武清城投·熙悦住宅示范区景观设计方案(27页).pdf
下载文档
上传人:故事
编号:376070
2022-05-05
27页
4.41MB
1、淡美之极,无问西东武清城投熙悦示范区艺术由空间开始,从自然消失。Art begins with space and disappears from nature.还原岛上的自然形态,Restoring the islands natural form,无需过多的修饰语言。There is no need for too much language.呈现云岛清新淡雅之风,Presenting the fresh and elegant wind of cloud island,仿佛湖中菁华浮梦之云。Like the floating dream clouds in the lake.淡美之极,无2、问西东。Light beauty is the best of all.Light beauty is the best of all Wuqing chengtou xiyue demonstration area故事源头故事源头l The beginning of l The beginning of StoryStory武清城投熙悦示范区项目位于天津武清商务区中央湖公园湖心岛内,四周环境优雅葱郁,建筑风格现代简约,我们希望未来整个地块呈现出一处清新淡雅、艺术简约的格调氛围,摒弃复杂的装饰手法,让设计与环境相互融合,自然天成。设计出发点设计出发点 l Staring l Staring P3、ointPoint“一朵云漂在空中,一座岛浮于湖中。”A cloud floated in the air and an island floated in a lake.设计概念的灵感来源于湖心岛的整体形状,空中云与湖中岛二者的曲线相呼应,一飘、一浮,云朵梦幻而憧憬,一直是美好灵动的象征。我们将设计主题定为“云岛”,将云朵抽离出来,创造出一条云带,浮于岛中,其若隐若现、虚无缥缈的惬意感与整个湖心岛的气质相匹配。The inspiration of the design concept comes from the overall shape of the island in the middle of the lake. The clouds in the air echo with the curves of the island in the middle of the lake.
CAD图纸
上传时间:2023-11-23
34份