个人中心
个人中心
添加客服WX
客服
添加客服WX
添加客服WX
关注微信公众号
公众号
关注微信公众号
关注微信公众号
升级会员
升级会员
返回顶部
房地产开发公司总部基地总体规划方案(58页)
房地产开发公司总部基地总体规划方案(58页).pdf
下载文档 下载文档
通用施工
上传人:偷**** 编号:501399 2022-07-29 58页 24.41MB
1、华润集团总部基地China resources group city总体规划Master planDesign PresentationAugust 18,2015现场情况现场情况Current site conditions Site Area:场地面积1,249,483 smExisting circulation现存交通Property/property line用地红线Golf course高尔夫球场EXTERNAL ROADWAY(2 LANES EACH DIRECTION)外部交通双向4车道EXISTING ENTRY现存入口NEW ENTRY新入口现场情况现场情况Current2、 site analysisLarge flat area surrounded by hillsand reservoir:workLake front view:Live&leisureSmall flat area surrounded by hills:academicWest entrance(underground serving Office)east entrance(serving public,academic,live&leisure,office visitors)现场情况现场情况Current site conditions View around lake:pote3、ntial zone for live&leisure现场情况现场情况Current site conditions View of reservoir heading west现场情况现场情况Current site conditions View of flat land area heading to lake:potential area for work现场情况现场情况Current site conditions View of flat land area looking north:potential area for work现场情况现场情况Current site cond4、itions View from tip of work zone looking north:potential area for work(showroom&reception)现场情况现场情况Current site conditions View of existing field looking north:potential area for academic functions来自场地的启发来自场地的启发Inspiration from siteLandscapeCantilevered buildingCovered pathNatural screen来自岭南园林的启发来自岭5、南园林的启发Inspiration from southern Chinese landscapeLandscapeCantilevered buildingCovered pathNatural screen场地策略地策略site strategiesSite strategy I场地策略场地策略1 1Site strategy ii场地策略场地策略2 2 publicpublicPrivatePrivateCentralized service场地方案地方案1 分分区Site strategy I zoningPrivate内部Golf course高尔夫球场PROPERTY line红线6、Public space公共区域:766,500 sm(56%)Private space内部区域:595,000 sm(44%)PUBLIC公共Features:Existing 18-hole golf course remains mostly untouched only 1-2 holes moveCirculation on both east&west travels through golf course60:40 ratio public to private spaceLess room for development such as separate service/lo7、ading area场地方案场地方案1 1场地入口研究场地入口研究Site strategy I site entrance studyCirculation to private zoneCirculation at both east and west must run through golf course;may travel beneath golf course to allow for uninterrupted play Public/golf zone场地方案场地方案1 1交通流线交通流线Site strategy I SITE circulationWork工作Live生活8、Leisure休闲Learn培训Future未来property line红线Private私密Golf course高尔夫球场PUBLIC公共PRIVATE INTERNAL ROADWAY(1 LANE EACH DIRECTION)园区内部路,双向2车道PUBLIC INTERNAL ROADWAY(1 LANE EACH DIRECTION)园区公共路,双向2车道EXTERNAL ROADWAY(2 LANES EACH DIRECTION)SECURITY CHECKPOINT检查控制点EAST ENTRY:ACCESS FOR HOTEL,SCHOOL,PUBLIC东入口:酒店、培9、训、公共WEST ENTRY:ACCESS FOR OFFICE&MEDICAL SCHOOL西入口:办公与医学院TRAFFIC DROP OFF&CONTROL POINT;SHUTTLE TRANSFER交通下课、控制、换乘中心场地方案场地方案1 1通勤车流线通勤车流线Site strategy I SHUTTLE CIRCULATIONSHUTTLE STOP通勤车车站property line红线Private内部Golf course高尔夫球场PUBLIC公共Shuttle route通勤车路线EXTERNAL ROADWAY(2 LANES EACH DIRECTION)外部路双向10、4车道Work工作Live生活Leisure休闲Learn培训Future未来场地方案场地方案1 1后勤流线后勤流线Site strategy I SERVICE CIRCULATIONService(loading,bus,mechanical,misc.)后勤服务(卸货、巴士、工程property line红线Private内部Golf course高尔夫球场PUBLIC公共PUBLIC INTERNAL ROADWAY(1 LANE EACH DIRECTION)园区公共路双向2车道EXTERNAL ROADWAY(2 LANES EACH DIRECTION)外部路双向4车道SECUR11、ITY CHECKPOINT检查口场地方案场地方案1 1停车停车Site strategy I parkingParking停车OFFICE,HEALTHCARE,GYM,CANTEEN,RETAIL:办公、健康、健身、餐厅、零售2,317 SPOTS车位TRAINING/MEDICAL:培训/医学院286 SPOTS车位GOLF 高尔夫:160 SPOTS车位HOTEL/APARTMENT/酒店、公寓465 SPOTS车位SCHOOL 学校:18 SPOTS车位property line红线Private内部Golf course高尔夫球场PUBLIC公共场地方案场地方案2 2分区分区Sit12、e strategy II zoningPublic space 公共区域:571,300 sm(42%)Private space:内部区域766,000 sm(58%)property line红线Private内部Golf course高尔夫球场PUBLIC公共Features:18-hole golf course condenses;course gets tighter Western entry travels through golf course;east enters into private zone40:60 ratio public to private spacem13、ore room for development such a separate service/loading area场地方案场地方案2 2交通流线交通流线Site strategy II site CIRCULATIONPRIVATE INTERNAL ROADWAY(1 LANE EACH DIRECTION)园区内部路双向2车道PUBLIC INTERNAL ROADWAY(1 LANE EACH DIRECTION)园区公共路双向2车道EXTERNAL ROADWAY(2 LANES EACH DIRECTION)SECURITY CHECKPOINT检查口EAST ENTRY:A14、CCESS FOR HOTEL,SCHOOL,PUBLIC东入口:酒店、学校、公共WEST ENTRY:ACCESS FOR OFFICE&MEDICAL SCHOOL西入口:办公、医学院TRAFFIC DROP OFF&CONTROL POINT;SHUTTLE TRANSFER下客、检查、换乘property line红线Private内部Golf course高尔夫球场PUBLIC公共Work工作Live生活Leisure休闲Future未来LEARN学习场地方案场地方案2 2通勤车流线通勤车流线Site strategy II SHUTTLE CIRCULATIONSHUTTLE ST15、OP通勤车站Shuttle route通勤车路线EXTERNAL ROADWAY(2 LANES EACH DIRECTION)外部路Work工作Live生活Leisure休闲Future未来LEARN学习property line红线Private内部Golf course高尔夫球场PUBLIC公共场地方案场地方案2 2后勤流线后勤流线Site strategy II SERVICE CIRCULATIONPUBLIC INTERNAL ROADWAY(1 LANE EACH DIRECTION)内部公共路双向2车道EXTERNAL ROADWAY(2 LANES EACH DIRECTIO16、N)SECURITY CHECKPOINT检查口Service(loading,bus depot,mechanical,misc.)后勤服务(卸货、巴士停放、机械等)property line红线Private内部Golf course高尔夫球场PUBLIC公共TRAINING/MEDICAL 培训/医学院:286 SPOTS车位场地方案场地方案2 2停车停车Site strategy II CAR PARKINGOFFICE,HEALTHCARE,GYM,CANTEEN,RETAIL办公、医疗、健身、餐厅、零售:2,317 SPOTS 车位GOLF 高尔夫球场:160 SPOTS车位HOT17、EL/APARTMENT/酒店/公寓465 SPOTS车位SCHOOL 学校:18 SPOTS车位property line红线Private内部Golf course高尔夫球场PUBLIC公共Concept 概念概念Modular growth 模数化延伸Pilotis 架空柱Base building module基本建筑模数Node节点Bridge连桥Office module 办公模数办公模数Multiple buildingssingle building1x1x1x2x2x2x6x6x1x1x1x1x1x1xOperational connectivity-larger commu18、nity-Direct communication-Maximum building efficiency-Flexibility in work space organization-Reduced core and service area Economic building-22%less faade area-22%less heat gain from exterior-Increase in efficiency ratio Office module 办公模数办公模数Massing transformation1.Efficient bar building2.Rotate to19、 create internal open space3.Maximize frontage to view context4.Create central space(frontage)5.Create rooftop terraces“Terrace building”Office module 办公模数办公模数Typical work stationw/pantry,managers office&perimeter meeting areaw/internal staircase atriumw/conference roomsw/perimeter senior staff offi20、ceExecutive offices w/reception&large conference rooms9m9m2m12m2m2m12m9m9m2m6m2m2m12m6m9m9m2m6m2m2m12m6m9m9m2m6m2m2m12m6m9m9m2m12m2m6m6m9m9m7.5m5m6m5m4.5m2mScheme 01 平面方案平面方案1Central spine 中央大道01c01B01aScheme 01 平面方案平面方案1Central spine 中央大道Central spineCentral spine connecting reservoir and mountainS21、cheme 01 平面方案平面方案1Central spine 中央大道Scheme 01 平面方案平面方案1Central spine 中央大道I.Central axis 中轴ii.Linked buildings with open views 联系建筑并保持开放视野landwaterviewviewviewviewiII.Courtyards open to context 面向环境开放的庭院Central spine 中央大道中央大道site plan 场地平面Office,headquarters,conference 办公、总部、会议Hotel,youth apartment&r22、etail酒店与零售Kindergarten,INTERNATIONAL SCHOOL 幼儿园/国际学校Showroom,reception,Conference 展示、接待、会议CR COLLEGE/MEDICAL SCHOOL 医学院/华润大学Ibm headquarters(kpf):Garden facing woodsGannet usa today(kpf):Stepping green terrace,Building on plinthConnection to nature与自然联系与自然联系Scheme 01 平面方案平面方案1Central spine 中央大道Centr23、al spine:canteen,meeting,Gym,Retail,commercial streetVertical&horizontal circulationOffice,reception,showroom&CR/pharmaceutical collegecourtyardsCentral spine 中央大道中央大道Perspective view office zone 透视 办公区Open courtyardConference,trainingCommercial spine canteen,medical centeratriumFitness centerrecept24、ion,showroom,conference,exhibitionCr,pharmaceutical collegeR&d officeLecture hallConference,trainingConference,trainingScheme 01 平面方案平面方案1Central spine 中央大道Scheme 01 平面方案平面方案1Central spine 中央大道Central spine 中央大道中央大道Circulation交通流线交通流线On gradebelow gradeParking for OFFICE,HEALTHCARE,GYM,CANTEEN,RETAI25、L:2,317 SPOTSParking for TRAINING/MEDICAL school:286 SPOTSParking levelCourtyard levelOpen to belowPedestrian zoneMain drop-offWest entranceMain drop-offwest entrancecourtyardminor drop-offsCentral spine 中央大道中央大道Parking 停车停车Parking level 1可建面积可建面积Site strategy I parking sectionCentral elevated indoo26、r/outdoor spineVehicular traffic(cars,shuttle)around central spineVehicular traffic(ceremonial)Pedestrian access from parking/drop-off levelParking level 2Access to spine at building levelsp1p2l1l2l3l4l5Pedestrian access from CEREMONIAL TRAFFIC LEVELCentral spine 中央大道中央大道sectionScheme 02 方案方案2 2Link27、ed courtyards 连通的庭院02c02B02aScheme 02 方案方案2 2Linked courtyards 连通的庭院courtyardcourtyardcourtyardcourtyardScheme 02 方案方案2 2Linked courtyards 连通的庭院linked courtyard 连通的庭院连通的庭院site plan 场地平面Office,headquarters,conference 办公、总部、会议Hotel,youth apartment&retail酒店与零售Kindergarten,INTERNATIONAL SCHOOL 幼儿园/国际学校S28、howroom,reception,Conference 展示、接待、会议CR COLLEGE/MEDICAL SCHOOL 医学院/华润大学Scheme 02 方案方案2Linked courtyards 连通的庭院I.Framed spaces 1.空间网格ii.Porosity2.透过性iv.Courtyards4.庭院Rope building:Office,canteen,meeting,reception,showroom&CR/pharmaceutical college entry Atrium,idea incubator spacesbridgesCourtyards&gr29、een rooftopsScheme 02 方案方案2 2Linked courtyards 连通的庭院Linked courtyard 连通的庭院连通的庭院Perspective view office zone 透视办公区Conference,trainingOffice campus 2Lecture hall,conferenceOffice campus 1Fitness center,medical center(below grade)reception,showroom,conference,exhibitionCr,pharmaceutical college campusC30、anteen,Conference,trainingCanteen,Conference,trainingEntry plazaScheme 02 方案方案2 2Linked courtyards 连通的庭院Scheme 02 方案方案2 2Linked courtyards 连通的庭院linked courtyard 连通的庭院连通的庭院Circulation 流线On gradebelow gradeParking for OFFICE,HEALTHCARE,GYM,CANTEEN,RETAIL:2,317 SPOTSParking for TRAINING/MEDICAL school:31、286 SPOTSParking levelCourtyard levelOpen to belowMain drop-offwest entranceMain drop-offwest entrancecourtyardlinked courtyard 连通的庭院连通的庭院parking 停车可建面积可建面积Site strategy II parking sectioncourtyardOpen to belowParking level 2Parking level 1Vehicular circulationParking level building accessp1p2l1l2l332、l4l5linked courtyard 连通的庭院通的庭院sectionPrecedents 案例比案例比较Santander comparisonSantanderSite area地块面积:1,230,870 smOffice space办公面积:150,000 smExecutive office space行政办公面积:8,500 smOther program其他功能:-hotel酒店-training center培训中心-daycare日间托儿-sports facility远动设施-golf clubhouse高尔夫会所-remote services location独立后33、勤服务中心Total Parking spots停车位:5,000个Parking level停车位置:at grade&below grade地面及地下Parking location停车位置:below buildings建筑下方Points of entry出入口:3+Circulation交通:edge of site地块周边Building height层高:5 levelsGolf course高尔夫球场:18 holeJiulong mountain九龙山Site area地块面积:1,249,483 smOffice space办公面积:180,000 smExecutive 34、office space行政办公面积:n/aOther program其他功能:-hotel 酒店-medical school 医学院-kindergarten/international school幼兒园/国际学校-retail 商业-youth apartments 青年旅馆-golf clubhouse 高尔夫会所Total Parking spots停车位:3,130 个Parking level停车位置:tbd 待定Parking location停车位置:below buildings建筑下方Points of entry 出入口:2Circulation交通:through site 贯穿地块Building height层高:5 levelsGolf course高尔夫球场:18 holeScheme 1Scheme 2
会员尊享权益 会员尊享权益 会员尊享权益
500万份文档
500万份文档 免费下载
10万资源包
10万资源包 一键下载
4万份资料
4万份资料 打包下载
24小时客服
24小时客服 会员专属
开通 VIP
升级会员
  • 周热门排行

  • 月热门排行

  • 季热门排行

  1. 2024质量技术交底范本汇编(679页).pdf
  2. 新疆风力发电场新建工程项目可行性研究报告130页.doc
  3. 城市园林绿化栽植造林工程场地平整及苗木栽植施工方案34页.doc
  4. 2023汽车工厂红线范围外第二回110千伏输电线路工程可行性研究报告(129页).doc
  5. 光明路加油站改造工程加油站带防渗池施工组织设计方案(69页).doc
  6. 有限空间施工及应急紧急方案(29页).doc
  7. 阳泽河水库清淤工程建设项目可行性研究报告47页.doc
  8. 南充市高铁商务区配套基础设施PPP项目1路级配碎石垫层试验段施工方案()(37页).doc
  9. 1.2MWp分布式光伏发电示范工程项目可研性分析报告62页.doc
  10. 巴中市巴州区寺岭乡等十二个乡镇场镇污水处理站及配套管网建设项目可行性研究报告154页.doc
  11. 新疆阿克苏地区阿瓦提县5000吨气调保鲜库建设项目可研报告61页.doc
  12. 新疆伊犁州察布查尔县美利奴基地多胎肉羊纯繁建设项目可研报告91页.doc
  13. 南泥湾镇污水处理站工程项目可行性研究报告85页.doc
  14. 供电公司路灯管理所路灯照明工程项目可行性研究报告可行性研究报告54页.doc
  15. 湖北高校框剪结构多层图书馆幕墙工程施工组织设计方案(幕墙安装)(101页).doc
  16. 什邡市八角镇爆竹园村贫困村灾后恢复重建道路硬化工程施工组织设计方案(105页).doc
  17. 榆林市档案馆消防工程施工组织设计方案(58页).doc
  18. 武汉市大汉阳地区现代有轨电车试验线工程BT项目夏季施工专项方案(12页).docx
  19. 杭州地铁5号线工程基坑监测方案(92页).doc
  20. 内蒙古制药产业污水处理站建设项目可行性研究报告(48页).doc
  21. 白酒生产线建设项目可行性研究报告(119页).doc
  22. 北川河河道治理工程可行性研究报告(67页).doc
  1. 48MW风电项目工程风机设备吊装专项施工方案86页.doc
  2. 2024质量技术交底范本汇编(679页).pdf
  3. 2025储能科技有限公司年产7GWh工商储生产线项目可行性研究报告(118页).pdf
  4. 新疆风力发电场新建工程项目可行性研究报告130页.doc
  5. 城市园林绿化栽植造林工程场地平整及苗木栽植施工方案34页.doc
  6. 城市儿童中心食堂改造项目精装修及设备安装调试工程施工方案218页.docx
  7. 2023汽车工厂红线范围外第二回110千伏输电线路工程可行性研究报告(129页).doc
  8. 小流域水土保持综合治理项目施工组织设计方案(71页).doc
  9. 大型车间钢结构厂房施工方案设计(184页).pdf
  10. 光明路加油站改造工程加油站带防渗池施工组织设计方案(69页).doc
  11. 有限空间施工及应急紧急方案(29页).doc
  12. 榆林市档案馆消防工程施工组织设计方案(58页).doc
  13. 阳泽河水库清淤工程建设项目可行性研究报告47页.doc
  14. 煤矿与建设机械装备生产制造基地项目锻压、下料厂房、热处理厂房、返修及涂装厂房吊车梁、屋架等预制构件制作及吊装工程施工方案【128页】.doc
  15. 襄樊电厂二期主厂房施工方案【202页】.doc
  16. 房地产开发全流程培训.ppt
  17. 龙城御园小区基坑降水与支护设计方案【30页】.doc
  18. 钢结构厂房土建及安装施工方案及配套设施方案【205页】.doc
  19. 茂兴研发办公楼石材幕墙玻璃明框幕墙工程施工方案【180页】.doc
  20. 成渝基坑支护设计方案【20页】.doc
  21. 大剧院项目基坑支护深基坑支护设计方案【23页】.doc
  22. 达旗中学教学楼抗震加固工程施工方案【34页】.doc
  1. 建筑工程夜间施工专项施工方案(18页).doc
  2. 房地产交易环节契税减征申报表(首套填写)(2页).doc
  3. 2024长隆北加油站建设项目可行性研究报告(145页).pdf
  4. 48MW风电项目工程风机设备吊装专项施工方案86页.doc
  5. 老旧小区改造施工方案及技术措施(365页).doc
  6. 房地产项目规划前期投资收益测算模板带公式.xls
  7. 施组方案管理要点解析培训课件(95页).pdf
  8. 2025商场地产夏日啤酒龙虾音乐嘉年华(吃货的夏天主题)活动策划方案-47页.pptx
  9. 2024大楼室内精装修工程专业分包投标文件(393页).docx
  10. 苏州水秀天地商业项目购物中心100%室内设计方案(158页).pptx
  11. 2022城区自来水提质改造智慧水务建设项目设计方案(199页).pdf
  12. 龙港市专业市场布局规划方案(2023-2035年)(草案)(61页).pdf
  13. 小区人员配置档案建立保洁绿化物业管理服务投标方案(593页).docx
  14. 铁路客运枢纽项目站前框构中桥工程路基注浆加固专项施工方案(19页).doc
  15. 室内移动式操作平台工程施工方案(19页).doc
  16. 装配式结构工业厂房基础、主体结构、门窗及装饰工程施工方案(83页).doc
  17. 地铁6号线区间盾构下穿管线专项施工方案(30页).doc
  18. 施工工程安全教育培训技术交底(13页).doc
  19. 消防火灾应急疏散演练预案(12页).doc
  20. 矿山治理工程施工组织设计方案(240页).docx
  21. 老旧小区改造工程施工方案及技术措施(364页).doc
  22. 北京科技园公寓建设项目整体报告方案.ppt