个人中心
个人中心
添加客服WX
客服
添加客服WX
添加客服WX
关注微信公众号
公众号
关注微信公众号
关注微信公众号
升级会员
升级会员
返回顶部
桩基施工方案-中文英文对照(14页)
桩基施工方案-中文英文对照(14页).doc
下载文档 下载文档
其它文档
上传人:正*** 编号:703723 2023-07-10 13页 92KB
1、塞拉利昂水泥厂项目桩基施工方案Cement terminal project pile foundation construction program in Sierra Leone一、旋挖成孔灌注桩施工 Rotary drilling hole pile construction1工程量1000M3砼 The project amount 1000M3 concrete2施工技术 Construction Technology本工程项目桩基施工采用旋挖成孔工程钻机,在施工前须对场地进行清表、清障、平整、压实,使场地表面耐力不小于100Kpa.施工时设置泥浆池、沉定池、泥浆循环系统和废浆池,沉2、淀池的容积两倍于一根桩的体积,储浆池容积大于16m3,以满足钻孔需要.Pile Foundation Construction of the project use a rotary drilling rig,before construction,we need to cleared the table , wrecker , leveling , compaction venue to make sure the surface endurance is not less than 100Kpa。During construction, we need to set Mud pools ,3、 sedimentation tanks , mud circulation system and waste slurry pond。To meet drilling demand, Sedimentation tank volume is twice the volume of a pile , storage slurry pond volume should be greater than 16m33工艺流程 Process 4操作工艺 Operation process(1)测量定位 Measurement Positioning(a)采用全站仪按照图纸测定位置并做好标色。Use t4、otal station measurement position in accordance with the drawings and make a standard color .(b)利用水准仪测定护筒标高其误差不大于10MM。Level determination Casings for elevation of the error should not more than 10MM(2)栓桩:桩位位置确定后,用两根相互垂直的十字线中心相交于桩点,并定出他的控制点,做好标识妥善保护。Bolt piles :once piles bit position is determined,w5、e use two mutually perpendicular crosshairs center intersect at the pile point, set his control point and marked properly protected.(3)钻机就位:履带坐落的位置应平整,坡度不大于3度,避免因场地不平整产生动力损失,倾斜、位移,重心高时还会引起安全事故。Rig in place : Tracked located position should be flat , the slope is not greater than 3 degrees and avoid 6、venue uneven loss of power , tilt , displacement , high center of gravity will also cause accidents(4)对准桩位:首先调整旋挖机的桅杆,使之处于垂直状态,让钻头对准桩点。Alignment Pile : First adjust the auger mast in a vertical state and the drill bucket should be align with the pile point .(5)埋设护筒:定出十字控制点后,可采用钻机进行取土,钻至设计深度进行护筒埋设。Bu7、ry casing:set cross control point the we use the rig dig the hole until the depth we can start to bury the casing.护筒采用厚度6mm的钢板制作而成,长度在2m左右,护筒的直径为850mm,为防止钻进施工中护筒外圈返浆造成塌孔和护筒脱落,护筒底部应坐落在稳定的土层上,并且进入原土0.30。5m。护筒埋设位置应准确其中心点与桩定位点误差不大于50mm,并应保证护筒的垂度和水平度。The casing was made by 6mm thick steel plate,the lengt8、h should be around 2m and the casing diameter is 850mm。 In order to prevent the outer tube Protection Drilling returned to the pulp caused the hole collapse and retaining barrel off the bottom of the pile casing should be located in the stable on the soil and into the original soil 0。3 0。5m。Casing l9、aying position should be accurate center point,pile anchor point error is not more than 50mm and also should ensure Casing for vertical and horizontal(6)泥浆制作:采用现场所泥浆搅拌机或人工制作,宜先加水并计算体积,在搅拌下加入规定的膨润土,纯碱以溶液的方式在搅拌下缓缓加入,搅拌时间一般不少于3分钟,必要时还可加入其他外加剂,以增大泥浆比重。另拌制泥浆应根据工艺和穿越土层情况进行配合调整,膨润土泥浆性能指标制备可按下列参数(砂土层);粘度19210、5;比重1。18-1。30;含沙率小于6%,胶体率95,PH值7。0-9。0。Mud production:site slurry mixer or artificially produced advised adding water and calculating the volume,after that added with stirring a predetermined bentonite, soda ash solution with stirring was slowly added and the stirring time is generally less than 3 m11、inutes , if necessary we can also add other admixtures to increase the mud weight. Besides, Mixing mud with the adjustment should be based on the process and through the soil , and the bentonite slurry performance indicators prepared according to the following parameters ( sand layer ) ; viscosity 112、925 ; proportion 1.18 - 1。30 ; sandy rate less than 6 , colloidal rate 95, PH value 7。09.0.(7)旋挖钻钻进成孔 Rotary Drill drilling hole(a)以钻具钻头自重和液压缸加压作为钻进压力,每一回次的钻进量应以深度仪所示值为参考依据,以钻机说明书钻速,钻压扭矩为指导,进尺适当,不多钻也不少钻。钻多,辅助时间加长。钻少,回次进尺少,效率降低。We take drill weight and hydraulic cylinder pressure as the drilling pres13、sure , drilling depth meter should be shown the value reference for speed drilling rig manual the WOB torque for guidance , footage appropriate , not much drill is also a lot of drilling 。 Drill multi Auxiliary longer . Drilling less footage back to the times , reducing efficiency(b)当钻头内装满土、砂后,将其提升上14、来,注意地下水位变化情况,并灌注泥浆.When the drill is filled with soil and sand , we raise it up and pay attention to the groundwater level changes then perfuse mud(c)旋转钻机将钻头内的土卸出,用铲车及时运走,运离不影响施工作业区。Rotary rig to drill within the soil unloaded then transported with a forklift in a timely manner and transported from 15、the impact of the construction work area(d)关闭钻头活门,将钻头转回孔口,降下钻头继续钻进。Close the shutter then reversal of the drill orifice , lower the drill bit to continued drilling (e)为保证孔壁稳定,应视表土松散层厚度,孔口下入长度适当的护筒,并保持泥浆面高度,随泥浆损耗及孔深增加,应及时向孔内补充泥浆,以维持孔内压力平衡。Should be considered to ensure the stability of hole wall the 16、topsoil loose layer thickness orifice into the appropriate length casing Protection , then keep the mud surface height with mud loss and deep hole should be timely supplement to the hole in the mud , in order to maintain the hole pressure balance。(f)提升钻头过快,易产生负压,造成塌孔.一般钻头提升速度控制在,装满渣土钻头提升0。937M/S,空钻头17、升降1.210M/S。If we improve drill too fast , its easy to produce negative pressure, which will result in hole collapse 。Usually when a drill filled with muck,the lifting speed should be controlled within 0。937M/S and for empty drill,the speed should be 1.210M/S(g)在桩端持力层钻进时右能会由于钻头的提升引起持力层的松驰,因此在接近孔底标高时应18、注意减小钻头的提升速度.Due to the enhancement of the drill in the pile end bearing stratum drilling may cause relaxation of the bearing layer elevation thus when drilling near the bottom of the hole we should pay attention to reduce the lifting speed of the drill(h)清孔:因旋挖钻用泥浆循环,在保障泥浆稳定的情况下,(清除孔底沉渣一般用双层底捞砂钻头,在不19、进尺的情况下,回转钻头使沉渣尽可能地进入斗内,反转,封闭斗门,即可达到目的.因本工程地质24M以下为粘土层,视具体情况,确定清孔方法,确保沉渣厚度符合要求。Cleanup holes :Because rotary drilling use mud circulation , so under the circumstance of stable mud protection ( when clear the hole bottom sediment generally we do with double bottom bailing bit , in the case of footage 20、, rotary drill bit so that sediment went into the bucket , inverted closed shutter and this can achieve the purpose .Because of the engineering geology 24M below are the clay layer so we should depend on the specific situation then determine hole cleaning methods , to ensure the sediment thickness r21、equired(i)钢筋笼制作:钢筋笼按设计图纸及相关规定要求制作。钢筋表面应洁净,使用前应将表面污垢、漆皮、鳞锈等清除干净;钢筋应平直,无局部弯曲、无裂纹、断伤。钢筋接头焊缝均匀、饱满、光滑;不得有裂纹、塌陷、咬边、夹渣,钢筋表面无明显烧伤等缺陷.每批焊条都应有出厂合格证。The reinforcement cage production : steel cage was designed according to drawings and related regulations requirements. Reinforced surface should be clean before 22、using.We should clean surface dirt , patent leather , scaly rust and the reinforcement should be straight with no local bending , no cracks , off injured. Reinforced joints should be uniform weld , full, smooth, without cracks , collapse , undercut , slag , steel surface burns and other defects 。 Ea23、ch batch of electrodes should have factory certification钢筋笼安装,视设计桩长的配筋长度及配备的工程吊车技术参数的实际情况,进行分段制作,遂段吊放钢筋笼,各段之间根据主筋直径按设计要求采用单面电焊连接。双点起吊,确保钢筋笼不变形.当钢筋笼吊放至设计位置后,在孔口固定钢筋笼上端.Reinforcement cage installation: According to the actual situation of the design length of pile reinforcement length and with enginee24、ring crane technical parameters , we should produce in segment , then the segment dipping steel cage main reinforcement diameter between paragraphs design requires single-sided welding . Using twopoint lifting to ensure no deformation of the reinforcement cage . When the reinforcement cage was dippi25、ng to the design position,we fixed reinforcement cage in the upper of the orifice。钢筋笼保护层垫块采用现场预制砂浆圆块.The protective layer of the reinforcement cage pads use the site prefabricated mortar round block(j)下钢筋笼,钢筋笼场内运输可采用人工抬运或加托架转运,不可使钢筋笼产生永久变形;钢筋笼采用双点起吊,对正后缓缓下入,不准强行压入。Reinforcing Steel Cage: Reinforceme26、nt cage inside can be transported by artificial lift or bracket transport and the cage cannot be made permanent deformation; The reinforcement cage use dual point lifting , slowly down into the positive , not allowed to press into by forcement.(k)下导管:导管连接要密封、顺直,导管下口离孔底约300mm就可,导管平台应平整,夹板牢固可靠。Lower c27、onduit : conduit connection must be sealed , straight, catheter down until the under mouth about 300mm from the bottom of the hole( the catheter platform should be smooth and plywood robust)当钢筋笼吊放定位后,就可在孔口安放导管平台,吊放导管。导管采用直径250mm钢制标准导管,各节导管及其与承料斗间均以丝扣连接。导管在吊放前,在地面连接作水压试验,确保无渗漏方可使用。When the reinforcem28、ent cage dipping positioned , the orifice can be placed with catheter platform then we start to dip catheter . The conduit was taken the 250mm diameter steel standards catheter, sections catheter and the Order of the hopper are threaded connection . Catheter before dipping in the ground connection f29、or water pressure test to ensure no leakage before use(l)浇筑砼:Pouring concrete钢筋笼,导管下放完毕,做隐蔽检查,必要时进行二次清孔,验收合格后,浇筑砼。砼采用现场搅拌。After decentralization of the reinforcement cage , catheters ,we need to do covert checks , and if necessary,we will do a second hole cleaning , after acceptance ,we can pour con30、crete( Concrete are mixing on site)预拌砼应具备设计的强度等级,有良好的和易性,塌落度宜180-220mm。Readymixed concrete should have the strength grade design , good workability , and slump should be 180 220mm初次灌注砼量应严格按照要求计算首灌砼立方量,以其数量必须满足充满孔底,并埋管深度不少于0.8m。Initial perfusion concrete amount calculated in accordance with the requi31、rements should be strictly cubic amount of initial concrete irrigation and the Quantity must fully filled the bottom of the hole meanwhile the buried depth should not less than 0.8m导管埋深,保证2-4m,随着砼面上升,随时提拨和拆除导管,以使导管在砼中始终保持2-4m。且在首批砼的初凝时间前完成砼浇灌,如无法保证,可经过试验给砼添加缓凝剂。为使砼密实,可利用吊机升降系统慢速振插导管。终灌时,按桩顶设计标高正确掌握最32、后灌注的砼量,使实灌砼面高出设计顶面1D以上,以确保清除浮浆后桩顶砼的完整性。在水下砼灌注时,要勤测砼塌落度,按要求做好试块,作为质量控制及质量评定的依据。Bury conduit in deep and make sure 24m,with the rising concrete surface,set aside at any time and removal of the catheter to make sure the catheter always keep in concrete 2- 4m 。Besides,we need to finish perfusing the con33、crete Before the initial setting time of the first concrete and if this can not be guaranteed , we can add retarder to the concrete through test . Crane lifting system can be used to make concrete dense slow vibration catheterization 。we can use Crane lifting system the slow vibration inserted cathe34、ter to make sure concrete compaction. Design elevation of the top of the pile when the final irrigation , proper understanding of the last perfusion concrete amount , the real irrigation concrete surface above the the design top surface 1D to ensure the integrity of the top of the pile of concrete t35、o remove laitance . Perfusion of the underwater concrete to ground measured concrete slump , required to do the test block , as the basis for quality control and quality assessment.砼灌注过程中,为防止钢筋笼上浮,应采取如下措施,在孔口固定钢筋笼上端;灌注时间尽量缩短,防止砼进入钢筋笼时流动性变差,当孔内砼进入钢筋笼1-2小时,应适当提升导管,减少导管埋深,增大钢筋笼在下层砼中的埋置深度。During Concret36、e casting process , in order to prevent steel cage floating we should take the following measures , fixing the upper end of the orifice reinforced cage ; making perfusion time as short as possible to prevent concrete to enter rebar cage which can cause flow variation , when the hole in the concrete 37、into the rebar cage 12 hours , we should be appropriate to enhance the catheters to reduce catheter burial depth and increasing the embedment depth of the reinforcement cage in the lower concrete灌注结束时,控制桩顶标高,砼面应超过设计标高1D以上,保障桩头质量。When perfusion was over , we must control the elevation of the top of t38、he pile , the concrete surface should be more than the design elevation 1D to protect the pile head quality 钻机移位:成孔施工完毕且验收合格后,移至下一桩位。另外当桩距(中心距)小于5m时,后一根桩钻孔必须在前一根桩砼灌注完成后24小时才能开钻.The rig shift : move to the next one bit after the construction is completed into the hole and acceptance . In addition , w39、hen the pile spacing ( center distance ) is less than 5m , the next pile drilling must be the first 24 hours after a pile of concrete perfusion completed(m)雨季施工 Rainy season construction 露天使用的电气设备,天关箱的防雨措施应可靠,放置较高位置,电焊机等导电设备应加保护罩。旋挖机雨期施工应有防雷接地并定期检查。Open use of electrical equipment , switch boxes , w40、aterresistant measures should be reliable , placed a higher position。Welding machines and other conductive equipment should be added to the protective cover . Rotary Drilling Rig working during rain period should be lightning protection,grounding and check regularly电气设备的接地保护就牢固可靠,漏电保护装置动作灵敏,操作人员应使用绝41、缘工具。检查有无地基塌陷情况,在旋挖钻机行走时,务必避开塌陷地段,桅杆还应适当向后倾斜一个安全角度。Ground protection of electrical equipment on a solid , reliable , sensitive action leakage protection device , the operator should use insulated tools and check for foundation collapse during rotary drilling rig walking then be sure to avoid the coll42、apse of the lot , the mast also should be appropriate backward tilt a safety point of view钻机上下托板时,应有防滑措施,避免侧滑引起的安全事故。Rig up and down the pallet should be nonslip measures to prevent security incidents caused by the sliding水管、导管、泥浆管不用时,应清理干净,整好平放。When water pipes, ducts , mud tubes are not used, we s43、hould clean up the put them flat 施工现场办公区、生活区所用电器装置应安全、可靠.在雷电频落区域,应加装防雷接地设施.Construction site office area, living area with electrical installations should be safe and reliable . Installation of lightning protection and grounding facilities in the lightning frequency off the area are very important 二44、 砼配比设计要求 Concrete mix design requirements1 原材料及配合比 Raw materials and mixture ratio(1)水泥应符合相关要求,采用免检水泥并经过测试,严禁使用快硬型水泥,水泥必须有出厂合格证,如果水泥出场日期超过三个月对水泥质量有怀疑时应视不同情况进行复检,复检合格后方可使用。水泥在运输及堆放过程中应有防雨防潮措施,不同品种、标号、生产厂家的水泥严禁使用在同一根桩砼中并分别堆放.Cement should comply with the relevant requirements , inspectionfree cement 45、and tested , prohibited the use of rapid hardening cement , the cement must have factory certification , cement exit date is more than three months then a suspect should be retested depending on the quality of the cement , complex inspection qualified before use . Cement transport and stacking proce46、ss should be rain and moisture measures , different varieties , label , cement manufacturers cannot use with a pile of concrete and stacked separately (2)石子的质量应符合相关要求,每批石料进场应有质保单。碎石的粒径采用5-40mm,5mm筛余量应为90%100%,40mm筛余量大于5%。石料堆场应选干净处,严禁混入沙土杂质。The quality of the stones should comply with the relevant re47、quirements of each batch the stone approach should warranty single 。 Gravel particle size should be 5 40mm the 5mm sieve margin should be 90 100 and the 40mm sieve margin should be greater than 5 % . Clean stone yard to be elected at non mixed sand impurities.(3)沙的质量应符合相关要求,选用级配合理、质地坚硬、颗粒干净的中粗砂,砂进场每48、批要有合格证,砂的模数控制在2。33.0之间,在储运堆放过程中防止混入杂物。Sand quality should comply with the relevant requirements , selection of gradation, hard texture and clean particles of grit。 sand approach each batch should have a certificate , the modulus of the sand control in is between 2。33.0 , stacked in the storage and t49、ransportation process to prevent mixed with debris2混凝土搅拌 Concrete mixing施工现场设砼搅拌站,由JS750型搅拌机、沙石堆场和水泥库组成。砼搅拌时应严格按配合比称重砂、石、外加剂。砼原材料投量允许偏差:水泥为2;砂石土为3%;水、外加剂为2%。原材料投料时应依次加入石、砂、水泥和外加剂,砼的搅拌时间不少于90S.砼搅拌过程中及时测试坍落度和制作试块,拌好的砼应及时浇筑,若出现离析现象应重新搅拌,砼坍落度控制在1822CM.Construction site set concrete mixing station , by t50、he JS750 -type mixer, sand yard and cement silo . Concrete mixing should be strict with the ratio of the weighing sand , stone , admixtures 。 Allowable deviation of concrete and amount of raw materials : cement 2 % ; the gravel soil 3 ; water , admixtures of 2 % 。 Raw material feeding should then ad51、ded to the stone , sand , cement and admixtures , concrete mixing time should not less than 90S 。 Test the Slump and production test block during concrete mixing process in a timely manner , the concrete should be marinated pouring segregation phenomenon should be re-mixed concrete slump control 18-52、 22CM3 砼浇筑 Concrete pouring按相关要求制作试块,试块为150150150MM,每根工程桩做一组试块,清水养护28D后,送交测试,试块脱模后及时放进现场砌置的水池内养护。Test block, according to the relevant requirements of the production test block should be 150 150 150MM, each pile do a group of test block and clean water after 28 days of curing , sent to test into the53、 scene in a timely manner after ejection of the test block puzzle set within the conservation pool三、 工程质量标准及质量保证措施 Engineering quality standards and quality assurance measures本工程施工及验收要求遵循相关的标准规定。The construction and acceptance requirements follow standard regulations 。(一)工程质量标准 Engineering quality s54、tandards1原材料和砼强度保证符合设计要求和相关的规定。Raw materials and concrete strength to ensure compliance with design requirements and other relevant provisions .2成孔深度符合设计要求,孔底沉渣厚度小于10CM。Drilling depth can meet the design requirements 。, sediment thickness of the bottom of the hole is less than 10CM3实际浇注量不小于计算体积。The 55、actual pouring amount is not less than the calculated volume .4浇筑后的桩顶标高及浮浆的处理符合设计要求和施工相关规定。The elevation of the top of the pile after pouring and floating pulp processing to meet the design requirements and construction of the relevant provisions (二)允许偏差项目 Tolerance variation project1成桩后的桩孔中心位置偏差,中间56、桩小于1/4D;边桩不小于1/6D。Deviation into a pile after pile hole center position , the middle of the pile is less than 1/4D; side pile is not less than 1/6D2钢筋笼的制作:Reinforcement cage production :(钢筋保护层:50mm);Reinforced protective layer : 50mm主筋间距偏差:10mm;Main reinforcement spacing deviation : 10mm;箍筋间距偏差:20mm57、;Stirrup spacing deviation : 20mm;钢筋笼直径偏差:10mm;Reinforcement cage diameter deviation : 10mm;钢筋笼总长度偏差:100mm;The total length of the reinforcement cage deviation : 100mm;钢筋搭接长度:10d;Reinforced Lap length : 10d;焊缝宽度:0。7d;Weld width : 0。7d;焊接厚度:0.3d。Welding thickness : 0.3d。3.桩垂直度小于1%。Pile vertical degre58、e is less than 1%。4.砼施工 Concrete Construction 砼强度等级大于设计砼强度等级;Concrete strength rating is higher than the design concrete strength rating ; 砼坍落度18-22cm 1822cm concrete slump 主筋保护层厚度75mm;main reinforcement protection layer thickness 75mm;所使用的材料必须具有质量保证书和检测试验合格报告;The material used must have a quality a59、ssurance books and testing compliance report ;成桩砼质量连续完整,无断桩、缩径、夹泥现象,浇筑砼密实度要好,桩头砼无疏松现象.The quality of the concrete piling is continuous complete , no broken pile necking silted phenomenon , pouring concrete density is better , trailer coupling concrete without loose(三)质量保证措施 Quality assurance measure60、s1。管理措施 Management measures(1)公司的工程技术部直接对该项目的工程质量进行监督和控制,直接掌握质量动态,指导全面质量管理工作,展开严格岗位责任制,对各工序、工种实行检查监督管理,行使质量否决权.Companys engineering department directly supervise and control the quality of the project and to gain direct control over the quality of dynamic guidance of total quality management , expan61、d the strict system of personal responsibility to implement the inspection and supervision of the management of various processes , type of work , the exercise of the quality of the veto(2)对主要工序设置管理点,严格按工序质量控制体系和工序控制点要求进行运转.Setting management points to major process and we should be in strict accord62、ance with the requirements of the process quality control system and process control point operation(3)实行三级质量验收制度;每道工序组100自检;质量100%检验;工地技术负责30抽查。The implementation of the three - tier system of quality inspection ; each process group 100% self-test ; quality 100 inspection ; site technology is respo63、nsible for 30 of spot checks(4)认真填写施工日记。Fill in construction Diary 。2技术措施Technical measures(1)桩轴线及桩位放样,定位后要进行复测,定位精度误差不超过5mm。埋设护筒时由测量人员到场,用仪器校正中心后方能固定护筒,保证护筒的垂直度.Loft pile axis and piles bit , to retest after positioning , the positioning accuracy error of should not more than 5 mm 。 when bury the c64、asings,the surveyor should at the scene, we should fix the casings with the center of instrument calibration, to ensure the verticality of the casings (2)钻机定位,旋挖钻机桅杆必须垂直,不合要求随时纠正.Rig positioning , rotary drilling rig mast must be vertical,if not,we should correct at any time。(3)孔底沉渣检测小于30cmThe hole 65、bottom sediment detect is less than 30cm(4)确保钢筋笼的垂直度Ensure the verticality of the reinforcement cage(5)砼搅拌时砂石料经过磅称称重,误差不超过3,严格控制水灰比。根据现场砂石料的含水率情况调整加水量。每根桩做1-2次坍落度试验。Aggregate concrete mixing after weighing scales, weighing error should less than 3% , and we should be strict control of the watercemen66、t ratio . Adjust the amount of water according to the site aggregate moisture content and each pile we should have 12 slump test (6)根据地层特点及时调整泥浆性能,防止钻孔扩径、缩径和坍塌,控制好砂层土的泥浆相对密度,确保孔壁稳定。Timely adjustment mud performance according to the formation characteristics in order to prevent drilling flaring , nec67、king and collapse , and good control of the sand layer soil slurry relative density to ensure the stability of the hole wall四、 施工总体计划 Construction master plan(一)施工总体计划 Construction master plan本工程施工合同约定: 180 天。根据工期要求。桩基设计及场地等条件,计划进旋挖钻机一台及其配套设备.The construction contract : 180 days. According to the sc68、hedule requirements . Pile foundation design and site conditions , we plan to purchase a rotary drilling rig and its ancillary equipment 施工中采用隔桩跳打(保证相邻桩距大于4倍桩径),钻孔、砼浇筑分开作业的方式进行施工。同时根据生产进程及时优化,提高施工效率.We take the skip drilling during construction ( to ensure adjacent pile spacing is greater than four 69、times the pile diameter ) , drilling,concrete pouring operations separately for construction 。 Simultaneously we optimized according to the production process in a timely manner to improve the efficiency of construction (二)施工进度计划 Construction schedule根据以往施工经验及网络优化成果,施工750工程桩用时情况分析如下:According to the70、 construction experience and network optimization based on past achievement ,Constructiing the 750 project pile time use,refer to the following analysis:钻机移位、就位及开钻准备;The rig shift , in place and prepare drilling 钻进成孔;Drilling into a hole吊放钢筋笼、导管;Dipping reinforcement cage and catheter ;水下砼浇筑;Underwa71、ter concrete pouring根据以上分析,一台旋挖转机每天(8h)可成孔 2 个,砼浇筑成桩 2 个。 Based on the above analysis , a rotary rig work every day (8h) can dig 2 holes and two concrete pouring into piles八 主要设备,工具配置 Major equipment , configuration tools根据土层特点,桩径以及桩长情况,选用8R-30旋挖转机,制浆设备,泥浆泵。Based on soil characteristics , pile diame72、ter and pile length ,we choose 8R30 rotary drilling rig , pulping equipment , mud pump主要设备工具表如下Main equipment tools table as following 序号serial number 名称Name 型号Model 数量Quantity 价值(万元)Value 备注Note 1旋挖钻机 Rotary drilling rig 12泥浆泵 Mud pump 23制浆机 Pulper 14砼搅拌机 Concrete mixer 15液压汽车吊Hydraulic truck crane26翻斗车 Dumpers 57电焊机 Welding machine 38挖掘机 Excavator 19装载机Loaders 110排污泵Sewage pump211泥浆比重计Mud hydrometer212水准仪Level113全站仪 Total station 114钻斗Drilling bucket115导管 Catheter/ conduit 116导管操作平台117上料斗 Hopper118发电机组 Generator sets 219清水泵Clean Water Pump220砼试模等 Concrete tryout12
会员尊享权益 会员尊享权益 会员尊享权益
500万份文档
500万份文档 免费下载
10万资源包
10万资源包 一键下载
4万份资料
4万份资料 打包下载
24小时客服
24小时客服 会员专属
开通 VIP
升级会员
  • 周热门排行

  • 月热门排行

  • 季热门排行

  1. 2025商场地产夏日啤酒龙虾音乐嘉年华(吃货的夏天主题)活动策划方案-47页.pptx
  2. 2022城区自来水提质改造智慧水务建设项目设计方案(199页).pdf
  3. 陕西化学工业公司招聘管理与职业发展管理手册30页.doc
  4. 动火作业安全告知卡(1页).docx
  5. 高处作业安全告知卡(1页).docx
  6. 广场工程建设项目施工招标评标报告表格(24页).pdf
  7. 原油码头消防工程维保方案(39页).docx
  8. 建筑工程外脚手架专项施工方案(悬挑式脚手架、落地式脚手架)(25页).doc
  9. 2020柏向堂房地产公司材料标准化手册3.0(143页).pdf
  10. 2021柏向堂房地产公司材料标准化手册4.0(108页).pdf
  11. 土建、装饰、维修改造等零星工程施工组织设计方案(187页).doc
  12. 深圳装饰公司施工图纸会审及设计交底管理制度【13页】.doc
  13. 房地产开发贷款实操指南(5页).pdf
  14. 学校宿舍楼建设工程施工方案【153页】.docx
  15. 住宅小区工程施工方案【234页】.docx
  16. 鄂尔多斯空港物流园区总体规划方案(2017-2030)环境影响评价报告书(23页).doc
  17. 规划兰园西路道路工程环境方案环境影响评价报告书(89页).pdf
  18. 屋面圆弧形穹顶结构高支模施工方案(40米)(47页).doc
  19. 埋石混凝土挡土墙施工方案(23页).doc
  20. 重庆市五小水利工程建设规划报告(64页).doc
  21. 厂区至矿区管网蒸汽管道系统扩容改造工程施工组织设计方案(105页).doc
  22. 超高纯氦气厂建设项目办公楼、变电站、水泵房及消防水池、门卫、厂房、仓库、配套工程施工组织设计方案(140页).doc
  1. 房地产交易环节契税减征申报表(首套填写)(2页).doc
  2. 2025商场地产夏日啤酒龙虾音乐嘉年华(吃货的夏天主题)活动策划方案-47页.pptx
  3. 2024大楼室内精装修工程专业分包投标文件(393页).docx
  4. 苏州水秀天地商业项目购物中心100%室内设计方案(158页).pptx
  5. 2022城区自来水提质改造智慧水务建设项目设计方案(199页).pdf
  6. 小区人员配置档案建立保洁绿化物业管理服务投标方案(593页).docx
  7. 室内移动式操作平台工程施工方案(19页).doc
  8. 地铁6号线区间盾构下穿管线专项施工方案(30页).doc
  9. 矿山治理工程施工组织设计方案(240页).docx
  10. 老旧小区改造工程施工方案及技术措施(364页).doc
  11. 2021柏向堂房地产公司材料标准化手册4.0(108页).pdf
  12. 川主寺城镇风貌整治景观规划设计方案(60页).pdf
  13. 建筑工程三级安全教育内容(24页).doc
  14. 新疆风电十三间房二期工程49.5mw风电项目可行性研究报告(附表)(239页).pdf
  15. 土建、装饰、维修改造等零星工程施工组织设计方案(187页).doc
  16. 四川凉山攀西灵山国际度假区小镇活力中心商业业态规划方案建议书(33页).pdf
  17. 埋石混凝土挡土墙施工方案(23页).doc
  18. 地下停车场环氧地坪漆施工方案(45页).doc
  19. 深圳装饰公司施工图纸会审及设计交底管理制度【13页】.doc
  20. 住宅定价策略及价格表制定培训课件.ppt
  21. 西安名京九合院商业项目招商手册(28页).pdf
  22. 2010-2030年湖北咸宁市城市总体规划(32页).doc
  1. 建筑工程夜间施工专项施工方案(18页).doc
  2. 赣州无动力亲子乐园景观设计方案(111页).pdf
  3. 2016泰安乡村旅游规划建设示范案例(165页).pdf
  4. 房地产交易环节契税减征申报表(首套填写)(2页).doc
  5. 龙山县里耶文化生态景区里耶古城片区旅游修建性详细规划2015奇创.pdf
  6. 连云港市土地利用总体规划2006-2020年调整方案文本图集(78页).pdf
  7. 850亩项目塑钢门窗工程施工组织设计方案(34页).doc
  8. 老旧小区改造工程施工方案及技术措施(364页).doc
  9. 城市更新项目地价公式测算表.xlsx
  10. 房地产项目规划前期投资收益测算模板带公式.xls
  11. 存储器基地项目及配套设施建筑工程临时用水施工方案(40页).docx
  12. 铁路客运枢纽项目站前框构中桥工程路基注浆加固专项施工方案(19页).doc
  13. 室内移动式操作平台工程施工方案(19页).doc
  14. 装配式结构工业厂房基础、主体结构、门窗及装饰工程施工方案(83页).doc
  15. 地铁6号线区间盾构下穿管线专项施工方案(30页).doc
  16. 施工工程安全教育培训技术交底(13页).doc
  17. 老旧小区改造施工方案及技术措施(365页).doc
  18. 新建贵广铁路线下工程沉降变形观测及评估监理实施细则(126页).doc
  19. 消防火灾应急疏散演练预案(12页).doc
  20. 矿山治理工程施工组织设计方案(240页).docx
  21. 崖城站悬臂式挡墙施工方案(92页).doc
  22. 北京科技园公寓建设项目整体报告方案.ppt