上岗滨江长滩壹号弧形公园景观概念深化设计方案(36页).pdf
下载文档
上传人:十二
编号:942765
2024-06-24
36页
95.35MB
1、HARBOR CITY PARKS-BAOSHAN,SHANGHAI CONCEPT REFINEMENT SUBMISSIONTHOMAS BALSLEY ASSOCIATESSIPG长滩一号 上海宝山概念深化文本递交ARC PARKThis concept was conceived from the unique and complex qualities and history of the SIPG site.This waterfront property has experienced a vast variety of incarnations throughout time.2、From its earliest likely existence of a natural tidal marshland,to a land-filled site developed for cargo shipping,to a future of exceptional living among a picturesque waterfront,verdant parks,and entertainment facilities.The sites arc of time is similar to a storys narrative arc or the arc of a ch3、aracter in a story ever changing and evolving.The landscape concept embodies this idea in both form and program.Upon first glance,the soft form of the arc is repeated and shaped to provide a positive and soothing quality for the residents and visitors to this developments open space.These forms also4、 assist in masking the hard and engineered character of the highway structure below the promenade surface.These sensual curves entice the visitors to be drawn into and move through the various open space areas,and at times pulled up onto curving landforms that provide the visitor with distinctive an5、d expansive views over the water,parks,and down the promenade.Both primary parks are organized around the hierarchal system of movement and spaces beginning with the strong curving armatures.The largest,the Urban Park,is divided into three landscape typologies:1.The civic plaza on the west side adja6、cent to the commercial develop provides for large gatherings and festivals;2.The heavily planted green side of the park adjacent to the residential development offers a quiet experience and more intimate landscape spaces for sitting and enjoying nature;3.The grand mound rises well above the park and7、 promenade offering views and backdrop to the park.A dramatic moment is provided as one rises up along the mound and pierces the landform through a tunnel with the sea beyond.The shallow s-curve of the primary north-south pathway once again harkens back to the arc of time;on one side is the modern c8、ivic world,on the other is a naturalized landscape of woodlands,wetlands,and grasslands.The second main park is the Community Park positioned between two residential developments.This park accommodates the needs of its adjacent residential community,and offers a variety of active and passive element9、s,such as multi-purpose lawns,play areas,interactive water features,tai chi glade,viewing terrace and shade pavilions,and grassy viewing knoll.One of the dramatic moments in this park is the 8-meter waterfall.This feature can be experienced at three elevation levels:at+12.5 the water of a reflective10、 pond spills over an infinity edge to create the waterfall;at+7.5 a pathway passes behind the waterfall;and at+4.5 as water falls into the interactive water basin.Along the promenade and esplanade,the arc and ellipse work playfully together creating a varied composition of landscape spaces and exper11、iences.Mounds rising up and over the promenade edge further help to camouflage the structure below.Sensual lines of gardens,amphitheaters,pathways,and overlooks suggest the movement of the water beyond.Access between the promenade and esplanade are achieved in a variety of ways by steps,amphitheater12、s,and easy serpentine sloping walks.Intermittently along the promenade,there are dramatic viewing outposts allowing visitors to move off the main path and view the broad views beyond.Along the developments retail edge is a“caf amenity zone”where table and chairs and other seating are proposed.Along 13、this zone is the primary promenade path,also accommodating emergency vehicles.Terminating the view at each end of the promenade are rebuilt gantry structures that are dramatically lit and where fog is emitted from them providing a whimsical focal point.Threading together the entire development from 14、east to west is largest arc,the Baoshan Garden Crescent.This is a linear botanic garden civic in scale and extends 1.1 kilometers.This iconic garden is in close proximity of all in the development.ARC PARKCONCEPT NARRATIVE弧形公园该设计概念的构思来源于港务地块的悠久的历史及其独特而丰富的内涵。无论时代如何变迁,这个地块仍傲然伫立于江边。从最早开始的潮汐形成的天然沼泽地,到用于15、货物运输的填埋地,再到即将建成的充满了海滨如画风景、公园生动气息和娱乐设施的优质居住地。这个地块的时间弧就像一个故事里的叙事时间弧或故事主角的时间弧一样不断变化和发展,高潮迭起。景观设计概念在形式和内容上都体现了这一理念。乍一看,地块处处充满了弧形的柔和线条,使这里居民和游客能时时感受到地块的开放式空间所带来的美好和平静。这类弧形线条也有助于柔化位于滨江公园下方的高速公路结构的坚硬而程式化。这些感性的曲线可以吸引游客,引领他们穿梭在不同的开放式空间之间,时不时地登上蜿蜒的平台纵览水域、自然公园和滨江公园的无与伦比的美景。两个主要公园均经过精心设计,力求与起伏不定标高所延伸出来的动线和空间融为一16、体。较大的是“城市公园”,它融合了三种景观类型:1.位于西侧毗邻商业区的公共广场,可以用来举办大型聚会和节日表演;2.毗邻住宅区的林荫密布的公园绿化道,这是一个宁静的景观空间,可以坐下来细细享受自然风光;3.被抬高到自然公园和滨江公园的标高之上的大土堆,既可以饱览美景也可以作为自然公园的背景。一条激动人心的动线沿着土堆上升经由一条隧道直通后方的大海。南北向主通道是一条微s形的曲线,再一次呼应了时间弧的设计理念;一侧是现代化都市,另一侧是充满了林地、湿地和草原景观的绿色天堂。第二个主要公园是“社区公园”,位于两个住宅区之间。这个公园用于满足其周边的住宅区的需求,并提供各类动态或静态的活动场所,如17、多功能草坪、游乐区、儿童游玩水景区、打太极的区域、观景台和遮阳亭、长满草的观景丘。这座公园内的激动人心的景点之一就是8米高的瀑布。这个瀑布横跨三个标高:在标高+12.5处,倒影池的水溢出形成瀑布;在标高+7.5处,有一条通道在瀑布后方通行;在标高+4.5处,瀑布水坠入互动水池。沿着滨江公园和滨江大道,圆弧和椭圆独具创意地构成一组多姿多彩的体验和景观空间的组合。抬升并架在滨江公园边缘上方的大土堆更有助于遮掩下方的结构。若赏够了水域美景,可以沿着花园、剧场、通道和观景台的路线体验各类陆地娱乐项目。滨江公园和滨江广场之间的入口形式多样,有阶梯,有露天剧场,还有平缓的盘旋型人行坡道。沿着滨江公园,时不18、时有一些美丽的观景亭,可以让游客移步过来一览上方美景。沿着商业区边沿是一个“咖啡厅休息区”,这里有桌子、椅子和其他可以坐下休息的地方。沿着这个休息区的是滨江公园主干道,同时也是紧急车道。滨江公园的每个端点的景观都以重建的龙门架结构收尾,这些龙门架结构被华丽地点亮,散发出的光雾形成了一片仿若虚幻的美景。从东到西串起整个地块的是一个最大的弧形公园。这是个线形的城市规模的植物公园,长1.1公里。这个标志性的公园几乎整个被划入项目地块范围。弧形公园设计概念概述SIPGBAOSHAN,SHANGHAIHARBOR CITY PARKSthomasbalsleyassociates2宝山 ARC PARK19、HISTORICAL MEANING“BAO-SHAN”Design of the mounds provides a cultural and historical connection to the hill that had once been built on the site for shipping navigation during the Ming Dynasty.The area was named“Baoshan”by Emporer Yoddle because of the hill.ALLUVIAL FORMATIONThe arcs in the design su20、ggest the eddies of the surrounding rivers,and harken back to the rivers process of land formation.MARITIME HISTORYElements of form and material througout the design reference the sites rich maritime history.SIPGBAOSHAN,SHANGHAIHARBOR CITY PARKSthomasbalsleyassociates3YANGTZE RIVERLANDFORMATIONLANDF21、ORMATION弧形公园历史内涵 SITE LOCATION PLANAERIAL PHOTOBAOSHAN DEVELOPMENT SITEYANGTZE RIVERMUDANJIANG ROADYOUYI BRANCH ROADDONGLIN ROADSHANGHAI RING EXPRESSWAY项目位置卫星照片长江宝山项目基地东林路友谊支路牡丹江路上海外环快速路 OVERALL MASTER PLANOVERALL PLANGRAND ESPLANADESKY WALKWAY PROMENADE“THE AGORAGARDENCRECENT“THE COMMONS”MARINAN01022、0200SIPGBAOSHAN,SHANGHAIHARBOR CITY PARKSthomasbalsleyassociates5总平面图凯门公园弧形公园安歌拉公园大型滨江公园游艇码头滨江人行天桥 ARC PARK CIRCULATION LEVEL-0.5LEGENDVehicularPedestrianParkingOpen SpaceN0100200SIPGBAOSHAN,SHANGHAIHARBOR CITY PARKSthomasbalsleyassociates6弧形公园-0.5m交通图列车行道人行道车库开放空间Open Space ARC PARK CIRCULATION LEV23、EL 4.5LEGENDVehicularPedestrian/Bike PathDedicated Bike Way ParkingOptional Additional ParkingN0100200SIPGBAOSHAN,SHANGHAIHARBOR CITY PARKSthomasbalsleyassociates7弧形公园4.5m交通图列车行道人行/自行车道自行车道车库可能的车库开放空间Open SpaceLEGENDService/Emergency VehiclesPedestrian Shared Bike and Pedestrian ARC PARK CIRCULATION24、 LEVEL 10.5N0100200SIPGBAOSHAN,SHANGHAIHARBOR CITY PARKSthomasbalsleyassociates8弧形公园10.5m交通图列服务通道和紧急通道人行道人行/自行车道开放空间LEGENDVehicularPedestrian/Bike PathDedicated Bike WaySIPGBAOSHAN,SHANGHAIHARBOR CITY PARKSthomasbalsleyassociates94.5 LEVEL PARKING(LINE OF STRUCTURE TO BE DETERMINED)4.5 LEVEL PARKING25、(LINE OF STRUCTURE TO BE DETERMINED)PARKINGACCESSPARKINGACCESS ARC PARK INTERSECTION A-LEVEL 4.5弧形公园4.5m层节点图列车行道人行/自行车道自行车道标高4.5m层车库范围标高4.5m层车库范围车库出入口车库出入口4.5 LEVEL PARKING(LINE OF STRUCTURE TO BE DETERMINED)4.5 LEVEL PARKING(LINE OF STRUCTURE TO BE DETERMINED)PARKINGACCESSPARKINGACCESS ARC PARK INT26、ERSECTION B-LEVEL 4.5LEGENDVehicularPedestrian/Bike PathDedicated Bike WaySIPGBAOSHAN,SHANGHAIHARBOR CITY PARKSthomasbalsleyassociates10图列弧形公园4.5m层节点车行道人行/自行车道自行车道标高4.5m层车库范围标高4.5m层车库范围车库出入口车库出入口N02550 THE AGORA PARK ENLARGEMENT PLANSIPGBAOSHAN,SHANGHAIHARBOR CITY PARKSthomasbalsleyassociates111234527、6789101112LIGHT/AIR OPENING TO LEVEL 4.5 SHARED PATHWAY-6M MINIMUMSECONDARY PEDESTRIAN PATHWAY CAFE/RETAIL ZONEINTERACTIVE FOUNTAIN OVERLOOKSTAIRSLANDSCAPED SLOPEPEDESTRIAN RAMPSLOPING SIDEWALKCAFE/PAVILIONWATER RILL131415161718192021222324CIVIC LAWNAMPHITHEATERGARDENTOT PLAYTAI-CHI LAWNDOG RUNSHADE28、D LAWN PICNICSHADED FORESTBIO PONDRESTAURANTSEATING ALCOVELAWN STEPS1125668891013161718192120221514242526242311121111734安歌拉公园放大平面图连通标高-4.5的照明/通风开口共用道路-至少6米人行次干道咖啡/商业区互动喷泉观景台楼梯景观坡人行坡道斜坡人行道咖啡厅/休息亭水沟公共草坪室外剧场花园儿童玩耍区太极草坪遛狗区野餐遮阳草坪遮阳树林水池餐厅坐席休息区草坪台阶 THE AGORA PARK ZONING AND CIRCULATION PLANN02550FORESTSIPG29、BAOSHAN,SHANGHAIHARBOR CITY PARKSthomasbalsleyassociates12ESPLANADETRANSITION ZONEPROMENADECAFE ZONEPARKPAVILLIONPICNICPLAY LAWNWATER RILLGARDENDOG PARKCIVIC LAWNWOODED HILLAMPHITHEATERBIO PONDPROSPECT POINTFOG FOUNTAINSHADE SHELTERGARDENGARDENGARDENWOODLANDPORTAL安歌拉公园分区和交通平面滨江公园过渡区滨江大道咖啡休闲区水雾喷泉观景点植30、被山坡室外剧场公共草坪野餐区水池遮阳区花园水沟玩耍草坪公园休息亭林地花园花园花园遛狗公园树林 THE AGORA PARK PLAZA VIEWSIPGBAOSHAN,SHANGHAIHARBOR CITY PARKSthomasbalsleyassociates13安歌拉公园广场视角 THE AGORA PARK TUNNEL VIEWSIPGBAOSHAN,SHANGHAIHARBOR CITY PARKSthomasbalsleyassociates14安歌拉公园通道视角 THE AGORA PARKSITE SECTIONAPOTENTIAL PARKING 4.5 BENEATH U31、PPER LEVEL OF PARK ACCESS FROM PARK STREETS 4.54.5m可能是停车库,或者是街面层到上层公园的入口SIPGBAOSHAN,SHANGHAIHARBOR CITY PARKSthomasbalsleyassociates15安歌拉公园剖面 THE AGORA PARK TRANSFORMER SUBSTATION ENLARGEMENTTRANSFORMER LOCATION PLANN02510PRECEDENT IMAGES-ALTERNATIVE VENT AND TRANSFORMER BUILDINGSSIPGBAOSHAN,SHANGHA32、IHARBOR CITY PARKSthomasbalsleyassociates16安歌拉公园变电站周边变电站位置案列照片N02550 THE COMMONSENLARGEMENT PLANSIPGBAOSHAN,SHANGHAIHARBOR CITY PARKSthomasbalsleyassociates1712345678LIGHT/AIR OPENING TO LEVEL 4.5 BELOWSHARED PATHWAY-6M MINIMUMSECONDARY PEDESTRIAN PATHWAY CAFE/RETAIL ZONEINTERACTIVE FOUNTAIN MEMORIA33、L WALLOVERLOOKSTAIRS910111213141516SEATWALLLANDSCAPED SLOPEPEDESTRIAN RAMPSLOPING SIDEWALKSHADE PAVILIONTHE FALLSINTERACTIVE PLAY BASINGARDEN17181920212223OVERLOOK LAWNCHILDRENS PLAYCOMMUNITY GREENURBAN PLAZACAFE KIOSK WITH SHADE STRUCTUREVIEWING MOUNDTREE GROVE5123417779101010141515192016161718111234、1221131321222323106886凯门公园放大平面图连通标高-4.5的照明/通风开口共用道路-至少6米人行次干道咖啡/商业区互动喷泉纪念墙观景台楼梯座墙景观坡人行坡道斜坡人行道遮阳亭瀑布互动玩耍池花园观景草坪儿童玩耍区社区绿化城市广场带遮阳结构的咖啡厅观景土堆小树林 THE COMMONSZONING AND CIRCULATION PLANN02550SIPGBAOSHAN,SHANGHAIHARBOR CITY PARKSthomasbalsleyassociates18INTERACTIVEPLAYBASINURBAN PLAZAFOUNTAINVIEWINGSUMMITPRO35、SPECT LAWNTHE FALLSLAWNCOMMUNITYGREENCHILDRENSPLAYESPLANADETRANSITION ZONEPROMENADECAFE ZONEFOREST凯门公园分区和交通图滨江公园过渡区滨江大道咖啡休闲喷泉观景峰观景草坪树林瀑布互动玩耍区草坪儿童玩耍区社区绿化城市广场 THE COMMONS BASIN VIEWSIPGBAOSHAN,SHANGHAIHARBOR CITY PARKSthomasbalsleyassociates19凯门公园效果图 THE COMMONSSITE SECTIONENew proposedtree pitsSIPGBA36、OSHAN,SHANGHAIHARBOR CITY PARKSthomasbalsleyassociates20POTENTIAL PARKING 4.5 BENEATH UPPER LEVEL OF PARK ACCESS FROM PARK STREETS 4.5层可能是停车库,或者是街面层到上层公园的入口安歌拉公园剖面123456789101112131415161718Gantry in FogTunnel PortalEarthform Terminus of Sky WalkwayAmphitheaterCafe Overlook-Shaded Shelter BeneathWil37、low GrovesClimbing BermInfinity Edge Pool with Fog and SailsSea GrassesGarden IslandRampPlanted Berm with SeatwallsStairs Through Overlook PlatformKioskSea Grass IslandsOverlook Platform and Beacon Shelter BeneathCruise Ship Viewing PlatformViewing Terraces1234567891011121314151617187N SKY WALKWAY A38、ND GRAND ESPLANADEPLAN AND PRECEDENT IMAGERYSAMPLE PROMENADEWEST PORTALEAST PORTALSIPGBAOSHAN,SHANGHAIHARBOR CITY PARKSthomasbalsleyassociates21滨江大道总体平面BUS DEPOTVEHICULAR CIRCULATIONACCESSIBLE PRIMARY CIRCULATIONACCESSIBLE SECONDARY PEDESTRIAN CIRCULATIONMINOR CIRCULATIONESPLANADE WEST PORTALILLUSTR39、ATIVE PLAN AND CIRCULATION DIAGRAM12345TUNNEL PORTALEARTHFORM TERMINUS OF SKY WALKWAYACCESSIBLE PEDESTRIAN RAMPMIRROR REFLECTING POOL WATER FEATURESHADE STRUCTURE/GARDEN SEATING12345N02550 SERVICE&EMERGENCY VEHICLE ROUTE SERVICE EMERGENCY VEHICLE ROUTE SIPGBAOSHAN,SHANGHAIHARBOR CITY PARKSthomasbals40、leyassociates22TRANSITION ZONEPROMENADECAFE ZONEACCESSIBLE ROUTE FROM 4.5 TO PROMENADE LEVEL EAST PORTALILLUSTRATIVE PLAN AND CIRCULATION DIAGRAM SERVICE&EMERGENCY VEHICLE ROUTE SERVICE&EMERGENCYVEHICLE 12345TRANSITION ZONEESPLANADECAFE ZONE64TRANSITION TO LOWER LEVELN02550SIPGBAOSHAN,SHANGHAIHARBOR41、 CITY PARKSthomasbalsleyassociates23VEHICULAR CIRCULATIONACCESSIBLE PRIMARY CIRCULATIONACCESSIBLE SECONDARY PEDESTRIAN CIRCULATIONMINOR CIRCULATION123456TUNNEL PORTALEARTHFORM TERMINUS OF SKY WALKWAYACCESSIBLE PEDESTRIAN RAMPSTAIRWAY ACCESSRETAIL PLAZAOVERLOOK15152221151086911141716752420421183 PROM42、ENADESAMPLE AREA ILLUSTRATIVE PLAN1168889+6+4.52334451010101011111212121214181818182415151515152121212017232312511191914ABA12345LIGHT/AIR OPENING TO LEVEL 4.5 BELOWSHARED PATHWAY-6M WIDE MINIMUMSECONDARY,PEDESTRIAN PATHWAYCAFE/RETAIL ZONEEVENT PLAZA678910 INTERACTIVE FOUNTAIN REFLECTION FOUNTAINSHAD43、E STRUCTURECAFE/KIOSKOVERLOOK1112131415PEDESTRIAN RAMPSTAIRSBEACONMEMORIAL WALL LANDSCAPED SLOPE2122232425SEATING NOOKSLOPING LAWNGRAND STAIRWAY CONNECTING RETAILSLOPING SIDEWALKCASCADING WATER FEATURE AMPHITHEATER STEPSSTAGEGARDENSSEATWALLHILLSIDE“RAFTS”1617181920N02550CBSIPGBAOSHAN,SHANGHAIHARBOR 44、CITY PARKSthomasbalsleyassociates24N052050 PROMENADECIRCULATION DIAGRAMSERVICE&EMERGENCY VEHICLE ROUTESERVICE&EMERGENCY VEHICLE ROUTESIPGBAOSHAN,SHANGHAIHARBOR CITY PARKSthomasbalsleyassociates25ACCESSIBLE PRIMARY CIRCULATIONACCESSIBLE SECONDARY PEDESTRIAN CIRCULATIONMINOR CIRCULATION PROMENADESAMPL45、E AREA-PERSEPCTIVE VIEW ASIPGBAOSHAN,SHANGHAIHARBOR CITY PARKSthomasbalsleyassociates26 PROMENADESAMPLE AREA-PERSEPCTIVE VIEW BSIPGBAOSHAN,SHANGHAIHARBOR CITY PARKSthomasbalsleyassociates2717581032561234567891011489Proposed Tree WellTall Shade TreePromenadeEsplanadeRoadwayBikewayWater FeatureOverloo46、kParkingGrassesExhaust Vent11 PROMENADESAMPLE AREA-SECTION ASIPGBAOSHAN,SHANGHAIHARBOR CITY PARKSthomasbalsleyassociates2812 PROMENADESAMPLE AREA-SECTION BSIPGBAOSHAN,SHANGHAIHARBOR CITY PARKSthomasbalsleyassociates29123456789101112125973285346Proposed Tree WellOrnamental PlantingPromenadeEsplanadeR47、oadwayBikewayOpen to SkyCafeRetail ZonePath Connecting Esplanade with PromenadeHillside“Rafts”Overlook with Seat Wall5111110 PROMENADESAMPLE AREA-SECTION CSIPGBAOSHAN,SHANGHAIHARBOR CITY PARKSthomasbalsleyassociates3012345678912356827555Proposed Tree WellOrnamental PlantingPromenadeEsplanadeRoadwayV48、iewing PlatformOpeningBeaconTall Shade Trees3749 PROMENADEIntakeMechanical VentilationExhaustNatural Ventilationand LightVENTING DIAGRAM AVENTING DIAGRAM BSIPGBAOSHAN,SHANGHAIHARBOR CITY PARKSthomasbalsleyassociates31 PROMENADEWATER FEATURE PRECEDENTSSIPGBAOSHAN,SHANGHAIHARBOR CITY PARKSthomasbalsle49、yassociates32 PROMENADESKY WALKWAY/GRAND ESPLANADE-MEMORIAL WALLSIPGBAOSHAN,SHANGHAIHARBOR CITY PARKSthomasbalsleyassociates33 ARC PARK PARK ON TUNNEL-PRECEDENTS BATTERY PARK New York-25 acres-3 ventilation structuresTHE BIG DIG Boston-15 acres-7 ventilation structuresPARK ON THE LID Mercer Island-250、0 acresKLYDE WARREN PARK Dallas-5.2 acresSIPGBAOSHAN,SHANGHAIHARBOR CITY PARKSthomasbalsleyassociates34Riverside Park South New YorkIntermediate PlanFinal Plan ARC PARK PARK ON TUNNEL-PRECEDENTSSIPGBAOSHAN,SHANGHAIHARBOR CITY PARKSthomasbalsleyassociates35JET FAN VENTILATED TUNNEL800M LENGTHIntermediate PlanFinal Plan ARC PARK PARK ON TUNNEL-PRECEDENTSSIPGBAOSHAN,SHANGHAIHARBOR CITY PARKSthomasbalsleyassociates36