个人中心
个人中心
添加客服WX
客服
添加客服WX
添加客服WX
关注微信公众号
公众号
关注微信公众号
关注微信公众号
升级会员
升级会员
返回顶部
ImageVerifierCode 换一换

江苏南京中央商场改造方案(82页).pdf

  • 资源ID:595000       资源大小:12MB        全文页数:82页
  • 资源格式:  PDF         下载积分: 30金币
下载报告请您先登录!


友情提示
2、PDF文件下载后,可能会被浏览器默认打开,此种情况可以点击浏览器菜单,保存网页到桌面,就可以正常下载了。
3、本站不支持迅雷下载,请使用电脑自带的IE浏览器,或者360浏览器、谷歌浏览器下载即可。
4、本站资源下载后的文档和图纸-无水印,预览文档经过压缩,下载后原文更清晰。
5、试题试卷类文档,如果标题没有明确说明有答案则都视为没有答案,请知晓。

江苏南京中央商场改造方案(82页).pdf

1、Prepared for Yurun Properties byFinal Schematic Design December 10,2010C2nanjing central emporium?table of contents?design a?ributes 4exterior design 5exterior op?on 1-view 1 6exterior op?on 1-view 2 7exterior op?on 2-view 1 8exterior op?on 2-view 2 9exterior op?on 3-view 2 10south eleva?on 11west e

2、leva?on 12north eleva?on 13east eleva?on 14exterior materials&details 15sec?ons 16sec?ons 17sec?ons 18sec?ons 19sec?ons 20sec?ons 21stacking diagram 22circula?on diagram 23rendering entrance 24rendering womens 25rendering mens 26atrium rendering 27interna?onal luxury-level 1 28plan level 1 29?nish?o

3、or plan level 1 30rcp level 1 31womens-level 2 32plan level 2 33?nish?oor plan level 2 34rcp level 2 3512Introduc?on?4mens&kids level 3 36 plan level 3 37?nish?oor plan level 3 38rcp level 3 39casual,sports&home-level 4 40plan level 4 41?nish?oor plan level 4 42rcp level 4 43entertainment-level 5 44

4、plan level 5 45?nish?oor plan level 5 46rcp level 5 47entertainment-level 6 48plan level 6 49?nish?oor plan level 6 50rcp level 6 51food and beverage-level 7/8 52plan level 7 53?nish?oor plan level 7 54rcp level 7 55plan level 8 56?nish?oor plan level 8 57rcp level8 58entertainment-level B1/B2 59pla

5、n level B1 60?nish?oor plan level B1 61rcp level B1 62 plan level B2 63rcp level B2 64567/8B1/B23?Prepared for Yurun Properties byFinal Schematic Design December 10,2010C3nanjing central emporium?table of contents?Fixtures?xture?nish matrix 65back wall type:B-1 66back wall type:B-2 67back wall type:

6、B-3 68back wall type:B-4 69typical columns 70shop type A 71shop type B 72shop type C 73atrium perspec?ve view 74atrium perspec?ve view 75atrium sec?ons 76atrium bulkhead&handrail details 77atrium box axon 78atrium?nish details 79typical?nish details 80main entry rcp and sec?on 81main entry rcp and s

7、ec?on 82secondary entry rcp and sec?on 83secondary entry rcp and sec?on 84typical elevator lobby 85typical restroom-womens 86typical restroom-mens 87 Public Spaces?MaterialsC4nanjing central emporium?A bright and fresh environment will be the hallmark of the Nanjing Central Emporium.Through a progre

8、ssion of defined moments,shoppers will journey through a spirited interpretation of a celebration.Sophisticated finishes,rich patterns,and bold colors create an inviting world of aesthetic joy and programmatic flexibility.?design attributes?Final Schematic Design December 10,2010Prepared for Yurun P

9、roperties byC5nanjing central emporium?exterior design?Final Schematic Design December 10,2010Prepared for Yurun Properties byGlass Wall System With PatternMetal PanelGlass Wall System Without PatternMetal Pattern?Glass Wall System With Pattern?Scope of Exterior Work and Finishes?Glass Wall System W

10、ith Pattern?C6nanjing central emporium?exterior option 1-view 1?Final Schematic Design December 10,2010Prepared for Yurun Properties byC7nanjing central emporium?exterior option 1-view 2?Final Schematic Design December 10,2010Prepared for Yurun Properties byC8nanjing central emporium?exterior option

11、 2-view 1?Final Schematic Design December 10,2010Prepared for Yurun Properties byC9nanjing central emporium?exterior option 2-view 2?Final Schematic Design December 10,2010Prepared for Yurun Properties byC10nanjing central emporium?exterior option 3-view 2?Final Schematic Design December 10,2010Prep

12、ared for Yurun Properties byC11nanjing central emporium?south elevation?Final Schematic Design December 10,2010Prepared for Yurun Properties byMetal Fin?Graphic Panel?L.E.D.?Air Vent?L.E.D.?Canopy?Canopy?Entry?Entry?Aluminum and Glass Storefront?Metal Trellis?Glass Wall SystemWith Pattern?Glass Wall

13、 System Without Pattern?C12nanjing central emporium?west elevation?Final Schematic Design December 10,2010Prepared for Yurun Properties byMetal Fin?Graphic Panel?L.E.D.?Air Vent?L.E.D.?Canopy?Canopy?Entry?Entry?Aluminum and Glass Storefront?Metal Trellis?Garage Entry?Glass Wall System Without Patter

14、n?Glass Wall SystemWith Pattern?Existing Building Not In Scope?C13nanjing central emporium?north elevation?Final Schematic Design December 10,2010Prepared for Yurun Properties byL.E.D.?Entry?Aluminum and Glass Storefront?Aluminum and Glass Storefront?Existing Building Not In Scope?Existing Building

15、Not In Scope?Glass Wall SystemWith Pattern?Glass Wall SystemWith Pattern?C14nanjing central emporium?east elevation?Final Schematic Design December 10,2010Prepared for Yurun Properties byAluminum and Glass Storefront?Building BeyondGlass Wall SystemWith Pattern?Metal Panel?Existing Planter?Existing

16、Windows?C15nanjing central emporium?exterior materials&details?Final Schematic Design December 10,2010Prepared for Yurun Properties byGlass Wall System?Prepared for Yurun Properties bynanjing central emporium?C16Final Schematic Design December 10,2010Prepared for Yurun Properties bysections?Prepared

17、 for Yurun Properties bynanjing central emporium?C17Final Schematic Design December 10,2010Prepared for Yurun Properties bysections?Prepared for Yurun Properties bynanjing central emporium?C18Final Schematic Design December 10,2010Prepared for Yurun Properties bysections?Prepared for Yurun Propertie

18、s bynanjing central emporium?C19Final Schematic Design December 10,2010Prepared for Yurun Properties bysections?Prepared for Yurun Properties bynanjing central emporium?C20Final Schematic Design December 10,2010Prepared for Yurun Properties bysections?Prepared for Yurun Properties bynanjing central

19、emporium?C21Final Schematic Design December 10,2010Prepared for Yurun Properties by?sectionsC22nanjing central emporium?stacking diagram?supermarketsupermarketsupermarketsupermarketinternational luxuryinternational luxuryinternational luxuryinternational luxurywomenswomenswomenswomenszone 3zone 3zon

20、e 2zone 2zone 1zone 1zone 4zone 4womenswomenswomenswomensmensmensmensmenssportsportsportsporthomehomehomehomef&bf&bf&bf&bf&bf&bf&bf&bentertainmententertainmententertainmententertainmentB1B1B1B1B1B1B2B21 1 1 1 2 2 2 2 3 3 3 3 4 4 4 4 5 5 5 5 6 6 6 6 7 7 7 7 8 8 8 8?Final Schematic Design December 10,

21、2010Prepared for Yurun Properties byC23nanjing central emporium?circulation diagramentryentry?Ring RoadSideStreetSideStreetMain AvenueMain AvenueN.T.S.entryentry?entryentry?Final Schematic Design December 10,2010Prepared for Yurun Properties byC24nanjing central emporium?interior rendering -entry?Fi

22、nal Schematic Design December 10,2010Prepared for Yurun Properties byC25nanjing central emporium?interior rendering -womens?Final Schematic Design December 10,2010Prepared for Yurun Properties byC26nanjing central emporium?interior rendering -mens?Final Schematic Design December 10,2010Prepared for

23、Yurun Properties byC27nanjing central emporium?interior rendering -atrium?Final Schematic Design December 10,2010Prepared for Yurun Properties byC28nanjing central emporium?Final Concept Design December 10,2010Prepared for Yurun Properties byC28nanjing central emporium?Final Schematic Design Decembe

24、r 10,2010Prepared for Yurun Properties bylevel 1Lustrous Surfaces Joy Gleaming Exultant Delicate Patterns Spirited Alluring Current?international luxury1Prepared for Yurun Properties byFinal Schematic Design December 10,2010C29nanjing central emporium?level 1 plan?05,00010,00020,000Prepared for Yuru

25、n Properties byFinal Schematic Design December 10,2010C30nanjing central emporium?level 1 finish plan?05,00010,00020,000refer to p.79 for atrium finish details?Prepared for Yurun Properties byFinal Schematic Design December 10,2010C31nanjing central emporium?level 1 rcp?05,00010,00020,00005,00010,00

26、020,00005,00010,00020,000C32nanjing central emporium?Final Concept Design December 10,2010Prepared for Yurun Properties byC32nanjing central emporium?Final Schematic Design December 10,2010Prepared for Yurun Properties bylevel 2womens2Subdued Colors Laughter Refined Joyful Subtle Patterning Simple D

27、elicate Details?Prepared for Yurun Properties byC33nanjing central emporium?Final Schematic Design December 10 201005,00010,00020,00005,00010,00020,000level 2 plan?05,00010,00020,000Prepared for Yurun Properties byC34nanjing central emporium?Final Schematic Design December 10 2010level 2 finish plan

28、?05,00010,00020,000refer to pg.C80 for typical finish details?ST-1(Field Tile)?ST-2(Atrium Tile)?ST-3(Large Stripe)?ST-4(Small Stripe)?Prepared for Yurun Properties byC35nanjing central emporium?Final Schematic Design December 10 2010level 2 rcp?05,00010,00020,00005,00010,00020,00005,00010,00020,000

29、C36nanjing central emporium?Final Concept Design December 10,2010Prepared for Yurun Properties byC36nanjing central emporium?Final Schematic Design December 10,2010Prepared for Yurun Properties bylevel 3womens3Subdued Colors Laughter Refined Joyful Subtle Patterning Simple Delicate Details?Prepared

30、for Yurun Properties byC37nanjing central emporium?Final Schematic Design December 10 201005,00010,00020,00005,00010,00020,00005,00010,00020,000level 3 plan?Prepared for Yurun Properties byC38nanjing central emporium?Final Schematic Design December 10 2010level 3 finish plan?05,00010,00020,00005,000

31、10,00020,000ST-1(Field Tile)?ST-2(Atrium Tile)?ST-3(Large Stripe)?ST-4(Small Stripe)?refer to pg.C80 for typical finish details?Prepared for Yurun Properties byC39nanjing central emporium?Final Schematic Design December 10 2010level 3 rcp?05,00010,00020,00005,00010,00020,00005,00010,00020,000C40nanj

32、ing central emporium?Final Concept Design December 10,2010Prepared for Yurun Properties byC40nanjing central emporium?Final Schematic Design December 10,2010Prepared for Yurun Properties bylevel 5Golden Accents Enthusiastic Diffused Shimmers Graceful Glowing Patterns Jubilant?sport5?Prepared for Yur

33、un Properties byC41nanjing central emporium?Final Schematic Design December 10 2010level 5 plan?05,00010,00020,00005,00010,00020,00005,00010,00020,000Prepared for Yurun Properties byC42nanjing central emporium?Final Schematic Design December 10 2010level 5 finish plan?05,00010,00020,000refer to pg.C

34、80 for typical finish details?ST-1(Field Tile)?ST-2(Atrium Tile)?ST-3(Large Stripe)?ST-4(Small Stripe)?Prepared for Yurun Properties byC43nanjing central emporium?Final Schematic Design December 10 2010level 5 rcp?05,00010,00020,00005,00010,00020,00005,00010,00020,000C44Final Concept Design December

35、 10,2010Prepared for Yurun Properties bynanjing central emporium?C44nanjing central emporium?Final Schematic Design December 10,2010Prepared for Yurun Properties bylevel 6Radiant Spirited Focused Light Earnest Glowing Patterns Tenacious Comfortinghome6?Prepared for Yurun Properties byC45nanjing cent

36、ral emporium?Final Schematic Design December 10 2010level 6 plan?05,00010,00020,00005,00010,00020,00005,00010,00020,000Prepared for Yurun Properties byC46nanjing central emporium?Final Schematic Design December 10 2010level 6 finish plan?05,00010,00020,000refer to pg.C80 for typical finish details?S

37、T-1(Field Tile)?ST-2(Atrium Tile)?ST-3(Large Stripe)?Prepared for Yurun Properties byC47nanjing central emporium?Final Schematic Design December 10 2010level 6 rcp?05,00010,00020,00005,00010,00020,00005,00010,00020,000C48nanjing central emporium?Final Concept Design December 10,2010Prepared for Yuru

38、n Properties byC48nanjing central emporium?Final Schematic Design December 10,2010Prepared for Yurun Properties bylevel 7/8?Details Honest Luminous Reflective Euphoric Versatile food&beverage7/8Prepared for Yurun Properties byC49nanjing central emporium?Final Schematic Design December 10 2010level 7

39、 plan?05,00010,00020,00005,00010,00020,00005,00010,00020,000Prepared for Yurun Properties byC50nanjing central emporium?Final Schematic Design December 10 2010level 7 finish plan?05,00010,00020,000refer to pg.C80 for typical finish details?ST-1(Field Tile)?ST-2(Atrium Tile)?ST-3(Large Stripe)?ST-4(S

40、mall Stripe)?Prepared for Yurun Properties byC51nanjing central emporium?Final Schematic Design December 10 2010level 7 rcp?05,00010,00020,00010,00020,000Prepared for Yurun Properties byC52nanjing central emporium?Final Schematic Design December 10 2010level 8 plan?05,00010,00020,00005,00010,00020,0

41、0005,00010,00020,0005,0005,00010,000000020,00000020 0Prepared for Yurun Properties byC53nanjing central emporium?Final Schematic Design December 10 2010level 8 finish plan?05,00010,00020,000ST-1(Field Tile)?ST-2(Atrium Tile)?ST-3(Large Stripe)?ST-4(Small Stripe)?refer to pg.C80 for typical finish de

42、tails?Prepared for Yurun Properties byC54nanjing central emporium?Final Schematic Design December 10 2010level 8 rcp?05,00010,00020,000C55nanjing central emporium?Final Concept Design December 10,2010Prepared for Yurun Properties byC55nanjing central emporium?Final Schematic Design December 10,2010P

43、repared for Yurun Properties bylevel B1/B2supermarket?B1/B2Cool Colors Laughter Glowing Gaiety Streamline Joy Bold Graphics?Prepared for Yurun Properties byC56nanjing central emporium?Final Schematic Design December 10,2010level B1 plan?05,00010,00020,00005,00010,00020,00005,00010,00020,000Prepared

44、for Yurun Properties byC57nanjing central emporium?Final Schematic Design December 10,2010level B1 finish plan?05,00010,00020,00005,00010,00020,000Prepared for Yurun Properties byC58nanjing central emporium?Final Schematic Design December 10,2010level B1 rcp?05,00010,00020,00005,00010,00020,00005,00

45、010,00020,000Prepared for Yurun Properties byC59nanjing central emporium?Final Schematic Design December 10,2010level B2 plan?05,00010,00020,00005,00010,00020,00005,00010,00020,000Prepared for Yurun Properties byC60nanjing central emporium?Final Schematic Design December 10,2010level B2 rcp?05,00010

46、,00020,000Prepared for Yurun Properties byFinal Schematic Design December 10,2010C61?nanjing central emporiumMetals-MT-1 MT-2 MT-2 MT-3 MT-4 MT-5 MT-1 MT-1-Accent Finish SF-1 PT-3 PT-3 WD-1SF-3 P-3 WC-3 CT-9WC-4 WD-5 WD-4SF-4Accent Finish CT-5 CT-5CT-5-CT-6WC-2-PT-4-SF-5Base Finish SF-1PT-3PT-3 MT-4

47、SF-3MT-4 MT-4 MT-4 MT-4 MT-4MT-4 MT-4Departments Cosmetics Watches Jewelry Shoes/Bags Womens Ladies Lingerie Mens Kids Casual Sports Home?Back Wall Fixtures Finish MatrixBack Wall Fixtures Finish MatrixPrepared for Yurun Properties byFinal Schematic Design December 10,2010C62?nanjing central emporiu

48、m150150800Per Shop Size?Per Shop Size?Vendor Finish?80015025002600Vendor Signage Area?Trim Finish?Fixture Used In:?Accent Finish?Vendor Finished Wall?Base?100100L1L2L3L4CosmeticsWomensMenCasualWatchesLadiesKidsSportsJewelryLingerieHomeShoes/bagsCosmeticsWatchesJewelryHomeBack Wall Type:B-1?B-1 Persp

49、ective View?B-1 Top View?123B-1 Side View?B-1 Front View?Finishes Shown:Cosmetics Dep.Prepared for Yurun Properties byFinal Schematic Design December 10,2010C63?nanjing central emporium120012001200Standard B-1 B.W.?Door Panel,Accent Finish?FRFR120026002600800L1L2L3L4CosmeticsWomensMenCasualWatchesLa

50、diesKidsSportsShoes/bagsMenLadiesWomensVendor Mirror?Vendor Signage Area?Accent Finish?Trim Finish?Vendor Finished Wall?Base?Fixture Used In:?Standard B-1 B.W.?Vendor Finish?Vendor Finish?Standard B-1 B.W.?JewelryLingerieHomeBack Wall Type:B-2?B-2 Perspective View?B-2 Top View?123B-2 Side View?B-2 F

51、ront View?Finishes Shown:Mens Dept.Prepared for Yurun Properties byFinal Schematic Design December 10,2010C64?nanjing central emporium400400400400600Per Shop Size?8001502100400Metal Screens?Fixture Used In:?10020025L1L2L3L4CosmeticsWomensMenCasualWatchesLadiesKidsSportsShoes/bagsShoes/bagsSportsCasu

52、alVendor Signage Area?Accent Finish?Vendor Finished Wall?Base?Vendor Finish?Per Shop Size?JewelryLingerieHomeBack Wall Type:B-3?B-3 Perspective View?B-3 Top View?123B-3 Side View?B-3 Front View?Finishes Shown:Sports Dept.Prepared for Yurun Properties byFinal Schematic Design December 10,2010C65?nanj

53、ing central emporium800Per Shop Size?Per Shop Size?Vendor Finish?1001002100Standards?Ceiling Height?300400L1L2L3L4CosmeticsWomensMenCasualWatchesLadiesKidsSportsJewelryLingerieHomeShoes/bagsLingerieKidsB-4 Perspective View?B-4 Top View?123B-4 Side View?B-4 Front View?Finishes Shown:LingerieMetal Scr

54、eens?Vendor Signage Area?Accent Finish?Vendor Finished Wall?Base?Fixture Used In:?Back Wall Type:B-4?Prepared for Yurun Properties byFinal Schematic Design December 10,2010C66?nanjing central emporiumTypical ColumnsLevel 1-Typ.ColumnLevel 5-Typ.ColumnLevel 2-Typ.ColumnLevel 6-Typ.ColumnLevel 3-Typ.C

55、olumnLevel 4-Typ.ColumnColumn Wrap:CT-5Column Wrap:CT-6Column Wrap:TBDColumn WrapCT-9BaseMT-1BaseMT-1BaseMT-1 BaseMT-1BaseMT-1BaseMT-1100100100100100100Per Ceiling HeightPer Ceiling HeightPer Ceiling HeightPer Ceiling HeightPer Ceiling HeightPer Ceiling HeightPer PlanPer PlanPer PlanPer PlanPer Plan

56、Per Plan?:CT-5?:MT-1?:MT-1?:MT-1?:MT-1?:MT-1?:MT-1?:CT-6?:CT-9?:?Column Wrap:WC-5Column WrapWC-2Prepared for Yurun Properties byFinal Schematic Design December 10,2010C67?nanjing central emporiumShop Type A?Prepared for Yurun Properties byFinal Schematic Design December 10,2010C68?nanjing central em

57、poriumShop Type B?Prepared for Yurun Properties byFinal Schematic Design December 10,2010C69?nanjing central emporiumShop Type C?Prepared for Yurun Properties byFinal Schematic Design December 10 2010C70nanjing central emporium?Atrium Perspective View?View from 3rd Floor?Prepared for Yurun Propertie

58、s byFinal Schematic Design December 10 2010C71nanjing central emporium?Atrium Perspective View?View from Ground Floor,Looking Up?Prepared for Yurun Properties byFinal Schematic Design December 10 2010C72nanjing central emporium?Atrium Sections?Section A?Section B?Key Plan(B)?B?Key Plan(A)?ABPrepared

59、 for Yurun Properties byFinal Schematic Design December 10 2010C73nanjing central emporium?Bulkhead and Handrail Details?Metal Stanchion?Glass Insetin Channel?Wood Handrail?Feature Light?Wood Panels?Section?Elevation?Plan?Prepared for Yurun Properties byFinal Schematic Design December 10 2010C74nanj

60、ing central emporium?Atrium Box Axons?View 1View 2?Prepared for Yurun Properties byC75nanjing central emporium?Final Schematic Design December 10,2010Prepared for Yurun Properties byatrium flooring details?Atrium Flooring Detail?Enlarged Atrium Finish Plan?ST-2-600 x600mm15 mm metal screed?Enlarged

61、Atrium Finish Plan?1200 mm600ST-2-1200 x1200mm1200 mm2400 mmPrepared for Yurun Properties byC76nanjing central emporium?Final Schematic Design December 10,2010Prepared for Yurun Properties bytypical flooring details?Accent Tile Pattern?Field Tile Pattern?Center(atrium)Field Tile?Shop Tile?Shop Floor

62、ingMT-1 15mm Metal ScreedST-2 Atrium TileST-3 Large StripeST-4 Small StripeST-1 Field Tile(changes per department)?Prepared for Yurun Properties byC77nanjing central emporium?Final Schematic Design December 10,2010Prepared for Yurun Properties bymain entry rcp and section?Section 1AScale 1:100Scale

63、1:200Ceiling Plan Floor 2Laquered Dimentional ScreenAfixed to BulkheadCustom Lighting FeatureBronze and Frosted GlassFull Height ScreenTravertine Stone ColumnsFrosted Glass Beyond ScreenOpen To BeyondOpen To Beyond?1AKey PlanPrepared for Yurun Properties byC78nanjing central emporium?Final Schematic

64、 Design December 10,2010Prepared for Yurun Properties bySection 1BScale 1:100Scale 1:200*Materials noted on Section 1A?Open To BeyondOpen To Beyond?Ceiling Plan Floor 2?1Bmain entry rcp and section?Key PlanPrepared for Yurun Properties byC79nanjing central emporium?Final Schematic Design December 10

65、,2010Prepared for Yurun Properties byCeiling Plan Floor 1Scale 1:100Section 2AScale 1:100Laquered Dimentional ScreenAfixed to GWBPainted GWBCeeLite PanelOpen To Beyond?2Asecondary entry rcp and section?Key PlanPrepared for Yurun Properties byC80nanjing central emporium?Final Schematic Design Decembe

66、r 10,2010Prepared for Yurun Properties byCeiling Plan Floor 1Scale 1:100Section 2BScale 1:100Laquered Dimentional ScreenAfixed to painted GWBCeeLite PanelPainted GWBEntrance Doors?2Bsecondary entry rcp and section?Key PlanPrepared for Yurun Properties byC81nanjing central emporium?Final Schematic De

67、sign December 10,2010Prepared for Yurun Properties bytypical elevator lobby?A.Enlarged Finish Floor Plan Typ.Elevator Lobby 1:100123B.Enlarged Reflected Ceiling Plan Typ.Elevator Lobby 1:100456C.View Typ.Elevator Lobby1234567812Engineered Stone FloorAccent Color engineered Stone FloorBuilt-in Seatin

68、gGWB Ceiling 2800 mm AFFBack Lighted Translucent Resin Panle with Custom Pattern or Laser cut Metal Panel with custom Pattern 3400mm AFFEdge lighted GWB Soffit 2800mm AFFLacquer Finished MDF panel with LED Light SlotWood panel with 1/4”Brushed Stainless Steel Flat Bar345678Key Note:Prepared for Yuru

69、n Properties byC82nanjing central emporium?Final Schematic Design December 10,2010Prepared for Yurun Properties bytypical restroom-womens?51A.Enlarged Finish Floor Plan Typ.Womens Restroom 1:10037B.Enlarged Refl ected Ceiling Plan Typ.Womens Restroom 1:100D.Section Elevation Typ.Womens Restroom 1:50

70、?C.Section Elevation Typ.Womens Restroom 1:50?DCField Tile 300mm x 600mmQuartz Counter TopDecorative Down Light fixture Field Tile 150mm x 300mmAccent Tile 300mm x 300mmLED Light Strip Edge of MirrorGWB Ceiling 2800 mm AFF150mm x 300mm Wall Tile Wet Wall2146537Key Notes:?28?84Prepared for Yurun Prop

71、erties byC83nanjing central emporium?Final Schematic Design December 10,2010Prepared for Yurun Properties bytypical restroom-mens?A.Enlarged Finish Floor Plan Typ.Mens Restroom 1:100B.Enlarged Refl ected Ceiling Plan Typ.Mens Restroom 1:100D.Section Elevation Typ.Mens Restroom 1:50?C.Section Elevation Typ.Womens Restroom 1:50DC21387Field Tile 300mm x 600mmQuartz Counter TopDecorative Down Light fixture Field Tile 150mm x 300mmAccent Tile 300mm x 300mmLED Light Strip Edge of MirrorGWB Ceiling 2800 mm AFF150mm x 300mm Wall Tile Wet Wall2146537Key Notes:?8?5


注意事项

本文(江苏南京中央商场改造方案(82页).pdf)为本站会员(故事)主动上传,地产文库仅提供信息存储空间,仅对用户上传内容的表现方式做保护处理,对上载内容本身不做任何修改或编辑。 若此文所含内容侵犯了您的版权或隐私,请立即通知地产文库(点击联系客服),我们立即给予删除!