个人中心
个人中心
添加客服WX
客服
添加客服WX
添加客服WX
关注微信公众号
公众号
关注微信公众号
关注微信公众号
升级会员
升级会员
返回顶部
国际贸易合同模板
国际贸易合同模板.doc
下载文档 下载文档
地产合同
上传人:地** 编号:1162957 2024-09-10 9页 62.50KB
1、购买合同样本Purchase Contract合同编号 (Contract No.):签订日期 (Date):签订地点(Place):买方:The Buyer:地址:Address: 电话(Tel): 传真(Fax):电子邮箱(E-mail)卖方:The Seller地址:Address: 电话(Tel):传真(Fax):电子邮箱(E-mail):买卖双方同意按照下列条款签订本合同:The Seller and the Buyer agree to conclude this Contract subject to the terms and conditions stated below:12、. 货物名称、规格和质量(Name, Specifications and Quality of Commodity):2. 数量(Quantity):允许的溢短装(%more or less allowed)3. 单价(Unit Price):4. 总值(Total Amount):5. 交货条件(Terms of Delivery):FOB/CFR/CIF/EXW6. 原产地国与制造商(Country of Origin and Manufacturers):7. 包装及标准(Packing):货物应具有防潮、防锈蚀、防震并适合于远洋运输的包装,由于货物包装不良而造成的货物残损、灭失应由卖3、方负责。卖方应在每个包装箱上用不褪色的颜色标明尺码、包装箱号码、毛重、净重及“此端向上”、“防潮”、“小心轻放”等标记。The packing of the goods shall be preventive from dampness, rust, moisture, erosion and shock, and shall be suitable for ocean transportation/ multiple transportation. The Seller shall be liable for any damage and loss of the goods attribut4、able to the inadequate or improper packing. The measurement, gross weight, net weight and the cautions such as Do not stack up side down, keep away from moisture, Handle with care shall be stenciled on the surface of each package with fadeless pigment.8. 唛头(Shipping Marks):9. 装运期限(Time of Shipment):5、10. 装运口岸(Port of Loading):11. 目的口岸(Port of Destination):12. 保险(Insurance):由按发票金额110%投保险和附加险。Insurance shall be covered by the _for 110% of the invoice value against _Risks and _Additional Risks.13. 付款条件(Terms of Payment):(1) 信用证方式:买方应在装运期前/合同生效后日,开出以卖方为受益人的不可撤销的议付信用证,信用证在装船完毕后日内到期。Letter of Credit: 6、The Buyer shall in _days prior to the time of shipment /after this Contract comes into effect, open an irrevocable Letter of Credit in favor of the Seller. The Letter of Credit shall expire _days after the completion of loading of the shipment as stipulated.(2) 付款交单:货物发运后,卖方出具以买方为付款人的付款跟单汇票,按即期付款交单(7、D/P)方式,通过卖方银行及银行向买方转交单证,换取货物。Documents against payment: After shipment, the Seller shall draw a sight bill of exchange on the Buyer and deliver the documents through Sellers bank and _Bank to the Buyer against payment, i.e D/P. The Buyer shall effect the payment immediately upon the first presentati8、on of the bill(s) of exchange.(3) 承兑交单:货物发运后,卖方出具以买方为付款人的付款跟单汇票,付款期限为_后日,按即期承兑交单(D/A 日)方式,通过卖方银行及_ 银行,经买方承兑后,向买方转交单证,买方在汇票期限到期时支付货款。Documents against Acceptance: After shipment, the Seller shall draw a sight bill of exchange, payable _days after the Buyers delivers the documents through Sellers bank9、 and _Bank to the Buyer against acceptance(D/A _days).The Buyer shall make the payment on date of the bill of exchange.(4) 货到付款:买方在收到货物后天内将全部货款支付卖方。Cash on delivery (COD): The Buyer shall pay to the Seller total amount within _days after the receipt of the goods.14. 单据(Documents Required):卖方应将下列单据提交10、银行议付/托收:The Seller shall present the following documents required to the bank for negotiation/collection:(1) 标明通知收货人/受货代理人的全套清洁的、已装船的、空白抬头、空白背书并注明运费已付/到付的海运/联运/陆运提单。Full set of clean on board Ocean/Combined Transportation/Land Bills of Lading and blank endorsed marked freight prepaid/ to collect;(2)11、 标有合同编号、信用证号(信用证支付条件下)及装运唛头的商业发票一式3份;Signed commercial invoice in 3 copies indicating Contract No., L/C No. (Terms of L/C) and shipping marks;(3) 由出具的装箱或重量单一式份;Packing list/weight memo in _copies issued by;(4) 由出具的质量证明书一式份;Certificate of Quality in _copies issued by;(5) 由出具的数量证明书一式份;Certificate of Q12、uantity in _copies issued by;(6) 保险单正本一式份(CIF 交货条件);Insurance policy/certificate in _copies (Terms of CIF);(7) 签发的产地证一式份;Certificate of Origin in _copies issued by;(8) 卫生证书一式_份;Certificate of Sanitary and Purity in _copies issued by official institution;(9) 无木质包装声明一式_份;Certificate declaration for no13、n-wood package in _copies;(10)熏蒸证书一式_份(若有木质包装);Certificate of fumigation in _ copies;(10) 产品批号及灌装日期证明一式_份;Document explanation for lot number for production and bottle date, month and year in _copies;(11) 产品前标及后标每个品项各10份;Extra front & back labels in 10 pieces for each item for customs declaration;(114、2) 产品条码指示;Bar code indication or certification for each item;(13) 产品成分分析;Analysis certificate, stating the inspection results of all specifications;(14) 厂商声明;Certificate of Manufacturer;(15) 装运通知(Shipping advice): 卖方应在交运后_ 天内以特快专递方式邮寄给买方上述第项单据副本一式一套。The Seller shall, within _days after shipment effe15、cted, send by courier each copy of the above-mentioned documents No. .15. 装运条款(Terms of Shipment):(1) FOB交货方式卖方应在合同规定的装运日期前30天,以方式通知买方合同号、品名、数量、金额、包装件、毛重、尺码及装运港可装日期,以便买方安排租船/订舱。装运船只按期到达装运港后,如卖方不能按时装船,发生的空船费或滞期费由卖方负担。在货物越过船弦并脱离吊钩以前一切费用和风险由卖方负担。The Seller shall, 30 days before the shipment date specif16、ied in the Contract, advise the Buyer by _of the Contract No., commodity, quantity, amount, packages, gross weight, measurement, and the date of shipment in order that the Buyer can charter a vessel/book shipping space. In the event of the Sellers failure to effect loading when the vessel arrives du17、ly at the loading port, all expenses including dead freight and/or demurrage charges thus incurred shall be for the Sellers account.(2) CIF或CFR交货方式卖方须按时在装运期限内将货物由装运港装船至目的港。在CFR术语下,卖方应在装船前2天以方式通知买方合同号、品名、发票价值及开船日期,以便买方安排保险。The Seller shall ship the goods duly within the shipping duration from the por18、t of loading to the port of destination. Under CFR terms, the Seller shall advise the Buyer by _of the Contract No., commodity, invoice value and the date of dispatch two days before the shipment for the Buyer to arrange insurance in time.16. 装运通知(Shipping Advice):一俟装载完毕,卖方应在天内以方式通知买方合同编号、品名、已发运数量、发19、票总金额、毛重、船名/车/机号及启程日期等。The Seller shall, immediately upon the completion of the loading of the goods, advise the Buyer of the Contract No., names of commodity, loading quantity, invoice values, gross weight, name of vessel and shipment date by _ within _days.17. 质量保证(Quality Guarantee):货物品质规格必须符合本合同及20、质量保证书之规定,品质保证期为货到目的港个月内。在保证期限内,因制造厂商在设计制造过程中的缺陷造成的货物损害应由卖方负责赔偿。The Seller shall guarantee that the commodity must be in conformity with the quality, specifications and quantity specified in this Contract and Letter of Quality Guarantee. The guarantee period shall be _months after the arrival of the 21、goods at the port of destination, and during the period the Seller shall be responsible for the damage due to the defects in designing and manufacturing of the manufacturer.18. 检验(Inspection)(以下两项任选一项):(1)卖方须在装运前日委托检验机构对本合同之货物进行检验并出具检验证书,货到目的港后,由买方委托检验机构进行检验。The Seller shall have the goods inspected22、 by _days before the shipment and have the Inspection Certificate issued by_. The Buyer may have the goods reinspected by _ after the goods arrival at the destination.(2) 发货前,制造厂应对货物的质量、规格、性能和数量/重量作精密全面的检验,出具检验证明书,并说明检验的技术数据和结论。货到目的港后,买方将申请中国商品检验局(以下简称商检局)对货物的规格和数量/重量进行检验,如发现货物残损或规格、数量与合同规定不符,除保险公司或23、轮船公司的责任外,买方得在货物到达目的港后日内凭商检局出具的检验证书向卖方索赔或拒收该货。在保证期内,如货物由于设计或制造上的缺陷而发生损坏或品质和性能与合同规定不符时,买方将委托中国商检局进行检验。The manufacturers shall, before delivery, make a precise and comprehensive inspection of the goods with regard to its quality, specifications, performance and quantity/weight, and issue inspection cer24、tificates certifying the technical data and conclusion of the inspection. After arrival of the goods at the port of destination, the Buyer shall apply to China Commodity Inspection Bureau (hereinafter referred to as CCIB) for a further inspection as to the specifications and quantity/weight of the g25、oods. If damages of the goods are found, or the specifications and/or quantity are not in conformity with the stipulations in this Contract, except when the responsibilities lies with Insurance Company or Shipping Company, the Buyer shall, within _days after arrival of the goods at the port of desti26、nation, claim against the Seller, or reject the goods according to the inspection certificate issued by CCIB. In case of damage of the goods incurred due to the design or manufacture defects and/or in case the quality and performance are not in conformity with the Contract, the Buyer shall, during t27、he guarantee period, request CCIB to make a survey.19. 索赔(Claim):买方凭其委托的检验机构出具的检验证明书向卖方提出索赔(包括换货),由此引起的全部费用应由卖方负担。若卖方收到上述索赔后_天未予答复,则认为卖方已接受买方索赔。The buyer shall make a claim against the Seller (including replacement of the goods) by the further inspection certificate and all the expenses incurred the28、reafter shall be borne by the Seller. The claims mentioned above shall be regarded as being accepted if the Seller fail to reply within _days after the Seller received the Buyers claim.20. 迟交货与罚款(Late delivery and Penalty):除合同第21条不可抗力原因外,如卖方不能按合同规定的时间交货,买方应同意在卖方支付罚款的条件下延期交货。罚款可由议付银行在议付货款时扣除,罚款率按每天收%29、,不足天时以天计算。但罚款不得超过迟交货物总价的_ %。如卖方延期交货超过合同规定天时,买方有权撤销合同,此时,卖方仍应不迟延地按上述规定向买方支付罚款。买方有权对因此遭受的其它损失向卖方提出索赔。Should the Seller fail to make delivery on time as stipulated in the Contract, with the exception of Force Majeure causes specified in Clause 21 of this Contract, the Buyer shall agree to postpone the 30、delivery on the condition that the Seller agree to pay a penalty which shall be deducted by the paying bank from the payment under negotiation. The rate of penalty is charged at_% for every _days, odd days less than _days should be counted as _days. But the penalty, however, shall not exceed_% of th31、e total value of the goods involved in the delayed delivery. In case the Seller fail to make delivery _days later than the time of shipment stipulated in the Contract, the Buyer shall have the right to cancel the Contract and the Seller, in spite of the cancellation, shall nevertheless pay the afore32、said penalty to the Buyer without delay.The buyer shall have the right to lodge a claim against the Seller for the losses sustained if any.21. 不可抗力(Force Majeure):凡在制造或装船运输过程中,因不可抗力致使卖方不能或推迟交货时,卖方不负责任。在发生上述情况时,卖方应立即通知买方,并在天内,给买方特快专递一份由政府主管当局签发的事故证明书。在此情况下,卖方仍有责任采取一切必要措施加快交货。如事故延续天以上,买方有权撤销合同。The Sel33、ler shall not be responsible for the delay of shipment or non-delivery of the goods due to Force Majeure, which might occur during the process of manufacturing or in the course of loading or transit. The Seller shall advise the Buyer immediately of the occurrence mentioned above and within_ days the34、reafter the Seller shall send a notice by courier to the Buyer for their acceptance of a certificate of the accident issued by the competent Government Authorities under whose jurisdiction the accident occurs as evidence thereof. Under such circumstances the Seller, however,are still under the oblig35、ation to take all necessary measures to hasten the delivery of the goods. In case the accident lasts for more than _days the Buyer shall have the right to cancel the Contract.22. 争议的解决 (Arbitration):凡因本合同引起的或与本合同有关的任何争议应协商解决。若协商不成,应提交中国国际经济贸易仲裁委员会,按照申请时该会当时施行的仲裁规则进行仲裁,仲裁地点在中国_。仲裁裁决是终局的,对双方均有约束力。Any 36、dispute arising from or in connection with the Contract shall be settled through friendly negotiation. In case no settlement is reached, the dispute shall be submitted to China International Economic and Trade Arbitration Commission(CIETAC), for arbitration in accordance with its rules in effect at 37、the time of applying for arbitration. The place of arbitration is in _, China. The arbitral award is final and binding upon both parties.23. 通知(Notices):所有通知用文写成,并按照如下地址用传真/快件送达给各方。如果地址有变更,一方应在变更后日内书面通知另一方。All notice shall be written in _ and served to both parties by fax/courier according to the fo38、llowing addresses. If any changes of the addresses occur, one party shall inform the other party of the change of address within _days after the change.24. 本合同使用的FOB、CFR、CIF术语系根据国际商会国际贸易术语解释通则。The terms in the Contract are based on INCOTERMS 1990 of the International Chamber of Commerce.25. 附加条款(Add39、itional clause):本合同上述条款与本附加条款抵触时,以本附加条款为准。Conflicts between Contract clause here above and this additional clause, if any, it is subject to this additional clause.26. 本合同用中英文两种文字写成,两种文字具有同等效力。本合同共份,自双方代表签字(盖章)之日起生效。本合同传真有效。This Contract is executed in two counterparts each in Chinese and English, each of which shall deemed equally authentic. This Contract is in _copies, effective since being signed/sealed by both parties. This contract is signed by fax, and taken as valid.买方代表人(签字): 卖方代表人(签字):Representative of the Buyer Representative of the Seller
会员尊享权益 会员尊享权益 会员尊享权益
500万份文档
500万份文档 免费下载
10万资源包
10万资源包 一键下载
4万份资料
4万份资料 打包下载
24小时客服
24小时客服 会员专属
开通 VIP
升级会员
  • 周热门排行

  • 月热门排行

  • 季热门排行

  1. 小区人员配置档案建立保洁绿化物业管理服务投标方案(593页).docx
  2. 陕西化学工业公司招聘管理与职业发展管理手册30页.doc
  3. 混凝土工程施工工艺标准化培训课件(50页).pptx
  4. 建筑工程外脚手架专项施工方案(悬挑式脚手架、落地式脚手架)(25页).doc
  5. 2020柏向堂房地产公司材料标准化手册3.0(143页).pdf
  6. 2021柏向堂房地产公司材料标准化手册4.0(108页).pdf
  7. 土建、装饰、维修改造等零星工程施工组织设计方案(187页).doc
  8. 深圳装饰公司施工图纸会审及设计交底管理制度【13页】.doc
  9. 天碱商业区观山苑工程人防监理规划(43页).doc
  10. 工程变形测量之基坑监测培训课件(155页).ppt
  11. 房地产开发企业拿地操作指引方案.pdf
  12. 北京物业管理责任公司制度手册【63页】.doc
  13. 新规下的户型增值秘籍.ppt(22页)
  14. 房地产开发贷款实操指南(5页).pdf
  15. 鄂尔多斯空港物流园区总体规划方案(2017-2030)环境影响评价报告书(23页).doc
  16. 规划兰园西路道路工程环境方案环境影响评价报告书(89页).pdf
  17. 屋面圆弧形穹顶结构高支模施工方案(40米)(47页).doc
  18. 埋石混凝土挡土墙施工方案(23页).doc
  19. 厂区至矿区管网蒸汽管道系统扩容改造工程施工组织设计方案(105页).doc
  20. 重庆市城口县东安乡等6个乡镇土地开发整理项目监理规划及施工组织设计方案(122页).doc
  21. 超高纯氦气厂建设项目办公楼、变电站、水泵房及消防水池、门卫、厂房、仓库、配套工程施工组织设计方案(140页).doc
  22. 园林景观投标方案施工组织设计方案技术标(115页).doc
  1. 房地产交易环节契税减征申报表(首套填写)(2页).doc
  2. 2024大楼室内精装修工程专业分包投标文件(393页).docx
  3. 苏州水秀天地商业项目购物中心100%室内设计方案(158页).pptx
  4. 龙港市专业市场布局规划方案(2023-2035年)(草案)(61页).pdf
  5. 小区人员配置档案建立保洁绿化物业管理服务投标方案(593页).docx
  6. 室内移动式操作平台工程施工方案(19页).doc
  7. 地铁6号线区间盾构下穿管线专项施工方案(30页).doc
  8. 施工工程安全教育培训技术交底(13页).doc
  9. 老旧小区改造施工方案及技术措施(365页).doc
  10. 消防火灾应急疏散演练预案(12页).doc
  11. 矿山治理工程施工组织设计方案(240页).docx
  12. 老旧小区改造工程施工方案及技术措施(364页).doc
  13. 北京科技园公寓建设项目整体报告方案.ppt
  14. 四川凉山攀西灵山国际度假区小镇活力中心商业业态规划方案建议书(33页).pdf
  15. 埋石混凝土挡土墙施工方案(23页).doc
  16. 地下停车场环氧地坪漆施工方案(45页).doc
  17. 深圳装饰公司施工图纸会审及设计交底管理制度【13页】.doc
  18. 地铁深基坑及钢筋笼吊装安全专项施工方案【98页】.doc
  19. 住宅定价策略及价格表制定培训课件.ppt
  20. 西安名京九合院商业项目招商手册(28页).pdf
  21. 2010-2030年湖北咸宁市城市总体规划(32页).doc
  22. 建筑工程施工进度计划表横道图自动生成版(模板).xls
  1. 建筑工程夜间施工专项施工方案(18页).doc
  2. 永胜县程海镇河口村“多规合一”实用性村庄规划方案(2020-2035年)(116页).pdf
  3. 赣州无动力亲子乐园景观设计方案(111页).pdf
  4. 2016泰安乡村旅游规划建设示范案例(165页).pdf
  5. 房地产交易环节契税减征申报表(首套填写)(2页).doc
  6. 龙山县里耶文化生态景区里耶古城片区旅游修建性详细规划2015奇创.pdf
  7. 连云港市土地利用总体规划2006-2020年调整方案文本图集(78页).pdf
  8. 850亩项目塑钢门窗工程施工组织设计方案(34页).doc
  9. 老旧小区改造工程施工方案及技术措施(364页).doc
  10. 城市更新项目地价公式测算表.xlsx
  11. 房地产项目规划前期投资收益测算模板带公式.xls
  12. 室内移动式操作平台工程施工方案(19页).doc
  13. 装配式结构工业厂房基础、主体结构、门窗及装饰工程施工方案(83页).doc
  14. 地铁6号线区间盾构下穿管线专项施工方案(30页).doc
  15. 施工工程安全教育培训技术交底(13页).doc
  16. 老旧小区改造施工方案及技术措施(365页).doc
  17. 新建贵广铁路线下工程沉降变形观测及评估监理实施细则(126页).doc
  18. 消防火灾应急疏散演练预案(12页).doc
  19. 矿山治理工程施工组织设计方案(240页).docx
  20. 崖城站悬臂式挡墙施工方案(92页).doc
  21. 老旧小区改造施工组织设计F方案(232页).doc
  22. 北京科技园公寓建设项目整体报告方案.ppt