江苏淮安雨润中央新天地购物中心建筑设计方案.pdf
下载文档
上传人:房**
编号:117986
2021-05-06
46页
26.25MB
1、目录 Contents 基地文脉分析 1 Site Analysis 设计灵感与展望 2 Project Aspirations in essence, the creation of a vertical cityscape is evident with the creation of elevated people spaces. The overall spine and form composition is that of an orthogonal circulation with triangulated forms. Apart from having a strong vi2、sual impact, this scheme has a strong rectilinear loop as its main circulation spine with stepped terraces that overlooks the central sunken plaza garden space where major events can take place. The central garden is the focal point and heart of the project and is a programmable people space. From a3、 planning standpoint, the retail podium comprises 6 levels of shopping for a total of 110, 000sm with 2 basement levels of shopping having a 20,000sm Hypermarket and further 2 levels of parking below ground. On top of the podium are distinct high rise buildings with different uses. The 300m land- mark tower houses 40,000sm of commercial office lease space, 50,000sm of Serviced Apartments and about
管理运营
上传时间:2024-12-17
190份