520.51010-1220-250.5-11:151256-6剖面86411302103.10.3015:1517:3020.51010-1220-250.5-11:151256-6剖面86511312103.10.3017:5020:0520.51010-1220-250.5-11:151256-6剖面86611322103.10.3020:2522:4020.51010-1220-250.5-11:151256-6剖面86711332103.10.3023:001:152186、0.51010-1220-250.5-11:151256-6剖面旋旋喷喷桩桩施施工工记记录录工程名称:真美花园二期 设计桩径:600mm 序号桩号施工日期工作时间施工桩长(m)旋转速度(r/min)提升速度(cm/min)高压水泥浆空压机水灰比水泥用量(kg/桩)备注开始时间(h min)终止时间(h min)压力(Mpa)流量(L/min)压力(Mpa)流量(L/min)机长:施工员:监理工程师:第 32 页86811342103.10.307:309:4520.51010-1220-250.5-11:151256-6剖面86911352103.10.3010:0512:2020.51010187、-1220-250.5-11:151256-6剖面87011362103.10.3012:4014:5520.51010-1220-250.5-11:151256-6剖面87111372103.10.3015:1517:3020.51010-1220-250.5-11:151256-6剖面87211382103.10.3017:5020:0520.51010-1220-250.5-11:151256-6剖面87311392103.10.3020:2522:4020.51010-1220-250.5-11:151256-6剖面87411402103.10.3023:001:1520.51010-188、1220-250.5-11:151256-6剖面87511412103.10.307:309:4520.51010-1220-250.5-11:151256-6剖面87611422103.10.3010:0512:2020.51010-1220-250.5-11:151256-6剖面87711432103.10.3012:4014:5520.51010-1220-250.5-11:151256-6剖面87811442103.10.3015:1517:3020.51010-1220-250.5-11:151256-6剖面87911452103.10.3017:5020:0520.51010-12189、20-250.5-11:151256-6剖面88011462103.10.3020:2522:4020.51010-1220-250.5-11:151256-6剖面88111472103.10.3023:001:1520.51010-1220-250.5-11:151256-6剖面88211482103.10.307:309:4520.51010-1220-250.5-11:151256-6剖面88311492103.10.3010:0512:2020.51010-1220-250.5-11:151256-6剖面88411502103.10.3012:4014:5520.51010-1220-190、250.5-11:151256-6剖面88511512103.10.3015:1517:3020.51010-1220-250.5-11:151256-6剖面88611522103.10.3017:5020:0520.51010-1220-250.5-11:151256-6剖面88711532103.10.3020:2522:4020.51010-1220-250.5-11:151256-6剖面88811542103.10.3023:001:1520.51010-1220-250.5-11:151256-6剖面88911552103.10.307:309:4520.51010-1220-250191、.5-11:151256-6剖面89011562103.10.3010:0512:2020.51010-1220-250.5-11:151256-6剖面891485213.10.317:3010:2025.51010-1220-250.5-11:163753-3剖面892486213.10.3110:4013:3025.51010-1220-250.5-11:163753-3剖面893487213.10.3113:5016:4025.51010-1220-250.5-11:163753-3剖面894488213.10.3117:0019:5025.51010-1220-250.5-11:163192、753-3剖面895489213.10.3120:1023:0025.51010-1220-250.5-11:163753-3剖面旋旋喷喷桩桩施施工工记记录录工程名称:真美花园二期 设计桩径:600mm 序号桩号施工日期工作时间施工桩长(m)旋转速度(r/min)提升速度(cm/min)高压水泥浆空压机水灰比水泥用量(kg/桩)备注开始时间(h min)终止时间(h min)压力(Mpa)流量(L/min)压力(Mpa)流量(L/min)机长:施工员:监理工程师:第 33 页896490213.10.3123:202:1025.51010-1220-250.5-11:163753-3剖面897193、491213.10.317:3010:2025.51010-1220-250.5-11:163753-3剖面898492213.10.3110:4013:3025.51010-1220-250.5-11:163753-3剖面899493213.10.3113:5016:4025.51010-1220-250.5-11:163753-3剖面900494213.10.3117:0019:5025.51010-1220-250.5-11:163753-3剖面901495213.10.3120:1023:0025.51010-1220-250.5-11:163753-3剖面902496213.10.3194、123:202:1025.51010-1220-250.5-11:163753-3剖面903497213.10.317:3010:2025.51010-1220-250.5-11:163753-3剖面904498213.10.3110:4013:3025.51010-1220-250.5-11:163753-3剖面905499213.10.3113:5016:4025.51010-1220-250.5-11:163753-3剖面906500213.10.3117:0019:5025.51010-1220-250.5-11:163753-3剖面907501213.10.3120:1023:002195、5.51010-1220-250.5-11:163754-4剖面908502213.10.3123:202:1025.51010-1220-250.5-11:163754-4剖面909503213.10.317:3010:2025.51010-1220-250.5-11:163754-4剖面910504213.10.3110:4013:3025.51010-1220-250.5-11:163754-4剖面911505213.10.3113:5016:4025.51010-1220-250.5-11:163754-4剖面912506213.10.3117:0019:5025.51010-1220196、-250.5-11:163754-4剖面913507213.10.3120:1023:0025.51010-1220-250.5-11:163754-4剖面914508213.10.3123:202:1025.51010-1220-250.5-11:163754-4剖面915509213.10.317:3010:2025.51010-1220-250.5-11:163754-4剖面916510213.10.3110:4013:3025.51010-1220-250.5-11:163754-4剖面917511213.10.3113:5016:4025.51010-1220-250.5-11:16197、3754-4剖面918512213.10.3117:0019:5025.51010-1220-250.5-11:163754-4剖面919513213.10.3120:1023:0025.51010-1220-250.5-11:163754-4剖面920514213.10.3123:202:1025.51010-1220-250.5-11:163754-4剖面921515213.10.317:3010:2025.51010-1220-250.5-11:163754-4剖面922516213.10.3110:4013:3025.51010-1220-250.5-11:163754-4剖面9235198、17213.10.3113:5016:4025.51010-1220-250.5-11:163754-4剖面旋旋喷喷桩桩施施工工记记录录工程名称:真美花园二期 设计桩径:600mm 序号桩号施工日期工作时间施工桩长(m)旋转速度(r/min)提升速度(cm/min)高压水泥浆空压机水灰比水泥用量(kg/桩)备注开始时间(h min)终止时间(h min)压力(Mpa)流量(L/min)压力(Mpa)流量(L/min)机长:施工员:监理工程师:第 34 页9241157213.10.317:309:4520.51010-1220-250.5-11:151256-6剖面9251158213.10.199、3110:0512:2020.51010-1220-250.5-11:151256-6剖面9261159213.10.3112:4014:5520.51010-1220-250.5-11:151256-6剖面9271160213.10.3115:1517:3020.51010-1220-250.5-11:151256-6剖面9281161213.10.3117:5020:0520.51010-1220-250.5-11:151256-6剖面9291162213.10.3120:2522:4020.51010-1220-250.5-11:151256-6剖面9301163213.10.3123:200、001:1520.51010-1220-250.5-11:151256-6剖面9311164213.10.317:309:4520.51010-1220-250.5-11:151256-6剖面9321165213.10.3110:0512:2020.51010-1220-250.5-11:151256-6剖面9331166213.10.3112:4014:5520.51010-1220-250.5-11:151256-6剖面9341167213.10.3115:1517:3020.51010-1220-250.5-11:151256-6剖面9351168213.10.3117:5020:052201、0.51010-1220-250.5-11:151256-6剖面9361169213.10.3120:2522:4020.51010-1220-250.5-11:151256-6剖面9371170213.10.3123:001:1520.51010-1220-250.5-11:151256-6剖面9381171213.10.317:309:4520.51010-1220-250.5-11:151256-6剖面9391172213.10.3110:0512:2020.51010-1220-250.5-11:151256-6剖面9401173213.10.3112:4014:5520.51010-202、1220-250.5-11:151256-6剖面9411174213.10.3115:1517:3020.51010-1220-250.5-11:151256-6剖面9421175213.10.3117:5020:0520.51010-1220-250.5-11:151256-6剖面9431176213.10.3120:2522:4020.51010-1220-250.5-11:151256-6剖面9441177213.10.3123:001:1520.51010-1220-250.5-11:151256-6剖面9451178213.10.317:309:4520.51010-1220-250203、.5-11:151256-6剖面9461179213.10.3110:0512:2020.51010-1220-250.5-11:151256-6剖面9471180213.10.3112:4014:5520.51010-1220-250.5-11:151256-6剖面9481181213.10.3115:1517:3020.51010-1220-250.5-11:151256-6剖面9491182213.10.3117:5020:0520.51010-1220-250.5-11:151256-6剖面9501183213.10.3120:2522:4020.51010-1220-250.5-11204、:151256-6剖面951518213.11.17:3010:2025.51010-1220-250.5-11:163754-4剖面旋旋喷喷桩桩施施工工记记录录工程名称:真美花园二期 设计桩径:600mm 序号桩号施工日期工作时间施工桩长(m)旋转速度(r/min)提升速度(cm/min)高压水泥浆空压机水灰比水泥用量(kg/桩)备注开始时间(h min)终止时间(h min)压力(Mpa)流量(L/min)压力(Mpa)流量(L/min)机长:施工员:监理工程师:第 35 页952519213.11.110:4013:3025.51010-1220-250.5-11:163754-4剖面9205、53520213.11.113:5016:4025.51010-1220-250.5-11:163754-4剖面954521213.11.117:0019:5025.51010-1220-250.5-11:163754-4剖面955522213.11.120:1023:0025.51010-1220-250.5-11:163754-4剖面956523213.11.123:202:1025.51010-1220-250.5-11:163754-4剖面957524213.11.17:3010:2025.51010-1220-250.5-11:163754-4剖面958525213.11.110:4206、013:3025.51010-1220-250.5-11:163754-4剖面959526213.11.113:5016:4025.51010-1220-250.5-11:163754-4剖面960527213.11.117:0019:5025.51010-1220-250.5-11:163754-4剖面961528213.11.120:1023:0025.51010-1220-250.5-11:163754-4剖面962529213.11.123:202:1025.51010-1220-250.5-11:163754-4剖面963530213.11.17:3010:2025.51010-12207、20-250.5-11:163754-4剖面964531213.11.110:4013:3025.51010-1220-250.5-11:163754-4剖面965532213.11.113:5016:4025.51010-1220-250.5-11:163754-4剖面966533213.11.117:0019:5025.51010-1220-250.5-11:163754-4剖面967534213.11.120:1023:0025.51010-1220-250.5-11:163754-4剖面968535213.11.123:202:1025.51010-1220-250.5-11:1637208、54-4剖面969536213.11.17:3010:2025.51010-1220-250.5-11:163754-4剖面970537213.11.110:4013:3025.51010-1220-250.5-11:163754-4剖面971538213.11.113:5016:4025.51010-1220-250.5-11:163754-4剖面972539213.11.117:0019:5025.51010-1220-250.5-11:163754-4剖面973540213.11.120:1023:0025.51010-1220-250.5-11:163754-4剖面974541213.209、11.123:202:1025.51010-1220-250.5-11:163754-4剖面9751184213.11.17:309:4520.51010-1220-250.5-11:151256-6剖面9761185213.11.110:0512:2020.51010-1220-250.5-11:151256-6剖面9771186213.11.112:4014:5520.51010-1220-250.5-11:151256-6剖面9781187213.11.115:1517:3020.51010-1220-250.5-11:151256-6剖面9791188213.11.117:5020:0210、520.51010-1220-250.5-11:151256-6剖面旋旋喷喷桩桩施施工工记记录录工程名称:真美花园二期 设计桩径:600mm 序号桩号施工日期工作时间施工桩长(m)旋转速度(r/min)提升速度(cm/min)高压水泥浆空压机水灰比水泥用量(kg/桩)备注开始时间(h min)终止时间(h min)压力(Mpa)流量(L/min)压力(Mpa)流量(L/min)机长:施工员:监理工程师:第 36 页9801189213.11.120:2522:4020.51010-1220-250.5-11:151256-6剖面9811190213.11.123:001:1520.51010-211、1220-250.5-11:151256-6剖面9821191213.11.17:309:4520.51010-1220-250.5-11:151256-6剖面9831192213.11.110:0512:2020.51010-1220-250.5-11:151256-6剖面9841193213.11.112:4014:5520.51010-1220-250.5-11:151256-6剖面9851194213.11.115:1517:3020.51010-1220-250.5-11:151256-6剖面9861195213.11.117:5020:0520.51010-1220-250.5-1212、1:151256-6剖面9871196213.11.120:2522:4020.51010-1220-250.5-11:151256-6剖面9881197213.11.123:001:1520.51010-1220-250.5-11:151256-6剖面9891198213.11.17:309:4520.51010-1220-250.5-11:151256-6剖面9901199213.11.110:0512:2020.51010-1220-250.5-11:151256-6剖面9911200213.11.112:4014:5520.51010-1220-250.5-11:151256-6剖面9213、921201213.11.115:1517:3020.51010-1220-250.5-11:151256-6剖面9931202213.11.117:5020:0520.51010-1220-250.5-11:151256-6剖面9941203213.11.120:2522:4020.51010-1220-250.5-11:151256-6剖面9951204213.11.123:001:1520.51010-1220-250.5-11:151256-6剖面9961205213.11.17:309:4520.51010-1220-250.5-11:151256-6剖面9971206213.11.214、110:0512:2020.51010-1220-250.5-11:151256-6剖面9981207213.11.112:4014:5520.51010-1220-250.5-11:151256-6剖面9991208213.11.115:1517:3020.51010-1220-250.5-11:151256-6剖面10001209213.11.117:5020:0520.51010-1220-250.5-11:151256-6剖面10011210213.11.120:2522:4020.51010-1220-250.5-11:151256-6剖面10021211213.11.123:001215、:1520.51010-1220-250.5-11:151256-6剖面10031212213.11.17:309:4520.51010-1220-250.5-11:151256-6剖面10041213213.11.110:0512:2020.51010-1220-250.5-11:151256-6剖面10051214213.11.112:4014:5520.51010-1220-250.5-11:151256-6剖面10061215213.11.27:309:4520.51010-1220-250.5-11:151256-6剖面10071216213.11.210:0512:2020.510216、10-1220-250.5-11:151256-6剖面旋旋喷喷桩桩施施工工记记录录工程名称:真美花园二期 设计桩径:600mm 序号桩号施工日期工作时间施工桩长(m)旋转速度(r/min)提升速度(cm/min)高压水泥浆空压机水灰比水泥用量(kg/桩)备注开始时间(h min)终止时间(h min)压力(Mpa)流量(L/min)压力(Mpa)流量(L/min)机长:施工员:监理工程师:第 37 页10081217213.11.212:4014:5520.51010-1220-250.5-11:151256-6剖面10091218213.11.215:1517:3020.51010-1220217、-250.5-11:151256-6剖面10101219213.11.217:5020:0520.51010-1220-250.5-11:151256-6剖面10111220213.11.220:2522:4020.51010-1220-250.5-11:151256-6剖面10121221213.11.223:001:1520.51010-1220-250.5-11:151256-6剖面10131222213.11.27:309:4520.51010-1220-250.5-11:151256-6剖面10141223213.11.210:0512:2020.51010-1220-250.5-1218、1:151256-6剖面10151224213.11.212:4014:5520.51010-1220-250.5-11:151256-6剖面10161225213.11.215:1517:3020.51010-1220-250.5-11:151256-6剖面10171226213.11.217:5020:0520.51010-1220-250.5-11:151256-6剖面10181227213.11.220:2522:4020.51010-1220-250.5-11:151256-6剖面10191228213.11.223:001:1520.51010-1220-250.5-11:1512219、56-6剖面10201229213.11.27:309:4520.51010-1220-250.5-11:151256-6剖面10211230213.11.210:0512:2020.51010-1220-250.5-11:151256-6剖面10221231213.11.212:4014:5520.51010-1220-250.5-11:151256-6剖面10231232213.11.215:1517:3020.51010-1220-250.5-11:151256-6剖面10241233213.11.217:5020:0520.51010-1220-250.5-11:151256-6剖面1220、0251234213.11.220:2522:4020.51010-1220-250.5-11:151256-6剖面10261235213.11.223:001:1520.51010-1220-250.5-11:151256-6剖面10271236213.11.27:309:4520.51010-1220-250.5-11:151256-6剖面10281237213.11.37:309:4520.51010-1220-250.5-11:151256-6剖面10291238213.11.310:0512:2020.51010-1220-250.5-11:151256-6剖面10301239213221、.11.312:4014:5520.51010-1220-250.5-11:151256-6剖面10311240213.11.315:1517:3020.51010-1220-250.5-11:151256-6剖面10321241213.11.317:5020:0520.51010-1220-250.5-11:151256-6剖面10331242213.11.320:2522:4020.51010-1220-250.5-11:151256-6剖面10341243213.11.323:001:1520.51010-1220-250.5-11:151256-6剖面10351244213.11.37222、:309:4520.51010-1220-250.5-11:151256-6剖面旋旋喷喷桩桩施施工工记记录录工程名称:真美花园二期 设计桩径:600mm 序号桩号施工日期工作时间施工桩长(m)旋转速度(r/min)提升速度(cm/min)高压水泥浆空压机水灰比水泥用量(kg/桩)备注开始时间(h min)终止时间(h min)压力(Mpa)流量(L/min)压力(Mpa)流量(L/min)机长:施工员:监理工程师:第 38 页10361245213.11.310:0512:2020.51010-1220-250.5-11:151256-6剖面10371246213.11.312:4014:55223、20.51010-1220-250.5-11:151256-6剖面10381247213.11.315:1517:3020.51010-1220-250.5-11:151256-6剖面10391248213.11.317:5020:0520.51010-1220-250.5-11:151256-6剖面10401249213.11.320:2522:4020.51010-1220-250.5-11:151256-6剖面10411250213.11.323:001:1520.51010-1220-250.5-11:151256-6剖面10421251213.11.37:309:4520.51010224、-1220-250.5-11:151256-6剖面10431252213.11.310:0512:2020.51010-1220-250.5-11:151256-6剖面10441253213.11.312:4014:5520.51010-1220-250.5-11:151256-6剖面10451254213.11.315:1517:3020.51010-1220-250.5-11:151256-6剖面10461255213.11.317:5020:0520.51010-1220-250.5-11:151256-6剖面10471256213.11.320:2522:4020.51010-1220225、-250.5-11:151256-6剖面10481257213.11.323:001:1520.51010-1220-250.5-11:151256-6剖面10491258213.11.37:309:4520.51010-1220-250.5-11:151256-6剖面10501259213.11.310:0512:2020.51010-1220-250.5-11:151256-6剖面10511260213.11.312:4014:5520.51010-1220-250.5-11:151256-6剖面10521261213.11.315:1517:3020.51010-1220-250.5-1226、1:151256-6剖面10531262213.11.317:5020:0520.51010-1220-250.5-11:151256-6剖面10541263213.11.320:2522:4020.51010-1220-250.5-11:151256-6剖面10551264213.11.323:001:1520.51010-1220-250.5-11:151256-6剖面10561265213.11.37:309:4520.51010-1220-250.5-11:151256-6剖面10571266213.11.310:0512:2020.51010-1220-250.5-11:151256227、-6剖面10581267213.11.312:4014:5520.51010-1220-250.5-11:151256-6剖面10591268213.11.315:1517:3020.51010-1220-250.5-11:151256-6剖面10601269213.11.317:5020:0520.51010-1220-250.5-11:151256-6剖面10611270213.11.320:2522:4020.51010-1220-250.5-11:151256-6剖面1062542213.11.47:3010:2025.51010-1220-250.5-11:163754-4剖面106228、3543213.11.410:4013:3025.51010-1220-250.5-11:163754-4剖面旋旋喷喷桩桩施施工工记记录录工程名称:真美花园二期 设计桩径:600mm 序号桩号施工日期工作时间施工桩长(m)旋转速度(r/min)提升速度(cm/min)高压水泥浆空压机水灰比水泥用量(kg/桩)备注开始时间(h min)终止时间(h min)压力(Mpa)流量(L/min)压力(Mpa)流量(L/min)机长:施工员:监理工程师:第 39 页1064544213.11.413:5016:4025.51010-1220-250.5-11:163754-4剖面1065545213.1229、1.417:0019:5025.51010-1220-250.5-11:163754-4剖面1066546213.11.420:1023:0025.51010-1220-250.5-11:163754-4剖面1067547213.11.423:202:1025.51010-1220-250.5-11:163754-4剖面1068548213.11.47:3010:2025.51010-1220-250.5-11:163754-4剖面1069549213.11.410:4013:3025.51010-1220-250.5-11:163754-4剖面1070550213.11.413:5016:4230、025.51010-1220-250.5-11:163754-4剖面1071551213.11.417:0019:5025.51010-1220-250.5-11:163754-4剖面1072552213.11.420:1023:0025.51010-1220-250.5-11:163754-4剖面1073553213.11.423:202:1025.51010-1220-250.5-11:163754-4剖面1074554213.11.47:3010:2025.51010-1220-250.5-11:163754-4剖面1075555213.11.410:4013:3025.51010-12231、20-250.5-11:163754-4剖面1076556213.11.413:5016:4025.51010-1220-250.5-11:163754-4剖面1077557213.11.417:0019:5025.51010-1220-250.5-11:163754-4剖面1078558213.11.420:1023:0025.51010-1220-250.5-11:163754-4剖面1079559213.11.423:202:1025.51010-1220-250.5-11:163754-4剖面1080560213.11.57:3010:2025.51010-1220-250.5-11:232、163754-4剖面1081561213.11.510:4013:3025.51010-1220-250.5-11:163754-4剖面1082562213.11.513:5016:4025.51010-1220-250.5-11:163754-4剖面1083563213.11.517:0019:5025.51010-1220-250.5-11:163754-4剖面1084564213.11.520:1023:0025.51010-1220-250.5-11:163754-4剖面1085565213.11.523:202:1025.51010-1220-250.5-11:163754-4剖面1233、086566213.11.57:3010:2025.51010-1220-250.5-11:163754-4剖面1087567213.11.510:4013:3025.51010-1220-250.5-11:163754-4剖面1088568213.11.513:5016:4025.51010-1220-250.5-11:163754-4剖面1089569213.11.517:0019:5025.51010-1220-250.5-11:163754-4剖面1090570213.11.520:1023:0025.51010-1220-250.5-11:163754-4剖面1091571213.1234、1.523:202:1025.51010-1220-250.5-11:163754-4剖面旋旋喷喷桩桩施施工工记记录录工程名称:真美花园二期 设计桩径:600mm 序号桩号施工日期工作时间施工桩长(m)旋转速度(r/min)提升速度(cm/min)高压水泥浆空压机水灰比水泥用量(kg/桩)备注开始时间(h min)终止时间(h min)压力(Mpa)流量(L/min)压力(Mpa)流量(L/min)机长:施工员:监理工程师:第 40 页1092572213.11.57:3010:2025.51010-1220-250.5-11:163754-4剖面1093573213.11.510:4013:235、3025.51010-1220-250.5-11:163754-4剖面1094574213.11.513:5016:4025.51010-1220-250.5-11:163754-4剖面1095575213.11.517:0019:5025.51010-1220-250.5-11:163754-4剖面1096576213.11.520:1023:0025.51010-1220-250.5-11:163754-4剖面1097577213.11.523:202:1025.51010-1220-250.5-11:163754-4剖面1098578213.11.57:3010:2025.51010-1236、220-250.5-11:163754-4剖面1099579213.11.510:4013:3025.51010-1220-250.5-11:163754-4剖面1100580213.11.513:5016:4025.51010-1220-250.5-11:163754-4剖面1101581213.11.517:0019:5025.51010-1220-250.5-11:163754-4剖面1102582213.11.520:1023:0025.51010-1220-250.5-11:163754-4剖面1103583213.11.523:202:1025.51010-1220-250.5-1237、1:163754-4剖面1104584213.11.57:3010:2025.51010-1220-250.5-11:163754-4剖面1105585213.11.510:4013:3025.51010-1220-250.5-11:163754-4剖面1106586213.11.513:5016:4025.51010-1220-250.5-11:163754-4剖面1107587213.11.517:0019:5025.51010-1220-250.5-11:163754-4剖面1108588213.11.520:1023:0025.51010-1220-250.5-11:163754-4剖238、面11091271213.11.57:309:4520.51010-1220-250.5-11:151256-6剖面11101272213.11.510:0512:2020.51010-1220-250.5-11:151256-6剖面11111273213.11.512:4014:5520.51010-1220-250.5-11:151256-6剖面11121274213.11.515:1517:3020.51010-1220-250.5-11:151256-6剖面11131275213.11.517:5020:0520.51010-1220-250.5-11:151256-6剖面111412239、76213.11.520:2522:4020.51010-1220-250.5-11:151256-6剖面11151277213.11.523:001:1520.51010-1220-250.5-11:151256-6剖面11161278213.11.57:309:4520.51010-1220-250.5-11:151256-6剖面11171279213.11.510:0512:2020.51010-1220-250.5-11:151256-6剖面11181280213.11.512:4014:5520.51010-1220-250.5-11:151256-6剖面11191281213.11240、.515:1517:3020.51010-1220-250.5-11:151256-6剖面旋旋喷喷桩桩施施工工记记录录工程名称:真美花园二期 设计桩径:600mm 序号桩号施工日期工作时间施工桩长(m)旋转速度(r/min)提升速度(cm/min)高压水泥浆空压机水灰比水泥用量(kg/桩)备注开始时间(h min)终止时间(h min)压力(Mpa)流量(L/min)压力(Mpa)流量(L/min)机长:施工员:监理工程师:第 41 页11201282213.11.517:5020:0520.51010-1220-250.5-11:151256-6剖面11211283213.11.520:25241、22:4020.51010-1220-250.5-11:151256-6剖面11221284213.11.523:001:1520.51010-1220-250.5-11:151256-6剖面11231285213.11.57:309:0513.51010-1220-250.5-11:133757-7剖面11241286213.11.59:2511:0013.51010-1220-250.5-11:133757-7剖面11251287213.11.511:2012:5513.51010-1220-250.5-11:133757-7剖面11261288213.11.513:1514:5013.5242、1010-1220-250.5-11:133757-7剖面11271289213.11.515:1016:4513.51010-1220-250.5-11:133757-7剖面11281290213.11.517:0518:4013.51010-1220-250.5-11:133757-7剖面11291291213.11.519:0020:3513.51010-1220-250.5-11:133757-7剖面11301292213.11.520:5522:3013.51010-1220-250.5-11:133757-7剖面11311293213.11.523:100:4513.51010-1243、220-250.5-11:133757-7剖面11321294213.11.57:309:0513.51010-1220-250.5-11:133757-7剖面11331295213.11.59:2511:0013.51010-1220-250.5-11:133757-7剖面11341296213.11.511:2012:5513.51010-1220-250.5-11:133757-7剖面11351297213.11.513:1514:5013.51010-1220-250.5-11:133757-7剖面1136589213.11.67:3010:2025.51010-1220-250.5-244、11:163754-4剖面1137590213.11.610:4013:3025.51010-1220-250.5-11:163754-4剖面1138591213.11.613:5016:4025.51010-1220-250.5-11:163754-4剖面1139592213.11.617:0019:5025.51010-1220-250.5-11:163754-4剖面1140593213.11.620:1023:0025.51010-1220-250.5-11:163754-4剖面1141594213.11.623:202:1025.51010-1220-250.5-11:163754-4245、剖面1142595213.11.67:3010:2025.51010-1220-250.5-11:163754-4剖面1143596213.11.610:4013:3025.51010-1220-250.5-11:163754-4剖面1144597213.11.613:5016:4025.51010-1220-250.5-11:163754-4剖面1145598213.11.617:0019:5025.51010-1220-250.5-11:163754-4剖面1146599213.11.620:1023:0025.51010-1220-250.5-11:163754-4剖面114760021246、3.11.623:202:1025.51010-1220-250.5-11:163754-4剖面旋旋喷喷桩桩施施工工记记录录工程名称:真美花园二期 设计桩径:600mm 序号桩号施工日期工作时间施工桩长(m)旋转速度(r/min)提升速度(cm/min)高压水泥浆空压机水灰比水泥用量(kg/桩)备注开始时间(h min)终止时间(h min)压力(Mpa)流量(L/min)压力(Mpa)流量(L/min)机长:施工员:监理工程师:第 42 页1148601213.11.67:3010:2025.51010-1220-250.5-11:163754-4剖面1149602213.11.610:40247、13:3025.51010-1220-250.5-11:163754-4剖面1150603213.11.613:5016:4025.51010-1220-250.5-11:163754-4剖面1151604213.11.617:0019:5025.51010-1220-250.5-11:163754-4剖面1152605213.11.620:1023:0025.51010-1220-250.5-11:163754-4剖面1153606213.11.623:202:1025.51010-1220-250.5-11:163754-4剖面1154607213.11.67:3010:2025.5101248、0-1220-250.5-11:163754-4剖面1155608213.11.610:4013:3025.51010-1220-250.5-11:163754-4剖面1156609213.11.613:5016:4025.51010-1220-250.5-11:163754-4剖面1157610213.11.617:0019:5025.51010-1220-250.5-11:163754-4剖面1158611213.11.620:1023:0025.51010-1220-250.5-11:163754-4剖面1159612213.11.623:202:1025.51010-1220-250.249、5-11:163754-4剖面1160613213.11.67:3010:2025.51010-1220-250.5-11:163754-4剖面1161614213.11.610:4013:3025.51010-1220-250.5-11:163754-4剖面1162615213.11.613:5016:4025.51010-1220-250.5-11:163754-4剖面1163616213.11.617:0019:5025.51010-1220-250.5-11:163754-4剖面1164617213.11.620:1023:0025.51010-1220-250.5-11:163754250、-4剖面1165618213.11.623:202:1025.51010-1220-250.5-11:163754-4剖面1166619213.11.67:3010:2025.51010-1220-250.5-11:163754-4剖面1167620213.11.610:4013:3025.51010-1220-250.5-11:163754-4剖面1168621213.11.613:5016:4025.51010-1220-250.5-11:163754-4剖面11691298213.11.67:309:0513.51010-1220-250.5-11:133757-7剖面117012992251、13.11.69:2511:0013.51010-1220-250.5-11:133757-7剖面11711300213.11.611:2012:5513.51010-1220-250.5-11:133757-7剖面11721301213.11.613:1514:5013.51010-1220-250.5-11:133757-7剖面11731302213.11.615:1016:4513.51010-1220-250.5-11:133757-7剖面11741303213.11.617:0518:4013.51010-1220-250.5-11:133757-7剖面11751304213.11.252、619:0020:3513.51010-1220-250.5-11:133757-7剖面旋旋喷喷桩桩施施工工记记录录工程名称:真美花园二期 设计桩径:600mm 序号桩号施工日期工作时间施工桩长(m)旋转速度(r/min)提升速度(cm/min)高压水泥浆空压机水灰比水泥用量(kg/桩)备注开始时间(h min)终止时间(h min)压力(Mpa)流量(L/min)压力(Mpa)流量(L/min)机长:施工员:监理工程师:第 43 页11761305213.11.620:5522:3013.51010-1220-250.5-11:133757-7剖面11771306213.11.623:100253、:4513.51010-1220-250.5-11:133757-7剖面11781307213.11.67:309:0513.51010-1220-250.5-11:133757-7剖面11791308213.11.69:2511:0013.51010-1220-250.5-11:133757-7剖面11801309213.11.611:2012:5513.51010-1220-250.5-11:133757-7剖面11811310213.11.613:1514:5013.51010-1220-250.5-11:133757-7剖面11821311213.11.615:1016:4513.51254、010-1220-250.5-11:133757-7剖面11831312213.11.617:0518:4013.51010-1220-250.5-11:133757-7剖面11841313213.11.619:0020:3513.51010-1220-250.5-11:133757-7剖面11851314213.11.620:5522:3013.51010-1220-250.5-11:133757-7剖面11861315213.11.623:100:4513.51010-1220-250.5-11:133757-7剖面11871316213.11.67:309:0513.51010-1220255、-250.5-11:133757-7剖面11881317213.11.69:2511:0013.51010-1220-250.5-11:133757-7剖面11891318213.11.611:2012:5513.51010-1220-250.5-11:133757-7剖面11901319213.11.613:1514:5013.51010-1220-250.5-11:133757-7剖面11911320213.11.615:1016:4513.51010-1220-250.5-11:133757-7剖面11921321213.11.617:0518:4013.51010-1220-250.5256、-11:133757-7剖面1193622213.11.77:3010:2025.51010-1220-250.5-11:163754-4剖面1194623213.11.710:4013:3025.51010-1220-250.5-11:163754-4剖面1195624213.11.713:5016:4025.51010-1220-250.5-11:163754-4剖面1196625213.11.717:0019:5025.51010-1220-250.5-11:163754-4剖面1197626213.11.720:1023:0025.51010-1220-250.5-11:163754-257、4剖面1198627213.11.723:202:1025.51010-1220-250.5-11:163754-4剖面1199628213.11.77:3010:2025.51010-1220-250.5-11:163754-4剖面1200629213.11.710:4013:3025.51010-1220-250.5-11:163754-4剖面1201630213.11.713:5016:4025.51010-1220-250.5-11:163754-4剖面1202631213.11.717:0019:5025.51010-1220-250.5-11:163754-4剖面120363221258、3.11.720:1023:0025.51010-1220-250.5-11:163754-4剖面旋旋喷喷桩桩施施工工记记录录工程名称:真美花园二期 设计桩径:600mm 序号桩号施工日期工作时间施工桩长(m)旋转速度(r/min)提升速度(cm/min)高压水泥浆空压机水灰比水泥用量(kg/桩)备注开始时间(h min)终止时间(h min)压力(Mpa)流量(L/min)压力(Mpa)流量(L/min)机长:施工员:监理工程师:第 44 页1204633213.11.723:202:1025.51010-1220-250.5-11:163754-4剖面1205634213.11.77:30259、10:2025.51010-1220-250.5-11:163754-4剖面1206635213.11.710:4013:3025.51010-1220-250.5-11:163754-4剖面1207636213.11.713:5016:4025.51010-1220-250.5-11:163754-4剖面1208637213.11.717:0019:5025.51010-1220-250.5-11:163754-4剖面1209638213.11.720:1023:0025.51010-1220-250.5-11:163754-4剖面1210639213.11.723:202:1025.510260、10-1220-250.5-11:163754-4剖面1211640213.11.77:3010:2025.51010-1220-250.5-11:163754-4剖面1212641213.11.710:4013:3025.51010-1220-250.5-11:163754-4剖面1213642213.11.713:5016:4025.51010-1220-250.5-11:163754-4剖面1214643213.11.717:0019:5025.51010-1220-250.5-11:163754-4剖面1215644213.11.720:1023:0025.51010-1220-250261、.5-11:163754-4剖面1216645213.11.723:202:1025.51010-1220-250.5-11:163754-4剖面1217646213.11.77:3010:2025.51010-1220-250.5-11:163754-4剖面1218647213.11.710:4013:3025.51010-1220-250.5-11:163754-4剖面1219648213.11.713:5016:4025.51010-1220-250.5-11:163754-4剖面1220649213.11.717:0019:5025.51010-1220-250.5-11:163754262、-4剖面1221650213.11.720:1023:0025.51010-1220-250.5-11:163754-4剖面1222651213.11.723:202:1025.51010-1220-250.5-11:163754-4剖面1223652213.11.77:3010:2025.51010-1220-250.5-11:163754-4剖面1224653213.11.710:4013:3025.51010-1220-250.5-11:163754-4剖面1225654213.11.713:5016:4025.51010-1220-250.5-11:163754-4剖面12266552263、13.11.717:0019:5025.51010-1220-250.5-11:163754-4剖面1227656213.11.720:1023:0025.51010-1220-250.5-11:163754-4剖面1228657213.11.723:202:1025.51010-1220-250.5-11:163754-4剖面1229658213.11.77:3010:2025.51010-1220-250.5-11:163754-4剖面1230659213.11.710:4013:3025.51010-1220-250.5-11:163754-4剖面1231660213.11.713:50264、16:4025.51010-1220-250.5-11:163754-4剖面旋旋喷喷桩桩施施工工记记录录工程名称:真美花园二期 设计桩径:600mm 序号桩号施工日期工作时间施工桩长(m)旋转速度(r/min)提升速度(cm/min)高压水泥浆空压机水灰比水泥用量(kg/桩)备注开始时间(h min)终止时间(h min)压力(Mpa)流量(L/min)压力(Mpa)流量(L/min)机长:施工员:监理工程师:第 45 页12321322213.11.77:309:0513.51010-1220-250.5-11:133757-7剖面12331323213.11.79:2511:0013.51265、010-1220-250.5-11:133757-7剖面12341324213.11.711:2012:5513.51010-1220-250.5-11:133757-7剖面12351325213.11.713:1514:5013.51010-1220-250.5-11:133757-7剖面12361326213.11.715:1016:4513.51010-1220-250.5-11:133757-7剖面12371327213.11.717:0518:4013.51010-1220-250.5-11:133757-7剖面12381328213.11.719:0020:3513.51010-1266、220-250.5-11:133757-7剖面12391329213.11.720:5522:3013.51010-1220-250.5-11:133757-7剖面12401330213.11.723:100:4513.51010-1220-250.5-11:133757-7剖面12411331213.11.77:309:0513.51010-1220-250.5-11:133757-7剖面12421332213.11.79:2511:0013.51010-1220-250.5-11:133757-7剖面12431333213.11.711:2012:5513.51010-1220-250.5267、-11:133757-7剖面12441334213.11.713:1514:5013.51010-1220-250.5-11:133757-7剖面12451335213.11.715:1016:4513.51010-1220-250.5-11:133757-7剖面12461336213.11.717:0518:4013.51010-1220-250.5-11:133757-7剖面12471337213.11.719:0020:3513.51010-1220-250.5-11:133757-7剖面12481338213.11.720:5522:3013.51010-1220-250.5-11:1268、33757-7剖面12491339213.11.723:100:4513.51010-1220-250.5-11:133757-7剖面12501340213.11.77:309:0513.51010-1220-250.5-11:133757-7剖面12511341213.11.79:2511:0013.51010-1220-250.5-11:133757-7剖面12521342213.11.711:2012:5513.51010-1220-250.5-11:133757-7剖面12531343213.11.713:1514:5013.51010-1220-250.5-11:133757-7剖面269、12541344213.11.715:1016:4513.51010-1220-250.5-11:133757-7剖面12551345213.11.717:0518:4013.51010-1220-250.5-11:133757-7剖面12561346213.11.719:0020:3513.51010-1220-250.5-11:133757-7剖面12571347213.11.720:5522:3013.51010-1220-250.5-11:133757-7剖面12581348213.11.723:100:4513.51010-1220-250.5-11:133757-7剖面125913270、49213.11.77:309:0513.51010-1220-250.5-11:133757-7剖面旋旋喷喷桩桩施施工工记记录录工程名称:真美花园二期 设计桩径:600mm 序号桩号施工日期工作时间施工桩长(m)旋转速度(r/min)提升速度(cm/min)高压水泥浆空压机水灰比水泥用量(kg/桩)备注开始时间(h min)终止时间(h min)压力(Mpa)流量(L/min)压力(Mpa)流量(L/min)机长:施工员:监理工程师:第 46 页12601350213.11.79:2511:0013.51010-1220-250.5-11:133757-7剖面12611351213.11.7271、11:2012:5513.51010-1220-250.5-11:133757-7剖面12621352213.11.713:1514:5013.51010-1220-250.5-11:133757-7剖面12631353213.11.715:1016:4513.51010-1220-250.5-11:133757-7剖面12641354213.11.717:0518:4013.51010-1220-250.5-11:133757-7剖面1265661213.11.87:3010:2025.51010-1220-250.5-11:163754-4剖面1266662213.11.810:4013:272、3025.51010-1220-250.5-11:163754-4剖面1267663213.11.813:5016:4025.51010-1220-250.5-11:163754-4剖面1268664213.11.817:0019:5025.51010-1220-250.5-11:163754-4剖面1269665213.11.820:1023:0025.51010-1220-250.5-11:163754-4剖面1270666213.11.823:202:1025.51010-1220-250.5-11:163754-4剖面1271667213.11.87:3010:2025.51010-1273、220-250.5-11:163754-4剖面1272668213.11.810:4013:3025.51010-1220-250.5-11:163754-4剖面1273669213.11.813:5016:4025.51010-1220-250.5-11:163754-4剖面1274670213.11.817:0019:5025.51010-1220-250.5-11:163754-4剖面1275671213.11.820:1023:0025.51010-1220-250.5-11:163754-4剖面1276672213.11.823:202:1025.51010-1220-250.5-1274、1:163754-4剖面1277673213.11.87:3010:2025.51010-1220-250.5-11:163754-4剖面1278674213.11.810:4013:3025.51010-1220-250.5-11:163754-4剖面1279675213.11.813:5016:4025.51010-1220-250.5-11:163754-4剖面1280676213.11.817:0019:5025.51010-1220-250.5-11:163754-4剖面1281677213.11.820:1023:0025.51010-1220-250.5-11:163754-4剖275、面1282678213.11.823:202:1025.51010-1220-250.5-11:163754-4剖面1283679213.11.87:3010:2025.51010-1220-250.5-11:163754-4剖面1284680213.11.810:4013:3025.51010-1220-250.5-11:163754-4剖面1285681213.11.97:3010:2025.51010-1220-250.5-11:163754-4剖面1286682213.11.910:4013:3025.51010-1220-250.5-11:163754-4剖面1287683213.1276、1.913:5016:4025.51010-1220-250.5-11:163754-4剖面旋旋喷喷桩桩施施工工记记录录工程名称:真美花园二期 设计桩径:600mm 序号桩号施工日期工作时间施工桩长(m)旋转速度(r/min)提升速度(cm/min)高压水泥浆空压机水灰比水泥用量(kg/桩)备注开始时间(h min)终止时间(h min)压力(Mpa)流量(L/min)压力(Mpa)流量(L/min)机长:施工员:监理工程师:第 47 页1288684213.11.917:0019:5025.51010-1220-250.5-11:163754-4剖面1289685213.11.920:102277、3:0025.51010-1220-250.5-11:163754-4剖面1290686213.11.923:202:1025.51010-1220-250.5-11:163754-4剖面1291687213.11.97:3010:2025.51010-1220-250.5-11:163754-4剖面1292688213.11.910:4013:3025.51010-1220-250.5-11:163754-4剖面1293689213.11.913:5016:4025.51010-1220-250.5-11:163754-4剖面1294690213.11.917:0019:5025.51010278、-1220-250.5-11:163754-4剖面1295691213.11.920:1023:0025.51010-1220-250.5-11:163754-4剖面1296692213.11.923:202:1025.51010-1220-250.5-11:163754-4剖面1297693213.11.97:3010:2025.51010-1220-250.5-11:163754-4剖面1298694213.11.910:4013:3025.51010-1220-250.5-11:163754-4剖面1299695213.11.913:5016:4025.51010-1220-250.5-279、11:163754-4剖面1300696213.11.917:0019:5025.51010-1220-250.5-11:163754-4剖面1301697213.11.920:1023:0025.51010-1220-250.5-11:163754-4剖面1302698213.11.923:202:1025.51010-1220-250.5-11:163754-4剖面1303699213.11.107:3010:2025.51010-1220-250.5-11:163754-4剖面1304700213.11.1010:4013:3025.51010-1220-250.5-11:163754-280、4剖面1305701213.11.1013:5016:4025.51010-1220-250.5-11:163754-4剖面1306702213.11.1017:0019:5025.51010-1220-250.5-11:163754-4剖面1307703213.11.1020:1023:0025.51010-1220-250.5-11:163754-4剖面1308704213.11.1023:202:1025.51010-1220-250.5-11:163754-4剖面1309705213.11.107:3010:2025.51010-1220-250.5-11:163754-4剖面1310281、706213.11.1010:4013:3025.51010-1220-250.5-11:163754-4剖面1311707213.11.1013:5016:4025.51010-1220-250.5-11:163754-4剖面1312708213.11.1017:0019:5025.51010-1220-250.5-11:163754-4剖面1313709213.11.1020:1023:0025.51010-1220-250.5-11:163754-4剖面1314710213.11.1023:202:1025.51010-1220-250.5-11:163754-4剖面1315711213282、.11.107:3010:2025.51010-1220-250.5-11:163754-4剖面旋旋喷喷桩桩施施工工记记录录工程名称:真美花园二期 设计桩径:600mm 序号桩号施工日期工作时间施工桩长(m)旋转速度(r/min)提升速度(cm/min)高压水泥浆空压机水灰比水泥用量(kg/桩)备注开始时间(h min)终止时间(h min)压力(Mpa)流量(L/min)压力(Mpa)流量(L/min)机长:施工员:监理工程师:第 48 页1316712213.11.1010:4013:3025.51010-1220-250.5-11:163754-4剖面1317713213.11.1013283、:5016:4025.51010-1220-250.5-11:163754-4剖面1318714213.11.1017:0019:5025.51010-1220-250.5-11:163754-4剖面1319715213.11.1020:1023:0025.51010-1220-250.5-11:163754-4剖面1320716213.11.1023:202:1025.51010-1220-250.5-11:163754-4剖面1321717213.11.107:3010:2025.51010-1220-250.5-11:163754-4剖面1322718213.11.1010:4013:3284、025.51010-1220-250.5-11:163754-4剖面1323719213.11.1013:5016:4025.51010-1220-250.5-11:163754-4剖面1324720213.11.1017:0019:5025.51010-1220-250.5-11:163754-4剖面1325721213.11.1020:1023:0025.51010-1220-250.5-11:163754-4剖面1326722213.11.1023:202:1025.51010-1220-250.5-11:163754-4剖面1327723213.11.107:3010:2025.510285、10-1220-250.5-11:163754-4剖面1328724213.11.1010:4013:3025.51010-1220-250.5-11:163754-4剖面1329725213.11.1013:5016:4025.51010-1220-250.5-11:163754-4剖面1330726213.11.1017:0019:5025.51010-1220-250.5-11:163754-4剖面1331727213.11.1020:1023:0025.51010-1220-250.5-11:163754-4剖面1332728213.11.1023:202:1025.51010-122286、0-250.5-11:163754-4剖面1333729213.11.107:3010:2025.51010-1220-250.5-11:163754-4剖面1334730213.11.1010:4013:3025.51010-1220-250.5-11:163754-4剖面1335731213.11.1013:5016:4025.51010-1220-250.5-11:163754-4剖面1336732213.11.1017:0019:5025.51010-1220-250.5-11:163754-4剖面1337733213.11.1020:1023:0025.51010-1220-250.287、5-11:163754-4剖面1338734213.11.1023:202:1025.51010-1220-250.5-11:163754-4剖面1339735213.11.107:3010:2025.51010-1220-250.5-11:163754-4剖面1340736213.11.1010:4013:3025.51010-1220-250.5-11:163754-4剖面1341737213.11.127:3010:2025.51010-1220-250.5-11:163754-4剖面1342738213.11.1210:4013:3025.51010-1220-250.5-11:163288、754-4剖面1343739213.11.1213:5016:4025.51010-1220-250.5-11:163754-4剖面旋旋喷喷桩桩施施工工记记录录工程名称:真美花园二期 设计桩径:600mm 序号桩号施工日期工作时间施工桩长(m)旋转速度(r/min)提升速度(cm/min)高压水泥浆空压机水灰比水泥用量(kg/桩)备注开始时间(h min)终止时间(h min)压力(Mpa)流量(L/min)压力(Mpa)流量(L/min)机长:施工员:监理工程师:第 49 页1344740213.11.1217:0019:5025.51010-1220-250.5-11:163754-4剖面289、1345741213.11.1220:1023:0025.51010-1220-250.5-11:163754-4剖面1346742213.11.1223:202:1025.51010-1220-250.5-11:163754-4剖面1347743213.11.127:3010:2025.51010-1220-250.5-11:163754-4剖面1348744213.11.1210:4013:3025.51010-1220-250.5-11:163754-4剖面1349745213.11.1213:5016:4025.51010-1220-250.5-11:163754-4剖面1350746290、213.11.1217:0019:5025.51010-1220-250.5-11:163754-4剖面1351747213.11.1220:1023:0025.51010-1220-250.5-11:163754-4剖面1352748213.11.1223:202:1025.51010-1220-250.5-11:163754-4剖面1353749213.11.127:3010:2025.51010-1220-250.5-11:163754-4剖面1354750213.11.1210:4013:3025.51010-1220-250.5-11:163754-4剖面13551355213.11291、.127:309:0513.51010-1220-250.5-11:133757-7剖面13561356213.11.129:2511:0013.51010-1220-250.5-11:133757-7剖面13571357213.11.1211:2012:5513.51010-1220-250.5-11:133757-7剖面13581358213.11.1213:1514:5013.51010-1220-250.5-11:133757-7剖面13591359213.11.1215:1016:4513.51010-1220-250.5-11:133757-7剖面13601360213.11.12292、17:0518:4013.51010-1220-250.5-11:133757-7剖面13611361213.11.1219:0020:3513.51010-1220-250.5-11:133757-7剖面13621362213.11.1220:5522:3013.51010-1220-250.5-11:133757-7剖面13631363213.11.1223:100:4513.51010-1220-250.5-11:133757-7剖面13641364213.11.127:309:0513.51010-1220-250.5-11:133757-7剖面13651365213.11.129:2293、511:0013.51010-1220-250.5-11:133757-7剖面13661366213.11.1211:2012:5513.51010-1220-250.5-11:133757-7剖面13671367213.11.1313:1514:5013.51010-1220-250.5-11:133757-7剖面13681368213.11.1315:1016:4513.51010-1220-250.5-11:133757-7剖面13691369213.11.1317:0518:4013.51010-1220-250.5-11:133757-7剖面13701370213.11.1319:0294、020:3513.51010-1220-250.5-11:133757-7剖面13711371213.11.1320:5522:3013.51010-1220-250.5-11:133757-7剖面旋旋喷喷桩桩施施工工记记录录工程名称:真美花园二期 设计桩径:600mm 序号桩号施工日期工作时间施工桩长(m)旋转速度(r/min)提升速度(cm/min)高压水泥浆空压机水灰比水泥用量(kg/桩)备注开始时间(h min)终止时间(h min)压力(Mpa)流量(L/min)压力(Mpa)流量(L/min)机长:施工员:监理工程师:第 50 页13721372213.11.1323:100:45295、13.51010-1220-250.5-11:133757-7剖面13731373213.11.137:309:0513.51010-1220-250.5-11:133757-7剖面13741374213.11.139:2511:0013.51010-1220-250.5-11:133757-7剖面13751375213.11.1311:2012:5513.51010-1220-250.5-11:133757-7剖面13761376213.11.1313:1514:5013.51010-1220-250.5-11:133757-7剖面13771377213.11.1315:1016:4513.296、51010-1220-250.5-11:133757-7剖面13781378213.11.1317:0518:4013.51010-1220-250.5-11:133757-7剖面13791379213.11.1319:0020:3513.51010-1220-250.5-11:133757-7剖面13801380213.11.1320:5522:3013.51010-1220-250.5-11:133757-7剖面13811381213.11.1323:100:4513.51010-1220-250.5-11:133757-7剖面13821382213.11.147:309:0513.510297、10-1220-250.5-11:133757-7剖面13831383213.11.149:2511:0013.51010-1220-250.5-11:133757-7剖面13841384213.11.1411:2012:5513.51010-1220-250.5-11:133757-7剖面13851385213.11.1413:1514:5013.51010-1220-250.5-11:133757-7剖面13861386213.11.1415:1016:4513.51010-1220-250.5-11:133757-7剖面13871387213.11.1417:0518:4013.5101298、0-1220-250.5-11:133757-7剖面13881388213.11.1419:0020:3513.51010-1220-250.5-11:133757-7剖面13891389213.11.1420:5522:3013.51010-1220-250.5-11:133757-7剖面13901390213.11.1423:100:4513.51010-1220-250.5-11:133757-7剖面13911391213.11.157:309:0513.51010-1220-250.5-11:133757-7剖面13921392213.11.159:2511:0013.51010-12299、20-250.5-11:133757-7剖面13931393213.11.1511:2012:5513.51010-1220-250.5-11:133757-7剖面13941394213.11.1513:1514:5013.51010-1220-250.5-11:133757-7剖面13951395213.11.1515:1016:4513.51010-1220-250.5-11:133757-7剖面13961396213.11.1517:0518:4013.51010-1220-250.5-11:133757-7剖面13971397213.11.1519:0020:3513.51010-12300、20-250.5-11:133757-7剖面13981398213.11.1520:5522:3013.51010-1220-250.5-11:133757-7剖面13991399213.11.1523:100:4513.51010-1220-250.5-11:133757-7剖面旋旋喷喷桩桩施施工工记记录录工程名称:真美花园二期 设计桩径:600mm 序号桩号施工日期工作时间施工桩长(m)旋转速度(r/min)提升速度(cm/min)高压水泥浆空压机水灰比水泥用量(kg/桩)备注开始时间(h min)终止时间(h min)压力(Mpa)流量(L/min)压力(Mpa)流量(L/min)机长:301、施工员:监理工程师:第 51 页旋旋喷喷桩桩施施工工记记录录工程名称:真美花园二期 设计桩径:600mm 序号桩号施工日期工作时间施工桩长(m)旋转速度(r/min)提升速度(cm/min)高压水泥浆空压机水灰比水泥用量(kg/桩)开始时间(h min)终止时间(h min)压力(Mpa)流量(L/min)压力(Mpa)流量(L/min)112013.10.157:302:3010:00221010-1220-250.5-11:15500222013.10.1510:302:3013:00221010-1220-250.5-11:15500332013.10.1513:302:3016:002302、21010-1220-250.5-11:15500442013.10.1516:302:3019:00221010-1220-250.5-11:15500552013.10.1519:302:3022:00221010-1220-250.5-11:15500662013.10.1522:302:301:00221010-1220-250.5-11:15500772013.10.158:002:3010:30221010-1220-250.5-11:15500882013.10.1511:002:3013:30221010-1220-250.5-11:15500992013.10.1514:00303、2:3016:30221010-1220-250.5-11:1550010102013.10.1517:002:3019:30221010-1220-250.5-11:1550011112013.10.1520:002:3022:30221010-1220-250.5-11:1550012122013.10.1523:002:301:30221010-1220-250.5-11:1550013132013.10.1512:002:3014:30221010-1220-250.5-11:1550014142013.10.1515:002:3017:30221010-1220-250.5-11:1304、550015152013.10.1518:002:3020:30221010-1220-250.5-11:1550016162013.10.1521:002:3023:30221010-1220-250.5-11:1550017172013.10.1523:552:302:25221010-1220-250.5-11:1550018182013.10.1514:002:3016:30221010-1220-250.5-11:1550019192013.10.1517:002:3019:30221010-1220-250.5-11:1550020202013.10.1520:002:3022:3305、0221010-1220-250.5-11:1550021212013.10.1523:002:301:30221010-1220-250.5-11:1550022222013.10.1517:002:3019:30221010-1220-250.5-11:1550023232013.10.1520:002:3022:30221010-1220-250.5-11:1550024242013.10.1523:002:301:30221010-1220-250.5-11:1550025252013.10.1517:502:3020:20221010-1220-250.5-11:1550026262306、013.10.1520:502:3023:20221010-1220-250.5-11:1550027272013.10.1523:502:302:20221010-1220-250.5-11:1550028282013.10.1517:502:3020:20221010-1220-250.5-11:15500机长:施工员:监理:第 52 页29292013.10.1520:502:3023:20221010-1220-250.5-11:1550030302013.10.1523:502:302:20221010-1220-250.5-11:15500317512013.10.157:302:307、5010:2025.51010-1220-250.5-11:16375327522013.10.1510:402:5013:3025.51010-1220-250.5-11:16375337532013.10.1513:502:5016:4025.51010-1220-250.5-11:16375347542013.10.1517:002:5019:5025.51010-1220-250.5-11:16375357552013.10.1520:102:5023:0025.51010-1220-250.5-11:16375367562013.10.1523:202:502:1025.51010-308、1220-250.5-11:16375377572013.10.157:302:5010:2025.51010-1220-250.5-11:16375387582013.10.1510:402:5013:3025.51010-1220-250.5-11:16375397592013.10.1513:502:5016:4025.51010-1220-250.5-11:16375407602013.10.1517:002:5019:5025.51010-1220-250.5-11:16375417612013.10.1520:102:5023:0025.51010-1220-250.5-11:16309、375427622013.10.1523:202:502:1025.51010-1220-250.5-11:16375437632013.10.1520:402:5023:3025.51010-1220-250.5-11:1637544312013.10.167:302:3010:00221010-1220-250.5-11:1550045322013.10.1610:302:3013:00221010-1220-250.5-11:1550046332013.10.1613:302:3016:00221010-1220-250.5-11:1550047342013.10.1616:302:30310、19:00221010-1220-250.5-11:1550048352013.10.1619:302:3022:00221010-1220-250.5-11:1550049362013.10.1622:302:301:00221010-1220-250.5-11:1550050372013.10.1617:302:3020:00221010-1220-250.5-11:1550051382013.10.1620:302:3023:00221010-1220-250.5-11:1550052392013.10.1623:302:302:00221010-1220-250.5-11:155005311、3402013.10.1618:002:3020:30221010-1220-250.5-11:1550054412013.10.1621:002:3023:30221010-1220-250.5-11:1550055422013.10.1619:302:3022:00221010-1220-250.5-11:1550056432013.10.1622:302:301:00221010-1220-250.5-11:15500旋旋喷喷桩桩施施工工记记录录工程名称:真美花园二期 设计桩径:600mm 序号桩号施工日期工作时间施工桩长(m)旋转速度(r/min)提升速度(cm/min)高压水泥浆空压312、机水灰比水泥用量(kg/桩)开始时间(h min)终止时间(h min)压力(Mpa)流量(L/min)压力(Mpa)流量(L/min)机长:施工员:监理:第 53 页57442013.10.1623:002:301:30221010-1220-250.5-11:15500587642013.10.167:302:5010:2025.51010-1220-250.5-11:16375597652013.10.1610:402:5013:3025.51010-1220-250.5-11:16375607662013.10.1613:502:5016:4025.51010-1220-250.5-1313、1:16375617672013.10.1617:002:5019:5025.51010-1220-250.5-11:16375627682013.10.1620:102:5023:0025.51010-1220-250.5-11:16375637692013.10.1623:202:502:1025.51010-1220-250.5-11:16375647702013.10.167:302:5010:2025.51010-1220-250.5-11:16375657712013.10.1610:402:5013:3025.51010-1220-250.5-11:16375667722013.314、10.1613:502:5016:4025.51010-1220-250.5-11:16375677732013.10.1617:002:5019:5025.51010-1220-250.5-11:16375687742013.10.1620:102:5023:0025.51010-1220-250.5-11:16375697752013.10.23:202:502:1025.51010-1220-250.5-11:16375707762013.10.167:302:5010:2025.51010-1220-250.5-11:16375717772013.10.1610:402:5013:30315、25.51010-1220-250.5-11:16375727782013.10.1613:502:5016:4025.51010-1220-250.5-11:16375737792013.10.1617:002:5019:5025.51010-1220-250.5-11:1637574452013.10.177:302:3010:00221010-1220-250.5-11:1550075462013.10.1710:302:3013:00221010-1220-250.5-11:1550076472013.10.1713:302:3016:00221010-1220-250.5-11:15316、50077482013.10.1716:302:3019:00221010-1220-250.5-11:1550078492013.10.1719:302:3022:00221010-1220-250.5-11:1550079502013.10.1722:302:301:00221010-1220-250.5-11:1550080512013.10.178:002:3010:30221010-1220-250.5-11:1550081522013.10.1711:002:3013:30221010-1220-250.5-11:1550082532013.10.1714:002:3016:302317、21010-1220-250.5-11:1550083542013.10.1717:002:3019:30221010-1220-250.5-11:1550084552013.10.1720:002:3022:30221010-1220-250.5-11:15500旋旋喷喷桩桩施施工工记记录录工程名称:真美花园二期 设计桩径:600mm 序号桩号施工日期工作时间施工桩长(m)旋转速度(r/min)提升速度(cm/min)高压水泥浆空压机水灰比水泥用量(kg/桩)开始时间(h min)终止时间(h min)压力(Mpa)流量(L/min)压力(Mpa)流量(L/min)机长:施工员:监理:第 5318、4 页85562013.10.1723:002:301:30221010-1220-250.5-11:1550086572013.10.1712:002:3014:30221010-1220-250.5-11:1550087582013.10.1715:002:3017:30221010-1220-250.5-11:1550088592013.10.1718:002:3020:30221010-1220-250.5-11:1550089602013.10.1721:002:3023:30221010-1220-250.5-11:1550090612013.10.1723:552:302:252319、21010-1220-250.5-11:1550091622013.10.177:302:3010:00221010-1220-250.5-11:1550092632013.10.1710:302:3013:00221010-1220-250.5-11:1550093642013.10.1713:302:3016:00221010-1220-250.5-11:1550094652013.10.1716:302:3019:00221010-1220-250.5-11:1550095662013.10.1719:302:3022:00221010-1220-250.5-11:15500966720320、13.10.1722:302:301:00221010-1220-250.5-11:1550097682013.10.178:002:3010:30221010-1220-250.5-11:1550098692013.10.1711:002:3013:30221010-1220-250.5-11:1550099702013.10.1714:002:3016:30221010-1220-250.5-11:15500100712013.10.1717:002:3019:30221010-1220-250.5-11:15500101722013.10.1720:002:3022:30221010-1321、220-250.5-11:15500102732013.10.1723:002:301:30221010-1220-250.5-11:15500103742013.10.1712:002:3014:30221010-1220-250.5-11:15500104752013.10.1715:002:3017:30221010-1220-250.5-11:15500105762013.10.1718:002:3020:30221010-1220-250.5-11:15500106772013.10.1721:002:3023:30221010-1220-250.5-11:1550010778201322、3.10.1723:552:302:25221010-1220-250.5-11:155001087802013.10.177:302:5010:2025.51010-1220-250.5-11:163751097812013.10.1710:402:5013:3025.51010-1220-250.5-11:163751107822013.10.1713:502:5016:4025.51010-1220-250.5-11:163751117832013.10.1717:002:5019:5025.51010-1220-250.5-11:163751127842013.10.1720:102:323、5023:0025.51010-1220-250.5-11:16375旋旋喷喷桩桩施施工工记记录录工程名称:真美花园二期 设计桩径:600mm 序号桩号施工日期工作时间施工桩长(m)旋转速度(r/min)提升速度(cm/min)高压水泥浆空压机水灰比水泥用量(kg/桩)开始时间(h min)终止时间(h min)压力(Mpa)流量(L/min)压力(Mpa)流量(L/min)机长:施工员:监理:第 55 页1137852013.10.1723:202:502:1025.51010-1220-250.5-11:163751147862013.10.177:302:5010:2025.51010-324、1220-250.5-11:163751157872013.10.1710:402:5013:3025.51010-1220-250.5-11:163751167882013.10.1713:502:5016:4025.51010-1220-250.5-11:163751177892013.10.1717:002:5019:5025.51010-1220-250.5-11:163751187902013.10.1720:102:5023:0025.51010-1220-250.5-11:163751197912013.10.1723:202:502:1025.51010-1220-250.5-325、11:163751207922013.10.177:302:5010:2025.51010-1220-250.5-11:163751217932013.10.1710:402:5013:3025.51010-1220-250.5-11:163751227942013.10.1713:502:5016:4025.51010-1220-250.5-11:163751237952013.10.1717:002:5019:5025.51010-1220-250.5-11:163751247962013.10.1720:102:5023:0025.51010-1220-250.5-11:16375125326、7972013.10.1723:202:502:1025.51010-1220-250.5-11:163751267982013.10.177:302:5010:2025.51010-1220-250.5-11:163751277992013.10.1710:402:5013:3025.51010-1220-250.5-11:163751288002013.10.1713:502:5016:4025.51010-1220-250.5-11:163751298012013.10.1717:002:5019:5025.51010-1220-250.5-11:163751308022013.10.1327、720:102:5023:0025.51010-1220-250.5-11:163751318032013.10.1723:202:502:1025.51010-1220-250.5-11:163751328042013.10.177:302:5010:2025.51010-1220-250.5-11:163751338052013.10.1710:402:5013:3025.51010-1220-250.5-11:163751348062013.10.1713:502:5016:4025.51010-1220-250.5-11:163751358072013.10.1717:002:5019328、:5025.51010-1220-250.5-11:163751368082013.10.1720:102:5023:0025.51010-1220-250.5-11:163751378092013.10.1723:202:502:1025.51010-1220-250.5-11:163751388102013.10.177:302:5010:2025.51010-1220-250.5-11:163751398112013.10.1710:402:5013:3025.51010-1220-250.5-11:163751408122013.10.1713:502:5016:4025.51010-329、1220-250.5-11:16375旋旋喷喷桩桩施施工工记记录录工程名称:真美花园二期 设计桩径:600mm 序号桩号施工日期工作时间施工桩长(m)旋转速度(r/min)提升速度(cm/min)高压水泥浆空压机水灰比水泥用量(kg/桩)开始时间(h min)终止时间(h min)压力(Mpa)流量(L/min)压力(Mpa)流量(L/min)机长:施工员:监理:第 56 页1418132013.10.1717:002:5019:5025.51010-1220-250.5-11:163751428142013.10.1720:102:5023:0025.51010-1220-250.5-11:330、16375143792013.10.187:302:3010:00221010-1220-250.5-11:15500144802013.10.1810:302:3013:00221010-1220-250.5-11:15500145812013.10.1813:302:3016:00221010-1220-250.5-11:15500146822013.10.1816:302:3019:00221010-1220-250.5-11:15500147832013.10.1819:302:3022:00221010-1220-250.5-11:15500148842013.10.1822:302331、:301:00221010-1220-250.5-11:15500149852013.10.187:302:3010:00221010-1220-250.5-11:15500150862013.10.1810:302:3013:00221010-1220-250.5-11:15500151872013.10.1813:302:3016:00221010-1220-250.5-11:15500152882013.10.1816:302:3019:00221010-1220-250.5-11:15500153892013.10.1819:302:3022:00221010-1220-250.5-1332、1:15500154902013.10.1822:302:301:00221010-1220-250.5-11:15500155912013.10.187:302:3510:0522.51010-1220-250.5-11:15625156922013.10.1810:252:3513:0022.51010-1220-250.5-11:15625157932013.10.1813:202:3515:5522.51010-1220-250.5-11:15625158942013.10.1816:152:3518:5022.51010-1220-250.5-11:15625159952013.10333、.1819:102:3521:4522.51010-1220-250.5-11:15625160962013.10.1822:052:350:4022.51010-1220-250.5-11:15625161972013.10.187:302:3510:0522.51010-1220-250.5-11:15625162982013.10.1810:252:3513:0022.51010-1220-250.5-11:15625163992013.10.1813:202:3515:5522.51010-1220-250.5-11:156251641002013.10.1816:152:3518:5022.51010-1220-250.5-11:156251651012013.10.1819:102:3521:4522.51010-1220-250.5-11:156251661022013.10