重庆CBD城市综合体景观设计方案.pdf
下载文档
上传人:故事
编号:175949
2021-08-22
36页
26.20MB
1、CONTENTS 1.PROJECT UNDERSTANDING 1. 项目理解 2. 总体景观设计 3. 景观细节设计 4. 景观设计策略 2.OVERALL LANDSCAPE DESIGN 3.LANDSCAPE DETAIL DESIGN 4.DESIGN ANALYSIS PROJECT UNDERSTANDING 1. 项目理解 区位分析 建筑解析 景观愿景 理念解析 LOCATION ANALYSIS BUILDING ANALYSIS LANDSCAPE VISION DESIGN INTEGRATION 区位分析LOCATION ANALYSIS 沙坪唄市 SHAPINGBE2、I DISTRICT 江北区 JIANGBEI DISTRICT 南岸区 NANAN DISTRICT 弹子石片区 DANZISHI DISTRICT 基地 SITE 解放碑商圈 观音桥商圈 重庆弹子石地区位于长江南岸,与朝 天门和江北城隔江而望,上接野猫 溪,下连王家沱,交通便利,为泽科 弹子石商业中心的打造确定了良好 的条件。 项目位于是弹子石中心地段,靠近朝 天门长江大桥,濒临城市主干道腾龙 大道,具有得天独厚的区位优势。 ChongQing,DanZiShi area is located in the South Bank of the Yangtze River,across th3、e river and look at Chaotianmen and Jiangbei town, connected with the wildcat Creek, even under Wang Jiatuo, the transportation is convenient, create good conditions for DanZiShi commercial center. The project is located in the center of the lot is a marble stone, near Chaotianmen, Yangtze River bridge, on the verge of urban trunk road dragon Avenue, has a unique location advantages. VALUE PROPOSI
地产商业
上传时间:2022-04-25
101份