博览会展商业综合体建筑工程展厅A1装饰工料机表(4页).pdf
下载文档
该文档所属资源包:
博览会展商业综合体建筑工程施工费用概算设计书资料合集
1、工料机表 工程名称:展厅A1装饰第 页1 序号名称规格单位市场价数量合价百分比 1 综合人工工日87.5001,060.1692,763.731.11 * 2 油漆工工日85.000145.6812,382.440.15 3 抹灰工工日85.00037,202.583,162,219.3 5 37.94 * 4 油漆工工日85.00029,483.862,506,128.3 7 30.07 * 5 其他工工日78.00013,260.701,034,334.5 4 12.41 * 6 木工(装饰)工日86.00017,982.981,546,535.8 9 18.56 * 7 油漆工工日85.2、000-239.38-20,347.67-0.24 * 8 乳化沥青kg4.27523,927.84102,280.250.34 * 9 中粒式沥青混凝土(AC-20)t426.8306,464.722,759,337.0 2 9.23 * 10 抗滑表层(AK-13-0)t552.4202,752.901,520,757.3 3 5.08 * 11 重质柴油kg5.300609.963,232.800.01 * 12 水m33.6203,388.9812,268.110.04 * 13 角钢kg4.35312,766.3055,565.320.19 * 14 木屑kg0.120172,5903、.3320,710.840.07 15 一般小方材 54cm2m31987.0329.6019,083.460.06 * 16 成品踢脚板(硬木)m15.000376.115,641.650.02 * 17 水泥 32.5级kg0.324144,517.6946,794.830.16 * 18 白水泥kg0.71411,816.818,434.840.03 * 19 干粉砂浆 DM5.0kg0.270653,159.04176,352.940.59 20 干粉砂浆 DP5.0kg0.270-235,755.66-63,654.03-0.21 21 干粉砂浆 DP10.0kg0.280-565,129.47-158,236.25-0.53 22 干粉砂浆 DP15.0kg0.285334,687.5095,385.940.32 23 干粉砂浆 DP20.0kg0.290622,313.561