卡尔森集团丽笙品牌建筑设计标准报告(英文版105页).pdf
下载文档
上传人:房**
编号:116335
2021-05-03
105页
1.21MB
1、Carlson Hotels Worldwide Technical Services Manual Design Hotel / Resort Design Brief Approval and Issue Concept Design Approval CHW TS-AP will issue a “Hotel/Resort Design Brief” incorporating specific requirements for the property, related to the destination as well as Food Model Rooms Concept App2、roval Model Rooms Construction Documentation Approval Public Area Design Approval Guest Rooms Model Rooms Review and Approval Construction Documentation (full Set of drawings and specifications including all schedules) Approval and Issue CHW TS-AP must approve the Model Rooms, Corridor and external 3、Wall prior to Construction Documentation completion. Approved Model Rooms are to be maintained for the project development duration and will only be demolished after approval by CHW TS-AP to do so. The Model Rooms, to be maintained for the duration of the project development/construction, will be used to establish and control: approved quality approved finishes approved fixtures and fittings inclu