博览会展商业综合体建筑工程展厅C1装饰工料机表(4页).pdf
下载文档
该文档所属资源包:
博览会展商业综合体建筑工程施工费用概算设计书资料合集
1、工料机表 工程名称:展厅C1装饰第 页1 序号名称规格单位市场价数量合价百分比 1 综合人工工日87.5001,174.25102,746.601.22 * 2 油漆工工日85.000159.0113,515.990.16 3 抹灰工工日85.00041,854.583,557,639.5 7 42.19 * 4 油漆工工日85.00027,717.432,355,981.4 6 27.94 * 5 其他工工日78.00013,647.771,064,526.1 2 12.62 * 6 木工(装饰)工日86.00015,788.561,357,816.3 6 16.10 * 7 油漆工工日852、.000-233.66-19,860.87-0.24 * 8 乳化沥青kg4.27526,502.86113,287.250.35 * 9 中粒式沥青混凝土(AC-20)t426.8307,160.433,056,286.1 5 9.58 * 10 抗滑表层(AK-13-0)t552.4203,049.161,684,415.3 2 5.28 * 11 重质柴油kg5.300675.613,580.710.01 * 12 水m33.6203,753.6913,588.350.04 * 13 角钢kg4.35312,843.2655,900.290.18 * 14 木屑kg0.120209,573、8.0725,149.370.08 15 一般小方材 54cm2m31987.03210.3120,481.330.06 * 16 成品踢脚板(硬木)m15.000523.537,852.950.02 * 17 水泥 32.5级kg0.324195,364.9563,259.170.20 * 18 白水泥kg0.71412,264.658,754.510.03 * 19 干粉砂浆 DM5.0kg0.270873,862.56235,942.890.74 20 干粉砂浆 DP5.0kg0.270-230,115.40-62,131.16-0.19 21 干粉砂浆 DP10.0kg0.280-762,220.50-213,421.74-0.67 22 干粉砂浆 DP15.0kg0.285430,074.67122,571.280.38 23 干粉砂浆 DP20.0kg0.290777,284.