深圳东部华侨城天麓私人会所软装设计方案(23页).pdf
下载文档
上传人:十二
编号:861656
2023-12-26
23页
8.72MB
1、深圳东部华侨城天麓私人会所軟裝設計方案Chengdu villa soft outfit design scheme软装色彩意向The soft outfit design intention绅士在现代已被引申为是上层社会的贵族文化精神及风度的体现。本案中以现代奢华为基调,同时加入米色金色及水晶营造出区别于家的温暖,休闲来中和现代的冰冷,坚硬。骑绅士则为空间赋予了更丰富的精神内 涵与贵族品质。犹如一位满载荣誉的贵族绅士忙碌工作后归属自我的闲适生活状态。The gentleman in the modern has been extended to the upper level of the 2、noble spirit of culture and the nobility of the embodiment.In this case to modern luxury as the keynote,while adding Beige gold and crystal camp create difference to the warmth of home,leisure to and modern cold,hard.On the gentleman,it gives more spiritual connotation and noble character to the spa3、ce.As an honour noble gentleman after busy work belonging self leisure life.29 Sep 2015现现 代代 绅绅 士士/The modern gentleman软装材质参考意向Design intention of soft in the hall13 OctT 2015平面佈置圖The Floor Plan 门厅软装设计意向Design intention of soft in the hall29 Sep 2015客厅软装设计意向The soft Design intent of the living room14、3 OctT 2015软装饰品设计意向The soft Design intent of the living room13 OctT 2015餐厅软装设计意向The soft Restaurant design intent13 OctT 2015餐厅软装设计意向The soft Restaurant design intent13 OctT 2015楼梯段景软装设计意向The soft Restaurant design intent13 OctT 2015客房软装设计意向Design intent of secondary lying soft13 OctT 2015平面佈置圖The F5、loor Plan 套房1软装设计意向The master bedroom decoration design intention13 OctT 2015套房2软装设计意向The master bedroom decoration design intention13 OctT 2015套房3软装设计意向The master bedroom decoration design intention13 OctT 2015套房4软装设计意向The master bedroom decoration design intention13 OctT 2015套房4软装设计意向The master be6、droom decoration design intention13 OctT 2015平面佈置圖The Floor Plan 包包展示区软装设计意向The Study soft design intention13 OctT 2015KTV软装设计意向 Kitchen design intention13 OctT 2015雪茄房装设计意向The soft Bathroom design intent13 OctT 2015雪茄房装设计意向The soft Bathroom design intent13 OctT 2015户外软装装设计意向The soft Bathroom design intent13 OctT 2015