个人中心
个人中心
添加客服WX
客服
添加客服WX
添加客服WX
关注微信公众号
公众号
关注微信公众号
关注微信公众号
升级会员
升级会员
返回顶部
常用施工工艺中英(5页)
常用施工工艺中英(5页).doc
下载文档 下载文档
其它文档
上传人:正*** 编号:878866 2024-01-09 5页 23KB
1、常用施工工艺中英中英文对照各种施工工艺大全1、 钢结构工程Steel Project1.1钢结构焊接 Welded Steel1.1.1工艺流程 作业准备电弧焊接(平焊、立焊、横焊、仰焊)焊缝检查Process Ready to workArc Weld(Flat Welding、Stand Welding、Sidelong Welding 、Welding belief) Weld inspection1.1.2钢结构电弧焊接:Arc Welding Steel:.1平焊:选择合适的焊接工艺,焊条直径,焊接电流,焊接速度,焊接电弧长度等,通过焊接工艺验证;清理焊口:焊前检查坡口、组装间隙是否2、符合要求,定位焊是否牢固,焊缝周围不得有油污、锈物;烘焙焊条应符合规定温度与时间,从烘箱中取出的焊条,放在焊条保温桶内,随用随取;焊拉电源:根据焊件厚度、焊接层次、焊条型号、直径、焊工熟练程度等因素,选择适宜的焊接电流;引弧:角焊缝起落弧点应在焊缝端部,宜大于10,不应随便打弧,打火引弧后应立即将焊条从焊缝区拉开,使焊条块结合与构件间保持24间隙产生电弧。对接焊缝及对接和角接组合焊缝,在焊缝两端设引弧板和引出板,必须在引弧板上引出后再焊到焊缝区,中途接头则应在焊缝接头前方1520处打火引弧,将焊件预热后再将焊条退回到焊缝起始处,把熔池填满到要求的厚度后,方可向前施焊;焊接速度:要求等速焊接,保3、证焊缝厚度、宽度均匀一致,从面罩内看熔池中铁水与熔渣保持等距离(23)为宜;焊接电弧长度:根据焊条型号不同而确定,一般要求电弧长度稳定不变,酸性焊条一般为34,碱性焊条一般为23为宜;焊接角度:根据两焊件的厚度确定,焊接角度有两个方面,一是焊条与焊接前进方向的夹角为6075;二是焊条与焊接左右夹角有两种情况,当焊件厚度相等时,焊件与焊件夹角为45;当焊件厚度不等时,焊条与较厚焊件一侧夹角应大于焊条与薄焊件一侧夹角;收弧:每条焊缝焊到末尾,应将弧坑填满后,往焊接方向相反的方向带弧,使弧坑甩在焊道貌岸然里边,以防弧坑咬肉。焊接完毕,应采用气割切除弧板,并修磨平整,不许用锤击落;清渣:整条焊缝焊完后4、清除熔渣,经焊工自检(包括外观及焊缝尺寸等)确无问题后,方可转移地点继续焊接。Flat Welding : choice of welding technology, electrode diameter, welding current, welding speed, the length of arc welding, weld process verification; Welding : welding inspection clearance groove, assembly space whether it meets the requirements, positioning i5、t firmly welding, weld around is not oil, rust; Electrode temperature and baking time should be required, the rod removed from the oven. tempreture-constant drum on the electrode, then used as admission; Latin America : welding supply welding thickness, welding levels and electrode type and diameter6、, skilled welders and other factors, and to select appropriate welding current; fillet weld arc : fluctuations in the point arc weld end, they are advised more than 10 mm, is not hard arc, sparking arc weld zone from the electrode should be started immediately. Component integration and maintaining 7、so-rod pieces have 2-4 mm gap arc. Butt Weld and docking and corner combinations Weld, in Weld ends located arc plate and extraction plate in igniting board then leads to the welding seam, joint halfway shall weld joints in front of 2.0 mm Department Firing arc, welding pieces after preheating rod w8、ill return to weld the origin, pool filled to the required thickness, before forward welding; Welding speed : Isokinetic welding requirements to ensure weld thickness, width uniform, which masks to look for hot metal and slag bath equidistance (2-3 mm)%; Arc welding rod length : different models and9、 determined that the general requirements of arc length is stable, acid electrode generally 3-4 mm, 2-3 mm normally alkaline electrode%; Welding perspective : According to determine the thickness of two pieces of welding, welding angle has two aspects : First, the angle between the direction of the 10、rod and welding of 60-75 ; The second is the angle between two electrodes and welding around, the same thickness as welding, welding and welding pieces incident angle of 45 ; When the thickness ranging from welding, welding electrode and thick and thin pieces of welding electrode side angle greater 11、than the angle between the side pieces; Arc : admission to the end of each weld should be filled crater, in the direction opposite to the direction of the back-arc welding, arc welding unchanged inside pit in 1974, to prevent the crater bite of meat. Welding completed, should be removed arc OFC boar12、ds and grinding formation, while the hammer down; Slag : After removal of the entire weld slag, welders self (including weld appearance and size, etc.) there is no problem, before relocation to continue welding1.1.2.2立焊:基本操作工艺过程与平焊相同,但应注意下述问题:在同等条件下,焊接电源比平焊电流小10%15%;采用短弧焊接,弧长一般为23;焊条角度根据焊件厚度确定.两焊件厚度13、相等,焊条与焊条左右方向夹角均为45;两焊件厚度不等时,焊条厚度不等时,焊条与较厚焊件一侧的夹角应大于较薄一侧的夹角.焊条应与垂直面形成6080角,使电弧略向上,吹向熔池中心;收弧:当焊到末尾,采用排弧法将弧坑填满,把电弧移至熔池中央停弧.严禁使弧坑甩在一边.为了防止咬肉,应压低电弧变换焊条角度,使焊条与焊件垂直或由弧稍向下吹.Welding process and the peace operation : basic welding, but they should pay attention to the following issues : under the same conditi14、ons, welding current and friction over the plate short-arc welding, arc length is generally 2-3 mm; According to determine perspective welding electrode thickness. Welding two pieces of equal thickness, electrode and the electrode are around 45 angle direction; Two welding thickness ranges, electrod15、e thickness ranges, with thick welding rod side of the incident angle and the angle is larger than the thinner side. with the vertical plane electrode formed 60 to 80 angle, arc slightly upward, towards the pool; Arc welding : admission to the end of the paper that will crater filled arc, arc moved 16、to the central pool stopped arc. To prevent occlude, Transformation should lower electrode arc angle, or vertical rod and welding pieces of blowing down slightly from the arc.1.1.2.3横焊:基本与平焊相同,焊接电流比同条件平焊的电流小10%15%,电弧长24.焊条的角度,横焊时焊条应向下倾斜,其角度为7080,防止铁水下坠.根据两焊件的厚度不同,可适当调整焊条角度,焊条与焊接前进方向为7090.Sidelong We17、lding same: basic welding, the welding current conditions compared with the current level of welding small beeswax, 2-4 mm long arc. Electrode angle, horizontal welding rod should be balancing its angle of 70 to 80 to prevent the fall of molten iron. According to the thickness of two different weldi18、ng pieces, it would be appropriate to adjust electrode perspective welding electrode and the direction of 70 -90 1.1.2.3仰焊:基本与立焊、横焊相同,其焊条与焊件的夹角和焊件厚度有关,焊条与焊接方向成7080角,宜有小电流、短弧焊接。Welding belief 、Sidelong Welding and Stand Welding: the same horizontal welding, the welding electrode and the incident angl19、e and thickness of the welding, welding electrode and the direction of 70 to 80 angle are advised to a small current, short-arc welding1.1.3冬期低温焊接:在环境温度低于0条件下进行电弧焊时,除遵守常温焊接的有关规定外,应调整焊接工艺参数,使焊缝和热影响区缓慢冷却.风力超过4级,应采取挡风措施;焊后未冷却的接头,应避免碰到冰雪;钢结构为防止焊接裂纹,应预热以控制层间温度.当工作地点温度在0以下时,应进行工艺试验,以确定适当的预热,后热温度.Welding :20、 In the winter low temperature environment under the conditions of temperature below 0, in addition to compliance with the relevant provisions of temperature welding, the welding parameters should be adjusted so that weld heat affected zone and slow cooling. Wind over four levels, measures should be21、 taken to wind; Not the cooling weld joints should avoid encountered snow; To prevent steel welding cracks. interlayer preheating temperature to be controlled. When the temperature is below zero degree work should be carried out when a process test to determine appropriate preheating, heat temperature.1.2普通紧固件连接工程施工工艺
会员尊享权益 会员尊享权益 会员尊享权益
500万份文档
500万份文档 免费下载
10万资源包
10万资源包 一键下载
4万份资料
4万份资料 打包下载
24小时客服
24小时客服 会员专属
开通 VIP
升级会员
  • 周热门排行

  • 月热门排行

  • 季热门排行

  1. 2025商场地产夏日啤酒龙虾音乐嘉年华(吃货的夏天主题)活动策划方案-47页.pptx
  2. 2022城区自来水提质改造智慧水务建设项目设计方案(199页).pdf
  3. 动火作业安全告知卡(1页).docx
  4. 高处作业安全告知卡(1页).docx
  5. 道路改造工程围墙宣传栏改造各类雕塑等土建施工方案53页.doc
  6. 广场工程建设项目施工招标评标报告表格(24页).pdf
  7. 原油码头消防工程维保方案(39页).docx
  8. 2020柏向堂房地产公司材料标准化手册3.0(143页).pdf
  9. 2021柏向堂房地产公司材料标准化手册4.0(108页).pdf
  10. 深圳装饰公司施工图纸会审及设计交底管理制度【13页】.doc
  11. 住宅小区工程施工方案【234页】.docx
  12. 屋面圆弧形穹顶结构高支模施工方案(40米)(47页).doc
  13. 埋石混凝土挡土墙施工方案(23页).doc
  14. 结构加固专项施工方案(28页).doc
  15. 土方开挖及地下室施工方案(21页).doc
  16. 家园工程项目雨季及防台防汛施工方案(29页).doc
  17. 重庆市五小水利工程建设规划报告(64页).doc
  18. 超高纯氦气厂建设项目办公楼、变电站、水泵房及消防水池、门卫、厂房、仓库、配套工程施工组织设计方案(140页).doc
  19. 邛崃市牟礼镇初级中学校学生宿舍建设工程施工组织设计方案(259页).doc
  20. 高层住宅工程施工方案(249页).doc
  21. 园林工程质量通病控制方案及防治措施(27页).doc
  22. 珠海市三灶镇二级生活污水处理厂工程技术标书方案说明书(135页).doc
  1. 房地产交易环节契税减征申报表(首套填写)(2页).doc
  2. 2025商场地产夏日啤酒龙虾音乐嘉年华(吃货的夏天主题)活动策划方案-47页.pptx
  3. 2024大楼室内精装修工程专业分包投标文件(393页).docx
  4. 苏州水秀天地商业项目购物中心100%室内设计方案(158页).pptx
  5. 2022城区自来水提质改造智慧水务建设项目设计方案(199页).pdf
  6. 小区人员配置档案建立保洁绿化物业管理服务投标方案(593页).docx
  7. 室内移动式操作平台工程施工方案(19页).doc
  8. 地铁6号线区间盾构下穿管线专项施工方案(30页).doc
  9. 矿山治理工程施工组织设计方案(240页).docx
  10. 老旧小区改造工程施工方案及技术措施(364页).doc
  11. 化工公司20000吨/年甲醛工程安全评价预评价报告(97页).doc
  12. 建筑工程外脚手架专项施工方案(悬挑式脚手架、落地式脚手架)(25页).doc
  13. 2020柏向堂房地产公司材料标准化手册3.0(143页).pdf
  14. 2021柏向堂房地产公司材料标准化手册4.0(108页).pdf
  15. 川主寺城镇风貌整治景观规划设计方案(60页).pdf
  16. 新疆风电十三间房二期工程49.5mw风电项目可行性研究报告(附表)(239页).pdf
  17. 土建、装饰、维修改造等零星工程施工组织设计方案(187页).doc
  18. 埋石混凝土挡土墙施工方案(23页).doc
  19. 地下停车场环氧地坪漆施工方案(45页).doc
  20. 深圳装饰公司施工图纸会审及设计交底管理制度【13页】.doc
  21. 住宅定价策略及价格表制定培训课件.ppt
  22. 2010-2030年湖北咸宁市城市总体规划(32页).doc
  1. 建筑工程夜间施工专项施工方案(18页).doc
  2. 赣州无动力亲子乐园景观设计方案(111页).pdf
  3. 2016泰安乡村旅游规划建设示范案例(165页).pdf
  4. 房地产交易环节契税减征申报表(首套填写)(2页).doc
  5. 龙山县里耶文化生态景区里耶古城片区旅游修建性详细规划2015奇创.pdf
  6. 连云港市土地利用总体规划2006-2020年调整方案文本图集(78页).pdf
  7. 850亩项目塑钢门窗工程施工组织设计方案(34页).doc
  8. 老旧小区改造工程施工方案及技术措施(364页).doc
  9. 城市更新项目地价公式测算表.xlsx
  10. 房地产项目规划前期投资收益测算模板带公式.xls
  11. 存储器基地项目及配套设施建筑工程临时用水施工方案(40页).docx
  12. 铁路客运枢纽项目站前框构中桥工程路基注浆加固专项施工方案(19页).doc
  13. 室内移动式操作平台工程施工方案(19页).doc
  14. 装配式结构工业厂房基础、主体结构、门窗及装饰工程施工方案(83页).doc
  15. 地铁6号线区间盾构下穿管线专项施工方案(30页).doc
  16. 施工工程安全教育培训技术交底(13页).doc
  17. 老旧小区改造施工方案及技术措施(365页).doc
  18. 新建贵广铁路线下工程沉降变形观测及评估监理实施细则(126页).doc
  19. 消防火灾应急疏散演练预案(12页).doc
  20. 矿山治理工程施工组织设计方案(240页).docx
  21. 崖城站悬臂式挡墙施工方案(92页).doc
  22. 北京科技园公寓建设项目整体报告方案.ppt