工程量计算金属指标查询表(65个).xls
下载文档
上传人:十二
编号:825630
2023-11-29
120页
1.09MB
1、2、冷冷轧轧钢钢板板(YB459-64)厚度(mm)宽度和长度(mm)理论重量(kg/m2)(比重:8.9)厚度(mm)宽度和长度(mm)理论重量(kg/m2)(比重:8.9)0.4600 x1200700 x1430800 x15001000 x20003.562.56000 x12007000 x1430800 x15001000 x200022.250.454.012.7524.480.54.453.026.700.65.343.531.500.76.234.035.600.87.124.540.050.98.015.044.501.08.905.548.951.19.796.053.42、01.210.686.557.851.3512.027.062.301.513.357.566.751.6514.608.071.201.816.029.080.102.017.8010.089.002.2520.032、冷冷轧轧铜铜条条(YB459-64)厚 度(mm)宽度(mm)长度(mm)理论重量(kg/m2)(比重:8.9)厚 度(mm)宽度(mm)长度(mm)理论重量(kg/m2)(比重:8.9)0.202004005008001.782.50200500500200022.250.252.232.7524.480.302.673.001000200026.700.353.123.53、031.150.4020050050020003.564.0035.600.454.014.5040.050.504.455.0044.500.605.345.5048.950.706.236.0053.400.807.126.5057.850.908.017.0062.301.008.908.0071.201.2010.689.0080.101.3011.5710.0089.001.4012.4611.0097.901.5013.3512.00106.81.6014.6913.00115.71.8016.0214.00124.62.0017.8015.00133.5注 铜板和条(热轧,冷轧)4、的制造牌号为T2,T3,T4和TU和TUP,其化学成分应符合YB145-71规定3、特特殊殊用用冷冷轧轧黄黄铜铜条条(YB555-65)厚 度(mm)宽度(mm)长度(mm)理论重量(kg/m2)(比重:8.8)厚 度(mm)宽度(mm)长度(mm)理论重量(kg/m2)(比重:8.8)0.2020030050010001.761.6200500500200014.080.252.201.815.840.302004002.642.017.600.353.082.522.000.402005003.522.7524.200.453.963.026.400.5050020004.403.530.5、800.554.844.035.200.605.284.539.600.706.165.044.000.807.045.548.400.907.926.052.801.08.86.557.201.210.567.061.601.311.448.070.401.412.329.079.201.513.2010.088.00注 (1)标记举例:用H80制成的、厚度为0.8mm、宽度为300mm、长度为1000mm的1/2硬条标记为:条H80-Y20.8x300 x1000YB555-65。(2)冷轧条分为定尺、倍尺和不定尺三种。多多面面体体的的体体积积和和表表面面积积图形尺寸符号立方体长方体棱柱三6、棱柱棱锥棱台圆柱和空心圆柱管SdFha,Ohba,n#癮癡癨癆1,1SptR斜线直圆柱直圆锥圆台球球扇形球楔球缺圆环体胎h2腬腨腲退蕬乨酒蠬扤恲hrcinSSdrh荄譒1SptR球带体桶形椭球体 a,b,c-半轴交叉圆柱体梯形体111,hrRl遲蔬謱haa1,重心(G)在对角线交点上G0=h/2Go=h/2Go=h/4Go=h/222(1(2hbaShhbaV21202FFFFFFFhG)()()()(SF21234aaahcbaShbSF()1fnSFfnSh湡F湡SFFV1212121(1)(2)(蜲2失夲夲夲夲失夲娲婲婨婓婲婒婨孲孒孓灒桴孲孒孨孖孨孒孓孒屨屒屓屨屒屖多多面面体体的的体体积7、积和和表表面面积积Go=h/4在球心上Go=3/4(r-h/2)Go=3(2r-h)2/4(3r-h)在环中心上琩倨倩潣sx1)21211hrrhShV杴hhrhh杴rhhG122201(4212222121Shl汲rSr(2122rRSShrRlrRlS牒rR陨V22220324r牒Rr牒RhG)4(.1)4(2.232drhSrr2()鐴萲32hh桲SrV)(2)(蜲2失夲夲夲夲失夲娲婲婨婓婲婒婨孲孒孓灒桴孲孒孨孖孨孒孓孒屨屒屓屨屒屖Go=h1+h/2在轴交点上在轴交点上在二轴交点上串倲贳蔴葡牒摄牒r摄rr8412(23(22112栲21rr桒桒ShrRbhV)2(o)3(22DV摄DV38、(12腬腬rV(6)(21111babbaa扡hbaabaahV常常用用图图形形求求面面积积、体体积积公公式式图形尺寸符号正方形长方形三角形平行四边形任意四边形正多边形菱形梯形湡pnraro0f22adbacah B,12,dd2,幨 璋 圆形椭圆形ab-主轴扇形弓形圆环部分圆环新月形L d/102d/10 3d/104d/10P 0.400.79 1.18 1.56pdrsrbr橰Ddr橰RtdDrR抛物线形等多边形CShD潋面积(F)表面积(S)重心(G)在对角线交点上在对角线交点上GB=1/3BD CD=DA对角线交点上在o点上在对角线交点上2abFFaddFaaF4.410楳x扡 桢 9、b楳nx楳nxbhFx挲朩刲氱匱楤層杨靤2楳nx2牰RF楳普x12aF常常用用图图形形求求面面积积、体体积积公公式式湡pnraro0f22cah B,1d2,幨 璋 在圆心上F=(/4)ab在主轴交点G上在圆心OO1G=(-P)L/2P5d/10 6d/10 7d/108d/10 9d/101.91 2.25 2.552.81 3.02rs扲6 0330024f.0e)1楳nee襲葨絲桢 FrrGFbGq.0340r10İ2İ22楳nx.23İrRrRGPPr楳nx0)楳nx02bF2bbhaa22dpprF22.İ501rsrsr0022橰tyDdDrRF)4(2222乴蹒橰 0)(02sr10、橰RtdDrR 在内、外接圆心处潢爷圶8642KKKKK潋4、冷冷轧轧黄黄钢钢板板(YB460-71)厚度(mm)宽度和长度(mm)理论重量(kg/m2)(比重:8.5)厚度(mm)宽度和长度(mm)理论重量(kg/m2)(比重:8.5)0.202005005006006007007008008001.702.0020050050060060070070080080017.000.252.132.2519.130.302.552.5021.250.352.982.7523.380.403.403.0025.500.453.823.5029.750.504.254.0034.000.605.1011、4.5038.200.705.955.0042.500.806.805.5046.750.907.656.0051.001.008.506.5055.251.109.357.0059.501.2010.207.5063.751.3511.488.0068.001.5012.759.0076.501.6514.0310.0085.001.8015.30注 (1)冷轧软板仅供应H59,H62,H68,H80,H90,H96,HMn58-2,HPb59-1牌号。(2)冷轧1/2硬板仅供应H62,H65,H68,H90,HMn58-2牌号。(3)冷轧特硬板仅供应H62牌号。(4)冷轧板材长度分为:定尺12、倍尺和不定尺三种。其通常长度为5002000mm,但长度不得小于宽度。5、特特殊殊用用冷冷轧轧黄黄钢钢板板(YB555-65)厚度(mm)宽度和长度(mm)理论重量(kg/m2)(比重:8.8)厚度(mm)宽度和长度(mm)理论重量(kg/m2)(比重:8.8)0.4600 x1200700 x1430800 x15001000 x20003.522.25600 x1200700 x1430800 x15001000 x200019.600.453.962.5022.000.504.402.7524.200.554.843.026.400.605.283.530.800.706.164.0313、5.200.807.044.539.600.907.925.044.001.08.805.548.401.19.686.052.801.210.566.557.201.3511.887.061.601.513.207.566.601.6514.528.070.401.815.849.079.202.017.6010.088.00注 标记举例:用H90制成的、厚度为2.5mm、宽度为600mm、长度为1200mm的软板标记为:板H90M2.5x600 x1200 xYB555-65。6、铝铝及及铝铝合合金金板板厚度(mm)理论重量(kg/m2)厚度(mm)理论重量(kg/m2)厚度(mm)理论重14、量(kg/m2)0.51.402.57.009.025.20.61.683.08.4010.028.00.82.243.59.8012.033.61.02.804.011.2014.039.21.23.365.014.0016.044.81.54.206.016.8018.050.41.85.047.019.6020.056.02.05.608.022.4022.061.6注 (1)板的宽度有1000,1200和500mm;板的长度有2000,3000和4000mm。(2)理论重量按LY11,LY12和LD10等牌号铝合金的比重2.8计算,对于其他牌号的铝合金和工业纯铝,应乘以 下列换算系数:15、LD2-0.961;LF2-0.953;LF21-0.975;LC4-1.018;工业纯铝-0.967。厚度(mm)理论重量(kg/m2)2570.03084.03598.040112.050140.060168.070196.080224.0 (2)理论重量按LY11,LY12和LD10等牌号铝合金的比重2.8计算,对于其他牌号的铝合金和工业纯铝,应乘以7、铅铅板板(GB1470-79)厚度(mm)理论重量(kg/m2)厚度(mm)理论重量(kg/m2)厚度(mm)理论重量(kg/m2)1.011.373.034.115.056.851.517.063.539.806.068.222.02216、.744.045.487.079.592.528.434.551.178.090.96注 (1)铅的化学成分按GB469-64标准。(2)板材理论重量按比重为11.34计算,宽度按500mm进张。(3)板材成卷供应,厚度大于15mm的板材,以片状供应,厚度不大于1.5mm的板材,应用木箱包装。厚度(mm)理论重量(kg/m2)9.0102.3310.0113.7012.0136.4416.0170.558、纯纯铜铜带带(YB464-64)厚 度(mm)宽度(mm)长度(m)理论重量(kg/m2)(比重:8.9)厚 度(mm)宽度(mm)长度(m)理论重量(kg/m2)(比重:8.9)0.05117、8150200.440.5018300104.450.060.530.554.900.070.620.605.340.080.710.655.790.090.800.706.230.10183000.890.756.680.121.070.807.120.151.340.857.570.181.600.908.010.201.781.008.900.221.961.109.790.252.231.20710.680.302.671.3011.570.353.1214.4012.460.403.561.5013.350.454.01注 纯铜带的制造牌号为T2,T3,T4,TUP,其化学成分符合Y18、B145-71的规定。9、铝铝带带宽 度(mm)厚 度 (mm)345681012重 量 (kg/m)100.0800.1070.1340.1610.2680.3350.4020.5360.6700.8041.0721.3401.6080.1610.2140.2680.322120.0960.1290.1930.2570.3220.386150.1210.1610.2410.3220.4020.482200.1610.2140.3220.4290.5680.643250.2010.2680.4020.5680.6700.804300.2410.3320.4820.6430.8040.9654019、0.3220.4290.6430.8581.0721.286500.4020.5360.8041.0721.3401.608600.4820.6430.9651.2861.6081.930800.6430.8581.2861.7152.1442.5731000.8041.0721.6082.1442.6803.2161200.9651.2861.9302.5733.2163.859注 表中重量系以LY11,LY12,(比重2.8)为准,其他合金应乘以下列系数:L1L6-0.967;LF2-0.953;LF21-0.975。1、热热轧轧铜铜条条(YB459-64)厚 度(mm)宽度(mm)长度(20、mm)理论重量(kg/m2)(比重:8.9)厚 度(mm)宽度(mm)长度(mm)理论重量(kg/m2)(比重:8.9)4.0200500100035.608.0200500100071.204.540.059.080.105.044.0510.089.05.548.9511.097.96.053.4012.0106.86.557.8513.0115.77.062.3014.0124.67.566.7515.0133.5(二二)英英国国标标准准线线规规(BWG)BWG)号号数数与与线线径径的的关关系系线规号码in.mm线规号码in.mm线规号码00.3248.230140.0802.0322821、10.3007.020150.0721.8292920.2767.010160.0641.6263030.2526.401170.0561.4223140.2325.893180.0481.2193250.2125.385190.0401.0163360.1924.877200.0360.9143470.1764.470210.0320.8133580.1604.064220.0280.7113690.1443.658230.0240.61037100.1283.251240.0220.55938110.1162.946250.0200.50839120.1042.642260.0180.4522、740130.0922.337270.01640.41741in.mm0.01480.3760.01360.3450.01240.3150.01160.2950.01080.2740.01000.2540.00920.2340.00840.2130.00760.1930.00680.1730.00600.1520.00520.1320.00480.1220.00440.112三三)刺刺钢钢丝丝规规格格和和重重量量说 明 和 用 途钢丝划号(号)刺间距离(mm)每kg长度(m)重量(kg/km)刺钢丝又名刺铁丝,俗称“花园铅丝”(因常作花园围墙篱笆之用,故名),系以镀锌钢丝经机器铰缠而成(一般用23、#12或#14钢丝制作)。适于作各种围墙(尤其是公园围墙和临时建筑场地 的围墙)篱笆或障碍物用。12656.4156757.21391007.91271258.6116146510.991.87511.586.910013.076.912514.071.4注 (1)刺钢丝规格的注写方法为“钢丝直径(号数)x尖数x刺间距离”,或“钢丝直径(号数)x刺间距离”。(2)表列刺钢丝的“每kg长度”和“重量”,仅供参考。四四)刻刻痕痕钢钢丝丝规规格格和和重重量量直径(mm)断面积(mm2)重量(kg/m)抗 拉 强 度(kg/mm2)屈 服 强 度(kg/mm2)I组II组I组II组2.54.900.024、3419016015212837.060.056180150144120412.560.094170140136112519.630.150160130126104注 刻痕钢丝是由预应力混凝土结构用碳素钢丝(冷拔高强度钢丝)在经特制的“刻痕机”进行刻痕而制成的 预应力钢筋混凝土结构用的钢丝。五五)钢钢丝丝网网规规格格和和重重量量号数钢丝直径(mm)重量(kg/m2)号数钢丝直径(mm)重量(kg/m2)号数201.61.562.06.72.53.05.15.50.50.62.2181.61.71.64.73.05.72.07.2161.61.950.71.123.06.31.44.1141.425、1.72.28.92.54.94.50.50.7121.21.41.02.31.82.55.71.86.8111.21.540.61.02.56.11.02.61.6101.01.21.44.82.56.63.50.71.591.01.31.02.91.42.25.71.24.080.70.73.20.450.71.22.10.92.71.21.84.51.24.370.70.82.80.40.71.22.30.71.81.11.85.01.03.660.70.92.50.40.71.22.70.51.11钢丝直径(mm)重量(kg/m2)号数钢丝直径(mm)重量(kg/m2)0.72.01026、.30.90.451.00.351.20.61.60.90.250.70.82.90.31.00.40.90.41.60.51.30.80.220.60.61.90.280.91.26.00.31.00.40.90.70.20.60.51.40.250.90.72.60.301.20.30.60.630.220.70.41.00.250.90.451.30.281.20.300.70.560.220.80.350.90.251.00.652.70.281.20.280.70.50.220.90.351.00.251.10.41.30.31.50.280.70.450.20.80.351.10.27、251.20.401.40.20.90.250.70.40.251.3六六)钢钢板板网网规规格格和和重重量量品 种规 格 (mm)每张大约重量(kg)生产单位丝梗厚度h孔眼宽度T丝梗宽度b节 距t网面宽度B网面长度L小0.5912518006000.875上海中国钢板网厂20000.8750.6912518006001.00020001.1250.7912518006001.12520001.250网0.75912518006001.25020001.3750.8912518006001.37520001.5001912515006001.62518001.87520002.125大0.57128、.22.5180028005.85上海中国钢板网厂171.2251800280011.7091.225150030007.951800360011.7091.1252000400014.76111.6401800360011.702000400014.601.271.2251800280014.0491.2251800360014.041.1252000400017.71111.6401800360014.04网2000400017.711.5111.6401800360017.55172.3652000400022.142172.3651500300015.901800360023.412029、00400029.52223.0751500300015.901800360023.412000400029.52273.81002000400029.523364.61152000400044.28456.1150七七)钢钢丝丝纱纱(窗窗纱纱)规规格格和和重重量量规 格面 积(m2/卷)重 量(kg/卷)(kg/m2)14目3x10027.8712.50.44814目4x10037.1616.60.44816目3x10027.8713.50.48416目4x10037.1618.00.484(八八)紫紫铜铜丝丝布布(紫紫铜铜纱纱)规规格格和和重重量量网 孔目铜 丝线 号净重(kg/m2)网 30、孔目铜 丝线 号净重(kg/m2)网 孔目8222.69130302.51166510242.69135311.97347012243.049840321.97347516262.152845331.97348020272.152850341.973410024302.152855351.973428302.332260351.7940铜 丝线 号净重(kg/m2)361.9734361.9734371.9734371.9734391.7940(九九)黄黄铜铜丝丝布布(黄黄铜铜纱纱)规规格格和和重重量量网 孔目铜 丝线 号净重(kg/m2)网 孔目铜 丝线 号净重(kg/m2)网 孔目824131、.578724340.86115010261.237526340.82526012271.255828360.53867014271.327630360.57418016320.610032360.61009018330.610034360.627910020330.717636360.717611022330.861140360.4844120铜 丝线 号净重(kg/m2)380.6458410.3947420.3347430.3767430.4306430.5023440.3347440.44851、铝铝及及铝铝合合金金直直角角角角型型材材(XC111)序 号主要尺寸(mm)截面面积(mm32、2)理论重量(kg/m)序 号主要尺寸(mm)H=BbH=Bb11210.2340.06525251.321220.4400.12226251.6312.51.60.3770.1052725241510.2940.08228252.55151.20.3530.098292536151.50.4340.12130253.271520.5640.15731253.581530.8200.223322549161.60.4290.1193325510162.40.7260.2023427211181.50.5240.14635272121820.6840.19036301.513191.60.58533、0.1633730214192.40.8610.23938302.515193.21.1250.31339303162010.3970.1104030417201.20.4730.13141322.418201.50.5840.16242323.2192020.7640.21243323.5202031.1400.13744326.5212041.4750.410453532220.51.60.6330.17646354232320.6800.24547382.424251.20.5970.1664838.33.5注 (1)铝及铝合金型材的尺寸、规格等摘自冶金工业部1970年颁发的铝及铝镁合金34、挤压型材。(2)表内理论重量均按LY12合金比重(2.78)进行计算,其他材料的比重及换算系数如下:L1L7(2.71)-0.975;LF2(2.68)-0.964;LF11(2.65)-0.953;LF21(2.73)-0.982;LD2(2.70)-0.971;LY11(2.80)-1.007;LY12(2.78)-1.000。(3)铝型材主要生产单位有哈尔滨和西北铝加工厂等。西北铝加工厂的产品断面为100400cm2,宽度小于530mm。(4)铝及铝合金型材规格的表示方法是型材类别组号加序号,如XC111-4,其中,XC表示型材,后面的数字依次为 类别、组号,连字符后的数字为顺序号。截面35、面积(mm2)理论重量(kg/m)序 号主要尺寸(mm)截面面积(mm2)理论重量(kg/m)H=Bb0.7340.2044938.353.5900.9980.7770.2165038.36.34.4441.2350.9640.268514021.5640.4351.1890.33152402.51.9440.5401.4100.392534032.3200.6451.5090.42954403.52.6710.7431.6410.45655403.52.6940.7491.8570.516564043.0570.8502.2420.623574053.7501.0431.0410.2895836、4543.4750.9611.0900.303594554.2771.1890.8840.246605032.9200.8121.1640.324615043.8571.0721.4380.400625054.7771.3281.7200.478635065.6551.5722.2400.62364506.56.1101.6991.4910.41565501210.6002.9471.9570.554666055.7771.6062.1310.592676066.8551.9063.7231.0366875710.0102.7832.0050.5576975811.3603.1582.657037、.73970751014.0003.8921.7730.498719058.7502.4332.5620.7127290813.7603.825 (2)表内理论重量均按LY12合金比重(2.78)进行计算,其他材料的比重及换算系数如下:L1L7(2.71)-0.975;(3)铝型材主要生产单位有哈尔滨和西北铝加工厂等。西北铝加工厂的产品断面为100400cm2,宽度小于530mm。(4)铝及铝合金型材规格的表示方法是型材类别组号加序号,如XC111-4,其中,XC表示型材,后面的数字依次为2、铝铝及及铝铝合合金金直直丁丁字字型型材材(XC211)序 号主要尺寸(mm)截面面积(cm2)理论重量38、(kg/m)序 号主要尺寸(mm)HBbH1152510.4050.11334322195021.3780.38335323202020.7600.2113632420301.50.7400.20637355203521.0600.29538356203721.1170.31139357204221.2000.33440378204221.2400.34541389204521.8600.517423810209022.1600.60043381121531.81.3000.36144391222481.41.9600.26745401325291.60.8470.2546401425351.39、50.8900.24747401525382.51.5100.420484016254021.2800.35649401725452.51.7260.480504218254532.0190.561514519254542.7080.75352502025481.41.0120.28853512125481.51.0820.301545422255021.4990.41755542325502.51.8510.51556642426382.51.5540.432576325277021.9200.53458702629381.61.0550.29359702729582.52.1800.60640、60742829583.52.9910.83161752930401.51.0400.289628030304021.3700.381638031304532.1500.597648332305643.2800.91265903330686.56.1001.696截面面积(cm2)理论重量(kg/m)Bb4532.2590.628482.41.8740.5215032.4230.674321.51.0000.2783542.7130.7544021.4680.4084221.5000.4174453.9101.087503.53.0260.841504.83.9901.1097555.510141、.5323653.3500.9334532.4790.6894543.2740.9106833.3000.91713069.8402.7366444.1001.140402.21.8600.5177044.6401.300512.42.4430.6795033.0400.8456833.6081.0035055.7811.6075022.3200.6453722.1000.5845522.4600.6846668.0802.2464033.4000.9455022.5600.7126034.1101.1435033.9531.099771015.7004.365主要尺寸(mm)1、热热轧轧铜铜42、板板(YB459-64)厚度(mm)宽 度 (mm)60090010001200130015001600180019002200230025002600280029003000最 大 长 度 (mm)5.035004000600060005.535004000600060006.035004000600060006.535004000600060007.035004000600060007.535004000600060008.0400050006000550048004200370035009.04000500060005000420037003300310010.040005000550043、4500380033003000300011.0400050005000400034003300280012.040005000450038003100280013.04000500040003600290014.04000450038003300270015.04500430036003100250016.04500430034002000240017.04500400032002700220018.0450039003000260019.0450037002800240020.0450035002600230021.0400033002500220022.0400030002400210044、23.0400030002400200024.0350028002200190025.03500280020001800注 热轧板的宽度按100mm进级。理论重量(kg/m2)(比重:8.9)44.5048.9553.4057.8562.3066.7571.2080.1089.097.9106.8115.7124.6133.5142.4151.3160.2169.1178.0186.9195.8204.7213.6222.54、铝铝及及铝铝合合金金等等边边等等壁壁工工字字型型材材(XC511)序 号主要尺寸(mm)截面面积(mm2)理论重量(kg/m)HBb123381.21.1780.32745、22634.53.53.1570.87535748811.0003.058468382.53.5090.97658660611.6003.2254、铝铝及及铝铝合合金金等等边边等等壁壁Z字字形形型型材材(XC411)序 号主要尺寸(mm)截面面积(cm2)理论重量(kg/m)序 号主要尺寸(mm)HBbH112.715.91.60.6880.1911138220151.20.5780.1631244320151.50.7210.2001350425181.50.8850.2461480525233.52.2670.6301580631252.51.9000.5281680732141.91.046、000.30317100834253.52.7640.76818100936262.52.0750.57719100103631.53.22.9600.823截面面积(cm2)理论重量(kg/m)Bb2532.6130.7262543.6901.001192.52.1020.5843034.0201.1183545.6801.5794046.0801.6903034.6201.2843546.4801.8014046.8801.913主要尺寸(mm)3、铝铝及及铝铝合合金金槽槽形形型型材材(XC311)序 号主要尺寸(mm)截面面积(cm2)理论重量(kg/m)序 号主要尺寸(mm)HBbH147、13131.60.5610.1563145213343.52.5790.7173246320151.30.6200.17233504212842.8680.7973450525132.41.1340.3153550625151.50.7950.2213655725181.50.8700.24237558251821.1400.3173860925202.51.5200.423396010252042.2800.634406011252553.2500.90441631230151.50.8700.24242641330181.50.9600.267437014302021.3350.3714448、7015302263.8701.07645701632251.81.4370.39946701732252.51.9250.53547701835202.51.7700.492487519353021.8330.510498020385056.5601.824508021401821.4530.40451802240182.51.7950.499528023401832.1290.592538024402142.9600.823548025402521.7300.481559026402532.5490.709561002740303.53.2500.9045710028403232.978049、.8285810029405045.2801.4685912830452032.3700.659截面面积(cm2)理论重量(kg/m)Bb4033.6381.0112554.3001.1952045.3310.9263022.1200.5893044.1311.1482554.8191.3403033.2990.9172544.1311.1483556.0001.6684044.4801.24538.34.86.2751.7443845.3001.4732533.4490.9592555.5001.529263.23.7001.0283044.9311.3714057.0801.968455750、.8312.177304.56.0101.671354.56.4141.7833568.2802.3024046.1311.7044068.9002.4746047.4802.07950610.6802.96940610.0802.802486.311.5503.2115059.5802.66340917.1004.754主要尺寸(mm)2、冷冷拔拔(轧轧)无无缝缝钢钢管管(YB231-70)外径(mm)壁 厚 (mm)0.250.300.400.500.600.801.01.2钢 管 理 论 重 量 (kg/m)501.211.44(51)1.231.47531.281.53(54)1.3151、1.59561.361.62(57)1.381.65601.461.74631.531.83651.581.89(68)1.651.98701.702.03(73)1.782.12751.822.18(76)1.852.2180(83)85(89)9095100(102)(108)110120125130(133)1401501601701801902001.41.51.61.82.02.22.52.83.01.681.791.912.142.372.592.933.253.481.711.831.962.182.422.642.993.323.551.781.912.032.272.522.52、763.113.463.701.821.942.072.312.562.813.183.533.771.892.022.152.402.662.923.303.663.921.922.052.182.452.712.973.363.744.002.022.162.312.582.863.133.553.944.222.132.272.422.713.013.303.724.154.442.202.352.502.803.113.403.854.294.592.362.462.622.933.263.574.044.494.812.372.532.703.023.353.684.164.364.53、962.472.642.823.163.503.844.354.845.182.542.712.903.243.603.954.464.975.322.572.762.943.293.654.004.535.055.402.712.903.093.473.844.224.775.325.692.823.023.213.604.004.374.965.525.922.883.083.293.694.094.485.085.666.063.023.243.453.864.294.705.335.946.363.053.273.493.914.344.765.396.016.433.213.463.54、684.134.595.025.706.366.813.403.643.884.354.835.306.006.707.173.463.733.974.454.935.406.136.847.323.673.954.214.725.235.746.507.257.773.744.034.284.815.325.846.627.397.924.364.665.255.836.387.248.078.665.466.066.647.548.429.027.868.789.408.058.989.5910.1110.85壁 厚 (mm)钢 管 理 论 重 量 (kg/m)3.23.54.04.55.55、03.704.014.545.055.553.794.104.645.165.673.944.274.835.385.924.024.364.935.496.044.174.535.135.716.294.254.625.235.836.414.494.885.526.166.784.735.135.816.497.144.895.316.026.717.405.125.576.317.057.775.235.746.517.278.015.526.006.817.608.385.686.177.007.828.625.756.267.107.938.756.076.607.498.379.256、46.316.867.798.719.626.467.047.988.939.836.777.388.389.3810.336.867.478.479.4910.477.267.908.9810.0411.107.658.329.4610.5911.707.818.509.6710.8211.968.299.0210.2611.4912.708.439.1910.4611.7012.939.2210.0611.4412.9314.309.6110.5011.9113.3714.8010.0010.9212.4313.9215.4810.2511.1812.7514.2615.7510.791157、.8013.4215.0516.6511.5212.6514.3916.1117.8513.5315.3817.2519.0914.3116.3118.3520.3015.2017.3019.5021.5918.2920.6022.8019.6721.6524.002、冷冷拔拔(轧轧)无无缝缝钢钢管管(YB231-70)外径(mm)壁 厚 (mm)3.03.23.54.04.55.05.56.0钢 管 理 论 重 量 (kg/m)56789100.5180.5360.561110.5920.6150.647120.6660.6940.7340.789(13)0.7400.7740.8200.858、88140.8140.8520.9060.986(15)0.8880.9320.9931.091.171.23160.9621.101.081.181.281.35(17)1.041.091.171.281.391.48181.111.171.251.381.501.60(19)1.181.251.341.481.611.731.541.92201.261.331.421.581.721.851.972.07(21)1.331.411.511.681.831.972.102.22221.411.491.601.771.942.102.242.37(23)1.481.571.681.872.0559、2.222.372.52(24)1.551.641.771.972.162.342.512.66251.631.721.862.072.282.472.642.81(27)1.781.882.032.272.502.712.923.11281.851.962.112.372.612.843.053.26291.922.022.202.472.722.963.193.40302.002.122.292.562.833.083.323.55322.151.282.462.763.053.333.593.85342.292.432.632.963.273.583.874.14(35)2.372.5160、2.723.063.383.704.004.29362.442.592.813.163.503.824.144.44382.592.752.983.353.724.074.414.74402.742.913.153.553.944.324.685.03422.893.073.323.754.164.564.955.3344.53.073.253.544.004.444.875.295.70453.113.313.584.044.494.935.365.77483.333.543.844.344.835.305.766.216.57.07.58.08.599.510112.812.932.97361、.113.293.453.453.683.603.803.983.773.974.164.344.094.324.534.744.414.664.905.134.574.835.095.334.735.015.275.525.055.355.645.926.186.445.375.706.016.316.606.885.696.046.386.717.027.326.096.476.847.207.557.886.176.566.947.307.657.998.328.636.657.087.497.898.288.669.039.57壁 厚 (mm)钢 管 理 论 重 量 (kg/m)12162、水水、煤煤气气输输送送钢钢管管规规格格、重重量量表表冶冶标标(YB)234-63公称内径钢 管 螺 纹外径(mm)普通管加厚管mm(in.)壁厚(mm)理论重量(不计管接头)(kg/m)壁厚(mm)理论重量(不计管接头)(kg/m)61/81020.892.500.4681/413.52.250.622.750.73103/8172.250.822.750.97151/221.252.751.253.251.44203/426.752.751.633.52.0125133.53.252.4242.91321 1/442.253.253.1343.77401 1/2483.53.844.25463、.58502603.54.884.56.16702 1/275.53.756.644.57.8880388.548.344.759.811004114410.85513.4412551404.515.045.518.2415061654.517.815.521.63注(1)表列钢管是适用于输送水、煤气及采暖系统等用的钢管。分镀锌和不镀锌(黑管)两种;又分带螺纹和 不带螺纹两种;按壁厚可分为普通钢管,加厚钢管和薄壁钢管。(2)钢管的长度规定为:无螺纹的黑管412m;带螺纹的黑管和镀锌管49m。每批允许有10%的(按根数计算)24m长的短尺钢管或49m米长的接管(即用一个管接头将两根钢管连接而成)64、。(3)经供需双方协议,可供应定尺长度或倍尺长度的钢管。其最大长度可到8m。按倍尺交货的钢管,每个单 倍尺应留切口510mm。(4)钢管用易焊接的软钢制造,钢号和制造方法(炉焊或电焊)均由制造厂选择。(5)钢管应能承受下列规定压力的水压试验:普通钢管和薄壁钢管:20kg/cm2;加厚钢管30kg/cm2。2、电电丝丝套套管管规规格格、重重量量表表名称外径(mm)近似内径(mm)管壁厚度(mm)重量(kg/m)每吨长度(m/t)5/815.912.31.80.6261597.443/419.115.51.80.6271302.08125.421.81.80.628954.201 1/431.8265、8.21.80.629750.751 1/238.134.51.80.630620.73电电焊焊钢钢管管规规格格、重重量量表表冶冶标标(YB)242-68外径(mm)壁 厚 (mm)0.50.60.81.01.21.41.51.6钢 管 的 理 论 重 量 (kg/m)(5)0.0550.0650.0830.099(6)0.0680.0800.1080.123(7)0.0800.0950.1220.148(8)0.0920.1100.1420.173(0.202)(9)0.1050.1250.1620.1970.231100.1170.1390.1820.222(0.261)(11)0.12966、0.1540.2010.2470.290120.1420.1690.2210.2710.3200.365(0.388)0.411(13)0.1840.2410.2960.3490.4000.4250.451(14)0.1990.2600.3210.3790.4340.4620.490150.2140.2800.3450.4090.468(0.499)0.529160.2280.3000.3700.4380.503(0.536)0.568(17)0.2440.3200.3950.4680.5370.5730.608180.2580.3400.4190.4970.572(0.610)0.647(167、9)0.2740.3590.4440.5270.6060.6470.687200.2880.3790.4690.5560.642(0.684)0.726(21)0.4930.5860.6750.7210.767220.5180.6160.7100.7580.806(23)0.5430.6450.7450.7950.846240.5670.6740.779(0.832)0.885250.5920.7030.8130.8690.925(26)0.6170.7340.8490.9060.963(27)0.6410.7620.8820.9431.000280.6660.7920.916(0.980)168、.040290.6910.8230.9511.0201.076300.7150.8510.986(1.050)1.120(31)0.7400.8811.0211.0901.152320.9101.0531.1301.200330.9411.0911.1701.238(34)0.9681.1221.2001.280(35)0.9981.1591.2401.320(36)1.0271.1921.2801.360(37)1.0591.2291.3101.396381.0871.2601.3501.440(39)1.291.391.47401.331.421.52(41)1.361.461.5542169、.411.501.60431.431.541.6344.51.481.591.65451.511.611.71(46)1.541.651.75(47)1.571.681.79(48)1.611.721.83511.711.831.96531.781.912.03(54)1.821.942.07571.922.052.18602.022.162.3163.52.142.292.44702.372.532.70762.572.762.94838995102108114121127133140152注 (1)表中括号内的外径或重量的钢管应经过冷拔;外径不大于63.5mm、壁厚不大于2.5mm的没有括70、号的钢管经过冷拔或不经过冷拔方法制造。其余的钢管均不经过冷拔方法制造 (2)钢管的长度:A.通常长度(不定尺):外径30mm 长26m;外径3070mm 长38m;外径大于70mm 长410m。B.定尺长度:外径30mm 长度在2.56m范围内;外径30mm 长度在410m范围内。C.倍尺长度:倍尺长度在通常长度范围内,每个倍尺长度应留5mm的切口;每批通常长度的钢管允许交5%(按重量)的短尺钢管。D.短尺钢管:外径70mm 的,长度不大于1m;外径70mm的,长度不小于1.5m。(3)钢管应用“YB-63”中的08,10,15和20号钢和“YB151-63”中的24号甲类钢和乙类钢制造。(471、)经需方要求并在合同中注明,凡用作承受流体压力的钢管,按下列规定进行水压试验:钢管外径102mm,60千克/cm2;钢管外径102mm,30千克/cm2。1.82.02.22.52.83.03.23.53.8(0.717)(0.789)0.762(0.838)(0.806)(0.888)0.8510.9370.8950.9860.9401.0401.1301.260(0.984)(1.090)(1.180)(1.330)1.0301.1301.2401.3901.0741.1801.2911.4501.1201.2301.3401.510(1.160)(1.280)(1.400)(1.570)72、1.2201.3301.4701.640(1.260)(1.380)(1.510)(1.700)1.2961.4301.5621.7601.3401.4801.6201.8201.3851.5301.671(1.880)1.4301.5801.7201.9401.4701.6300.7802.0001.5201.6801.8302.0701.5621.7301.8872.1301.6101.7801.9402.1901.651.821.992.261.691.872.05(2.31)1.741.922.102.371.791.972.162.441.822.022.212.501.882.1073、2.292.592.893.071.912.122.322.622.913.111.962.172.372.682.002.222.432.74壁 厚 (mm)钢 管 的 理 论 重 量 (kg/m)2.052.272.482.813.113.333.842.182.422.642.993.323.553.794.102.272.512.763.113.463.703.944.272.312.562.813.183.533.774.024.362.452.712.973.363.744.004.254.622.582.863.133.553.944.224.494.832.733.033.3274、3.764.194.484.755.183.023.353.684.164.634.965.285.743.293.654.004.535.025.405.756.266.763.604.004.374.965.525.926.316.867.424.294.705.335.946.366.777.387.984.595.025.706.366.817.267.908.544.935.406.136.847.327.818.509.207.778.299.029.768.218.749.5410.228.739.2910.1410.989.179.7710.6611.5411.1812.10175、1.7812.7612.8213.88注 (1)表中括号内的外径或重量的钢管应经过冷拔;外径不大于63.5mm、壁厚不大于2.5mm的没有括号的钢管经过冷拔或不经过冷拔方法制造。其余的钢管均不经过冷拔方法制造 (2)钢管的长度:A.通常长度(不定尺):外径30mm 长26m;外径3070mm 长38m;外径大于70mm 长410m。B.定尺长度:外径30mm 长度在2.56m范围内;外径30mm 长度在410m范围内。C.倍尺长度:倍尺长度在通常长度范围内,每个倍尺长度应留5mm的切口;每批通常长度的钢管允许交5%(按重量)的短尺钢管。D.短尺钢管:外径70mm 的,长度不大于1m;外径70m76、m的,长度不小于1.5m。(4)经需方要求并在合同中注明,凡用作承受流体压力的钢管,按下列规定进行水压试验:钢管外径102mm,60千克/cm2;钢管外径102mm,30千克/cm2。4.04.24.54.85.05.57.887.107.437.937.798.168.718.388.789.389.969.6710.1210.8211.5011.9610.2610.8511.3712.1512.9213.4411.5412.0912.1312.7113.5914.4615.0412.7314.6215.1715.7813.4214.0615.0416.0016.6518.2414.601577、.3016.3717.4218.1319.78(一一)低低碳碳钢钢丝丝、电电镀镀锌锌钢钢丝丝的的规规格格和和重重量量型 号公称直径(mm)理论重量每捆重量型 号公称直径(mm)低碳钢丝电镀、热镀锌钢丝(kg/100m)(kg)低碳钢丝电镀、热镀锌钢丝0.160.0158191.001.000.180.0200181.201.20330.200.200.024710,5171.401.40320.220.220.0298(10)161.601.60310.250.250.038510,5151.801.80300.280.280.0483(10)142.002.00290.300.300.05578、5(10),5132.202.20280.350.350.0755 15,(10),5122.502.50270.400.400.0987 15,(10),5112.802.80260.450.450.125 15,(10),5103.03.00250.500.500.154 15,(10),593.53.50240.550.550.1872584.04.00230.600.600.2222574.54.50220.700.700.3022565.05.00210.800.800.3952555.505.50200.900.900.4992546.06.00注 (1)低碳钢丝的规格为0.16179、0mm,本表仅列常用规格。(2)理论重量的数值未计锌层的重量;(3)热镀锌公称直径中没有0.22,0.280,0.55三种规格,括号()和 中数字分别为电镀锌和热镀锌每捆重量,其他均与低碳钢丝相同。理论重量每捆重量(kg/100m)(kg)0.617250.88825.501.2125.502.5825.502.0025.502.4725.502.98503.85504.82505.55507.55509.875012.505015.405018.705022.2050 (3)热镀锌公称直径中没有0.22,0.280,0.55三种规格,括号()和 中数字分别为电镀锌和热镀锌每捆重量,(五五)瓦80、瓦楞楞白白铁铁皮皮规规格格和和重重量量规 格每 张 重 (kg)重量(kg/m2)号厚(mm)066x1.820.66x2.120.66x2.42181.24514.1016.3818.8411.80191.06712.0514.0516.0810.10200.88910.6812.5414.288.94210.8129.6211.2412.828.03220.7118.7610.2611.707.33230.6357.949.2610.536.59240.5597.268.469.666.05250.5086.217.308.335.22260.4575.466.427.324.58270.81、4065.266.146.994.38280.3565.085.906.784.24290.3304.625.386.163.86300.3054.244.925.643.53注 表内铁皮规格为宽x长(m x m)(六六)马马口口铁铁板板规规格格和和重重量量厚(mm)宽(in.)长(in.)kg/张张/箱kg/箱0.24214200.34322476.8320.24220280.68611276.8320.28514220.40422490.4960.28520280.809112101.8080.32018 3/418 3/40.42522495.2000.32010280.8511008582、.1000.35020200.35522579.8750.22820280.64711272.4640.25720280.72911281.6480.27120280.76811286.0160.30520280.86511296.8800.31120280.88211298.7840.31920280.905112101.360薄薄钢钢板板习习用用号号数数的的厚厚度度习用号数厚 度习用号数厚 度普通薄钢板镀锌薄钢板普通薄钢板镀锌薄钢板(in)(mm)(in)(mm)(in)(mm)(in)80.16444.180.16814.270210.03290.8350.036690.14953.8083、0.15323.900220.02990.7580.0336100.13453.410.13823.510230.02690.6820.0306110.11963.030.12333.130240.02390.6060.0276120.10462.650.10842.742130.08972.280.09342.370250.02090.5300.0247140.07471.890.07851.990260.01790.4550.0217150.06731.710.07101.800270.01640.4160.0202160.05981.520.06351.610280.01490.378084、.0187170.05381.360.05751.460290.01350.3420.0172180.04781.220.05161.310300.01200.3040.0157190.04181.060.04561.155310.01050.2660.0142200.03590.9110.03961.000320.00970.2460.0134注 表列习用号数及钢板厚度为英美制规定,与我国实际生产的镀锌薄钢板及普通薄钢板的产品规格有出入,有上面的表可知,我国产品无号数称呼的目的,是为满足目前习惯称呼与实际厚度的关系对照,选录本表,供作参考。实际规格仍应以我国产品为准。(mm)0.9300.885、550.7780.7000.6270.5520.5130.4750.4370.3990.3610.340镀锌薄钢板 有上面的表可知,我国产品无号数称呼的目的,是为满足目前习惯称呼与实际厚度的关系对照,选录本表,2、冷冷拔拔(轧轧)无无缝缝钢钢管管(YB231-70)外径(mm)壁 厚 (mm)0.250.300.400.500.600.801.01.2钢 管 理 论 重 量 (kg/m)50.02920.03480.0450.0550.0650.0830.0990.11260.03540.04210.0550.0680.0800.1030.1230.14270.04160.04960.065086、.0800.0950.1220.1480.17280.04770.0570.0750.0920.1100.1420.1730.20290.0540.0640.0850.1050.1250.1620.1970.231100.0600.0720.0950.1170.1390.1820.2220.261110.0660.0790.1050.1290.1540.2010.2470.290120.0720.0870.1150.1420.1690.2210.2710.320(13)0.0790.0940.1240.1540.1840.2410.2960.349140.0850.1010.1340.166087、.1990.2600.3210.379(15)0.0910.1090.1440.1790.2140.2800.3450.409160.0970.1160.1540.1910.2280.3000.3700.438(17)0.1030.1240.1640.2030.2440.3200.3950.468180.1000.1310.1740.2160.2580.3400.4190.497(19)0.1150.1380.1830.2280.2740.3590.4440.527200.1220.1460.1930.2400.2880.3790.4690.556(21)0.2030.2530.3030.3988、90.4930.586220.2120.2650.3180.4190.5180.616(23)0.2220.2770.3330.4380.5430.645(24)0.2360.2900.3470.4560.5670.674250.2420.3020.3630.4780.5920.703(27)0.2620.3270.3920.5160.6410.762280.2720.3400.4060.5360.6660.792290.2820.3520.4180.5530.6910.823300.2920.3640.4360.5760.7150.851320.3110.3890.4660.6150.76589、0.910340.3310.4130.4960.6550.8140.968(35)0.3410.4260.5100.6750.8330.998360.3500.4380.5250.6950.8631.027380.3700.4640.5550.7340.9121.087400.3900.4940.5850.7740.9621.146421.0101.20844.51.0701.281451.0901.295481.1601.3821.41.51.61.82.02.22.52.80.1240.1290.1340.1590.1660.1740.1860.1970.1930.2030.2130.2390、00.2470.2600.2770.2270.2400.2530.2750.2960.3150.3390.2620.2770.2920.3190.3450.3690.4010.4270.2960.3140.3320.3630.3950.4230.4620.4960.3310.3510.3710.4070.4440.4770.5240.5660.3650.3880.4110.4520.4930.5320.5860.6350.4000.4250.4510.4960.5430.5850.6470.7030.4340.4620.4900.5410.5920.6400.7090.7720.4680.4991、90.5290.5850.6410.6940.7710.8410.5030.5360.5680.6290.6910.7470.8320.910.5370.5730.6080.6740.7400.8020.8940.980.5720.6100.6470.7170.7890.8560.9561.050.6060.6470.6870.7620.8380.9101.021.120.6420.6840.7260.8060.8880.9651.081.190.6750.7210.7670.8510.9371.021.141.260.7100.7580.8060.8950.9861.071.201.330.92、7450.7950.8460.9401.041.131.261.390.7790.8320.8850.9841.091.181.331.460.8130.8690.9251.031.131.241.391.530.8820.9431.001.121.231.341.511.670.9160.981.041.161.281.401.571.740.9511.021.0761.221.331.471.631.830.9861.051.121.251.381.511.701.881.0531.131.201.341.481.621.822.021.1221.201.281.431.581.721.993、42.151.1591.241.321.471.631.782.002.221.1921.281.361.521.681.832.072.291.261.351.441.611.781.942.192.431.331.421.521.691.872.052.312.561.411.501.601.791.972.162.442.701.481.591.651.882.102.292.592.891.511.611.711.912.122.322.622.911.611.721.832.052.272.482.813.11壁 厚 (mm)钢 管 理 论 重 量 (kg/m)锅锅炉炉用用无无缝缝钢94、钢管管(YB232-70)常常用用高高压压无无缝缝钢钢管管公称直径(mm)Pg22(Mpa)Pg32(Mpa)外径X壁厚 (mm)重 量(kg/m)外径X壁厚 (mm)重 量(kg/m)614X40.98614X40.9861024X62.6824X62.661524X4.52.1635X95.772535X64.2943X108.063243X76.1849X1010.124057X910.6568X1317.535068X1014.3083X1525.146583X1119.53102X1735.6480102X1430.38127X2157.97100127X1746.12159X28995、6.67(125)168X28104.96125159X2073.00180X30121.33150180X2293.32219X35158.883、锅锅炉炉用用无无缝缝钢钢管管(YB232-70)沸沸水水管管用用无无缝缝钢钢管管外径(mm)壁 厚 (mm)2.533.544.555.56 理 论 重 量 (kg/m)512.993.554.104.645.165.676.176.66573.364.004.625.235.836.416.997.55604.224.835.526.166.787.397.9963.54.485.185.876.557.217.878.51704.965.7496、6.517.278.018.759.47766.267.107.938.759.5610.36836.867.798.719.6210.5111.39897.388.389.3810.3811.3312.28958.9810.0411.1012.1413.171029.6710.8211.9613.0914.2110810.2611.4912.7013.9015.09789107.608.488.639.679.1510.2611.329.7510.9512.1010.8812.2313.5414.811.9113.4214.8716.2813.1214.8016.4218.0014.161597、.9317.7619.4815.1917.1619.0920.9616.4018.5520.6422.6917.4419.7321.9724.173、锅锅炉炉用用无无缝缝钢钢管管(YB232-70)过过热热蒸蒸汽汽管管用用无无缝缝钢钢管管外径(mm)壁 厚 (mm)2.533.544.555.56 理 论 重 量 (kg/m)221.201.411.601.77241.331.551.771.97251.391.631.862.07291.631.922.202.472.722.963.19321.762.152.462.763.053.333.593.85382.192.502.983.3598、3.724.074.414.74402.312.743.153.553.944.324.685.03422.442.893.323.754.164.564.955.331、热热轧轧无无缝缝钢钢管管(YB231-70)外径(mm)壁 厚 (mm)1213141516171819钢 管 理 论 重 量 (kg/m)3238424550545713.3214.116014.2115.0715.8863.515.2416.1917.096816.5717.6318.6419.6120.527017.1618.2719.3320.3521.317318.0519.2420.3721.4622.4923.99、4824.4125.307618.9420.2021.4122.5723.6824.7425.7526.718321.0122.4423.8225.1526.4427.6728.8529.998922.7924.3725.8927.3728.8030.1931.5232.809524.5626.2927.9729.5931.1732.7034.1835.6110226.6328.5330.3832.1833.9335.6437.2938.8910828.4130.4632.4534.4036.3038.1539.9541.7011430.1932.3834.5336.6238.6740.674100、2.6244.5112132.1934.6236.9439.2141.4343.6045.7247.7912734.0336.5539.0141.4343.8046.1248.3950.6113335.8138.4741.0943.6546.1748.6351.0553.4214037.8840.7243.5046.2448.9351.5754.1656.7014639.6642.6445.5748.4651.3054.0856.8259.5115241.4344.5647.6550.6853.6656.6059.4862.3215943.5046.8150.1753.2756.4359.53101、62.5965.6016846.1749.6953.1756.6059.9863.3166.5969.8218049.7253.5457.3161.0464.7168.3471.9175.4419453.8658.0362.1566.2270.2474.2178.1382.0020356.5260.9165.9469.5473.7877.9782.1286.2121961.2666.0470.7875.4680.1084.6989.2393.7124568.9574.3879.7683.0890.3695.69100.77105.9027377.2483.3689.4295.44101.411102、07.33113.20119.2029984.9391.6998.40105.44111.67118.23124.74131.2032592.63100.03107.38114.68121.93129.13136.28143.38351100.32108.36116.35124.29132.19140.03147.82155.56377108.02117.00125.33133.29142.44150.93159.36167.75402115.41124.71133.94143.15152.30161.40170.45179.45426122.52132.41142.25152.04161.7103、8171.47181.11190.71450130.61140.09150.52160.90171.24181.52191.76201.94(465)134.05144.90155.70166.46177.16187.81198.41208.97480139.49149.71160.88172.00183.08192.10205.07216.00500145.41156.12167.79179.40190.97202.48213.95225.37530154.29165.74178.14190.50202.80215.06227.27239.42(550)159.20172.15185.051104、97.90210.70223.44236.14248.80560163.16175.36188.50201.60214.64226.64240.58253.48600175.00188.18202.31216.39230.42244.40258.34272.22630183.88197.80212.67227.49242.26256.98271.66286.28注 (1)表中带括号的规格,不推荐使用。(2)热轧钢管的通常长度为812.5米,短尺长度为1.53.0米。(3)钢管的理论重量计算公式为:P=0.02466S(D-S)式中 P-钢管的理论重量(千克/米)(钢管的比重为7.85);D-钢105、管的公称外径(毫米);S-钢管的公称壁厚(毫米)。(4)钢管的标记方法举例如下:用10号钢制造的外径为76毫米、壁厚为3.5毫米的直径和壁厚为普通级精确度、长度为3000毫米倍尺 的热钢保应标记为:钢管10-76X3.5X3000倍-YB231-70。2022(24)25(26)28303234.0336.3538.4736.9939.6142.0240.4443.4046.1743.4046.6649.7251.1752.5855.2446.3649.9153.2754.8756.4359.3849.8253.7157.4159.1960.9164.2252.7856.9760.9662.8106、964.7668.3671.7655.7360.2264.5166.5968.6172.5076.2079.7159.1964.0268.6670.9173.1077.3481.3885.2362.1567.2772.2174.6076.9481.4885.8289.9765.1170.5975.7678.3080.7985.6290.2694.7068.5674.3379.9082.6285.2890.4695.44100.3373.0079.2185.2388.1691.0596.67102.10107.3378.9285.7292.3395.5698.74104.96110.98116.107、8085.2893.32100.62104.19107.72114.63121.33127.8590.2698.20105.94109.74113.49120.83127.99134.9498.15106.88115.42119.61123.75131.89139.83147.57110.98120.99130.80135.64140.42149.84159.07168.09124.79136.18147.38152.90158.38169.18179.78190.19137.61150.29162.77168.93175.05187.13199.02210.71150.44164.39178108、.15184.96191.72205.09218.25231.23163.26178.50193.54200.99208.39223.04237.49251.74176.08192.61208.93217.02225.06240.99256.73272.26壁 厚 (mm)钢 管 理 论 重 量 (kg/m)188.40206.16223.72232.42241.08258.24275.21291.18200.25219.19237.93247.23256.48274.83292.98310.93212.08232.20252.12262.01271.85291.38310.72329.842109、19.47240.34261.00271.26281.47301.74321.81341.69226.87248.47269.88280.51291.09312.10332.91353.52236.74259.32281.72292.84303.91325.91347.71369.30251.53275.60299.47317.50323.14346.62369.90392.92261.40286.45311.31323.66335.97360.43384.70406.76266.33291.88317.23286.06313.58340.90300.85329.85358.66 用10号钢制110、造的外径为76毫米、壁厚为3.5毫米的直径和壁厚为普通级精确度、长度为3000毫米倍尺1、热热轧轧无无缝缝钢钢管管(YB231-70)外径(mm)壁 厚 (mm)2.533.544.555.56钢 管 理 论 重 量 (kg/m)321.822.152.462.763.053.333.593.85382.192.592.983.353.724.074.414.74422.442.893.353.754.164.564.955.38452.623.113.584.044.494.935.365.77502.933.484.014.545.055.556.046.51543.774.364.935111、.496.046.587.10574.004.625.235.836.416.997.55604.224.885.526.166.787.397.9963.54.485.185.876.557.217.878.51684.815.576.317.057.778.489.17704.965.746.517.278.018.759.47735.186.006.817.608.389.169.91765.406.267.107.938.759.5610.36836.867.798.719.6210.5111.39897.388.389.3810.3611.3312.28957.908.9810.04112、11.1012.1413.171028.509.6710.8211.9613.0914.2110810.2611.4912.7013.9015.0911410.8512.1513.4414.7215.9812111.5412.9314.3015.6717.0212712.1313.5915.0416.4817.9013312.7314.2615.7817.2918.7914015.0416.6518.2419.8314615.7017.3919.0620.7315216.3718.1319.8721.6015917.1518.9920.8222.6416820.1022.0423.971802113、1.5923.7025.7519423.3125.6027.8220329.1421931.52245273299325351377402426450(465)480500530(550)5606006306.577.588.599.510114.094.324.534.745.055.355.645.925.696.046.386.717.027.327.607.836.176.566.947.307.657.998.328.636.977.427.868.298.709.109.499.867.618.118.609.089.549.9910.4310.8511.678.108.639.1114、69.6710.1710.6511.1311.5912.488.589.159.7110.2610.8011.3211.8312.3313.299.149.7510.3610.9511.5312.1012.6513.1914.249.8610.5311.1911.8412.4713.1013.7114.3015.4610.2410.8811.5612.2312.8913.5414.1714.8016.0110.6611.3912.1112.8213.5214.2114.8815.5416.8211.1411.9112.6713.4214.1514.8715.5816.2817.6312.261115、3.1213.9614.8015.6216.4217.2218.0019.5313.2214.1615.0715.9816.8717.7618.6319.4821.1614.1915.1916.1817.1618.1319.0920.0320.9622.7915.3116.4017.4818.5519.6020.6421.6722.6924.6916.2717.4418.5919.7320.8621.9723.0824.1726.3117.2318.4719.7020.9122.1223.3124.4825.6527.9418.3519.6820.9922.2923.5824.8626.122116、7.3729.8419.3220.7222.1023.4824.8426.1927.5328.8531.4720.2821.7523.2124.6626.1027.5228.9330.3333.1021.4022.9624.5126.4427.5729.0830.5732.0634.9922.3623.0025.6227.2328.8230.4131.9855.5436.6223.3225.0326.7328.4130.0831.7433.3935.0238.2524.4526.2428.0229.7931.5533.2935.0336.7540.1525.8927.7929.6931.573117、3.4335.2937.1338.9742.5927.7029.8731.9133.9335.9537.9539.9541.9245.8530.0032.2834.5036.7038.8941.0643.2345.3849.6431.5033.8336.1638.4740.7743.0545.3347.5952.0834.0636.6039.1241.6344.1246.6149.0851.5456.4338.2341.0943.8546.7649.5652.3855.1757.9563.4842.6445.9249.1052.2855.4558.6061.7364.8671.0753.915118、7.4160.8964.3767.8371.2778.1358.7462.5466.3570.1473.9277.6885.1867.6771.8075.9180.0184.1092.2381.6886.1090.5199.2987.2191.9599.67106.06壁 厚 (mm)钢 管 理 论 重 量 (kg/m)92.5597.57102.50112.5897.87103.20108.50119.08101.10116.48112.20123.15104.52110.22115.90127.22108.96114.91120.83132.65115.62121.94128.23140.119、78120.17126.62133.10146.21122.28128.97135.63148.92131.17138.34145.50159.78137.81145.36152.89167.91(七七)冷冷弯弯卷卷边边角角钢钢 b-边宽;c-卷边宽;d-厚宽序 号尺 寸 (mm)截面面积(cm2)理论重量(kg/m)生 产 单 位bcd1301521.601.26天津市轧钢三厂240151.51.531.20湖北武汉薄板厂3401522.001.57上海钢铁研究所450202.53.002.365301010.650.52660152.2.632.10760152.53.252.598602120、022.882.26960202.53.502.751075152.53.993.14注 根据需方要求,经供需双方协商,可供应上表尺寸之外的冷弯边角钢。九九)冷冷弯弯焊焊接接I I型型管管规 格 (mm)截面面积(cm2)理论重量(kg/m)生 产 单位如图4.253.32湖北武汉薄板厂上海钢铁研究所十十)冷冷弯弯吊吊顶顶轻轻钢钢龙龙骨骨材料号或序号名 称断面形式一般规格(mm)重量(kg/m)宽 度高 度厚 度北北京京市市建建筑筑轻轻钢钢结结构构厂厂生生产产的的轻轻钢钢龙龙骨骨UC50主 龙 骨U15501.50.92UC38主 龙 骨U12381.20.56U50龙 骨U50190.50.121、41U25龙 骨U25190.50.312L25异型龙骨L15351.20.46T23龙 骨T23380.50.5北北京京灯灯具具厂厂生生产产的的轻轻钢钢龙龙骨骨BD大 龙 骨 U15451.0UZ中 龙 骨U50190.5UX小 龙 骨U25190.5SD大 龙 骨U30601.5TZ中 龙 骨T22351.0TX小 龙 骨T22221.0(一一)普普通通薄薄钢钢板板厚度(mm)宽 度 (mm)500600710750800850900950理 论 重 量 (kg/m)(比重7.85)0.20.7850.9421.1151.1781.2561.3351.4131.4920.250.9011.122、1801.3931.4721.5701.6881.7661.8640.31.1801.1431.6721.7061.8842.0022.1202.2370.351.3701.6501.9512.0612.1982.3352.4732.6100.41.5701.8842.2292.3552.5122.6692.8262.9830.451.7702.1202.5082.6492.8263.0033.1793.3560.51.9602.3552.7872.9443.1403.3363.5333.7290.552.1592.5913.0653.2383.4543.6703.8864.1020.62.3123、602.8263.3443.5333.7684.0044.2394.4750.72.7503.2973.9014.1214.3964.6714.9465.2200.752.9443.5334.1804.4164.715.0045.2605.5930.83.413.774.464.715.025.345.655.970.93.534.245.025.305.656.016.366.711.03.934.715.575.896.286.677.677.461.14.325.186.136.486.917.347.778.201.24.715.656.697.077.548.018.488.951.124、254.915.896.977.367.858.348.839.321.45.506.597.808.248.799.349.9010.441.55.897.078.368.839.4210.0110.6011.191.66.287.548.929.4210.0510.6811.3011.931.87.078.4810.0310.6011.3012.0112.7213.422.07.859.4211.1511.7812.5613.3514.1314.922.28.6410.3612.2612.9513.8214.6815.5416.412.59.8111.7813.9314.7215.7016125、.6817.6618.642.810.9913.1915.6116.4917.5818.6819.7820.883.011.7814.1316.7217.6618.8420.0221.2022.373.212.5615.0717.8418.8420.1021.3522.6123.863.513.7516.4919.5120.6121.9823.3524.7326.103.814.9217.9021.1822.3723.8625.3626.8528.344.015.7018.8422.2923.5525.1226.6928.2629.83100011001250140015001.5701.72126、71.9632.1982.3551.9632.1592.4532.7472.9442.3552.5912.9443.2973.5332.7483.0223.4343.8474.1213.1403.4543.9254.3964.7103.5333.8864.4164.9465.2993.9254.3184.9065.4955.8894.3184.7495.3976.0456.4764.7105.1815.8886.5047.0655.4956.0456.8687.6938.2435.8886.4767.3598.2438.8316.286.917.858.799.247.077.778.839.127、8910.007.858.649.8110.9911.788.649.5010.7912.1012.959.4210.3611.7813.1914.139.8110.7912.2713.7414.7210.9912.0913.7415.3916.4911.7812.9514.7216.4917.6612.5613.8215.7017.5818.8414.1315.5417.6619.7821.2015.7017.2719.6321.9823.5517.2719.0021.5924.1825.9119.6321.5924.5327.4829.4421.9024.1827.4830.7732.97128、23.5525.9129.4432.9735.3325.1227.6331.4035.4737.6827.4830.2234.4438.4741.2129.8332.8137.2941.7644.7531.4032.5439.2543.9647.10理 论 重 量 (kg/m)(比重7.85)(二二)酸酸洗洗薄薄钢钢板板和和镀镀锌锌薄薄钢钢板板(YB181-65)厚度(mm)宽 度 和 长 度 (mm)公称 尺寸允许偏差400 x800510 x510510 x710530 x760710 x710710 x1420750 x750每 张 钢 板 的 理 论 重 量 (kg)(比重7.85)0129、.25 0.270.30 0.400.45 0.500.050.630.510.710.790.991.981.100.68 0.770.85 2.141.190.750.610.850.951.192.371.320.880.710.991.111.382.771.541.100.821.141.271.583.161.771.130.921.281.421.783.561.991.26 1.421.581.983.962.210.550.06 1.561.742.184.352.430.60 1.902.374.752.650.65 2.062.575.142.870.700.07 2.2130、12.775.543.090.75 2.372.975.943.310.800.08 2.533.176.333.530.90 2.843.567.123.971.000.09 7.914.421.10 8.714.861.200.11 9.505.301.30 10.295.741.400.12 10.086.181.50 11.876.621.600.14 12.667.061.80 14.247.952.000.15 15.838.83 注 钢板的宽度和长度的允许偏差为:宽度800,+6mm;长度1500,+10mm;宽度800,+10mm;长度1500,+15mm。750 x15007131、50 x1800800 x800800 x1200800 x1600850 x850850 x1700900 x900900 x18002.212.651.261.882.511.422.841.593.182.382.861.362.042.71 3.061.723.442.653.181.512.263.011.703.401.913.823.093.711.762.643.521.993.972.224.453.534.242.013.014.022.274.542.545.093.974.772.263.394.522.555.102.865.724.425.302.513.775.0132、22.845.673.186.364.865.832.764.145.523.126.243.506.995.306.363.014.526.023.406.803.817.035.746.893.274.906.533.697.374.138.276.187.423.525.287.047.977.944.448.906.627.953.775.657.544.258.514.779.547.708.484.026.038.044.549.075.0910.177.959.534.526.789.045.1010.215.7211.448.8310.005.027.5410.045.6711133、.346.3612.729.7111.665.538.2911.046.2412.476.9913.9910.6012.726.039.0412.046.8013.617.6315.2611.4813.786.539.8013.067.3714.748.2716.5312.3614.847.0310.5514.087.9415.888.9917.8013.2515.907.5411.3015.808.5117.019.5419.0714.1316.968.0412.0616.089.0718.1410.1720.3515.9019.089.0413.5618.0810.2120.4111.44134、22.8917.6621.2010.0515.0720.0811.3422.6812.7225.43宽 度 和 长 度 (mm)每 张 钢 板 的 理 论 重 量 (kg)(比重7.85)注 钢板的宽度和长度的允许偏差为:宽度800,+6mm;长度1500,+10mm;宽度800,+10mm;长度1500,+15mm。900 x20001000 x20003.53 3.81 4.24 4.94 5.65 6.36 7.067.857.778.647.489.429.1810.209.8910.9910.0011.7811.3012.5612.7214.1314.1315.7015.5417.2135、716.9618.8418.3720.4119.7821.9821.2023.5522.4125.1225.6328.2628.2631.40(三三)中中、厚厚钢钢板板厚度(mm)宽 度 和 长 度 (mm)600650700710750800850900每 张 钢 板 的 理 论 重 量 (kg)(比重7.85)4.521.2022.9624.7325.0826.4928.2630.0331.97523.5525.5127.4827.8729.4431.4033.3635.435.525.9428.0630.2230.6532.3834.5436.7038.36628.2630.6232.9136、733.4435.3337.6840.0442.26732.9735.7233.4739.0141.2143.9646.7149.40837.6840.8243.9644.5947.1050.2453.3856.62942.3945.9249.4650.1652.9956.5260.0563.391047.1051.0354.9555.7458.8862.8066.7370.861151.8156.1360.4561.3164.7669.0873.4077.721256.5261.2365.9466.8870.6575.3680.0784.781361.2366.3871.4472.4676.137、5481.6486.7491.851465.9471.4476.9378.0382.4387.9293.4298.911570.6576.5482.4383.6088.3194.20100.09105.981675.3681.6487.9289.1894.20100.48106.76113.041884.7891.8598.91100.32105.98118.04120.11127.172094.20102.05109.90111.47117.75125.60133.45141.3022103.62112.26120.89122.62129.53138.16146.80155.4324113.138、04122.46131.81133.76141.30150.72160.14169.5625117.75127.56137.38139.34147.19157.00166.81176.6326122.46132.67142.87144.91153.08163.38173.49183.6928131.88142.87153.86156.06164.85175.84186.83197.8230141.30153.08164.85167.21176.62188.40200.18211.9532150.72163.28175.84178.35188.40200.06213.52226.0834160.139、14173.46186.83189.50200.18213.52226.87240.2135164.85178.59192.32195.07206.06219.80233.54247.2836169.55183.69197.82200.65211.95226.08240.21254.3438178.98193.90208.81211.79223.73238.64253.56268.4740188.40204.10219.80222.94235.50251.20266.90282.6042197.82214.31230.79234.09247.28263.72280.25296.7344207.140、24224.51241.78245.23259.05276.32293.59310.8645211.95229.61247.28250.81264.94282.60300.26317.9346216.66234.72252.77256.38270.82288.88306.94324.9948226.08244.92263.76267.53282.60301.44320.28339.1250235.50255.13274.75278.68294.38314.00383.63353.2552244.92265.33286.74289.82306.15326.66346.97367.3854254.141、34275.54296.73300.97317.93339.12360.32381.5155259.05280.64302.23306.54328.81345.40366.99388.5856263.76285.74307.72312.12330.70351.68373.66395.6458273.18295.95318.71323.26341.48364.24287.01409.7760282.60306.15329.70334.41358.25376.48400.35423.909501000110012001300140015001600170033.5635.3338.8642.394142、5.9249.4652.9956.5260.0537.2939.2543.1847.1051.0354.9558.8862.8066.7341.0243.1847.4951.8156.1360.4564.7669.0873.4044.7547.1051.1856.5261.2365.9470.6575.3680.0752.2054.9560.4565.9471.4476.9382.4887.9293.4259.6062.8069.0875.8681.6487.9294.20100.48106.7667.1270.6577.7284.7891.8598.91105.98113.04120.117143、4.5878.5085.3694.20102.05109.90117.75125.60133.4582.0386.3594.99103.62112.26120.89129.53138.16146.8089.4994.20103.62113.04122.46131.88141.30150.72160.1496.95102.20112.26122.40132.67142.87153.08163.28173.49104.41109.90120.89131.88142.87153.86164.95175.84186.83111.80117.75129.53141.30153.08164.85176.6144、3188.40200.18119.32125.60138.16150.72163.28175.84188.40200.96213.52134.24141.30155.48169.56183.69197.82211.95226.08240.21149.15157.00172.70188.40204.10219.80235.50251.20266.90164.07172.70189.97207.24224.51241.78259.50276.32293.59178.98188.40207.24226.68244.92263.76282.60301.44320.28186.44196.25215.8145、8235.50255.12274.75294.38314.00333.63193.90204.10224.51244.92265.33285.74306.15326.56346.97208.81219.80241.78263.76285.74307.72329.70351.68373.66223.73235.50259.05282.60306.15329.70353.25376.80400.35238.64251.20276.32301.44326.56351.68376.80401.92427.04253.56266.90293.59320.68346.97373.60400.35427.0146、4457.43261.01274.75802.23329.70357.18384.65412.13439.60467.08268.47282.60310.86339.12367.38395.64423.90452.16480.42283.39298.30328.13357.90387.79417.62447.45477.28507.11298.30314.00345.40376.80408.20439.60471.00502.40533.80313.22329.70362.67395.64428.61461.58494.55527.52560.49328.13345.40379.94414.4147、8449.02483.56518.10552.64587.18335.59358.25388.58423.90459.23494.55529.88565.20600.53343.05361.10377.21433.32469.43505.54541.65577.70613.87357.96376.80414.48452.16489.84527.52565.20602.88640.56372.88392.50431.75471.00510.25549.50588.75628.00667.25387.76408.20449.02489.84530.66571.48612.30653.12693.9148、4402.71423.90466.20508.08551.07593.46635.85678.24720.63410.16431.75474.93518.10561.28604.45647.63690.80733.98417.62439.60483.56527.52571.48615.44659.40703.36747.32432.54455.30500.83546.30591.89637.42682.95728.46774.01447.45471.00518.10565.20612.30659.40706.50753.60800.70宽 度 和 长 度 (mm)每 张 钢 板 的 理 论 重149、 量 (kg)(比重7.85)厚度(mm)1800190020002400300063.5967.1270.6584.78105.984.570.6574.5878.5094.20117.75577.7282.0386.35103.62129.535.584.7889.4994.20113.04141.30698.91104.41109.90131.88164.857113.04119.32125.64150.72188.408127.17134.24141.30169.56211.959141.30149.15157.00188.40235.5010155.43164.07172.70207150、.24259.0511169.56178.98188.40226.08282.6012183.69193.90204.10244.92306.1513197.82208.81219.80263.76329.7014211.95223.73235.50282.60353.2515226.08238.64251.20301.44376.8016254.34268.47282.62339.12423.9018282.60298.30314.00376.80471.0020310.86328.13345.40414.48518.1022339.12357.96376.80452.16565.20243151、53.25372.88392.50471.00588.7525367.38387.79408.20489.84612.3026395.64417.62439.60527.52659.4028423.90447.65471.00565.20706.5030425.16447.28502.40602.88753.6032480.42507.11533.80640.56800.7034494.55522.03549.50659.40824.2535508.62536.94565.20678.24847.8036536.94566.77596.60715.92894.9038565.20596.606152、28.00753.60942.0040593.46626.43659.40791.28989.1042621.72656.26690.80828.961036.2044635.85671.18706.50847.801059.7545649.98686.09722.20866.641083.3046678.24715.92753.60940.321130.4048706.50745.75785.00942.001177.5050734.76775.58816.40979.681224.6052763.02805.41847.801017.361271.7054777.15820.33863.5153、01036.201295.2555791.28835.24879.201055.041318.8056819.54865.07910.601092.721365.9058847.80894.90942.001130.401413.0060(四四)花花纹纹钢钢板板(YB184-65)钢板基本厚度(mm)纹高(mm)钢板宽度(mm)钢板长度(mm)理论重量(kg/m2)钢板基本厚度(mm)纹高(mm)菱形扁豆形菱形扁豆形菱形2.51.02.5由6001800mm,其宽度以50mm进级由6001200mm,其长度以100mm进级21.622.651.531.02.525.626.65.51.53.5154、1.02.529.530.561.541.02.533.434.472.04.51.02.537.338.882.0注 (1)花纹钢板按GB700-65规定的平炉或转炉13号乙类钢供应。(2)标记举例:由B3号钢制成的,尺寸为4mmX1000mmX4000mm,菱形花纹的钢板,其标记为:菱形花纹钢板B3-4X1000X4000-YB184X65。钢板宽度(mm)钢板长度(mm)理论重量(kg/m2)扁豆形菱形扁豆形2.56001800mm,其宽度以50mm进级6001200mm,其长度以100mm进级42.342.32.546.246.22.550.150.12.559.058.02.566.155、865.8纹高(mm)暂暂时时采采用用的的槽槽钢钢品品种种(不不推推荐荐使使用用)型 号尺 寸截面面积理论重量hbdtrr1(mm)(cm2)(kg/m)6.565404.87.57.53.758.546.7012120535.59.09.04.515.3612.0624a240787.012.012.06.034.2126.5524b240809.012.012.06.039.0030.6224c2408211.012.012.06.043.8134.3927a270827.512.512.56.2539.2730.8327b270849.512.512.56.2544.6735.0727c156、2708611.512.512.56.2550.0739.3030a300857.513.513.56.7543.8934.4530b300879.513.513.56.7549.5939.1630c3008911.513.513.56.7555.8943.81注 上表中所列各号槽钢是暂时保留的品种,不推荐使用。当需方特殊需要时,经供需双方协议,也可以供应。(一一)圆圆钢钢规规格格、重重量量表表冶冶标标(YB)158-63直 径(mm)截面面积(cm2)理论重量(kg/m)直 径(mm)截面面积(cm2)理论重量(kg/m)50.19630.1544515.9012.485.60.24630.157、1934818.1014.2160.28270.2225019.6415.426.30.31170.2455322.0617.3270.38480.3025624.6319.3380.50270.3956028.2722.1990.63590.4996331.1724.47100.78540.6176533.1826.05110.95030.7467038.4830.21121.1310.8887544.1834.68131.3271.048050.2739.46141.5391.218556.7544.55151.7671.399063.6249.94162.0111.589570.8855158、.64172.2701.7810078.5461.65182.5452.0010586.5967.97192.8352.2311095.0374.60203.1422.47120113.1088.78213.4642.72125122.7296.33223.8012.98130132.73104.20244.5243.55140153.72120.84254.9093.85150176.72138.72265.8094.17160201.06157.83286.1584.83170226.98178.18307.0695.55180254.47199.76328.0426.31190283.5159、3222.57349.0797.13200314.16246.623610.187.99210346.36271.893811.348.90220380.13298.404012.579.87240452.39355.134213.8510.87250490.88385.84注 圆钢的长度规定如下:A.通常长度(非定尺的)普通钢:直径25mm.长510m 直径2648mm.长49m 直径50110mm.长48m 直径120mm.长36m 优质钢:各种直径.长26m B.定尺长度(合同中确定)C.倍尺长度(合同中确定)短尺圆钢的交货数量不得超过一批订货总量的10%。普通钢短尺不短于2.5m,优质160、钢短尺不短于1.5m。(三三)六六角角钢钢规规格格、重重量量表表冶冶标标(YB)160-63对边宽(mm)截面面积(cm2)理论重量(kg/m)对边宽(mm)截面面积(cm2)理论重量(kg/m)80.55420.435286.7905.3390.70150.551307.7946.12100.8660.680328.8686.96111.0480.8233410.0107.86121.2470.9793611.2208.81131.4631.1503812.5109.82141.6971.334013.8610.88151.9481.534215.2711.99162.2171.744517161、.5413.77172.4901.964820.0015.66182.8062.205021.6416.99193.1262.455324.3319.10203.4642.725627.1521.32213.8223.005828.1322.08224.1913.296031.1824.50234.5813.596334.3726.98244.9933.926536.5923.70255.4124.256840.0431.43265.8474.597042.2333.30276.3134.96注 (1)六角钢的长度规定如下:A.通常长度:26m;B.定尺或倍尺长度在合同中确定。长度小于1.5m162、的短尺钢材的交货数量,不得超过一批订货总量的15%。(GB705-65)规定为10%。(2)六角钢不得有显著的扭转。(3)六角钢的端头应切得正直。(4)GB705-65:每米弯曲不得大于8mm,总弯曲度不得大于钢材总长度0.6%。五五)热热轧轧等等边边角角钢钢(YB)166-65 b-边宽;d-边厚;r-内圆弧半径角钢号数尺 寸 (mm)截面面积(cm2)理论重量(kg/m)外表面积(m2/m)bdr22033.51.1320.8890.07841.4591.1450.0772.52531.4321.1240.09841.8591.4590.09733034.51.7491.3730.1174163、2.2761.7860.1173.63632.1091.6560.14142.7562.1630.14153.3822.6540.141440352.3591.8520.15743.0862.4220.15753.7912.9760.1564.545352.6592.0880.17743.4862.7360.17754.2923.3690.17665.0763.9850.17655035.52.9712.3320.19743.8973.0590.19754.8033.7700.19665.6884.4650.1965.656363.3432.6240.22144.3903.4460.22055164、.4154.2510.22088.3676.5680.2196.363474.9783.9070.24856.1434.8220.24867.2885.7210.24789.5157.4690.2471011.6579.1510.246770485.5704.3720.27556.8755.3970.27568.1606.4060.27579.4247.3980.275810.6778.3730.274(7.5)75597.3675.8180.29568.7976.9050.294710.1607.9760.294811.5039.0300.2941014.12611.0890.2938805165、7.9126.2110.31569.3977.3760.314710.8608.5250.314812.3039.6580.3141015.12611.8740.31399061010.6378.3500.354712.3019.6560.354813.94410.9460.3531017.16713.4760.3531220.30615.9400.3521010061211.9329.3660.393713.79610.830.393815.63812.2760.3931019.26115.1200.3921222.80017.8980.3911426.25620.6110.3911629.166、62723.2570.39011110715.19611.9280.433817.23813.5320.4331021.26116.6900.4321225.20019.7820.4311429.05622.8090.43112.512581419.75015.5040.4921024.37319.1330.4911228.91222.6960.4911433.36726.1930.490141401027.37321.4880.5511232.51225.5220.5511437.56729.4900.5501642.53933.3930.54916160101631.50224.7290.167、6301237.44129.3910.6301443.29633.9870.6291649.06738.5180.629181801242.24133.1590.7101448.80638.3830.7091655.46743.5420.7091861.95548.6340.70820200141854.64242.8940.7881662.01348.6800.7881869.30154.4010.7872076.50560.0560.7872490.66171.1680.785注 (1)等边角钢的通常长度:24号长39m;58号长412m;914号长419m;1620号长619m。(2)制168、造钢号:A3,A3F,B3F。(3)标记举例:普通碳素钢甲类平炉3号沸腾钢160mmX160mmX16mm的热轧等边角钢的标记为:热轧等边角钢160 x160 x16-YB166-65A3F-YB170-63热热轧轧不不等等边边角角钢钢(YB)167-65 B-长边宽度;b-短边宽度;d-边厚;r-内圆弧半径角钢号数尺 寸(mm)截面面积(cm2)理论重量(kg/m)外表面积(m2/m)Bbdr2.5/1.6251633.51.1620.9120.08041.4991.1760.0793.2/2322031.4921.1710.10241.9391.5220.1014/2.54025341.8169、901.4840.12742.4671.9360.1274.5/2.84528352.1491.6870.14342.8062.2030.1435/3.2503235.52.4311.9080.16143.1772.4940.1605.6/3.65636362.7432.1530.18143.5902.8180.18054.4153.4660.1806.3/46340474.0583.1850.20254.9933.9200.20265.9084.6380.20176.8025.3390.2017/4.5704547.54.5473.5700.22655.6094.4030.22566.647170、5.2180.22577.6576.0110.225(7.5/5)7550586.1254.8080.24567.2605.6990.24589.4677.4310.2441011.5909.0980.2448/5805056.3755.0050.25567.5605.9350.25578.7246.8480.25589.8677.7450.2549/5.69056597.2125.6610.28768.5576.7170.28679.8807.7560.286811.1838.7790.28610/6.3100636109.6177.5500.320711.1118.7220.320812.171、5849.8780.3191015.46712.1420.31910/81008061010.6378.3500.354712.3019.6560.354813.94410.9460.3531017.16713.4760.35311/711070610.6378.3500.354712.3019.6560.354813.94410.9460.3531017.16713.4760.35312.5/81258071114.09611.0360.403815.98912.5510.4031019.71215.4740.4021223.35118.3300.40214/91409081218.0381172、4.1600.4531022.26117.4750.4521226.40020.7240.4511430.45623.9080.45116/10160100101325.31519.8720.5121230.05423.5920.5111434.70927.2470.5101639.28130.8350.51018/11180110101428.37322.2730.5711233.71226.4640.5711438.96730.5890.5701644.13934.6490.56920/12.52001251237.91229.7610.6411443.86734.4360.6401649173、.73939.0450.6391855.52643.5880.639注 (1)不等边角钢的通常长度:2.5/1.65.6/3.6长39m;6.3/49/5.6号长412m;10/6.314/9号长419m;16/1020/12.5号长619m。(2)制造钢号:A3,A3F,B3F。(3)标记举例:普通碳素钢甲类平炉3号沸腾钢160mmX160mmX16mm的热轧等边角钢的标记为:热轧不等边角钢160 x80 x12-YB167-65A3F-YB170-6311/711070热热轧轧普普通通工工字字钢钢(G GB)706706-65 h-高度;b-腿宽;d-腰厚;t-平均腿厚;r-内圆弧半径;r174、1-腿端圆弧半径型 号尺 寸(mm)截面面积(cm2)理论重量(kg/m)hbdtrr110100684.57.66.53.314.311.112.6126745.08.473.518.114.214140805.59.17.53.821.516.916160886.09.98.04.026.120.518180946.510.78.54.330.624.120a2001007.011.49.04.535.527.920b2001029.011.49.04.539.531.122a2201107.512.39.54.842.033.022b2201129.512.39.54.846.436.4175、25a2501168.01310548.538.125b250118101310553.542.028a2801228.513.710.55.355.4543.428b28012410.513.710.55.361.0547.932a3201309.51511.55.867.0552.732b32013211.51511.55.873.4557.732c32013413.51511.55.879.9562.836a36013610.015.812.06.076.359.936b36013812.015.812.06.083.565.636c36014014.015.812.06.090.771176、.240a40014210.516.512.56.386.167.640b40014412.516.512.56.394.178.840c40014614.516.512.56.310280.145a45015011.518.013.56.810280.445b45015213.518.013.56.811187.445c45015415.518.013.56.812094.550a50015812.020.014.07.011993.650b5001.6014.020.014.07.012910150c50016216.020.014.07.013910956a56016612.52114.177、57.3135.25106.256b56016814.52114.57.3146.45115.056c56017016.52114.57.3157.85123.963a63017613.022157.5154.9121.663b63017815.022157.5167.5131.563c63018017.022157.5180.1141.012120745.08.47.03.517.814.024a2401168.013.010.05.047.737.424b24011810.013.010.05.052.641.227a2701228.513.710.55.354.642.827b27012178、410.513.710.55.360.047.130a3001269.014.411.05.561.248.030b30012811.014.411.05.567.252.730c30013013.014.411.05.573.457.455a55016612.521.014.57.313410555b55016814.521.014.57.314511455c55017016.521.014.57.3156123注 (1)工字钢的通常长度:818号工字钢519m;2063号工字钢长619m。(2)制造钢号:A3,A3F,B3F。(3)标记举例:普通碳素钢甲类平炉3号沸腾钢400mmX144m179、mX12.5mm的热轧普通工字钢的标记为:热轧普通工字钢400X144X12.5-GB706-65A3F-YB170-33热热轧轧轻轻型型工工字字钢钢(Y YB)163163-63 h-高度;b-腿宽;d-腰厚;t-平均腿厚;r-内圆弧半径;r1-腿端圆弧半径型 号尺 寸截面面积理论重量hbdtrr1(mm)(cm2)(kg/m)10100554.57.27.02.512.09.4612120644.87.37.53.014.711.514140734.97.58.03.017.413.716160815.07.88.53.520.21518180905.18.16.03.523.418.41180、8a1801005.18.39.03.525.419.9202001005.28.49.54.026.821.020a2001105.28.69.54.028.922.7222201105.48.710.04.030.624.022a2201205.48.910.04.032.825.8242401155.69.510.54.034.827.324a2401255.69.810.54.037.529.4272701256.09.811.04.540.231.527a2701356.010.211.04.543.233.9303001356.510.212.05.046.536.530a3001181、456.510.712.05.049.939.2333301407.011.213.05.053.842.2363601457.512.314.06.061.948.6404001558.013.015.06.071.456.1454501608.614.216.07.083.065.2505001709.515.217.07.097.876.85555018010.316.518.07.011489.86060019011.117.820.08.0132104656502001219.222.09.0153120707002101320.824.010.017613870a700210152182、4.024.010.020215870b70021017.528.224.010.0243184注 (1)轻型工字钢的通常长度:1018号工字钢519m;2070号工字钢长619m。(2)制造钢号:A3,A3F等。(3)标记举例:普通碳素钢甲类平炉3号沸腾钢240mmX115mmX5.6mm的热轧轻型工字钢的标记为:热轧轻型工字钢240 x115x5.6-YB193-93A3F-YB170-63热热轧轧普普通通槽槽钢钢(G GB)707-65707-65 h-高度;b-腿宽;d-腰厚;t-平均腿厚;r-内圆弧半径;r1-腿端圆弧半径型 号尺 寸截面面积理论重量hbdtrr1(mm)(cm2)(183、kg/m)550374.57.07.03.506.935.446.363404.87.57.53.758.4446.63880435.08.08.04.010.248.0410100485.38.58.54.2512.7410.0012.6126535.59.09.04.515.6912.3714a140586.09.59.54.7518.5114.5314b140608.09.59.54.7521.3116.7316a160636.510.010.05.021.9517.2316160658.510.010.05.025.1519.7418a180687.010.510.55.2525.69184、20.1718180709.010.510.55.2529.2922.9920a200737.011.011.05.528.8322.6320200759.011.011.05.532.8325.7722a220777.011.511.55.7531.8424.9922220799.011.511.55.7536.2428.4525a250787.012.012.06.034.9127.4725b250809.012.012.06.039.9131.3925c2508211.012.012.06.044.9135.3228a280827.512.512.56.240.0231.4228b280185、849.512.512.56.245.6235.8128c2808611.512.512.56.251.2240.2132a320888.014.014.07.048.738.2232b3209010.014.014.07.055.143.2532c3209212.014.014.07.061.548.2836a360969.016.016.08.06.8947.8036b3609811.016.016.08.068.0953.4536c36010013.016.016.08.075.2959.1040a40010010.518.018.09.075.0558.9140b40010212.51186、8.018.09.083.0565.1940c40010414.518.018.09.091.0571.47注 (1)普通槽钢通常长度:58号长512m;1018号长519m;2040号长619m。(2)制造钢号:A3,A3F,B3F等。(3)标记举例:普通碳素钢甲类平炉3号沸腾钢180mmX68mmX7mm的热轧普通槽钢的标记为:热轧普通槽钢180 x68x7-GB707-65A3F-YB170-63热热轧轧轻轻型型槽槽钢钢(Y YB)164-63-63 h-高度;b-腿宽;d-腰厚;t-平均腿厚;r-内圆弧半径;r1-腿端圆弧半径型 号尺 寸截面面积理论重量hbdtrr1(mm)(cm2)187、(kg/m)550324.47.06.02.56.164.846.565364.47.26.02.57.515.90880404.57.46.52.58.897.0510100464.57.67.03.010.908.5912120524.87.87.53.013.3010.414140584.98.18.03.015.6012.314a140624.98.78.03.017.0013.316160645.08.48.53.518.1014.216a160685.09.08.53.519.5015.318180705.18.79.03.520.7016.318a180745.19.39.03.188、522.2017.420200765.29.09.54.023.418.420a200805.29.79.54.025.219.822220825.49.510.04.026.721.022a220875.410.210.04.028.822.624240905.610.010.54.030.624.024a240955.610.710.54.032.925.827270956.010.5114.535.227.7303001006.511.012540.531.8333301057.011.713546.536.5363601107.512.614653.441.9404001158.013189、.515661.548.3注 (1)轻型槽钢的通常长度:58号长512m;1018号长519m;2040号长619m。(2)制造钢号:A3,A3F,B3F等。(3)标记举例:普通碳素钢甲类平炉3号沸腾钢180mmX70mmX5.1mm的热轧轻型槽钢的标记为:热轧轻型槽钢180mm*70mm*5.1mm-YB164-63A3F-YB170-63十十一一)钢钢筋筋混混凝凝土土结结构构用用热热轧轧钢钢筋筋 (1)螺纹钢 (2)竹节钢直 径 (mm)截面积(cm2)重 量(kg/m)直 径(mm)截面积(cm2)重 量(kg/m)直 径(mm)60.2830.222286.164.83570.3850190、.302328.046.31680.5030.3953610.187.99990.6360.5004012.579.8712100.7850.624515.9012.4816121.1310.895019.6315.4119141.541.215523.7618.6520162.011.586028.2722.1922182.542.007038.1830.2125203.142.478050.2739.4628223.802.989063.6249.9430254.913.8532圆(kg/m)方(kg/m)0.2220.2830.4990.6360.6170.7850.8881.1301.191、5802.0102.2302.8302.4703.1402.9803.8003.8504.9104.836.1505.5507.0706.3108.040一一)冷冷弯弯内内卷卷边边槽槽钢钢(CJ/YB99-81厂厂标标标标准准)h-高度;b-长腿宽;c-短腿宽;d-壁厚序号尺 寸 (mm)截面面积(mm2)理论重量(kg/m)hbcd16030152.53.3392.604260301533.9083.04838040152.54.3383.384410050202.56.0094.7495100502036.6085.154610060152.55.8384.5547100601536.90192、85.388812060152.56.3394.9449120601537.5085.58610120602037.8086.09011140602038.4036.55812160702039.6087.494131807020310.2087.962142007020314.14711.035注 根据需方要求,经供需双方协商,可供应上表尺寸之外的内卷边槽钢。生 产 单 位北京第二轧钢厂南京轧钢厂天津市轧钢三厂武汉薄板厂辽宁鞍山冷弯型钢厂上海钢铁研究所五五)冷冷弯弯Z形形钢钢 h-高度;b-边宽;d-壁厚序 号尺 寸 (mm)截面面积(cm2)理论重量(kg/m)生 产 单 位had1804193、02.53.82.96北京第二轧钢厂280402.53.752.94江苏南京轧钢厂3100252.53.52.75天津市轧钢三厂41002534.143.25湖北武汉薄板厂5100502.54.753.73上海钢铁研究所61005035.644.447100602.55.254.1281006036.244.8791605037.445.84二二)冷冷弯弯外外卷卷边边槽槽钢钢(CJ/YB100-81厂厂标标标标准准)h-高度;b-长腿宽;c-短腿宽;d-壁厚序 号 规 格 (mm)生 产 单 位hbcd13050205015403.0北京第二轧钢厂250100255020502.54.0南京轧194、钢厂3100200306020603.04.0天津市轧钢三厂武汉薄板厂辽宁鞍山冷弯型钢厂上海钢铁研究所注 根据需方要求,经供需双方协商,可供应上表尺寸之外的外卷边槽钢。(三三)冷冷弯弯方方形形焊焊接接管管 a-边长度;d-壁厚序 号尺 寸 (mm)截面面积(cm2)理论重量(kg/m)生 产 单位ad1402.53.5892.799 北京第二轧钢厂24034.2083.282 天津市轧钢三厂3502.54.5893.58湖北武汉薄板厂45035.4084.218 辽宁鞍山冷弯型钢厂5602.55.5894.359 上海钢铁研究所66036.6085.15476048.5476.60787037195、.8086.090970410.1477.015108039.0087.0261180411.7479.163注 根据需方要求,经供需双方协商,可供应上表尺寸之外的冷弯方形焊接管。(四四)冷冷弯弯矩矩形形焊焊接接钢钢管管(CJ/YB101-81厂厂标标标标准准)b-长边长度;a-短边长度;d-壁厚序 号尺 寸 (mm)截面面积(mm2)理论重量(kg/m)生 产 单 位bad150302.53.5892.799北京第二轧钢厂2503034.2083.288天津市轧钢三厂360402.54.5893.579湖北武汉薄板厂4604035.4094.218辽宁鞍山冷弯型钢厂5705036.6085.196、154上海钢铁研究所6705048.5486.6677804036.6085.1548804048.5486.6679806037.8086.090108060410.1487.91511906038.4085.558129060410.9488.539注 根据需方要求,经供需双方协商,可供应上表尺寸之外的冷弯矩形焊接钢管。二二)方方钢钢规规格格、重重量量表表冶冶标标(YB)157-63边长(mm)截面面积(cm2)理论重量(kg/m)边长(mm)截面面积(cm2)理论重量(kg/m)50.250.196309.007.0660.360.2833210.248.0470.490.3853411197、.569.0780.640.5023612.9610.1790.810.6363814.4411.24101.000.7854016.0012.56111.210.954217.6413.85121.441.134520.2515.90131.691.334823.0418.09141.961.545025.0019.63152.251.775328.0922.05162.562.015631.3624.61172.892.276036.0028.26183.242.546339.6931.16193.612.826542.2533.17204.003.147049.0038.49214.41198、3.467556.2544.16224.843.808064.0050.24245.764.528572.2556.72256.254.919081.0063.59266.765.309590.2570.85287.846.15100100.0078.50注 (1)在标准件中,边长105250毫米的方钢未列出截面面积及重量,必要时可参照表列数据的倍数进行计算。(2)方钢的长度规定如下:A.通常长度(非定尺的):普通钢:边长25mm.长510m 边长2650mm.长49m 边长53110mm.长48m 边长120mm.长36m 优质钢:各种边长尺寸.长26m B.定尺长度(合同中确定)C.倍尺长199、度(合同中确定)短尺方钢的交货数量不得超过一批订货总量的10%。普通钢短尺不短于2.5m,优质钢短尺不短于1.5m。3、热热轧轧黄黄铜铜板板(YB460-71)厚度(mm)宽 度 (mm)200500600900100012001300150016001800190022002300250026002800最 大 长 度 (mm)5.0300035004000600060005.5300035004000600060006.0300035004000600060006.5320035004000600060007.0320035004000600060007.53200350040006000200、60008.0350040005000600055004800420037009.03500400050006000500042003700330010.03500400050005500450038003300300011.03500400050005000400034003000280012.0350040005000450038003100280013.035004000500040003600290014.035004000450038003300270015.040004500450036003100250016.040004500430034002900240017.0400045201、00400032002700220018.04000450039003000260019.04000450037002800240020.04000450035002600230021.0400032002500220022.0400030002400210023.0400030002400200024.0350028002200190025.03500280020001800注 (1)热轧黄铜板制造牌号为:H62,H59,HSn62-1,HPb59-1。(2)热轧板的宽度按100mm进级。理论重量(kg/m2)(比重:8.50)2900300042.5046.7551.0055.2559.5063.75350068.00310076.50300085.0093.50102.0110.5119.0127.5136.0144.5153.0161.5170.0178.5187.0195.5204.0212.5