EDAW:中信朱家角新镇居住综合区概念性总体规划方案(54页).pdf
下载文档
上传人:偷****
编号:399551
2022-06-02
54页
97.25MB
该文档所属资源包:
住宅公寓社区居住区组团综合项目详细概念总体规划设计方案
1、INTRODUCTIONEDAW is pleased to provide a Conceptual Master Plan for the Development of the New Town at Zhujiaojiao in Qingpu on behalf of CITIC Pacific China Holdings Limited. This conceptual master plan is intended to provide a clear framework for development and inspire innovative ideas for both C2、ITIC and the Qingpu authorities to guide the future growth of Qingpu. The EDAW design team, in collaboration with the project team at CITIC, seek creative and inspiring solutions that not only strengthen the existing historic and cultural identity of Zhujiajiao, but also re-defines and re-positions 3、Qingpu as a destination that offers a contemporary and exciting new lifestyle within a unique living environment. 序言易道很高兴代表中信泰富(中国)投资有限公司(CITIC)为青浦区朱家角新镇提供概念性总体规划。这个概念性规划意在为中信泰富及青浦区相关部门提供一个明晰的开发框架、激发一些富有新意的想法,指导青浦区未来的发展。易道的设计团队与中信泰富的项目团队紧密合作,寻求富有创意和鼓舞人心的解决方案,不仅增强朱家角现存的历史、文化特色,而且要在一个独特的生活环境中把青浦区重新定义、定位成一个具有当代特色和令人兴奋的新生活方式的目的地。项目理解区域环境当地环境基地面积基地分析愿景愿景概述了解朱家角阿姆斯特丹的启示设定目标朱家角新镇中心定位规划原则朱家角新镇区位确认特色分区创造联系