个人中心
个人中心
添加客服WX
客服
添加客服WX
添加客服WX
关注微信公众号
公众号
关注微信公众号
关注微信公众号
升级会员
升级会员
返回顶部
江苏南京中央商场改造方案(82页)
江苏南京中央商场改造方案(82页).pdf
下载文档 下载文档
施工方案
上传人:故事 编号:595000 2022-09-23 82页 12MB
1、Prepared for Yurun Properties byFinal Schematic Design December 10,2010C2nanjing central emporium?table of contents?design a?ributes 4exterior design 5exterior op?on 1-view 1 6exterior op?on 1-view 2 7exterior op?on 2-view 1 8exterior op?on 2-view 2 9exterior op?on 3-view 2 10south eleva?on 11west e2、leva?on 12north eleva?on 13east eleva?on 14exterior materials&details 15sec?ons 16sec?ons 17sec?ons 18sec?ons 19sec?ons 20sec?ons 21stacking diagram 22circula?on diagram 23rendering entrance 24rendering womens 25rendering mens 26atrium rendering 27interna?onal luxury-level 1 28plan level 1 29?nish?o3、or plan level 1 30rcp level 1 31womens-level 2 32plan level 2 33?nish?oor plan level 2 34rcp level 2 3512Introduc?on?4mens&kids level 3 36 plan level 3 37?nish?oor plan level 3 38rcp level 3 39casual,sports&home-level 4 40plan level 4 41?nish?oor plan level 4 42rcp level 4 43entertainment-level 5 444、plan level 5 45?nish?oor plan level 5 46rcp level 5 47entertainment-level 6 48plan level 6 49?nish?oor plan level 6 50rcp level 6 51food and beverage-level 7/8 52plan level 7 53?nish?oor plan level 7 54rcp level 7 55plan level 8 56?nish?oor plan level 8 57rcp level8 58entertainment-level B1/B2 59pla5、n level B1 60?nish?oor plan level B1 61rcp level B1 62 plan level B2 63rcp level B2 64567/8B1/B23?Prepared for Yurun Properties byFinal Schematic Design December 10,2010C3nanjing central emporium?table of contents?Fixtures?xture?nish matrix 65back wall type:B-1 66back wall type:B-2 67back wall type:6、B-3 68back wall type:B-4 69typical columns 70shop type A 71shop type B 72shop type C 73atrium perspec?ve view 74atrium perspec?ve view 75atrium sec?ons 76atrium bulkhead&handrail details 77atrium box axon 78atrium?nish details 79typical?nish details 80main entry rcp and sec?on 81main entry rcp and s7、ec?on 82secondary entry rcp and sec?on 83secondary entry rcp and sec?on 84typical elevator lobby 85typical restroom-womens 86typical restroom-mens 87 Public Spaces?MaterialsC4nanjing central emporium?A bright and fresh environment will be the hallmark of the Nanjing Central Emporium.Through a progre8、ssion of defined moments,shoppers will journey through a spirited interpretation of a celebration.Sophisticated finishes,rich patterns,and bold colors create an inviting world of aesthetic joy and programmatic flexibility.?design attributes?Final Schematic Design December 10,2010Prepared for Yurun P9、roperties byC5nanjing central emporium?exterior design?Final Schematic Design December 10,2010Prepared for Yurun Properties byGlass Wall System With PatternMetal PanelGlass Wall System Without PatternMetal Pattern?Glass Wall System With Pattern?Scope of Exterior Work and Finishes?Glass Wall System W10、ith Pattern?C6nanjing central emporium?exterior option 1-view 1?Final Schematic Design December 10,2010Prepared for Yurun Properties byC7nanjing central emporium?exterior option 1-view 2?Final Schematic Design December 10,2010Prepared for Yurun Properties byC8nanjing central emporium?exterior option11、 2-view 1?Final Schematic Design December 10,2010Prepared for Yurun Properties byC9nanjing central emporium?exterior option 2-view 2?Final Schematic Design December 10,2010Prepared for Yurun Properties byC10nanjing central emporium?exterior option 3-view 2?Final Schematic Design December 10,2010Prep12、ared for Yurun Properties byC11nanjing central emporium?south elevation?Final Schematic Design December 10,2010Prepared for Yurun Properties byMetal Fin?Graphic Panel?L.E.D.?Air Vent?L.E.D.?Canopy?Canopy?Entry?Entry?Aluminum and Glass Storefront?Metal Trellis?Glass Wall SystemWith Pattern?Glass Wall13、 System Without Pattern?C12nanjing central emporium?west elevation?Final Schematic Design December 10,2010Prepared for Yurun Properties byMetal Fin?Graphic Panel?L.E.D.?Air Vent?L.E.D.?Canopy?Canopy?Entry?Entry?Aluminum and Glass Storefront?Metal Trellis?Garage Entry?Glass Wall System Without Patter14、n?Glass Wall SystemWith Pattern?Existing Building Not In Scope?C13nanjing central emporium?north elevation?Final Schematic Design December 10,2010Prepared for Yurun Properties byL.E.D.?Entry?Aluminum and Glass Storefront?Aluminum and Glass Storefront?Existing Building Not In Scope?Existing Building 15、Not In Scope?Glass Wall SystemWith Pattern?Glass Wall SystemWith Pattern?C14nanjing central emporium?east elevation?Final Schematic Design December 10,2010Prepared for Yurun Properties byAluminum and Glass Storefront?Building BeyondGlass Wall SystemWith Pattern?Metal Panel?Existing Planter?Existing 16、Windows?C15nanjing central emporium?exterior materials&details?Final Schematic Design December 10,2010Prepared for Yurun Properties byGlass Wall System?Prepared for Yurun Properties bynanjing central emporium?C16Final Schematic Design December 10,2010Prepared for Yurun Properties bysections?Prepared17、 for Yurun Properties bynanjing central emporium?C17Final Schematic Design December 10,2010Prepared for Yurun Properties bysections?Prepared for Yurun Properties bynanjing central emporium?C18Final Schematic Design December 10,2010Prepared for Yurun Properties bysections?Prepared for Yurun Propertie18、s bynanjing central emporium?C19Final Schematic Design December 10,2010Prepared for Yurun Properties bysections?Prepared for Yurun Properties bynanjing central emporium?C20Final Schematic Design December 10,2010Prepared for Yurun Properties bysections?Prepared for Yurun Properties bynanjing central 19、emporium?C21Final Schematic Design December 10,2010Prepared for Yurun Properties by?sectionsC22nanjing central emporium?stacking diagram?supermarketsupermarketsupermarketsupermarketinternational luxuryinternational luxuryinternational luxuryinternational luxurywomenswomenswomenswomenszone 3zone 3zon20、e 2zone 2zone 1zone 1zone 4zone 4womenswomenswomenswomensmensmensmensmenssportsportsportsporthomehomehomehomef&bf&bf&bf&bf&bf&bf&bf&bentertainmententertainmententertainmententertainmentB1B1B1B1B1B1B2B21 1 1 1 2 2 2 2 3 3 3 3 4 4 4 4 5 5 5 5 6 6 6 6 7 7 7 7 8 8 8 8?Final Schematic Design December 10,21、2010Prepared for Yurun Properties byC23nanjing central emporium?circulation diagramentryentry?Ring RoadSideStreetSideStreetMain AvenueMain AvenueN.T.S.entryentry?entryentry?Final Schematic Design December 10,2010Prepared for Yurun Properties byC24nanjing central emporium?interior rendering -entry?Fi22、nal Schematic Design December 10,2010Prepared for Yurun Properties byC25nanjing central emporium?interior rendering -womens?Final Schematic Design December 10,2010Prepared for Yurun Properties byC26nanjing central emporium?interior rendering -mens?Final Schematic Design December 10,2010Prepared for 23、Yurun Properties byC27nanjing central emporium?interior rendering -atrium?Final Schematic Design December 10,2010Prepared for Yurun Properties byC28nanjing central emporium?Final Concept Design December 10,2010Prepared for Yurun Properties byC28nanjing central emporium?Final Schematic Design Decembe24、r 10,2010Prepared for Yurun Properties bylevel 1Lustrous Surfaces Joy Gleaming Exultant Delicate Patterns Spirited Alluring Current?international luxury1Prepared for Yurun Properties byFinal Schematic Design December 10,2010C29nanjing central emporium?level 1 plan?05,00010,00020,000Prepared for Yuru25、n Properties byFinal Schematic Design December 10,2010C30nanjing central emporium?level 1 finish plan?05,00010,00020,000refer to p.79 for atrium finish details?Prepared for Yurun Properties byFinal Schematic Design December 10,2010C31nanjing central emporium?level 1 rcp?05,00010,00020,00005,00010,0026、020,00005,00010,00020,000C32nanjing central emporium?Final Concept Design December 10,2010Prepared for Yurun Properties byC32nanjing central emporium?Final Schematic Design December 10,2010Prepared for Yurun Properties bylevel 2womens2Subdued Colors Laughter Refined Joyful Subtle Patterning Simple D27、elicate Details?Prepared for Yurun Properties byC33nanjing central emporium?Final Schematic Design December 10 201005,00010,00020,00005,00010,00020,000level 2 plan?05,00010,00020,000Prepared for Yurun Properties byC34nanjing central emporium?Final Schematic Design December 10 2010level 2 finish plan28、?05,00010,00020,000refer to pg.C80 for typical finish details?ST-1(Field Tile)?ST-2(Atrium Tile)?ST-3(Large Stripe)?ST-4(Small Stripe)?Prepared for Yurun Properties byC35nanjing central emporium?Final Schematic Design December 10 2010level 2 rcp?05,00010,00020,00005,00010,00020,00005,00010,00020,00029、C36nanjing central emporium?Final Concept Design December 10,2010Prepared for Yurun Properties byC36nanjing central emporium?Final Schematic Design December 10,2010Prepared for Yurun Properties bylevel 3womens3Subdued Colors Laughter Refined Joyful Subtle Patterning Simple Delicate Details?Prepared 30、for Yurun Properties byC37nanjing central emporium?Final Schematic Design December 10 201005,00010,00020,00005,00010,00020,00005,00010,00020,000level 3 plan?Prepared for Yurun Properties byC38nanjing central emporium?Final Schematic Design December 10 2010level 3 finish plan?05,00010,00020,00005,00031、10,00020,000ST-1(Field Tile)?ST-2(Atrium Tile)?ST-3(Large Stripe)?ST-4(Small Stripe)?refer to pg.C80 for typical finish details?Prepared for Yurun Properties byC39nanjing central emporium?Final Schematic Design December 10 2010level 3 rcp?05,00010,00020,00005,00010,00020,00005,00010,00020,000C40nanj32、ing central emporium?Final Concept Design December 10,2010Prepared for Yurun Properties byC40nanjing central emporium?Final Schematic Design December 10,2010Prepared for Yurun Properties bylevel 5Golden Accents Enthusiastic Diffused Shimmers Graceful Glowing Patterns Jubilant?sport5?Prepared for Yur33、un Properties byC41nanjing central emporium?Final Schematic Design December 10 2010level 5 plan?05,00010,00020,00005,00010,00020,00005,00010,00020,000Prepared for Yurun Properties byC42nanjing central emporium?Final Schematic Design December 10 2010level 5 finish plan?05,00010,00020,000refer to pg.C34、80 for typical finish details?ST-1(Field Tile)?ST-2(Atrium Tile)?ST-3(Large Stripe)?ST-4(Small Stripe)?Prepared for Yurun Properties byC43nanjing central emporium?Final Schematic Design December 10 2010level 5 rcp?05,00010,00020,00005,00010,00020,00005,00010,00020,000C44Final Concept Design December35、 10,2010Prepared for Yurun Properties bynanjing central emporium?C44nanjing central emporium?Final Schematic Design December 10,2010Prepared for Yurun Properties bylevel 6Radiant Spirited Focused Light Earnest Glowing Patterns Tenacious Comfortinghome6?Prepared for Yurun Properties byC45nanjing cent36、ral emporium?Final Schematic Design December 10 2010level 6 plan?05,00010,00020,00005,00010,00020,00005,00010,00020,000Prepared for Yurun Properties byC46nanjing central emporium?Final Schematic Design December 10 2010level 6 finish plan?05,00010,00020,000refer to pg.C80 for typical finish details?S37、T-1(Field Tile)?ST-2(Atrium Tile)?ST-3(Large Stripe)?Prepared for Yurun Properties byC47nanjing central emporium?Final Schematic Design December 10 2010level 6 rcp?05,00010,00020,00005,00010,00020,00005,00010,00020,000C48nanjing central emporium?Final Concept Design December 10,2010Prepared for Yuru38、n Properties byC48nanjing central emporium?Final Schematic Design December 10,2010Prepared for Yurun Properties bylevel 7/8?Details Honest Luminous Reflective Euphoric Versatile food&beverage7/8Prepared for Yurun Properties byC49nanjing central emporium?Final Schematic Design December 10 2010level 739、 plan?05,00010,00020,00005,00010,00020,00005,00010,00020,000Prepared for Yurun Properties byC50nanjing central emporium?Final Schematic Design December 10 2010level 7 finish plan?05,00010,00020,000refer to pg.C80 for typical finish details?ST-1(Field Tile)?ST-2(Atrium Tile)?ST-3(Large Stripe)?ST-4(S40、mall Stripe)?Prepared for Yurun Properties byC51nanjing central emporium?Final Schematic Design December 10 2010level 7 rcp?05,00010,00020,00010,00020,000Prepared for Yurun Properties byC52nanjing central emporium?Final Schematic Design December 10 2010level 8 plan?05,00010,00020,00005,00010,00020,041、0005,00010,00020,0005,0005,00010,000000020,00000020 0Prepared for Yurun Properties byC53nanjing central emporium?Final Schematic Design December 10 2010level 8 finish plan?05,00010,00020,000ST-1(Field Tile)?ST-2(Atrium Tile)?ST-3(Large Stripe)?ST-4(Small Stripe)?refer to pg.C80 for typical finish de42、tails?Prepared for Yurun Properties byC54nanjing central emporium?Final Schematic Design December 10 2010level 8 rcp?05,00010,00020,000C55nanjing central emporium?Final Concept Design December 10,2010Prepared for Yurun Properties byC55nanjing central emporium?Final Schematic Design December 10,2010P43、repared for Yurun Properties bylevel B1/B2supermarket?B1/B2Cool Colors Laughter Glowing Gaiety Streamline Joy Bold Graphics?Prepared for Yurun Properties byC56nanjing central emporium?Final Schematic Design December 10,2010level B1 plan?05,00010,00020,00005,00010,00020,00005,00010,00020,000Prepared 44、for Yurun Properties byC57nanjing central emporium?Final Schematic Design December 10,2010level B1 finish plan?05,00010,00020,00005,00010,00020,000Prepared for Yurun Properties byC58nanjing central emporium?Final Schematic Design December 10,2010level B1 rcp?05,00010,00020,00005,00010,00020,00005,0045、010,00020,000Prepared for Yurun Properties byC59nanjing central emporium?Final Schematic Design December 10,2010level B2 plan?05,00010,00020,00005,00010,00020,00005,00010,00020,000Prepared for Yurun Properties byC60nanjing central emporium?Final Schematic Design December 10,2010level B2 rcp?05,0001046、,00020,000Prepared for Yurun Properties byFinal Schematic Design December 10,2010C61?nanjing central emporiumMetals-MT-1 MT-2 MT-2 MT-3 MT-4 MT-5 MT-1 MT-1-Accent Finish SF-1 PT-3 PT-3 WD-1SF-3 P-3 WC-3 CT-9WC-4 WD-5 WD-4SF-4Accent Finish CT-5 CT-5CT-5-CT-6WC-2-PT-4-SF-5Base Finish SF-1PT-3PT-3 MT-447、SF-3MT-4 MT-4 MT-4 MT-4 MT-4MT-4 MT-4Departments Cosmetics Watches Jewelry Shoes/Bags Womens Ladies Lingerie Mens Kids Casual Sports Home?Back Wall Fixtures Finish MatrixBack Wall Fixtures Finish MatrixPrepared for Yurun Properties byFinal Schematic Design December 10,2010C62?nanjing central emporiu48、m150150800Per Shop Size?Per Shop Size?Vendor Finish?80015025002600Vendor Signage Area?Trim Finish?Fixture Used In:?Accent Finish?Vendor Finished Wall?Base?100100L1L2L3L4CosmeticsWomensMenCasualWatchesLadiesKidsSportsJewelryLingerieHomeShoes/bagsCosmeticsWatchesJewelryHomeBack Wall Type:B-1?B-1 Persp49、ective View?B-1 Top View?123B-1 Side View?B-1 Front View?Finishes Shown:Cosmetics Dep.Prepared for Yurun Properties byFinal Schematic Design December 10,2010C63?nanjing central emporium120012001200Standard B-1 B.W.?Door Panel,Accent Finish?FRFR120026002600800L1L2L3L4CosmeticsWomensMenCasualWatchesLa50、diesKidsSportsShoes/bagsMenLadiesWomensVendor Mirror?Vendor Signage Area?Accent Finish?Trim Finish?Vendor Finished Wall?Base?Fixture Used In:?Standard B-1 B.W.?Vendor Finish?Vendor Finish?Standard B-1 B.W.?JewelryLingerieHomeBack Wall Type:B-2?B-2 Perspective View?B-2 Top View?123B-2 Side View?B-2 F51、ront View?Finishes Shown:Mens Dept.Prepared for Yurun Properties byFinal Schematic Design December 10,2010C64?nanjing central emporium400400400400600Per Shop Size?8001502100400Metal Screens?Fixture Used In:?10020025L1L2L3L4CosmeticsWomensMenCasualWatchesLadiesKidsSportsShoes/bagsShoes/bagsSportsCasu52、alVendor Signage Area?Accent Finish?Vendor Finished Wall?Base?Vendor Finish?Per Shop Size?JewelryLingerieHomeBack Wall Type:B-3?B-3 Perspective View?B-3 Top View?123B-3 Side View?B-3 Front View?Finishes Shown:Sports Dept.Prepared for Yurun Properties byFinal Schematic Design December 10,2010C65?nanj53、ing central emporium800Per Shop Size?Per Shop Size?Vendor Finish?1001002100Standards?Ceiling Height?300400L1L2L3L4CosmeticsWomensMenCasualWatchesLadiesKidsSportsJewelryLingerieHomeShoes/bagsLingerieKidsB-4 Perspective View?B-4 Top View?123B-4 Side View?B-4 Front View?Finishes Shown:LingerieMetal Scr54、eens?Vendor Signage Area?Accent Finish?Vendor Finished Wall?Base?Fixture Used In:?Back Wall Type:B-4?Prepared for Yurun Properties byFinal Schematic Design December 10,2010C66?nanjing central emporiumTypical ColumnsLevel 1-Typ.ColumnLevel 5-Typ.ColumnLevel 2-Typ.ColumnLevel 6-Typ.ColumnLevel 3-Typ.C55、olumnLevel 4-Typ.ColumnColumn Wrap:CT-5Column Wrap:CT-6Column Wrap:TBDColumn WrapCT-9BaseMT-1BaseMT-1BaseMT-1 BaseMT-1BaseMT-1BaseMT-1100100100100100100Per Ceiling HeightPer Ceiling HeightPer Ceiling HeightPer Ceiling HeightPer Ceiling HeightPer Ceiling HeightPer PlanPer PlanPer PlanPer PlanPer Plan56、Per Plan?:CT-5?:MT-1?:MT-1?:MT-1?:MT-1?:MT-1?:MT-1?:CT-6?:CT-9?:?Column Wrap:WC-5Column WrapWC-2Prepared for Yurun Properties byFinal Schematic Design December 10,2010C67?nanjing central emporiumShop Type A?Prepared for Yurun Properties byFinal Schematic Design December 10,2010C68?nanjing central em57、poriumShop Type B?Prepared for Yurun Properties byFinal Schematic Design December 10,2010C69?nanjing central emporiumShop Type C?Prepared for Yurun Properties byFinal Schematic Design December 10 2010C70nanjing central emporium?Atrium Perspective View?View from 3rd Floor?Prepared for Yurun Propertie58、s byFinal Schematic Design December 10 2010C71nanjing central emporium?Atrium Perspective View?View from Ground Floor,Looking Up?Prepared for Yurun Properties byFinal Schematic Design December 10 2010C72nanjing central emporium?Atrium Sections?Section A?Section B?Key Plan(B)?B?Key Plan(A)?ABPrepared59、 for Yurun Properties byFinal Schematic Design December 10 2010C73nanjing central emporium?Bulkhead and Handrail Details?Metal Stanchion?Glass Insetin Channel?Wood Handrail?Feature Light?Wood Panels?Section?Elevation?Plan?Prepared for Yurun Properties byFinal Schematic Design December 10 2010C74nanj60、ing central emporium?Atrium Box Axons?View 1View 2?Prepared for Yurun Properties byC75nanjing central emporium?Final Schematic Design December 10,2010Prepared for Yurun Properties byatrium flooring details?Atrium Flooring Detail?Enlarged Atrium Finish Plan?ST-2-600 x600mm15 mm metal screed?Enlarged 61、Atrium Finish Plan?1200 mm600ST-2-1200 x1200mm1200 mm2400 mmPrepared for Yurun Properties byC76nanjing central emporium?Final Schematic Design December 10,2010Prepared for Yurun Properties bytypical flooring details?Accent Tile Pattern?Field Tile Pattern?Center(atrium)Field Tile?Shop Tile?Shop Floor62、ingMT-1 15mm Metal ScreedST-2 Atrium TileST-3 Large StripeST-4 Small StripeST-1 Field Tile(changes per department)?Prepared for Yurun Properties byC77nanjing central emporium?Final Schematic Design December 10,2010Prepared for Yurun Properties bymain entry rcp and section?Section 1AScale 1:100Scale 63、1:200Ceiling Plan Floor 2Laquered Dimentional ScreenAfixed to BulkheadCustom Lighting FeatureBronze and Frosted GlassFull Height ScreenTravertine Stone ColumnsFrosted Glass Beyond ScreenOpen To BeyondOpen To Beyond?1AKey PlanPrepared for Yurun Properties byC78nanjing central emporium?Final Schematic64、 Design December 10,2010Prepared for Yurun Properties bySection 1BScale 1:100Scale 1:200*Materials noted on Section 1A?Open To BeyondOpen To Beyond?Ceiling Plan Floor 2?1Bmain entry rcp and section?Key PlanPrepared for Yurun Properties byC79nanjing central emporium?Final Schematic Design December 1065、,2010Prepared for Yurun Properties byCeiling Plan Floor 1Scale 1:100Section 2AScale 1:100Laquered Dimentional ScreenAfixed to GWBPainted GWBCeeLite PanelOpen To Beyond?2Asecondary entry rcp and section?Key PlanPrepared for Yurun Properties byC80nanjing central emporium?Final Schematic Design Decembe66、r 10,2010Prepared for Yurun Properties byCeiling Plan Floor 1Scale 1:100Section 2BScale 1:100Laquered Dimentional ScreenAfixed to painted GWBCeeLite PanelPainted GWBEntrance Doors?2Bsecondary entry rcp and section?Key PlanPrepared for Yurun Properties byC81nanjing central emporium?Final Schematic De67、sign December 10,2010Prepared for Yurun Properties bytypical elevator lobby?A.Enlarged Finish Floor Plan Typ.Elevator Lobby 1:100123B.Enlarged Reflected Ceiling Plan Typ.Elevator Lobby 1:100456C.View Typ.Elevator Lobby1234567812Engineered Stone FloorAccent Color engineered Stone FloorBuilt-in Seatin68、gGWB Ceiling 2800 mm AFFBack Lighted Translucent Resin Panle with Custom Pattern or Laser cut Metal Panel with custom Pattern 3400mm AFFEdge lighted GWB Soffit 2800mm AFFLacquer Finished MDF panel with LED Light SlotWood panel with 1/4”Brushed Stainless Steel Flat Bar345678Key Note:Prepared for Yuru69、n Properties byC82nanjing central emporium?Final Schematic Design December 10,2010Prepared for Yurun Properties bytypical restroom-womens?51A.Enlarged Finish Floor Plan Typ.Womens Restroom 1:10037B.Enlarged Refl ected Ceiling Plan Typ.Womens Restroom 1:100D.Section Elevation Typ.Womens Restroom 1:5070、?C.Section Elevation Typ.Womens Restroom 1:50?DCField Tile 300mm x 600mmQuartz Counter TopDecorative Down Light fixture Field Tile 150mm x 300mmAccent Tile 300mm x 300mmLED Light Strip Edge of MirrorGWB Ceiling 2800 mm AFF150mm x 300mm Wall Tile Wet Wall2146537Key Notes:?28?84Prepared for Yurun Prop71、erties byC83nanjing central emporium?Final Schematic Design December 10,2010Prepared for Yurun Properties bytypical restroom-mens?A.Enlarged Finish Floor Plan Typ.Mens Restroom 1:100B.Enlarged Refl ected Ceiling Plan Typ.Mens Restroom 1:100D.Section Elevation Typ.Mens Restroom 1:50?C.Section Elevation Typ.Womens Restroom 1:50DC21387Field Tile 300mm x 600mmQuartz Counter TopDecorative Down Light fixture Field Tile 150mm x 300mmAccent Tile 300mm x 300mmLED Light Strip Edge of MirrorGWB Ceiling 2800 mm AFF150mm x 300mm Wall Tile Wet Wall2146537Key Notes:?8?5
会员尊享权益 会员尊享权益 会员尊享权益
500万份文档
500万份文档 免费下载
10万资源包
10万资源包 一键下载
4万份资料
4万份资料 打包下载
24小时客服
24小时客服 会员专属
开通 VIP
升级会员
  • 周热门排行

  • 月热门排行

  • 季热门排行

  1. 小区人员配置档案建立保洁绿化物业管理服务投标方案(593页).docx
  2. 陕西化学工业公司招聘管理与职业发展管理手册30页.doc
  3. 建筑工程外脚手架专项施工方案(悬挑式脚手架、落地式脚手架)(25页).doc
  4. 2020柏向堂房地产公司材料标准化手册3.0(143页).pdf
  5. 2021柏向堂房地产公司材料标准化手册4.0(108页).pdf
  6. 土建、装饰、维修改造等零星工程施工组织设计方案(187页).doc
  7. 深圳装饰公司施工图纸会审及设计交底管理制度【13页】.doc
  8. 桥梁工程深基坑开挖专项施工方案(24页).doc
  9. 深基坑土方开挖及基坑支护专项施工方案.doc
  10. 天碱商业区观山苑工程人防监理规划(43页).doc
  11. 工程变形测量之基坑监测培训课件(155页).ppt
  12. 房地产开发企业拿地操作指引方案.pdf
  13. 新规下的户型增值秘籍.ppt(22页)
  14. 房地产开发贷款实操指南(5页).pdf
  15. 鄂尔多斯空港物流园区总体规划方案(2017-2030)环境影响评价报告书(23页).doc
  16. 规划兰园西路道路工程环境方案环境影响评价报告书(89页).pdf
  17. 屋面圆弧形穹顶结构高支模施工方案(40米)(47页).doc
  18. 埋石混凝土挡土墙施工方案(23页).doc
  19. 重庆市五小水利工程建设规划报告(64页).doc
  20. 厂区至矿区管网蒸汽管道系统扩容改造工程施工组织设计方案(105页).doc
  21. 超高纯氦气厂建设项目办公楼、变电站、水泵房及消防水池、门卫、厂房、仓库、配套工程施工组织设计方案(140页).doc
  22. 园林景观投标方案施工组织设计方案技术标(115页).doc
  1. 房地产交易环节契税减征申报表(首套填写)(2页).doc
  2. 2024大楼室内精装修工程专业分包投标文件(393页).docx
  3. 苏州水秀天地商业项目购物中心100%室内设计方案(158页).pptx
  4. 龙港市专业市场布局规划方案(2023-2035年)(草案)(61页).pdf
  5. 小区人员配置档案建立保洁绿化物业管理服务投标方案(593页).docx
  6. 室内移动式操作平台工程施工方案(19页).doc
  7. 地铁6号线区间盾构下穿管线专项施工方案(30页).doc
  8. 矿山治理工程施工组织设计方案(240页).docx
  9. 老旧小区改造工程施工方案及技术措施(364页).doc
  10. 北京科技园公寓建设项目整体报告方案.ppt
  11. 川主寺城镇风貌整治景观规划设计方案(60页).pdf
  12. 建筑工程三级安全教育内容(24页).doc
  13. 新疆风电十三间房二期工程49.5mw风电项目可行性研究报告(附表)(239页).pdf
  14. 土建、装饰、维修改造等零星工程施工组织设计方案(187页).doc
  15. 四川凉山攀西灵山国际度假区小镇活力中心商业业态规划方案建议书(33页).pdf
  16. 埋石混凝土挡土墙施工方案(23页).doc
  17. 地下停车场环氧地坪漆施工方案(45页).doc
  18. 深圳装饰公司施工图纸会审及设计交底管理制度【13页】.doc
  19. 地铁深基坑及钢筋笼吊装安全专项施工方案【98页】.doc
  20. 住宅定价策略及价格表制定培训课件.ppt
  21. 西安名京九合院商业项目招商手册(28页).pdf
  22. 2010-2030年湖北咸宁市城市总体规划(32页).doc
  1. 建筑工程夜间施工专项施工方案(18页).doc
  2. 赣州无动力亲子乐园景观设计方案(111页).pdf
  3. 2016泰安乡村旅游规划建设示范案例(165页).pdf
  4. 房地产交易环节契税减征申报表(首套填写)(2页).doc
  5. 龙山县里耶文化生态景区里耶古城片区旅游修建性详细规划2015奇创.pdf
  6. 连云港市土地利用总体规划2006-2020年调整方案文本图集(78页).pdf
  7. 850亩项目塑钢门窗工程施工组织设计方案(34页).doc
  8. 老旧小区改造工程施工方案及技术措施(364页).doc
  9. 城市更新项目地价公式测算表.xlsx
  10. 房地产项目规划前期投资收益测算模板带公式.xls
  11. 存储器基地项目及配套设施建筑工程临时用水施工方案(40页).docx
  12. 铁路客运枢纽项目站前框构中桥工程路基注浆加固专项施工方案(19页).doc
  13. 室内移动式操作平台工程施工方案(19页).doc
  14. 装配式结构工业厂房基础、主体结构、门窗及装饰工程施工方案(83页).doc
  15. 地铁6号线区间盾构下穿管线专项施工方案(30页).doc
  16. 施工工程安全教育培训技术交底(13页).doc
  17. 老旧小区改造施工方案及技术措施(365页).doc
  18. 新建贵广铁路线下工程沉降变形观测及评估监理实施细则(126页).doc
  19. 消防火灾应急疏散演练预案(12页).doc
  20. 矿山治理工程施工组织设计方案(240页).docx
  21. 崖城站悬臂式挡墙施工方案(92页).doc
  22. 北京科技园公寓建设项目整体报告方案.ppt